A main tower overall vertical rotation construction monitoring system and method

Through the overall vertical rotation construction monitoring system of the main tower, GPS, inclinometer and other technologies are used to monitor and adjust the hoisting process in real time, solving the control difficulty and collision risk problems in the vertical rotation construction of large-sized steel towers, and achieving an accurate and safe construction process. .

CN112095489BActive Publication Date: 2024-10-11CHINA RAILWAY MAJOR BRIDGE ENG GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010918668.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-09-04
Publication Date
2024-10-11
Estimated Expiration
2040-09-04

AI Technical Summary

Technical Problem

The existing technology cannot effectively guide the overall vertical rotation construction instructions and multi-angle and multi-dimensional control analysis of large-size steel towers, resulting in difficult construction, difficult quality control, and the risk of collision.

Method used

The overall vertical rotation construction monitoring system of the main tower is adopted. Through components such as GPS, inclinometer, connection pin displacement monitoring device and pulling device, the position and posture of the main tower during the hoisting process are monitored and adjusted in real time to ensure that the hoisting equipment is in the same straight line. Avoid collisions.

Benefits of technology

It achieves precise control of the vertical rotation construction of the steel tower, reduces construction difficulty and quality risks, and ensures the safety and stability of the hoisting process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112095489B_ABST
    Figure CN112095489B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of bridge construction monitoring, and specifically to a main tower overall vertical rotation construction monitoring system and method. The main tower overall vertical rotation construction monitoring system includes: a first large floating crane GPS and a second large floating crane GPS, which are respectively arranged at the bow and stern of the large floating crane, and the azimuth slope with the large floating crane as the baseline is calculated by obtaining the coordinates of the bow and stern of the large floating crane; a main tower positioning device, which is arranged on the upper hoist to obtain the coordinates of the main tower, and calculate the offset distance of the main tower relative to the baseline based on the azimuth slope; a first small floating crane GPS and a second small floating crane GPS, which are respectively arranged at the bow and stern of the small floating crane, to obtain the coordinates of the bow and stern of the small floating crane, and calculate the offset distance of the bow and stern of the small floating crane relative to the baseline based on the azimuth slope. It can solve the problem that the prior art cannot provide construction instructions for the entire vertical rotation process, and the risk of collision is prone to occur.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of bridge construction monitoring, and in particular to a main tower integral vertical rotation construction monitoring system and method. Background Art

[0002] Steel tower is a crucial force transmission component of cable-stayed bridge. The quality of its design and construction is directly related to the safety of the entire cable-stayed bridge. Conventional steel towers are difficult to hoist as a whole due to their large overall volume and weight. They are usually assembled in sections, and several sections are hoisted to the installation location in sequence. Then, they are welded and spliced ​​at the installation location until a complete steel tower is formed. However, the location environment of bridge construction is relatively harsh. The on-site welding and assembly construction work is affected by multiple factors including wind, rain, waves and salinity. The on-site welding quality is difficult to ensure stably. At the same time, when the steel tower structure is large, the on-site welding and assembly construction is too difficult and the construction quality control is difficult. At present, with the development of construction equipment and construction technology, it has become more and more common for large-structure steel towers to be prefabricated in the factory and then transported to the project site for overall hoisting and installation. This construction method not only guarantees the manufacturing quality of the steel tower, but also avoids long-term dangerous operations at high altitudes, shortens the construction period and reduces the overall cost of the project.

[0003] For the overall vertical rotation construction of large-sized steel towers, there are currently few related monitoring technologies at home and abroad. The stress control single variable monitoring method is mainly used, which is unable to provide construction instruction guidance for the entire vertical rotation process and conduct multi-angle and multi-dimensional control analysis and corresponding danger prediction. Summary of the invention

[0004] In view of the defects existing in the prior art, the purpose of the present invention is to provide a main tower overall vertical rotation construction monitoring system and method, which can solve the problem that the prior art is unable to provide construction instruction guidance for the entire vertical rotation process and is prone to collision risks.

