An integrated wall-attached device based on synchronous climbing of a light steel platform

By designing lower-mounted steel frames, rolling wall frames and temporary wall frames on light-duty steel platforms, combined with single-sided circulating rail frames, the synchronous increase of construction elevator rails is achieved, solving the low efficiency and high cost of elevators in traditional construction. The problem of this has improved construction efficiency and safety.

CN112723094BActive Publication Date: 2025-01-14CHINA CONSTR THIRD ENG BUREAU GRP SOUTH CHINA CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202110122650.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-01-29
Publication Date
2025-01-14
Estimated Expiration
2041-01-29

AI Technical Summary

Technical Problem

In the construction of traditional super high-rise buildings, the construction elevator can only run to the bottom of the top mold/climbing mold, which is inefficient and is not conducive to observation and inspection on large-scale projects. The dual-guiding rail device increases the project volume and cost, mainly due to the top mold or climbing. The top of the mold lacks attachment points for rails to be raised.

Method used

A synchronous climb integrated wall attachment device based on light-weight steel platform is designed, including a lower-mounted steel frame, a rolling wall attachment frame and a temporary wall attachment frame. These components realize synchronous climb of the top mold platform and pass through a single-sided circulating rail frame. The combination with the rolling wall frame ensures that the elevator rails can be circulated upward.

Benefits of technology

It improves construction efficiency, reduces costs, provides convenient installation and disassembly and turnaround use, ensures the reliability of personnel transportation, and solves the problem of changes in adhesion points due to wall retention.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112723094B_ABST
    Figure CN112723094B_ABST
Patent Text Reader

Abstract

The invention discloses an integrated wall attachment device based on the synchronous climbing of a light steel platform, which relates to the technical field of high-rise building engineering, and comprises: a lower hanging steel frame, wherein the upper end of the lower hanging steel frame is fixed to the top form platform, and the lower end is detachably fixed to the concrete shear wall through a temporary wall attachment frame; a single-sided circulating guide rail frame, wherein the single-sided circulating guide rail frame is detachably fixed to one side of the elevator guide rail close to the lower hanging steel frame; a rolling wall attachment frame, wherein one side of the rolling wall attachment frame is connected to the lower hanging steel frame, and the other side is slidably connected to the single-sided circulating guide rail frame; when the top form platform is lifted, the lower hanging steel frame, the rolling wall attachment frame and the temporary wall attachment frame climb together with the same, and the single-sided circulating guide rail frame is dismantled and circulated from the bottom to the top. The invention has the characteristics of reasonable design, convenient installation and disassembly, and turnover use, which greatly improves work efficiency, reduces construction cost, and provides a strong guarantee for personnel transportation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of high-rise building engineering, and in particular to an integrated wall attachment device based on synchronous climbing of a light steel platform. Background Art

[0002] During the construction of traditional super-high-rise buildings, the construction elevator can only run to the bottom of the top formwork / climbing formwork, and needs to pass through the outer protective walkway board of the top formwork / climbing formwork to reach the working surface, which is inefficient and not conducive to the needs of on-site observation and inspection of large-scale projects. The project also has a double guide rail device to achieve the purpose of synchronous climbing, but the steel guide rail frame will double the amount of work and the cost is high. The fundamental reason for the above problems is that the top operating surface of the top formwork or climbing formwork is higher than the construction working layer, and there are no attachment points in the middle and top for the guide rail to be raised. The specification requires that the spacing between the wall attachment devices of the construction elevator must be less than 10.5m, and the top free end must be less than 7.5m. In particular, some areas require that the last exit layer of the elevator must have an attached wall on its top, which further increases the difficulty of the top formwork / climbing formwork operating surface on the construction elevator. Summary of the invention

[0003] The purpose of the present invention is to solve the above-mentioned technical problems and to provide an integrated wall-attaching device which can climb synchronously with the top formwork / climbing formwork platform, thereby ensuring that the wall-attaching device is strong and durable and easy to install and disassemble, and realizing the synchronous heightening of the guide rails of the construction elevator.

[0004] In order to solve the above technical problems, the technical solution adopted by the present invention is:

[0005] An integrated wall attachment device based on synchronous climbing of a light steel platform comprises a top formwork platform erected above a concrete shear wall, and an elevator guide rail arranged on one side of the concrete shear wall, comprising:

[0006] A lower hanging steel frame, the upper end of which is fixed to the top formwork platform, and the lower end of which is detachably fixed to the concrete shear wall through a temporary wall-attached frame;

[0007] A single-side circulating guide rail frame, which is detachably fixed to a side of the elevator guide rail close to the lower hanging steel frame;

[0008] A rolling wall-mounted frame, one side of which is connected to the lower hanging steel frame, and the other side of which is slidably connected to the single-sided circulating guide rail frame;

[0009] When the top form platform is lifted, the lower hanging steel frame, the rolling wall-attached frame and the temporary wall-attached frame are lifted together with it, and the single-sided circulating guide rail frame is dismantled and circulates from the bottom to the top.

