Drainage pipe desilting equipment

By designing spiral dehydration twisting dragons and power-configured worm-driven drainage pipe silt equipment, the problems of low efficiency and high cost in the existing technology are solved, efficient sludge dehydration and sewage separation are achieved, and the cost of silt is reduced.

CN112196085BActive Publication Date: 2024-11-26TIANJIN WATER RESOURCES RES INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202011172679.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-10-28
Publication Date
2024-11-26
Estimated Expiration
2040-10-28

AI Technical Summary

Technical Problem

The existing pipeline silt equipment is inefficient and costly, and the harmful gases in the pipeline pose a threat to workers' health and safety. The large sludge water content leads to a small load of sludge equipment, which increases the cost.

Method used

A drainage pipe silt equipment including silt collection assembly, dehydration assembly and propulsion assembly was designed. The silt compression and dehydration of silt is carried out through a spiral dehydration twisting dragon, which increases the separation ratio between silt and sewage, and uses the power configuration worm to drive dehydration and propulsion at the same time. Adjust the transmission ratio to suit different humidity conditions.

Benefits of technology

The amount of sludge removed per unit time has been improved, the cost of dredging is reduced, construction efficiency has been improved, and the risk of equipment jamming is reduced through the design of spiral dehydration and twisting dragons.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112196085B_ABST
    Figure CN112196085B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of dredging equipment, and discloses a drainage pipeline dredging equipment, including a dredging assembly, a dehydration assembly, a shell assembly and a propulsion assembly. The dredging assembly is located at the end of the dehydration assembly. The sludge is collected by the dredging assembly and then transferred to the inside of the dehydration assembly and then dehydrated by the dehydration assembly. The propulsion assembly is used to drive the dredging equipment to move. The dehydration assembly includes a spiral dehydration auger and a shell assembly. The spiral dehydration auger is rotatably arranged inside the shell assembly. The pitch of the spiral blades on the spiral dehydration auger gradually decreases in the direction from the silt inlet to the silt discharge outlet of the shell assembly. The bracket mechanism is fixedly arranged on the outer wall of the shell, and a drainage hole is opened on the side wall of the shell. The spiral dehydration auger is arranged to compress and dehydrate the sludge while dredging, so that the mixing ratio between sewage and sludge is reduced, thereby increasing the amount of sludge removed per unit time, improving construction efficiency, and reducing costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of pipeline desilting equipment, and in particular to drainage pipeline desilting equipment. Background Art

[0002] The urban underground pipeline system bears an important responsibility for flood control and drainage in the entire urban life and production. In recent years, the frequent heavy rains in major provinces and cities have also been a huge test for the underground pipeline projects in the municipal engineering construction in various cities. Usually, in the construction of public infrastructure, in order to facilitate the discharge of rainwater and sewage, it is completed by a complex drainage pipeline system laid underground. During long-term use, foreign matter will be deposited in the drainage pipe, mainly silt. If the silt in the pipe is not removed regularly, it will cause the pipe to be blocked, affecting the discharge rate of the water flow. After the silt and other foreign matter in the pipe accumulates for too long, harmful gases such as hydrogen sulfide will be produced, which will cause environmental pollution and this gas is flammable and explosive, which is easy to cause explosion accidents. Not only that, the acid and alkali substances in the wastewater are easy to corrode the pipe wall, so the dredging of the drainage pipe is particularly important.

[0003] Because the existing pipelines are buried for a long time, a wellhead is usually opened at a certain distance to facilitate the installation and maintenance of the pipeline. There are two main existing pipeline dredging methods: 1) Manual dredging, specifically, first intercepting and draining, then opening the well cover to discharge the harmful gases in the pipeline, and then workers drill into the pipeline to use special dredging equipment for manual dredging, but this method is inefficient and the harmful gases in the pipeline are not conducive to the health and safety of workers; 2) For some pipeline dredging equipment, a small sewage suction device is first sent into the pipeline and then the sludge is sent to the collection vehicle on the ground through a connected conveying pipeline and then transported away. However, usually due to the extremely high water content of the sludge in the pipeline, the dredging equipment will be sent to the collection equipment on the ground together with the sewage when dredging is performed, which will result in a small amount of sludge actually loaded on the collection equipment, which also leads to an increase in the cost of pipeline dredging. Summary of the invention

[0004] In view of the deficiencies in the prior art, the purpose of the present invention is to provide a drainage pipe dredging device, which can discharge excess water in the sludge while dredging, thereby increasing the sludge discharge volume and reducing the dredging cost.

