A connection structure and connection method of integrated steel and crossbeam

By using the structure of interface, tenon, brake iron and wedge blocks in the connection between integrated steel and cross beams, replacing the traditional bolt welding method, the rapid and reliable installation of integrated steel and cross beams is achieved, and the connection reliability in the existing technology is solved and the problem of low construction efficiency.

CN112502281BActive Publication Date: 2025-01-03WUXI GUANGCAI MACHINERY MFG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202011411500.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-12-03
Publication Date
2025-01-03
Estimated Expiration
2040-12-03

AI Technical Summary

Technical Problem

In building structures, the connection between integrated steel and cross beams has problems such as low reliability of bolt connection clearance, large welding workload, difficult quality, high labor intensity, low efficiency and large smoke emissions.

Method used

The connecting structure including interfaces, tenons, brake iron and wedge blocks is adopted. The tenons are pre-assembled and brake iron tightened on site through pre-welded interfaces and tenons, and locked with locking bolts to replace the traditional bolt-added welding method.

Benefits of technology

It realizes rapid and reliable installation of cross beams, reduces connection clearance and welding operations, improves connection strength and construction efficiency, and reduces on-site assembly difficulty.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112502281B_ABST
    Figure CN112502281B_ABST
Patent Text Reader

Abstract

The present invention discloses a connection structure between an integrated steel and a crossbeam, which includes an interface provided on the integrated steel, a tenon provided at the end of the crossbeam, and a brake iron. The end edge of the tenon exceeds the side wall of the tenon to form a limit edge. An installation cavity is formed on the interface. Two wedge blocks are respectively provided on both sides of the installation cavity. The two wedge blocks are arranged at intervals and form an installation seam that gradually narrows from top to bottom. The tenon is placed in the installation cavity from top to bottom so that the limit edge is embedded in the installation seam. The brake iron is inserted into the gap between the limit edge and the installation seam to tighten the limit edge. The above-mentioned connection structure between the integrated steel and the crossbeam replaces the original connection method of bolt connection and welding, and realizes fast and reliable installation on site through splicing and clamping, reduces the connection gap, eliminates the welding operation, ensures the connection strength, reduces the difficulty of on-site assembly, and provides a new idea for the installation method of the crossbeam. The present invention also discloses a connection method between the integrated steel and the crossbeam.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of integrated steel installation, and in particular to a connection structure and a connection method of an integrated steel and a crossbeam. Background Art

[0002] At present, steel structures are increasingly used in the field of building structures. Various new steel structures are constantly emerging and have been applied in the engineering field. The number is also increasing, and it has broad prospects. Integrated steel is a type of steel structure, especially in the height direction, the welding connection method is very advantageous, which reduces the difficulty of on-site construction and improves construction efficiency.

[0003] However, when installing the crossbeam between two integrated steel sections on site, the current method is to first fix them with bolts and then weld them into shape. In this method, there is a connection gap in the bolt connection, which reduces the reliability. In addition, the on-site welding workload is large, which is not conducive to working in high-altitude places. The welding quality is difficult to guarantee, the labor intensity is high, the construction efficiency is low, and the on-site welding smoke emissions are large, which needs further optimization. Summary of the invention

[0004] One purpose of the present invention is to provide a connection structure of an integrated steel and a crossbeam, change the existing crossbeam connection structure, realize simple installation of the crossbeam, avoid a large amount of welding work on site, and ensure connection reliability.

[0005] Another object of the present invention is to provide a method for connecting integrated steel and a crossbeam.

[0006] To achieve the above object, on the one hand, the present invention adopts the following technical solutions:

[0007] A connection structure between an integrated steel and a crossbeam, comprising an interface arranged on the integrated steel, a tenon arranged at the end of the crossbeam and a brake iron, the end edge of the tenon exceeds the side wall of the tenon to form a limit edge, an installation cavity is formed on the interface, two wedge blocks are respectively arranged on both sides of the installation cavity, the two wedge blocks are arranged at intervals, and form an installation seam that gradually narrows from top to bottom, the tenon is placed into the installation cavity from top to make the limit edge embedded in the installation seam, and the brake iron is inserted into the gap between the limit edge and the installation seam to tighten the limit edge.

