Immersed MBR membrane pool device and method for sewage treatment using the same
By integrating components such as MBR membrane filtration and aeration erosion in the sewage treatment tank, and using PLC control and dosing devices, the existing sewage treatment devices have large land area, high cost and low sewage treatment efficiency have been solved, and high efficiency has been achieved , low-cost sewage treatment and membrane flux recovery.
Patent Information
- Application Number
- CN202110641063.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-06-09
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2041-06-09
AI Technical Summary
The existing sewage treatment equipment has problems such as large area, high cost, low activated sludge concentration, low sewage treatment efficiency, and poor membrane flux recovery after MBR membrane cleaning.
Design an immersion MBR membrane pool device, integrate the MBR membrane filtration assembly, aeration erosion assembly, backwash assembly, water production assembly and sludge discharge pump in the same sewage treatment pond, and comprehensive control is carried out through the PLC controller to achieve The combined operation of aeration, filtration, water production and backwashing is used to improve the membrane cleaning effect using a dosing device.
The water quality after treatment is met, the area is small, the cost is low, the activated sludge concentration is high, the sewage treatment efficiency is high, and the membrane flux recovery is high after membrane cleaning, reducing the sludge load and energy consumption.
Smart Images

Figure CN113233581B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to an immersed MBR membrane pool device and a method for treating sewage using the same, and is applied in the field of sewage treatment. Background Art
[0002] Existing sewage treatment devices include aeration reaction tanks and secondary sedimentation tanks. The aerated biological filter is filled with biological fillers (activated sludge, etc.), and the sewage first reacts in the aeration reaction tank, then enters the secondary sedimentation tank for precipitation, and then the supernatant in the secondary sedimentation tank (i.e., sewage after sewage treatment) is discharged. However, there are many problems such as excessive removal of chloride ions and total phosphorus, suspended solids, CODcr and ammonia nitrogen content in the discharged water after treatment, large footprint, high cost, low activated sludge concentration, and low sewage treatment efficiency. Although there are also membrane bioreactors (MBR) used in the prior art to treat sewage, the membrane bioreactor generally includes a water collection tank, a raw water pump, an aerated biological filter (BAF), a membrane bioreactor (MBR) and a backwash tank connected in sequence by pipelines, which has a large footprint and high cost, and there are also problems such as low activated sludge concentration, low sewage treatment efficiency, and low membrane flux recovery after MBR membrane cleaning.
[0003] Therefore, it has become an urgent task to provide a submerged MBR membrane pool device with qualified water quality after treatment, small footprint, low cost, high activated sludge concentration, high sewage treatment efficiency, and high membrane flux recovery after membrane cleaning, as well as a method of using the same for sewage treatment. Summary of the invention
[0004] In order to overcome the shortcomings of existing sewage treatment devices, such as large footprint and high cost, low activated sludge concentration, low sewage treatment efficiency, and low membrane flux recovery after MBR membrane cleaning, the present invention provides an immersed MBR membrane pool device and a method for sewage treatment using the same. The MBR membrane filtration component is arranged in a sewage treatment pool, an aeration and flushing component, a backwash component, a water production component and a sludge pump are connected to the sewage treatment pool, and a PLC controller is used for comprehensive control, so that aeration, filtration, water production and backwashing are all carried out in the same sewage treatment pool. The device has the advantages of meeting the water quality standards after treatment, small footprint, low cost, high activated sludge concentration, high sewage treatment efficiency, and high membrane flux recovery after membrane cleaning.
