A switch device in front of a meter box and a meter box
By setting up an edge computing module in the switch device in front of the metering box meter for local processing, the problem of pressure processing in the station terminal is solved, the measurement error and power stolen analysis of the power meter are realized, the burden on the station terminal is reduced, and the burden on the station terminal is improved. Processing speed.
Patent Information
- Application Number
- CN201911113828.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-11-14
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2039-11-14
AI Technical Summary
In the prior art, all data is sent to the terminal area for processing. The processing pressure of the terminal area caused by high calculation speed and capability requirements, and the control instructions are not issued in time.
The edge calculation module is set up in the switch device in front of the metering box meter to perform local processing of the total power data and the power distribution data of each meter, calculate the metering error and power stolen analysis, and only send the analysis results in abnormal situations Go to the terminal of the station.
It reduces the processing pressure of the terminals in the station area, reduces power consumption, ensures processing speed, and provides support for the accurate replacement of the power meter.
Smart Images

Figure CN112798834B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of electric energy metering, and in particular relates to a switch device in front of a meter box and a meter box. Background Art
[0002] my country's electricity metering field has achieved full coverage of smart electricity meters. Smart electricity meters are the terminals of smart grids. In addition to the basic electricity metering functions of traditional electricity meters, in order to adapt to the use of smart grids and new energy, they also have metering functions, user-side control functions, two-way data communication functions for multiple data transmission models and other intelligent functions.
[0003] The existing meter box is equipped with multiple electric energy meters, which can measure the electric energy of a building and each user in the building. The meter box also includes a post-meter switch set on each power supply branch between each electric energy meter and the user to control the power supply to each user, and a pre-meter switch, which is set on the power supply trunk line to control the overall power supply of the building.
[0004] Normally, each electric energy meter has a communication module that can exchange data with the substation terminal and send the metering data it collects to the substation terminal for data analysis and calculation. The substation terminal analyzes, calculates and processes the massive data from each electric energy meter to obtain various information such as the electricity consumption information of the entire substation, the electricity consumption information of each community in the substation, the electricity consumption information of each user in each community, the metering error of each electric energy meter, and the electricity theft situation in the substation. This undoubtedly puts a huge processing pressure on the substation terminal and places high demands on the computing speed and capability of the substation terminal, which results in the delay in issuing control instructions. Summary of the invention
[0005] The invention provides a switch device in front of a meter box and a meter box, which are used to solve the problem in the prior art that all data are sent to a substation terminal for processing, resulting in high processing pressure at the substation terminal.
[0006] In order to solve the above technical problems, the technical solutions and beneficial effects of the present invention are as follows:
[0007] A switch device in front of a meter box of the present invention comprises a pre-meter processing module, an edge computing module, a first communication module, a second communication module and a pre-meter power-on / off execution module; the pre-meter processing module controls the connection with the pre-meter power-on / off execution module, so that the pre-meter power-on / off execution module executes the instructions issued by the pre-meter processing module to control the on / off of the power supply trunk; it also obtains the total electric energy data of the power supply trunk, sends the obtained total electric energy data of the meter box to the edge computing module, and receives the calculation and analysis results returned by the edge computing module; it is also used to connect with the substation terminal through the first communication module to send it up when the calculation and analysis results are abnormal; the edge computing module is used to communicate with each electric energy meter through the second communication module to obtain The electric energy data collected by each electric energy meter is taken and compared with the total electric energy data to calculate the metering error of each electric energy meter and analyze the anti-electricity theft, and the calculation and analysis results are returned to the pre-meter processing module; the device also includes a third communication module, and the pre-meter processing module is used to communicate with each post-meter switch device through the third communication module to obtain the execution on and off status of the post-meter power-on and power-off execution module in each post-meter switch device; the pre-meter processing module also obtains the execution on and off status of the pre-meter power-on and power-off execution module, and judges whether there is an abnormal situation based on the execution on and off status of the pre-meter power-on and power-off execution module and the post-meter power-on and power-off execution modules. In case of abnormality, the abnormal situation is sent to the substation terminal through the second communication module.
