Program maintenance task processing method, device, equipment and storage medium

By obtaining the task information list from the server and calculating the predicted time-consuming, the problem of being unable to predict the time-consuming of maintenance tasks in the existing technology is solved, scientific prediction and efficiency improvement of maintenance tasks are achieved, and the work efficiency and task scheduling of the maintenance team are optimized. .

CN112085289BActive Publication Date: 2024-10-15GUANGZHOU FANGGUI INFORMATION TECHNOLOGY CO LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202010978817.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-09-17
Publication Date
2024-10-15
Estimated Expiration
2040-09-17

AI Technical Summary

Technical Problem

Existing program error tracking software cannot effectively predict the total and average time it takes maintenance team members to complete program maintenance tasks, resulting in the inability to understand work efficiency and analyze maintenance costs, and cannot effectively improve the work efficiency of the maintenance team.

Method used

By obtaining the task information list from the server, calculating the difference between task resolution time and creation time, introducing a duration adjustment factor to determine the resolution time of unfinished tasks, classifying and summarizing based on the dimensions of maintenance tasks, and calculating the average and total predicted time consumption, so that Schedule unfinished tasks.

Benefits of technology

It achieves scientific and accurate prediction of maintenance tasks, helps the maintenance team customize the duration adjustment factor, improves the efficiency and work efficiency of maintenance tasks, and optimizes task dispatch and scheduling.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112085289B_ABST
    Figure CN112085289B_ABST
Patent Text Reader

Abstract

The present application discloses a method, device, equipment and storage medium for processing program maintenance tasks, the method comprising: obtaining a task information list from a server, the list comprising a plurality of data records, each data record being used to describe the project dimension, the person in charge dimension, the task creation time and the task resolution time of a program maintenance task, and a data record with an empty task resolution time being an unfinished maintenance task; calling the list for calculation, determining the difference between the task resolution time and the task creation time as the individual time consumption of the corresponding maintenance task, for the unfinished maintenance task, importing a duration adjustment factor to determine its task resolution time to determine its individual time consumption; classifying and summarizing based on any dimension to which the maintenance task belongs, calculating the average predicted time consumption for each classification, and calculating the total predicted time consumption for all unfinished maintenance tasks in each classification based on the average predicted time consumption. The present application helps to improve the processing efficiency of program maintenance tasks.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of computer software engineering, and in particular to a method, device, equipment and storage medium for processing program maintenance tasks. Background Art

[0002] During the program development process, the development team will inevitably encounter program errors such as program vulnerabilities, program anomalies, program failures, etc. caused by problems in code writing or the operating environment. For this reason, a maintenance team will be set up within the development team to resolve program errors that arise in various situations.

[0003] Today, most maintenance teams use bug tracking software to create tasks for recording bugs and build workflows for the maintenance team so that the maintenance team can find, record, and track bugs in the programs they develop. This way, the maintenance team can assign unfinished maintenance tasks to team members at the appropriate time.

[0004] Existing bug tracking software cannot predict the total time and average time it takes for each team member to complete program maintenance tasks. This makes it impossible for the maintenance team to intuitively understand the work efficiency of each team member through the bug tracking software, and it is impossible to predict whether the members have completed their work targets within a quarter.

[0005] Secondly, the program error tracking software cannot predict the total time it takes for the maintenance team to solve all program maintenance tasks for a project, nor can it predict the average time it takes for the maintenance team to complete all program maintenance tasks for a project. This will make it impossible for the maintenance team to effectively analyze the maintenance costs of each project through the program error tracking software and to predict the work efficiency of the maintenance team.

[0006] To sum up, although program error tracking software can improve the repair efficiency of the maintenance team to a certain extent, program error tracking software still has various deficiencies in its functions. In most cases, it can only be used as a software for recording program errors, which is not enough to effectively improve the work efficiency of the maintenance team. Summary of the invention

[0007] The primary purpose of the present application is to provide a method for processing program maintenance tasks, which helps to improve the maintenance efficiency of computer program maintenance tasks by utilizing maintenance task-related data of computer programs.

[0008] As other purposes of the present application, a program maintenance task processing control device, an electronic device and a non-volatile storage medium compatible with the aforementioned method are provided.

[0009] In order to meet the various objectives of this application, this application adopts the following technical solutions:

[0010] A program maintenance task processing method provided to meet the primary purpose of this application includes the following steps:

[0011] Initiate a request to the server to obtain a task information list, wherein the task information list includes multiple data records, each of which is used to describe the project dimension, the person in charge dimension, the task creation time, and the task resolution time of a program maintenance task, wherein the program maintenance task described by the data record with a blank task resolution time is an unfinished maintenance task;

[0012] The task information list is called for calculation, and the difference between the task resolution time and the task creation time in each data record is determined as the individual time consumption of the corresponding maintenance task, wherein, for unfinished maintenance tasks, a duration adjustment factor is introduced to determine its task resolution time to determine the corresponding individual time consumption;

[0013] Based on any dimension to which the maintenance tasks belong, the maintenance tasks are classified and summarized, and the average predicted time of all maintenance tasks corresponding to each category is calculated. Based on the average predicted time, the total predicted time of all unfinished maintenance tasks corresponding to each category is calculated.

