A BIM-based engineering inspection system and method
Through the BIM-based engineering inspection system and the use of live video and image comparison technology, the problem of rapid and accurate inspection of construction conditions during power plant construction has been solved, and construction safety has been improved and the BIM system has been improved.
Patent Information
- Application Number
- CN202010565519.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-06-19
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2040-06-19
AI Technical Summary
During the construction phase of power plant projects, construction units are often unable to quickly and accurately inspect the construction conditions, leading to safety hazards and accidents.
Adopting a BIM-based engineering inspection system, through the real-view video system and image comparison system, the axis positioning is used to determine the absolute coordinate origin, and the three-dimensional model and animation data are captured, and converted into signals and transmitted to the factory real-view shooting device to realize automated photography and Video shooting to quickly compare whether the construction conditions are consistent with the design drawings.
It enables the rapid and accurate discovery of construction problems during the construction phase, avoids safety hazards, improves project safety and efficiency, and provides support for the improvement of the BIM system.
Smart Images

Figure CN111626378B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of engineering construction safety, and more specifically to a BIM-based engineering inspection system and method. Background Art
[0002] Power plant projects can generally be divided into four stages: feasibility study report stage, preliminary design stage, construction stage and trial production stage. The preliminary design stage and construction stage are two important links. The power plant construction process should be constructed according to the construction drawings, but some construction units fail to strictly follow the construction drawings, or cut corners, or are rough and careless, resulting in continuous safety hazards during the construction process, and even safety hazards turn into safety accidents.
[0003] At present, there is a lack of measures to quickly and accurately inspect the construction status of engineering projects during the engineering supervision process. Summary of the invention
[0004] Based on this, the present application provides a BIM-based engineering inspection system and method with the characteristics of safety, efficiency, easy implementation and simple control.
[0005] A BIM-based engineering inspection system and method, comprising the following steps:
[0006] 1) The real-scene video system determines the absolute coordinate origin in the BIM system based on the axis grid positioning, clarifies the coordinates of the shooting points in the BIM system, the shooting angle and the shooting path, obtains the BIM image through rendering based on the existing 3D model, and obtains the BIM animation through shooting along a specific path, and then imports the BIM image and animation data into the BIM data converter;
[0007] 2) The BIM data converter receives the corresponding position data, angle data and path data of the BIM rendered image and BIM animation. The data converter converts the position data, angle data and path data in the BIM system into corresponding signals and transmits them to the receiver of the real-scene shooting device in the factory area.
[0008] 3) A real-scene shooting device for the factory area that has obtained the orientation, size, elevation and other information of the factory building structures in advance, combines the terminal data input by the BIM data converter, selects the most appropriate flight path based on its built-in positioning system and the input position signal to automatically fly to the shooting point in the factory area, shoots or records the real scene of the factory area based on the input angle signal or path signal, and selects an appropriate camera based on the shooting method in the BIM system. After the selection is made, the three-view image of the factory object is obtained according to the positioning and the specific shooting angle, and the factory animation is obtained according to the positioning and the specific path;
[0009] 4) Input the BIM image and the factory image into the image comparison device, which extracts the contours of the BIM three-view image and the factory entity three-view image, or captures the pictures of the BIM animation video and the factory entity animation video at the same time, and quickly determines whether the BIM photography and the factory entity photography pictures are consistent.
[0010] Preferably, the position of the BIM grid relative to the software absolute coordinate origin in step 1) is determined and unchanged, and the grid axis span is also fixed.
[0011] Preferably, when the real-scene video recording system described in step 1) shoots the BIM rendering image, the position of the camera in the software relative to the origin is determined, and the shooting angle of the camera in the software is also clear.
[0012] Preferably, when the real-scene video recording system described in step 1) shoots the BIM animation, the initial position of the camera in the software relative to the origin is determined, the shooting path in the software is determined, and the shooting angle of the camera in the software is also clear.
[0013] Preferably, the BIM data converter described in step 2) is a compact mobile storage device with a size of 10x10x30mm, and the data converter is embedded in the factory real-scene shooting device.
[0014] Preferably, the BIM data converter described in step 2) has the functions of data storage and data conversion, and can store and convert the corresponding shooting position information, path information and angle information in the BIM rendering image and BIM animation into relevant signal information and input it into the real-scene shooting device of the factory area.
[0015] Preferably, the real-scene shooting device of the factory area described in step 3) is a lightweight flying device with a front camera, the size of the device is 10x10x5cm, and the real-scene shooting device of the factory area has its own light. The camera of the real-scene shooting device of the factory area includes a standard lens, a wide-angle lens, a telephoto lens and a fisheye lens.
[0016] Preferably, the built-in positioning system of the factory real-scene shooting device described in step 3) includes an axis grid system, factory building information and origin information, the axis grid system is consistent with the BIM axis grid, the origin information is corresponding to the BIM origin information, and the factory building information is obtained by statistics and collation of specific construction conditions.
