A formwork-free ring beam structure and construction method thereof
Through the formless ring beam structure, the ring beam bricks are combined with the steel bar frame, and the tie rod and compression spring mechanism are used for splicing and supporting, the problem of cumbersome form removal and waste of resources in the production of existing ring beams is solved, and the construction efficiency is improved. Connection strength.
Patent Information
- Application Number
- CN202011164989.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-10-27
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2040-10-27
AI Technical Summary
The existing ring beam production method requires formwork support, which leads to cumbersome formwork removal and waste of resources, affecting construction efficiency.
The formless ring beam structure is adopted, and the ring beam bricks are combined with the steel bar frame, and the pull rod and compression spring mechanism are used for splicing and supporting, avoiding the use of the formwork, and concrete is poured during construction to fix the bricks.
It reduces formwork waste, improves construction efficiency, enhances the connection strength between ring beams and concrete, avoids the pull rod falling off, and achieves resource conservation and construction simplification.
Smart Images

Figure CN112196182B_ABST
Abstract
Description
Technical field:
[0001] The invention relates to the technical field of ring beam structures of buildings, and in particular to a formwork-free ring beam structure and a construction method thereof. Background technology:
[0002] Ring beams are continuous closed beams set around the outer walls of buildings and part of the inner transverse walls. Generally, reinforced concrete ring beams or reinforced brick ring beams are set in the wall. The purpose is to enhance the overall rigidity of the building and the stability of the wall. Ring beams can reduce the adverse effects of uneven foundation settlement or large vibration loads on the building and the cracks in the wall caused by them.
[0003] Ring beams are generally cast with reinforced concrete. The existing method of making ring beams is to first lay the steel bars where the ring beam is to be laid on the built brick wall, then set up the templates on both sides of the ring beam, and finally pour the concrete and cure it to form. This method requires supporting the templates on both sides of the ring beam. After the ring beam solidifies, the templates need to be removed. This method will generate a large number of scrapped templates, resulting in a large waste of resources. The template removal and collection work is cumbersome, affecting construction efficiency. Summary of the invention:
[0004] The purpose of the present invention is to solve the above technical problems and provide a formwork-free ring beam structure and a construction method thereof.
[0005] In order to achieve the above object, the present invention adopts the following technical solutions:
[0006] A formwork-free ring beam structure comprises a ring beam body, wherein the ring beam body comprises ring beam bricks and a steel bar frame, wherein the ring beam bricks are located on both sides of the steel bar frame, one end of the ring beam brick is provided with a protrusion which is integrated with the ring beam brick, and the other end of the ring beam brick is provided with a connecting groove, wherein the protrusion is clamped in the connecting groove of adjacent ring beam bricks and splices and connects a plurality of ring beam bricks into a whole, wherein the ring beam brick is provided with a hanging groove, wherein the hanging grooves on the ring beam bricks located on both sides of the steel bar frame are arranged facing each other, a pull rod is connected between the ring beam bricks, and clamping blocks are fixedly connected at both ends of the pull rod, and the clamping blocks are clamped in the hanging grooves, and the space between the steel bar frame and the ring beam bricks is filled with concrete.
[0007] Furthermore, a trapezoidal groove is provided on the inner wall of the hanging groove on the ring beam brick, and the trapezoidal groove is arranged horizontally. A sliding groove is provided on the side wall of the clamping block, and an upper slider and a lower slider are slidably connected in the sliding groove. The upper slider is rotatably connected to an upper connecting rod, and the lower slider is rotatably connected to a lower connecting rod. The ends of the upper connecting rod and the lower connecting rod away from the clamping block are rotatably connected to the same extrusion block, and a accommodating hole is provided on the side wall of the clamping block, and a compression spring is provided in the accommodating hole, one end of the compression spring is fixedly connected to the bottom of the accommodating hole, and the other end of the compression spring is fixedly connected to the side wall of the extrusion block, and the extrusion block abuts against the trapezoidal groove under the extrusion of the compression spring.
[0008] Furthermore, a first guide groove is provided on the inner side wall of the slide groove, and first protruding columns protruding outward are provided on both sides of the upper slide block and the lower slide block, and the first protruding columns are embedded in the first guide groove and move along the guide groove.