[0005] In order to achieve the above object, the present invention provides the following technical solutions:

[0006] A drainage pipe desilting device comprises a silt collecting component, a dehydration component, a housing component and a propulsion component. The silt collecting component is located at the end of the dehydration component. The silt is collected by the silt collecting component and then transferred to the interior of the dehydration component for dehydration. The dehydration component is used to drive the desilting device to move.

[0007] The dewatering assembly includes a spiral dewatering auger, which is rotatably arranged inside the housing assembly, and the pitch of the spiral blades on the spiral dewatering auger gradually decreases in the direction from the silt inlet to the silt outlet of the housing assembly, and the housing assembly includes a bracket mechanism and a shell, and the bracket mechanism is fixedly arranged on the outer wall of the shell, and a drainage hole is opened on the side wall of the shell. This solution compresses and dehydrates the sludge while dredging by arranging a spiral dewatering auger, so that the mixing ratio between the sludge and the sewage reaches the required value, thereby increasing the amount of sludge removed per unit time, improving construction efficiency, and reducing costs.

[0008] In the present invention, further, the propulsion assembly includes a propulsion arm assembly, a power configuration worm and a driving component, the power configuration worm is connected and arranged between the driving component and the spiral dewatering auger, the driving component is fixedly arranged on the propulsion arm assembly, the propulsion arm assembly includes a transfer turbine, a support part and a propulsion wheel, the transfer turbine and the propulsion wheel are rotatably arranged on the support part, the transfer turbine and the propulsion wheel are connected through a transmission assembly, and the transfer turbine is meshed with the power configuration worm. This scheme distributes power to the spiral dewatering auger and the propulsion arm assembly at the same time by setting a power configuration worm, so as to realize the action of a set of driving components driving the spiral dewatering auger and the propulsion arm assembly at the same time. In addition, the relationship between the degree of sludge dehydration and the propulsion speed of the equipment can be controlled by adjusting the transmission ratio between the transfer turbine and the power configuration worm, thereby configuring a suitable propulsion progress and dehydration ratio according to different humidity conditions of the sludge.

[0009] In the present invention, further, the support portion includes a worm shield and multiple groups of support arms, and the multiple groups of support arms are fixedly arranged on the side wall of the worm shield. This solution fixes multiple groups of support arms on the side wall of the worm shield to improve the connection strength between the support arms and the worm shield.

[0010] In the present invention, further, the support part includes a worm shield, a telescopic drive part and multiple groups of support arms, the multiple groups of support arms are hingedly arranged on the side wall of the worm shield, the rotating shaft of the transfer turbine is coaxially arranged with the hinge shaft on the support arm, the telescopic drive part is connected and arranged between the worm shield and the support arm, and the telescopic drive part is used to drive the support arm to rotate around the hinge shaft. This solution sets the multiple groups of support arms and the worm shield in a hinged manner, thereby adjusting the inclination angle of the support arms, thereby changing the support radius of the multiple groups of support arms, thereby facilitating the use of the device for dredging pipelines with different diameters.

[0011] In the present invention, further, the sludge collecting assembly includes a sludge collecting cover, a gathering auger and a connecting neck, the sludge collecting cover is fixedly arranged on the housing assembly through the connecting neck, and the gathering auger is rotatably arranged in the connecting neck. The sludge collecting assembly is detachably arranged on the housing assembly, which can facilitate the timely replacement and installation of sludge collecting covers and gathering auger of different specifications at a later stage.

[0012] In the present invention, further, a primary filter screen is detachably provided inside the shell, a discharge port is provided near the primary filter screen, and a plurality of support retaining rings are fixedly provided on the outer wall of the primary filter screen. This solution can filter and separate the sludge and sewage squeezed out by the spiral dewatering auger by providing a primary filter screen.

