Mechanical dark excavation and jacking system and construction method for large-section rectangular segment segments of subway stations
Through the combination of box room pipe segments and push-up system, the technical difficulties of large-section rectangular segment pipe segments in subway stations in non-excavation construction are solved, efficient mechanical concealed excavation and push-up, and overcoming the reinforced concrete prefabricated pipe segments The volume and weight issues improve the safety and efficiency of construction.
Patent Information
- Application Number
- CN202110480072.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-04-30
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2041-04-30
AI Technical Summary
Large-section rectangular segment pipe segments in subway stations have high technical difficulties in non-excavation and overpushing construction. The reinforced concrete prefabricated pipe segments are large in size, heavy in weight, and difficult to transport. There are risks in structural construction and stress conversion, and overall strength and bearing capacity. A problem of insufficient.
The box room pipe piece consists of steel plates and built-in trusses, combined with the reaction wall, the starting table, the rear back plate, the oil cylinder and the top iron. Through section processing and assembly, temporary support columns and rotary spray concrete piles are set up to take advantage of steam to maintain health. Technology, realize the mechanical concealed excavation and pushing system and construction method of large-size steel-concrete combined segment pipe segments.
Overcome the technical difficulties of prefabricated large-size reinforced concrete pipe sheets during lifting and transportation, improve the overall stiffness, deformation resistance and bearing capacity, simplify lifting and transportation, reduce costs, and enhance the safety and stability of construction. , realizes high-efficiency mechanical concealed excavation and pushing construction of large-size steel-concrete structure combined segment pipe segments.
Smart Images

Figure CN113073982B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of trenchless construction, and in particular to a mechanical dark excavation and jacking system for large-section rectangular segment segments of subway stations and a construction method. Background Art
[0002] Trenchless engineering technology solves the problems of damage to urban buildings and traffic congestion during pipeline burial construction, and highlights its advantages in soil stabilization and environmental protection. This is very important for cities with heavy traffic, dense population, numerous ground buildings, and complex underground pipelines. It creates a clean, comfortable and beautiful environment for the city. At present, a large number of underground projects have adopted trenchless technologies such as pipeline jacking.
[0003] However, for subway station construction, because of its large spatial area, jacking construction has proven to be technically very difficult. In addition, my country's urban traffic tunnels and pipe gallery rectangular jacking pipes all use reinforced concrete integral prefabricated pipe segments, and the maximum size has not exceeded width × height (15m × 10m) so far, while the general size of subway station construction is width × height (18m × 12m) or more. The limitation of jacking pipes further increases the technical difficulty. Moreover, large prefabricated components are difficult to hoist and transport, and there are also many risks in structural construction and force conversion.
[0004] At present, the construction is still mainly carried out by excavating foundation pit support, casting concrete structure of the station body, backfilling the top earth, and restoring the road structure. Summary of the invention
[0005] The purpose of the present invention is to propose a mechanical dark excavation jacking system and construction method for large-section rectangular segmental pipe segments of subway stations, so as to solve the problems in the prior art that non-excavation jacking construction of large-section subway stations is difficult, the reinforced concrete prefabricated pipe segments are large in size, heavy in weight, and difficult to transport, there are risks in structural construction and force conversion, and the overall strength and bearing capacity are insufficient.
[0006] In order to achieve the above object, the present invention adopts the following technical solutions:
[0007] The mechanical dark excavation and jacking system for large-section rectangular segment segments of subway stations comprises box-chamber segments and jacking systems, wherein the box-chamber segments are composed of steel plates and built-in trusses, and the jacking system comprises reaction walls, a starting platform, a rear back plate, an oil cylinder and a jacking iron, wherein the starting platform is composed of a guide rail foundation beam and a track, and the reaction wall is a C reinforced concrete wall, wherein the embedded steel plate in the reaction wall is welded to the rear back plate, and the rear back plate is assembled into four pieces, the upper, lower, left and right, and the rear back plate is composed of a panel and a stiffening plate, and the oil cylinder is composed of a plurality of jacks, and the appearance of the jacking iron is the same as that of the box-chamber segments.
