A method for using a soft-lap joint movable support device for a tunnel secondary lining trolley

By using longitudinal and circumferential soft-lap rubber strips to seal the edges of the template on the tunnel lining trolley, the problems of grout leakage and hard compression caused by the error between the template and the inner wall of the arch were solved, achieving high efficiency and safety in tunnel construction.

CN111734452BActive Publication Date: 2024-11-26LUOYANG GAOFEI BRIDGE MACHINERY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010736035.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-07-28
Publication Date
2024-11-26
Estimated Expiration
2040-07-28

AI Technical Summary

Technical Problem

During the construction of existing tunnel secondary lining trolleys, shape errors exist between the formwork and the arch and low sidewall edges, leading to grout leakage, bulging, or voids in the arch. Furthermore, the rigid compression between the formwork and the edges can easily cause damage.

Method used

A flexible support device is adopted, which uses longitudinal and circumferential soft overlapping rubber strips to seal the edges of the template, thereby compensating for errors and gaps between the template and the inner wall of the arch and reducing damage from hard extrusion. The longitudinal and circumferential soft overlapping rubber strips are used to seal the edges of the template, and are used in conjunction with lifting cylinders and lead screws for support and positioning.

Benefits of technology

It effectively prevents grout leakage, bulging, and voids in the arch, reduces damage to the formwork and arch edges, and is simple and convenient to operate, thus improving construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111734452B_ABST
    Figure CN111734452B_ABST
Patent Text Reader

Abstract

A method for using a soft-lap articulated support device for a tunnel secondary lining trolley. After the pouring construction of the lining concrete of the second lining trolley for the first section lining construction is completed; the second lining trolley is driven by a walking device to enter a position for the second section lining construction, stops and positions, supports the template according to the first section lining construction method, and the annular soft-lap rubber strip is sealed with the edge of the inner side of the arch wall of the first section. After the annular soft-lap of the second lining trolley is completed, the longitudinal soft-lap of the first section of the second lining trolley is repeated to perform the longitudinal soft-lap of the second section; after the longitudinal soft-lap and annular soft-lap of the second section of the second lining trolley are completed, the lining concrete is poured in the arch cavity through a pouring pipe; the rear end of the trolley of the tunnel secondary lining trolley and the edge of the template are longitudinally soft-lapped and annularly soft-lapped by articulated installation, so as to reduce the damage to the template and the burrs of the first section arch body and the edge of the short side wall. The operation is simple, convenient and fast, and can improve production.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a method for using a soft overlapping device for a tunnel secondary lining trolley, in particular to a method for using a soft overlapping movable joint support device for a tunnel secondary lining trolley. Background Art

[0002] At present, after the construction of the first section of the second lining is completed, the existing tunnel secondary lining trolley needs to be demoulded and moved to the location of the adjacent second section of the lining construction to stop; after the template is re-supported by hydraulic pressure, the lining and concrete pouring of the second section of the arch body are carried out; before the construction of the second section of the arch body, the template of the secondary lining trolley is re-supported, and after the re-support is completed, the rear end of the template is sealed with the arch wall of the first section, and the bottom edge template at the lower end of both sides of the template is sealed with the short side wall; due to the error and gap in the shape of the outer side of the rear end of the template and the inner wall of the first section of the arch body, there is a gap between the bottom edge of the lower end of both sides of the template and the short side wall; soft overlapping rubber strips are usually used to seal the gaps, and then support plates and support frames are welded for support; due to the soft overlapping rubber strips The supporting components are temporarily processed sealing components, and the soft overlapping rubber strips seal the uneven support. During construction, the gap between the second and first lining construction is prone to leakage, bulging or arch cavity. In addition, when the template is supporting the second section, there are burrs on the end of the arch body and the edge of the short side wall of the first section, and there are errors or inconsistencies in the shapes of the template and the arch body and the short side wall of the first section. When the template of the second lining trolley is re-supported by hydraulic pressure, the template is prone to hard squeezing with the burrs on the edges of the first arch body and the short side wall, causing damage to the burrs on the template and the first arch body or the edge of the short side wall, and even edge defects or falling off. In view of the above reasons, a method for using a soft overlapping movable support device for a tunnel second lining trolley is proposed. Summary of the invention