[0005] The technical solution of the present invention is as follows:
[0006] A submerged MBR membrane pool device, comprising a PLC controller, a total liquid level sensor, a raw water pump, a sewage treatment pool, an MBR membrane filtration component, an aeration flushing component, a backwash component, a water production component and a sludge pump; the MBR membrane filtration component comprises at least two MBR membrane filtration units, each of which is arranged in the sewage treatment pool, and a detection head of the total liquid level sensor extends into the sewage treatment pool;
[0007] The water inlet of the raw water pump is connected to an external sewage source, and the water outlet is connected to a sewage treatment tank;
[0008] The aeration and flushing assembly includes a blower, an air filter, a first rotor flowmeter, a first pressure transmitter and a first pressure gauge, the air outlet of the blower extends into the bottom of the sewage treatment tank through an aeration pipe, the outer end of the aeration pipe extending into the sewage treatment tank is connected to a plurality of branch pipes, each branch pipe extends to the bottom of each MBR membrane filter unit, and the outer end of each branch pipe is provided with an air outlet to aerate and flush the MBR membrane filter unit, the air filter, the first rotor flowmeter, the first pressure transmitter and the first pressure gauge are sequentially installed on the aeration pipe along the direction from the blower to the sewage treatment tank;
[0009] The water production component includes a second pressure transmitter, a second pressure gauge, a water production control valve, a first water production pump, a second rotor flowmeter, an electromagnetic flowmeter, a turbidity meter and a reused sewage tank, the reused sewage tank is connected to the water outlet of each MBR membrane filtration unit through a water production pipeline, and the second pressure transmitter, the second pressure gauge, the water production control valve, the first water production pump, the second rotor flowmeter, the electromagnetic flowmeter, and the turbidity meter are sequentially installed on the water production pipeline along the direction from the MBR membrane filtration unit to the reused sewage tank;
[0010] The backwash assembly includes a backwash tank water replenishment control valve, a backwash tank, a backwash pump, a third pressure gauge, a backwash control valve, a third liquid level sensor and a third liquid level gauge. The liquid outlet of the backwash tank is connected to the water production pipeline between the second pressure transmitter and the second pressure gauge through a backwash outlet pipe. The backwash pump, the third pressure gauge and the backwash control valve are sequentially installed on the backwash outlet pipe in the direction from the backwash tank to the second pressure transmitter. The liquid inlet of the backwash tank is connected to the water production pipeline between the turbidity meter and the reuse sewage tank through a backwash inlet pipe. The backwash tank water replenishment control valve is installed on the backwash inlet pipe between the backwash tank and the turbidity meter. The liquid inlet of the backwash tank is also connected to an external water source. The detection head of the third liquid level sensor is installed on the outer wall of the backwash tank, and the position of the detection head of the third liquid level sensor is 4-5 cm higher than the liquid outlet of the backwash pump. The third liquid level gauge is connected to the third liquid level sensor to display the detection result of the third liquid level sensor.
[0011] One end of the sludge pump extends into the bottom of the sewage treatment tank, and the other end is connected to the sludge recovery tank outside the sewage treatment tank;
[0012] The input end of the PLC controller is respectively connected to the total liquid level sensor, the third liquid level sensor, the first rotor flowmeter, the first pressure transmitter, the second pressure transmitter, the second rotor flowmeter, the electromagnetic flowmeter, the turbidity meter, and the switch-in-place signal line of the water production control valve, the switch-in-place signal line of the backwash tank water replenishment control valve, and the switch-in-place signal line of the backwash control valve for signal collection; the output end of the PLC controller is respectively connected to the raw water pump, the mud pump, the blower, the first water production pump, the backwash pump, and the control line of the water production control valve, the control line of the backwash tank water replenishment control valve, and the control line of the backwash control valve for control, wherein the control of the blower by the PLC controller includes start-stop control and speed control to aerate and flush the MBR membrane filtration unit.
[0013] The submerged MBR membrane pool device of the present application sets the MBR membrane filtration component in the sewage treatment pool, connects the aeration flushing component, backwashing component, water production component and mud pump to the sewage treatment pool, and comprehensively controls them through the PLC controller, so that aeration flushing, filtration, water production and backwashing are all carried out in the same sewage treatment pool, replacing the secondary sedimentation tank of the traditional process, which not only occupies a small area and has a low cost, but also makes the activated sludge concentration high, the sewage treatment efficiency high, the water quality after treatment meets the standard, and the membrane flux recovery degree is high after online membrane cleaning. Among them, the reactor of this case operates under high volumetric load, low sludge load and long sludge age, and only a small amount of residual sludge is discharged. Due to the long sludge age, it is more suitable for the growth of microorganisms with a long generation time, which is conducive to the removal of difficult-to-degrade organic matter in wastewater and can greatly improve the degradation efficiency of difficult-to-degrade organic matter. Among them, the aeration flushing component can enhance the activity of sludge, promote the degradation of harmful substances in wastewater, and can also flush the MBR membrane filtration unit to prevent sludge from adhering to the MBR membrane filtration unit and affecting the filtration effect. The blower speed is 1000r / min and the flow rate is 100m 3 / min, the aeration flushing component aerates the MBR membrane filtration unit; the blower speed is 3000r / min, and the flow rate is 300m 3 / min, the aeration flushing component flushes the MBR membrane filtration unit.