[0008] Preferably, the box chamber segment is composed of ~ sections, which are processed in the factory, transported to the construction site for assembly, and temporary support columns are set up. Self-compacting concrete is poured inside to form large-sized steel-concrete composite segment segments.
[0009] Preferably, jet-sprayed concrete piles are provided at the rear of the reaction wall.
[0010] Preferably, the main reinforcement of the guide rail foundation beam penetrates into the bottom plate.
[0011] Preferably, the inter-ring contact surfaces of the chamber segments are preset with water stop grooves.
[0012] Preferably, the outer surface of the chamber segment is provided with an outdoor anti-corrosion layer, and the inner surface of the chamber segment is provided with an indoor anti-corrosion layer.
[0013] Preferably, the outdoor anti-corrosion layer adopts epoxy coating; the indoor anti-corrosion layer is epoxy zinc-rich primer, epoxy micaceous iron intermediate paint and fire retardant coating from the inside to the outside.
[0014] Preferably, the adjacent chamber segments are assembled with staggered seams, the outer annular seams of the chamber segments are connected by on-site welding, and the inner annular seams are connected by high-strength bolts.
[0015] The method for constructing a mechanical dark excavation and top-pushing system for large-section rectangular segment segments of a subway station comprises the following steps:
[0016] S1. Chamber segment production:
[0017] The chamber segments are processed in the factory in 4 to 6 sections and trial assembled in the factory;
[0018] S2. Set up enclosures, launching wells and receiving wells:
[0019] Set up a launching well at the inlet end and a receiving well at the outlet end inside the enclosure; calculate data and set the dimensions of the launching and receiving wells;
[0020] S3. Construction of jacking system:
[0021] The construction sequence of the jacking system is to cast the reaction wall, build the starting platform, and install the backrest plate, cylinder, and jacking iron in sequence;
[0022] S4. Installation of chamber segments:
[0023] In the launching well, the box chamber segments are assembled, temporary support columns are set up, and self-compacting concrete is poured inside. Steam curing is used to form large-sized steel-concrete composite segment segments. When the strength meets the requirements, the next process is entered;
[0024] S5, jacking:
[0025] Start the jacking system, the oil cylinder extends, the chamber segments are pushed in, and the oil cylinder is retracted;
[0026] S6. Continuous construction:
[0027] Repeat the above steps S4 and S5 to continue the construction.
[0028] Preferably, in step S2 of setting enclosures, the originating and receiving ends are reinforced:
[0029] Double-tube high-pressure jet grouting piles are used for reinforcement at the starting and receiving ends, and the reinforcement range extends to the top, bottom, left and right of the tunnel.
[0030] Compared with the prior art, the present invention provides a mechanical dark excavation and jacking system and construction method for large-section rectangular segment segments of subway stations, which has the following beneficial effects:
[0031] 1. In the present invention, the box-type segment is composed of steel plates and built-in trusses, which are processed in sections in a steel structure processing factory. The size is small, the weight for lifting and transportation is relatively light, and the transportation and lifting are convenient. After entering the construction site, the segment is assembled and self-compacting concrete is poured. The external constraint of the segment puts the concrete in a multi-directional compression state. The concrete is not easy to bend when the external constraint is compressed, and the bearing capacity is 1+1>2. The two materials have complementary advantages, large bending stiffness, and are not easy to bend and deform. The whole has extremely high overall stiffness, deformation resistance and bearing capacity. Steam curing is adopted to ensure the stability and reliability of the segment quality, and the overall structure is formed quickly. The steel-concrete combined box-type segment structure makes full use of the advantages of the tensile properties of steel, the compressive properties of concrete, and the torsional stability of steel trusses, and overcomes the technical difficulties of prefabricated large-size reinforced concrete segments in lifting, large transportation tonnage, and bending and cracking resistance. Before the formal assembly in the working pit, a trial assembly is carried out in the processing plant to meet and further ensure the assembly quality, safety, and construction period requirements.
