A method for generating prefabrication assembly information

By generating layout drawings and statistical data through BIM models and software tools, the problems of low efficiency and high error in prefabricated assembly information generation are solved, and the flexibility of efficient and accurate prefabricated assembly information calculation and drawing changes is achieved.

CN112487540BActive Publication Date: 2024-09-20NANJING YANGTZE RIVER URBAN AGCHITECTURAL DESIGN
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202011446798.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-12-09
Publication Date
2024-09-20
Estimated Expiration
2040-12-09

AI Technical Summary

Technical Problem

The existing technology has low efficiency and high error rate in generating prefabricated assembly information, resulting in inaccurate calculations. Furthermore, it requires recalculation when the design drawings are changed, which wastes a lot of time.

Method used

The layout drawings were generated using a BIM model. Revit and Dynamo software were used for component numbering, labeling, and data statistics. The prefabrication rate was calculated by calculating the volume and weight of the components, and Excel software was used for data verification.

Benefits of technology

It improved the efficiency and accuracy of generating prefabricated assembly information, reduced the error rate, and decreased the statistical workload and cost when drawings were changed.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112487540B
    Figure CN112487540B
Patent Text Reader

Abstract

The present invention discloses a method for generating prefabricated assembly information, and belongs to the technical field of building engineering. A method for generating prefabricated assembly information of the present invention comprises the following steps: S100, obtaining component information, and generating a layout drawing according to the component information and using a BIM model; S200, performing data statistics on the components in the layout drawing to obtain component statistical data; S300, calculating the prefabricated assembly rate according to the component statistical data. The present invention overcomes the shortcomings of the prior art that the generation efficiency of prefabricated assembly information is low, and the error rate of the generated prefabricated assembly information is high, and provides a method for generating prefabricated assembly information, which can improve the generation efficiency of prefabricated assembly information, and can greatly reduce the error rate of prefabricated assembly information, thereby improving the accuracy of the generated prefabricated assembly information.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of building engineering, and more specifically, relates to a method for generating prefabricated assembly information. Background Art

[0002] With the development of modern industrial technology and the acceleration of urbanization, the construction field has also ushered in various technological innovations, one of which is prefabricated buildings. Prefabricated buildings began to arouse people's interest in the early 20th century and finally became a reality in the 1960s. Britain, France, the Soviet Union and other countries first tried it. Due to the fast construction speed and low production cost of prefabricated buildings, they were quickly promoted around the world.

[0003] The early prefabricated buildings were rather rigid and stereotyped. Later, people made improvements in design, increasing flexibility and diversity, so that prefabricated buildings can not only be built in batches, but also have rich styles. There is a kind of mobile home in the United States, which is a relatively advanced prefabricated building. Each residential unit is like a large trailer. It can be used as long as it is pulled to the site by a special car, and then hoisted by a crane onto the floor pad and connected to the pre-buried waterway, power supply, and telephone system. The mobile home has heating, bathroom, kitchen, dining room, bedroom and other facilities. Mobile homes can be a single unit or connected to each other.

[0004] Construction projects that use prefabricated construction technology require prefabricated components to be manufactured in prefabricated factories. For the entire prefabricated building, architectural drawings need to be drawn, so it is necessary to calculate and count prefabrication information in advance. In the prior art, statistics on prefabrication information have the following disadvantages:

[0005] First, the workload of statistical prefabrication assembly information is large, and the calculated related values ​​are inaccurate; second, manual statistics of prefabricated components and calculation of component quantities based on two-dimensional drawings will inevitably lead to deviations from the actual component volume or area, which greatly affects the accuracy of the results; in addition, when changes need to be made to the drawing design, the data of the prefabricated components need to be recalculated, resulting in a lot of waste of working time.

[0006] In summary, how to improve the production efficiency of prefabricated assembly information and reduce the error rate of calculating prefabricated assembly information of prefabricated buildings, so as to provide a data basis for calculating the prefabrication rate and assembly rate of prefabricated buildings, is a problem that needs to be urgently solved in the existing technology. Summary of the invention

[0007] 1. Problem to be solved

[0008] The present invention overcomes the shortcomings of the prior art in that the generation efficiency of prefabricated assembly information is low and the error rate of the generated prefabricated assembly information is high, and provides a method for generating prefabricated assembly information, which can improve the generation efficiency of prefabricated assembly information and can greatly reduce the error rate of prefabricated assembly information, thereby improving the accuracy of the generated prefabricated assembly information.

[0009] 2. Technical solution

[0010] In order to solve the above problems, the technical solution adopted by the present invention is as follows:

[0011] A method for generating prefabrication assembly information of the present invention comprises the following steps: S100, acquiring component information, and generating a layout drawing according to the component information and using a BIM model; S200, performing data statistics on the components in the layout drawing to obtain component statistical data; S300, calculating a prefabrication assembly rate according to the component statistical data.