[0008] A meter box of the present invention comprises a switch device in front of the meter box, at least one electric energy meter and a switch device behind the meter box corresponding to the electric energy meter, wherein the switch device in front of the meter box comprises a pre-meter processing module, an edge computing module, a first communication module, a second communication module, a third communication module and a pre-meter power-on and power-off execution module; the switch device behind the meter box comprises a post-meter processing module, a fourth communication module and a post-meter power-on and power-off execution module; the pre-meter processing module controls the connection with the pre-meter power-on and power-off execution module so that the pre-meter power-on and power-off execution module executes the instructions issued by the pre-meter processing module to control the on and off of the power supply trunk; the total electric energy data of the power supply trunk is also obtained, the total electric energy data of the meter box obtained is sent to the edge computing module, and the calculation and analysis results returned by the edge computing module are received; the first communication module is also used to connect to the substation terminal to upload when the calculation and analysis results are abnormal; the third communication module is also used to communicate with the fourth communication module of each post-meter switch device; the edge computing module is connected to the power supply trunk through the second The communication module is used to communicate with each electric energy meter to obtain the sub-electric energy data collected by each electric energy meter, and compare it with the total electric energy data to calculate the metering error of each electric energy meter and analyze the anti-electricity theft, and return the calculation and analysis results to the pre-meter processing module; the post-meter processing module is connected to the fourth communication module to exchange data with the switch device in front of the meter box; it also controls the connection of the post-meter power-on and power-off execution module so that the post-meter power-on and power-off execution module executes the instructions issued by the post-meter processing module to control the on and off of the power supply branch; the pre-meter processing module is also used to communicate with the fourth communication module of each post-meter switch device through the third communication module to obtain the execution on and off status of the post-meter power-on and power-off execution module in each post-meter switch device; the pre-meter processing module also obtains the execution on and off status of the pre-meter power-on and power-off execution module, and judges whether there is an abnormal situation based on the execution on and off status of the pre-meter power-on and power-off execution module and the post-meter power-on and power-off execution modules. In the case of abnormality, the abnormal situation is sent to the substation terminal through the second communication module.
[0009] Its beneficial effects: The present invention is provided with an edge computing module in the switch device in front of the meter box, and the edge computing module can compare the total electric energy data obtained by the pre-meter processing module with the sub-electric energy data sent by each electric energy meter, so as to calculate the metering error of each electric energy meter and analyze the anti-electricity theft, obtain the calculation and analysis results, and send them to the substation terminal only when the calculation and analysis results are abnormal. The present invention places the metering error calculation and anti-electricity theft analysis of each electric energy meter in the switch device in front of the meter box for analysis and calculation processing, that is, performs on-site processing, provides support for the accurate replacement of electric energy meters, can greatly reduce the processing pressure of the substation terminal, reduce the power consumption of the substation terminal, and ensure the processing speed of the substation terminal.
[0010] As a further improvement of the switch device, the first communication module is a carrier communication module.
[0011] As a further improvement of the switch device, the second communication module is an RS-485 module.
[0012] As a further improvement of the switch device, the third communication module is a Bluetooth module.
[0013] As a further improvement of the metering box, the first communication module is a carrier communication module, the second communication module is an RS-485 module, the third communication module is a Bluetooth module, and the fourth communication module is a Bluetooth module. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a schematic diagram of the overall connection inside the metering box of the present invention;
[0015] Figure 2 It is a schematic diagram of the internal structure connection of the metering box of the present invention;
[0016] Figure 3 It is a flow chart of obtaining calculation and analysis results of the metering box of the present invention;
[0017] Figure 4 It is a flow chart of the judgment state perception of the meter box of the present invention. DETAILED DESCRIPTION
[0018] Metering box embodiment:
[0019] This embodiment provides a metering box, such as Figure 1 As shown, the meter box includes a pre-meter switch device, two electric energy meters and two post-meter switch devices, and the specific number of electric energy meters and post-meter switch devices is set according to demand. The pre-meter switch device and the post-meter switch device are communicatively connected to realize data interaction, and the pre-meter switch device can also be communicatively connected with the electric energy meter to realize data interaction.
[0020] like Figure 2 As shown, the pre-meter switch device includes a pre-meter processing module, a pre-meter power-on and power-off execution module, an edge computing module, and a first communication module ( Figure 2 HPLC module), the second communication module ( Figure 2 RS-485 module) and the third communication module ( Figure 2 Bluetooth module in the middle).