[0003] The purpose of the present invention is to overcome the problem that after the existing tunnel second lining trolley completes the construction of the first section of the second lining, it needs to be demoulded and moved to the position of the adjacent second section of the lining construction to stop moving; before the construction of the second section of the arch body, the template of the second lining trolley is re-supported, because there are errors and gaps in the shape of the outer side of the rear end of the template and the inner wall of the first section of the arch body, and there are gaps between the bottom edges of the lower ends of the template and the short side walls; the soft overlapping rubber strips and the supporting components are temporarily processed sealing components, and the soft overlapping rubber strips seal and support unevenly, which is prone to leakage, bulging or arch body cavities during construction; in addition, when the template is supporting the second section, there are burrs on the ends of the arch body of the first section and the edges of the short side walls, and the template is easily hard squeezed with the burrs on the edges of the first section of the arch body and the short side walls, causing damage to the burrs on the template and the first section of the arch body or the edge of the short side wall, and even edge defects or falling off; now through reasonable design, the present invention provides A method for using a soft-lap articulated support device for a tunnel secondary lining trolley is provided; the rear end of the trolley of the tunnel secondary lining trolley of the present invention and the edge of the template are movably installed with longitudinal soft lap and circumferential soft lap, and the longitudinal soft lap and circumferential soft lap are respectively installed with circumferential soft lap rubber strips and longitudinal soft lap rubber strips; the longitudinal soft lap and circumferential soft lap are respectively sealed with the circumferential soft lap rubber strip and the longitudinal soft lap rubber strip to carry out concrete pouring construction of the tunnel arch wall; the longitudinal soft lap and circumferential soft lap can seal the edge of the template; the error and gap between the template and the inner wall of the first section of the arch body during the secondary lining construction, the leakage of slurry, bulging or hollowing of the arch body can be compensated by the soft lap rubber strip, the hard extrusion of the burrs between the template and the first section of the arch body and the edge of the short side wall is reduced, and the damage to the burrs between the template and the first section of the arch body and the edge of the short side wall is reduced; the operation is simple, convenient and fast, and production can be improved.

[0004] In order to achieve the above-mentioned purpose, the present invention adopts the following technical scheme: a method for using a soft-lap joint movable support device for a tunnel second lining trolley, wherein the soft-lap joint movable support device for the tunnel second lining trolley is composed of a second lining trolley, a trolley frame, a template, a trolley front end, a trolley rear end, annular soft-lap rubber strips, longitudinal soft-lap rubber strips, longitudinal step-shaped flanges, annular soft-lap frames, bottom edge panels, support seats, hinge ears, rubber strip support plates, angle support plates, annular flanges, soft-lap rubber strip interlayers, interlayer compression holes, installation holes, fastening bolts, longitudinal straight-edge flanges, walking devices, lifting cylinders, side mold cylinders, and screw rods; the middle part of the second lining trolley is longitudinally arranged as a trolley frame, a track is arranged between the trolley frame of the second lining trolley and the ground, a walking device is arranged between the front end and the rear end of the trolley frame of the second lining trolley and the track respectively, and a lifting cylinder is arranged between the upper end of the walking device and the trolley frame; at least three trolley frames are longitudinally evenly arranged between the trolley frame and the template. Annular flange, templates are arranged on the outside of at least three annular flanges, at least three pairs of longitudinal step-shaped flanges or longitudinal straight-sided flanges are symmetrically arranged on the lower ends of both sides of at least three annular flanges, and a hinge ear is arranged between the lower ends of both sides of the annular flanges and the longitudinal step-shaped flanges or longitudinal straight-sided flanges respectively; support seats are arranged on the inner sides of the longitudinal step-shaped flanges and the annular flanges respectively, screw rods are arranged between the lower parts of both sides of the trolley frame and the support seats of the longitudinal step-shaped flanges and the annular flanges, and side mold cylinders are arranged between the middle parts of both sides of the trolley frame and the support seats of the annular flanges; the outer side between two adjacent longitudinal step-shaped flanges or longitudinal straight-sided flanges is arranged as a bottom panel, at least three pairs of longitudinal step-shaped flanges or longitudinal straight-sided flanges and the bottom panel are arranged as longitudinal soft lap support frames, and two longitudinal soft lap rubber strips are arranged on the bottom panels of the longitudinal soft lap support frames on both sides respectively; the longitudinal step-shaped flange, the bottom panel and a pair of longitudinal soft lap rubber strips are arranged as longitudinal soft lap;

[0005] The right end of the secondary lining trolley is set as the trolley front end, and the left end of the secondary lining trolley is set as the trolley rear end; at least four sections of annular soft lap frames are evenly arranged on the outer side of the annular flange at the rear end of the trolley, and the annular soft lap frames are evenly arranged with reserved installation holes corresponding to the annular flange, and the annular flange corresponds to the installation hole positioning screw holes, and fastening bolts are respectively arranged in the positioning screw holes and the installation holes; the annular soft lap frame is set as an arc plate body, and the outer arc end of the annular soft lap frame is set as a rubber strip support plate, and the inner corners of the annular soft lap frame and the rubber strip support plate are evenly arranged. At least two corner support plates are arranged, at least four sections of annular soft lap frames are respectively arranged with the rubber strip support plates to form at least four soft lap frames, at least four longitudinal soft lap support frames are combined to form an arc-shaped annular soft lap support frame body, the radius of an arc-shaped annular soft lap support frame body is smaller than the radius of the longitudinal step-shaped flange and is reserved as a step, an annular soft lap rubber strip is respectively arranged on the reserved step, and an arc-shaped annular soft lap support frame body and an annular soft lap rubber strip are arranged to be annular soft lap;