[0032] 2. In the present invention, adjacent chamber segments are assembled with staggered seams, so that the pipe surface is smooth, the integrity is good, the joint stiffness is evenly distributed, the longitudinal stiffness of the segments is improved, and the deformation of the joints and the entire structure is reduced; the joint waterproofing is easier to handle, and the joint deformation is smaller, which is further beneficial to waterproofing; the on-site welding difficulty is relatively small, and the welding quality is high.
[0033] 3. In the present invention, the starting and receiving working shafts are reserved for the construction of the main enclosure structure. Both the starting and receiving ends are reinforced with double-tube high-pressure rotary jet piles to reinforce the upper, lower, left and right ranges of the tunnel, further improving the safety and stability of the construction environment.
[0034] 4. In the present invention, the main reinforcement of the guide rail foundation beam of the starting platform penetrates into the bottom plate and is pre-embedded during the construction of the bottom plate to improve stability; a rotary sprayed concrete pile is arranged at the rear of the reaction wall to enhance the bearing pressure and meet the design requirements; a steel plate is pre-embedded in the reaction wall to be welded to the rear back plate to prevent local concrete damage due to excessive reaction force; the rear back plate adopts a panel and an internal stiffening plate to ensure strength while reducing weight, and is divided into four pieces, namely, upper, lower, left and right pieces, which are assembled into a whole on site for easy production, transportation and installation; the top iron has the same appearance as the pipe joint, directly bears the top force of the rear main jack, and transmits the top force to the pipe joint evenly through the top iron to ensure uniform force on the pipe joint.
[0035] 5. The present invention arranges steel plates, built-in trusses, concrete and temporary support columns, so that the box-chamber segments have good tensile, compressive and torsion resistance, fully meeting the construction requirements; the box-chamber segments are provided with segmental waterproofing and anti-corrosion, further improving the reliability and durability of the project.
[0036] 6. The friction coefficient between the steel-concrete composite pipe segment and the surrounding soil is small, and it is easier to push into construction than prefabricated reinforced concrete pipe segments. The construction speed is fast and the site requirements are small. It can realize the one-time mechanical dark excavation and pushing construction of large-size steel-concrete structure composite segmental pipe segments, thereby improving work efficiency.
[0037] The parts not involved in the device are the same as the prior art or can be implemented by the prior art. The pipe segments of the present invention are made of steel plates and built-in trusses, which are processed in sections, small in size, and easy to transport and hoist. The external constraint of the pipe segments puts the concrete in a multi-directional compressive state. The concrete is not easy to bend when the external constraint is compressed, and the bearing capacity is 1+1>2. The two materials complement each other, have high bending stiffness, are not easy to bend and deform, and have extremely high overall stiffness, deformation resistance and bearing capacity. Steam curing ensures the stability and reliability of the quality of the pipe segments, and the overall structure is formed quickly. The steel-concrete combined box chamber pipe segment structure makes full use of the tensile properties of steel, the compressive properties of concrete, and the torsional stability of steel trusses, etc., to overcome the technical difficulties of prefabricated large-size reinforced concrete pipe segments in hoisting, transportation tonnage, and bending and crack resistance. A trial assembly is carried out before formal assembly to further ensure the assembly quality, safety, and construction period requirements. Staggered assembly is adopted, the pipe surface is flat, the integrity is good, the joint stiffness is evenly distributed, and the deformation of the joint and the entire structure is reduced; waterproofing is easier to handle, The welding difficulty is relatively low and the welding quality is high; the starting and receiving ends are reinforced to further improve the safety and stability of the construction environment; the main reinforcement of the starting platform guide rail foundation beam is embedded to improve stability; the reaction wall is equipped with rotary sprayed concrete piles to enhance the bearing pressure; the reaction wall is embedded with steel plates to prevent local concrete damage caused by excessive reaction force; the backrest plate reduces the weight while ensuring the strength requirement; it is made in blocks to facilitate production, transportation and installation; the top iron ensures that the pipe section is evenly stressed; it is assembled in the starting well, temporary support columns are set, self-compacting concrete is poured, and a steam curing system is used; the steel plate, built-in trusses, concrete and temporary support columns make the box body have good tensile, compressive and torsion resistance, fully meeting the construction requirements; the segments are waterproof and anti-corrosion, further improving the reliability and durability of the project; the friction coefficient of the steel-concrete composite segment with the surrounding soil is small, and it is easier to push in construction than the reinforced concrete prefabricated segment, the construction speed is fast, and the site requirements are small. It can realize the one-time mechanical dark excavation and top pushing construction of large-size steel-concrete structure composite segment segments, thereby improving work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] Figure 1 It is a structural schematic diagram of the chamber segment;
[0039] Figure 2 It is a schematic diagram of the cross-sectional structure of the chamber segment;
[0040] Figure 3 This is a schematic diagram of the structure of the originating station;
[0041] Figure 4 The side view cross-sectional structure diagram of the reaction wall and the starting platform
[0042] Figure 5 It is a flow chart of the present invention.
