A large-span glass rib support curtain wall system and its installation process
By supporting the curtain wall system with large-span glass ribs, using components such as insulated tempered glass and tempered laminated glass ribs, combined with the use of silicone structural adhesive and weather-resistant sealant, the traditional glass curtain wall system solves the problem of sight blocking and vertical elevation in long-span situations. It solves unfriendly problems and achieves high permeability, lightweight and improved structural performance.
Patent Information
- Application Number
- CN202010741127.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-07-29
- Publication Date
- 2025-01-24
- Estimated Expiration
- 2040-07-29
AI Technical Summary
Traditional glass curtain wall systems require large steel keel support in large spans, resulting in obstruction of vision, unfriendly facades and poor indoor experience.
Using large span glass ribs to support the curtain wall system, including hollow tempered glass, tempered tension glass ribs, stainless steel cables, hidden cable hinge fixtures, solid cables, hanging components and horizontal tie rod components, sealing through silicone structure glue and weather resistance sealing The use of glue realizes the stable connection and support of glass ribs.
The high -pass transparency, lightweight and structural performance of the large span curtain wall system can be achieved. The maximum span can reach 18 meters. It is friendly, environmentally friendly, and does not require post -maintenance.
Smart Images

Figure CN111749378B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of assembled wall panels, in particular to a large-span glass rib supporting curtain wall system and an installation process thereof. Background Art
[0002] Glass curtain wall refers to the building's external protective structure or decorative structure that has a certain displacement capacity relative to the main structure and does not share the effects on the main structure. Glass curtain wall is a beautiful and novel building wall decoration method, and is a prominent feature of the modernist high-rise building era. Large-span glass rib curtain wall: The building is no longer surrounded by four walls with windows on top. Modern buildings are full of modern characteristics and a sense of future technology.
[0003] Domestic curtain wall development history: ① 1980s-1990s: pioneering stage (simple curtain wall system); ② The first decade of the 21st century: development stage; ③ 2010s-2020s: glass curtain walls are widely used, but as a special glass: glass rib curtain wall system has developed rapidly in recent years. Traditional glass curtain walls require large steel keels to support the glass curtain wall system. The larger the span, the larger the cross-section of the steel keel, resulting in obstructed indoor and outdoor vision, and the facade presents large steel columns, which makes the indoor experience poor and the outdoor appearance visually unfriendly.
[0004] At present, buildings are no longer just objects that can be lived in. Buildings have become the symbol and memory of a city. Complex buildings are also the boosters of technological development. How to solve some special requirements of buildings, then new curtain wall systems will be born to meet the architects' extreme requirements for buildings. For this reason, we have developed a large-span glass rib support curtain wall system. Summary of the invention
[0005] The purpose of the present invention is to overcome the deficiencies of the prior art and to provide a large-span glass rib support curtain wall system and its installation process, which has the advantages of increasing the span of the curtain wall, improving the permeability of the curtain wall, reducing the deadweight of the building, meeting the structural performance requirements, and being environmentally friendly.
[0006] To achieve the above-mentioned purpose, the technical solution adopted by the present invention is: a large-span glass rib support curtain wall system, including hollow tempered glass, tempered laminated glass ribs, stainless steel cables, hidden cable ball hinge clamps, cable fixing parts, hanging components and transverse tie rod components, a chamber is spliced between four hollow tempered glasses, the cable fixing parts are provided at the center position of the chamber, the stainless steel cables are provided at the horizontal sides of the cable fixing parts, the stainless steel cables are arranged in the transverse gaps between the hollow tempered glasses, the hollow tempered glasses are bonded into a whole piece by silicone weather-resistant sealant, the tempered laminated glass ribs are vertically provided at the transverse gaps of the hollow tempered glasses by silicone structural adhesive, the hollow tempered glasses around the chamber are fixedly connected by the hidden cable ball hinge clamps, the hanging components are arranged at the top position of the tempered laminated glass ribs, and the transverse tie rod components are arranged at the bottom connection of the tempered laminated glass ribs.
[0007] Preferably, a glass chamfer is provided at a corner of the hollow tempered glass, and the glass chamfer surrounds the chamber having a rectangular structure.
