Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

130results about How to "Intuitive display" patented technology

Mirror image type industry linkage engine system and method based on knowledge graph

The invention discloses a mirror image type industry linkage engine system and method based on a knowledge graph, and relates to the technical field of industry linkage engines, and the system comprises a data collection module which collects multi-industry data in multiple modes, and the cleaning accuracy is 90% or above; the knowledge graph construction module is combined from bottom to top and from top to bottom, and is used for distributed storage and block chain evidence storage; the industry mirror image model generation module is used for generating a model through machine learning, and the association accuracy is 95% or above; the linkage analysis and decision module is used for finding a linkage strategy through an intelligent algorithm; and the user interaction module has a graphical interface, is fast in response, can feed back optimization, and supports multi-language and VR / AR display. The system is accurate and efficient in data processing, integrates multi-source data to construct the knowledge graph, is deep and comprehensive in industry analysis, simulates industry relations to assist decision making, is intelligent and reliable in decision making support, provides strategies and evaluation, is convenient and friendly in user experience, improves interactivity through multiple technologies, promotes accurate decision making of enterprises, and promotes collaborative development and innovation of the industry.
Owner:HEFEI INFORMATION ENG SUPERVISION CONSULTING CO LTD

Three-dimensional model data management system and method for engineering surveying and mapping

The invention relates to the technical field of data processing and analysis, in particular to a three-dimensional model data management system and method for engineering surveying and mapping. The method comprises the following steps: acquiring engineering surveying and mapping data; preprocessing the engineering surveying and mapping data to obtain standard engineering surveying and mapping data; performing multi-dimensional feature recognition on the standard engineering surveying and mapping data to obtain multi-dimensional surveying and mapping feature data; performing key engineering surveying and mapping information extraction on the multi-dimensional surveying and mapping characteristic data to obtain key engineering surveying and mapping information; performing association analysis on the multi-dimensional surveying and mapping characteristic data and the key engineering surveying and mapping information to generate multi-dimensional engineering surveying and mapping associated data; monitoring the engineering surveying and mapping data in real time to obtain engineering surveying and mapping real-time monitoring data; through a data processing technology, a geographic information system technology and a three-dimensional mapping technology, integrated management of multi-source heterogeneous data is realized, and dynamic updating management of the data is realized, so that the presentation accuracy of the engineering surveying and mapping three-dimensional model is improved.
Owner:JINCHENG HEAVY IND MASCH (DALIAN) CO LTD

Dynamic construction carbon emission visualization method and system based on numerical simulation

The invention provides a dynamic construction carbon emission visualization method and system based on numerical simulation, and belongs to the field of carbon emission calculation. The method aims at solving the problems that an existing method cannot conduct visual display of construction carbon emission and cannot reflect the internal relation between dynamic carbon emission and the construction process. Firstly, a process analysis method and an input-output analysis method are used for accurately metering dynamic construction carbon emission, then carbon emission positioning is carried out according to a carbon footprint theory, then space-time correlation between construction carbon emission and a building model is achieved through a numerical simulation method, and finally the dynamic visualization target of construction carbon emission is achieved. According to the method, the construction process is regarded as the product production process, dynamic construction carbon emission metering is achieved by counting all resource investment of a project and final building composition, the relation between spatial and temporal distribution and internal composition of carbon emission can be simply, meticulously and visually displayed, and the construction carbon emission generation process is reduced to the maximum extent.
Owner:HARBIN INST OF TECH +1

Heart disease prediction system based on electrocardiosignal and large model

The invention discloses a heart disease prediction system based on an electrocardiosignal and a large model, and relates to the field of electrocardiosignal processing, and the system is characterized in that the electrocardiosignal of a user is collected by using a heart coat, and baseline offset suppression and noise processing operation are carried out on the electrocardiosignal by using a data processing center; a variability sequence is extracted from the processed electrocardiosignal, an electrocardiograph scatter diagram is drawn according to variability, and scatter points in the scatter diagram are numbered and coded in a partitioned mode to obtain the sequence information entropy of the heart rate variability sequence; segmenting the electrocardiosignal based on the sequence information entropy and the wave crest, obtaining a waveform segment of a single cardiac pulse according to a segmentation result, inputting the waveform segment into the large medical prediction model, and outputting the characteristic change of the electrocardiosignal; and comparing the feature change with a pre-stored disease feature standard and outputting a disease prediction result. According to the method, the complex characteristics of the electrocardiosignals and the prediction capacity of the large model are combined, and the diagnosis precision and the early-stage discovery rate of heart diseases can be remarkably improved.
Owner:BEIJING WEIHE HEALTH TECH CO LTD