[0043] In the figure: 1. box chamber segment; 101. steel plate; 102. truss; 2. reaction wall; 201. jet-sprayed concrete pile; 3. starting platform; 301. guide rail foundation beam; 302. track; 4. rear backboard; 5. oil cylinder; 6. top iron; 7. temporary support column; 8. water stop groove. DETAILED DESCRIPTION
[0044] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0045] In the description of the present invention, it is necessary to understand that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0046] Reference Figure 1-4 The invention discloses a mechanical dark excavation and jacking system for large-section rectangular segment segments of subway stations and a construction method thereof, comprising a box segment 1 and a jacking system. The box segment 1 is composed of a steel plate 101 and an internal truss 102, and is divided into 4 to 6 sections.
[0047] It is processed in sections at the steel structure processing factory, with small size and relatively light weight for lifting and transportation, which is convenient for transportation and lifting. It is assembled after entering the starting well at the construction site, and a temporary support column 7 is set up. Self-compacting concrete is poured through the reserved channels. Steam curing is adopted, and the overall structure is formed quickly to ensure the stability and reliability of the quality of the segment, forming a large-size steel-concrete composite segment. After the strength meets the requirements, it enters the next process.
[0048] The external constraint of the pipe segment puts the concrete in a multi-directional compressive state. The concrete is not easy to bend under the external constraint pressure, and the bearing capacity is 1+1>2. The two materials complement each other, with high bending stiffness and not easy to bend and deform. The whole has extremely high overall stiffness, deformation resistance and bearing capacity.
[0049] The box-type segment 1 structure fully utilizes the advantages of steel's tensile strength, concrete's compressive strength, and steel trusses 102's torsional stability, overcoming the technical difficulties of large-size prefabricated reinforced concrete segments' large tonnage, bending resistance, and crack resistance during hoisting and transportation. The combined effects of steel plates 101, built-in trusses 102, concrete, and temporary support columns 7 give the box body excellent tensile, compressive, and torsional resistance, fully meeting construction requirements.
[0050] The friction coefficient between the steel-concrete composite pipe segment and the surrounding soil is small. Compared with the prefabricated reinforced concrete pipe segment, it is easier to construct with a high construction speed and small site requirements. It can realize the one-time mechanical dark excavation and jacking construction of large-size steel-concrete structure composite segmental pipe segments, thereby improving work efficiency.
[0051] Take the pipe segment section size of 22.3×14.1m as an example:
[0052] The steel plate 101 box body is made of 16mm thick steel plate 101, steel truss 102 main frame ∠90×5, connecting brace ∠50×5, connecting plate -8×20×20mm, the pipe segment is made of 6 pieces, and the box body and truss 102 are processed in the processing plant.