[0006] The longitudinal soft lap rubber strip corresponds to the longitudinal length setting of the template, the circumferential soft lap rubber strip is equal to or greater than the circumferential length setting of the template, the width of the longitudinal soft lap rubber strip and the circumferential soft lap rubber strip is set to 10cm-20cm, the thickness of the longitudinal soft lap rubber strip and the circumferential soft lap rubber strip is set to 1.5cm-4cm, the longitudinal soft lap rubber strip and the circumferential soft lap rubber strip are provided with at least one layer of soft lap rubber strip interlayer, and interlayer compression holes are evenly arranged between the soft lap rubber strip interlayer and the upper and lower sides of the soft lap rubber strip;

[0007] Before the construction of the secondary lining trolley, the outer side of the longitudinal step-shaped flange at the rear end of the trolley is first fixed with at least four annular soft lap joint frames, one of which is an arc-shaped annular soft lap joint support frame. After the annular soft lap joint support frame is installed, a annular soft lap joint rubber strip is laid on the arc-shaped annular soft lap joint support frame by gluing to complete the installation of the annular soft lap joint; the outer side of the annular soft lap joint rubber strip after laying is 3mm-15mm higher than the outer side of the template;

[0008] After the circumferential soft lap rubber strip is laid, the longitudinal step-shaped flange or the longitudinal straight-sided flange of the longitudinal soft lap support frame is respectively installed on the lower ends of both sides of the formwork through hinged ears. After the longitudinal soft lap support frame is installed, a pair of longitudinal soft lap rubber strips are laid on the longitudinal soft lap support frames at the lower ends of both sides of the formwork by gluing to complete the installation of the longitudinal soft lap.

[0009] After the longitudinal soft overlap and circumferential soft overlap of the second lining trolley are installed, the second lining trolley is driven by the walking device to enter the position of the first section lining construction, the template on the top of the second lining trolley is lifted upward by the lifting cylinder, and the templates on both sides of the second lining trolley are supported outward by the side template cylinder, and positioned and reinforced by the screw rod; after the template reinforcement support on the top and both sides of the second lining trolley is completed, the longitudinal soft overlap on both sides of the second lining trolley is supported outward by the screw rod, and the screw rod is stopped after the longitudinal soft overlap is closed with the low side walls on both sides of the tunnel. After the longitudinal soft overlap is closed with the low side walls, the template of the first section of the second lining trolley is completed. Support and longitudinal soft overlap; the formwork support and longitudinal soft overlap of the first section of the second lining trolley are completed, and the gap between the formwork at the front end and rear end of the second lining trolley and the first lining arch wall of the tunnel is sealed; after the formwork support and both ends of the formwork of the second lining trolley for the first section of lining construction are completed, there is a closed arch cavity between the formwork of the second lining trolley and the first lining of the tunnel, and the second lining trolley casts lining concrete in the arch cavity through a casting pipe; after the casting construction of the first section of lining concrete is completed, the second lining trolley removes the screw rods respectively, and the second lining trolley is shrunk and demoulded by the lifting cylinder and the side mold cylinder respectively.

[0010] After the demoulding of the first section of the second lining trolley, the second lining trolley is driven by the walking device to the position of the second section of the lining construction. The template at the rear end of the trolley stops and is positioned when it is 1cm-3cm away from the edge of the arch wall end of the first section of the lining construction; after the second lining trolley is positioned; the template is supported according to the first section of the lining construction method. While the template is supporting, the annular soft overlapping rubber strip is correspondingly squeezed with the edge of the inner side of the arch wall of the first section. The annular soft overlapping rubber strip is squeezed to shrink and increase the load to be pressure-sealed; after the template is lifted upward, the side mold cylinder supports the templates on both sides of the second lining trolley to the outside and the inner sides of the arch wall of the first section. The wall is squeezed accordingly, and the annular soft lap rubber strip is squeezed to shrink and increase the load. After the templates on the top and both sides of the second lining trolley are supported, the annular soft lap of the second lining trolley is completed; after the annular soft lap of the second lining trolley is completed, the longitudinal soft lap of the first section of the second lining trolley is repeated to perform the longitudinal soft lap of the second section; after the longitudinal soft lap and annular soft lap of the second section of the second lining trolley are completed, the gap between the template at the front end of the trolley and the arch wall of the first lining of the tunnel is blocked; there is a closed arch cavity between the template of the second lining trolley and the first lining of the tunnel, and the second lining trolley performs lining concrete pouring construction in the arch cavity through the pouring pipe;