[0005] In order to achieve the above purpose, the technical solution adopted by the present invention is:

[0006] On the one hand, the present invention provides a main tower overall vertical rotation construction monitoring system, which is used to be installed on the main tower hoisting device, the main tower hoisting device includes an upper hoist, a large floating crane and a small floating crane, and is characterized in that the main tower overall vertical rotation construction monitoring system includes:

[0007] The first large floating crane GPS and the second large floating crane GPS are respectively arranged at the bow and stern of the large floating crane, and the azimuth slope with the large floating crane as the baseline is calculated by obtaining the coordinates of the bow and stern of the large floating crane;

[0008] A main tower positioning device, which is arranged on the upper hoisting device to obtain the coordinates of the main tower and calculate the offset distance of the main tower relative to the baseline based on the azimuth slope;

[0009] The first small floating vessel GPS and the second small floating vessel GPS are respectively arranged at the bow and stern of the small floating vessel to obtain the coordinates of the bow and stern of the small floating vessel, and calculate the offset distance of the bow and stern of the small floating vessel relative to the baseline based on the azimuth slope.

[0010] On the basis of the above technical solution, the upper lifting device comprises:

[0011] - a shoulder pole beam, wherein two sets of connecting devices are arranged at intervals in the middle thereof, each set of connecting devices comprises a first connecting member arranged on both sides of the shoulder pole beam;

[0012] - Two lifting beams, which are respectively arranged at the two ends of the shoulder pole beam, and the middle part of each lifting beam is rotatably connected to the two ends of the shoulder pole beam;

[0013] The main tower positioning device comprises: a first main tower GPS and a second main tower GPS, which are respectively arranged in the middle of the two lifting beams to obtain the average value of the coordinates of the middle of the two groups of lifting beams as the coordinates of the main tower.

[0014] On the basis of the above technical solution, it also includes three sets of inclinometers, which are respectively arranged in the middle of the shoulder pole beam and the rotation center of the two lifting beams to obtain the inclination angle at each position and calculate the elevation of the two ends of the two lifting beams based on the coordinates of the middle part of the lifting beam.

[0015] On the basis of the above technical solution, each group of the first connecting members includes two connecting pins and two connecting plates respectively arranged on both sides of the shoulder pole beam, and the connecting plates are provided with pin holes matched with the connecting pins;

[0016] The main tower integral vertical rotation construction system also includes four sets of pin displacement monitoring devices, which are respectively arranged on the four connecting plates to monitor the displacement of the four sets of connecting pins;

[0017] It also includes four sets of pulling devices, which are arranged on the main tower and are respectively connected to the four connecting pins. When the displacement of the connecting pin exceeds a set threshold, the connecting pin is pulled.

[0018] On the basis of the above technical scheme, it also includes two sets of image acquisition devices, which are respectively arranged at the two ends of the shoulder beam to monitor the lifting posture of the main tower; it also includes two sets of ranging sensors, which are respectively arranged on the inner sides of the booms of two large floating cranes to monitor the distance between the main tower and the booms of the large floating cranes.

[0019] On the other hand, the present invention also provides a method for monitoring the overall vertical rotation of a main tower, comprising the following steps:

[0020] Obtain the coordinates of the bow and stern of the large floating crane, and calculate the azimuth slope with the large floating crane as the baseline;

[0021] Obtain the coordinates of the main tower, and calculate the offset distance of the main tower relative to the baseline based on the azimuth slope of the large floating crane;

[0022] Obtaining the coordinates of the bow and stern of the small floating crane, and calculating the offset distance of the bow and stern of the small floating crane relative to the baseline based on the azimuth slope of the large floating crane;

[0023] Determine whether the offset distance of the main tower and the offset distance of the bow and stern of the small floating crane are less than the set threshold. If not, adjust the small floating crane so that the main tower and the small floating crane meet the set threshold and then continue the main tower vertical rotation construction. If so, continue the main tower vertical rotation construction.

[0024] On the basis of the above technical solution, the azimuth slope A of the large floating crane (5) is calculated according to the formula A=(Y2-Y1) / (X2-X1), wherein Y2 is the Y-axis coordinate of the bow of the large floating crane, and Y1 is the Y-axis coordinate of the stern of the large floating crane; X2 is the X-axis coordinate of the bow of the large floating crane, and X1 is the X-axis coordinate of the stern of the large floating crane;

[0025] The offset △1 of the main tower is calculated according to the formula △1=(Y3-Y2)-(X3-X2)×A, where Y3 is the Y-axis coordinate of the main tower and X3 is the X-axis coordinate of the main tower.

[0026] Calculate the offset △2 of the bow of the small floating crane according to the formula △2=(Y4-Y2)-(X4-X2)×A;

[0027] Calculate the offset △3 of the stern of the small floating crane according to the formula △3=(Y5-Y2)-(X5-X2)×A;

[0028] Among them, Y4 is the Y-axis coordinate of the bow of the small floating crane, X4 is the X-axis coordinate of the bow of the small floating crane, Y5 is the Y-axis coordinate of the stern of the small floating crane, and X5 is the X-axis coordinate of the stern of the small floating crane.

