A shield machine and its tunnel excavation material transportation system

By using the following supporting trolleys, box culvert cranes, transportation vehicles, pipe segment unloaders, multi-pipe segment cranes and single-pipe segment cranes in the tunnel boring material transportation system, the rapid unloading and batch lifting of pipe segments are achieved. , solves the problem of too long waiting time in the tunnel and improves material transportation efficiency and construction efficiency.

CN111502714BActive Publication Date: 2024-11-26CHINA RAILWAY CONSTR HEAVY IND
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010479170.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-05-29
Publication Date
2024-11-26
Estimated Expiration
2040-05-29

AI Technical Summary

Technical Problem

In the existing tunnel boring technology, the rubber wheel transport vehicle waits for the pipe sheet to be lifted in the tunnel for too long, which affects the construction organization and material transportation efficiency, and cannot meet the needs of synchronous tunnel construction.

Method used

A tunnel boring material transportation system was designed, including a rear supporting trolley, box culvert crane, transportation vehicle, pipe segment unloader, multi-pipe segment crane and single-pipe segment crane, and the whole vehicle unloading is carried out through pipe segment unloader. , Multi-pipe cranes and single-pipe cranes are hoisted in batches to reduce the waiting time of transport vehicles in the tunnel.

Benefits of technology

It effectively reduces the waiting time of rubber wheel transport vehicles in the tunnel, improves the dynamic efficiency of material transportation, saves construction time, and improves construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111502714B_ABST
    Figure CN111502714B_ABST
Patent Text Reader

Abstract

The present invention discloses a tunnel excavation material transportation system, including a rear matching trolley laid in the tunnel along the excavation direction, a box culvert crane movably arranged on the rear matching trolley and used for lifting box culverts, a transport vehicle moving on the surface of each box culvert laid in the tunnel and used for carrying pipe segments, a pipe segment unloading machine arranged on the rear matching trolley and used for unloading pipe segments from the transport vehicle, a multi-pipe segment crane movably arranged on the rear matching trolley and used for lifting pipe segments from the pipe segment unloading machine to a position temporarily stored at a preset distance from the front end of the box culvert, a single pipe segment crane movably arranged on the rear matching trolley and used for lifting a single pipe segment from the pipe segment temporary storage to the pipe segment feeding machine, and a pipe segment feeding machine laid in the tunnel and used for transporting pipe segments to the pipe segment assembly machine. The present invention can reduce the waiting time of the transport vehicle in the tunnel for pipe segment lifting, and improve the dynamic efficiency of material transportation in the tunnel. The present invention also discloses a shield machine, and its beneficial effects are as described above.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of shield tunneling, and in particular to a tunnel excavation material transportation system. The present invention also relates to a shield tunneling machine. Background Art

[0002] With the development of China's machinery industry, more and more mechanical equipment has been widely used.

[0003] In the field of tunnel excavation technology, various large-scale engineering machinery are often needed, such as tunnel boring machines (TBM), which can complete the construction processes of excavation, support, slag removal and other parallel and continuous operations. They are factory-based assembly line tunnel construction equipment integrating mechanical, electrical, hydraulic, optical, and gas systems. They have the advantages of fast excavation speed, environmental protection, and high comprehensive benefits. They can realize the construction of deep-buried long tunnels in complex geographical features that are difficult to achieve with traditional drilling and blasting methods. A shield machine is a tunnel boring machine that uses the shield method. The shield construction method is that the tunnel boring machine constructs the tunnel shield, that is, the supporting segment, while excavating.

[0004] In order to realize the synchronous construction of tunnels, the tail end of the tunnel boring machine is generally equipped with other supporting construction equipment such as segment assemblers. As an important part of the shield machine, the segment assembler uses pre-made concrete segments to support the tunnel dug by the tunnel boring machine and prevent the impact of surface settlement and groundwater infiltration caused by excavation on the tunnel. The assembly speed of the segment assembler also has a great impact on the excavation speed of the entire shield machine. Improving the segment assembly speed can effectively speed up the construction progress of the project.

