Multifunctional pile driver and construction method thereof

Through the fine-tuning device of the multi-function pile planter and the force arm turbine device, the problems of noise, vibration and cost in traditional pile foundation construction are solved, precise implantation and efficient construction are achieved, and construction efficiency and safety are improved.

CN112064637BActive Publication Date: 2024-11-26BEIJING ZHONGYAN DADI TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202011028108.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-09-26
Publication Date
2024-11-26
Estimated Expiration
2040-09-26

AI Technical Summary

Technical Problem

Traditional pile foundation construction methods have noise and vibration problems, large equipment and difficult to move, high construction costs, and difficult to ensure the vertical accuracy and straightness of pile planting, and harsh environment affects operation safety.

Method used

A multi-function pile planter was designed, using fine-tuning device and rolling wheel to achieve precise docking of prefabricated piles. The implantation under different working conditions is achieved through multiple force arms and turbine turbo rod devices. The equipment is small and flexible, and the planting can be completed alone. pile tasks to reduce construction processes and costs.

Benefits of technology

The precise docking of prefabricated piles and implantation under different working conditions are achieved, which reduces construction noise and vibration, improves construction efficiency, reduces costs, and enhances the adaptability and safety of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112064637B_ABST
    Figure CN112064637B_ABST
Patent Text Reader

Abstract

The present invention discloses a multifunctional pile driver and a construction method thereof, which belongs to the technical field of pile foundation construction, and includes a chassis, a first lever arm, a second lever arm, a third lever arm, a first oil cylinder, a second oil cylinder, a third oil cylinder, a fourth oil cylinder, a fine-tuning device, a pile driver, and a clamp; the first lever arm and the first oil cylinder are both connected to the chassis through a pin shaft, the first lever arm and the first oil cylinder are connected by a pin shaft, the first lever arm and the second lever arm are connected by a pin shaft, the second lever arm and the third lever arm are connected by a pin shaft, the second lever arm and the third lever arm of the third oil cylinder are both connected by a pin shaft, and the third lever arm is connected to the pile driver through a fine-tuning device. The present invention can realize the implantation of prefabricated piles under different working conditions, especially inclined piles, through multiple lever arms and turbine vortex devices, and no other equipment is needed during construction, which reduces the construction process, improves the construction efficiency, and saves costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of pile foundation construction, and in particular to a multifunctional pile driver and a construction method thereof. Background Art

[0002] With the advancement of foundation engineering, a new type of pile foundation construction method that integrates drilling, deep mixing, and prefabrication of various pile foundation technologies has gradually begun to be used and promoted. This method effectively makes up for the shortcomings of the current soft soil pile foundation and has good social benefits and promotion value. The construction of various prefabricated piles generally starts 2 hours after the cement slurry is injected. The prefabricated piles are usually implanted into the hole by hammering and pressing. At present, the construction process requires the use of lifting equipment to move various prefabricated piles to the pre-drilled holes and slowly implant various pile bodies. Accordingly, a mixing pile machine improved on the basis of the traditional mixing pile machine has emerged.

[0003] The traditional diesel pile driver causes vibration and noise pollution due to the collision between the hammer head and the pile body. Although the static pressure pile driver reduces the noise pollution, it still has some noise and vibration problems. In addition, the machine is large, the equipment is difficult to move, and the construction site requirements are high. In terms of construction technology: when welding is required to connect the piles, a guide hoop is generally set at the head of the already implanted pile body to facilitate the connection and placement of the upper implanted pile body. After welding, the misalignment error of the upper and lower pile bodies is generally between 5 and 10 mm, which makes it difficult to ensure the vertical accuracy and straightness accuracy requirements of the implanted pile body. In addition, during the pile implantation operation, the construction company must be equipped with large-scale lifting equipment for the lifting and placement of various implanted pile bodies, which greatly increases the construction cost. In addition, during the entire process of prefabricated piles, the construction personnel are always located around the prefabricated holes, the environment is harsh, and there are great risks in operational safety. Therefore, in order to solve the above problems, the present invention proposes a multifunctional pile driver and a construction method thereof. Summary of the invention

[0004] In view of the above technical problems existing in the prior art, the present invention proposes a multifunctional pile driver and a construction method thereof, which overcomes the shortcomings of the prior art. By setting a fine-tuning device and a rolling wheel, the accurate docking of prefabricated piles can be achieved; by multiple force arms and turbine worm devices, the implantation of prefabricated piles under different working conditions can be achieved, especially inclined piles; compared with traditional static presses and diesel hammers, the pile driver of the present invention has a smaller lift, lighter equipment, and stronger adaptability to the site; the pile driver of the present invention can complete the pile planting task alone without the help of other equipment, reducing the construction process, improving the construction efficiency, and saving costs.