[0013] In the present invention, further, the spiral dehydration augers are arranged in two groups, and the two groups of spiral dehydration augers are arranged in parallel and side by side. The two groups of spiral dehydration augers are connected to the power configuration worm through a rotation direction control transmission part, and the rotation direction control transmission part controls the rotation direction of the two groups of spiral dehydration augers. This scheme sets two groups of parallel and side-by-side spiral dehydration augers, which can make the two groups of spiral dehydration augers rotate together during dehydration, thereby cutting and cutting the spiral blades on the two groups of spiral dehydration augers through joint extrusion, and can not only dehydrate, but also cut and tear the cloth strips, strip plastic films and short branches mixed in the sludge to prevent them from stopping the equipment.

[0014] In the present invention, further, the rotation direction control transmission part includes a main driving gear and two sets of driven gears, the two sets of driven gears are meshed, and the main driving gear drives one set of driven gears to rotate. The structural setting of the rotation direction control transmission part of this scheme can make the two sets of spiral dehydrating augers rotate in opposite directions under the drive of the main driving gear, and the cutting effect is better.

[0015] In the present invention, further, the rotation direction control transmission part includes a main drive gear and two sets of driven gears, and the main drive gear is meshed with the two sets of driven gears at the same time. The structural setting of the rotation direction control transmission part of this scheme can make the two sets of spiral dewatering augers rotate in the same direction under the drive of the main drive gear. The internal structure of this rotation direction control transmission part is simple, and the stability is high, which is convenient for later maintenance.

[0016] In the present invention, further, the support mechanism includes a support wheel and a support arm, the support wheel is rotatably arranged at the end of the support arm, and the support arm is a telescopic structure. The structural setting of this solution can adjust the length of the support mechanism, thereby the device can be sent into pipelines of different diameters for dredging.

[0017] Compared with the prior art, the present invention has the following beneficial effects:

[0018] The spiral dewatering dragon arranged in the device of the present invention can compress and dehydrate the silt while clearing the silt, thereby reducing the mixing ratio between the silt and the sewage as much as possible under the condition that the mud pump can pump, thereby increasing the amount of silt removed per unit time, improving construction efficiency and reducing costs.

[0019] At the same time, by setting a power configuration worm, power is distributed to the spiral dewatering auger and the propulsion arm assembly at the same time, so as to realize the action function of a set of driving components to drive the spiral dewatering auger and the propulsion arm assembly at the same time. In addition, the propulsion speed of the propulsion assembly for the dredging equipment can be adjusted by adjusting the transmission ratio between the transfer turbine and the power configuration worm, thereby controlling the relationship between the degree of sludge dehydration and the propulsion speed of the equipment, so that the appropriate propulsion speed and dehydration ratio can be configured according to the different humidity conditions of the sludge. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 This is a schematic diagram of the explosion structure of Example 1 of the present invention.

[0021] Figure 2 It is a schematic diagram of the overall structure of the first embodiment of the present invention.

[0022] Figure 3 It is a schematic diagram of the exploded structure of the silt collecting assembly in the present invention.

[0023] Figure 4 It is a schematic diagram of the structure of the spiral dehydration auger in the present invention.

[0024] Figure 5 It is a schematic diagram of the structure of the propulsion assembly when the support arm is fixedly arranged in the present invention.

[0025] Figure 6 It is a schematic structural diagram of the propulsion assembly when the support arm is rotatably arranged in the present invention.

[0026] Figure 7 It is a schematic structural diagram of the telescopic support arm in the present invention.

[0027] Figure 8 It is a transmission schematic diagram of the rotation direction control transmission part for controlling two groups of spiral dehydration augers to rotate towards each other in the present invention.

[0028] Fig. 9 It is a transmission schematic diagram of the rotation direction control transmission part for controlling two groups of spiral dehydration augers to rotate in the same direction in the present invention.

[0029] Fig.10 It is a schematic diagram of the use state of the present invention.