[0014] Furthermore, before the duration adjustment factor is imported for the unfinished maintenance task, the time parameter corresponding to the unfinished maintenance task input by the user is first received as the duration adjustment factor.

[0015] Preferably, the maintenance task is a planned task created based on any programming error such as a vulnerability, anomaly, or failure caused by a computer program.

[0016] In a further embodiment, it comprises the post-step:

[0017] The unfinished maintenance tasks are scheduled based on the assignee dimension, and a task modification instruction is sent to the server, so that the server responds to the task modification instruction and modifies the unfinished maintenance tasks of one category under the assignee dimension to belong to another category.

[0018] In a preferred embodiment, scheduling of unfinished maintenance tasks based on the dimension of the person in charge and sending a task modification instruction to the server include the following specific measures:

[0019] Determine the unfinished maintenance tasks corresponding to the category with the largest total predicted time consumption under the project dimension / responsor dimension;

[0020] Determine the category with the smallest average forecast time or total forecast time under the agent dimension;

[0021] Encapsulating the task modification instruction so that the task modification instruction includes indication information of the partially uncompleted maintenance tasks of the largest classification and indication information of the smallest classification;

[0022] The task modification instruction is sent to the server so that the server implements the modification according to the instruction information.

[0023] Furthermore, the task modification instruction triggers the server to push a notification message to users corresponding to the category in which the ownership relationship of the unfinished maintenance task is changed.

[0024] Preferably, the method is triggered by a computer timer task and executes each step cyclically.

[0025] A program maintenance task processing device proposed to meet another purpose of the present application includes:

[0026] A list request module is used to initiate a request to the server to obtain a task information list, wherein the task information list includes multiple data records, each of which is used to describe the project dimension, the person in charge dimension, the task creation time, and the task resolution time of a program maintenance task, wherein the program maintenance task described by the data record with a blank task resolution time is an unfinished maintenance task;

[0027] An adjustment trial calculation module is used to call the task information list for calculation, and determine the difference between the task resolution time and the task creation time in each data record as the individual time consumption of the corresponding maintenance task, wherein, for the unfinished maintenance task, a duration adjustment factor is introduced to determine its task resolution time to determine the corresponding individual time consumption;

[0028] The time consumption prediction module is used to classify and summarize the maintenance tasks based on any dimension to which they belong, calculate the average predicted time consumption of all maintenance tasks corresponding to each category, and calculate the total predicted time consumption of all unfinished maintenance tasks corresponding to each category based on the average predicted time consumption.

[0029] An electronic device proposed to meet another purpose of the present application includes a central processing unit and a memory, wherein the central processing unit is used to call and run a computer program stored in the memory to execute the steps of the program maintenance task processing method described in the application.

[0030] A non-volatile storage medium is proposed to meet another purpose of the present application, which stores a computer program implemented according to the program maintenance task processing method. When the computer program is called and executed by a computer, the steps included in the method are executed.

[0031] Compared with the prior art, the advantages of this application are as follows:

[0032] This application obtains data records about program maintenance tasks from the server, that is, the task information list, and processes it accordingly, in order to pursue more scientific and accurate prediction results, in order to effectively utilize the information related to maintenance tasks recorded by software tools such as program error tracking software. Based on the data records of the task information list obtained, this application introduces a time adjustment factor to the unfinished maintenance tasks to assist in the evaluation of task time, thereby technically providing a way to allow the maintenance team to customize the time adjustment factor according to the work situation of its members and the actual situation of each project, thereby helping to preliminarily predict the resolution time of each unfinished maintenance task, and then preliminarily predict the resolution time of each maintenance task including the unfinished maintenance task, that is, calculate the individual time consumption of each data record, and then calculate the average predicted time consumption of the maintenance tasks classified in each dimension, and the total predicted time consumption of the unfinished maintenance tasks. The maintenance team can analyze the maintenance time cost of each project and the work efficiency of each member of the maintenance team through the various data obtained by calculation, so as to distribute the maintenance tasks in the maintenance team to the corresponding members and further realize scheduling. It can be understood that the implementation of this application will effectively improve the work efficiency of the maintenance team in completing maintenance tasks.

[0033] Additional aspects and advantages of the present application will be partially given in the following description, which will become apparent from the following description, or will be understood through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:

[0035] Figure 1 A schematic diagram of a typical network deployment architecture related to implementing the technical solution of this application;

[0036] Figure 2 A flowchart of a typical embodiment of the program maintenance task processing method of the present application;

[0037] Figure 3 A flowchart of another embodiment of the method for processing maintenance tasks of the present application program;

[0038] Figure 4 It is a principle block diagram of a typical embodiment of the program maintenance task processing device of the present application. DETAILED DESCRIPTION

[0039] The embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present application, and cannot be interpreted as limiting the present application.

[0040] It will be understood by those skilled in the art that, unless expressly stated, the singular forms "one", "said", and "the" used herein may also include plural forms. It should be further understood that the term "comprising" used in the specification of the present application refers to the presence of the features, integers, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, integers, steps, operations, elements, components and / or groups thereof. It should be understood that when we refer to an element as being "connected" or "coupled" to another element, it may be directly connected or coupled to the other element, or there may be an intermediate element. In addition, the "connection" or "coupling" used herein may include wireless connection or wireless coupling. The term "and / or" used herein includes all or any unit and all combinations of one or more associated listed items.