[0005] In order to achieve the above object, the present invention adopts the following technical solution:

[0006] A multifunctional pile driver, characterized in that it includes a chassis, a first force arm, a second force arm, a third force arm, a first oil cylinder, a second oil cylinder, a third oil cylinder, a fourth oil cylinder, a fine-tuning device, a pile driver, and a clamp; the fine-tuning device includes a sliding shoe, a sliding groove, a cylinder sleeve support, a cylinder rod support, and a hydraulic cylinder; the pile driver includes a fourth oil cylinder, a fifth oil cylinder, a sixth oil cylinder, a seventh oil cylinder, an eighth oil cylinder, a vibrating hammer, a hydraulic motor, a rotating motor, a moving motor, a driving motor, a clamping hoop, a moving hoop, a rolling wheel, a concave groove, a bracket, a turbine vortex rod device, and a block; the first force arm and the first oil cylinder are both connected to the chassis through a pin shaft, the first force arm is connected to the first oil cylinder by a pin shaft, the first force arm is connected to the second force arm by a pin shaft, the first force arm and the second force arm of the second oil cylinder are both connected by a pin shaft, the second force arm and the third force arm are connected by a pin shaft, and the second force arm and the third force arm of the third oil cylinder are both connected by a pin shaft. The third force arm is connected with the pile planting device through a pin shaft; the fourth oil cylinder and the seventh oil cylinder are connected with the clamping hoop and the bracket through a pin shaft, the fifth oil cylinder and the sixth oil cylinder are connected with the mobile hoop and the bracket through a pin shaft, the vibrating hammer is connected with the bracket through a pin shaft, and the eighth oil cylinder is installed on the vibrating hammer, the clamping hoop is installed with a rotating motor, a rolling wheel and a clamping block, the clamping hoop is connected with the rotating motor, the rolling wheel and the clamping block through bolts, a concave groove and a mobile motor are installed in the mobile hoop, the mobile hoop is connected with the concave groove and the mobile motor through bolts, and the bracket is connected with the turbine vortex rod device through welding; the sliding shoe is connected with the third force arm through welding, the sliding groove is connected with the turbine vortex rod device through welding, the cylinder sleeve support is welded to the third force arm, the cylinder rod support is welded to the turbine vortex rod device, the cylinder sleeve of the hydraulic cylinder is connected with the cylinder sleeve support through bolts, and the cylinder rod of the hydraulic cylinder is connected with the cylinder rod support through bolts.

[0007] Preferably, the chassis is a crawler structure.

[0008] Preferably, the first lever arm is a telescopic rod, and the telescopic rod is divided into two sections.

[0009] Preferably, there are two eighth oil cylinders, the top end of the oil cylinder rod of the eighth oil cylinder is an arc-shaped structure, and a rubber pad is installed on the arc-shaped structure.

[0010] Preferably, the clamping block is a tile-like structure, and the curvature of the clamping block can be selected according to the diameter of the clamped prefabricated pile.

[0011] Preferably, the concave groove is a single-leaf hyperbolic structure, and the curvature of the concave groove matches the diameter of the precast pile. When clamping precast piles of different diameters, the concave groove is replaced.

