A double-row pile support structure
By introducing space triangular truss columns and plane truss structures into the double-row pile structure, combined with mesh shotcrete and steel mesh, the problem of the limited effect of the double-row pile spatial system and the weak bending resistance of the single-row piles is solved, achieving a more efficient Structural support, suitable for a variety of engineering scenarios.
Patent Information
- Application Number
- CN202010548977.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-06-16
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2040-06-16
AI Technical Summary
The existing double-row pile spatial system has limited effect, and the single-row pile has weak bending resistance and cannot effectively support engineering structures such as high slopes, deep foundation pits, and deep river embankments.
The connecting web rods and oblique web rods between the front and rear rows of piles are used to form a space triangular truss column structure to enhance the lateral stiffness, and a plane truss structure is formed through rigid frame beams and crown beams to improve the bending resistance. At the same time, mesh shotcrete and steel bars are used network to achieve more efficient structural support.
The lateral stiffness and bending resistance of the double-row piles are significantly improved, forming a spatially integrated structure, which reduces the project cycle and cost. It is also recyclable and suitable for a variety of engineering scenarios.
Smart Images

Figure CN111576452B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical fields of municipal engineering, construction engineering and water conservancy engineering, and in particular to a double-row pile support structure suitable for high slope support, deep foundation pit support and deep river embankment protection, which can be used as a temporary or permanent structure. Background Art
[0002] With the rapid development of national park city construction, there are more and more dangerous projects such as high slopes, deep foundation pits and high river embankments, and the attention to safety issues has reached a new height. As a relatively new type of support, the double-row pile support structure has a stiffness similar to the portal structure. Although the action principle has been greatly improved compared with the single-row pile, the bending resistance has also been greatly improved compared with the single-row pile. However, the double-row piles and the rigid frame beam form a portal structure. When the pile row spacing is less than 4 times the pile diameter, the spatial system effect is limited, and the overall effect of the front and rear pile structures of the portal structure is limited. It is necessary to strengthen the connection between the pile structures to play a more efficient role in the spatial structure system. Summary of the invention
[0003] The purpose of the present invention is to provide a double-row pile support structure that can enhance the lateral stiffness of the double-row piles and strengthen the bending resistance of the structural support system in order to address the problems of limited effect of the existing double-row pile spatial system and weak bending resistance of the single-row piles.
[0004] The technical solution of the technology of the present invention is achieved as follows: a double-row pile support structure, including a front row of piles and a rear row of piles, the pile tops of the front row of piles are provided with a front row of crown beams, and the pile tops of the rear row of piles are provided with a rear row of crown beams, characterized in that: a rigid frame beam is provided between the front row of crown beams and the rear row of crown beams, the front row of crown beams, the rear row of crown beams and the rigid frame beams together form a plane truss structure, vertically spaced connecting webs are provided between adjacent pile bodies in the front and rear rows, vertically spaced front webs are provided between adjacent pile bodies in the front row of piles, and a spatial triangular truss column structure is formed between the two adjacent front row pile bodies and the corresponding rear row of piles.
[0005] The double-row pile support structure described in the present invention, wherein the front row piles and the rear row piles are arranged in double rows in a staggered manner in the longitudinal direction, the front row crown beams and the rear row crown beams use the pile position nodes as connection points, the rigid frame beams are arranged between the adjacent connection points of the front row crown beams and the rear row crown beams, and the rigid frame beams between the front row crown beams and the rear row crown beams are in a continuous W shape as a whole.
[0006] In the double-row pile support structure of the present invention, diagonal web members are provided between the adjacent connecting web members arranged at intervals in the vertical direction, one end of the diagonal web member is connected to the pile body of the front row piles, and the other end thereof is connected to the pile body of the rear row piles.
[0007] In the double-row pile supporting structure of the present invention, the connecting web members between the adjacent front and rear rows of piles, the front row web members and the oblique web members are all arranged in the range of the pile body above the bottom of the foundation pit or the slope.