[0005] At present, in synchronous tunnel construction, the segments are usually lifted from the rubber-wheeled transport vehicle to the segment transfer vehicle by a multi-segment crane, and then the single-segment crane lifts the segments to the segment feeder, or the single-segment crane directly lifts the segments from the rubber-wheeled transport vehicle to the segment feeder. In these two material transportation methods, after the rubber-wheeled transport vehicle has transported the segments to the destination, it needs to wait for the multi-segment crane or the single-segment crane to lift the entire ring of segments away in multiple times, so it takes a long waiting time, resulting in a long stay time of the rubber-wheeled transport vehicle, and the rubber-wheeled transport vehicle transporting box culverts or accessories cannot enter the shield machine, which affects the construction organization and material transportation efficiency, and cannot meet the material transportation requirements required for the tunneling speed of the shield machine in the synchronous tunnel construction.

[0006] Therefore, how to minimize the waiting time of the rubber-wheeled transport vehicle in the tunnel for the pipe segment to be hoisted and improve the dynamic efficiency of material transportation in the tunnel is a technical problem faced by those skilled in the art. Summary of the invention

[0007] The object of the present invention is to provide a tunnel excavation material transportation system, which can minimize the waiting time of the rubber-wheeled transport vehicle in the tunnel for the pipe segment hoisting, and improve the dynamic efficiency of material transportation in the tunnel. Another object of the present invention is to provide a shield machine.

[0008] In order to solve the above technical problems, the present invention provides a tunnel excavation material transportation system, including a rear-end matching trolley laid in the tunnel along the excavation direction, a box culvert crane movably arranged on the rear-end matching trolley and used for lifting box culverts, a transport vehicle that moves on the surface of each box culvert laid in the tunnel and is used to carry segments, a segment unloading machine arranged on the rear-end matching trolley and used to unload the entire vehicle of segments from the transport vehicle, a multi-segment crane movably arranged on the rear-end matching trolley and used to lift segments from the segment unloading machine to a position temporarily stored at a preset distance from the front end of the box culvert, a single-segment crane movably arranged on the rear-end matching trolley and used to lift a single segment from a segment temporary storage to a segment feeding machine, and the segment feeding machine laid in the tunnel and used to transport segments to a segment assembly machine.

[0009] Preferably, a single crane slide rail extending along the excavation direction is provided on the front end area of ​​the rear supporting trolley, and a multi-crane slide rail extending along the excavation direction is provided on the rear end area of ​​the rear supporting trolley, and the single-segment crane can be slidably set on the single crane slide rail, and the multi-segment crane can be slidably set on the multi-crane slide rail.

[0010] Preferably, the box culvert crane is slidably disposed on the multi-crane slide rail, and the box culvert crane is located at the rear end of the multi-segment crane.

[0011] Preferably, the multi-crane slide rail and the single-crane slide rail are distributed in vertical layers on the rear matching trolley, and the single-crane slide rail is located below the multi-crane slide rail.

[0012] Preferably, the multi-crane slide rail and the single-crane slide rail can be detachably connected to the rear supporting trolley.

[0013] Preferably, limit blocks for limiting the movement stroke of the multi-segment crane, the box culvert crane and the single-segment crane are provided at preset positions on the multi-segment crane slide rail and the single-segment crane slide rail.

[0014] Preferably, the segment unloader comprises a lifting platform which can be vertically lifted on the rear supporting trolley, and a supporting arm which can be laterally extended on the lifting platform and is used to extend to the bottom of each segment carried on the transport vehicle to support it.

[0015] Preferably, both side surfaces of the lifting platform can be vertically flipped and connected to both side walls of the rear matching trolley.

[0016] Preferably, the segment unloader also includes guide wheels arranged on both sides of the lifting platform, and the rear supporting device is also provided with a C-shaped guide rail extending along the excavation direction, and the guide wheel is arranged in the C-shaped guide rail to prevent the lifting platform from tipping over.