[0029] On the basis of the above technical solution, the step of making corresponding adjustments according to whether the difference between the elevations of the two ends of the two lifting beams meets the requirements is also included, specifically including:

[0030] Obtain the inclination angles at both ends and the middle of the shoulder pole beam to calculate the elevations of both ends of the lifting beam in combination with the coordinates of the middle of the lifting beam;

[0031] Determine whether the difference between the elevations of the two ends of the two lifting beams meets the requirements. If so, continue the vertical rotation construction of the main tower. If not, adjust the corresponding lifting ropes until the requirements are met and then continue the vertical rotation construction of the main tower.

[0032] On the basis of the above technical solution, according to the formula:

[0033] H1=(Z 扁 / 2)+(L 扁 / 2)sin(B 1-X )+(L 起 / 2)×sin(B 3-Y );

[0034] H2=(Z 扁 / 2)+(L 扁 / 2)sin(B 1-X )-(L 起 / 2)×sin(B 3-Y );

[0035] H3=(Z 扁 / 2)+(L 扁 / 2)sin(B 1-X )+(L 起 / 2)×sin(B 4- Y );

[0036] H4=(Z 扁 / 2)+(L 扁 / 2)sin(B 1-X )-(L 起 / 2)×sin(B 4- Y );

[0037] Calculate the elevations H1, H2, H3 and H4 at both ends of the two lifting beams;

[0038] Among them, Z is the Z-axis coordinate of the center of the shoulder beam, that is, the average Z-axis coordinate of the middle of the two sets of lifting beams 扁 =Z A31GPS +Z A32GPS , Z A31GPS and Z A32GPS are the Z-axis coordinates of the middle of the two lifting beams, L 扁 is the length of the shoulder beam, B 1-X is the inclination angle of the shoulder beam around the X axis, B 3-Y and B 4-Y are the inclination angles of the two lifting beams around the Y axis, L 起 is the length of the lifting beam.

[0039] On the basis of the above technical solution, the method further includes a step of adjusting the displacement of the four groups of connecting pins to determine whether they meet a set threshold value, specifically including:

[0040] Obtaining displacements of the four groups of connecting pins;

[0041] It is determined whether the displacements of the four groups of connecting pins all meet the set threshold value. If so, the main tower vertical rotation construction is continued. If not, the corresponding connecting pins are adjusted by the pulling device to meet the set threshold value and then the main tower vertical rotation construction is continued.

[0042] Compared with the prior art, the advantages of the present invention are: when the main tower overall vertical rotation construction monitoring system and method are used, the coordinates of the bow and stern of the large floating crane are obtained through the first large floating crane GPS and the second large floating crane GPS, and the azimuth slope with the large floating crane as the baseline is calculated through the coordinates of the bow and stern of the large floating crane; the coordinates of the main tower are obtained through the main tower positioning device, and the offset distance of the main tower relative to the baseline is calculated based on the azimuth slope of the large floating crane; the coordinates of the bow and stern of the small floating crane are obtained through the first small floating crane GPS and the second small floating crane GPS, and the offset distance of the bow and stern of the small floating crane relative to the baseline is calculated based on the azimuth slope of the large floating crane; it is judged whether the offset distance of the main tower and the offset distance of the bow and stern of the small floating crane are less than a set threshold value, if not, the small floating crane is adjusted so that the main tower and the small floating crane meet the set threshold value, and then the main tower vertical rotation construction is continued, if so, the main tower vertical rotation construction is continued. This design can ensure that the large floating crane, main tower and small floating crane are in the same straight line during the vertical rotation of the main tower, avoiding the main tower from shaking or colliding with the boom of the large floating crane. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0044] Figure 1 A schematic diagram of the arrangement position of the GPS in an embodiment of the present invention;

[0045] Figure 2 A schematic diagram of the arrangement positions of the pin displacement monitoring device and the inclinometer in an embodiment of the present invention;

[0046] Figure 3 It is a flow chart of the method for monitoring the overall vertical rotation construction of the main tower in an embodiment of the present invention.

[0047] In the figure: 1. upper lifting device; 11. shoulder pole beam; 111. first connecting piece; 1111. connecting plate; 1112. connecting pin; 12. lifting beam; 2. lower lifting device; 3. main tower; 4. small floating crane; 5. large floating crane; 6. pulling device. DETAILED DESCRIPTION

[0048] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.