[0008] Preferably, the hidden cable ball joint clamp includes a hard glass pad, a stainless steel glass support plate, a crimping groove, a glass connecting hole and a clip, the stainless steel glass support plate is arranged at the gap between the hollow tempered glasses, the hollow tempered glass is arranged in the crimping groove through the hard glass pad, the hollow tempered glass is pressed in the glass connecting hole through injection adhesive and bolts, and the clip is crimped to the tempered laminated glass rib through stainless steel bolts.
[0009] Preferably, the cable fixing member comprises a first pressing block and a second pressing block, the stainless steel cable is pressed between the first pressing block and the second pressing block, and a clamping ring is provided at one end of the stainless steel cable located at the hollow tempered glass.
[0010] Preferably, the hanging assembly includes a diagonal galvanized steel square tube, a horizontal galvanized steel square tube, a lining steel plate, a stainless steel connecting plate, a reinforcing steel plate and a connecting piece. The diagonal galvanized steel square tube is fixedly connected to the top end of the horizontal galvanized steel square tube. The lining steel plate is arranged in the horizontal galvanized steel square tube. The bottom end of the horizontal galvanized steel square tube is connected to the reinforcing steel plate through the stainless steel connecting plate, and the reinforcing steel plate is horizontally connected to the connecting piece.
[0011] Preferably, the top end of the tempered laminated glass rib is connected to a glass rib clamping plate via a stud bolt, and the glass rib clamping plate is connected to the bottom end of the reinforcing steel plate via a stainless steel bolt assembly.
[0012] Preferably, the transverse tie rod assembly comprises a tie rod and a tie rod joint connected to the tie rod, and the tie rod joint is connected to the bottom end of the glass rib clamping plate.
[0013] Preferably, an installation process of a large-span glass rib support curtain wall system comprises the following steps:
[0014] 8.1. The hollow tempered glass and the tempered laminated glass rib are vertically bonded by silicone structural adhesive, and the weight of the hollow tempered glass is borne by the stainless steel cable. The stainless steel cable is fixedly connected by the fixed cable piece. The joints of the four hollow tempered glasses are fixedly connected by the hidden cable ball joint clamp. The spliced tempered laminated glass ribs are used to support the keel. Due to the large span, three sections of the tempered laminated glass ribs need to be spliced. The spliced joints ensure that the strength and rigidity of the tempered laminated glass ribs are not less than the tempered laminated glass ribs themselves.
[0015] 8.2. Use the glass rib clamps and set up two safety measures:
[0016] The first safety measure: using the stud bolts for clamping, the stud bolts bear the tensile and shearing forces, and through independent calculation, the stud bolts meet the requirements of shearing resistance, tensile resistance and bending resistance;
[0017] The second safety measure: the glass rib sandwich panel and the tempered laminated glass rib are bonded together by high-strength epoxy resin adhesive to form a whole;
[0018] 8.3. The upper part of the tempered laminated glass rib adopts a hanging force-bearing mode, and the lower support adopts a vertical opening, which can be freely extended and retracted in the vertical direction, releasing the vertical constraint of the bottom, so that the tempered laminated glass rib is a tension-bending component;
[0019] 8.4. The span of the tempered laminated glass rib is increased, and horizontal pull rods are provided at the segmented glass rib clamping plates.