[0014] The submerged MBR membrane pool device also includes a dosing device, which includes a first drug storage tank, a second drug storage tank, a first dosing pump, a second dosing pump and a pipeline mixer. The pipeline mixer is installed on the backwash outlet pipeline between the backwash control valve and the third pressure gauge. The liquid outlets of the first drug storage tank and the second drug storage tank are respectively connected to the pipeline mixer through the first dosing pipeline and the second dosing pipeline. The first dosing pump is installed on the first dosing pipeline between the first drug storage tank and the pipeline mixer, and the second dosing pump is installed on the second dosing pipeline between the second drug storage tank and the pipeline mixer. The output end of the PLC controller is also respectively connected to the first dosing pump and the second dosing pump for control.
[0015] The setting of the dosing device enables the MBR membrane filtration components to be cleaned with drugs (drug washing) during backwashing to restore the membrane flux, which can effectively improve the recovery degree of membrane flux after membrane cleaning.
[0016] The dosing device also includes a dosing barrel pump, a second liquid level gauge and a second liquid level sensor. The dosing barrel pump is connected to the liquid inlet of the second medicine storage tank through a dosing delivery pipeline, and the external medicine barrel is connected to the dosing barrel pump through a pipeline. The detection head of the second liquid level sensor is installed on the outer wall of the second medicine storage tank, and the position of the second liquid level sensor detection head is 4-5cm higher than the liquid outlet of the second dosing pump. The second liquid level gauge is connected to the second liquid level sensor to display the detection result of the second liquid level sensor; the dosing device also includes a first liquid level gauge and a first liquid level sensor. The external water source is connected to the liquid inlet of the first medicine storage tank through a pipeline. The detection head of the first liquid level sensor is installed on the outer wall of the first medicine storage tank, and the position of the first liquid level sensor detection head is 4-5cm higher than the liquid outlet of the first dosing pump. The first liquid level gauge is connected to the first liquid level sensor to display the detection result of the first liquid level sensor; the input end of the PLC controller is also respectively connected to the first liquid level sensor and the second liquid level sensor for signal acquisition.
[0017] The introduction of an external water source facilitates the replenishment of the medicine in the first medicine storage tank. The setting of the dosing barrel pump makes the replenishment of the medicine in the second medicine storage tank faster and more convenient.
[0018] The first medicine storage tank is filled with a citric acid solution with a mass percentage concentration of 0.8-1.2% or a sulfuric acid solution or a hydrochloric acid solution with a mass percentage concentration of 0.3-0.5%, the second medicine storage tank is filled with a NaClO solution with a mass percentage concentration of 8-12%; the medicine barrel is filled with a NaClO solution with a mass percentage concentration of 8-12%.
[0019] The preferred medicines in the first medicine storage tank, the second medicine storage tank and the medicine barrel make the medicine washing effect better.
[0020] The dosing device also includes a first safety valve, a first Y-type filter, a second safety valve, a second Y-type filter, a fourth pressure gauge and a fifth pressure gauge; the first Y-type filter is connected to the first dosing pipeline between the first drug storage tank and the first dosing pump, the fourth pressure gauge is connected to the first dosing pipeline between the first dosing pump and the pipeline mixer, the first safety valve is connected to the first drug storage tank through one end of the pipeline, and the other end is connected to the first dosing pipeline between the fourth pressure gauge and the pipeline mixer; the second Y-type filter is connected to the second dosing pipeline between the second drug storage tank and the second dosing pump, the fifth pressure gauge is connected to the second dosing pipeline between the second dosing pump and the pipeline mixer, the second safety valve is connected to the second drug storage tank through one end of the pipeline, and the other end is connected to the second dosing pipeline between the fifth pressure gauge and the pipeline mixer.
[0021] The safety valve ensures that the first and second medicine storage tanks will not explode due to excessive pressure. The use of the Y-type filter can filter out impurities in the medicine solution and improve the medicine washing effect.