[0049] The embodiments of the present invention are further described in detail below with reference to the accompanying drawings.

[0050] like Figure 1 As shown, the present invention provides a main tower overall vertical rotation construction monitoring system, which is used to be arranged on the main tower hoisting device, the main tower hoisting device includes an upper hoisting device 1, a large floating crane 5 and a small floating crane 4, and the main tower overall vertical rotation construction monitoring system includes: a first large floating crane GPS and a second large floating crane GPS, which are respectively arranged at the bow and stern of the large floating crane 5, and the azimuth slope with the large floating crane 5 as the baseline is calculated by obtaining the coordinates of the bow and stern of the large floating crane 5; a main tower positioning device, which is used to be arranged on the upper hoisting device 1 to obtain the coordinates of the main tower, and calculate the offset distance of the main tower relative to the baseline based on the azimuth slope; a first small floating crane GPS and a second small floating crane GPS, which are respectively arranged at the bow and stern of the small floating crane to obtain the coordinates of the bow and stern of the small floating crane, and calculate the offset distance of the bow and stern of the small floating crane relative to the baseline based on the azimuth slope.

[0051] When using the main tower overall vertical rotation construction monitoring system, the coordinates of the bow and stern of the large floating crane 5 are obtained through the first large floating crane GPS and the second large floating crane GPS, and the azimuth slope with the large floating crane 5 as the baseline is calculated through the coordinates of the bow and stern of the large floating crane 5; the coordinates of the main tower are obtained through the main tower positioning device, and the offset distance of the main tower relative to the baseline is calculated based on the azimuth slope of the large floating crane 5; the coordinates of the bow and stern of the small floating crane 4 are obtained through the first small floating crane GPS and the second small floating crane GPS, and the offset distance of the bow and stern of the small floating crane 4 relative to the baseline is calculated based on the azimuth slope of the large floating crane 5; it is determined whether the offset distance of the main tower and the offset distance of the bow and stern of the small floating crane 4 are less than the set threshold value, if not, the small floating crane 4 is adjusted to make the main tower 3 and the small floating crane 4 meet the set threshold value before continuing the main tower vertical rotation construction, if so, the main tower vertical rotation construction is continued. Such a design can ensure that the large floating crane 5, the main tower 3 and the small floating crane 4 are in the same straight line during the vertical rotation of the main tower, thereby preventing the main tower 3 from shaking or colliding with the boom of the large floating crane 5.

[0052] In this embodiment, the first large floating crane GPS and the second large floating crane GPS are numbered A1 and A2 respectively, and the first small floating crane GPS and the second small floating crane GPS are numbered A4 and A5 respectively.

[0053] See also Figure 2 As shown, in some optional embodiments, the upper lifting device 1 includes: a shoulder pole beam 11, in which two groups of connecting devices are arranged at intervals in the middle, and each group of connecting devices includes a first connecting member 111 arranged on both sides of the shoulder pole beam 11; two lifting beams 12, which are respectively arranged at the two ends of the shoulder pole beam 11, and the middle part of each lifting beam 12 is rotatably connected to the two ends of the shoulder pole beam 11.

[0054] The main tower positioning device includes: a first main tower GPS and a second main tower GPS, which are respectively arranged in the middle of two lifting beams 12 to obtain the average value of the middle coordinates of the two sets of lifting beams as the coordinates of the main tower.

[0055] In this example, the first main tower GPS and the second main tower GPS are numbered A31 and A32 respectively, and A3 is the average value of the coordinates of A31 and A32.

[0056] In this embodiment, the middle coordinates of the two lifting beams 12 are obtained by setting the first main tower GPS and the second main tower GPS in the middle of the two lifting beams 12, and the average value of the middle coordinates of the two lifting beams 12 is used as the coordinates of the main tower to monitor the position of the main tower.

[0057] In addition, a total station prism is respectively provided in the middle of the two lifting beams 12. When the GPS instrument fails, the GPS on the upper hoist 1 is not easy to replace. The elevation data is collected by the total station in conjunction with the prism, and the GPS coordinate data is replaced by the total station data.

[0058] The combination of GPS system and total station system is utilized to ensure that the three-dimensional coordinate data can be mutually verified and the stability of the three-dimensional coordinate data source can be guaranteed when the GPS signal stability is poor.

[0059] In some optional embodiments, three sets of inclinometers are further included, which are respectively arranged in the middle of the shoulder beam 11 and the rotation center of the two lifting beams 12 to obtain the inclination angle at each position and calculate the elevation of the two ends of the two lifting beams 12 based on the coordinates of the middle of the lifting beam.