[0009] Furthermore, the ring beam bricks are provided with a plurality of hook grooves, and the hook grooves are provided at the upper ends of the ring beam bricks.
[0010] Furthermore, a bite groove which passes through from top to bottom is opened on the side wall of the ring beam brick.
[0011] A construction method of a formwork-free ring beam, applied to the above-mentioned formwork-free ring beam structure, comprises the following main steps:
[0012] Step 1, smoothing the upper end surface of the wall below the ring beam, removing debris and protrusions, and plugging holes of material leakage, so that the upper end surface of the wall forms a flat surface without material leakage;
[0013] Step 2, placing pads on the upper end surface of the wall, and tying the steel bar frame on the pads;
[0014] Step 3, laying ring beam bricks on both sides of the steel frame at the upper end of the wall, the ring beam bricks are laid on the inner and outer sides of the wall, the outer wall of the inner ring beam bricks is flush with the inner wall of the wall, and the hook grooves of the ring beam bricks are arranged facing each other;
[0015] Step 4, prepare the pull rod, press the extrusion block on the pull rod toward the clamping block to shrink the compression spring, clamp the extrusion block on the pull rod together with the clamping block into the hook groove, and then the extrusion block is pushed outward and clamped into the trapezoidal groove under the elastic force of the compression spring; clamp the protrusions of the ring beam bricks into the connecting grooves of the adjacent ring beam bricks in sequence so that the ring beam bricks are spliced and connected into a whole, cut the ring beam bricks at the corners and splice them with cement mortar, fix the ring beam bricks at the corners so that the ring beam bricks are enclosed in a closed ring;
[0016] Step 5, moisten the ring beam bricks and the upper end of the wall with a proper amount of glue, then pour and fill concrete in the cavity enclosed between the ring beam bricks, and vibrate the concrete to make it dense;
[0017] Step 6, smoothing the upper end surface of the poured concrete, and curing the concrete after the pouring is completed; after the concrete is solidified, it forms a wall ring beam together with the ring beam bricks.
[0018] During the construction of a formwork-free ring beam structure provided by the present invention, the clamping blocks at both ends of the pull rod are clamped in the hanging grooves of the ring beam bricks on both sides. The specific operation is that the extrusion block is pressed toward the clamping block, the compression spring is contracted, and the extrusion block and the clamping block are clamped into the hanging groove together. Then, under the elastic force of the compression spring, the extrusion block is stretched outward and clamped into the trapezoidal groove, thereby locking the pull rod and the ring beam brick. The compression spring squeezes the extrusion block tightly in the trapezoidal groove, so that the relative position between the ring beam bricks on both sides remains stable, and the extrusion block is located in the trapezoidal groove, and the trapezoidal groove is recessed in the hanging groove, so that the extrusion block is blocked by the side wall of the trapezoidal groove and is not easy to detach upward, thereby avoiding the pull rod from falling off during construction.
[0019] The present invention provides a formwork-free ring beam structure and a construction method thereof, which have the following beneficial effects: by adopting ring beam bricks to replace the existing formwork for construction, after the construction is completed, the ring beam bricks are consolidated with concrete to form a ring beam, thereby avoiding the formwork removal operation, improving construction efficiency, reducing the generation of formwork waste, and saving resources; the ring beam bricks are supported by tie rods and keep a stable position under the clamping of extrusion blocks, and the extrusion blocks are located in trapezoidal grooves and blocked by the side walls of the trapezoidal grooves, thereby avoiding the tie rods from falling off during construction; the tie rods are solidified in the concrete after the concrete is poured, thereby improving the connection strength between the ring beam bricks and the concrete; by providing bite grooves on the side walls of the ring beam bricks, the poured concrete is filled in the bite grooves, thereby increasing the bite consolidation strength with the ring beam bricks. Description of the drawings:
[0020] The specific embodiments of the present invention are further described in detail below in conjunction with the accompanying drawings:
[0021] Figure 1 A schematic diagram of the cross-sectional structure of a formwork-free ring beam structure provided by the present invention;
[0022] Figure 2 for Figure 1 Schematic diagram of the structure of the middle F part;
[0023] Figure 3 for Figure 2 Schematic diagram of the structure of the middle G part;
[0024] Figure 4A schematic diagram of the cross-sectional structure of the joint between the clamping block and the upper sliding block in a template-free ring beam structure provided by the present invention;
[0025] Figure 5 A schematic diagram of a top view of the structure of the ring beam bricks and the tie rods in a formwork-free ring beam structure provided by the present invention;
[0026] Figure 6 A schematic diagram of the structure of mutually splicing ring beam bricks in a formwork-free ring beam structure provided by the present invention;
[0027] Figure 7 A three-dimensional schematic diagram of a formwork-free ring beam structure provided by the present invention.