[0008] In particular, the interface comprises a bottom plate and side plates welded to the integrated steel, the installation cavity is enclosed by the bottom plate and the two side plates, and the wedge block is fixed to the inner side wall of the side plate.

[0009] In particular, a locking bolt is provided between the two side plates, and the locking bolt is located above the tenon to set an upper limit on the tenon.

[0010] Particularly, a notch is provided on the bottom plate opposite to the installation seam.

[0011] In particular, the inclination angles of the bevels of the brake iron and the wedge block are consistent, which is 70° to 80°.

[0012] In particular, the tenon comprises an I-shaped beam welded to the cross beam, an end plate is arranged at the end of the I-shaped beam, and the edge of the end plate forms a limiting edge.

[0013] On the other hand, the present invention adopts the following technical solutions:

[0014] The connection method based on the above-mentioned connection structure of the integrated steel and the crossbeam comprises the following steps:

[0015] Before leaving the factory, the joints are welded on the integrated steel and the tenons are welded on the ends of the beams;

[0016] During on-site construction, place the tenon from top to the installation seam of the interface to complete the pre-assembly;

[0017] Insert the brake iron into the gap of the installation seam to tighten the tenon;

[0018] Screw the locking bolt into the interface to lock the tenon.

[0019] In summary, the beneficial effect of the present invention is that, compared with the prior art, the connection structure and connection method of the integrated steel and the beam replace the original connection method of bolt connection and welding, and realize fast and reliable installation on site through splicing and clamping, which reduces the connection gap, eliminates the welding operation, ensures the connection strength, reduces the difficulty of on-site assembly, and provides a new idea for the installation method of the beam. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 is a schematic diagram of a connection structure between an integrated steel and a crossbeam provided in an embodiment of the present invention;

[0021] Figure 2 is a top view of a connection structure between an integrated steel and a crossbeam provided in an embodiment of the present invention;

[0022] Figure 3 It is a structural schematic diagram of an interface in a connection structure between an integrated steel and a crossbeam provided in an embodiment of the present invention;

[0023] Figure 4 It is a structural schematic diagram of the tenon in the connection structure between the integrated steel and the crossbeam provided in an embodiment of the present invention.

[0024] in:

[0025] 1-interface; 11-wedge block; 12-bottom plate; 13-side plate; 14-installation seam; 15-notch; 2-tenon; 21-limiting edge; 22-I-beam; 23-end plate; 3-brake iron; 4-locking bolt. DETAILED DESCRIPTION

[0026] The technical solution of the present invention is further described below with reference to the accompanying drawings and through specific implementation methods.

[0027] See also Figures 1 to 4 As shown, this embodiment provides a connection structure between an integrated steel and a crossbeam, which includes an interface 1 arranged on the integrated steel, a tenon 2 arranged at the end of the crossbeam, and a brake iron 3.

[0028] The end edge of the tenon 2 extends beyond the side wall of the tenon 2 to form a limiting edge 21 . Specifically, the tenon 2 includes an I-beam 22 welded to the crossbeam, and an end plate 23 is provided at the end of the I-beam 22 . The edge of the end plate 23 forms the limiting edge 21 .

[0029] An installation cavity is formed on the interface 1, and two wedge blocks 11 are respectively arranged on both sides of the installation cavity. Specifically, the interface 1 includes a bottom plate 12 and a side plate 13 welded on the integrated steel. The installation cavity is enclosed by the bottom plate 12 and the two side plates 13, and the wedge blocks 11 are fixed on the inner walls of the side plates 13.