[0041] It will be understood by those skilled in the art that, unless otherwise defined, all terms (including technical and scientific terms) used herein have the same meaning as those generally understood by those skilled in the art to which this application belongs. It should also be understood that terms such as those defined in general dictionaries should be understood to have meanings consistent with those in the context of the prior art, and will not be interpreted with idealized or overly formal meanings unless specifically defined as here.

[0042] It will be understood by those skilled in the art that the "client", "terminal" and "terminal device" used herein include both devices with wireless signal receivers, which are devices with only wireless signal receivers without transmission capabilities, and devices with receiving and transmitting hardware, which are devices with receiving and transmitting hardware capable of two-way communication on a two-way communication link. Such devices may include: cellular or other communication devices such as personal computers, tablet computers, which have single-line displays or multi-line displays or cellular or other communication devices without multi-line displays; PCS (Personal Communications Service, personal communication system), which can combine voice, data processing, fax and / or data communication capabilities; PDA (Personal Digital Assistant, personal digital assistant), which may include a radio frequency receiver, pager, Internet / intranet access, web browser, notepad, calendar and / or GPS (Global Positioning System, global positioning system) receiver; conventional laptop and / or palmtop computers or other devices, which have and / or include a conventional laptop and / or palmtop computer or other device with and / or including a radio frequency receiver. The "client", "terminal" and "terminal device" used herein may be portable, transportable, installed in a vehicle (air, sea and / or land), or suitable for and / or configured to run locally, and / or in a distributed form, at any other location on the earth and / or in space. The "client", "terminal" and "terminal device" used herein may also be a communication terminal, an Internet terminal, a music / video playing terminal, for example, a PDA, a MID (Mobile Internet Device) and / or a mobile phone with a music / video playing function, or a smart TV, a set-top box and other devices.

[0043] The hardware referred to by the names such as "server", "client", and "service node" in this application is essentially an electronic device with the equivalent capabilities of a personal computer. It is a hardware device with the necessary components revealed by the von Neumann principle, such as a central processing unit (including an arithmetic unit and a controller), a memory, an input device, and an output device. The computer program is stored in its memory, and the central processing unit calls the program stored in the external memory into the internal memory for execution, executes the instructions in the program, and interacts with the input and output devices to complete specific functions.

[0044] It should be pointed out that the concept of "server" referred to in this application can also be extended to the case of server clusters. According to the network deployment principle understood by those skilled in the art, the servers should be logically divided. In physical space, these servers can be independent of each other but can be called through interfaces, or integrated into a physical computer or a set of computer clusters. Those skilled in the art should understand this flexibility, and should not use it to restrict the implementation of the network deployment method of this application.

[0045] See also Figure 1 , the hardware foundation required for the implementation of the relevant technical solutions of this application can be deployed according to the architecture shown in the figure. The server 80 referred to in this application is deployed in the cloud. As a front-end application server, it can be responsible for further connecting relevant data servers, instant messaging servers, and database servers for program error tracking software, interface component databases, and other servers that provide relevant support, etc., so as to form a logically associated service cluster to provide services for related terminal devices such as the smartphone 81 and personal computer 82 shown in the figure. The smartphone and personal computer can both access the Internet through a well-known network access method, and establish a data communication link with the server 80 in the cloud, so as to run the terminal application related to the service provided by the server. In the relevant technical solutions of this application, the server 80 is responsible for establishing the program error tracking software operation service, and the terminal correspondingly runs the application corresponding to the software.

[0046] The program error tracking software described in this application has the main purpose of providing a service for maintenance team members to record program maintenance task information, that is, the maintenance team can create program maintenance tasks on this software and enter program maintenance task information, including the project dimension, the person in charge dimension, the task creation time, the task resolution time and other information of a program maintenance task. This software builds a maintenance task database to store all recorded program maintenance task information, and stores the maintenance task database in the relevant server so that this application can obtain it through the relevant network protocol for the implementation of this application.

[0047] It should be noted that the program error tracking software may be third-party software or software independently developed by the maintenance team.

[0048] A common program error tracking software, such as Jira Software, can be used by users to input maintenance task related information through related controls provided on the graphical user interface of this software, so as to create maintenance tasks; this software can be run on a server, and can store maintenance tasks created by users in a corresponding database, so that users can connect to the Jira Software database through Python and the Atlassian library of this software, and obtain relevant information of corresponding maintenance tasks through the JQL statements provided by this software, so as to further implement the relevant information of maintenance tasks. The technical solution of this application can be applied to Jira Software, and of course, it can also be applied to other similar software. The subsequent description can be understood by those skilled in the art in conjunction with the examples given here.

[0049] Those skilled in the art should be aware that, although the various methods of the present application are described based on the same concept and thus present commonality to each other, unless otherwise specified, these methods can be independently executed. Similarly, for each embodiment disclosed in the present application, they are all proposed based on the same inventive concept, therefore, concepts with the same expression, and concepts that are appropriately changed for convenience despite different expressions, should be understood as equivalent.