[0010] Furthermore, the lower hanging steel frame is fixed on the top mold platform through a reaction force tripod, and the reaction force tripod is welded by I-beams to form a diagonal bracing structure.

[0011] Furthermore, the lower hanging steel frame is a long lattice column formed by welding square tube columns, cross bars and diagonal braces.

[0012] Furthermore, the temporary wall-mounted frame is composed of a double-layer column and a vertical scissors brace arranged between the double-layer columns. The side of the double-layer column close to the lower steel frame is detachably fixedly connected to the lower part of the lower steel frame, and the side of the double-layer column close to the concrete shear wall is detachably connected to the concrete shear wall through a rotatable wall-mounted part.

[0013] Furthermore, the rotatable wall attachment includes a bracket, a screw arranged on the connection side of the bracket and the concrete shear wall, the concrete shear wall is preset with a screw hole, the bracket extends into the screw hole through the screw to form a fixed fit with a nut, a connecting sleeve is provided on the side of the bracket close to the double-layer column, the connecting sleeve is connected to the double-layer column through positive and negative thread screws, and a guide wheel is provided at the bottom of the bracket, and the wheel surface of the guide wheel is in contact with the concrete shear wall.

[0014] Furthermore, the elevator guide rail is composed of a conventional sheet-shaped elevator guide rail, and the elevator guide rail is detachably connected to the single-side circulating guide rail frame by bolts.

[0015] Furthermore, the rolling wall-mounted frame is a double-layer truss welded from square steel pipes, the side of the rolling wall-mounted frame close to the lower hanging steel frame is fixedly connected to the lower hanging steel frame, and the side of the rolling wall-mounted frame close to the single-sided circulating guide frame is provided with a roller assembly that cooperates with the single-sided circulating guide frame.

[0016] Furthermore, the roller assembly is three horizontal rollers, a clamping space is formed between the three rollers, and the single-sided circulating guide rail frame is located in the clamping space and rolls against each of the rollers.

[0017] Compared with the prior art, the present invention has the following beneficial effects:

[0018] The present invention proposes an integrated wall-attaching device based on the synchronous climbing of a light steel platform, which is composed of a lower hanging steel frame, a rolling wall-attaching frame, a temporary wall-attaching frame, and a single-sided circulating guide rail frame. When the platform is lifted, the lower hanging steel frame, the rolling wall-attaching frame, and the temporary wall-attaching frame climb together with it; the present invention has the characteristics of reasonable design, convenient installation and disassembly, and recyclable use, which greatly improves work efficiency, reduces construction costs, and provides a strong guarantee for personnel transportation. The adjustable temporary wall-attaching device solves the problem of changes in attachment points caused by the gradual inward retraction of the wall, and the combined use of the rolling wall-attaching device and the single-sided circulating guide rail frame ensures that the elevator guide rail can be cyclically raised upward. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0020] Figure 1 It is a structural schematic diagram of the present invention;

[0021] Figure 2 It is a structural schematic diagram of the lower hanging steel frame of the present invention;

[0022] Figure 3 It is a structural schematic diagram of the reaction force support frame of the present invention;

[0023] Figure 4 It is a structural schematic diagram of the temporary wall-mounted frame of the present invention;

[0024] Figure 5 A top view of the temporary wall-mounted frame of the present invention;

[0025] Figure 6 This is a schematic diagram of the structure of the rotatable wall-attaching member of the present invention;

[0026] Figure 7 This is a schematic diagram of the structure of a single-side circulating guide rail frame of the present invention;

[0027] Figure 8 It is a schematic diagram of the structure of the rolling wall-mounted frame of the present invention.

[0028] In the figure: 1. top formwork platform, 2. lower hanging steel frame, 3. reaction tripod, 4. elevator guide rail, 5. single-side circulating guide rail frame, 6. rolling wall frame, 7. concrete shear wall, 8. temporary wall frame, 81. double-layer column, 82. vertical scissors brace, 9. rotatable wall attachment, 91. screw, 92. bracket, 93. positive and negative thread screw, 94. guide wheel. DETAILED DESCRIPTION

[0029] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0030] like Figure 1-8 As shown, an integrated wall attachment device based on synchronous climbing of a light steel platform includes a top formwork platform 1 erected above a concrete shear wall 7, and an elevator guide rail 4 arranged on one side of the concrete shear wall 7, including:

[0031] A lower hanging steel frame 2, wherein the upper end of the lower hanging steel frame 2 is fixed to the top formwork platform, and the lower end is detachably fixed to the concrete shear wall 7 through a temporary wall-attached frame 8;

[0032] A single-sided circulating guide rail frame 5, wherein the single-sided circulating guide rail frame 5 is detachably fixed to a side of the elevator guide rail 4 close to the lower hanging steel frame 2;

[0033] A rolling wall-mounted frame 6, one side of which is connected to the lower hanging steel frame 2, and the other side of which is slidably connected to the single-sided circulating guide rail frame 5;

[0034] When the top mold platform 1 is lifted, the lower hanging steel frame 2, the rolling wall-attached frame 6 and the temporary wall-attached frame 8 are lifted together with it, and the single-side circulating guide rail frame 5 is dismantled and circulates from the bottom to the top.

[0035] The present invention proposes an integrated wall attachment device based on synchronous climbing of a light steel platform, which is composed of a lower hanging steel frame 2, a rolling wall attachment frame 6, a temporary wall attachment frame 8, and a single-sided circulating guide rail frame 5. When the platform is lifted, the lower hanging steel frame 2, the rolling wall attachment frame 6, and the temporary wall attachment frame 8 climb together with it; the present invention has the characteristics of reasonable design, convenient installation and disassembly, and can be used in a cyclic manner, which greatly improves the work efficiency, reduces the cost, and provides a strong guarantee for personnel transportation. The adjustable temporary wall attachment device solves the problem of changes in the attachment point due to the gradual inward retraction of the wall, and the combined use of the rolling wall attachment device and the single-sided circulating guide rail frame ensures that the elevator guide rail can be cyclically raised upward.

[0036] Specifically, as shown in the figure, the lower hanging steel frame 2 is fixed on the top mold platform 1 through the reaction force tripod 3, and the reaction force tripod 3 is formed by welding I-beams to form a diagonal bracing structure. The reaction force tripod 3 serves as the upper attachment point of the lower hanging steel frame to fix it on the top mold platform 1.

[0037] Specifically, as shown in the figure, the lower hanging steel frame 2 is a long lattice column welded together by square tube columns, cross bars and diagonal braces. One end of the lower hanging steel frame 2 is fixed to the top mold platform and the other end is fixed to the temporary wall. Its function is to provide an attachment point for the rolling wall frame 6.

[0038] Specifically, as shown in the figure, the temporary wall-attached frame 8 is composed of a double-layer column 81 and a vertical scissor brace 82 arranged between the double-layer columns 81. The side of the double-layer column 81 close to the lower hanging steel frame 2 is detachably fixedly connected to the lower part of the lower hanging steel frame 2, and the side of the double-layer column 81 close to the concrete shear wall 7 is detachably connected to the concrete shear wall 7 through a rotatable wall-attached member 9. By providing the vertical shear brace 82, the stability between the double-layer columns 81 is enhanced to form a whole.

[0039] Specifically, as shown in the figure, the rotatable wall attachment 9 includes a bracket 92, a screw 91 provided on the side where the bracket 92 is connected to the concrete shear wall 7, a screw hole is preset on the concrete shear wall 7, the bracket 92 extends into the screw hole through the screw 91 to form a fixed fit with the nut, a connecting sleeve is provided on the side of the bracket 92 close to the double-layer column 81, the connecting sleeve is connected to the double-layer column 81 through a positive and negative thread screw 93, a guide wheel 94 is provided at the bottom of the bracket 92, and the wheel surface of the guide wheel 94 is in conflict with the concrete shear wall 7. When in use, when the position needs to be lifted, the screw 91 can be disassembled to achieve upward rotation.

[0040] Specifically, as shown in the figure, the elevator guide rail 4 is composed of a conventional elevator guide rail in sheet form, and the elevator guide rail 4 is detachably connected to the single-side circulating guide rail frame 5 by bolts. Its function is to connect the ordinary guide rail frame of the construction elevator with the rolling wall-mounted frame. The circulating guide rail frame is connected to the conventional elevator guide rail by bolts and has the characteristics of being detachable, and circulates from the bottom piece to the top piece.

[0041] Specifically, as shown in the figure, the rolling wall-mounted frame 6 is a double-layer truss welded from square steel pipes, and the side of the rolling wall-mounted frame 6 close to the lower hanging steel frame 2 is fixedly connected to the lower hanging steel frame 2, and the side of the rolling wall-mounted frame 6 close to the single-sided circulating guide frame 5 is provided with a roller assembly that cooperates with the single-sided circulating guide frame 5 to realize one-way sliding on the facade.

[0042] Specifically, as shown in the figure, the roller assembly is three horizontal rollers, a clamping space is formed between the three rollers, and the single-sided circulating guide rail frame 5 is located in the clamping space and rolls against each of the rollers.