Precise recognition and detection method and system for internal defects of die steel

The invention relates to the technical field of die steel detection, and particularly discloses a die steel internal defect accurate identification and detection method and system.The method comprises the steps that a plurality of probe path lines of die steel detection faces are obtained, the die steel detection faces comprise the axial detection face and the radial detection face, and the axial detection face and the radial detection face are matched with each other; each probe path line is used for movement detection of an ultrasonic probe; acquiring a plurality of detection point echo signals of each probe on each probe path line, and acquiring echo enrichment area information according to each detection point echo signal; obtaining two-dimensional defect graph information and defect graph depth information corresponding to each detection point echo signal according to the echo enrichment area information; and generating a two-dimensional defect scanning image according to the two-dimensional defect graphic information corresponding to each detection point echo signal. According to the method, the echo signals of the multiple detection points of the probe on each probe path line are obtained and comprehensively analyzed, so that misjudgment can be effectively reduced, and the detection reliability is improved.
Owner:SHENZHEN ZHAOHENG FUSHUN SPECIAL STEEL CO LTD

Three-dimensional visualization method applied to substation operation and maintenance system

The invention relates to the field of power system operation and maintenance, in particular to a three-dimensional visualization method applied to a substation operation and maintenance system, which comprises the following steps of: acquiring a three-dimensional model and position information of substation equipment, constructing an integral three-dimensional model of a substation by utilizing technologies such as laser scanning and photogrammetry and combining positioning technologies such as GPS (Global Positioning System) and RTK (Real-Time Kinematic); a sensor is installed on equipment, operation parameters such as voltage, current, temperature and vibration are collected in real time and transmitted to a three-dimensional visualization system through a wireless or wired communication network, association display of real-time data and a three-dimensional model is achieved, and the system provides a three-dimensional view capable of rotating, zooming and translating. The operation state and fault alarm information of the equipment are displayed in real time, and historical data query and alarm log functions are supported. By analyzing real-time and historical data, the system can identify and predict potential faults of the equipment, generate maintenance plans and optimization suggestions, and support remote collaboration and fault handling.
Owner:LVLIANG POWER SUPPLY CO OF STATE GRID SHANXI ELECTRIC POWER CO +1

Mine resource reserve dynamic management system based on multiple models and construction method

The invention discloses a multi-model-based mine resource reserve dynamic management system and a construction method, and belongs to the technical field of mine resource management, and the system comprises a model updating data module which is used for designing a data import tool or interface; the basic information module is used for recording and managing key information; the mine right management module is used for recording and managing mine right, environment and policy and regulation information of the mine; the geological exploration management module is used for recording and managing geological exploration activities; the reserve management module is used for generating a reserve report and dynamically updating reserve statistics; the resource planning management module is used for designing, adjusting and monitoring long-term and short-term planning of resources; the system management module is used for maintaining system operation and storing user and authority information; the three-dimensional large screen module is used for displaying a three-dimensional mineral resource model and data; the problems of insufficient real-time performance, low manual operation efficiency, lack of dynamic monitoring capability, insufficient intelligent degree, limited visualization degree and the like in mine resource reserve management are solved.
Owner:TIANJIN CEMENT IND DESIGN & RES INST CO LTD

Method for accelerating construction of multi-component material thermodynamic database and storage medium

The invention relates to a method for accelerating the construction of a multi-component material thermodynamic database and a storage medium, and the method comprises the following steps: dividing all end compounds of a system into three subsets: a labeled sample pool, an unlabeled sample pool and a test set, the data formation of the labeled sample pool and the test set can be obtained through calculation according to a first principle, and the data formation of the unlabeled sample pool can be obtained through calculation according to a second principle; the unlabeled sample pool is composed of an uncalculated interlaced compound; constructing a decision model based on the marked sample pool, observing the prediction precision on the test set, and if the prediction precision reaches a predetermined standard, stopping iteration; and carrying out formation energy and uncertainty distribution prediction on all unmarked samples by using an integrated learning model, and establishing a system thermodynamic database by using a result. Compared with the prior art, the automatic process of constructing the material thermodynamic database can be realized by giving a plurality of initial compounds to form the energy sample, and the operation is simple and quick.
Owner:SHANGHAI UNIV