[0030] The two wedge blocks 11 are arranged at intervals to form a mounting gap 14 that gradually narrows from top to bottom. The tenon 2 is placed into the mounting cavity from top to embed the limit edge 21 into the mounting gap 14 to complete the pre-connection. Afterwards, the brake iron 3 is inserted into the gap between the limit edge 21 and the mounting gap 14, and the limit edge 21 is tightened. The brake iron 3 and the bevel of the wedge block 11 have the same inclination angle, preferably 70° to 80°.

[0031] In particular, a notch 15 is provided on the bottom plate 12 opposite to the installation seam 14 for observing the assembly status and for conveniently ejecting the brake iron 3 and the tenon 2 during disassembly.

[0032] The cooperation between the brake iron 3 and the wedge block 11 can fully reduce the assembly gap, limit the lateral displacement of the beam, and improve the assembly effect. However, there is still a risk of vertical movement of the beam. Therefore, after the brake iron 3 is inserted, a locking bolt 4 is passed across the two side plates 13. The locking bolt 4 is located above the tenon 2 to upper limit the tenon 2, thereby fully ensuring the connection reliability.

[0033] In this regard, the present embodiment further provides a method for connecting an integrated steel and a crossbeam, comprising the following steps:

[0034] 1) Before leaving the factory, weld the interface 1 on the integrated steel and weld the tenon 2 on the end of the beam;

[0035] 2) During on-site construction, the tenon 2 is placed from above into the installation seam 14 of the interface to complete the pre-assembly;

[0036] 3) Insert the brake iron 3 into the gap of the installation seam 14 to tighten the tenon 2;

[0037] 4) Screw the locking bolt 4 into the interface 1 to lock the tenon 2.

[0038] In summary, the connection structure and connection method of the integrated steel and the beam replace the original connection method of bolt connection and welding, and realize fast and reliable installation on site through splicing and clamping, which reduces the connection gap, eliminates the welding operation, ensures the connection strength, reduces the difficulty of on-site assembly, and provides a new idea for the installation method of the beam.

[0039] The above embodiments are only to illustrate the basic principles and characteristics of the present invention. The present invention is not limited by the above examples. Without departing from the spirit and scope of the present invention, the present invention may be subject to various changes and modifications, which are within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A connection structure of integrated steel and beam, characterized in that: It includes an interface arranged on the integrated steel, a tenon arranged at the end of the crossbeam, and a brake iron, the end edge of the tenon exceeds the side wall of the tenon to form a limit edge, an installation cavity is formed on the interface, two wedge blocks are respectively arranged on both sides of the installation cavity, the two wedge blocks are arranged at intervals, and form an installation seam that gradually narrows from top to bottom, the tenon is placed in the installation cavity from top to make the limit edge embedded in the installation seam, and the brake iron is inserted into the gap between the limit edge and the installation seam to fasten the limit edge; The interface comprises a bottom plate and a side plate welded on the integrated steel, the installation cavity is enclosed by the bottom plate and the two side plates, and the wedge block is fixed on the inner side wall of the side plate; The tenon comprises an I-shaped beam welded on the crossbeam, an end plate is arranged at the end of the I-shaped beam, and the edge of the end plate forms the limiting edge.

2. The connection structure of integrated steel and beam according to claim 1, characterized in that: A locking bolt is disposed between the two side plates and is located above the tenon to set an upper limit on the tenon.

3. The connection structure of integrated steel and beam according to claim 1, characterized in that: A notch is provided on the bottom plate opposite to the installation seam.

4. The connection structure of integrated steel and crossbeam according to claim 1, characterized in that: The inclined angles of the bevels of the brake iron and the wedge-shaped block are consistent, and are 70° to 80°.

5. A method for connecting the integrated steel and beam connection structure according to any one of claims 1 to 4, characterized in that: Includes steps: Before leaving the factory, the joints are welded on the integrated steel and the tenons are welded on the ends of the beams; During on-site construction, place the tenon from top to the installation seam of the interface to complete the pre-assembly; Insert the brake iron into the gap of the installation seam to tighten the tenon; Screw the locking bolt into the interface to lock the tenon.