[0011] After the longitudinal soft lap joint, circumferential soft lap joint and template sealing of the front end of the second section of the second lining trolley are completed, the template support for the second section construction is completed. There is a closed arch cavity between the template of the second lining trolley and the first lining of the tunnel. The second lining trolley pours lining concrete in the arch cavity of the second section construction through the pouring pipe. After the lining concrete pouring construction of the second section is completed and the arch body is solidified and stabilized, the second lining trolley demoulds the second section; after the demoulding of the second section, the second lining trolley repeats the concrete pouring construction of the later lining construction section according to the method of pouring lining concrete for the second section of the tunnel.

[0012] Beneficial effects: The rear end of the trolley of the tunnel secondary lining trolley of the present invention and the edge of the template are installed with longitudinal soft lap and circumferential soft lap by movable joints, and the longitudinal soft lap and circumferential soft lap are respectively installed with circumferential soft lap rubber strips and longitudinal soft lap rubber strips. The longitudinal soft lap and circumferential soft lap are respectively sealed with circumferential soft lap rubber strips and longitudinal soft lap rubber strips to carry out concrete pouring construction of the tunnel arch wall. The longitudinal soft lap and circumferential soft lap can seal the edge of the template, and the soft lap rubber strip can compensate for the error and gap between the template and the inner wall of the first section of the arch during the secondary lining construction to produce leakage, bulging or arch body cavities, reduce the hard extrusion of the burrs on the edges of the template and the first section of the arch and the short side wall, reduce the damage to the burrs on the edges of the template and the first section of the arch and the short side wall, and the operation is simple, convenient and fast, which can improve production. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] The present invention will be further described below in conjunction with the accompanying drawings:

[0014] Figure 1 It is a schematic diagram of the general assembly structure;

[0015] Figure 2 yes Figure 1 A right view structural diagram of ;

[0016] Figure 3 yes Figure 1 A schematic diagram of a partial structure from a side view;

[0017] Figure 4 yes Figure 2 Schematic diagram of the local structure;

[0018] Figure 5 yes Figure 4 Schematic diagram of the local structure;

[0019] Figure 6 yes Figure 5 A schematic diagram of the longitudinal structure of the longitudinal step-shaped flange and the annular soft lap joint frame;

[0020] Figure 7 yes Figure 5 Schematic diagram of the three-dimensional structure of the longitudinal step-shaped flange and the longitudinal soft overlapping rubber strip;

[0021] Figure 8 yes Figure 4 Schematic diagram of the local structure of the annular soft lap-jointed frame;

[0022] Fig. 9 yes Figure 8 Schematic diagram of the structure of the annular soft lap frame and the rubber strip support plate;

[0023] Fig.10 yes Fig. 9 Schematic diagram of the cross-sectional structure;

[0024] Fig.11 yes Fig. 9 Schematic diagram of the structure with the annular flange;

[0025] Fig.12 yes Figure 1 A schematic diagram of the structure of a longitudinal straight-edge flange replacing a longitudinal stepped flange;

[0026] Fig.13 yes Figure 1 Schematic diagram of the soft overlapping rubber strip structure;

[0027] Figure 1 , 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13: second lining trolley 1, trolley frame 2, formwork 3, trolley front end 4, trolley rear end 5, circumferential soft lap rubber strip 6, longitudinal soft lap rubber strip 7, longitudinal step-shaped flange 8, circumferential soft lap frame 9, bottom edge panel 10, support seat 11, hinge ear 12, rubber strip support plate 13, corner support plate 14, circumferential flange 15, soft lap rubber strip interlayer 16, interlayer compression hole 17, installation hole 18, fastening bolt 19, longitudinal straight edge flange 20, walking device 21, lifting cylinder 22, side mold cylinder 23, screw rod 24. DETAILED DESCRIPTION

[0028] The present invention is further described in detail below in conjunction with embodiments and specific implementation modes:

[0029] Example 1

[0030] A trolley frame 2 is longitudinally arranged in the middle of the secondary lining trolley 1, and a track is arranged between the trolley frame 2 of the secondary lining trolley 1 and the ground. A walking device 21 is arranged between the trolley frames 2 at the front and rear ends of the secondary lining trolley 1 and the track respectively, and a lifting cylinder 22 is arranged between the upper end of the walking device 21 and the trolley frame 2; at least three annular flanges 15 are longitudinally evenly arranged between the trolley frame 2 and the template 3, and the template 3 is arranged outside the at least three annular flanges 15, and at least three pairs of longitudinal step-shaped flanges 8 or longitudinal straight-sided flanges 20 are symmetrically arranged at the lower ends of both sides of the at least three annular flanges 15, and a hinge ear 12 is arranged between the lower ends of both sides of the annular flanges 15 and the longitudinal step-shaped flanges 8 or the longitudinal straight-sided flanges 20 respectively; the longitudinal step-shaped flanges 8, Support seats 11 are respectively arranged on the inner side of the annular flange 15, screw rods 24 are arranged between the lower part of both sides of the trolley frame 2 and the support seats 11 of the longitudinal step-shaped flange 8 and the annular flange 15, and side mold cylinders 23 are arranged between the middle part of both sides of the trolley frame 2 and the support seats 11 of the annular flange 15; the outer side between two adjacent longitudinal step-shaped flanges 8 or longitudinal straight-sided flanges 20 is arranged as a bottom panel 10, at least three pairs of longitudinal step-shaped flanges 8 or longitudinal straight-sided flanges 20 and the bottom panel 10 are arranged as longitudinal soft lap support frames, and two longitudinal soft lap rubber strips 7 are respectively arranged on the bottom panel 10 of the longitudinal soft lap support frames on both sides; the longitudinal step-shaped flange 8, the bottom panel 10 and a pair of longitudinal soft lap rubber strips 7 are arranged as longitudinal soft lap;

[0031] The right end of the secondary lining trolley 1 is set as the trolley front end 4, and the left end of the secondary lining trolley 1 is set as the trolley rear end 5; at least four sections of annular soft lap frames 9 are evenly arranged on the outer side of the annular flange 15 of the trolley rear end 5, and the annular soft lap frames 9 are evenly arranged with reserved installation holes 18 corresponding to the annular flange 15, and the annular flange 15 has positioning screw holes corresponding to the installation holes 18, and fastening bolts 19 are respectively arranged in the positioning screw holes and the installation holes 18; the annular soft lap frame 9 is set as an arc plate body, and the outer arc end of the annular soft lap frame 9 is set as a rubber strip support plate 13, and the annular soft lap frame 9 and the rubber strip support plate At least two corner support plates 14 are evenly arranged between the inner corners of 13, at least four sections of annular soft lap frames 9 are respectively arranged with the rubber strip support plate 13 to form at least four soft lap frames, at least four longitudinal soft lap support frames are combined to form an arc-shaped annular soft lap support frame body, the radius of an arc-shaped annular soft lap support frame body is smaller than the radius of the longitudinal step-shaped flange 8 and is reserved as a step, and an annular soft lap rubber strip 6 is respectively arranged on the reserved step, and an arc-shaped annular soft lap support frame body and an annular soft lap rubber strip 6 are arranged to be annular soft lap;

[0032] The longitudinal soft lap rubber strip 7 corresponds to the longitudinal length setting of the template 3, the circumferential soft lap rubber strip 6 is equal to or greater than the circumferential length setting of the template 3, the width of the longitudinal soft lap rubber strip 7 and the circumferential soft lap rubber strip 6 is set to 10cm-20cm, the thickness of the longitudinal soft lap rubber strip 7 and the circumferential soft lap rubber strip 6 is set to 1.5cm-4cm, the longitudinal soft lap rubber strip 7 and the circumferential soft lap rubber strip 6 are provided with at least one layer of soft lap rubber strip interlayer 16, and interlayer compression holes 17 are evenly arranged between the soft lap rubber strip interlayer 16 and the upper and lower surfaces of the soft lap rubber strip 6;

[0033] Before the construction of the secondary lining trolley 1, the outer side of the longitudinal step-shaped flange 8 of the rear end 5 of the trolley is first fixed by fastening bolts 19 to install at least four annular soft lap joint frames 9, which are an arc-shaped annular soft lap joint support frame. After the annular soft lap joint support frame is installed, an annular soft lap joint rubber strip 6 is laid on the arc-shaped annular soft lap joint support frame by gluing to complete the installation of the annular soft lap joint; the outer side of the annular soft lap joint rubber strip 6 after laying is higher than the outer side of the template 3 by 3mm-15mm;

[0034] After the annular soft lap rubber strip 6 is laid, the longitudinal step-shaped flange 8 or the longitudinal straight-sided flange 20 of the longitudinal soft lap support frame is respectively installed on the lower ends of both sides of the template 3 through the hinge ears 12. After the longitudinal soft lap support frame is installed, a pair of longitudinal soft lap rubber strips 7 are laid on the longitudinal soft lap support frames at the lower ends of both sides of the template 3 by gluing to complete the installation of the longitudinal soft lap.