[0017] The present invention also provides a shield machine, comprising a fuselage and a tunnel boring material transportation system arranged on the fuselage, wherein the tunnel boring material transportation system is specifically the tunnel boring material transportation system described in any one of the above items.

[0018] The tunnel excavation material transportation system provided by the present invention mainly includes a rear-end supporting trolley, a box culvert crane, a transport vehicle, a segment unloader, a multi-segment crane, a single-segment crane and a segment feeder. Among them, the rear-end supporting trolley is a rear-end supporting equipment of the shield machine, which is generally laid in the tunnel along the excavation direction and is mainly used to install and carry the remaining parts of the material transportation system. The box culvert crane can be movably arranged on the rear-end supporting trolley, which is mainly used to hoist the box culvert and hoist the box culvert to a preset position in the tunnel for assembly for the passage of transport vehicles and personnel. The transport vehicle is a dynamic mobile device, which mainly moves on the surface of each box culvert that has been laid in the tunnel so as to transport the segments (and other accessories) to the preset position in the tunnel. The segment unloader is arranged on the rear-end supporting trolley, which is mainly used to unload the entire segment vehicle from the transport vehicle after the transport vehicle moves into place, so that the transport vehicle can quickly unload and evacuate, and then quickly enter the next round of segment transportation operations. The multi-segment crane is movably arranged on the rear matching trolley, and is mainly used to lift multiple segments from the segment unloading machine to the front preset distance position of each assembled box culvert, so as to temporarily store a certain amount of segments. The single-segment crane is also movably arranged on the rear matching trolley, and is mainly used to lift each segment from the segment temporary storage in the tunnel to the segment feeding machine. After receiving the single segment, the segment feeding machine transports it to the segment assembling machine for sequential assembly to form a complete ring shield pipe. In this way, the tunnel excavation material transportation system provided by the present invention can first unload the whole vehicle through the segment unloading machine after the transport vehicle carries the segment to the place, and then lift it in batches through the multi-segment crane and the single-segment crane. Therefore, the transport vehicle can quickly evacuate from the tunnel and continue the next round of segment transportation operations. Compared with the prior art, it can minimize the waiting time of the rubber-wheeled transport vehicle in the tunnel for segment lifting, and improve the dynamic efficiency of material transportation in the tunnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.

[0020] Figure 1 The present invention provides a schematic diagram of the overall structure of a specific implementation method.

[0021] Figure 2 for Figure 1 Schematic diagram of the AA cross-section structure shown in .

[0022] Figure 3 for Figure 1 Schematic diagram of BB cross-section structure shown in.

[0023] Figure 4 for Figure 1 Schematic diagram of CC cross-section structure shown in.

[0024] in, Figure 1 — Figure 4 :

[0025] Segment—a, tunnel—b;

[0026] The rear supporting trolley is 1, box culvert is 2, box culvert crane is 3, transport vehicle is 4, segment unloader is 5, multi-segment crane is 6, single segment crane is 7, segment feeder is 8, single crane slide rail is 9, multi-crane slide rail is 10, C-type guide rail is 11, pin is 12;

[0027] Lifting platform—51, supporting arm—52, guide wheel—53. DETAILED DESCRIPTION

[0028] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0029] Please refer to Figure 1 to Figure 4 , Figure 1 This is a schematic diagram of the overall structure of a specific implementation method provided by the present invention. Figure 1 This is a schematic diagram of the overall structure of a specific implementation method provided by the present invention. Figure 2 for Figure 1 The schematic diagram of the AA cross-section structure is shown in FIG. Figure 3 for Figure 1 The schematic diagram of the BB cross-section structure is shown in FIG. Figure 4 for Figure 1 Schematic diagram of CC cross-section structure shown in.

[0030] In a specific embodiment provided by the present invention, the tunnel excavation material transportation system mainly includes a rear supporting trolley 1, a box culvert crane 3, a transport vehicle 4, a segment unloader 5, a multi-segment crane 6, a single segment crane 7 and a segment feeder 8.