[0021] The pre-meter processing module is a CPU module, which mainly completes the functions of AC analog quantity acquisition, electric energy calculation, switch status perception, control command issuance, etc. It interacts with the HPLC module, RS-485 module, pre-meter power-on and power-off execution module, and edge computing module.
[0022] The HPLC module mainly completes the data interaction between the pre-meter processing module and the substation terminal, and sends the switch device of the meter box and the calculation and analysis results (electricity meter error calculation and electricity theft analysis results) to the substation terminal through HPLC.
[0023] The RS-485 module mainly realizes the data interaction between the edge computing module and each electric energy meter, and transmits the electric energy data (including power, current, voltage and other data) collected by each electric energy meter to the edge computing module.
[0024] The edge computing module is connected to the pre-meter processing module and the RS-485 module. The total power data (including power, current, voltage and other data) of the power supply trunk is obtained from the pre-meter processing module, and the sub-power data detected by each power meter is obtained from the RS-485 module. By comparing the total power data and the sub-power data, the error calculation and power theft analysis of the power meter are completed, and the calculation and analysis results are obtained, and the calculation and analysis results are returned to the pre-meter processing module. The specific calculation and analysis are prior art and will not be repeated here.
[0025] The pre-meter power-on and power-off execution module is connected to the pre-meter processing module to realize the traditional switch power-on and power-off function according to the control instructions of the pre-meter processing module. At the same time, the current main switch state (that is, the execution power-on and power-off status of the pre-meter power-on and power-off execution module) can be sent to the pre-meter processing module.
[0026] The Bluetooth module realizes data interaction between the switch device before the meter and the switch device after the meter, so as to send the sub-switch status of the switch device after the meter (that is, the execution power-on and power-off status of the power-on and power-off execution module after the meter) to the processing module before the meter, so that the processing module before the meter can judge whether there is any abnormality based on the main switch status and the sub-switch status, so as to complete the switch status perception.
[0027] like Figure 2 As shown, the post-meter switch device includes a post-meter processing module, a fourth communication module ( Figure 2 The module in the figure is Bluetooth module) and the power-on and power-off execution module in the table.
[0028] The post-meter processing module is connected to the Bluetooth module and the post-meter power-on and power-off execution module, and mainly realizes the functions of post-meter switch state perception and control command issuance. The Bluetooth module mainly realizes the communication between the post-meter processing module and the pre-meter processing module in the pre-meter switch device to send the sub-switch state to the pre-meter processing module. The post-meter power-on and power-off execution module mainly executes the power-on and power-off control commands issued by the post-meter processing module, and sends the current sub-switch state to the post-meter processing module.
[0029] The functions that can be achieved by the above-mentioned metering device are further explained below, including the metering error detection and anti-electricity theft analysis function of the electric energy meter, and the switch state sensing function.
[0030] like Figure 3As shown in the figure, each electric energy meter sends the collected sub-electric energy data to the edge computing module through the RS-485 module of the pre-meter switch device. At the same time, the pre-meter processing module of the pre-meter switch device also sends the total electric energy data to the edge computing module. The edge computing module uses the existing algorithm (which can be an artificial intelligence algorithm) to monitor the calculation error of the electric energy meter and conduct anti-electricity theft analysis. If the metering error of the electric energy meter is abnormal or the electricity theft behavior is found, the information is immediately sent to the pre-meter processing module, and the pre-meter processing module sends it to the substation terminal through the HPLC module. This function can realize the online monitoring of the metering error of the electric energy meter and provide support for the accurate replacement of the electric energy meter.
[0031] like Figure 4 As shown, the pre-meter on-off execution module in the pre-meter switch device sends its own total switch state to the pre-meter processing module in the pre-meter switch device. At the same time, the post-meter on-off execution module in the post-meter switch device also sends its own sub-switch state to the post-meter processing module in the post-meter switch device. The post-meter processing module sends this information to the pre-meter processing module in the pre-meter switch device through the Bluetooth module. The pre-meter processing module determines whether there is an abnormality based on the total switch state and each sub-switch state. If there is an abnormality, it sends the abnormality to the station terminal through the HPLC module. This function can realize full perception of the switch state of the meter box, which can effectively reduce customer complaints caused by switch tripping.
[0032] Pre-meter switch device embodiment:
[0033] This embodiment provides a pre-meter switch device, which is the pre-meter switch device in the meter box embodiment. The introduction of this device in the meter box embodiment is clear enough and will not be repeated here.