[0035] Example 2

[0036] After the longitudinal soft overlap and circumferential soft overlap of the secondary lining trolley 1 are installed, the secondary lining trolley 1 is driven by the walking device 21 to enter the position of the first section lining construction, the template 3 on the top of the secondary lining trolley 1 is lifted upward by the lifting cylinder 22, and the templates 3 on both sides of the secondary lining trolley 1 are supported outward by the side template cylinder 23, and positioned and reinforced by the screw rod 24; after the templates 3 on the top and both sides of the secondary lining trolley 1 are reinforced and supported, the longitudinal soft overlap on both sides of the secondary lining trolley 1 is supported outward by the screw rod 24, and the screw rod 24 is stopped after the longitudinal soft overlap is closed with the short side walls on both sides of the tunnel. After the longitudinal soft overlap is closed with the short side walls, the template 3 of the first section of the secondary lining trolley 1 is completed. The support and longitudinal soft overlap of the formwork 3 of the first section of the second lining trolley 1 are completed, and the gap between the formwork 3 at the front end 4 and the rear end 5 of the second lining trolley 1 and the first lining arch wall of the tunnel is blocked; after the support of the formwork 3 of the second lining trolley 1 of the first section lining construction and the blocking of both ends of the formwork 3 are completed, the formwork 3 of the second lining trolley 1 and the first lining of the tunnel are closed. The second lining trolley 1 casts lining concrete in the arch cavity through a casting pipe; after the casting of the first section of the lining concrete is completed, the second lining trolley 1 removes the screw rod 24 respectively, and the second lining trolley 1 is shrunk and demoulded by the lifting cylinder 22 and the side mold cylinder 23 respectively.

[0037] Example 3

[0038] After the demoulding of the first section of the second lining trolley 1, the second lining trolley 1 is driven by the walking device 21 to enter the position of the second section lining construction, and the template 3 at the rear end 5 of the trolley stops and is positioned when it leaves the edge of the arch wall end of the first section lining construction by 1cm-3cm; after the second lining trolley 1 is positioned; the template 3 is supported according to the first section lining construction method, and while the template 3 is supported, the annular soft overlapping rubber strip 6 is correspondingly squeezed with the edge of the inner side of the arch wall of the first section, and the annular soft overlapping rubber strip 6 is squeezed to shrink and increase the load to be pressure-sealed; after the template 3 is lifted upward, the side mold cylinder 23 supports the templates 3 on both sides of the second lining trolley 1 outward and on both sides of the arch wall of the first section The inner wall of the second lining trolley 1 is squeezed accordingly, and the annular soft lap rubber strip 6 is squeezed to shrink and increase the load. After the templates 3 on the top and both sides of the second lining trolley 1 are supported, the annular soft lap of the second lining trolley 1 is completed; after the annular soft lap of the second lining trolley 1 is completed, the longitudinal soft lap of the first section of the second lining trolley 1 is repeated to perform the longitudinal soft lap of the second section; after the longitudinal soft lap and annular soft lap of the second section of the second lining trolley 1 are completed, the gap between the template 3 at the front end 4 of the trolley and the first lining arch wall of the tunnel is blocked; there is a closed arch cavity between the template 3 of the second lining trolley 1 and the first lining of the tunnel, and the second lining trolley 1 performs lining concrete pouring construction in the arch cavity through a pouring pipe;

[0039] After the longitudinal soft lap joint, circumferential soft lap joint and sealing of the formwork 3 at the front end 4 of the trolley 1 in the second section are completed, the support of the formwork 3 for the second section construction is completed, and the closed arch cavity is between the formwork 3 of the second lining trolley 1 and the first lining of the tunnel. The second lining trolley 1 casts lining concrete in the arch cavity of the second section construction through the casting pipe. After the lining concrete casting construction of the second section is completed and the arch body is solidified and stabilized, the second lining trolley 1 demoulds the second section; after the demoulding of the second section, the second lining trolley 1 repeats the concrete pouring construction of the later lining construction section according to the method of lining concrete pouring construction of the second section tunnel.