[0012] A construction method of a multifunctional pile driver, characterized in that a multifunctional pile driver is used for construction, and the specific construction steps are as follows:

[0013] Step 1: Check the oil supply of each cylinder and the rotation capacity of the pile planting device, and adjust the vibrating hammer through the hydraulic horse to keep the vibrating hammer and the bracket in the same plane;

[0014] Step 2: Drive the chassis to move the multifunctional pile driver to the storage place of the prefabricated piles, and drive the first lever arm, the second lever arm, and the third lever arm to move by adjusting the first oil cylinder, the second oil cylinder, and the third oil cylinder, so that the third lever arm is close to the storage place of the prefabricated piles;

[0015] Step 3: If the precast piles are piled up, firstly, the fourth and seventh oil cylinders are used to drive the clamping hoop close to the precast piles, and the fifth and sixth oil cylinders are used to open the movable hoop, and the first, second and third oil cylinders are adjusted to drive the first, second and third lever arms to move, and then the position of the pile-planting device is adjusted to make the precast piles enter the clamping hoop, and the fourth and seventh oil cylinders are driven to make the clamping block in close contact with the precast piles;

[0016] Step 4: Rotate the chassis to make the precast piles leave the precast pile storage place in a horizontal state, and drive the mobile hoop to close by the fifth and sixth oil cylinders, so that the concave groove is in close contact with the precast piles; open the clamping hoop by driving the fourth and seventh oil cylinders, start the mobile motor, drive the concave groove to rotate, and then drive the precast piles to move. When the center of gravity of the precast piles moves to the middle position of the fifth and sixth oil cylinders, stop the mobile motor;

[0017] Step 5: Drive the fourth and seventh oil cylinders to close the clamping hoop, ensure that the clamping block is in close contact with the prefabricated pile, and drive the chassis to move the multifunctional pile driver to the vicinity of the designed pile position;

[0018] Step 6: The turbine worm device is rotated by driving the motor, and then the pile planting device is driven to rotate, so that the prefabricated pile is rotated to a vertical state, and the first lever arm, the second lever arm, and the third lever arm are driven to move by adjusting the first cylinder, the second cylinder, and the third cylinder, so that the prefabricated pile is roughly aligned with the designed pile position, and the prefabricated pile is accurately aligned with the pile position by the fine-tuning device;

[0019] Step 7: Open the clamping hoop by driving the fourth and seventh oil cylinders, start the moving motor, drive the concave groove to rotate, and then drive the precast pile to move into the pile hole. When the precast pile is exposed 0.5-1m above the ground, stop the moving motor, use the clamp to clamp the precast pile stably, drive the clamping hoop to open by the fourth and seventh oil cylinders, and open the moving hoop by the fifth and sixth oil cylinders;

[0020] Step 8: Repeat steps 3 to 6. If the precast piles are connected by welding, the two sections of the precast piles are welded after the precast piles are accurately aligned with the pile position. The clamping hoop is opened by driving the fourth oil cylinder and the seventh oil cylinder, and the moving motor is started to drive the concave groove to rotate, thereby driving the precast pile to move into the pile hole. If the precast piles are connected mechanically, the clamping hoop is closed by driving the fourth oil cylinder and the seventh oil cylinder after the precast piles are accurately aligned with the pile position, and the moving hoop is opened by the fifth oil cylinder and the sixth oil cylinder, and the rotating motor is started to drive the rolling wheel to drive the precast pile to rotate. When the mechanical docking interface is aligned, the rotating motor is stopped, the moving hoop is closed by the fifth oil cylinder and the sixth oil cylinder, and the moving motor is started to drive the concave groove to rotate, thereby driving the precast pile to dock. The concave groove is continuously driven to rotate by the moving motor, thereby driving the precast pile to move into the pile hole.

[0021] Step 9: When the precast pile is implanted into the pile position, if the precast pile cannot be implanted further only by driving the concave groove to rotate by the mobile motor, start the hydraulic motor to move the vibratory hammer to the precast pile, stop the hydraulic motor, start the eighth oil cylinder, ensure that the top of the oil cylinder rod of the eighth oil cylinder is in close contact with the precast pile, open the clamping hoop by driving the fourth oil cylinder and the seventh oil cylinder, open the mobile hoop by the fifth oil cylinder and the sixth oil cylinder, start the vibratory hammer, and at the same time, drive the first force arm, the second force arm, and the third force arm to move by adjusting the first oil cylinder, the second oil cylinder, and the third oil cylinder, thereby driving the precast pile to move into the pile hole;

[0022] Step 10: Repeat steps 7 and 9 until the length of the precast piles reaches the design requirements.

[0023] Preferably, the prefabricated piles are pipe piles, and the diameter of the pipe piles is 300mm-800mm.