[0030] In the attached drawings: 10, gathering auger; 101, connecting female end; 11, sludge collecting cover; 12, connecting neck; 20, shell; 21, primary filter; 210, discharge port; 22, spiral dewatering auger; 221, connecting male end; 222, spur; 30, propulsion assembly; 301, supporting arm; 302, driving component; 303, worm shield; 304, transfer turbine; 305, power configuration worm; 306, propulsion wheel; 40, mud pump; 50, end cover; 60, fixed arm; 61, supporting wheel; 62, sliding arm; 71, bearing; 72, spring; 73, telescopic drive unit; 81, driven gear; 810, double gear; 82, main drive gear; 90, cross pipe; 91, inspection well; 92, suction equipment; 93, sewage; 94, sludge. DETAILED DESCRIPTION

[0031] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0032] It should be noted that when a component is referred to as being "fixed to" another component, it may be directly on the other component or there may also be a component centered. When a component is considered to be "connected to" another component, it may be directly connected to the other component or there may also be a component centered. When a component is considered to be "set on" another component, it may be directly set on the other component or there may also be a component centered. The terms "vertical", "horizontal", "left", "right" and similar expressions used herein are for illustrative purposes only.

[0033] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art to which the present invention belongs. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more of the related listed items.

[0034] Embodiment 1

[0035] Please also see Figures 1 to 7A preferred embodiment of the present invention provides a drainage pipe desilting device, including a silt collecting component, a dehydration component, a shell component and a propulsion component 30. The silt collecting component is located at the front end of the entire pipe desilting device, that is, the end of the device located in the propulsion direction when the device is propulsed in the pipe. The silt collecting component is detachably fixed to the end of the dehydration component, and as the silt cleaning device is continuously advanced, the silt 94 deposited at the bottom of the pipe will be scooped up by the silt collecting cover 11 in the silt collecting component and gathered at the silt inlet. At the same time, the stirring and pushing of the gathering auger 10 will stir the collected silt 94 again. Stirring makes the mixture between the solid-liquid phase and the sewage 93 more uniform, so that after the uniformly mixed solid-liquid phase mixture is sent into the housing component at a later stage, the sewage 93 will be evenly removed under the compression of the spiral dewatering auger 22. The propulsion component 30 is fixedly arranged at the rear end of the dredging equipment. Since the sludge collecting cover 11 arranged at the front end of the equipment can collect the sewage 93 and the sludge 94 in the dewatering component for dehydration treatment, the internal environment of the pipeline after being collected by the sludge collecting cover 11 is drier and cleaner, thereby reducing the probability of the motor and other electrical components arranged in the propulsion component 30 being damp and water-infected. The propulsion component 30 propels the movement of the dredging equipment through its own driving force;

[0036] like Figure 1As shown, the dehydration component includes a spiral dehydration auger 22, which is rotatably arranged inside the housing component through existing rotating parts such as a bearing 71 group. The two ends of the rotating main shaft of the spiral dehydration auger 22 are rotatably arranged on the connecting neck 12 and the end cover 50 respectively. Due to driving reasons, it is necessary to fix the rotating main shafts between the gathering auger 10, the spiral dehydration auger 22 and the power configuration worm 305 together. At the same time, in order to facilitate disassembly and maintenance, the connecting ends of the two groups of rotating main shafts that need to be connected and fixed together are provided with a connecting male end 221 and a connecting female end 101. When connecting, the connecting male end 221 is inserted into the connecting female end 101, and a pin is used to be inserted into the connecting male end 221 and the connecting female end 101 at the same time along the radial direction of the rotating main shaft to complete the connection and fixation. This structural form is convenient for installation and disassembly. At the same time, the pitch between the spiral blades of the spiral dewatering auger 22 arranged in the housing assembly along the direction from the silt inlet to the silt discharge outlet gradually decreases. Due to the reduction of the pitch between the spiral blades, the space between each two sets of spiral blades gradually decreases. Therefore, when the sludge 94 enters the next pitch space from the previous pitch space, the reduced space will squeeze the entering sludge 94, thereby the sewage 93 in the sludge 94 can be discharged to achieve the dehydration effect. The squeezed sewage 93 will be filtered by the filter and then flow out from the drainage hole on the side wall of the housing 20. The housing assembly in the housing assembly includes a bracket mechanism and a housing 20. The housing 20 is provided with a sludge discharge outlet. The sludge discharge outlet can be directly connected to the mud pump 40 to deliver the sludge 94 after dehydration to the ground collection equipment through the mud pump 40. If the mud pump 40 is too large to be installed on the sludge discharge outlet, it can be directly connected to the conveying pipeline and the other end of the conveying pipeline can be connected to the suction equipment 92 on the ground. The bracket mechanism is fixedly arranged on the outer wall of the shell 20, and a accommodating space for the spiral dehydration auger 22 is formed inside the shell 20 for placing the spiral dehydration auger 22. In addition, the bracket mechanism is fixedly arranged on the outer wall of the shell 20, and each group of support wheels 61 in the bracket mechanism is against the inner wall of the pipeline, thereby setting up the dredging equipment inside the pipeline.