[0017] Compared with the prior art, the present invention has the following characteristics and beneficial effects:
[0018] (1) The present invention uses a real-scene video recording system and an image comparison system to provide an efficient measure for engineering inspection, so that it can accurately and quickly find out whether the power plant buildings and structures are in compliance with the construction standards during the construction phase. Figure 1In order to timely discover problems arising during the construction process and avoid potential safety hazards in the project.
[0019] (2) The plant real-scene shooting device in the present invention is a small-scale automated photography device similar to an aircraft, which can shoot buildings and structures in the plant, making it convenient for staff to check the actual operation status of the plant, and can also play an important role in the maintenance process of the power plant.
[0020] (3) The present invention further plays the important role of BIM and can provide suggestions for the improvement of BIM.
[0021] (4) The BIM-based engineering inspection method in the present invention has a clear process, can be used on a large scale, and has the characteristics of safety, high efficiency, easy implementation, and simple control. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to more clearly illustrate the technical solutions in the embodiments of the present application or related technologies, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0023] Figure 1 A structural schematic diagram of a BIM-based engineering inspection system in the present invention is shown;
[0024] Figure 2 A schematic diagram of a process of a BIM-based engineering inspection system and method in the present invention is shown;
[0025] Figure 3 A schematic diagram showing a positioning method based on an axis grid system in the present invention;
[0026] Figure 4 A schematic diagram of a plant real scene shooting device in the present invention is shown.
[0027] Explanation of the numbers in the figure: 1. Real-scene video recording system; 2. BIM data converter; 3. Factory real-scene shooting device; 4. Image comparison device; 5. Mobile storage device; 6. Shooting lens. DETAILED DESCRIPTION
[0028] In order to make the purpose, technical solutions and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not intended to limit the present application. Based on the examples in the present application, all other examples obtained by ordinary technicians in the field without making creative work are within the scope of protection of the present application.
[0029] It should be understood by those skilled in the art that the electrical components appearing in this document are all connected to an external main controller and 220V AC power, and the main controller can be a conventional known device that controls a computer, etc. Unless otherwise defined, the technical terms or scientific terms used in the claims and the specification should be the usual meanings understood by persons with ordinary skills in the technical field to which this application belongs. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but can include electrical connections, whether direct or indirect. "And / or" describes the association relationship of associated objects, indicating that three relationships can exist.
[0030] A BIM-based engineering inspection system and method, comprising the following steps:
[0031] 1) If Figure 1-3 As shown, the real-scene video recording system 1 determines the absolute coordinate origin in the BIM system as the intersection of axis 1 and axis A in the axis grid system based on the axis grid positioning, and then clarifies the coordinates of the shooting points in the BIM system as L1, L2, L3, shooting angles α and β and shooting paths O1, O2, and obtains the BIM image by rendering on the basis of the existing three-dimensional model, and obtains the BIM animation by shooting a specific path, and then imports the BIM image and animation data into the BIM data converter 2;
[0032] 2) The BIM data converter 2 receives the corresponding position data, angle data and path data of the BIM rendered image and the BIM animation. The data converter 2 converts the position data, angle data and path data in the BIM system into corresponding signals and transmits them to the receiver of the factory real scene shooting device 3.
[0033] 3) The real-scene shooting device 3 of the factory area, which has obtained the orientation, size and elevation information of the factory area buildings and structures in advance, combines the terminal data input by the BIM data converter 2, selects the most appropriate flight path according to its built-in positioning system and the input position signal, and automatically flies to the shooting point of the factory area, and shoots or records the real scene of the factory area according to the input angle signal or path signal. At the same time, according to the shooting method in the BIM system, selects the appropriate camera 6, and after the selection, obtains the three-view image of the factory area object according to the positioning and the specific shooting angle, and obtains the factory area animation according to the positioning and the specific path;
[0034] 4) Inputting the BIM image and the factory image into the image comparison device 4, the image comparison device 4 extracts the contours of the BIM three-view image and the factory entity three-view image, or captures the pictures of the BIM animation video and the factory entity animation video in the same time, and quickly determines whether the BIM photography and the factory entity photography pictures are consistent.
[0035] Preferably, the position of the BIM axis grid relative to the absolute coordinate origin of the software is determined and unchanged, the axis span of the axis grid is also fixed, and when the real-scene video recording system 1 shoots a BIM rendering image, the position of the camera in the software relative to the origin is determined, and the shooting angle of the camera in the software is also clear. When the real-scene video recording system 1 shoots a BIM animation, the initial position of the camera in the software relative to the origin is determined, the camera path in the software is determined, and the shooting angle of the camera in the software is also clear.