[0024] Preferably, in the process of the multifunctional pile driver moving the precast pile to the vicinity of the designed pile position in step 5, the precast pile is in a horizontal state, and the distance between the precast pile and the ground is 0.3-1.5 m.

[0025] Beneficial technical effects brought by the present invention:

[0026] By setting a fine-tuning device and a rolling wheel, the precise docking of prefabricated piles can be achieved; by using multiple force arms and turbine vortex rod devices, the implantation of prefabricated piles under different working conditions, especially inclined piles, can be achieved; compared with traditional static presses and diesel hammers, the pile driver of the present invention has a smaller lift, lighter equipment, and stronger adaptability to the site; the pile driver of the present invention can complete the pile planting task alone without the help of other equipment, thereby reducing the construction process, improving the construction efficiency, and saving costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 The present invention is a schematic structural diagram of a multifunctional pile driver and a pile driver in a construction method thereof.

[0028] Figure 2 The present invention is a schematic structural diagram of a multifunctional pile driver and a pile driver in a construction method thereof.

[0029] Figure 3 The present invention is a schematic structural diagram of a multifunctional pile driver and a fine-tuning device in a construction method thereof.

[0030] Figure 4 The present invention is a schematic diagram of a structural cross-section of a fine-tuning device in a multifunctional pile driver and a construction method thereof.

[0031] Figure 5 The present invention is a schematic diagram of a cross-section of a movable hoop in a multifunctional pile driver and a construction method thereof.

[0032] Among them, 1-chassis, 2-first lever, 3-second lever, 4-third lever, 5-first oil cylinder, 6-second oil cylinder, 7-third oil cylinder, 8-fine-tuning device, 9-pile device, 81-slipper, 82-slide, 83-cylinder sleeve support, 84-hydraulic oil cylinder, 85-cylinder rod support, 91-fourth oil cylinder, 92-fifth oil cylinder, 93-sixth oil cylinder, 94-seventh oil cylinder, 95-eighth oil cylinder, 96-vibration hammer, 97-hydraulic motor, 98-rotation motor, 99-mobile motor, 910-drive motor, 911-holding hoop, 912-mobile hoop, 913-rolling wheel, 914-concave groove, 915-bracket, 916-turbine vortex rod device, 917-block. DETAILED DESCRIPTION

[0033] The present invention is further described in detail below with reference to the accompanying drawings and specific embodiments:

[0034] like Figures 1 to 5As shown, a multifunctional pile driver is characterized in that it includes a chassis 1, a first lever 2, a second lever 3, a third lever 4, a first oil cylinder 5, a second oil cylinder 6, a third oil cylinder 7, a fourth oil cylinder 91, a fine-tuning device 8, a pile driver 9, and a clamp; the fine-tuning device 8 includes a sliding shoe 81, a slide groove 82, a cylinder sleeve support 83, a cylinder rod support 85, and a hydraulic cylinder 84; the pile driver 9 includes a fourth oil cylinder 91, a fifth oil cylinder 92, a sixth oil cylinder 93, a seventh oil cylinder 94, an eighth oil cylinder 95, a vibrating hammer 96, a hydraulic motor 97, a rotating motor 98, a moving motor 99, and a driving motor 9 10, a clamping hoop 911, a moving hoop 912, a rolling wheel 913, a concave groove 914, a bracket 915, a turbine vortex rod device 916, and a clamping block 917; the first lever arm 2 and the first oil cylinder 5 are both connected to the chassis 1 through a pin shaft, the first lever arm 2 and the first oil cylinder 5 are connected by a pin shaft, the first lever arm 2 and the second lever arm 3 are connected by a pin shaft, the second lever arm 3 and the third lever arm 4 are connected by a pin shaft, the second lever arm 3 and the third lever arm 4 of the third oil cylinder 7 are both connected by a pin shaft, and the third lever arm 4 of the third oil cylinder 7 is connected by a pin shaft. The force arm 4 is connected to the pile-planting device 9 through the fine-tuning device 8; the fourth oil cylinder 91 and the seventh oil cylinder 94 are connected to the clamping hoop 911 and the bracket 915 through a pin shaft, the fifth oil cylinder 92 and the sixth oil cylinder 93 are connected to the mobile hoop 912 and the bracket 915 through a pin shaft, the vibrating hammer 96 is connected to the bracket 915 through a pin shaft, and the eighth oil cylinder 95 is installed on the vibrating hammer 96, the clamping hoop 911 is installed with a rotating motor 98, a rolling wheel 913 and a clamping block 917, the clamping hoop 911 is connected to the rotating motor 98, the rolling wheel 913 and the clamping block 917 through bolts, and the mobile hoop 912 is connected to the bracket 915 through a pin shaft. A concave groove 914 and a moving motor 99 are installed, the moving hoop 912 is connected to the concave groove 914 and the moving motor 99 by bolts, and the bracket 915 is connected to the turbine vortex rod device 916 by welding; the sliding shoe 81 is connected to the third force arm 4 by welding, the sliding groove 82 is connected to the turbine vortex rod device 916 by welding, the cylinder sleeve support 83 is welded to the third force arm 4, the cylinder rod support 85 is welded to the turbine vortex rod device 916, the cylinder sleeve of the hydraulic cylinder 84 is connected to the cylinder sleeve support 83 by bolts, and the cylinder rod of the hydraulic cylinder 84 is connected to the cylinder rod support 85 by bolts.