[0053] The segment single ring has 6 pieces and 3 sizes, namely:
[0054] Segment A: 15.8m×1.5m×1.0m;
[0055] Segment B: 7.05m×3.5m×1.5m;
[0056] Segment C: 7.05m×3.0m×1.5m;
[0057] Segment segmentation Length × width × height m Quantity / piece Unit weight / t Segment Standard Section A 15.8×1.5×1.0 2 10.9 Segment Standard Section B 7.05×3.5×1.5 2 6.2 Segment Standard Section C 7.05×3.0×1.5 2 5.9 Temporary support-column 12.1×0.84×0.75 3 6.0 Temporary support-beam 20.3×0.56×0.67 1 7.0
[0058] In addition to temporary support, the total weight of a single ring of steel is 46t; the weight of a single ring of concrete is 99.5m 3 ×2.4t / m 3 =239t, total weight of single ring: 239+46=285t.
[0059] The chamber segment 1 is processed in a steel structure processing plant and transported by a 30t or larger flatbed trailer. A 45t gantry crane is used at the construction site in conjunction with a 100t crawler crane for assembly in the working pit.
[0060] In contrast, if reinforced concrete prefabricated components are used, a separate factory is required with supporting molds and complete sets of equipment, and the prefabrication cost is high. In addition, the pipe segment is heavy. For example, the size of 11m×2.9m weighs about 62.1t, which makes it difficult to transport and hoist the pipe segment. There is a risk of cracking during the hoisting and transportation process. The steel plate 101 and truss 102 are used, which are low-cost, easy to process, and avoid damage to the pipe segment during the hoisting process.
[0061] Before the formal assembly in the working pit, a trial assembly is carried out in the processing plant to meet and further ensure the assembly quality, safety and construction period requirements.
[0062] The jacking system comprises a reaction wall 2, a launching platform 3, a rear back plate 4, an oil cylinder 5 and a jacking iron 6, and the jacking system is arranged in the launching well.
[0063] A starting well is set at the inlet end inside the enclosure, and a receiving well is set at the outlet end; the retaining structure adopts an underground continuous wall, and starting and receiving working wells are reserved for the construction of the main structure; the thickness and depth of the underground continuous wall are set according to the construction requirements.
[0064] The width of the reserved hole in the working well is W=D+2B, where B is the net width of the working surface and D is the outer diameter of the pipe.
[0065] The starting and receiving ends are reinforced with double-tube high-pressure rotary jet piles. The reinforcement range extends to the top, bottom, left and right of the tunnel, further improving the safety and stability of the construction environment.
[0066] Take the underground excavation section of 70m and the structure buried depth of 20m as an example:
[0067] The retaining structure adopts a 1000mm thick underground continuous wall with a depth of 27m. The main structure is a two-story, double-column, three-span rectangular reinforced concrete box structure. The net width B of the working surface is 2.5m, D is the outer diameter of the pipe 22.3m, and the reserved hole size width W=D+2B=22.3+2×2.5=27m. The reinforcement length is 3m at the starting and arrival ends, and the reinforcement range is 3m above and below the tunnel and 3m on the left and right.
[0068] The launching platform 3 is set at the bottom of the launching well, and is composed of a guide rail foundation beam 301 and a track 302. The main reinforcement of the guide rail foundation beam 301 penetrates into the bottom plate to improve stability and is pre-buried during the bottom plate construction; the track 302 adopts a heavy rail;
[0069] The reaction wall 2 is a C50 reinforced concrete wall. The embedded steel plate in the reaction wall 2 is welded to the rear backrest plate 4 to prevent local concrete damage caused by excessive reaction force. A jet-sprayed concrete pile 201 is set at the rear of the reaction wall 2 as a pressure-bearing structure to enhance the bearing pressure and meet the design requirements.
[0070] The rear backrest plate 4 is designed according to the jacking jack and is made into four parts, namely, upper, lower, left and right parts, which are assembled into a whole on site, which is convenient for production, transportation and installation; the rear backrest plate 4 is composed of a panel and a stiffening plate, which ensures the strength requirement and reduces the weight;
[0071] The oil cylinder 5 is composed of several jacks, and the oil cylinder frame is designed according to the arrangement of the jacks;
[0072] The appearance of the top iron 6 is the same as that of the box chamber segment 1; it directly bears the top force of the rear main jack and evenly transmits the top force to the pipe section through the top iron 6 to ensure that the pipe section is evenly stressed.