[0060] After obtaining the elevations of both ends of the two lifting beams 12, determine whether the difference between the elevations of both ends of the two lifting beams 12 meets the requirements. If so, continue the vertical rotation construction of the main tower. If not, adjust the corresponding lifting ropes until the requirements are met and then continue the vertical rotation construction of the main tower.

[0061] In this embodiment, such a design can monitor the elevation of both ends of the lifting beam 12 in real time to determine whether the entire main tower is stable, so as to accurately control the posture of the main tower. In this example, the inclinometer in the middle of the shoulder beam 11 is labeled B1, and a spare inclinometer B2 is provided, and the inclinometers at the rotation centers of the two lifting beams 12 are labeled B3 and B4.

[0062] In some optional embodiments, each set of first connecting members 111 includes two connecting pins 1112 and two connecting plates 1111 respectively arranged on both sides of the shoulder beam 11, and the connecting plates 1111 are provided with pin holes matched with the connecting pins 1112;

[0063] The main tower integral vertical rotation construction system also includes four sets of pin displacement monitoring devices, which are respectively arranged on four connecting plates 1111 to monitor the displacement of four sets of connecting pins 1112 .

[0064] In this embodiment, the displacement state of the connecting pin 1112 is monitored by the pin displacement monitoring device. When one of the four groups of connecting pins 1112 meets the set threshold, the corresponding connecting pin 1112 is adjusted to meet the set threshold and then the main tower vertical rotation construction is continued. This can prevent the connecting pin 1112 from falling off and avoid major accidents.

[0065] In some optional embodiments, four sets of pulling devices 6 are further included, which are arranged on the main tower and are respectively connected to four connecting pins 1112. When the displacement of the connecting pin 1112 exceeds a set threshold, the connecting pin 1112 is pulled.

[0066] In some optional embodiments, the pulling device 6 is a jack.

[0067] In this embodiment, by pulling the connecting pin 1112 with a jack disposed on the main tower, the connecting pin 1112 can be made safer and prevented from falling off.

[0068] In this embodiment, the four groups of pin displacement monitoring devices are numbered C1, C2, C3 and C4 respectively.

[0069] In some optional embodiments, two sets of image acquisition devices are also included, which are respectively arranged at the two ends of the shoulder beam 11 to monitor the lifting posture of the main tower.

[0070] In this embodiment, the image acquisition device mainly monitors the main tower vertical rotation process, when cutting into the pull rod position, the main tower vertical rotation process posture video image and the pull rod and the main tower spacing monitoring, mainly the distance between the elevation, to avoid the main tower and the pull rod collision. In this example, the pull rod is the two booms of the large floating crane 5.

[0071] In some optional embodiments, two sets of distance measuring sensors are further included, which are respectively arranged on the inner sides of the booms of the two large floating cranes 5 to monitor the distance between the main tower 3 and the booms of the large floating cranes.

[0072] In this embodiment, the distance measuring sensor is an ultrasonic or laser distance measuring sensor, which is arranged in the overlapping area of ​​the picket rod and the main tower, that is, the overlapping area when the main tower passes through two picket rods, to detect the distance between the picket rod and the main tower, and play an early warning and anti-collision role.

[0073] All monitoring equipment uses RS232 or RS485 to connect to wireless DTU devices and connect to fixed power supply equipment. Data transmission and data exchange are carried out through 2G / 3G / 4G network via network servers and control computers at the steel tower vertical rotation construction site. After the on-site control computer receives and sends the corresponding data information, it is transmitted to the network platform through the network. The background multi-user computers will obtain the corresponding data information by directly accessing the network platform.

[0074] The communication architecture is simple, reliable and highly adaptable. The on-site control computer has the functions of on-site debugging, setting and controlling sensors, such as remotely turning on and off sensors to save battery power and facilitate on-site technical personnel to deal with possible situations. Back-end users obtain corresponding information data by accessing the data uploaded to the cloud platform by the on-site computer, making the entire communication control architecture convenient for on-site staff to maintain and debug, and convenient for back-end users to obtain and display data.

[0075] like Figure 3 As shown, the present invention also provides a method for monitoring the overall vertical rotation of a main tower, comprising the following steps:

[0076] S1: Obtain the coordinates of the bow and stern of the large floating crane vessel 5 to calculate the azimuth slope of the large floating crane vessel 5 .