[0020] Due to the application of the above technical solution, the present invention has the following advantages compared with the prior art:
[0021] 1. The maximum span is 18 meters, which can be used for large-span curtain wall systems;
[0022] 2. Fully transparent glass installation, transparent and atmospheric;
[0023] 3. The tempered laminated glass ribs are connected by silicone structural adhesive, and the outer wall joints are bonded with silicone weather-resistant sealant, which is light in weight, reduces the building's deadweight, and meets the structural performance requirements;
[0024] 4. Made of tempered glass, it is environmentally friendly and requires no maintenance. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Attached Figure 1 It is a schematic diagram of the connection of the side structure of the hollow tempered glass of the present invention;
[0026] Attached Figure 2 The present invention is attached Figure 1 Sectional view at AA;
[0027] Attached Figure 3 It is a schematic diagram of the connection of the front structure of the hollow tempered glass of the present invention;
[0028] Attached Figure 4 It is a schematic diagram of the connection structure between the hollow tempered glass and the tempered laminated glass ribs of the present invention;
[0029] Attached Figure 5 This is a schematic diagram of the connection structure of the stainless steel glass rib clamp of the present invention;
[0030] Attached Figure 6 It is a structural schematic diagram of the hoisting assembly of the present invention;
[0031] Attached Figure 7 This is a schematic diagram of the bottom structure of the tempered laminated glass rib of the present invention;
[0032] Attached Figure 8 It is a schematic diagram of the connection structure of the pull rod assembly described in the present invention. DETAILED DESCRIPTION
[0033] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0034] Attached Figure 1 To Attachment Figure 4 In the invention, a large-span glass rib supporting curtain wall system includes hollow tempered glass 10 with specifications of 15 LOW-E (ultra-clear) + 16A + 15, tempered laminated glass rib 20 with specifications of 19 (ultra-clear) + 2.28 SGP + 19 (ultra-clear) + 2.28 SGP + 19 (ultra-clear), φ12 stainless steel cable 30, hidden cable ball joint fixture 40, cable fixing piece 50, hanging assembly and transverse tie rod assembly. It is transparent and reduces the self-weight of the glass curtain wall.
[0035] A chamber 45 is spliced between four hollow tempered glasses 10, a fixing cable 50 is bonded at the center of the chamber 45, and stainless steel cables 30 are provided at both horizontal sides of the fixing cable 50. The stainless steel cables 30 are arranged in the horizontal gaps between the hollow tempered glasses 10, and the hollow tempered glasses 10 are bonded into a whole piece by silicone weatherproof sealant 15. Tempered laminated glass ribs 20 are vertically arranged at the horizontal gaps of the hollow tempered glasses 10 by silicone structural adhesive 16, and the hollow tempered glasses 10 around the chamber 45 are fixedly connected by hidden cable ball joint clamps 40. The hanging assembly is arranged at the top position of the tempered laminated glass rib 20, and the horizontal pull rod assembly is arranged at the bottom connection of the tempered laminated glass rib 20. A glass chamfer 11 is provided at one corner of the hollow tempered glass 10, and the glass chamfer 11 is arranged to surround the chamber 45 of a rectangular structure.
[0036] The hidden cable ball joint fixture 40 includes a hard glass pad 41, a stainless steel glass support plate 42, a crimping groove 43, a glass connection hole 46 and a clip 47. The stainless steel glass support plate 42 is arranged at the gap between the hollow tempered glass 10, the hollow tempered glass 10 is arranged in the crimping groove 43 through the hard glass pad 41, the hollow tempered glass 10 is pressed in the glass connection hole 46 through HY70 injection adhesive and M27 stud bolts 28, and the clip 47 is crimped with the tempered laminated glass rib 20 through stainless steel bolts.
[0037] The cable fixing member 50 includes a first pressing block 51 and a second pressing block 52, and a stainless steel cable 30 is pressed between the first pressing block 51 and the second pressing block 52. The stainless steel cable 30 is provided with a clamping ring 53 at one end of the hollow tempered glass 10. When a super strong earthquake or other catastrophic damage occurs, the tempered laminated glass rib 20 may be damaged, and the stainless steel cable 30 replaces the tempered laminated glass rib 20 as a structural support to prevent the glass panel from collapsing and ensure the integrity of the building.
[0038] Attached Figure 6 To Attachment Figure 7 In the embodiment, the hanging assembly includes an inclined galvanized steel square tube 70, a horizontal galvanized steel square tube 71, a lining steel plate 72, a stainless steel connecting plate 73, a reinforcing steel plate 74 and a connecting piece 75. The inclined galvanized steel square tube 70 is fixedly connected to the top of the horizontal galvanized steel square tube 71, the horizontal galvanized steel square tube 71 is provided with a lining steel plate 72, the bottom end of the horizontal galvanized steel square tube 71 is connected to the reinforcing steel plate 74 through the stainless steel connecting plate 73, and the reinforcing steel plate 74 is horizontally connected to the connecting piece 75. The top of the stainless steel cable 30 is provided with a cable adjustment end 35, which is crimped to the top of the horizontal galvanized steel square tube 71, and an inverted U-shaped connecting plate 76 is provided between the connecting piece 75 and the hollow tempered glass 10.