Real-time monitoring system for safety production based on artificial intelligence

The invention relates to the technical field of safety monitoring, in particular to a real-time monitoring system for safety production based on artificial intelligence. The system comprises a processor, a memory, a smoke sensor and a camera device, the memory stores a computer program instruction, and when the computer program instruction is executed by the processor, the following steps are realized: inputting an acquired workshop image into a semantic segmentation model, and obtaining a change sequence of smoke concentration and smoke position; inputting the change sequence of the smoke concentration and the smoke position into a trained LSTM model, and predicting future smoke concentration and smoke position; an escape route is calculated in the digital twin workshop model through superposition of the gravitational field function and the repulsive field function; whether the difference between the smoke concentration collected in real time and the future smoke concentration exceeds a preset value or not is judged, and if yes, the escape route is determined again. The safety of the escape route generated by the system is higher.
Owner:SANZHI INFORMATION TECHNOLOGY (LUOYANG) CO LTD +1

Cooperative pollution supervision method, server, medium and program product

The invention provides a pollution collaborative supervision method, a server, a medium and a program product, and relates to the field of pollution supervision. The method comprises the following steps: acquiring air quality condition data, pollution source monitoring data, pollution types and other pollution conditions of a park before a set time length; and then marking the data on a map by different color identifiers. And then determining the pollutant treatment capability of the employees according to historical work data of the employees, and determining an anti-pollution work distribution suggestion in combination with the pollution condition of the park. And after the distribution suggestion is adopted, acquiring antifouling work schedules of different sub-regions and dynamically marking the antifouling work schedules on a map. And finally, when a client instruction is received, the client is controlled to display a map, and the pollution condition of the park and the antifouling work progress are displayed. By implementing the method, a manager can intuitively master pollution conditions of different areas of the park, so that decisions can be made quickly and targeted antifouling measures can be taken conveniently.
Owner:TANGSHAN LANZHAN ENVIRONMENTAL PROTECTION TECH CO LTD

A construction site safety assessment system

The present invention belongs to the field of construction site safety technology, specifically a construction site construction safety assessment system, the system includes: a scene reconstruction design module, a data perception module, a data communication module and a data processing module. The present invention has the beneficial effects of being able to realize real-time, accurate and comprehensive data collection and transmission of construction sites, improving the data quality and timeliness of construction safety assessments; being able to realize clear, intuitive and dynamic scene reconstruction and display of construction sites, improving the visualization and interactivity of construction safety assessments; being able to realize scientific, objective and consistent risk analysis and assessment of construction sites, improving the systematicness and reliability of construction safety assessments; being able to realize efficient, accurate and intelligent design and construction optimization and adjustment of construction sites, improving the optimization and automation of construction safety assessments.
Owner:FUJIAN ZHONGLIN ENG CONSTR CO LTD +1

External wall quality defect identification method and system

The invention provides an external wall quality defect identification system, which comprises a preprocessing module used for preprocessing an image of a to-be-detected external wall, the image comprising an infrared image and a high-definition image of the external wall; the defect judgment module is used for analyzing the image by using a pre-trained machine learning model so as to identify and mark potential defects in the image; the defect confirmation module is used for finely screening the potential defects so as to determine real defects from the potential defects; and the output module is used for outputting the image of the outer wall marked with the defect. The invention further provides a corresponding method.
Owner:SHANGHAI HIGHWAY ENGINEERING SUPERVISION CO LTD

Intelligent mine monitoring method and system based on three-dimensional visualization

The invention discloses an intelligent mine monitoring method and system based on three-dimensional visualization, and the method comprises the steps: obtaining the geological data of an ore body region, constructing a surface model, and carrying out the boundary filling of the surface model, and obtaining an ore body three-dimensional model; vegetation data and identification data of the mine surface are obtained and marked in the ore body three-dimensional model, and a mine three-dimensional model is obtained; according to the working parameters and the task process of the mining equipment, updating the mine three-dimensional model according to a preset time interval, and displaying the mine three-dimensional model in a three-dimensional visual platform; and monitoring environment information of a mine, personnel behavior information and a working state of mining equipment, identifying abnormal information, and synchronizing the abnormal information to the three-dimensional visual platform for supervision. According to the invention, visual management can be carried out on the mining area environment, the mining state and the data information, so that the mine data management efficiency and intuition are improved.
Owner:CHINESE ACAD OF GEOLOGICAL SCI