[0028] Explanation of the numbers in the figure: 1. Ring beam brick; 11. Protrusion; 12. Connecting groove; 13. Hook groove; 14. Trapezoidal groove; 15. Engaging groove; 2. Steel bar frame; 3. Pull rod; 31. Snap block; 311. Slide groove; 312. Accommodating hole; 313. First guide groove; 32. Upper slider; 321. First protrusion; 33. Lower slider; 34. Upper connecting rod; 35. Lower connecting rod; 36. Extrusion block; 37. Compression spring; 4. Concrete; A. Ring beam body; B. Wall. Specific implementation method:
[0029] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.
[0030] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0031] It should be noted that all directional indications in the embodiments of the present invention (such as up-down-left-right-front-back...) are only used to explain the relative position relationship - movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly. The connection can be a direct connection or an indirect connection.
[0032] like Figure 1-6As shown, a formwork-free ring beam structure includes a ring beam body A, wherein the ring beam body A includes a ring beam brick 1 and a steel frame 2, wherein the ring beam brick 1 is located on both sides of the steel frame 2, wherein one end of the ring beam brick 1 is provided with a protrusion 11 which is integrated with the ring beam brick 1, and the other end of the ring beam brick 1 is provided with a connecting groove 12, wherein the protrusion 11 is snapped into the connecting groove 12 of adjacent ring beam bricks 1 and multiple ring beam bricks 1 are spliced and connected into a whole, wherein the ring beam brick 1 is provided with a hanging groove 13, wherein the hanging grooves 13 on the ring beam bricks 1 on both sides of the steel frame 2 are arranged facing each other, wherein a pull rod 3 is connected between the ring beam bricks 1, wherein both ends of the pull rod 3 are fixedly connected with a clamping block 31, wherein the clamping block 31 is clamped in the hanging groove 13, and the space between the steel frame 2 and the ring beam brick 1 is filled with concrete 4.
[0033] Specifically, a trapezoidal groove 14 is provided on the inner wall of the hanging groove 13 provided on the ring beam brick 1, and the trapezoidal groove 14 is arranged horizontally. A sliding groove 311 is provided on the side wall of the clamping block 31, and an upper slider 32 and a lower slider 33 are slidably connected in the sliding groove 311, the upper slider 32 is rotatably connected to the upper connecting rod 34, and the lower slider 33 is rotatably connected to the lower connecting rod 35, and the upper connecting rod 34 and the lower connecting rod 35 are rotatably connected to the same extrusion block 36 at one end away from the clamping block 31, and a accommodating hole 312 is provided on the side wall of the clamping block 31, and a compression spring 37 is provided in the accommodating hole 312, one end of the compression spring 37 is fixedly connected to the bottom of the accommodating hole 312, and the other end of the compression spring 37 is fixedly connected to the side wall of the extrusion block 36, and the extrusion block 36 abuts against the trapezoidal groove 14 under the extrusion of the compression spring 37.
[0034] Specifically, a first guide groove 313 is formed on the inner side wall of the slide groove 311 , and first protruding columns 321 protruding outward are formed on both sides of the upper slider 32 and the lower slider 33 . The first protruding columns 321 are embedded in the first guide groove 313 and move along the guide groove.
[0035] Specifically, the hook grooves 13 are arranged at multiple locations on the ring beam brick 1, and the hook grooves 13 are arranged at the upper end of the ring beam brick 1.