[0031] Among them, the rear supporting trolley 1 is the rear supporting equipment of the shield machine, which is generally laid in the tunnel along the excavation direction and is mainly used to install and carry the remaining components of the material transportation system.

[0032] The box culvert crane 3 is movably arranged on the rear supporting trolley 1, and is mainly used to hoist the box culvert 2, and hoist the box culvert 2 to a preset position in the tunnel for assembly, so as to allow transport vehicles 4 and personnel to pass.

[0033] The transport vehicle 4 is a dynamic mobile device, which mainly moves on the surface of each already laid box culvert 2 in the tunnel, so as to carry the pipe segments (and other accessories) to the preset positions in the tunnel. Generally, the transport vehicle 4 can be a rubber-wheeled transport vehicle that can travel on the surface of the box culvert 2.

[0034] The segment unloader 5 is arranged on the rear matching trolley 1, and is mainly used to unload the entire segment from the transport vehicle 4 after the transport vehicle 4 moves into position, so that the transport vehicle 4 can unload and evacuate quickly, and then quickly enter the next round of segment transportation operation.

[0035] The multi-segment crane 6 is movably arranged on the rear supporting trolley 1, and is mainly used to lift multiple segments from the segment unloader 5 to a preset distance position at the front end of each assembled box culvert 2, so as to temporarily store a certain amount of segments.

[0036] The single segment hoist 7 is also movably arranged on the rear supporting trolley 1, and is mainly used to hoist each segment from the segment temporary storage in the tunnel to the segment feeder 8. After receiving the single segment, the segment feeder 8 transports it to the segment assembly machine for sequential assembly to form a complete ring shield pipe. Generally, the segment feeder 8 is arranged on the tunnel segment under the support beam of the segment assembly machine, and is connected to the middle shield through a chain.

[0037] In this way, the tunnel excavation material transportation system provided by this embodiment can first unload the entire vehicle through the segment unloader 5 after the transport vehicle 4 carries the segment to the destination, and then lift it in batches through the multi-segment crane 6 and the single-segment crane 7. Therefore, the transport vehicle 4 can quickly evacuate from the tunnel and continue the next round of segment transportation operations. Compared with the prior art, it can minimize the waiting time of the rubber-wheeled transport vehicle in the tunnel for segment lifting, and improve the dynamic efficiency of material transportation in the tunnel. In addition, the multi-segment crane 6, the single-segment crane 7, and the box culvert crane 3 can work at the same time, thereby saving construction time and improving construction efficiency. The multi-segment crane 6 lifts the segment to the preset position at the front end of the box culvert 2, which is equivalent to adding a segment storage position, making the material transportation during the construction process more flexible and more efficient.

[0038] In order to facilitate the mobile hoisting of the multi-segment crane 6 and the single-segment crane 7 on the rear supporting trolley 1, in this embodiment, a single crane slide rail 9 extending along the excavation direction is provided at the front end area of ​​the rear supporting trolley 1 (the front and rear ends are based on the excavation direction, and the tunnel entrance is the rear end), and a multi-crane slide rail 10 extending along the excavation direction is provided at the rear end area of ​​the rear supporting trolley 1. In addition, the multi-segment crane 6 can be slidably arranged on the multi-crane slide rail 10, and the single-segment crane 7 can be slidably arranged on the single-crane slide rail 9. Specifically, the multi-segment crane 6 can be installed on the multi-crane slide rail 10 through bearing rollers, and similarly, the single-segment crane 7 can also be installed on the single-crane slide rail 9 through bearing rollers.

[0039] Furthermore, considering that the working area of ​​the single-segment crane 7 is relatively forward, while the working areas of the multi-segment crane 6 and the box culvert crane 3 are relatively backward, in order to match the structure on the trolley 1 and reduce the cost, in this embodiment, the box culvert crane 3 can also be slidably arranged on the multi-crane slide rail 10, that is, slide on the same rail with the multi-segment crane 6. At the same time, in order to avoid motion interference, the box culvert crane 3 is specifically located at the rear end of the multi-segment crane 6.