[0012] Furthermore, the specific process of generating the layout drawing in step S100 is: selecting the required components from the component information, numbering and labeling the selected components to obtain processed components; and then using the BIM model to process the processed components to obtain the layout drawing, thereby greatly improving the generation efficiency of the layout drawing and further improving work efficiency.

[0013] Furthermore, the specific process of obtaining component statistical data in step S200 is: extracting components with different numbers from the layout diagram; then obtaining information of the components with different numbers, the information including the name, length, thickness, height, volume, quantity and number of layers of the components; and then calculating the total volume of the components with corresponding numbers according to the information of the components with different numbers, thereby improving the calculation efficiency of the data and further improving the generation efficiency of the prefabrication information.

[0014] Furthermore, the specific process of obtaining the prefabrication rate in step S300 is: classifying components with different numbers to obtain components of different categories, and calculating the corresponding prefabrication rate according to the volume and weight of components of the same category.

[0015] Furthermore, the required components are selected according to the Revit software, and the selected components are numbered and labeled using the Dynamo software.

[0016] Furthermore, the specific process of classifying components with different numbers is as follows: the components of the main structure and the external protective structure are classified as Z1, the components of the assembled internal and external protective structures are classified as Z2, and the components of the internal building components are classified as Z3.

[0017] Furthermore, the specific process of calculating the prefabrication rate is as follows: the total volumes of components of the same category are added together to obtain a volume value, and then the volume value is multiplied by a corresponding weight to obtain the prefabrication rate.

[0018] Furthermore, the layout diagram, component statistics and prefabrication assembly rate are statistically analyzed to obtain a calculation report.

[0019] 3. Beneficial effects

[0020] Compared with the prior art, the present invention has the following beneficial effects:

[0021] A method for generating prefabricated assembly information of the present invention generates a layout drawing using a BIM model, which greatly improves the generation efficiency of the prefabricated assembly information; further, component statistical data is obtained through the BIM model, which improves the generation efficiency of the prefabricated assembly information, and can greatly reduce the error rate of the prefabricated assembly information, thereby improving the accuracy of the generated prefabricated assembly information; in addition, the layout drawing, component statistical data and prefabricated assembly rate are associated and configured through the BIM model, so that when the layout drawing is changed, corresponding other prefabricated assembly information can be changed accordingly, which greatly reduces the workload of statistical prefabricated assembly information and further reduces the statistical cost of prefabricated assembly information. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a schematic diagram of the method flow of the present invention. DETAILED DESCRIPTION

[0023] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments; moreover, the various embodiments are not relatively independent and can be combined with each other as needed to achieve better results. Therefore, the following detailed description of the embodiments of the present invention provided in the drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0024] In order to further understand the content of the present invention, the present invention is described in detail in conjunction with the accompanying drawings and embodiments.

[0025] Example 1

[0026] Combination Figure 1As shown, a method for generating prefabricated assembly information of the present invention generates a layout drawing through a BIM model, and further obtains construction statistical data and prefabricated assembly rate through the layout drawing, which greatly improves the generation efficiency of prefabricated assembly information and improves the accuracy of prefabricated assembly information; further realizes the associated configuration of the layout drawing, construction statistical data and prefabricated assembly rate, thereby improving the correlation between each information.

[0027] A method for generating prefabricated assembly information of the present invention comprises the following specific steps:

[0028] (1) Generate layout diagram

[0029] Step S100: Obtain component information, and generate a layout drawing based on the component information and using the BIM model. The specific process of generating a layout drawing in the present invention is: first, select the required components from the component information. It is worth noting that the present embodiment uses the Revit software to select the required components;

[0030] Afterwards, the selected components are numbered and labeled to obtain the processed components. It is worth noting that the specific process of numbering the selected components in the present invention is: numbering the components according to the preset rules, for example, the shear wall components are numbered as JLQ. In addition, the specific process of labeling the selected components in the present invention is: using revit to generate various drawing views, writing the view names accordingly, matching the preset template, and then calling the component number to generate text labels in the drawing. This embodiment uses dynamo software to number and label the selected components.

[0031] The BIM model is then used to process the processed components to obtain a layout drawing. Specifically, this embodiment uses Revit software to generate a layout drawing for the processed components. It should be noted that the required layout drawings can be generated in batches through Revit software, which greatly improves the efficiency of generating layout drawings and further improves work efficiency.

[0032] (2) Generate component statistics

[0033] Step S200: Performing data statistics on the components in the layout diagram to obtain component statistical data. The specific process is as follows:

[0034] Components with different numbers are extracted from the layout drawing. In this embodiment, Dynamo software is used to extract components from the layout drawing; then information of components with different numbers is obtained, and the information includes the name, length, thickness, height, volume, quantity and number of layers of the components; in this embodiment, the information of components with different numbers is obtained through Dynamo software.