[0050] See also Figure 2 A typical embodiment of the program maintenance task processing method of the present application includes the following steps:

[0051] Step S11, initiate a request to the server to obtain a task information list, the task information list includes multiple data records, each data record is used to describe the project dimension, the person in charge dimension, the task creation time, and the task resolution time of a program maintenance task, wherein the program maintenance task described by the data record with a blank task resolution time is an unfinished maintenance task:

[0052] This step obtains data related to multiple maintenance tasks from the server for the implementation of subsequent steps, so it is necessary to send a request to the server to obtain a task information list containing multiple data records. The task information list can be composed of multiple rows of data records, each of which corresponds to various data describing a maintenance task related to a computer program.

[0053] The maintenance task refers to a planned task created by the maintenance team members based on any programming error such as vulnerabilities, anomalies, and failures caused by the computer program during the process of developing or running a computer program. The maintenance team members can enter relevant information through program error tracking software to record the maintenance task; the maintenance task is managed based on the project dimension, and each project can contain multiple maintenance tasks. Each maintenance task can be assigned to the corresponding person in charge of handling the task, so it can also be managed based on the person in charge.

[0054] On the server side, maintenance team members enter relevant information for each maintenance task on the program error tracking software. This information is stored in the corresponding database by the program error tracking software. Members input this relevant information through the relevant controls provided by the program error tracking software graphical user interface to effectively manage maintenance tasks and provide a data source for the task information list.

[0055] When a request is made to the server to obtain the task information list, the server extracts the relevant information from its database and generates a data record in the task information list for each maintenance task. The data record contains maintenance task information such as the project dimension, the person in charge dimension, the task creation time and the task resolution time related to the maintenance task. It can also usually include unique feature information such as the feature code or keywords of the maintenance task, so as to determine the specific maintenance task and facilitate the specification of the scheduled maintenance task during subsequent scheduling.

[0056] Since the server side records the project dimension related to each maintenance task, that is, which project it belongs to, and records the person in charge dimension related to each maintenance task, that is, which person in charge handles it, the data records in the task information list will also reflect the contents of these two dimensions of the maintenance task.

[0057] Generally speaking, when a maintenance task begins to be processed or generated, the task creation time will be recorded according to the inherent business logic of the program error tracking software. When the maintenance task is processed, the program error tracking software will also record its corresponding task resolution time. It can be understood that the difference between the task resolution time and the task creation time is understood as the processing time of the maintenance task, which represents the individual time spent on actually resolving the maintenance task. Therefore, it can also be understood that when a task only has a task creation time but no task resolution time, it is generally because the maintenance task is in the process of being processed, that is, the maintenance task is an unfinished maintenance task.

[0058] The task information list provided by the server in response to the request of this method includes completed maintenance tasks and unfinished maintenance tasks. The task resolution time of the former is not empty, while the task resolution time of the latter is generally empty because it is not marked.

[0059] Step S12, calling the task information list for calculation, determining the difference between the task resolution time and the task creation time in each data record as the individual time consumption of the corresponding maintenance task, wherein, for unfinished maintenance tasks, importing a duration adjustment factor to determine its task resolution time to determine the corresponding individual time consumption:

[0060] As mentioned above, the task information list will contain multiple data records; this step will obtain the task creation time and task resolution time contained in each data record, and perform a difference calculation on the task creation time and the task resolution time to determine the individual time consumption corresponding to each maintenance task.

[0061] It should be noted that, as mentioned above, in the task information list, some of the data records will not include the task resolution time, that is, the unfinished maintenance tasks, which makes it impossible to calculate their corresponding individual time consumption. If this problem is not handled accordingly, this step will not be able to accurately calculate the individual time consumption of the unfinished maintenance tasks. For this reason, this step imports a duration adjustment factor to determine the task resolution time of the unfinished maintenance tasks.

[0062] In a typical embodiment, the duration adjustment factor can be manually set in advance and can be a duration, for example, uniformly set to 1 hour. When the unfinished maintenance tasks are included in the task information ranking list, the manually set duration will be added to the current system time as the task resolution time for all unfinished maintenance tasks. According to actual needs, to adapt to different unfinished maintenance tasks, the duration adjustment factor can also be personalized so that different unfinished maintenance tasks have different task resolution times. In another equivalent implementation, the duration adjustment factor can be input by the user as a specified specific time, and the specific time can be directly used as the task resolution time, which can be handled flexibly.

[0063] The duration adjustment factor can be entered by the user through relevant controls in the graphical user interface or other methods. After the user enters it, it can be used to determine the task resolution time of all unfinished maintenance tasks in the task information list. Technical personnel in this field can flexibly design this.

[0064] In one embodiment, the programming language for implementing the difference calculation between the task resolution time and the task creation time of each maintenance task can be Python. The difference calculation can be performed by calling the mktime and strptime functions in the Python time library in Python to format the obtained task creation time and task resolution time into timestamps that can be added and subtracted, and then the calculation result is calculated in milliseconds and formatted into a numerical string with two decimal places, so as to obtain the individual time consumption of the maintenance task. Since the manually set task resolution time is also recorded for the unfinished maintenance tasks, the individual time consumption of all maintenance tasks can be calculated.

[0065] The individual time consumed calculated in this step represents the time consumed to complete the corresponding maintenance task. Although the individual time consumed for unfinished maintenance tasks is simulated by giving the time adjustment factor, it does not affect the calculation of the individual time consumed.