[0036] Specifically, a vertically penetrating engaging groove 15 is formed on the side wall of the ring beam brick 1 .
[0037] Specifically, the ring beam bricks 1 are made of cement and sand; and the pull rods 3 are made of steel.
[0038] like Figure 1-7 As shown, a construction method of a formwork-free ring beam is applied to the above-mentioned formwork-free ring beam structure, comprising the following main steps:
[0039] Step 1, smoothing the upper end surface of the wall B below the ring beam, removing debris and protrusions, and plugging holes of material leakage, so that the upper end surface of the wall B forms a flat surface without material leakage;
[0040] Step 2, placing a pad on the upper end surface of the wall B, and tying the steel bar frame 2 on the pad;
[0041] Step 3, build the ring beam bricks 1 on both sides of the steel frame at the upper end of the wall B, the ring beam bricks 1 are built on the inner and outer sides of the wall B, the outer wall of the inner ring beam bricks 1 is flush with the inner wall of the wall B, and the hook grooves 13 of the ring beam bricks 1 are arranged facing each other;
[0042] Step 4, prepare the pull rod 3, press the extrusion block 36 on the pull rod 3 toward the clamping block 31, so that the compression spring 37 contracts, and clamp the extrusion block 36 on the pull rod 3 together with the clamping block 31 into the hook groove 13, and then the extrusion block 36 is pushed outward and clamped into the trapezoidal groove 14 under the elastic force of the compression spring 37; clamp the protrusion 11 of the ring beam brick 1 in the connecting groove 12 of the adjacent ring beam brick 1 in sequence so that the ring beam brick 1 is spliced and connected into a whole, cut the ring beam brick 1 at the corner and splice it with cement mortar, fix the ring beam brick 1 at the corner, so that the ring beam brick 1 is enclosed into a closed ring;
[0043] Step 5, moisten the ring beam bricks 1 and the upper end of the wall B with an appropriate amount of glue, then pour and fill concrete 4 in the cavity enclosed between the ring beam bricks 1, and vibrate and compact the concrete 4;
[0044] Step 6, smoothing the upper end surface of the poured concrete 4, and curing the concrete 4 after the pouring is completed; after the concrete 4 is solidified, it forms a wall ring beam together with the ring beam bricks 1.
[0045] The cam 36 is pressed against the locking cam 31 and the locking cam 31 is pressed against the locking cam 31 by the spring 37 so that the locking cam 36 and the locking cam 31 are locked into the locking cam 13. The cam 36 is pressed against the locking cam 31 and the locking cam 31 is pressed against the locking cam 13. The cam 36 is pressed against the locking cam 31 and the locking cam 31 is locked into the locking cam 13. The cam 36 is then pushed outward and locked into the trapezoidal groove 14 under the elastic force of the compression spring 37. The cam 36 is then pressed against the locking cam 31 and the locking cam 31 is locked into the trapezoidal groove 14. The cam 36 is locked against the trapezoidal groove 14. The cam 36 is then pressed against the locking cam 31 and the locking cam 31 is locked into the trapezoidal groove 14. The cam 36 is then pressed against the locking cam 31 and the locking cam 31 is locked into the trapezoidal groove 14. The cam 36 is then pressed against the locking cam 31 and the locking cam 31 is locked into the trapezoidal groove 14. The cam 36 is then pressed against the locking cam 31 and the locking cam 31 is locked into the trapezoidal groove 14. The cam 36 is then pressed against the locking cam 31 and the locking cam 31 is locked into the trapezoidal groove 14.
[0046] The above shows and describes the basic principles, main features and characteristics of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of the present invention is defined by the attached claims and their equivalents.