[0034] Although the content of the present invention has been described in detail through the above preferred embodiments, it should be appreciated that the above description should not be considered as a limitation of the present invention. After reading the above content, it will be apparent to those skilled in the art that various modifications and substitutions of the present invention will occur. Therefore, the protection scope of the present invention should be limited by the appended claims.
Claims
1. A switch device before a meter box, characterized in that: It includes a pre-meter processing module, an edge computing module, a first communication module, a second communication module and a pre-meter power-on and power-off execution module; The pre-meter processing module controls the connection to the pre-meter power-on and power-off execution module, so that the pre-meter power-on and power-off execution module executes the instructions issued by the pre-meter processing module to control the on and off of the power supply trunk; it also obtains the total power data of the power supply trunk, sends the total power data of the meter box obtained to the edge computing module, and receives the calculation and analysis results returned by the edge computing module; it is also used to connect to the substation terminal through the first communication module to send it up when the calculation and analysis results are abnormal; The edge computing module is used to communicate with each electric energy meter through the second communication module to obtain the electric energy data collected by each electric energy meter, and compare it with the total electric energy data to calculate the metering error of each electric energy meter and analyze the anti-electricity theft, and return the calculation and analysis results to the pre-meter processing module; The device also includes a third communication module, and the pre-meter processing module is used to communicate with each post-meter switch device through the third communication module to obtain the execution power-on and power-off status of the post-meter power-on and power-off execution module in each post-meter switch device; the pre-meter processing module also obtains the execution power-on and power-off status of the pre-meter power-on and power-off execution module, and judges whether there is an abnormal situation based on the execution power-on and power-off status of the pre-meter power-on and power-off execution module and each post-meter power-on and power-off execution module, and in case of abnormality, sends the abnormal situation to the substation terminal through the second communication module.
2. The switch device before the meter box according to claim 1 is characterized in that: The first communication module is a carrier communication module.
3. The switch device before the meter box according to claim 1 is characterized in that: The second communication module is an RS-485 module.
4. The switch device before the meter box according to claim 1 is characterized in that: The third communication module is a Bluetooth module.
5. A metering box, characterized in that: It includes a meter box front switch device, at least one electric energy meter and a meter box back switch device corresponding to the electric energy meter, wherein the meter box front switch device includes a meter front processing module, an edge computing module, a first communication module, a second communication module, a third communication module and a meter front power on / off execution module; the meter box back switch device includes a meter back processing module, a fourth communication module and a meter back power on / off execution module; The pre-meter processing module controls the connection to the pre-meter power-on / off execution module, so that the pre-meter power-on / off execution module executes the instructions issued by the pre-meter processing module to control the on / off of the power supply trunk; it also obtains the total power data of the power supply trunk, sends the total power data of the meter box obtained to the edge computing module, and receives the calculation and analysis results returned by the edge computing module; it is also used to connect to the substation terminal through the first communication module to send it up when the calculation and analysis results are abnormal; it is also used to communicate with the fourth communication module of each post-meter switch device through the third communication module; The edge computing module is used to communicate with each electric energy meter through the second communication module to obtain the electric energy data collected by each electric energy meter, and compare it with the total electric energy data to calculate the metering error of each electric energy meter and analyze the anti-electricity theft, and return the calculation and analysis results to the pre-meter processing module; The post-meter processing module is connected to the fourth communication module to exchange data with the switch device in front of the meter box; it also controls the connection to the post-meter power-on and power-off execution module, so that the post-meter power-on and power-off execution module executes the instructions sent by the post-meter processing module to control the on and off of the power supply branch; The pre-meter processing module is also used to communicate with the fourth communication module of each post-meter switch device through the third communication module to obtain the execution power-on and power-off status of the post-meter power-on and power-off execution module in each post-meter switch device; the pre-meter processing module also obtains the execution power-on and power-off status of the pre-meter power-on and power-off execution module, and judges whether there is an abnormal situation based on the execution power-on and power-off status of the pre-meter power-on and power-off execution module and each post-meter power-on and power-off execution module. If there is an abnormal situation, the abnormal situation is sent to the substation terminal through the second communication module.
6. The metering box according to claim 5, characterized in that: The first communication module is a carrier communication module, the second communication module is an RS-485 module, the third communication module is a Bluetooth module, and the fourth communication module is a Bluetooth module.