[0066] The determination of individual time consumption facilitates the statistics of the total amount of individual time consumption of each project and each handler according to the project dimension and the handler dimension of the maintenance task to which it belongs, and even further analyzes the total amount of individual time consumption corresponding to each handler handling different projects. In this way, the maintenance team can further analyze the maintenance time of each project and the work efficiency of each handler.

[0067] It can be seen that by introducing a duration adjustment factor in the process of calculating the individual time consumption for unfinished maintenance tasks, the individual time consumption of unfinished maintenance tasks can be effectively predicted, thereby providing corresponding key data for the implementation of subsequent steps of this application, making the execution of subsequent steps more scientific and well-founded, and ultimately pursuing more accurate prediction results.

[0068] Step S13, classify and summarize the maintenance tasks based on any dimension to which they belong, calculate the average predicted time of all maintenance tasks corresponding to each category, and calculate the total predicted time of all unfinished maintenance tasks corresponding to each category based on the average predicted time:

[0069] The so-called classification aggregation in this application mainly means classifying the same elements under each dimension into one category, and aggregating one or more fields of the maintenance tasks related to each classified element, so as to obtain the average predicted time and total predicted time for each classified element.

[0070] As mentioned above, maintenance tasks have two dimensions, one is the (belonging) project dimension, and the other is the (belonging) person-in-charge dimension. By classifying the corresponding dimensions, for example, for the project dimension, it is classified into Project A, Project B...Project N; for the person-in-charge dimension, it is classified into Person A, Person B...Project F. Each category generally contains several maintenance tasks belonging to the same category. Therefore, various related data can be summarized and calculated for each category.

[0071] When summarizing the classified task information list, in this application, the average predicted time is obtained by summing up and averaging the individual time of the maintenance tasks of the same classification. For example, for the project dimension, the average predicted time can be calculated by dividing the sum of the individual time of all maintenance tasks corresponding to each specific project by the total number of all maintenance tasks of the project. Similarly, for the agent dimension, the average predicted time can be calculated by dividing the sum of the individual time of all maintenance tasks that each specific agent is responsible for by the total number of maintenance tasks that he is responsible for.

[0072] The intermediate process or final results obtained by classification and aggregation can be stored as a dimension list of corresponding dimensions for subsequent calls.

[0073] It can be seen that the average predicted time refers to the average predicted time corresponding to each maintenance task under a certain category of a certain dimension. The prediction and determination of the average predicted time depends on the introduction of the duration adjustment factor used to determine the task resolution time of the unfinished maintenance task so that the data records corresponding to each maintenance task in the task information list are complete, and then the task creation time and task resolution time are calculated to obtain the individual time of the unfinished maintenance task. Finally, the average predicted time of all maintenance tasks associated with each category under each dimension is calculated through classification and summary.

[0074] The total predicted time of unfinished maintenance tasks is calculated and determined for unfinished maintenance tasks. For example, by querying the total number of unfinished maintenance tasks of a certain category under a certain dimension and the average predicted time corresponding to the category, the total predicted time required for unfinished maintenance tasks in the category can be determined. Specifically, for the project dimension, the total predicted time of unfinished maintenance tasks for each project can be determined; for the agent dimension, the total predicted time of unfinished maintenance tasks for each agent can be determined; and even the total predicted time of unfinished maintenance tasks for each agent under different projects can be calculated.

[0075] Although the calculation of the average predicted time and the total predicted time is the result of importing the duration adjustment factor to determine the task resolution time of the unfinished maintenance task and calculating based on this, that is, part of the calculation of this application is performed around the duration adjustment factor, which is subject to the possibility of subjective interference, but it helps to infinitely approach the actual result in terms of adjustment capability, so that the accuracy of the average predicted time and the total predicted time is infinitely close to the actual work results. In theory, it will help to control and improve the work efficiency of the maintenance team in completing maintenance tasks.

[0076] refer to Figure 3 In another embodiment of the present application, the average predicted time and the total predicted time are further used to implement maintenance task scheduling that can effectively improve the work efficiency of the maintenance team. This embodiment mainly adds step S14 on the basis of the typical embodiment, and therefore, the following mainly further describes the differences:

[0077] Step S14, scheduling the unfinished maintenance tasks based on the assignee dimension, and sending a task modification instruction to the server, so that the server responds to the task modification instruction and modifies the unfinished maintenance tasks of one category under the assignee dimension into unfinished maintenance tasks of another category:

[0078] The scheduling of maintenance tasks needs to be carried out on a person-by-person basis. Therefore, when scheduling maintenance tasks, this application mainly uses the person in charge as the scheduling object. However, the data basis for implementing the scheduling can be based on the actual situation of the project and the person in charge, so it can be implemented flexibly.

[0079] Specifically, because the average predicted time and the total predicted time can be calculated based on the project dimension or the handler dimension, the average predicted time and the total predicted time can be used as the basis for the scheduling implemented in this application. Therefore, we can consider the average predicted time and the total predicted time of each category to which they belong respectively from the project dimension and the handler dimension, and flexibly implement various maintenance task scheduling methods through various methods.