Claims
1. A formwork-free ring beam structure, Features: The invention comprises a ring beam body (A), wherein the ring beam body (A) comprises a ring beam brick (1) and a steel frame (2), wherein the ring beam brick (1) is located on both sides of the steel frame (2), one end of the ring beam brick (1) is provided with a protrusion (11) which is integral with the ring beam brick (1), and the other end of the ring beam brick (1) is provided with a connecting groove (12), wherein the protrusion (11) is clamped in the connecting groove (12) of an adjacent ring beam brick (1) and a plurality of ring beam bricks (1) are connected to each other. ) are spliced and connected into a whole, the ring beam brick (1) is provided with a hook groove (13), the hook grooves (13) on the ring beam bricks (1) located on both sides of the steel frame (2) are arranged facing each other, a tie rod (3) is connected between the ring beam bricks (1), both ends of the tie rod (3) are fixedly connected with a clamping block (31), the clamping block (31) is clamped in the hook groove (13), and concrete (4) is filled between the steel frame (2) and the ring beam brick (1); A trapezoidal groove (14) is provided on the inner wall of the hook groove (13) provided on the ring beam brick (1), and the trapezoidal groove (14) is arranged transversely. A sliding groove (311) is provided on the side wall of the clamping block (31), and an upper slider (32) and a lower slider (33) are slidably connected in the sliding groove (311). The upper slider (32) is rotatably connected to an upper connecting rod (34), and the lower slider (33) is rotatably connected to a lower connecting rod (35). The distance between the upper connecting rod (34) and the lower connecting rod (35) is The same extrusion block (36) is rotatably connected to one end of the clamping block (31); a receiving hole (312) is provided on the side wall of the clamping block (31); a compression spring (37) is provided in the receiving hole (312); one end of the compression spring (37) is fixedly connected to the bottom of the receiving hole (312); the other end of the compression spring (37) is fixedly connected to the side wall of the extrusion block (36); and the extrusion block (36) is abutted against the trapezoidal groove (14) under the compression of the compression spring (37); A first guide groove (313) is provided on the inner side wall of the slide groove (311), and first convex columns (321) protruding outward are provided on both sides of the upper slide block (32) and the lower slide block (33), and the first convex columns (321) are embedded in the first guide groove (313) and move along the guide groove; The hook grooves (13) on the ring beam brick (1) are arranged at a plurality of locations, and the hook grooves (13) are arranged at the upper end of the ring beam brick (1).
2. A formwork-free ring beam structure according to claim 1, Features: The side wall of the ring beam brick (1) is provided with an engaging groove (15) which passes through from top to bottom.
3. A construction method for formwork-free ring beam, Features: The formwork-free ring beam structure as claimed in any one of claims 1 to 2 is applied; the main steps are as follows: Step 1, smoothing the upper end surface of the wall (B) below the ring beam, removing debris and protrusions, and plugging holes of material leakage, so that the upper end surface of the wall (B) forms a flat surface without material leakage; Step 2, placing a pad on the upper end surface of the wall (B), and tying a steel bar frame (2) on the pad; Step 3, laying ring beam bricks (1) on both sides of the steel frame at the upper end of the wall (B), the ring beam bricks (1) being laid on the inner and outer sides of the wall (B), the outer wall of the inner ring beam bricks (1) being flush with the inner wall of the wall (B), and the hook grooves (13) of the ring beam bricks (1) being arranged facing each other; Step 4, prepare the pull rod (3), press the extrusion block (36) on the pull rod (3) toward the clamping block (31) to shrink the compression spring (37), and clamp the extrusion block (36) on the pull rod (3) together with the clamping block (31) into the hook groove (13), and then the extrusion block (36) is pushed outward and clamped into the trapezoidal groove (14) under the elastic force of the compression spring (37); sequentially clamp the protrusions (11) of the ring beam bricks (1) into the connecting grooves (12) of the adjacent ring beam bricks (1) so that the ring beam bricks (1) are spliced and connected into a whole, cut the ring beam bricks (1) at the corners and splice them with cement mortar, fix the ring beam bricks (1) at the corners so that the ring beam bricks (1) are enclosed into a closed ring; Step 5, moistening the ring beam bricks (1) and the upper end of the wall (B) with an appropriate amount of glue, then pouring and filling concrete (4) in the cavity enclosed between the ring beam bricks (1), and vibrating and compacting the concrete (4); Step 6, smoothing the upper end surface of the poured concrete (4), and curing the concrete (4) after the pouring is completed; after the concrete (4) is solidified, it forms a wall ring beam together with the ring beam bricks (1).