[0036] like Figure 1 As shown, the BIM data converter 2 is a small mobile storage device with a size of 10x10x30mm, and the data converter 2 is embedded in the factory real scene shooting device 3. The BIM data converter 2 has the functions of data storage and data conversion, and can store the corresponding shooting position information, path information and angle information in the BIM rendering image and BIM animation and convert them into relevant signal information to input into the factory real scene shooting device 3.
[0037] like Figure 4 As shown, the real-scene shooting device 3 of the factory area is a lightweight flying device with a front camera 6, the size of the device is 10x10x5cm, and it has a built-in mobile storage device 5. The real-scene shooting device 3 of the factory area has its own light. The camera 6 of the real-scene shooting device 3 of the factory area includes a standard lens, a wide-angle lens, a telephoto lens and a fisheye lens. The built-in positioning system of the real-scene shooting device 3 of the factory area includes an axis network system, factory building information and origin information. Its axis network system is consistent with the BIM axis network, and its origin information corresponds to the BIM origin information. The factory building information is obtained by statistics and collation of specific construction conditions.
[0038] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0039] The above-mentioned embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.
Claims
1. A BIM-based engineering inspection method, characterized in that: The following steps are involved: 1) The real-scene video recording system (1) determines the absolute coordinate origin in the BIM system based on the axis grid positioning, and then clarifies the coordinates of the shooting point, shooting angle and shooting path in the BIM system. The BIM image is obtained by rendering based on the existing 3D model, and the BIM animation is obtained by shooting a specific path. The BIM image and animation data are then imported into the BIM data converter (2); 2) The BIM data converter (2) receives the corresponding position data, angle data and path data of the BIM rendering image and the BIM animation. The data converter (2) converts the position data, angle data and path data in the BIM system into corresponding signals and transmits them to the receiver of the factory real scene shooting device (3); 3) A real-scene shooting device (3) of the factory area that has obtained the orientation, size and elevation information of the factory area buildings and structures in advance, combines the terminal data input by the BIM data converter (2), selects the most appropriate flight path according to its built-in positioning system and the input position signal, automatically flies to the shooting point of the factory area, shoots or records the real scene of the factory area according to the input angle signal or path signal, and selects an appropriate camera (6) according to the shooting method in the BIM system. After the selection is made, a three-view image of the factory area object is obtained according to the positioning and the specific shooting angle, and a factory animation is obtained according to the positioning and the specific path; 4) Inputting the BIM image and the factory image into the image comparison device (4), the image comparison device (4) extracts the contours of the BIM three-view image and the factory entity three-view image, or captures the pictures of the BIM animation video and the factory entity animation video at the same time, and quickly determines whether the BIM photography and the factory entity photography pictures are consistent.
2. The BIM-based engineering inspection method according to claim 1, characterized in that: The position of the BIM axis grid relative to the absolute coordinate origin of the software in step 1) is fixed and unchanged, and the axis span of the axis grid is also fixed.
3. The BIM-based engineering inspection method according to claim 1, characterized in that: When the real-scene video recording system (1) described in step 1) captures the BIM rendering image, the position of the camera in the software relative to the origin is determined, and the shooting angle of the camera in the software is also clear.
4. The BIM-based engineering inspection method according to claim 1, characterized in that: When the real-scene video recording system (1) described in step 1) shoots the BIM animation, the initial position of the camera in the software relative to the origin is determined, the shooting path in the software is determined, and the shooting angle of the camera in the software is also clear.
5. The BIM-based engineering inspection method according to claim 1, characterized in that: The BIM data converter (2) described in step 2) is a small mobile storage device with a size of 10x10x30mm, and the data converter (2) is embedded in the factory real scene shooting device (3).
6. The BIM-based engineering inspection method according to claim 1, characterized in that: The BIM data converter (2) described in step 2) has the functions of data storage and data conversion, and can store and convert the corresponding shooting position information, path information and angle information in the BIM rendering image and the BIM animation into relevant signal information and input it into the factory real scene shooting device (3).
7. The BIM-based engineering inspection method according to claim 1, characterized in that: The real-scene shooting device (3) of the factory area described in step 3) is a lightweight flying device with a front camera (6), the size of the device is 10x10x5cm, and a mobile storage device (5) is built in. The real-scene shooting device (3) of the factory area has its own light, and the camera (6) of the real-scene shooting device (3) of the factory area includes a standard lens, a wide-angle lens, a telephoto lens and a fisheye lens.
8. The BIM-based engineering inspection method according to claim 1, characterized in that: The built-in positioning system of the factory real scene shooting device (3) described in step 3) includes an axis network system, factory building information and origin information. Its axis network system is consistent with the BIM axis network, and its origin information corresponds to the BIM origin information. The factory building information is obtained by statistics and collation of specific construction conditions.
Citation Information
Patent Citations
Engineering inspection system based on BIM
CN212135466U