[0037] like Figure 5As shown, the propulsion assembly 30 includes a propulsion arm assembly, a power configuration worm 305 and a driving component 302. The power configuration worm 305 is connected and arranged between the driving component 302 and the spiral dehydration auger 22. The driving component 302 is fixedly arranged at one end of the worm shield 303. The other end of the worm shield 303 is fixedly arranged on the end cover 50. The two ends of the power configuration worm 305 are rotatably arranged on the worm shield 303 and the end cover 50. The output shaft of the driving component 302 can be connected to the power configuration worm 305 through a coupling or a connecting sleeve and other existing connection methods, thereby transmitting the power of the driving component 302 into the device. The propulsion arm assembly includes a transfer turbine 304, a support part and a propulsion wheel 306. The support part includes a worm shield 303 and a plurality of support brackets 301. The plurality of support brackets 301 are fixedly arranged on the side wall of the worm shield 303. The transfer turbine 304 and the propulsion wheel 306 are rotatably arranged on the support part, and the transfer turbine 304 and the propulsion wheel 306 are connected by a chain or a rack, and the transfer turbine 304 is meshed with the power configuration worm 305, so that when the power configuration worm 305 rotates, the transfer turbine 304 can be driven to rotate. Then the power is transmitted to the propulsion wheel 306 through the chain, thereby driving the propulsion wheel 306 to rotate, thereby driving the entire dredging equipment to move in the pipeline.

[0038] like Figure 6 As shown, at the same time, the support part has another setting form different from the above-mentioned fixed connection, specifically including a worm guard 303, a telescopic drive part 73 and multiple groups of support arms 301, and the multiple groups of support arms 301 are hingedly arranged on the side wall of the worm guard 303, and the rotating shaft of the transfer turbine 304 is coaxially arranged with the hinge shaft on the support arm 301. This coaxial arrangement can ensure that when the support arm 301 is rotating, no matter what angle the support arm 301 is at, the wheelbase of the rotating shaft between the transfer turbine 304 and the propulsion wheel 306 rotatably arranged thereon will not change, thereby ensuring that the length of the chain for transmission between the two is unique, instead of requiring the replacement of chains of different lengths as the support arm 301 rotates. The telescopic drive part 73 is hingedly connected between the end cover 50 and the support arm 301. The telescopic drive part 73 can be set as a point push rod or a cylinder or an electric cylinder or other existing components that can realize telescopic movement. The telescopic drive part 73 is used to drive the support arm 301 to rotate around the hinge axis. In this way, the inclination angle of the support arm 301 can be adjusted, thereby changing the support radius of multiple groups of support arms 301, and then the device can be conveniently used for pipeline desilting work with different pipe diameters or for obstacle avoidance operation during the propulsion process.

[0039] like Figure 3As shown, the silt collecting assembly includes a silt collecting cover 11, a gathering auger 10 and a connecting neck 12. The silt collecting cover 11 is fixedly arranged on the housing assembly through the connecting neck 12, and the gathering auger 10 is rotatably arranged in the connecting neck 12. The silt collecting cover 11 is usually set as a trumpet-shaped cover structure, and the gathering auger 10 is also set as a structure adapted to the structure of the silt collecting cover 11. The trumpet-shaped silt collecting cover 11 can fit the circular pipe more closely, and it is convenient to shovel the silt 94 in the pipe. The gathering auger 10 can also stir and mix the silt 94 and the sewage 93 again in the process of pushing the silt 94 in the silt collecting cover 11 into the dewatering assembly. At the same time, multiple groups of thorns 222 can be fixedly welded on the blade surfaces of the gathering auger 10 and the spiral dewatering auger 22, so that the solidified silt 94 can be stirred and shredded by the thorns 222 to play a role in refinement. The sludge collecting cover 11 can be configured as two groups of sludge collecting half covers, which are fixed and docked together by screws during assembly, thereby facilitating disassembly and assembly. At the same time, this structure also facilitates the removal of the pins passing through the connecting male end 221 and the connecting female end 101 when disassembling the gathering auger 10.