Data display method and device and computer storage medium

The invention provides a data display method and device and a computer storage medium. The method comprises the steps of determining at least one item of to-be-displayed data; determining the corresponding proportion of each item of to-be-displayed data in each item of to-be-displayed data; the minimum proportion of all the proportions is determined, and the minimum proportion is not larger than the proportions of other all the proportions; based on the minimum proportion, determining a display area of each item of to-be-displayed data in a cylinder; on the basis of the cylinders, the proportions corresponding to the to-be-displayed data and the corresponding display areas, a histogram is generated, and the display areas corresponding to the to-be-displayed data cover the display areas of the cylinders; and displaying the generated histogram. According to the scheme, a user can conveniently and quickly know and judge the proportion condition of each item of to-be-displayed data. The comparison condition of each item of to-be-displayed data can be displayed more visually, and the data interpretation time is shortened, so that the data expression effect of the cylindrical object is improved.
Owner:SHANDONG LANGCHAO YUNTOU INFORMATION TECH CO LTD

Alarm clustering topology method and system based on multi-dimensional features

The invention discloses an alarm clustering topology method and system based on multi-dimensional features, belongs to the technical field of network security, and aims to solve the technical problems of poor timeliness, multiple repeated false alarms and low association degree of network alarm information processing. Comprising the steps of collecting original alarm information; performing multi-dimensional aggregation on the pre-processed alarm information based on a set alarm dimension; calculating the alarm weight of each alarm set based on the weight of each reference factor; clustering each alarm set based on the new alarm dimension; screening the alarm information of alarm convergence based on a predefined rule base; calculating the alarm number and the alarm weight sum between each pair of IP node addresses, and calculating the thickness and the color depth of a side line according to the normalized weight sum; an IP node topological graph and side boundary thickness and color depth information are constructed through a visual tool, and a topological relation graph between IP nodes is drawn; and visually displaying the alarm information.
Owner:SHANDONG LANGCHAO YUNTOU INFORMATION TECH CO LTD

Text clustering system for open source security intelligence

The invention provides a text clustering system for open source security intelligence. The text clustering system comprises a data acquisition module, a preprocessing module, a feature extraction module, a similarity calculation module, a clustering initialization module, an iterative clustering module, an evaluation module and a result output module. The system collects a target text, removes noise, calculates a word frequency and an inverse document frequency to construct a feature vector, calculates similarity after normalization processing, randomly selects an initial clustering center, iteratively updates the clustering center until the clustering center is stable, evaluates a clustering effect, outputs a clustering result and generates a topic tag. According to the invention, the analysis efficiency and accuracy of open source security intelligence can be improved, and security threats can be quickly identified and responded.
Owner:SUZHOU PRISM COLORFUL INFORMATION TECH CO LTD

Video imaging detection device and method for deformation of underground structured light casing pipe

The invention discloses an underground structured light casing deformation video imaging detection device and method.The underground structured light casing deformation video imaging detection device comprises a detection device body, and the detection device body comprises a ground system, a logging cable, an underground video imaging detection probe, a structured light generation device and a structured light installation structure. A reference light path is arranged on the shaft wall in the image, and shaft corrosion and deformation problems are accurately identified through the change of the reference light path; the device improves the detection accuracy and efficiency of the inner wall of the shaft, obtains video images of the inner wall of the shaft, truly, visually and comprehensively displays the corrosion and deformation problems of the shaft wall, can reflect the geometric morphology of the inner wall of the shaft through a reference light path provided by the structured light even if the corrosion and the deformation are slight, achieves accurate recognition, and improves the detection accuracy and efficiency of the inner wall of the shaft. A reliable and comprehensive basis is provided for further processing of shaft corrosion and deformation problems, scientific decision making and fine operation are achieved, and the operation efficiency and the success rate of shaft problem processing are improved.
Owner:XIAN ZHENGYUAN JINGXIANG ELECTRONIC TECH CO LTD