[0039] In order to facilitate hoisting, the top of the tempered laminated glass rib 20 is connected to a 16mm glass rib clamp 26 through a stud bolt 28. The glass rib clamp 26 is connected to the bottom of the reinforcing steel plate 74 through a stainless steel bolt assembly 27. The bottom of the tempered laminated glass rib 20 is vertically suspended and connected to a 16mm thick stainless steel clamp 29 through a stud bolt 28. The tempered laminated glass rib 20 is always in a hanging state, effectively avoiding deformation of the main structure and causing glass extrusion and breakage, forming a stable curtain wall system. Figure 5 In the embodiment, a stainless steel glass rib clamp 25 is used at the connection of the tempered laminated glass rib 20. Due to the large span, the maximum span is 18 meters. Currently, there is basically no super-long glass rib on the market. It is necessary to use multiple sections of stainless steel glass rib clamps 25 for splicing. The clamps and the glass ribs are connected with special epoxy resin glue, and the stud bolts 28 and the tempered laminated glass ribs 20 are fixed with high-strength compression glue to make the hole edge evenly stressed and avoid the damage of the tempered laminated glass rib 20 caused by local stress.
[0040] Attached Figure 8 In the embodiment, the transverse tie rod assembly includes a φ38 mm tie rod 60 and a tie rod joint 61 connected to the tie rod 60. The tie rod joint 61 is connected to the bottom end of the glass rib clamping plate 26.
[0041] An installation process of a large-span glass rib support curtain wall system comprises the following steps:
[0042] 8.1. The hollow tempered glass 10 and the tempered laminated glass rib 20 are vertically bonded by silicone structural adhesive 16, and the weight of the hollow tempered glass 10 is borne by the stainless steel cable 30. The stainless steel cable 30 is fixedly connected by the cable fixing member 50, and the joints of the four hollow tempered glasses 10 are fixedly connected by the hidden cable ball joint clamp 40. The spliced tempered laminated glass rib 20 is used to support the keel. Due to the large span, three sections of tempered laminated glass ribs 20 need to be spliced, and the strength and rigidity of the tempered laminated glass rib 20 at the splicing are guaranteed to be no less than the tempered laminated glass rib 20 itself.
[0043] 8.2. Use 26 pairs of 16mm thick glass rib plywood and set up two safety measures:
[0044] The first safety measure: using stud bolts 28 for clamping, the stud bolts 28 bear the tensile and shearing forces, and through independent calculation, the stud bolts 28 meet the requirements of shearing, tensile and bending resistance. The second safety measure: through high-strength epoxy resin bonding, the glass rib clamping plate 26 and the tempered laminated glass rib 20 become a whole.
[0045] 8.3. The upper part of the tempered laminated glass rib 20 adopts a hanging force-bearing mode, and the lower support adopts a vertical opening, which can freely expand and contract in the vertical direction, releasing the vertical constraint of the bottom, so that the tempered laminated glass rib 20 is a tension-bending component, avoiding the tempered laminated glass rib 20 from bearing vertical pressure.
[0046] 8.4. The span of the tempered laminated glass rib 20 is increased, and a horizontal tie rod 60 is provided at the segmented glass rib clamping plate 26 to prevent the tempered laminated glass rib 20 from becoming unstable under the action of negative wind pressure.
[0047] The present invention has the following advantages:
[0048] 1. The maximum span is 18 meters, which can be used for large-span curtain wall systems.
[0049] 2. Fully transparent glass installation, transparent and atmospheric.
[0050] 3. The tempered laminated glass ribs are connected by silicone structural adhesive, and the outer wall joints are bonded with silicone weather-resistant sealant. It is light in weight, reduces the building's own weight, and meets the structural performance requirements.
[0051] 4. Made of tempered glass, it is environmentally friendly and requires no maintenance.
[0052] The above are only specific application examples of the present invention and do not constitute any limitation on the protection scope of the present invention. Any technical solution formed by equivalent transformation or equivalent replacement shall fall within the protection scope of the present invention.