[0008] In the double-row pile supporting structure described in the present invention, the connecting web members are on the same horizontal plane as the corresponding front-row web members.
[0009] The double-row pile support structure described in the present invention is characterized in that the front row piles are provided with reserved steel bars for the front row pile webs, and the rear row piles are provided with reserved steel bars for the rear row pile webs, and the two ends of the connecting webs are respectively connected to the corresponding reserved steel bars on the front and rear rows of adjacent pile bodies.
[0010] The double-row pile support structure described in the present invention is provided with bolt holes or front-row web member reserved steel bars on the front-row piles, and the front-row web members are connected to the corresponding bolt holes of the front-row piles by bolts, or the front-row web members are connected to the front-row web member reserved steel bars preset on the front-row piles.
[0011] The double-row pile support structure described in the present invention is provided with mesh sprayed concrete between adjacent connecting webs in the vertical direction, the front row piles are provided with front row pile steel mesh reserved steel bars, and the rear row piles are provided with rear row steel mesh reserved steel bars, the front and rear ends of the steel mesh of the mesh sprayed concrete are respectively connected to the corresponding reserved steel bars on the front and rear adjacent piles, and the upper and lower ends of the steel mesh are respectively connected to the corresponding connecting webs.
[0012] In the double-row pile support structure described in the present invention, the width of the front-row crown beam is greater than the pile diameter of the front-row piles, and the width of the rear-row crown beam is greater than the pile diameter of the rear-row piles.
[0013] The double-row pile support structure described in the present invention has a front-row connecting plate on the top of the front-row piles, a rear-row connecting plate on the top of the rear-row piles, and both ends of the rigid frame beam are bolted to the corresponding front-row connecting plate and rear-row connecting plate respectively.
[0014] In order to overcome the problems of limited effect of the existing double-row pile space system and weak bending resistance of the single-row pile, the present invention provides a spatial triangular truss column structural support system in which the pile body is connected to the web, which can achieve effective connection between the front and rear rows of piles, form a spatial integrated structure, enhance the lateral stiffness of the double-row piles, enhance the bending resistance of the structural support system, and achieve prefabricated installation or cast-in-place construction of concrete components. At the same time, it can also achieve assembly and construction of steel rods and can be recycled and reused, which can effectively shorten the project period, reduce the occupation of underground space and reduce the project cost.
[0015] The double-row pile space system of the present invention forms a serrated soil side through excavation. The concave space on the serrated soil side has a unique matching effect with the spatial triangular truss column structure of the present invention. It has the function of providing a space for installing underground water pipelines outside the foundation pit for diverting and draining the foundation pit in foundation pit support, it has the function of planting plants to beautify the environment in slope support projects, and it has the function of reducing the flow velocity of water, reducing scouring and beautifying the environment in water conservancy and river embankment projects. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the planar structure of the present invention.
[0017] Figure 2 It is a three-dimensional space schematic diagram of the present invention.
[0018] Figure 3 yes Figure 2 sectional view of .
[0019] Figure 4 It is a schematic diagram of the connection between the pile body and the web in the present invention.
[0020] Figure 5 It is a schematic diagram of the connection between the pile body and the mesh shotcrete in the present invention.
[0021] Figure 6 It is a schematic diagram of the connection between the crown beam and the rigid frame beam of another structure in the present invention.
[0022] Figure 7 It is a schematic diagram of the connection between the web member and the mesh shotcrete of another structure in the present invention.
[0023] Markings in the figure: 1 is the front row piles, 2 is the back row piles, 3 is the front row crown beam, 4 is the back row crown beam, 5 is the rigid frame beam, 6 is the connecting web member, 7 is the front row web member, 8 is the inclined web member, 9 is the reserved steel bars for the front row pile web members, 10 is the reserved steel bars for the back row pile web members, 11 is the reserved steel bars for the front row web members, 12 is mesh sprayed concrete, 13 is the reserved steel bars for the front row pile steel mesh, 14 is the reserved steel bars for the back row steel mesh, 15 is the front row connecting plate, and 16 is the back row connecting plate. DETAILED DESCRIPTION
[0024] The present invention will be described in detail below in conjunction with the accompanying drawings.