[0035] Preferably, the chassis 1 is a crawler structure.

[0036] Preferably, the first lever arm 2 is a telescopic rod, and the telescopic rod is divided into two sections.

[0037] Preferably, there are two eighth oil cylinders 95 , and the top end of the oil cylinder rod of the eighth oil cylinder 95 is an arc-shaped structure, on which a rubber pad is installed.

[0038] Preferably, the clamping block 917 is a tile-shaped structure, and the curvature of the clamping block 917 can be selected according to the diameter of the clamped prefabricated pile.

[0039] Preferably, the concave groove 914 is a single-leaf hyperboloid structure, and the curvature of the concave groove 914 matches the diameter of the precast pile. When clamping precast piles of different diameters, the concave groove 914 is replaced.

[0040] A construction method of a multifunctional pile driver, characterized in that a multifunctional pile driver is used for construction, and the specific construction steps are as follows:

[0041] Step 1: Check the oil supply of each oil cylinder and the rotation ability of the pile planting device 9, and adjust the vibrating hammer 96 through the hydraulic horse to keep the vibrating hammer 96 and the bracket 915 in the same plane;

[0042] Step 2: Drive the chassis 1 to move the multifunctional pile driver to the storage place of the prefabricated piles, and drive the first lever 2, the second lever 3, and the third lever 4 to move by adjusting the first oil cylinder 5, the second oil cylinder 6, and the third oil cylinder 7, so that the third lever 4 is close to the storage place of the prefabricated piles;

[0043] Step 3: If the precast piles are piled up, firstly, the fourth oil cylinder 91 and the seventh oil cylinder 94 are used to drive the clamping hoop 911 to approach the precast piles, and the fifth oil cylinder 92 and the sixth oil cylinder 93 are used to open the movable hoop 912, and the first oil cylinder 5, the second oil cylinder 6 and the third oil cylinder 7 are adjusted to drive the first lever 2, the second lever 3 and the third lever 4 to move, and then adjust the position of the pile planting device 9, so that the precast piles enter the clamping hoop 911, and drive the fourth oil cylinder 91 and the seventh oil cylinder 94 to make the clamping block 917 in close contact with the precast piles;

[0044] Step 4: Rotate the chassis 1 to make the precast piles leave the precast pile storage place in a horizontal state, and drive the mobile hoop 912 to close by the fifth oil cylinder 92 and the sixth oil cylinder 93, so that the concave groove 914 is in close contact with the precast pile; drive the fourth oil cylinder 91 and the seventh oil cylinder 94 to open the clamping hoop 911, start the mobile motor 99, drive the concave groove 914 to rotate, and then drive the precast pile to move. When the center of gravity of the precast pile moves to the middle position of the fifth oil cylinder 92 and the sixth oil cylinder 93, stop the mobile motor 99;

[0045] Step 5: Drive the fourth oil cylinder 91 and the seventh oil cylinder 94 to close the clamping hoop 911, ensure that the clamping block 917 is in close contact with the prefabricated pile, and drive the chassis 1 to move the multifunctional pile driver to the vicinity of the designed pile position;