[0022] The water production component also includes a second water production pump connected in parallel with the first water production pump on the water production pipeline, and the output end of the PLC controller is also connected to the second water production pump for control.
[0023] The second water production pump is a backup water production pump, which can prevent the situation where sewage treatment cannot be performed due to failure of the first water production pump, thereby improving the sewage treatment efficiency.
[0024] The first medicine storage tank is also provided with a stirring device to facilitate the configuration of the medicine in the first medicine storage tank.
[0025] The total liquid level sensor can adopt the E+H float level switch of Germany's Endress+Hauser; the first liquid level sensor, the second liquid level sensor and the third liquid level sensor can all adopt the KAS NormLine series capacitive sensors of Cree Group.
[0026] The detection head of the total liquid level sensor extends into the sewage treatment tank, and the detection heads of the first liquid level sensor, the second liquid level sensor and the third liquid level sensor are respectively arranged on the outer walls of the first medicine storage tank, the second medicine storage tank and the backwash tank.
[0027] The air outlet comprises a first air outlet arranged on the end surface of the outer end of the branch pipe and a plurality of second air outlet holes spaced and distributed on the outer side wall of the branch pipe along the extending direction of the branch pipe.
[0028] The preferred arrangement of the positions of the first air outlet and the second air outlet can effectively improve the aeration and flushing effect.
[0029] The method for treating sewage using the submerged MBR membrane pool device mainly comprises the following steps performed in sequence:
[0030] (1) Water intake process: The PLC controller turns on the raw water pump to pump sewage from the external sewage source into the sewage treatment tank. When the total liquid level sensor detects that the sewage water level reaches a predetermined water level, the PLC controller turns off the raw water pump to stop water intake;
[0031] (2) Aeration and flushing process: The PLC controller turns on the blower, which generates compressed air. The compressed air is filtered by the air filter and then introduced into the bottom of the sewage treatment pool to perform aeration and flushing on the MBR membrane filtration unit. The first rotor flowmeter and the first pressure transmitter respectively detect the air flow and pressure in the pipeline and feed them back to the PLC controller. The first pressure gauge displays the pressure value. When the pressure exceeds the preset value, the PLC controller turns off the blower and stops aeration and flushing.
[0032] (3) Filtration and water production process: maintain the aeration and flushing process, and at the same time, the PLC controller opens the water production control valve, the first water production pump and the backwash tank water supply control valve. The sewage in the sewage treatment pool is filtered by the MBR membrane filtration component and then sucked into the reuse sewage tank and the backwash tank; the second pressure transmitter, the second rotor flowmeter, the electromagnetic flowmeter, and the turbidity meter respectively monitor the water pressure, water production flow rate and turbidity information of the sewage in the pipeline after filtration, and send the information to the PLC controller, and the second pressure gauge displays the water pressure value; when the water production time reaches the preset time or the water pressure exceeds the preset value, the PLC controller closes the water production control valve, the first water production pump and the backwash tank water supply control valve;
[0033] (4) Backwashing process: When the PLC controller detects that the water production flow rate is less than the preset value or the second pressure transmitter detects that the transmembrane pressure difference under the same filtration flow rate is greater than 14-16 kPa compared with the transmembrane pressure difference during the initial stable operation, the aeration flushing process is started, the filtration and water production processes are stopped, and the PLC controller opens the backwashing control valve and the backwashing pump in sequence. The filtered recycled sewage in the backwashing tank is used to flush the MBR membrane filtration component through the backwashing outlet pipe in the opposite direction of the sewage filtration; the third pressure gauge displays the water pressure value in the backwashing outlet pipe, the third liquid level sensor detects the liquid level in the backwashing tank, and the third liquid level meter displays the liquid level value; the backwashing process lasts for a preset time;
[0034] (5) Sludge discharge process: After the sewage is filtered through the MBR membrane filtration component, the sludge left behind accumulates at the bottom of the sewage treatment tank. The PLC controller turns on the sludge discharge pump to pump the sludge to an external sludge recovery tank.
[0035] The method of sewage treatment by the submerged MBR membrane pool device of the present application is simple and easy to operate, and mainly includes water intake, aeration flushing, filtration and water production, backwashing and sewage discharge. It combines multiple processes of water intake, aeration flushing, filtration and water production, backwashing and sewage discharge in the same pool, which greatly reduces the land occupation and saves costs. In addition, it adopts the membrane filtration sewage treatment method, and the viscosity sludge load in the pool is small and the concentration of activated sludge is high, which can greatly improve the sewage treatment efficiency. In addition, the use of recycled sewage for backwashing is green, environmentally friendly and energy-saving.