[0025] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the invention.
[0026] In the description of the present invention, it should be understood that the terms “longitudinal”, “transverse”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “radial”, “circumferential”, “layer”, “level”, “front row”, “back row”, etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred pile position or rod must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0027] The disclosure below provides many different implementations or examples for realizing different structures of the present invention. In order to simplify the disclosure of the present invention, the components and settings of specific examples are described below. Of course, they are merely examples, and the purpose is not to limit the present invention. Although the present invention is described in detail with reference to the embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the following embodiments, or to replace some of the technical features therein by equivalents. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
[0028] like Figures 1 to 7 As shown, a double-row pile support structure comprises a front row pile 1 and a rear row pile 2, wherein the pile tops of the front row piles 1 are provided with a front row crown beam 3, and the pile tops of the rear row piles 2 are provided with a rear row crown beam 4, wherein the width of the front row crown beam 3 is greater than the pile diameter of the front row piles 1 to ensure reliable connection between the front row piles, and the width of the rear row crown beam 4 is greater than the pile diameter of the rear row piles 2 to ensure reliable connection between the rear row piles, and a rigid frame beam 5 is provided between the front row crown beam 3 and the rear row crown beam 4, and the front row crown beam 3, the rear row crown beam 4 and the rigid frame beam 5 together form a plane truss structure, and the truss is segmented according to geological changes, support height changes and construction work, and settlement joints are set in the segments. Specifically, the front row piles 1 The front row of piles 1 and the rear row of piles 2 are arranged in double rows in a staggered manner in the longitudinal direction, the front row of crown beams 3 and the rear row of crown beams 4 use the pile position nodes as connection points, the rigid frame beams 5 are arranged between the adjacent connection points of the front row of crown beams 3 and the rear row of crown beams 4, the front row of piles 1 are provided with front row connecting plates 15 at the top of the piles, and the rear row of piles 2 are provided with rear row connecting plates 16 at the top of the piles, and the two ends of the rigid frame beams 5 are respectively bolted to the corresponding front row connecting plates 15 and rear row connecting plates 16, and the rigid frame beams 5 between the front row of crown beams 3 and the rear row of crown beams 4 are in a continuous W shape as a whole, have greater rigidity, and can save materials, and the front row of crown beams 3, the rear row of crown beams 4 and the rigid frame beams 5 can be formed into an integral structure to form a solid large crown beam.
[0029] The above structure forms the main structure of the double-row piles of the present invention, which has a good supporting effect. Then, the foundation pit is excavated. It is common to use 1 to 3 meters as a level, and the level is divided into 3 to 4 layers. Each level of earthwork excavation simultaneously removes the soil between the piles to form a serrated soil side surface. The concave space on the serrated soil side surface has a unique matching effect with the spatial triangular truss column structure of the present invention. In the foundation pit support, it is a space for diverting and discharging groundwater outside the foundation pit. In the slope support project, it has the effect of planting plants to beautify the environment. In the water conservancy river embankment project, it has the effect of reducing the flow rate of water and reducing scouring. The connecting webs are constructed to connect the reserved steel bars of the front row pile webs and the reserved steel bars of the rear row pile webs. The mesh sprayed concrete between the connecting webs is used to retain soil. The steel mesh of the mesh sprayed concrete is welded or tied to the reserved steel bars of the front row pile steel mesh and the reserved steel bars of the rear row pile steel mesh. The mesh sprayed steel mesh is extended and connected to the connecting web steel bars and tied.