[0046] Step 6: The turbine worm device 916 is rotated by driving the motor 910, thereby driving the pile planting device 9 to rotate, so that the prefabricated pile is rotated to a vertical state, and the first lever arm 2, the second lever arm 3, and the third lever arm 4 are moved by adjusting the first oil cylinder 5, the second oil cylinder 6, and the third oil cylinder 7, so that the prefabricated pile is roughly aligned with the designed pile position, and the prefabricated pile is accurately aligned with the pile position by the fine-tuning device 8;

[0047] Step 7: The clamping hoop 911 is opened by driving the fourth oil cylinder 91 and the seventh oil cylinder 94, and the moving motor 99 is started to drive the concave groove 914 to rotate, thereby driving the precast pile to move into the pile hole. When the precast pile is exposed 0.5-1m above the ground, the moving motor 99 is stopped, and the precast pile is clamped and stabilized by a clamp. The clamping hoop 911 is driven to open by the fourth oil cylinder 91 and the seventh oil cylinder 94, and the moving hoop 912 is opened by the fifth oil cylinder 92 and the sixth oil cylinder 93.

[0048] Step 8: Repeat steps 3 to 6. If the precast piles are connected by welding, the two sections of the precast piles are welded after the precast piles are accurately aligned with the pile position. The clamping hoop 911 is opened by driving the fourth oil cylinder 91 and the seventh oil cylinder 94, and the moving motor 99 is started to drive the concave groove 914 to rotate, thereby driving the precast pile to move into the pile hole. If the precast piles are connected by mechanical means, the precast piles are accurately aligned with the pile position, and the clamping hoop 911 is closed by driving the fourth oil cylinder 91 and the seventh oil cylinder 94. The fifth and sixth oil cylinders 92 and 93 are used to open the mobile hoop 912, and the rotary motor 98 is started to make the rolling wheel 913 drive the precast pile to rotate. When the mechanical docking interface is aligned, the rotary motor 98 is stopped, and the mobile hoop 912 is closed by the fifth and sixth oil cylinders 92 and 93, and the mobile motor 99 is started to drive the concave groove 914 to rotate, thereby driving the precast pile to complete docking, and the mobile motor 99 continuously drives the concave groove 914 to rotate, thereby driving the precast pile to move into the pile hole;

[0049] Step nine: When the precast pile is being implanted into the pile position, if the precast pile cannot be implanted further only by driving the concave groove 914 to rotate by the mobile motor 99, start the hydraulic motor 97 to move the vibrating hammer 96 to the precast pile, stop the hydraulic motor 97, start the eighth oil cylinder 95, ensure that the top of the oil cylinder rod of the eighth oil cylinder 95 is in close contact with the precast pile, open the clamping hoop 911 by driving the fourth oil cylinder 91 and the seventh oil cylinder 94, open the mobile hoop 912 by the fifth oil cylinder 92 and the sixth oil cylinder 93, start the vibrating hammer 96, and at the same time, drive the first lever 2, the second lever 3, and the third lever 4 to move by adjusting the first oil cylinder 5, the second oil cylinder 6, and the third oil cylinder 7, thereby driving the precast pile to move into the pile hole;

[0050] Step 10: Repeat steps 7 and 9 until the length of the precast piles reaches the design requirements.

[0051] Preferably, the prefabricated piles are pipe piles, and the diameter of the pipe piles is 300mm-800mm.

[0052] Preferably, in the process of the multifunctional pile driver moving the precast pile to the vicinity of the designed pile position in step 5, the precast pile is in a horizontal state, and the distance between the precast pile and the ground is 0.3-1.5 m.

[0053] The present invention discloses a multifunctional pile driver and a construction method thereof. Precise docking of prefabricated piles is achieved by arranging a fine-tuning device and a rolling wheel. Prefabricated piles can be implanted under different working conditions, especially inclined piles, by means of a plurality of force arms and a turbine worm device. Compared with conventional static presses and diesel hammers, the pile driver of the present invention has a smaller lift, is lighter in equipment, and has stronger adaptability to sites. The pile driver of the present invention can complete the pile planting task alone without the help of other equipment, thereby reducing the construction process, improving the construction efficiency, and saving the cost.