Claims

1. A method for using a soft-lap joint articulated support device for a tunnel secondary lining trolley, wherein the soft-lap joint articulated support device for a tunnel secondary lining trolley comprises a secondary lining trolley (1), a trolley frame (2), a template (3), a trolley front end (4), a trolley rear end (5), an annular soft-lap joint rubber strip (6), a longitudinal soft-lap joint rubber strip (7), a longitudinal step-shaped flange (8), an annular soft-lap joint frame (9), a bottom edge panel (10), a support seat (11), a hinge ear (12), a rubber strip support plate (13), an angle support plate (14), an annular flange (15), a soft-lap joint rubber strip interlayer (16), an interlayer compression hole (17), a mounting hole (18), a fastening bolt (19), a longitudinal straight edge flange (20), a walking device (21), a lifting cylinder (22), a side mold cylinder (23), and a screw rod (24); Features: A trolley frame (2) is longitudinally arranged in the middle of the secondary lining trolley (1), a track is arranged between the trolley frame (2) of the secondary lining trolley (1) and the ground, a walking device (21) is arranged between the trolley frame (2) at the front end and the rear end of the secondary lining trolley (1) and the track, and a lifting cylinder (22) is arranged between the upper end of the walking device (21) and the trolley frame (2); at least three annular flanges (15) are longitudinally evenly arranged between the trolley frame (2) and the template (3), the template (3) is arranged outside the at least three annular flanges (15), at least three pairs of longitudinal step-shaped flanges (8) or longitudinal straight-edge flanges (20) are symmetrically arranged at the lower ends of both sides of the at least three annular flanges (15), and a hinge ear (12) is arranged between the lower ends of both sides of the annular flanges (15) and the longitudinal step-shaped flanges (8) or the longitudinal straight-edge flanges (20); the longitudinal step-shaped flanges (8) and annular flanges (15), support seats (11) are respectively arranged on the inner side, screw rods (24) are arranged between the lower parts of both sides of the trolley frame (2) and the support seats (11) of the longitudinal step-shaped flanges (8) and the annular flanges (15), and side mold cylinders (23) are arranged between the middle parts of both sides of the trolley frame (2) and the support seats (11) of the annular flanges (15); the outer side between two adjacent longitudinal step-shaped flanges (8) or longitudinal straight-sided flanges (20) is arranged as a bottom panel (10), at least three pairs of longitudinal step-shaped flanges (8) or longitudinal straight-sided flanges (20) and the bottom panel (10) are arranged as longitudinal soft lap support frames, and two longitudinal soft lap rubber strips (7) are respectively arranged on the bottom panels (10) of the longitudinal soft lap support frames on both sides; the longitudinal step-shaped flanges (8), the bottom panel (10) and a pair of longitudinal soft lap rubber strips (7) are arranged as longitudinal soft lap; The right end of the secondary lining trolley (1) is set as the trolley front end (4), and the left end of the secondary lining trolley (1) is set as the trolley rear end (5); at least four sections of circumferential soft lap joint frames (9) are evenly arranged on the outer side of the circumferential flange (15) of the trolley rear end (5); the circumferential soft lap joint frames (9) are evenly arranged with reserved mounting holes (18) corresponding to the circumferential flange (15); the circumferential flange (15) has positioning screw holes corresponding to the mounting holes (18); and fastening bolts (19) are respectively arranged in the positioning screw holes and the mounting holes (18); the circumferential soft lap joint frame (9) is set as an arc-shaped plate body, and the outer arc end of the circumferential soft lap joint frame (9) is set as a rubber strip support plate (13); At least two corner support plates (14) are evenly arranged between the frame (9) and the inner corner of the rubber strip support plate (13); at least four sections of annular soft lap frames (9) are respectively arranged with the rubber strip support plate (13) to form at least four soft lap frames; at least four longitudinal soft lap support frames are combined to form an arc-shaped annular soft lap support frame body; the radius of an arc-shaped annular soft lap support frame body is smaller than the radius of the longitudinal step-shaped flange (8) and is reserved as a step; an annular soft lap rubber strip (6) is respectively arranged on the reserved step; an arc-shaped annular soft lap support frame body and an annular soft lap rubber strip (6) are arranged to form annular soft lap; The longitudinal soft overlapping rubber strip (7) corresponds to the longitudinal length setting of the template (3), the circumferential soft overlapping rubber strip (6) is equal to or greater than the circumferential length setting of the template (3), the width of the longitudinal soft overlapping rubber strip (7) and the circumferential soft overlapping rubber strip (6) is set to 10cm-20cm, the thickness of the longitudinal soft overlapping rubber strip (7) and the circumferential soft overlapping rubber strip (6) is set to 1.5cm-4cm, the longitudinal soft overlapping rubber strip (7) and the circumferential soft overlapping rubber strip (6) are provided with at least one layer of soft overlapping rubber strip interlayer (16), and interlayer compression holes (17) are evenly arranged between the soft overlapping rubber strip interlayer (16) and the upper and lower surfaces of the soft overlapping rubber strip 6; Before the construction of the secondary lining trolley (1), the outer side of the longitudinal step-shaped flange (8) at the rear end (5) of the trolley is first fixedly installed with a curved circular soft overlap support frame composed of at least four circular soft overlap frames (9) by means of fastening bolts (19). After the circular soft overlap support frame is installed, a circular soft overlap rubber strip (6) is laid on the curved circular soft overlap support frame by gluing to complete the installation of the circular soft overlap. After the laying is completed, the outer side of the circular soft overlap rubber strip (6) is 3 mm to 15 mm higher than the outer side of the template (3); After the circumferential soft lap rubber strip (6) is laid, the longitudinal step-shaped flange (8) or the longitudinal straight-edge flange (20) of the longitudinal soft lap support frame is respectively mounted on the lower ends of both sides of the template (3) through hinge ears (12). After the longitudinal soft lap support frame is installed, a pair of longitudinal soft lap rubber strips (7) are laid on the longitudinal soft lap support frames at the lower ends of both sides of the template (3) by gluing to complete the installation of the longitudinal soft lap.