[0080] In order to facilitate data reference during scheduling, in one embodiment, based on the project dimension and the handler dimension, the data of the average predicted time and the total predicted time corresponding to each category can be organized to generate a corresponding project prediction list and handler prediction list, that is, the project prediction list stores the mapping relationship data between each project and its corresponding average predicted time and the total predicted time of unfinished maintenance tasks, and the handler prediction list stores the mapping relationship data between each handler and its corresponding average predicted time and the total predicted time of unfinished maintenance tasks. Of course, the setting of these lists is only for the convenience of data reference and text description. In other embodiments, these lists do not need to be set, and it does not affect the implementation of this application.

[0081] In view of this, the methods for scheduling unfinished maintenance tasks can be described in two categories, as follows:

[0082] The first type of scheduling implementation method is mainly based on the project dimension and can be divided into four steps:

[0083] Step 1: Determine the unfinished maintenance tasks corresponding to the category with the largest total predicted time consumption under the project dimension.

[0084] This step requires determining the unfinished maintenance tasks to be scheduled, and the implementation method for determining the unfinished maintenance tasks to be scheduled is also flexible. For example, half of the total amount of unfinished maintenance tasks of a certain category under a certain dimension can be used for scheduling, and the unfinished maintenance tasks with the earliest task creation time can be used for scheduling. The above methods can be implemented flexibly.

[0085] In one embodiment, if the project forecast list exists, the project forecast list is queried, or the project (classification) with the longest total predicted time consumption under the project dimension is determined directly based on the various calculation results mentioned above. Then, the part of the unfinished maintenance tasks corresponding to the project (classification) in the task information list is queried as the scheduled maintenance tasks.

[0086] Step 2: Determine the category with the smallest average forecast time or total forecast time under the agent dimension.

[0087] This step aims to determine the specific persons who will receive the unfinished tasks. There are many rules that can be used to determine these recipients, for example:

[0088] In the first rule, this step can determine the handler (classification) with the shortest average prediction time as the receiving object by querying the handler prediction list or according to other relationships disclosed in the previous text.

[0089] In the second rule, this step can determine the handler (category) with the shortest total prediction time as the receiving object by querying the handler prediction list or according to other relationships disclosed in the previous text.

[0090] In the third rule, the average prediction time and the total prediction time can even be compared at the same time, and the object can be determined according to a more comprehensive investigation principle, and technical personnel in this field can flexibly change it accordingly.

[0091] Step three: encapsulate the task modification instruction so that the task modification instruction includes the indication information of the part of the unfinished maintenance tasks of the largest classification and the indication information of the smallest classification.

[0092] In one embodiment, this step encapsulates the task modification instruction according to one or more of the unfinished maintenance tasks under the above-mentioned project with the largest total predicted time consumption and the determined receiving object, so that the instruction not only includes the indication information of the unfinished maintenance tasks, but also includes the indication information of the receiving object. The indication information of the unfinished maintenance task can be the unique characteristic information of the maintenance task given in the task information list, and the indication information of the receiving object can be the specific person in charge (classification). In this way, the task modification instruction can be generated.

[0093] Step 4: Send the task modification instruction to the server so that the server implements the modification according to the instruction information.

[0094] In one embodiment, this step sends the task modification instruction to the server. After the task modification instruction is sent to the server, the server will be triggered to parse the instruction information encapsulated in the task modification instruction, and then replace the corresponding unfinished maintenance task's handler dimension with the receiving object, i.e., the handler, according to the instruction information. Thus, one or more unfinished maintenance tasks belonging to the project with the largest total predicted time consumption are dispatched to the handler with the smallest average predicted time consumption or total predicted time consumption.

[0095] In a further embodiment, after the task modification instruction triggers the server to implement the modification described above according to the instruction information, it can continue to trigger the server to push notification information to the project with the largest total predicted time consumption and the user corresponding to the receiving object. The push notification information can be sent to the third-party instant messaging platform bound by the above two users, or to the email addresses of the above two users, which can be flexibly designed by those skilled in the art.

[0096] The second type of scheduling implementation method is mainly based on the dimension of the person in charge, and can be implemented in the following four steps:

[0097] Step 1: Determine the unfinished maintenance tasks corresponding to the category with the largest total predicted time consumption under the agent dimension.

[0098] In one embodiment, if there is a predicted list of handlers, the handler (classification) with the largest total predicted time consumption under the handler dimension is determined by querying the predicted list of handlers, or directly querying from the task information list based on the various calculation results mentioned above, and then the part of the unfinished maintenance tasks corresponding to the handler (classification) in the task information list is queried as the scheduled maintenance tasks. The method for determining this part of unfinished maintenance tasks can be implemented by referring to the description of the previous method for implementing scheduling.

[0099] Step 2: Determine the category with the smallest average forecast time or total forecast time under the agent dimension.

[0100] The implementation principle of this step is the same as the implementation principle of step 2 of the scheduling method mainly based on the project dimension. Please refer to its various implementation examples, so it will not be described here again.

[0101] Step three: encapsulate the task modification instruction so that the task modification instruction includes the indication information of the part of the unfinished maintenance tasks of the largest classification and the indication information of the smallest classification.

[0102] Similarly, this step encapsulates the task modification instruction according to one or more of the unfinished maintenance tasks under the handler with the largest total predicted time consumption and the determined recipient, so that the instruction not only contains the indication information of the unfinished maintenance tasks, but also contains the indication information of the recipient. The indication information of the unfinished maintenance task can be the unique characteristic information of the maintenance task given in the task information list, and the indication information of the recipient can be the specific handler (classification). In this way, the task modification instruction can be generated.