[0030] Specifically, connecting webs 6 arranged at intervals vertically are provided between adjacent pile bodies in the front and rear rows, and front row webs 7 arranged at intervals vertically are provided between adjacent pile bodies in the front row piles 1. Steel plates, steel bars, pins or bolts for connecting the webs are reserved on the pile bodies. The connecting webs 6 and the corresponding front row webs 7 are on the same horizontal plane, and a spatial triangular truss column structure is formed between the two adjacent front row pile bodies and the corresponding rear row piles. The implementation steps of the connecting webs and the front row webs are consistent with the layered and graded excavation of earthwork. From top to bottom, for every level of soil excavated, the corresponding connecting webs and front row webs of this level are implemented simultaneously to form a triangular spatial truss system simultaneously. This structure can make the double-row piles better form a whole, thereby greatly improving the overall lateral stiffness and lateral bending resistance of the double-row piles.
[0031] In order to further improve the stability and reliability of the connection structure, diagonal web members 8 are arranged between the adjacent connecting web members 6 arranged at intervals vertically, one end of the diagonal web member 8 is connected to the pile body of the front row pile 1, and the other end thereof is connected to the pile body of the rear row pile 2. The connecting web members 6, the front row web members 7 and the diagonal web members 8 between the adjacent front and rear rows of piles are all arranged in the pile body range above the bottom of the foundation pit or the slope. After excavation to the bottom of the foundation pit or the slope, a steel mesh can be set according to the situation and concrete can be used to seal the triangular area.
[0032] In this embodiment, the front row piles 1 are provided with front row pile web rod reserved steel bars 9, the rear row piles 2 are provided with rear row pile web rod reserved steel bars 10, the two ends of the connecting web rod 6 are respectively connected to the corresponding reserved steel bars on the front and rear adjacent pile bodies, bolt holes or front row web rod reserved steel bars 11 are provided on the front row piles 1, the front row web rod 7 is connected to the corresponding bolt holes of the front row piles 1 by bolts, or the front row web rod 7 is connected to the front row web rod reserved steel bars 11 preset on the front row piles 1, and the front row web rod can adopt double-piece channel steel to connect the front row piles as a whole and fix them.
[0033] Among them, mesh sprayed concrete 12 is arranged between adjacent connecting webs 6 in the vertical direction to achieve the retaining effect. When the front and rear rows of piles adopt recyclable steel pipe piles, a detachable retaining plate is adopted between the piles. The front row piles 1 are provided with front row pile steel mesh reserved steel bars 13, and the rear row piles 2 are provided with rear row steel mesh reserved steel bars 14. The front and rear ends of the steel mesh of the mesh sprayed concrete 12 are respectively connected to the corresponding reserved steel bars on the front and rear adjacent pile bodies, and the upper and lower ends of the steel mesh are respectively connected to the corresponding connecting webs 6. When a detachable retaining plate is adopted between the piles, the reserved steel bars 13 and 14 can adopt reserved bolt holes.
[0034] The double-row pile support structure of the present invention has changed the characteristic of the traditional double-row piles with few overall connection points due to the arrangement of rigid frame beams between the top crown beams of the front and rear rows of piles and the vertical web connections between the piles. The double-row piles form an integrated spatial triangular truss column structure, and the overall horizontal stiffness of the double-row piles is improved, as well as the horizontal bending resistance of the row of piles. The double-row pile support structure is mainly used for soil support such as deep foundation pits, high slopes and river embankments in industries such as municipal engineering, water conservancy engineering and construction engineering, and has the characteristics of high structural reliability, simple implementation, material saving and low engineering cost. Specific embodiment 1
[0036] A double-row pile support structure is used in slope support. It is a permanent structure. The diameter of the front row piles is 800mm, and the diameter of the rear row piles is 800mm. Mechanical drilling is used to construct reinforced concrete cast-in-place piles. The double rows are arranged in equilateral triangles with a spacing of 2m. The pile bodies of the front row piles are reserved with several groups of front row pile belly bars. Each group of steel bars has 10 and a diameter of 22mm. Each group of steel bars used to connect the front row belly bars has 10 and a diameter of 22mm. The steel mesh of the front row piles is reserved. The diameter of the steel bar is 10mm and the vertical spacing is 150mm. The rear row pile body is equipped with several groups of reserved steel bars for the rear row pile webs. Each group has 10 steel bars with a diameter of 22mm. The diameter of the reserved steel bars in the rear row steel mesh is 10mm and the vertical spacing is 150mm. The top of the front row piles is equipped with a front row crown beam of 1000×600mm, and the top of the rear row piles is equipped with a rear row crown beam of 1000×600mm. The front row crown beam and the rear row crown beam are connected by a 400×400mm rigid frame beam.