2. A method for using a soft-lap joint movable support device for a tunnel secondary lining trolley according to claim 1, Features: After the longitudinal soft overlap and the circumferential soft overlap of the second lining trolley (1) are installed, the second lining trolley (1) is driven by the walking device (21) to enter the position of the first section lining construction, and the template (3) on the top of the second lining trolley (1) is lifted upward by the lifting cylinder (22), and the templates (3) on both sides of the second lining trolley (1) are supported outwardly by the side template cylinder (23), and positioned and reinforced by the screw rod (24); after the top and the templates (3) on both sides of the second lining trolley (1) are reinforced and supported, the longitudinal soft overlap on both sides of the second lining trolley (1) is supported outwardly by the screw rod (24), and the screw rod (24) is stopped from supporting outwardly after the longitudinal soft overlap is closed with the short side walls on both sides of the tunnel, and the first section of the template (3) of the second lining trolley (1) is completed. The support and longitudinal soft overlap of the template (3) of the first section of the second lining trolley (1) are completed, and the gap between the template (3) at the front end (4) and the rear end (5) of the second lining trolley (1) and the first lining arch wall of the tunnel is blocked; after the support of the template (3) of the second lining trolley (1) and the blocking of both ends of the template (3) of the first section lining construction are completed, the template (3) of the second lining trolley (1) and the first lining of the tunnel are closed. The second lining trolley (1) performs pouring construction of lining concrete in the arch cavity through the pouring pipe; after the pouring construction of the first section lining concrete is completed, the second lining trolley (1) is respectively removed from the screw rod (24), and the second lining trolley (1) is respectively contracted and demoulded through the lifting cylinder (22) and the side mold cylinder (23).

3. A method for using a soft-lap joint movable support device for a tunnel secondary lining trolley according to claim 1, Features: After the demoulding of the first section of the second lining trolley (1), the second lining trolley (1) is driven by the walking device (21) to enter the position of the second section of the lining construction, and the template (3) at the rear end (5) of the trolley is stopped and positioned when it is 1 cm-3 cm away from the edge of the end of the arch wall of the first section of the lining construction; after the second lining trolley (1) is positioned; the template (3) is supported according to the first section of the lining construction method, and while the template (3) is supporting, the annular soft overlapping rubber strip (6) is correspondingly squeezed with the edge of the inner side of the arch wall of the first section, and the annular soft overlapping rubber strip (6) is squeezed to shrink and increase the load to be pressure-sealed; after the template (3) is lifted upward, the side mold cylinder (23) supports the templates (3) on both sides of the second lining trolley (1) to outwardly align with the arch wall of the first section. The inner walls on both sides are squeezed accordingly, and the annular soft lap rubber strip (6) is squeezed to shrink and increase the load. After the templates (3) on the top and both sides of the secondary lining trolley (1) complete the support, the annular soft lap of the secondary lining trolley (1) is completed; after the annular soft lap of the secondary lining trolley (1) is completed, the longitudinal soft lap of the first section of the secondary lining trolley (1) is repeated to perform the longitudinal soft lap of the second section; after the longitudinal soft lap and annular soft lap of the second section of the secondary lining trolley (1) are completed, the gap between the template (3) at the front end (4) of the trolley and the primary lining arch wall of the tunnel is blocked; the template (3) of the secondary lining trolley (1) and the primary lining of the tunnel form a closed arch cavity, and the secondary lining trolley (1) performs lining concrete pouring construction in the arch cavity through a pouring pipe; After the longitudinal soft overlap, the circumferential soft overlap and the sealing of the template (3) at the front end (4) of the secondary lining trolley (1) of the second section are completed, the template (3) support of the second section construction is completed, and the template (3) of the secondary lining trolley (1) and the first lining of the tunnel are a closed arch cavity. The secondary lining trolley (1) performs lining concrete pouring construction in the arch cavity of the second section construction through a pouring pipe. After the lining concrete pouring construction of the second section is completed and the arch body is solidified and stabilized, the secondary lining trolley (1) performs demoulding of the second section construction; after the demoulding of the second section construction, the secondary lining trolley (1) repeats the concrete pouring construction of the later lining construction section according to the method of pouring lining concrete for the second section tunnel.