Antique palace wall rammed earth foundation for field entity display

The utility model discloses an antique palace wall rammed earth foundation for on-site entity display, which comprises a concrete cushion layer, the concrete cushion layer is provided with a plurality of upper and lower layers of rammed solidified clay, lateral closed glass and an antique black brick palace wall, and every two adjacent layers of rammed solidified clay are connected through an antique binder. The compacted and solidified clay is located between the lateral closed glass and the antique black brick palace wall, and top closed glass located above the compacted and solidified clay is arranged between the lateral closed glass and the antique black brick palace wall. The archaistic brick palace wall and palace wall rammed earth foundation combined entity display structure has the advantages that the archaistic brick palace wall and palace wall rammed earth foundation combined entity display structure is built on an archaistic excavation site or a park, and the original appearance of the archaistic brick palace wall and the original appearance of the rammed earth palace wall foundation can be restored to the maximum extent; and people can have a deeper understanding of manufacturing and construction of ancient black brick palace wall and rammed earth palace wall foundations.
Owner:CHENGDU JIANGONG ROAD & BRIDGE CONSTR

A new energy storage configuration method and system

The present invention belongs to the field of new energy technology, and discloses a new energy storage configuration method and system. The method comprises the following steps: constructing a regional integrated new energy generation and storage distribution map; classifying several new energy storage systems in the new energy generation and storage distribution map; collecting real-time operation data of new energy power stations, and using a power generation prediction model to predict power generation; constructing a consumption target function of the new energy power station and a cost target function of the attached energy storage cluster; according to the consumption target function and the corresponding cost target function, using a new energy storage configuration model, performing new energy storage configuration, and obtaining a new energy storage configuration plan; visually displaying several new energy storage configuration plans in combination with the new energy generation and storage distribution map. The present invention solves the problems of poor energy storage configuration effect, low accuracy, lack of value of the plan, poor real-time performance, and poor timeliness in the prior art.
Owner:BEIJING LU DIAN POWER CONSTR CO LTD +1

Screen projection method and system, three-dimensional scanning equipment and storage medium

The invention provides a screen projection method and system, a three-dimensional scanning device and a storage medium, the method is applied to the three-dimensional scanning device, the three-dimensional scanning device comprises a plurality of modules, the plurality of modules at least comprise a main control module and at least one function sub-module, different modules correspond to different display contents, and each module has at least one display content; the method comprises the following steps: receiving configuration information input by a user for the three-dimensional scanning equipment; in response to the configuration information, splicing the at least two display contents to obtain a spliced display content; and sending the tiled display content to a display device. According to the screen projection method provided by the embodiment of the invention, the display contents output by the main control module and the function sub-module can be flexibly customized, the customized display contents are spliced, and the spliced display contents are displayed on the display equipment, so that a plurality of display contents can be displayed more intuitively, a user does not need to switch among the display contents, and the user experience is improved. And the three-dimensional reconstruction efficiency is obviously improved.
Owner:SHINING 3D TECH CO LTD

Urban style and feature element identification method and system based on VR depth visual perception

The invention belongs to the technical field of urban style and feature recognition, and discloses an urban style and feature element recognition method and system based on VR depth visual perception, and the method comprises the steps: collecting the three-dimensional data and image data of an urban environment in real time through a multi-sensor device; performing data preprocessing to generate a high-quality three-dimensional point cloud and a panoramic image; performing feature extraction on the preprocessed data by adopting a deep learning algorithm, identifying features of urban style and feature elements, and generating feature vectors; utilizing a trained deep neural network model to classify and identify the feature vectors, and determining categories and positions of different urban style and feature elements; a three-dimensional model of urban styles and features is displayed through VR equipment, and a user can perform interaction and exploration in a virtual environment; and performing data analysis on the identification result, and generating a statistical report and a change trend of the urban style and feature elements. According to the method, the problems of low efficiency, insufficient accuracy, data updating lagging and the like in a traditional method are solved, and the method has wide application prospect and practical value.
Owner:HARBIN INST OF TECH

Virtual simulation system design method of spacecraft unfolding mechanism

The invention discloses a virtual simulation system design method for a spacecraft unfolding mechanism, and belongs to the technical field of spacecraft unfolding mechanism simulation. The problems that an existing spacecraft unfolding mechanism is long in ground simulation period and poor in flexibility are solved. Comprising the steps of obtaining 2D position coordinates under a pixel coordinate system by adopting a PnP algorithm based on world coordinate system 3D position coordinates of feature points in a real scene point cloud model; obtaining a first coordinate transformation matrix from an AR equipment coordinate system to a world coordinate system in combination with the internal reference of the AR equipment; a real space coordinate system is established, a second coordinate transformation matrix from the AR equipment coordinate system to the real space coordinate system is obtained through calculation, and the pose of the expansion mechanism virtual model under the AR equipment coordinate system is obtained based on the second coordinate transformation matrix; a virtual simulation framework and a real scene point cloud model are fused to obtain a fused virtual framework, an expansion mechanism virtual model is fixedly arranged on the fused virtual framework to obtain a virtual simulation system, and a selected rendering position in a real scene is rendered through AR equipment. The method is used for simulation of the spacecraft unfolding mechanism.
Owner:HARBIN INST OF TECH