[0036] Furthermore, after the filtration and water production process is carried out for 9 minutes, the backwash process is carried out at an interval of 1 minute. The backwash time for each time is 30 seconds (including 20 seconds of flushing, 7 seconds of immersion, and 3 seconds of delay), and the aeration flushing time for backwashing is 27 seconds. In the existing process of using MBR membrane filtration to treat sewage, the MBR membrane cleaning scheme is as follows: after the filtration and water production process is carried out for 8 minutes, the backwash process is carried out once at an interval of 2 minutes. The backwash time for each time is 60 seconds (including 30 seconds of flushing, 25 seconds of immersion, and 5 seconds of delay), and the aeration flushing time for backwashing is 55 seconds. The membrane flux before washing is about 40-50%, and the membrane flux after washing after adopting this preferred scheme is 80-90%, which is about 40% higher than the membrane flux after washing in the existing process of using MBR membrane filtration to treat sewage.
[0037] When the backwashing process lasts for a preset time and stops, the water production flow rate at this time is still less than the preset value or the second pressure transmitter detects that the transmembrane pressure difference at the same filtration flow rate is still greater than 14-16 kPa than the transmembrane pressure difference during the initial stable operation, the method for treating sewage by the submerged MBR membrane pool device also includes a dosing backwashing process: stopping water inlet, aeration flushing, filtration and water production processes, the PLC controller opens the backwashing control valve, the backwashing pump and the first dosing pump or the second dosing pump in sequence, and the solution in the first storage tank or the second storage tank is turned on. After the solution in the second drug storage tank is mixed with the recycled sewage flowing out of the backwash tank at the pipeline mixer, the MBR membrane filtration component is flushed against the sewage filtration direction through the backwash outlet pipe to dredge and restore the membrane flux; then, the first dosing pump or the second dosing pump is turned off, and the second dosing pump or the first dosing pump is started, and the solution in the second drug storage tank or the solution in the first drug storage tank is mixed with the recycled sewage flowing out of the backwash tank at the pipeline mixer, and then the MBR membrane filtration component is flushed against the sewage filtration direction through the pipeline to dredge and restore the membrane flux.
[0038] The backwashing process with added chemicals can further enhance the backwashing effect, so that the membrane flux recovery degree can be further improved after membrane cleaning.
[0039] Each time the dosing injection timer is up, the PLC controls the backwash pump and the first dosing pump or the second dosing pump to shut down. After a delay of 3-5 seconds, the PLC controls the backwash valve to close and enters the liquid immersion timing. When the timing is up, the PLC controls the blower to turn on for aeration. When the aeration timing is up, the PLC shuts down the blower to clear and restore the membrane flux.
[0040] Furthermore, each online maintenance cleaning uses a 25-minute dosing backwashing process, including 10 minutes of liquid medicine injected into the sewage treatment pool (including a 3-second delay) and 10 minutes of soaking with the solution in the first drug storage tank, and 5 minutes of high-pressure air aeration flushing after the soaking time. The frequency of the dosing backwashing process is once every 7 days. If the membrane is severely blocked (membrane flux is about 30%), the dosing backwashing process using the solution in the second drug storage tank is performed once every month, and the dosing backwashing process using the solution in the first drug storage tank is performed once every 2 months. In the existing process of using MBR membrane filtration to treat sewage, the MBR membrane cleaning scheme is as follows: Each online maintenance cleaning dosing backwashing process takes 35 minutes, including 10 minutes of liquid medicine injected into the sewage treatment pool (including a 3-second delay) and 15 minutes of soaking with a 1% mass percentage citric acid solution, and 10 minutes of high-pressure air aeration flushing after the soaking time. The frequency of the dosing backwashing process used for online maintenance cleaning is once every 7 days. The membrane flux after washing by adopting the preferred solution is 90%, which is 60% higher than that of the existing process of treating sewage by MBR membrane filtration.