[0037] Then, the earthwork of the slope on one side is excavated. The excavation is carried out in layers and grades, with 2 to 4 layers as one level. For each excavation layer, the mesh spraying concrete is used for retaining. The mesh spraying concrete is a cast-in-place reinforced concrete slab with a thickness of 200mm. The steel mesh connects the reserved steel bars of the steel mesh of the front row piles and the reserved steel bars of the back row piles. For each excavation level, the 300×300mm connecting web bars between the front row piles and the back row piles and the 300×300mm front row web bars connecting the front row piles are simultaneously implemented. They are all cast-in-place reinforced concrete structures. The steel bars at one end of the connecting web bars are connected to the reserved steel bars of the front row piles, and the other end is connected to the reserved steel bars of the back row piles. The front row web bars are connected to the reserved steel bars of the front row piles, and the horizontal elevation of the connecting web bars is consistent with that of the front row web bars. As the excavation depth increases, the overall force of the structure also increases. The vertical spacing between the connecting web bars and the front row web bars can be selected to be denser. In order to further increase the rigidity, diagonal web bars can also be set between the connecting web bars. Repeated layered and graded excavation, implementation of mesh spraying concrete, connecting braces and front braces, implementation of diagonal braces when necessary, until the bottom of the slope is dug, the bottom of the slope is sealed with concrete and drainage ditches are set at the foot of the slope. In addition, for the beauty of the slope, flower pots are placed between each level of connecting braces and front braces to plant vines. Specific embodiment 2
[0039] A double-row pile support structure, which differs from the first embodiment in that the usage scenario is temporary foundation pit support. The front and rear rows of piles are steel pipe piles with a diameter of 500mm. Vibratory pile-forming technology is adopted, and double rows of equilateral triangles are arranged with a spacing of 1.5m. Bolt holes are reserved in the pile bodies of the front row piles, and bolt holes are reserved in the pile bodies of the rear row piles. The tops of the front row piles are provided with double-jointed 300mm I-beam front row crown beams and front row connecting plates, and the tops of the rear row piles are provided with double-jointed 300mm I-beam rear row crown beams and rear row connecting plates. Rigid frame beams are used to connect the front and rear row piles through connecting plates and bolts.
[0040] Then, the foundation pit is excavated in layers and grades. Each layer is excavated and installed with a height of 500mm. V-shaped retaining plates are installed. The retaining plates are equivalent to the mesh sprayed concrete in Example 1. The material of the retaining plates is a corrugated steel plate with a height of 500mm, a thickness of 3mm, and a wave height of 100mm. The front row and the rear side are connected through reserved holes. The connecting webs between the piles are excavated and installed at each level with a height of 2000mm. The material of the connecting webs between the piles is double-jointed 160mm channel steel. One end of the channel steel is connected to the reserved holes of the front row of piles by bolts, and the other end is connected to the reserved holes of the rear row of piles. Double-jointed 200mm I-beam front-row webs are installed between the front-row piles. The front-row webs are connected to the reserved holes of the pile body by bolts. The retaining plates, connecting webs, and front-row webs are installed to the bottom of the foundation pit through cyclic layering and graded excavation. The dismantling and backfilling process of the supporting structure is the opposite of the excavation process. According to the layered position of the foundation pit retaining plates, connecting webs and front row webs, they are dismantled piece by piece from bottom to top. After each layer of rods is dismantled, the corresponding height of earth is backfilled in time and compacted. The above process is repeated until the bottom elevation of the top crown beam is reached, and then the rigid frame beam, front row crown beam and rear row crown beam are dismantled. Finally, the steel pipe piles are pulled out one by one and filled with gravel soil in layers and compacted.