[0077] Specifically, the azimuth slope A of the large floating crane (5) is calculated according to the formula A=(Y2-Y1) / (X2-X1), wherein Y2 is the Y-axis coordinate of the bow of the large floating crane, Y1 is the Y-axis coordinate of the stern of the large floating crane; X2 is the X-axis coordinate of the bow of the large floating crane, and X1 is the X-axis coordinate of the stern of the large floating crane.

[0078] S2: Obtain the coordinates of the main tower, and calculate the offset distance of the main tower based on the azimuth slope of the large floating crane 5.

[0079] Specifically, the offset △1 of the main tower is calculated according to the formula △1=(Y3-Y2)-(X3-X2)×A, where Y3 is the Y-axis coordinate of the main tower and X3 is the X-axis coordinate of the main tower.

[0080] S3: The coordinates of the bow and stern of the small floating crane vessel 4 , and the offset distances of the bow and stern of the small floating crane vessel 4 are calculated based on the azimuth slope of the large floating crane vessel 5 .

[0081] Specifically, the offset △2 of the bow of the small floating crane is calculated according to the formula △2=(Y4-Y2)-(X4-X2)×A;

[0082] Calculate the offset △3 of the stern of the small floating crane according to the formula △3=(Y5-Y2)-(X5-X2)×A;

[0083] Among them, Y4 is the Y-axis coordinate of the bow of the small floating crane, X4 is the X-axis coordinate of the bow of the small floating crane, Y5 is the Y-axis coordinate of the stern of the small floating crane, and X5 is the X-axis coordinate of the stern of the small floating crane.

[0084] S4: Determine whether the offset distance of the main tower and the offset distance of the bow and stern of the small floating crane 4 are less than the set threshold. If not, adjust the small floating crane 4 so that the main tower 3 and the small floating crane 4 meet the set threshold and then continue the main tower vertical rotation construction. If so, continue the main tower vertical rotation construction.

[0085] This method can ensure that the large floating crane 5, the main tower 3 and the small floating crane 4 are in the same straight line during the vertical rotation of the main tower, avoiding the risk of the main tower shaking or colliding with the boom of the large floating crane 5.

[0086] In some optional embodiments, the step of making corresponding adjustments according to whether the elevation difference between the two ends of the two lifting beams 12 meets the requirements is also included, specifically including:

[0087] The inclination angles at the two ends and the middle of the shoulder beam 11 are obtained to calculate the elevations of the two ends of the two lifting beams 12 in combination with the coordinates of the middle of the lifting beam.

[0088] Determine whether the difference between the elevations of the two ends of the two lifting beams 12 meets the requirements. If so, continue the vertical rotation construction of the main tower. If not, adjust the corresponding lifting ropes until the requirements are met and then continue the vertical rotation construction of the main tower.

[0089] Specifically, according to the formula:

[0090] H1=(Z 扁 / 2)+(L 扁 / 2)sin(B 1-X )+(L 起 / 2)×sin(B 3-Y );

[0091] H2=(Z 扁 / 2)+(L 扁 / 2)sin(B 1-X )-(L 起 / 2)×sin(B 3-Y );

[0092] H3=(Z 扁 / 2)+(L 扁 / 2)sin(B 1-X )+(L 起 / 2)×sin(B 4- Y );

[0093] H4=(Z 扁 / 2)+(L 扁 / 2)sin(B 1-X )-(L 起 / 2)×sin(B 4- Y );

[0094] Calculate the elevations H1, H2, H3 and H4 at both ends of the two lifting beams 12;

[0095] Wherein, Z is the Z-axis coordinate of the center of the shoulder beam 11, that is, the average Z-axis coordinate of the middle of the two sets of lifting beams 12. 扁 =Z A31GPS +Z A32GPS , Z A31GPS and Z A32GPS are the Z-axis coordinates of the middle of the two lifting beams 12, L 扁 is the length of the shoulder beam 11, B 1-X is the inclination angle of the shoulder beam 11 around the X-axis, B 3-Y and B 4-Y are the inclination angles of the two lifting beams 12 around the Y axis, L 起 is the length of the lifting beam 12.

[0096] In this embodiment, such a design can monitor the elevations of both ends of the lifting beam 12 in real time to determine whether the entire main tower is stable, so as to accurately control the posture of the main tower.

[0097] In some optional embodiments, the step of adjusting the displacement of the four groups of connecting pins 1112 according to whether they meet the set threshold is included, specifically including:

[0098] Obtain the displacement of the four groups of connecting pins 1112; determine whether the displacement of the four groups of connecting pins 1112 all meet the set threshold. If so, continue the main tower vertical rotation construction; if not, adjust the corresponding connecting pins 1112 through the pulling device 6 to make them meet the set threshold and then continue the main tower vertical rotation construction.