[0103] Step 4: Send the task modification instruction to the server so that the server implements the modification according to the instruction information.

[0104] The implementation of this step is the same as the implementation of step 4 of the scheduling method mainly based on the project dimension. Please refer to its various implementation examples, so it will not be described here again.

[0105] The various scheduling methods implemented above make full use of the average prediction time and total prediction time of each dimension and each classification to reasonably schedule the unfinished maintenance tasks. When scheduling is based on the dimension of the person in charge, the unfinished tasks of the person in charge whose current work is too saturated can be assigned to the person in charge whose current work is not saturated or to the person in charge with the highest current work efficiency, or to the person in charge with the highest work efficiency of the unsaturated work; when scheduling is based on the project dimension, the unfinished maintenance tasks of the project with the most unfinished maintenance tasks can be assigned to the person in charge whose current work is not saturated or to the person in charge with the highest current work efficiency, or to the person in charge with the highest work efficiency of the unsaturated work. It can be seen that through such scheduling, the workload between each project and each person in charge can be automatically and scientifically balanced, the human scheduling time spent by the maintenance team in scheduling can be reduced, and the workload coordination between multiple projects and multiple persons in charge around maintenance tasks can be achieved to achieve a better configuration, effectively improving the efficiency of project-related maintenance task processing.

[0106] In a further embodiment, the program maintenance task processing method described in the present application can be triggered by a computer timer task and execute all the steps it contains in a loop; the computer timer task can be pre-set by the user of the present application, or it can be based on the uniformly set duration adjustment factor. In particular, when the duration adjustment factor is a uniformly set duration, it can be triggered to run with the help of this duration, so that the imported duration adjustment factor can be used as a basis for predicting unfinished maintenance tasks, and can also be used as a trigger basis for controlling the execution of this method, thereby controlling task scheduling more scientifically.

[0107] Furthermore, by functionalizing each step in the method disclosed in the above embodiments, a program maintenance task processing device of the present application can be constructed. Figure 4 In a typical embodiment, the device comprises:

[0108] The list request module 11 is used to initiate a request to the server to obtain a task information list, wherein the task information list includes multiple data records, each of which is used to describe the project dimension, the person in charge dimension, the task creation time, and the task resolution time of a program maintenance task, wherein the program maintenance task described by the data record with a blank task resolution time is an unfinished maintenance task;

[0109] The adjustment trial calculation module 12 is used to call the task information list for calculation, and determine the difference between the task solution time and the task creation time in each data record as the individual time consumption of the corresponding maintenance task, wherein, for the unfinished maintenance task, the duration adjustment factor is introduced to determine its task solution time to determine the corresponding individual time consumption;

[0110] The time consumption prediction module 13 classifies and summarizes the maintenance tasks based on any dimension to which they belong, calculates the average predicted time consumption of all maintenance tasks corresponding to each category, and calculates the total predicted time consumption of all unfinished maintenance tasks corresponding to each category based on the average predicted time consumption.

[0111] Furthermore, to facilitate the execution of the present application, the present application provides an electronic device, including a central processing unit and a memory, wherein the central processing unit is used to call and run a computer program stored in the memory to execute the steps of the program maintenance task processing method described in the aforementioned embodiments.

[0112] It can be seen that the memory is suitable for using a non-volatile storage medium. By implementing the aforementioned method as a computer program and installing it in an electronic device such as a mobile phone, the relevant program code and data are stored in the non-volatile storage medium of the electronic device. The program is further run by the central processor of the electronic device, and it is transferred from the non-volatile storage medium to the memory for operation, so that the desired purpose of the present application can be achieved. Therefore, it can be understood that in one embodiment of the present application, a non-volatile storage medium can also be provided, in which a computer program implemented according to each embodiment of the program maintenance task processing method is stored. When the computer program is called and executed by the computer, the steps included in the method are executed.

[0113] To sum up, this application provides the maintenance team with more intuitive data by calculating the average predicted time and the total predicted time for each category under each dimension, which facilitates the implementation of maintenance task scheduling and helps to improve the work efficiency of the maintenance team.

[0114] It will be appreciated by those skilled in the art that the present application package relates to devices for performing one or more of the operations and methods described in the present application. These devices may be specially designed and manufactured for the desired purpose, or may also include known devices in general-purpose computers. These devices have computer programs stored in their memory, which are selectively activated or reconstructed. Such computer programs may be stored in a device (e.g., computer) readable medium or in any type of medium suitable for storing electronic instructions and coupled to a bus, respectively, the computer readable medium including but not limited to any type of disk (including floppy disk, hard disk, optical disk, CD-ROM, and magneto-optical disk), ROM (Read-Only Memory), RAM (Random Access Memory), EPROM (Erasable Programmable Read-Only Memory), EEPROM (Electrically Erasable Programmable Read-Only Memory), flash memory, magnetic card or optical card. That is, the readable medium includes any medium that stores or transmits information in a readable form by a device (e.g., computer).