Claims
1. An installation process for a large-span glass rib support curtain wall system, characterized in that: The large-span glass rib supporting curtain wall system includes hollow tempered glass, tempered laminated glass rib, stainless steel cable, hidden cable ball joint clamp, cable fixing piece, hanging assembly and transverse tie rod assembly. A chamber is spliced between four hollow tempered glasses. The cable fixing piece is provided at the center of the chamber. The stainless steel cable is provided at both horizontal sides of the cable fixing piece. The stainless steel cable is arranged in the transverse gap between the hollow tempered glasses. The hollow tempered glasses are bonded into a whole piece by silicone weatherproof sealant. The tempered laminated glass rib is vertically arranged at the transverse gap of the hollow tempered glasses by silicone structural adhesive. The hollow tempered glasses around the chamber are fixedly connected by the hidden cable ball joint clamp. The hanging assembly is arranged at the top position of the tempered laminated glass rib, and the transverse tie rod assembly is arranged at the bottom connection of the tempered laminated glass rib. A glass chamfer is provided at one corner of the hollow tempered glass, and the glass chamfer surrounds the chamber in a rectangular parallelepiped structure; The hidden cable ball joint fixture comprises a hard glass pad, a stainless steel glass support plate, a crimping groove, a glass connection hole and a clip, wherein the stainless steel glass support plate is arranged at the gap between the hollow tempered glass, the hollow tempered glass is arranged in the crimping groove through the hard glass pad, the hollow tempered glass is pressed tightly in the glass connection hole through injection adhesive and bolts, and the clip is crimped to the tempered laminated glass rib through stainless steel bolts; The cable fixing member comprises a first pressing block and a second pressing block, the stainless steel cable is pressed between the first pressing block and the second pressing block, and a clamping ring is provided at one end of the stainless steel cable located at the hollow tempered glass; The hanging assembly comprises an inclined galvanized steel square tube, a horizontal galvanized steel square tube, a lining steel plate, a stainless steel connecting plate, a reinforcing steel plate and a connecting piece. The inclined galvanized steel square tube is fixedly connected to the top of the horizontal galvanized steel square tube. The lining steel plate is arranged inside the horizontal galvanized steel square tube. The bottom end of the horizontal galvanized steel square tube is connected to the reinforcing steel plate through the stainless steel connecting plate. The reinforcing steel plate is horizontally connected to the connecting piece. The top end of the tempered laminated glass rib is connected to a glass rib clamping plate through a stud bolt, and the glass rib clamping plate is connected to the bottom end of the reinforced steel plate through a stainless steel bolt assembly; Installation technology of large-span glass rib support curtain wall system The following steps are involved: 8.
1. The hollow tempered glass and the tempered laminated glass rib are vertically bonded by silicone structural adhesive, and the weight of the hollow tempered glass is borne by the stainless steel cable. The stainless steel cable is fixedly connected by the fixed cable piece. The joints of the four hollow tempered glasses are fixedly connected by the hidden cable ball joint clamp. The spliced tempered laminated glass ribs are used to support the keel. Due to the large span, three sections of the tempered laminated glass ribs need to be spliced. The spliced joints ensure that the strength and rigidity of the tempered laminated glass ribs are not less than the tempered laminated glass ribs themselves; 8.
2. Use the glass rib clamps and set up two safety measures: The first safety measure: using the stud bolts for clamping, the stud bolts bear the tensile and shearing forces, and through independent calculation, the stud bolts meet the requirements of shearing resistance, tensile resistance and bending resistance; The second safety measure: the glass rib sandwich panel and the tempered laminated glass rib are bonded together by high-strength epoxy resin adhesive to form a whole; 8.
3. The upper part of the tempered laminated glass rib adopts a hanging force-bearing mode, and the lower support adopts a vertical opening, which can be freely extended and retracted in the vertical direction, releasing the vertical constraint of the bottom, so that the tempered laminated glass rib is a tension-bending component; 8.
4. The span of the tempered laminated glass rib is increased, and horizontal pull rods are arranged at the segmented glass rib clamping plates.
2. The installation process of the large-span glass rib support curtain wall system according to claim 1 is characterized in that: The transverse tie rod assembly comprises a tie rod and a tie rod joint connected to the tie rod, and the tie rod joint is connected to the bottom end of the glass rib clamping plate.
Citation Information
Patent Citations
Long-span glass rib supporting curtain wall system
CN212295228U