[0099] In this embodiment, the displacement state of the connecting pin 1112 is monitored by the pin displacement monitoring device. When one of the four groups of connecting pins 1112 meets the set threshold, the corresponding connecting pin 1112 is adjusted to meet the set threshold and then the main tower vertical rotation construction is continued. This can prevent the connecting pin 1112 from falling off and avoid major accidents.

[0100] In the description of the present application, it should be noted that the terms "upper", "lower", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. Unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a connection between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present application can be understood according to the specific circumstances.

[0101] It should be noted that, in this application, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.

[0102] The above description is only a specific implementation of the present application, so that those skilled in the art can understand or implement the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest range consistent with the principles and novel features applied for herein.

Claims

1. A main tower integral vertical rotation construction monitoring system, which is used to be installed on a main tower hoisting device, the main tower hoisting device comprising an upper hoist (1), a large floating crane (5) and a small floating crane (4), characterized in that: The main tower overall vertical rotation construction monitoring system includes: A first large floating crane GPS and a second large floating crane GPS, which are respectively arranged at the bow and stern of the large floating crane (5), and calculate the azimuth slope with the large floating crane (5) as the baseline by acquiring the coordinates of the bow and stern of the large floating crane (5); A main tower positioning device, which is arranged on the upper lifting device (1) to obtain the coordinates of the main tower and calculate the offset distance of the main tower relative to the baseline based on the azimuth slope; A first small floating crane GPS and a second small floating crane GPS, which are respectively arranged at the bow and stern of the small floating crane (4) to obtain the coordinates of the bow and stern of the small floating crane (4), and calculate the offset distance of the bow and stern of the small floating crane (4) relative to the baseline based on the azimuth slope; The upper lifting device (1) comprises: - a shoulder pole beam (11), wherein two groups of connection devices are provided at intervals in the middle thereof, each group of connection devices comprising a first connection member (111) provided on both sides of the shoulder pole beam (11); - two lifting beams (12), which are respectively arranged at the two ends of the shoulder pole beam (11), and the middle part of each lifting beam (12) is rotatably connected to the two ends of the shoulder pole beam (11); The main tower positioning device comprises: a first main tower GPS and a second main tower GPS, which are respectively arranged in the middle of the two lifting beams (12) to obtain the average value of the coordinates of the middle of the two sets of lifting beams as the coordinates of the main tower; Each group of the first connecting members (111) comprises two connecting pins (1112) and two connecting plates (1111) respectively arranged on both sides of the shoulder beam (11), wherein the connecting plates (1111) are provided with pin holes that cooperate with the connecting pins (1112); The main tower integral vertical rotation construction monitoring system further comprises four sets of pin displacement monitoring devices, which are respectively arranged on the four connecting plates (1111) and are used to monitor the displacement of the four sets of connecting pins (1112); It also includes four sets of pulling devices (6), which are arranged on the main tower and are respectively connected to the four connecting pins (1112), and when the displacement of the connecting pins (1112) exceeds a set threshold, the connecting pins (1112) are pulled; It also includes three sets of inclinometers, which are respectively arranged at the middle of the shoulder beam (11) and the rotation centers of the two lifting beams (12) to obtain the inclination angles at various positions and calculate the elevations of the two ends of the two lifting beams (12) based on the coordinates of the middle of the lifting beam (12).

2. A main tower integral vertical rotation construction monitoring system as claimed in claim 1, characterized in that: It also includes two sets of image acquisition devices, which are respectively arranged at the two ends of the shoulder beam (11) to monitor the lifting posture of the main tower; and two sets of distance measuring sensors, which are respectively arranged on the inner sides of the booms of two large floating cranes (5) to monitor the distance between the main tower and the booms of the large floating cranes.

3. A monitoring method using the main tower integral vertical rotation construction monitoring system as claimed in claim 1, characterized in that: The following steps are involved: Obtaining the coordinates of the bow and stern of the large floating crane (5), and calculating the azimuth slope with the large floating crane (5) as the baseline; Obtaining the coordinates of the main tower, and calculating the offset distance of the main tower relative to the baseline based on the azimuth slope of the large floating crane (5); Obtaining the coordinates of the bow and stern of the small floating crane (4), and calculating the offset distance of the bow and stern of the small floating crane (4) relative to the baseline based on the azimuth slope of the large floating crane (5); It is determined whether the offset distance of the main tower and the offset distance of the bow and stern of the small floating crane (4) are less than a set threshold value. If not, the small floating crane is adjusted so that the main tower (3) and the small floating crane (4) meet the set threshold value and then the main tower vertical rotation construction is continued. If so, the main tower vertical rotation construction is continued.