[0040] like Figure 7 As shown, the support mechanism includes a support wheel 61 and a support arm frame, and the support wheel 61 is rotatably arranged at the end of the support arm frame, and the support arm frame is a telescopic structure. Its specific structural form is that the support arm frame is divided into a fixed arm 60 and a sliding arm 62, and the sliding arm 62 is slidably penetrated on the fixed arm 60 and limited by a pin. In addition, the support wheel 61 is rotatably arranged in the adjustment chute of the sliding arm 62 through a bearing 71, and a spring 72 is arranged between the bearing 71 and the inner wall of the adjustment chute. The bearing 71 can be pressed against the bottom of the adjustment chute by the elastic force of the spring 72. Through this arrangement, when the support wheel 61 encounters a small protrusion on the inner wall of the pipeline, the support wheel 61 can be retracted by squeezing the spring 72 to cross the obstacle. The sealing methods of various joints in this embodiment are all existing sealing methods, which can effectively prevent the invasion of sewage 93 and sludge 94. At the same time, the driving component 302 used is also the existing technology, and the selection of its specific model and the action control are all the existing technology and will not be repeated here.

[0041] Embodiment 2

[0042] like Figure 4 As shown, the difference between the second embodiment and the first embodiment is that the spiral dehydration augers 22 are arranged in two groups, and the two groups of spiral dehydration augers 22 are arranged in parallel and side by side, and the two groups of spiral dehydration augers 22 are connected to the power configuration worm 305 through the rotation direction control transmission part, and the rotation direction control transmission part controls the rotation direction of the two groups of spiral dehydration augers 22. At the same time, when multiple groups of thorns 222 are fixedly arranged on the spiral blade, it is more convenient to tear and refine objects such as cloth strips that are easy to entangle.

[0043] like Figure 8 As shown, the rotation direction control transmission part includes a main driving gear 82 and two sets of driven gears 81, the two sets of driven gears 81 are meshed, and the main driving gear 82 drives one set of driven gears 81 to rotate. The two sets of driven gears 81 are respectively fixedly sleeved on the rotating main shafts of the two sets of spiral dehydration augers 22, and one set of driven gears 81 is set as a double gear 810. The two sets of gear teeth of this double gear are respectively meshed with the main driving gear 82 and the other set of driven gears 81, and the main driving gear 82 is fixed on the output end of the power configuration worm 305.

[0044] like Fig. 9 As shown, the rotation direction control transmission part includes a main driving gear 82 and two sets of driven gears 81, and the main driving gear 82 is meshed with the two sets of driven gears 81 at the same time. The two sets of driven gears 81 are respectively fixedly sleeved on the rotating main shafts of the two sets of spiral dehydration augers 22, and the main driving gear 82 is located in the middle position of the two sets of driven gears 81 and is meshed with the two sets of driven gears 81 at the same time.

[0045] In the second embodiment, two groups of spiral dewatering augers 22 are arranged so that when the two groups of augers are rotating, the spiral blades on the two groups of augers can squeeze and cut each other, so that it is easier to tear the cloth strips or other objects that are prone to entanglement mixed in the silt 94 into pieces, thereby preventing the spiral dewatering augers 22 from stopping due to entanglement and eventually causing the dredging equipment to fail to work.

[0046] Working principle:

[0047] like Fig.10 As shown, taking Example 1 as an example, first, the staff wears protective equipment and enters from the inspection well 91 and cleans out a short distance of the silt 94 on the side of the transverse pipe 90 close to the inspection well 91, so as to put the dredging equipment into the transverse pipe 90, and then connects the conveying pipeline to the silt discharge port and connects the other end of the pipeline to the suction equipment 92 on the ground, and connects the electrical components in the dredging equipment, and then controls the operation of the dredging equipment through the ground control equipment. The dredging equipment gradually moves forward under the push of the propulsion component 30. At the same time, the silt 94 deposited in the pipeline will be collected by the silt collecting component and transmitted to the inside of the dehydration component for dehydration treatment until the dredging work is completed.