[0054] Of course, the above description is not a limitation of the present invention, and the present invention is not limited to the above examples. Changes, modifications, additions or substitutions made by technicians in this technical field within the essential scope of the present invention also fall within the protection scope of the present invention.

Claims

1. A multifunctional pile driver, characterized in that: It includes a chassis, a first force arm, a second force arm, a third force arm, a first oil cylinder, a second oil cylinder, a third oil cylinder, a fourth oil cylinder, a fine-tuning device, a pile planting device, and a clamp; the fine-tuning device includes a sliding shoe, a sliding groove, a cylinder sleeve support, a cylinder rod support, and a hydraulic cylinder; the pile planting device includes a fourth oil cylinder, a fifth oil cylinder, a sixth oil cylinder, a seventh oil cylinder, an eighth oil cylinder, a vibrating hammer, a hydraulic motor, a rotating motor, a mobile motor, a driving motor, a clamping hoop, a mobile hoop, a rolling wheel, a concave groove, a bracket, a turbine vortex rod device, and a block; the first force arm and the first oil cylinder are both connected to the chassis through a pin shaft, the first force arm is connected to the first oil cylinder by a pin shaft, the first force arm is connected to the second force arm by a pin shaft, the first force arm and the second force arm of the second oil cylinder are both connected by a pin shaft, the second force arm and the third force arm are connected by a pin shaft, the second force arm and the third force arm of the third oil cylinder are both connected by a pin shaft, and the The three force arms are connected to the pile planting device through a fine-tuning device; the fourth oil cylinder and the seventh oil cylinder are connected to the clamping hoop and the bracket through a pin shaft, the fifth oil cylinder and the sixth oil cylinder are connected to the mobile hoop and the bracket through a pin shaft, the vibrating hammer is connected to the bracket through a pin shaft, and the eighth oil cylinder is installed on the vibrating hammer, the clamping hoop is installed with a rotating motor, a rolling wheel and a clamping block, the clamping hoop is connected to the rotating motor, the rolling wheel and the clamping block through bolts, a concave groove and a mobile motor are installed in the mobile hoop, the mobile hoop is connected to the concave groove and the mobile motor through bolts, and the bracket is connected to the turbine vortex rod device through welding; the sliding shoe is connected to the third force arm through welding, the sliding groove is connected to the turbine vortex rod device through welding, the cylinder sleeve support is welded to the third force arm, the cylinder rod support is welded to the turbine vortex rod device, the cylinder sleeve of the hydraulic cylinder is connected to the cylinder sleeve support through bolts, and the cylinder rod of the hydraulic cylinder is connected to the cylinder rod support through bolts.

2. A multifunctional pile driver according to claim 1, characterized in that: The chassis is a crawler structure.

3. The multifunctional pile driver according to claim 1, characterized in that: The first lever arm is a telescopic rod, and the telescopic rod is divided into two sections.

4. The multifunctional pile driver according to claim 1, characterized in that: There are two eighth oil cylinders, and the top end of the oil cylinder rod of the eighth oil cylinder is an arc-shaped structure, and a rubber pad is installed on the arc-shaped structure.

5. The multifunctional pile driver according to claim 1, characterized in that: The clamping block is a tile-like structure, and the curvature of the clamping block is selected according to the diameter of the clamped prefabricated pile.

6. The multifunctional pile driver according to claim 1, characterized in that: The concave groove is a single-leaf hyperbolic structure, and the curvature of the concave groove matches the diameter of the precast pile. When clamping precast piles of different diameters, the concave groove is replaced.