[0073] Take the dark excavation section of 70m and the structure buried depth of 20m as an example: the total length of the dark excavation section of the jacking pipe construction section is 70m. The thrust of the jacking machine will gradually increase during the jacking process. The calculated maximum jacking thrust will reach about 27,000t, and the back of the jacking pipe will provide a huge reaction force.
[0074] The departure platform 3 uses 43# heavy rails with a height of 140mm;
[0075] The back wall is set to be 1200mm thick and 15500mm high. It adopts C50 reinforced concrete wall and is equipped with jet-sprayed concrete piles 201. The designed maximum thrust is 30000T. There are 8 pieces of pre-buried steel plates 101 in the reaction wall 2, with a thickness of 10mm and a size of 500mm×500mm.
[0076] The backrest board 4 is set to be 22.7m in length, 15.1m in height and 2m in thickness, of which the panel thickness is 40mm and the internal stiffening board thickness is 30mm. It is made into four pieces, namely, upper, lower, left and right pieces, and assembled into a whole on site;
[0077] Cylinder 5, a total of 44 jacks are set. The cylinder 5 frame is designed according to the jack arrangement. The jacking force of a single jack is 630t, the jack length is 3.5m, and the stroke of cylinder 5 is 2.5m;
[0078] The top iron 6 is set to have a thickness of 500 mm.
[0079] The contact surface between the rings of the chamber segment 1 is preset with a water stop groove 8. After the single section is assembled on site, the water stop strip is pasted between the rings. Compared with the reinforced concrete segment, the waterproof structure is simple and the water stop effect is good.
[0080] The outer surface of the chamber segment 1 is provided with an outdoor anti-corrosion layer, and the inner surface of the chamber segment 1 is provided with an indoor anti-corrosion layer.
[0081] The outdoor anti-corrosion layer adopts epoxy coating; the indoor anti-corrosion layer is epoxy zinc-rich primer, epoxy micaceous iron intermediate paint and fire retardant coating from inside to outside.
[0082] Adjacent box chamber segments 1 are assembled with staggered seams, the outer annular seams of the box chamber segments 1 are connected by on-site welding, and the internal annular seams are connected by high-strength bolts; on-site welding is less difficult and the welding quality is high; staggered assembly makes the pipe surface smooth, the integrity is good, the joint stiffness is evenly distributed, the longitudinal stiffness of the segments is improved, and the deformation of the joints and the entire structure is reduced; it is easier to handle joint waterproofing, and the joint deformation is smaller, which is further beneficial to waterproofing.
[0083] See also Figure 5 The construction method of the mechanical dark excavation and top-pushing system and construction method of the large-section rectangular segment pipe segment of the subway station includes the following steps:
[0084] S1. Chamber segment production:
[0085] The chamber segment 1 is divided into 4 to 6 sections for processing in the factory and trial assembly is carried out in the factory;
[0086] S2. Set up enclosures, launching wells and receiving wells:
[0087] Set up a launching well at the inlet end and a receiving well at the outlet end inside the enclosure; calculate data and set the dimensions of the launching and receiving wells;
[0088] During the fencing process, the starting and receiving ends are reinforced; double-tube high-pressure rotary jet piles are used for reinforcement at both the starting and receiving ends, and the reinforcement range extends to the top, bottom, left and right of the tunnel.
[0089] S3. Construction of jacking system:
[0090] The construction sequence of the jacking system is to cast the reaction wall 2, build the starting platform 3, and install the backrest plate 4, the cylinder 5, and the jacking iron 6 in sequence;
[0091] When pouring the reaction wall 2, the steel plate is embedded, the main reinforcement of the guide rail foundation beam 301 is embedded during the bottom plate construction, the guide rail foundation beam 301 is poured, the track 302 is installed, the rear backrest plate 4 is assembled into a whole on site, and is welded and connected to the embedded steel plate of the reaction wall 2. The cylinder frame is designed according to the arrangement of the jack, installed on the rear backrest plate 4, and the cylinder 5 is installed, and the top iron 6 is installed at the front end of the cylinder 5;
[0092] S4. Installation of chamber segments:
[0093] In the launching well, the chamber segments 1 are assembled, temporary support columns 7 are set, and self-compacting concrete is poured inside; steam curing is adopted to form large-sized steel-concrete composite segment segments, and when the strength meets the requirements, the next process is entered;
[0094] S5, jacking:
[0095] Start the jacking system, the oil cylinder 5 extends, the chamber segment 1 pushes forward, and the oil cylinder 5 retracts;
[0096] S6. Continuous construction:
[0097] Repeat the above steps S4 and S5 to continue the construction.