Geographic information land area measuring device

The invention relates to the field of land area measuring devices, in particular to a geographic information land area measuring device. The device comprises a plurality of measuring units which are connected in series for use; the measuring unit comprises a supporting column, a connecting storage cylinder, a guide belt, a laser measuring assembly, a guide piece and a data collector. The connecting storage cylinder is located on the supporting column. One end of the guide belt is stored in the connecting storage cylinder, and the other end of the guide belt is connected with the adjacent connecting storage cylinder; the laser measuring assembly is located at the upper and lower ends of the connecting storage cylinder and comprises a laser emitting part and a laser receiving part; a plurality of groups of guide pieces are arranged along the guide belt and are provided with upper and lower guide windows for laser to pass through, and the upper and lower guide windows are used for guiding laser emission paths of the laser emission pieces at the upper and lower ends respectively; and the laser measuring assembly is arranged at the upper end of the data collector. According to the invention, the measurement units with different numbers and different connection modes are adopted for combined measurement, the measurement mode is flexible, convenient, accurate and efficient, the display is visual, and field land area measurement is facilitated.
Owner:ZIBO TONGSHENG SURVEYING & MAPPING CO LTD

A method for realizing orthogonal connection of flow chart nodes

The present invention discloses a method for realizing orthogonal connection of flow chart nodes, and relates to the field of information technology. The method comprises the following steps: processing the boundary boxes of the starting node and the ending node in the flow chart respectively to obtain the processed node positions and boundary information; constructing the scale layer, grid layer and reference points of the flow chart in sequence based on the processed node positions and boundary information, and establishing an optimized grid route map according to the adjacent relationship between the reference points; calculating the shortest path between the starting node and the ending node in the optimized grid route map, and extracting the best orthogonal connection path from the shortest path calculation result. The present invention comprehensively considers factors such as path length, number of inflection points, overlap between the connection line and the node boundary, and connection line crossing nodes by improving the Dijkstra algorithm, so as to generate more beautiful and standardized orthogonal connection lines of flow chart nodes.
Owner:GUODIAN NANJING AUTOMATION

Road and bridge visual construction operation and maintenance system and method based on BIM (Building Information Modeling) technology

The invention provides a road and bridge visual construction operation and maintenance system and method based on a BIM technology, and relates to the field of intelligent analysis. According to the method, design data are extracted from design software, construction data are recorded in real time in the construction process, stress data are obtained by arranging a stress sensor, and nondestructive testing is carried out to obtain a stress distribution image. A three-dimensional model is constructed by using a BIM technology, stress features are extracted from the BIM model mapping stress distribution through a 3D convolutional neural network, and a contrast loss function is constructed to enhance the distinguishing between a normal area and an abnormal area. A potential abnormal region is identified by applying an energy-based graph optimization method, and a three-dimensional region of stress abnormal distribution is determined through a clustering algorithm. Real-time updating of data is ensured based on the cloud computing technology, the precision of decision support is improved by adopting advanced data processing and machine learning technologies, and the efficiency and safety of road and bridge construction and operation and maintenance are improved.
Owner:ZHANGJIAKOU JIYUAN ROAD & BRIDGE ENG CO LTD

Static electricity generating apparatus of atomizer

This invention provides an electrostatic generation device for an atomizer. It solves the problem of poor spraying effect of the atomizer. When this utility model is used, the fan blows air through the water outlet pipe, and part of the airflow passes through the pressure tube into the water tank, continuously increasing the air pressure inside the water tank. The greater pressure forces the liquid inside the water tank into the inlet pipe and along the inlet pipe into the guide tube, spraying out from the guide tube in the direction away from the fan through the water outlet pipe. The liquid is electrified by the charged metal valve core, and the electrostatically charged liquid is sprayed out through the air outlet, forming electrostatically charged atomized particles. The spray can easily adhere to the object being sprayed, resulting in a higher spraying efficiency.
Owner:ZHEJIANG PRULDE ELECTRIC APPLIANCE CO LTD