7. A construction method of a multifunctional pile driver, characterized in that: The multifunctional pile driver described in claim 1 is used for construction, and the specific construction steps are as follows: Step 1: Check the oil supply of each cylinder and the rotation capacity of the pile planting device, and adjust the vibrating hammer through the hydraulic horse to keep the vibrating hammer and the bracket in the same plane; Step 2: Drive the chassis to move the multifunctional pile driver to the storage place of the prefabricated piles, and drive the first lever arm, the second lever arm, and the third lever arm to move by adjusting the first oil cylinder, the second oil cylinder, and the third oil cylinder, so that the third lever arm is close to the storage place of the prefabricated piles; Step 3: If the precast piles are piled up, firstly, the fourth and seventh oil cylinders are used to drive the clamping hoop close to the precast piles, and the fifth and sixth oil cylinders are used to open the movable hoop, and the first, second and third oil cylinders are adjusted to drive the first, second and third lever arms to move, and then the position of the pile-planting device is adjusted to make the precast piles enter the clamping hoop, and the fourth and seventh oil cylinders are driven to make the clamping block in close contact with the precast piles; Step 4: Rotate the chassis to make the precast piles leave the precast pile storage area in a horizontal state, and drive the movable hoop to close through the fifth and sixth oil cylinders to make the concave grooves closely contact with the precast piles; The clamping hoop is opened by driving the fourth and seventh oil cylinders, and the moving motor is started to drive the concave groove to rotate, thereby driving the precast pile to move. When the center of gravity of the precast pile moves to the middle position between the fifth and sixth oil cylinders, the moving motor is stopped; Step 5: Drive the fourth and seventh oil cylinders to close the clamping hoop, ensure that the clamping block is in close contact with the prefabricated pile, and drive the chassis to move the multifunctional pile driver to the vicinity of the designed pile position; Step 6: The turbine worm device is rotated by driving the motor, and then the pile planting device is driven to rotate, so that the prefabricated pile is rotated to a vertical state, and the first lever arm, the second lever arm, and the third lever arm are driven to move by adjusting the first cylinder, the second cylinder, and the third cylinder, so that the prefabricated pile is roughly aligned with the designed pile position, and the prefabricated pile is accurately aligned with the pile position by the fine-tuning device; Step 7: Open the clamping hoop by driving the fourth and seventh oil cylinders, start the moving motor, drive the concave groove to rotate, and then drive the precast pile to move into the pile hole. When the precast pile is exposed 0.5-1m above the ground, stop the moving motor, use the clamp to clamp the precast pile stably, drive the clamping hoop to open by the fourth and seventh oil cylinders, and open the moving hoop by the fifth and sixth oil cylinders; Step 8: Repeat steps 3 to 6. If the precast piles are connected by welding, the two sections of the precast piles are welded after the precast piles are accurately aligned with the pile position. The clamping hoop is opened by driving the fourth oil cylinder and the seventh oil cylinder, and the moving motor is started to drive the concave groove to rotate, thereby driving the precast pile to move into the pile hole. If the precast piles are connected mechanically, the clamping hoop is closed by driving the fourth oil cylinder and the seventh oil cylinder after the precast piles are accurately aligned with the pile position, and the moving hoop is opened by the fifth oil cylinder and the sixth oil cylinder, and the rotating motor is started to drive the rolling wheel to drive the precast pile to rotate. When the mechanical docking interface is aligned, the rotating motor is stopped, the moving hoop is closed by the fifth oil cylinder and the sixth oil cylinder, and the moving motor is started to drive the concave groove to rotate, thereby driving the precast pile to dock. The concave groove is continuously driven to rotate by the moving motor, thereby driving the precast pile to move into the pile hole. Step 9: When the precast pile is implanted into the pile position, if the precast pile cannot be implanted further only by driving the concave groove to rotate by the mobile motor, start the hydraulic motor to move the vibratory hammer to the precast pile, stop the hydraulic motor, start the eighth oil cylinder, ensure that the top of the oil cylinder rod of the eighth oil cylinder is in close contact with the precast pile, open the clamping hoop by driving the fourth oil cylinder and the seventh oil cylinder, open the mobile hoop by the fifth oil cylinder and the sixth oil cylinder, start the vibratory hammer, and at the same time, drive the first force arm, the second force arm, and the third force arm to move by adjusting the first oil cylinder, the second oil cylinder, and the third oil cylinder, thereby driving the precast pile to move into the pile hole; Step 10: Repeat steps 7 and 9 until the length of the precast piles reaches the design requirements.

8. The construction method of a multifunctional pile driver according to claim 7, characterized in that: The prefabricated piles are pipe piles, and the diameter of the pipe piles is 300mm-800mm.

9. The construction method of a multifunctional pile driver according to claim 7, characterized in that: In the process of the multifunctional pile driver moving the prefabricated pile to the vicinity of the designed pile position in step 5, the prefabricated pile is in a horizontal state, and the distance between the prefabricated pile and the ground is 0.3-1.5m.