[0035] Thereafter, the total volume of components with corresponding numbers is calculated based on the information of components with different numbers. Specifically, this embodiment uses Dynamo software for calculation. Compared with the prior art of manually calculating component statistical data, the present invention improves the efficiency of data calculation and further improves the efficiency of generating prefabricated information.

[0036] (3) Calculation of prefabrication rate

[0037] S300, calculating the prefabrication assembly rate based on component statistical data; specifically, classifying components with different numbers to obtain components of different categories. It is worth noting that the specific process of classifying components with different numbers is: classifying the components of the main structure and the external protective structure as Z1, classifying the components of the assembled internal and external protective structures as Z2, and classifying the components of the internal building components as Z3.

[0038] Then, the corresponding prefabrication rate is calculated based on the volume and weight of the components of the same category; the specific process of calculating the prefabrication rate of the present invention is: the total volume of the components of the same category is added to obtain the volume value, and then the volume value is multiplied by the corresponding weight to obtain the prefabrication rate. It is worth noting that the weight value is the specified value for calculating the prefabrication rate in the prior art.

[0039] It is worth further explaining that the calculation result of the prefabrication rate can be calculated by Dynamo software and Revit software, and the calculation result can be further verified with the component statistical data to prevent statistical errors, thereby ensuring the accuracy of the prefabrication information. It should be noted that in this embodiment, the relevant data for calculating the prefabrication rate is imported into the calculation software through Dynamo software, and then the prefabrication rate is calculated by the calculation software. The calculation software in this embodiment is Excel software.

[0040] (4) Generate calculation report

[0041] The calculation book is obtained by statistically analyzing the layout drawings, component statistics and prefabrication assembly rates, which greatly reduces the difficulty of writing the calculation book and further improves the efficiency of generating the calculation book.

[0042] A method for generating prefabricated assembly information of the present invention generates a layout drawing using a BIM model, which greatly improves the generation efficiency of the prefabricated assembly information; further, component statistical data is obtained through the BIM model, which improves the generation efficiency of the prefabricated assembly information, and can greatly reduce the error rate of the prefabricated assembly information, thereby improving the accuracy of the generated prefabricated assembly information; in addition, the layout drawing, component statistical data and prefabricated assembly rate are associated and configured through the BIM model, so that when the layout drawing is changed, corresponding other prefabricated assembly information can be changed accordingly, which greatly reduces the workload of statistical prefabricated assembly information and further reduces the statistical cost of prefabricated assembly information.

[0043] The present invention has been described in detail above in conjunction with specific exemplary embodiments. However, it should be understood that various modifications and variations may be made without departing from the scope of the present invention as defined by the appended claims. The detailed description and the accompanying drawings should be considered only as illustrative and not restrictive, and if there are any such modifications and variations, they will fall within the scope of the present invention described herein. In addition, the background technology is intended to illustrate the current status and significance of the research and development of the present technology and is not intended to limit the present invention or the application field of the present application and the present invention.

Claims

1. A method for generating prefabrication assembly information, characterized in that: The following steps are involved: S100, obtaining component information, and generating a layout drawing based on the component information and using a BIM model; S200, performing data statistics on the components in the layout diagram to obtain component statistical data; S300, calculating the prefabrication rate according to the component statistical data; the specific process of obtaining the prefabrication rate in step S300 is: classifying components with different numbers to obtain components of different categories, and calculating the corresponding prefabrication rate according to the volume and weight of components of the same category; the specific process of classifying components with different numbers is: classifying the components of the main structure and the external protective structure as Z1, classifying the components of the assembled internal and external protective structure as Z2, and classifying the components of the internal building parts as Z3; the specific process of calculating the prefabrication rate is: adding the total volume of components of the same category to obtain the volume value, and then multiplying the volume value by the corresponding weight to obtain the prefabrication rate; Select the required components according to the Revit software; use the Dynamo software to number and label the selected components.

2. The method for generating prefabrication assembly information according to claim 1, characterized in that: The specific process of generating the layout diagram in step S100 is as follows: Selecting required components from the component information, and numbering and marking the selected components to obtain processed components; The BIM model is used to process the processed components to obtain the layout drawing.

3. A method for generating prefabrication assembly information according to claim 2, characterized in that: The specific process of obtaining component statistical data in step S200 is as follows: Extract components with different numbers from the layout drawing; Get the information of components with different numbers, including the name, length, thickness, height, volume, quantity and number of layers of the components; The total volume of components with corresponding numbers is calculated based on the information of components with different numbers.

4. A method for generating prefabrication assembly information according to any one of claims 1 to 3, characterized in that: The layout drawing, component statistics and prefabrication assembly rate are statistically analyzed to obtain a calculation report.

Citation Information

Patent Citations

  • Rapid assembly type integrated house and installation method

    CN103821229A

  • Fabricated fringe frame beam component and designing method

    CN108661169A

  • BIM-based prefabricated assembly information statistics method, device and apparatus

    CN109190296A