A gantry crane operation state monitoring method and monitoring system

The application discloses a gantry crane operation state monitoring method and a monitoring system. The method comprises the following steps: acquiring load data, stress data and beam span deflection of the gantry crane; determining the maximum combined stress of a beam unit of the gantry crane and the displacement value of a node of the beam unit according to the load data; performing operation state early warning of the gantry crane according to the load data, the stress data, the beam span deflection, the maximum combined stress and the displacement value; generating a maximum combined stress cloud chart according to the maximum combined stress, generating a gantry crane deformation cloud chart according to the displacement value, displaying the maximum combined stress cloud chart, the gantry crane deformation cloud chart, the load data and the operation state early warning information on a three-dimensional model of the gantry crane. The method realizes comprehensive monitoring of the gantry crane state, improves the comprehensiveness and reliability of the operation state early warning of the gantry crane, and can more intuitively display the operation state of the gantry crane through various information visualization.
Owner:CHINA RAILWAY MAJOR BRIDGE ENG GRP CO LTD +2

Readable storage device capable of preventing edge of touch screen from being touched by mistake

The utility model discloses a readable storage device capable of preventing the edge of a touch screen from being touched by mistake, which comprises a memory shell, an embedded touch screen, a power button and a USB (Universal Serial Bus) plug, a central processing unit is integrally mounted in the surface area of a circuit main board, and memory cards are arranged in the two memory areas of the circuit main board. According to the utility model, the embedded touch screen is arranged on the memory shell, so that storage details can be visually displayed, and the edge touch induction screen and the induction chip are arranged, so that the storage details can be visually displayed, and therefore, the storage details can be visually displayed. Data loss caused by mistaken touch of the edge of the touch screen is avoided, and a good edge mistaken touch prevention effect is achieved; according to the USB plug, the flexible connecting belt is arranged at the conductive connector to connect the connecting sleeve and the USB plug, and the plug protection seat, the protection adhesive film and the opening seam are arranged, so that the USB plug is well protected, and the dustproof effect of the USB plug is greatly improved.
Owner:SHENZHEN JINXINLONG ELECTRONIC TECH CO LTD

Adjustable acrylic showing stand

The utility model relates to the technical field of acrylic showing stands, in particular to an adjustable acrylic showing stand. According to the technical scheme, the adjustable acrylic showing stand comprises an aluminum profile frame and further comprises acrylic side plates, an acrylic top plate and an adjustable goods shelf assembly. An acrylic top plate is arranged on the upper end face of the aluminum profile frame and connected with the aluminum profile frame in a hinged mode. Acrylic side plates are arranged on the periphery of the aluminum profile frame. Through the arrangement of the adjustable goods shelf assembly, the acrylic bottom plate and the sliding adjusting block are made to slide along the inner side groove of the aluminum profile frame to adjust the position, the free number of acrylic goods shelf pieces are inserted into the inserting holes to be spliced and combined, and the arrangement freedom degree of the space between the goods display above the acrylic goods shelf pieces is greatly improved; the problem that in an existing acrylic showing stand, due to the fact that the distance between goods shelves in the existing acrylic showing stand is inconvenient to adjust, the goods display adaptability is low is solved.
Owner:HUZHOU HUAHONG NEW MATERIAL CO LTD

New energy station plan curve importing method and system

The invention relates to the technical field of new energy power system data rapid import, and provides a new energy station plan curve import method and system, and the method comprises the steps: obtaining a data set which is used for power plant regulation and control and is dispatched by a power grid; obtaining each plan value in the data set and corresponding time corresponding to each plan value, performing rationality verification on each corresponding time, and if the verification is passed, storing the data set into a database; drawing a plan curve according to each plan value in the data set stored in the database and the corresponding time corresponding to each plan value, and carrying out real-time dynamic visualization display on the drawn plan curve; and after the plan curve is drawn and displayed completely, forming 288 data at the interval of 5 minutes by using the plan curve through an interpolation method, and importing the 288 data into a database. According to the method, the plan curve display efficiency and accuracy can be effectively improved, the display of the plan curve can be adjusted in real time according to the data change, and the error problem caused by manual work is effectively solved.
Owner:NANJING GUODIAN NANZI POWER GRID AUTOMATION CO LTD