[0040] Moreover, considering that the single segment crane 7 needs to hoist the segments temporarily stored at the bottom of the tunnel onto the segment feeder 8 when performing the hoisting operation, and the segment feeder 8 is also laid at the bottom of the tunnel, the hoisting working height of the single segment crane 7 is relatively low. When the multi-segment crane 6 performs the hoisting operation, it needs to hoist the segments on the segment unloader 5 to the preset position at the front end of the culvert 2, and the working space of the segment unloader 5 and the transport vehicle 4 are both on the surface of the culvert 2, and their working heights are relatively high. Based on this, in this embodiment, the multi-crane slide rails 10 and the single-crane slide rails 9 are distributed along the vertical layers on the rear matching trolley 1, and the single-crane slide rails 9 are located below the multi-crane slide rails 10.

[0041] In addition, in order to facilitate the inspection and replacement of the multi-crane slide rail 10 and the single-crane slide rail 9, in this embodiment, both can be detachably connected to the rear supporting trolley 1. Specifically, the multi-crane slide rail 10 and the single-crane slide rail 9 can be installed on the rear supporting trolley 1 by fasteners such as bolts.

[0042] Considering that the movement strokes of the multi-segment crane 6 and the single-segment crane 7 on their respective slide rails are generally fixed, in order to prevent the two from accidentally derailing, the present embodiment also provides limit blocks at preset positions on the multi-segment crane slide rail 10 and the single-segment crane slide rail 9. Specifically, the limit blocks can be provided at both ends of the multi-segment crane slide rail 10 and the single-segment crane slide rail 9 to limit the movement of the multi-segment crane 6 and the single-segment crane 7 by abutting against them, thereby preventing the two from derailing during movement.

[0043] In a preferred embodiment of the segment unloader 5, the segment unloader 5 specifically includes a lifting platform 51, a support arm 52 and a guide wheel 53. The lifting platform 51 can be vertically lifted and lowered on the rear supporting trolley 1. Generally, when the lifting platform 51 is not lifted and lowered, its surface can be flush with the top surface of the culvert 2. At the same time, the maximum lifting height of the lifting platform 51 can be kept at a preset distance from the multi-hoist slide rail 10. The support arm 52 is set on the lifting platform 51. Generally, two support arms 52 can be set at the same time, and are respectively located on both sides of the lifting platform 51. The support arms 52 can be folded and stretched along a preset trajectory to stably support each segment. In this way, when the transport vehicle 4 moves into position on the surface of the culvert 2, the lifting platform 51 of the segment unloader 5 can be raised by a certain distance, and then the support arm 52 is unfolded and extended to the bottom of each segment carried on the transport vehicle 4 to support it. After that, the lifting platform 51 continues to rise, thereby lifting all the segments of the vehicle and separating them from the transport vehicle 4, completing the unloading of the entire vehicle. At this point, the transport vehicle 4 can quickly evacuate from the tunnel.

[0044] Furthermore, considering that the mass of each segment is relatively large when the supporting arm carries each segment, when the lifting platform 51 is raised to a certain height, it is easy to tip over due to the unstable center of gravity of the segment. To this end, the present embodiment adds guide wheels 53 on both sides of the lifting platform 51. Correspondingly, the present embodiment also provides a C-shaped guide rail 11 extending along the excavation direction on the rear matching trolley 1. The C-shaped guide rail 11 is used to cooperate with the guide wheel 53, so that the lifting platform 51 can slide on the C-shaped guide rail 11 through the guide wheel 53. Specifically, the cross-section of the C-shaped guide rail 11 is C-shaped, and has a protective layer on the top and bottom surfaces. On the basis of allowing the guide wheel 53 to roll smoothly, it can form a limiting and clamping effect on the guide wheel 53, thereby preventing the lifting platform 51 from tipping over during the movement after the lifting.