[0041] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A double-row pile support structure, comprising a front row pile (1) and a rear row pile (2), wherein the pile tops of the front row piles (1) are provided with a front row crown beam (3), and the pile tops of the rear row piles (2) are provided with a rear row crown beam (4), characterized in that: A rigid frame beam (5) is arranged between the front row crown beam (3) and the rear row crown beam (4); the front row crown beam (3), the rear row crown beam (4) and the rigid frame beam (5) together form a plane truss structure; a connecting web member (6) arranged vertically at intervals is arranged between adjacent pile bodies in the front row of piles (1); a front row web member (7) arranged vertically at intervals is arranged between adjacent pile bodies in the front row of piles (1); a spatial triangular truss column structure is formed between two adjacent front row pile bodies and the corresponding rear row piles; the front row piles (1) and The rear row piles (2) are arranged in a double row in a staggered manner in the longitudinal direction; the front row crown beams (3) and the rear row crown beams (4) are connected at the pile position nodes; the rigid frame beams (5) are arranged between the adjacent connection points of the front row crown beams (3) and the rear row crown beams (4); the rigid frame beams (5) between the front row crown beams (3) and the rear row crown beams (4) are in a continuous W shape as a whole; an oblique web bar (8) is arranged between the adjacent connecting web bars (6) arranged at intervals in the vertical direction; one end of the oblique web bar (8) is connected to the front row piles (1); The connecting web (6) is connected to the pile body, and the other end is connected to the pile body of the rear row pile (2); the connecting web (6) and the corresponding front row web (7) are on the same horizontal plane; mesh sprayed concrete (12) is arranged between the vertically adjacent connecting webs (6); the front row pile (1) is provided with a front row pile steel mesh reserved steel bar (13), and the rear row pile (2) is provided with a rear row steel mesh reserved steel bar (14); the front and rear ends of the steel mesh of the mesh sprayed concrete (12) are respectively connected to the corresponding reserved steel bars on the front and rear adjacent pile bodies. The steel bars are connected, the upper and lower ends of the steel mesh are respectively connected to corresponding connecting webs (6); the width of the front row crown beam (3) is greater than the pile diameter of the front row piles (1), and the width of the rear row crown beam (4) is greater than the pile diameter of the rear row piles (2); the tops of the front row piles (1) are provided with front row connecting plates (15), and the tops of the rear row piles (2) are provided with rear row connecting plates (16); and the two ends of the rigid frame beam (5) are respectively bolted to the corresponding front row connecting plates (15) and rear row connecting plates (16).
2. The double-row pile support structure according to claim 1 is characterized in that: The connecting web members (6), the front web members (7) and the oblique web members (8) between the adjacent front and rear row piles are all arranged in the range of the pile body above the bottom of the foundation pit or the slope.
3. The double-row pile support structure according to claim 1 is characterized in that: The front row piles (1) are provided with front row pile web reserved steel bars (9), the rear row piles (2) are provided with rear row pile web reserved steel bars (10), and the two ends of the connecting web bars (6) are respectively connected to the corresponding reserved steel bars on the front and rear row adjacent pile bodies.
4. The double-row pile support structure according to claim 1 is characterized in that: Bolt holes or front-row web member reserved steel bars (11) are provided on the front-row piles (1); the front-row web members (7) are connected to corresponding bolt holes of the front-row piles (1) via bolts, or the front-row web members (7) are connected to front-row web member reserved steel bars (11) preset on the front-row piles (1).