[0098] In the present invention, the box chamber segment 1 is composed of a steel plate 101 and an internal truss 102, which is processed in sections at a steel structure processing factory. It has a small size and a relatively light weight for hoisting and transportation, and is convenient for transportation and hoisting. It is assembled after entering the construction site and poured with self-compacting concrete. The external constraint of the segment puts the concrete in a multi-directional compressive state, and the concrete is not easy to bend when the external constraint is compressed, and the bearing capacity 1+1>2. The two materials have complementary advantages, large bending stiffness, and are not easy to bend and deform. The whole has extremely high overall stiffness, deformation resistance and bearing capacity. Steam curing is adopted to ensure the stability and reliability of the segment quality, and the overall structure is formed quickly. The steel-concrete combined box chamber segment 1 structure makes full use of the tensile properties of steel and the concrete The advantages of the steel truss 102 such as high compressive performance and torsional stability have overcome the technical difficulties of large-size reinforced concrete segments in the process of lifting and transportation, such as large tonnage and anti-bending and anti-cracking. Before the formal assembly of the working shaft, a trial assembly is carried out in the processing plant to meet and further ensure the assembly quality, safety and construction period requirements. The adjacent box chamber segments 1 are assembled with staggered seams, which makes the pipe surface smooth, the integrity good, the joint stiffness evenly distributed, and the longitudinal stiffness of the segments is improved, reducing the deformation of the joints and the entire structure. The joint waterproofing is easier to handle, and the joint deformation is small, which is further conducive to waterproofing. The on-site welding is less difficult and the welding quality is high. The construction of the main enclosure structure reserves the starting and receiving working shafts, and the starting and receiving ends are both double Heavy-tube high-pressure rotary jet piles are used for reinforcement to strengthen the upper, lower, left and right range of the tunnel, further improving the safety and stability of the construction environment; the main reinforcement of the guide rail foundation beam 301 of the starting platform 3 penetrates into the bottom plate and is pre-buried during the construction of the bottom plate to improve stability; rotary jet concrete piles 201 are set at the rear of the reaction wall 2 to enhance the weighing pressure and meet the design requirements; the reaction wall 2 is pre-buried with a steel plate 101 to weld it to the rear back plate 4 to prevent local concrete damage due to excessive reaction force; the rear back plate 4 uses a panel and an internal stiffening plate to ensure strength requirements while reducing weight, and is divided into four pieces of upper, lower, left and right, which are assembled on site into a whole for easy production, transportation and installation; the top iron 6 has the same appearance as the pipe section and directly bears the top of the rear main jack The force is transmitted to the pipe section through the jacking iron 6 to ensure that the force is evenly applied to the pipe section; the box section 1 is assembled in the starting well, temporary support columns 7 are set, self-compacting concrete is poured, and a steam curing system is adopted; the steel plate 101, the built-in truss 102, the concrete and the temporary support columns 7 make the box section have good tensile, compressive and torsion resistance, which fully meets the construction requirements; the box section 1 is provided with segment waterproofing and anti-corrosion, which further improves the reliability and durability of the project; the steel-concrete composite segment has a small friction coefficient with the surrounding soil, and is easier to jack up than the reinforced concrete prefabricated segment, with a fast construction speed and small site requirements. It can realize the one-time mechanical dark excavation and jacking construction of large-size steel-concrete structure composite segment segments, thereby improving work efficiency.