[0045] In addition, considering that there is a tendency for vertical deviation to occur when laying the track of the rear-matching trolley and the box culvert 2, in this embodiment, pins 12 are provided on both sides of the lifting platform 51, and the pins 12 are connected to the side walls of the rear-matching trolley 1, so that the lifting platform 51 is rotatably connected to the rear-matching trolley 1, and the lifting platform 51 can perform a small-amplitude flipping movement on the rear-matching trolley 1. Of course, the connection between the rear-matching trolley 1 and the segment unloader 5 can be replaced by the pulling of components such as chains, and the segment unloader 5 can be pushed by the rear-matching trolley 1 to achieve synchronous movement of the segment unloader 5 and the shield machine.

[0046] This embodiment also provides a shield machine, which mainly includes a fuselage and a tunnel boring material transportation system arranged on the fuselage, wherein the specific content of the tunnel boring material transportation system is the same as the above-mentioned related content and will not be repeated here.

[0047] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A tunnel excavation material transportation system, characterized in that: The invention comprises a rear-end supporting trolley (1) laid in the tunnel along the excavation direction, a box culvert crane (3) movably arranged on the rear-end supporting trolley (1) and used for lifting the box culvert (2), a transport vehicle (4) moving on the surface of each box culvert (2) laid in the tunnel and used for carrying pipe segments, a pipe segment unloading machine (5) arranged on the rear-end supporting trolley (1) and used for unloading the pipe segments from the transport vehicle (4), a multi-segment crane (6) movably arranged on the rear-end supporting trolley (1) and used for lifting pipe segments from the pipe segment unloading machine (5) to a position temporarily stored at a preset distance from the front end of the box culvert (2), a single pipe segment crane (7) movably arranged on the rear-end supporting trolley (1) and used for lifting a single pipe segment from a pipe segment temporary storage location to a pipe segment feeding machine (8), and the pipe segment feeding machine (8) laid in the tunnel and used for transporting pipe segments to a pipe segment assembly machine; A single crane slide rail (9) extending in the excavation direction is arranged on the front end region of the rear supporting trolley (1), and a multi-crane slide rail (10) extending in the excavation direction is arranged on the rear end region of the rear supporting trolley (1), and the single segment crane (7) is slidably arranged on the single crane slide rail (9), and the multi-segment crane (6) is slidably arranged on the multi-crane slide rail (10); The multi-crane slide rail (10) and the single-crane slide rail (9) are distributed in a vertical layer on the rear matching trolley (1), and the single-crane slide rail (9) is located below the multi-crane slide rail (10); Limit blocks for limiting the movement travel of the multi-segment crane (6), the box culvert crane (3), and the single-segment crane (7) are provided at preset positions on the multi-segment crane slide rail (10) and the single-segment crane slide rail (9); The segment unloader (5) comprises a lifting platform (51) which is vertically liftable and arranged on the rear supporting trolley (1), and a supporting arm (52) which is laterally extendable and arranged on the lifting platform (51) and is used to extend to the bottom of each segment carried on the transport vehicle (4) to support it. The side surfaces of the lifting platform (51) can be vertically flipped and connected to the side walls of the rear matching trolley (1).

2. The tunnel excavation material transportation system according to claim 1, characterized in that: The box culvert crane (3) is slidably arranged on the multi-crane slide rail (10), and the box culvert crane (3) is located at the rear end of the multi-segment crane (6).

3. The tunnel excavation material transportation system according to claim 2, characterized in that: The segment unloader (5) further comprises guide wheels (53) arranged on both sides of the lifting platform (51), and the rear matching trolley (1) is further provided with a C-shaped guide rail (11) extending along the excavation direction, and the guide wheel (53) is arranged in the C-shaped guide rail (11) to prevent the lifting platform (51) from tipping over.

4. A shield machine, comprising a machine body and a tunnel boring material transportation system arranged on the machine body, characterized in that: The tunnel boring material transportation system is specifically the tunnel boring material transportation system according to any one of claims 1-3.