4. The monitoring method according to claim 3, characterized in that: The azimuth slope A of the large floating crane (5) is calculated according to the formula A=(Y2-Y1) / (X2-X1), wherein Y2 is the Y-axis coordinate of the bow of the large floating crane, Y1 is the Y-axis coordinate of the stern of the large floating crane; X2 is the X-axis coordinate of the bow of the large floating crane, and X1 is the X-axis coordinate of the stern of the large floating crane; The offset △1 of the main tower is calculated according to the formula △1=(Y3-Y2)-(X3-X2)×A, where Y3 is the Y-axis coordinate of the main tower and X3 is the X-axis coordinate of the main tower; Calculate the offset △2 of the bow of the small floating crane according to the formula △2=(Y4-Y2)-(X4-X2)×A; Calculate the offset △3 of the stern of the small floating crane according to the formula △3=(Y5-Y2)-(X5-X2)×A; Among them, Y4 is the Y-axis coordinate of the bow of the small floating crane, X4 is the X-axis coordinate of the bow of the small floating crane, Y5 is the Y-axis coordinate of the stern of the small floating crane, and X5 is the X-axis coordinate of the stern of the small floating crane.

5. The monitoring method according to claim 3, characterized in that: The step of making corresponding adjustments according to whether the difference between the elevations of the two ends of the two lifting beams (12) meets the requirements is also included, specifically including: Obtaining the inclination angles at both ends and the middle of the shoulder pole beam (11) to calculate the elevations of both ends of the two lifting beams (12) in combination with the coordinates of the middle of the lifting beam; It is determined whether the difference between the elevations of the two ends of the two lifting beams (12) meets the requirements. If so, the main tower vertical rotation construction is continued. If not, the corresponding lifting ropes are adjusted until the requirements are met and the main tower vertical rotation construction is continued.

6. The monitoring method according to claim 5, characterized in that: According to the formula: H1=(Z 扁 / 2)+(L 扁 / 2)sin(B 1-X )+(L 起 / 2)×sin(B 3-Y ); H2=(Z 扁 / 2)+(L 扁 / 2)sin(B 1-X )-(L 起 / 2)×sin(B 3-Y ); <h2 style=";text-align:left;direction:ltr">H3=(Z<h2 style=";text-align:left;direction:ltr"> 扁 <h2 style=";text-align:left;direction:ltr"> / 2)+(L<h2 style=";text-align:left;direction:ltr"> 扁 <h2 style=";text-align:left;direction:ltr"> / 2)sin(B<h2 style=";text-align:left;direction:ltr"> 1-X <h2 style=";text-align:left;direction:ltr"> )+(L<h2 style=";text-align:left;direction:ltr"> 起 <h2 style=";text-align:left;direction:ltr"> / 2)×sin(B<h2 style=";text-align:left;direction:ltr"> 4- Y <h2 style=";text-align:left;direction:ltr"> ); H4=(Z 扁 / 2)+(L 扁 / 2)sin(B 1-X )-(L 起 / 2)×sin(B 4- Y ); Calculate the elevations H1, H2, H3 and H4 at both ends of the two lifting beams (12); Wherein, Z is the Z-axis coordinate of the center of the shoulder beam (11), that is, the average Z-axis coordinate of the middle of the two sets of lifting beams (12). 扁 =Z A31GPS +Z A32GPS , Z A31GPS and Z A32GPS are the Z-axis coordinates of the middle of the two lifting beams (12), L 扁 is the length of the shoulder beam (11), B 1-X is the inclination angle of the shoulder beam (11) around the X-axis, B 3-Y and B 4-Y are the inclination angles of the two lifting beams (12) around the Y axis, L 起 is the length of the lifting beam (12).

7. The monitoring method according to claim 3, characterized in that: The method also includes the step of adjusting the displacement of the four groups of connecting pins (1112) monitored to see whether they meet a set threshold, specifically including: Obtaining the displacements of the four groups of connecting pins (1112); It is determined whether the displacements of the four groups of connecting pins (1112) all meet the set threshold value. If so, the main tower vertical rotation construction is continued. If not, the corresponding connecting pins (1112) are adjusted by the pulling device (6) to meet the set threshold value and then the main tower vertical rotation construction is continued.