[0099] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. The mechanical underground excavation and jacking system for large-section rectangular segment segments of subway stations is characterized by: It comprises a chamber segment (1) and a jacking device; The box-chamber segment (1) is composed of a steel plate (101) and an internal truss (102); the box-chamber segment (1) is composed of 4 to 6 sections, processed in a factory, transported to a construction site for assembly, and a temporary support column (7) is provided. Self-compacting concrete is poured inside to form a large-sized steel-concrete composite segment; The jacking device comprises a reaction wall (2), a starting platform (3), a rear back plate (4), an oil cylinder (5) and a jacking iron (6); the starting platform (3) is composed of a guide rail foundation beam (301) and a track (302); the reaction wall (2) is a C50 reinforced concrete wall; the embedded steel plate in the reaction wall (2) is welded to the rear back plate (4); the rear back plate (4) is divided into four parts, upper, lower, left and right, for assembly; the rear back plate (4) is composed of a panel and a stiffening plate; the oil cylinder (5) is composed of a plurality of jacks; the appearance of the jacking iron (6) is the same as that of the chamber segment (1); The method for constructing the mechanical dark excavation and top-pushing system for large-section rectangular segment segments of a subway station comprises the following steps: S1. Chamber segment production: The chamber segments (1) are processed in the factory in 4 to 6 sections and trial-assembled in the factory; S2. Set up enclosures, launching wells and receiving wells: Set up a launching well at the inlet end and a receiving well at the outlet end inside the enclosure; calculate data and set the dimensions of the launching and receiving wells; S3. Construction of jacking device: The construction sequence of the jacking device is to cast the reaction wall (2), build the starting platform (3), and install the backrest plate (4), the cylinder (5), and the jacking iron (6) in sequence; S4. Installation of chamber segments: In the launch well, the chamber segments (1) are assembled, temporary support columns (7) are set, and self-compacting concrete is poured inside; steam curing is adopted to form large-sized steel-concrete composite segment segments, and after the strength meets the requirements, the next process is entered; S5, jacking: The jacking device is started, the oil cylinder (5) is extended, the chamber segment (1) is pushed forward, and the oil cylinder (5) is retracted; S6. Continuous construction: Repeat the above steps S4 and S5 to continue the construction.
2. The large-section rectangular segment mechanical tunneling and pushing system for subway stations according to claim 1 is characterized in that: A jet-sprayed concrete pile (201) is provided at the rear of the reaction wall (2).
3. The large-section rectangular segment mechanical tunneling and pushing system for subway stations according to claim 1 is characterized in that: The main reinforcement of the guide rail foundation beam (301) penetrates into the bottom plate.
4. The large-section rectangular segment mechanical tunneling and pushing system for subway stations according to claim 1 is characterized in that: The inter-ring contact surfaces of the chamber segments (1) are provided with water stop grooves (8) in advance.
5. The large-section rectangular segment mechanical tunneling and pushing system for subway stations according to claim 1 is characterized in that: The outer surface of the chamber segment (1) is provided with an outdoor anti-corrosion layer, and the inner surface of the chamber segment (1) is provided with an indoor anti-corrosion layer.
6. The large-section rectangular segment mechanical tunneling and pushing system for subway stations according to claim 5 is characterized in that: The outdoor anti-corrosion layer adopts epoxy coating; the indoor anti-corrosion layer is epoxy zinc-rich primer, epoxy micaceous iron intermediate paint and fire retardant coating from inside to outside.
7. The large-section rectangular segment mechanical tunneling and pushing system for subway stations according to claim 1 is characterized in that: The adjacent chamber segments (1) are assembled by staggered seams, the outer annular seams of the chamber segments (1) are connected by on-site welding, and the inner annular seams are connected by high-strength bolts.
8. The method for constructing a mechanical dark excavation and top-pushing system for large-section rectangular segment segments of a subway station according to any one of claims 1 to 7, characterized in that: In step S2, the originating and receiving ends are reinforced: Double-tube high-pressure rotary jet piles are used for reinforcement at both the starting and receiving ends, and the reinforcement range extends to the top, bottom, left and right of the tunnel.