[0043] The technical solution adopted by the present invention to solve its technical problems is: a section of steel frame is hung up and down on the light steel platform to extend to the completed structural layer, the upper part of the steel frame is welded to the top mold platform through a reaction tripod, and the lower part of the steel frame is connected to the main structure through a temporary wall attachment frame, which provides a reliable attachment point for the elevator guide rail frame. The lower hanging steel frame is connected to the single-sided circulation guide rail frame of the construction elevator through a rolling wall attachment device. The present invention has the characteristics of reasonable design, convenient installation and disassembly, and can be used in a turnover manner, which greatly improves work efficiency, reduces construction costs, and provides a strong guarantee for personnel transportation. The adjustable temporary wall attachment device solves the problem of changes in the attachment point due to the gradual inward retraction of the wall, and the combined use of the rolling wall attachment device and the single-sided circulation guide rail frame ensures that the elevator guide rail can be circulated upward and continuously raised.

[0044] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

[0045] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. An integrated wall attachment device based on synchronous climbing of a light steel platform, comprising a top formwork platform (1) erected above a concrete shear wall (7), and an elevator guide rail (4) arranged on one side of the concrete shear wall (7), characterized in that: include: A lower hanging steel frame (2), wherein the upper end of the lower hanging steel frame (2) is fixed to the top formwork platform, and the lower end is detachably fixed to the concrete shear wall (7) via a temporary wall attachment frame (8); A single-sided circulating guide rail frame (5), wherein the single-sided circulating guide rail frame (5) is detachably fixed to a side of the elevator guide rail (4) close to the lower hanging steel frame (2); A rolling wall-mounted frame (6), wherein one side of the rolling wall-mounted frame (6) is connected to the lower hanging steel frame (2), and the other side is slidably connected to the single-sided circulating guide rail frame (5); When the top formwork platform (1) is lifted, the lower hanging steel frame (2), the rolling wall-attached frame (6), and the temporary wall-attached frame (8) are lifted together with it, and the single-sided circulating guide rail frame (5) is dismantled and circulates from the bottom to the top; The lower hanging steel frame (2) is fixed on the top mold platform (1) via a reaction force tripod (3), and the reaction force tripod (3) is welded by I-beams to form a diagonal bracing structure; The lower hanging steel frame (2) is a long lattice column formed by welding square tube columns, cross bars and diagonal braces; The temporary wall-attached frame (8) is composed of a double-layered column (81) and a vertical scissor brace (82) arranged between the double-layered columns (81); the side of the double-layered column (81) close to the lower hanging steel frame (2) is detachably fixedly connected to the lower part of the lower hanging steel frame (2); the side of the double-layered column (81) close to the concrete shear wall (7) is detachably connected to the concrete shear wall (7) via a rotatable wall-attached member (9); The rotatable wall attachment (9) comprises a bracket (92), a screw (91) arranged on the side where the bracket (92) is connected to the concrete shear wall (7), a screw hole is preset on the concrete shear wall (7), the bracket (92) extends into the screw hole through the screw (91) to form a fixed fit with a nut, a connecting sleeve is arranged on the side of the bracket (92) close to the double-layer column (81), the connecting sleeve is connected to the double-layer column (81) through a positive and negative thread screw (93), and a guide wheel (94) is arranged at the bottom of the bracket (92), and the wheel surface of the guide wheel (94) contacts the concrete shear wall (7).

2. The integrated wall attachment device based on synchronous climbing of a light steel platform according to claim 1 is characterized in that: The elevator guide rail (4) is composed of a conventional sheet-shaped elevator guide rail, and the elevator guide rail (4) is detachably connected to the single-side circulating guide rail frame (5) by means of bolts.

3. The integrated wall attachment device based on synchronous climbing of a light steel platform according to claim 2 is characterized in that: The rolling wall-mounted frame (6) is a double-layer truss formed by welding square steel pipes. The side of the rolling wall-mounted frame (6) close to the lower hanging steel frame (2) is fixedly connected to the lower hanging steel frame (2). The side of the rolling wall-mounted frame (6) close to the single-sided circulating guide rail frame (5) is provided with a roller assembly that cooperates with the single-sided circulating guide rail frame (5).

4. The integrated wall attachment device based on synchronous climbing of a light steel platform according to claim 3 is characterized in that: The roller assembly comprises three horizontal rollers, a clamping space is formed between the three rollers, and the single-sided circulating guide rail frame (5) is located in the clamping space and rolls against each of the rollers.

Citation Information

Patent Citations

  • Integrated wall attaching device based on synchronous climbing of light steel platform

    CN214989509U