[0115] Those skilled in the art will appreciate that each block in these structure diagrams and / or block diagrams and / or flow charts and combinations of blocks in these structure diagrams and / or block diagrams and / or flow charts can be implemented using computer program instructions. Those skilled in the art will appreciate that these computer program instructions can be provided to a general-purpose computer, a professional computer, or a processor of other programmable data processing methods to implement, thereby executing the scheme specified in the block or multiple blocks of the structure diagrams and / or block diagrams and / or flow charts disclosed in this application through the processor of the computer or other programmable data processing method.

[0116] Those skilled in the art will appreciate that the various operations, methods, steps, measures, and schemes in the processes discussed in this application may be alternated, altered, combined, or deleted. Further, other steps, measures, and schemes in the various operations, methods, and processes discussed in this application may also be alternated, altered, rearranged, decomposed, combined, or deleted. Further, the steps, measures, and schemes in the prior art that are similar to those disclosed in this application may also be alternated, altered, rearranged, decomposed, combined, or deleted.

[0117] The above description is only a partial implementation method of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present application. These improvements and modifications should also be regarded as the scope of protection of the present application.

Claims

1. A program maintenance task processing method, characterized in that: The steps include: Initiate a request to the server to obtain a task information list, wherein the task information list includes multiple data records, each of which is used to describe the project dimension, the person in charge dimension, the task creation time, and the task resolution time of a program maintenance task, wherein the program maintenance task described by the data record with a blank task resolution time is an unfinished maintenance task; The task information list is called to perform calculations, and the difference between the task resolution time and the task creation time in each data record is determined as the individual time consumption of the corresponding maintenance task, wherein, for unfinished maintenance tasks, a time parameter corresponding to the unfinished maintenance task input by the user is received as a duration adjustment factor, and the duration adjustment factor is imported to determine its task resolution time to determine the corresponding individual time consumption; Based on any dimension to which the maintenance tasks belong, they are classified and summarized. According to the individual time consumption of each maintenance task in each category, the average predicted time consumption of all maintenance tasks corresponding to each category is calculated. Based on the average predicted time consumption, the total predicted time consumption of all unfinished maintenance tasks corresponding to each category is calculated.

2. The method according to claim 1, characterized in that The maintenance task is a planned task created based on any programming error such as loopholes, anomalies, and failures caused by computer programs.

3. The method according to claim 1, characterized in that: Including post-steps: The unfinished maintenance tasks are scheduled based on the assignee dimension, and a task modification instruction is sent to the server, so that the server responds to the task modification instruction and modifies the unfinished maintenance tasks of one category under the assignee dimension to belong to another category.

4. The method according to claim 3, characterized in that Scheduling unfinished maintenance tasks based on the agent dimension and sending task modification instructions to the server include the following specific measures: Determine the unfinished maintenance tasks corresponding to the category with the largest total predicted time consumption under the project dimension / responsor dimension; Determine the category with the smallest average forecast time or total forecast time under the agent dimension; Encapsulating the task modification instruction so that the task modification instruction includes indication information of the partially uncompleted maintenance tasks of the largest classification and indication information of the smallest classification; The task modification instruction is sent to the server so that the server implements the modification according to the instruction information.

5. The method according to claim 3, characterized in that: The task modification instruction triggers the server to push notification messages to users corresponding to the categories involving the change of the attribution relationship of the unfinished maintenance tasks.

6. The method according to any one of claims 1 to 5, characterized in that The method is triggered by a computer timing task and executes each step cyclically.

7. A program maintenance task processing device, characterized in that: A list request module is used to initiate a request to the server to obtain a task information list, wherein the task information list includes multiple data records, each of which is used to describe the project dimension, the person in charge dimension, the task creation time, and the task resolution time of a program maintenance task, wherein the program maintenance task described by the data record with a blank task resolution time is an unfinished maintenance task; an adjustment trial calculation module, for calling the task information list for calculation, and determining the difference between the task resolution time and the task creation time in each data record as the individual time consumption of the corresponding maintenance task, wherein, for an unfinished maintenance task, receiving the time parameter input by the user for the unfinished maintenance task as a duration adjustment factor, and importing the duration adjustment factor to determine its task resolution time to determine the corresponding individual time consumption; The time consumption prediction module classifies and summarizes the maintenance tasks based on any dimension to which they belong. According to the individual time consumption of each maintenance task in each category, the average predicted time consumption of all maintenance tasks corresponding to each category is calculated. Based on the average predicted time consumption, the total predicted time consumption of all unfinished maintenance tasks corresponding to each category is calculated.

8. An electronic device, comprising a central processing unit and a memory, characterized in that: The central processing unit is used to call and run a computer program stored in the memory to execute the steps of the program maintenance task processing method as described in any one of claims 1 to 6.

9. A non-volatile storage medium, characterized in that: It stores a computer program implemented according to the program maintenance task processing method described in any one of claims 1 to 6 in the form of computer-readable instructions, and when the computer program is called and executed by a computer, the steps included in the method are executed.

Citation Information

Patent Citations

  • Task processing method and apparatus

    CN105955873A

  • Method and system for generating communication tower electronic maintenance work record sheet

    CN106709648A

  • Method and apparatus for estimating completion time of process

    CN108154252A

  • Offline task delay alarm system and method and computer system

    CN111010292A

  • Task processing method, device and equipment and storage medium

    CN111475298A