[0048] The above description is a detailed description of the preferred feasible embodiments of the present invention, but the embodiments are not intended to limit the scope of the patent application of the present invention. All equivalent changes or modified changes completed under the technical spirit suggested by the present invention should fall within the patent scope covered by the present invention.

Claims

1. A drainage pipe desilting device, characterized in that: It comprises a silt collecting component, a dewatering component, a shell component and a propulsion component (30), wherein the silt collecting component is located at the end of the dewatering component, the silt (94) is collected by the silt collecting component and then transferred to the interior of the dewatering component for dewatering, and the propulsion component (30) is used to drive the silt removal equipment to move; The dehydration assembly comprises a spiral dehydration auger (22), the spiral dehydration auger (22) is rotatably arranged inside the housing assembly, the pitch of the spiral blades on the spiral dehydration auger (22) gradually decreases in the direction from the silt inlet to the silt discharge outlet of the housing assembly, the housing assembly comprises a bracket mechanism and a housing (20), the bracket mechanism is fixedly arranged on the outer wall of the housing (20), and a drainage hole is opened on the side wall of the housing (20); The propulsion assembly (30) comprises a propulsion arm assembly, a power configuration worm (305) and a driving component (302); the power configuration worm (305) is connected and arranged between the driving component (302) and the spiral dehydration auger (22); the driving component (302) is fixedly arranged on the propulsion arm assembly; the propulsion arm assembly comprises a transfer turbine (304), a support part and a propulsion wheel (306); the transfer turbine (304) and the propulsion wheel (306) are rotatably arranged on the support part; the transfer turbine (304) and the propulsion wheel (306) are connected via a transmission assembly; the transfer turbine (304) and the power configuration worm (305) are meshed; A primary filter screen (21) is detachably disposed inside the housing (20), a discharge port (210) is disposed near the silt discharge port of the primary filter screen (21), and a plurality of support retaining rings are fixedly disposed on the outer side wall of the primary filter screen (21).

2. A drainage pipe desilting device according to claim 1, characterized in that: The support portion comprises a worm shield (303) and a plurality of groups of support arms (301), wherein the plurality of groups of support arms (301) are fixedly arranged on the side wall of the worm shield (303).

3. A drainage pipe desilting device according to claim 1, characterized in that: The support portion comprises a worm gear shield (303), a telescopic drive portion (73) and a plurality of support arms (301); the plurality of support arms (301) are hingedly arranged on the side wall of the worm gear shield (303); the rotating shaft of the transfer turbine (304) is coaxially arranged with the hinge shaft on the support arm (301); the telescopic drive portion (73) is connected between the worm gear shield (303) and the support arm (301); the telescopic drive portion (73) is used to drive the support arm (301) to rotate around the hinge shaft.

4. A drainage pipe desilting device according to claim 1, characterized in that: The sludge collecting component comprises a sludge collecting cover (11), a gathering auger (10) and a connecting neck (12); the sludge collecting cover (11) is fixedly arranged on the outer shell component via the connecting neck (12); and the gathering auger (10) is rotatably arranged in the connecting neck (12).

5. The drainage pipe desilting equipment according to claim 1, characterized in that: The spiral dehydrating augers (22) are arranged in two groups, and the two groups of spiral dehydrating augers (22) are arranged in parallel and in parallel. The two groups of spiral dehydrating augers (22) are connected to the power configuration worm (305) through a rotation direction control transmission part, and the rotation direction control transmission part controls the rotation direction of the two groups of spiral dehydrating augers (22).

6. A drainage pipe desilting device according to claim 5, characterized in that: The rotation direction control transmission part comprises a main driving gear (82) and two sets of driven gears (81), the two sets of driven gears (81) are meshed with each other, and the main driving gear (82) drives one set of driven gears (81) to rotate.

7. A drainage pipe desilting device according to claim 5, characterized in that: The rotation direction control transmission part comprises a main driving gear (82) and two sets of driven gears (81), and the main driving gear (82) is meshed with the two sets of driven gears (81) at the same time.

8. The drainage pipe desilting equipment according to claim 1, characterized in that: The support mechanism comprises a support wheel (61) and a support arm frame, wherein the support wheel (61) is rotatably arranged at the end of the support arm frame, and the support arm frame is a telescopic structure.