[0041] If the membrane is seriously clogged, it is cleaned online. The process of backwashing with 1% citric acid solution by mass and then 10% NaClO by mass is performed once every month. The process of backwashing with 1% citric acid solution by mass and then 10% NaClO by mass is performed once every two months. The membrane flux after washing by adopting this preferred solution is 90%, which is about 60% higher than the membrane flux after washing by the existing process of treating sewage by MBR membrane filtration.
[0042] The dosing backwashing process also includes a second drug storage tank dosing process: a NaClO solution with an external mass percentage of 8-12% is supplied to the second drug storage tank through a dosing delivery pipeline by a dosing barrel pump, a second liquid level sensor detects the liquid level in the second drug storage tank, and a second liquid level meter displays the liquid level value. When the liquid level reaches a predetermined value, the dosing barrel pump stops pumping the drug solution into the dosing tank, and dosing stops.
[0043] A dosing drum pump is provided to replenish the second storage tank more quickly and conveniently.
[0044] The dosing backwashing process also includes a first medicine storage tank dosing process: adding water from an external water source into the first medicine storage tank, and adding a predetermined amount of citric acid, sulfuric acid or hydrochloric acid into the first medicine storage tank, the first liquid level sensor detects the liquid level in the first medicine storage tank, and the first liquid level meter displays the liquid level value. When the liquid level reaches the predetermined value, stop adding water and stir evenly, and the dosing of the first medicine storage tank is completed.
[0045] The first medicine storage tank can be replenished quickly by connecting to an external water source and manually adding raw materials.
[0046] Compared with the prior art, the present invention has the following advantages:
[0047] 1) The submerged MBR membrane tank device of the present application connects the aeration flushing component, backwashing component, water production component and sludge pump to the sewage treatment tank, and controls them comprehensively through the PLC controller, so that aeration flushing, filtration, water production and backwashing are all carried out in the same sewage treatment tank, replacing the secondary sedimentation tank of the traditional process, which not only occupies a small area and has a low cost, but also has a high concentration of activated sludge, high sewage treatment efficiency, and the treated water quality meets the standard, and the membrane flux recovery degree is high after online membrane cleaning;
[0048] 2) The method for sewage treatment by the submerged MBR membrane pool device of the present application is simple and easy to operate, and mainly includes water intake, aeration flushing, filtration and water production, backwashing and sewage discharge. It combines multiple processes of water intake, aeration flushing, filtration and water production, backwashing and sewage discharge in the same pool, which can greatly improve the sewage treatment efficiency, and with the cooperation of high-pressure air mechanical flushing, the membrane flux recovery rate is higher after membrane cleaning. BRIEF DESCRIPTION OF THE DRAWINGS
[0049] Figure 1 It is a process flow chart of the submerged MBR membrane pool device and the method for treating sewage using the same according to the present invention.
[0050] Description of labels:
[0051] Total liquid level sensor 1, raw water pump 2, sewage treatment tank 3, MBR membrane filtration unit 4, sludge pump 9, blower 5-1, air filter 5-2, first rotor flowmeter 5-3, first pressure transmitter 5-4, first pressure gauge 5-5, second pressure transmitter 6-1, second pressure gauge 6-2, water production control valve 6-3, first water production pump 6-4, second rotor flowmeter 6-5, second water production pump 6-6, electromagnetic flowmeter 6-7, turbidity meter 6-8, reuse sewage tank 6-9, backwash tank water supply control valve 7-1, backwash tank 7-2, backwash pump 7-3, backwash control Control valve 7-4, third pressure gauge 7-5, third liquid level sensor 7-6, third liquid level gauge 7-7, first medicine storage tank 8-1, second medicine storage tank 8-2, first dosing pump 8-3, second dosing pump 8-4, pipeline mixer 8-5, dosing barrel pump 8-6, second liquid level gauge 8-7, second liquid level sensor 8-8, first liquid level gauge 8-9, first liquid level sensor 8-10, first safety valve 8-11, first Y-type filter 8-12, second safety valve 8-13, second Y-type filter 8-14, fourth pressure gauge 8-15, fifth pressure gauge 8-16. DETAILED DESCRIPTION
[0052] The following is attached to the instruction manual Figure 1 The technical solution of the present invention is described in detail.
[0053] Example 1
[0054] The submerged MBR membrane pool device of the present invention comprises a PLC controller, a total liquid level sensor 1, a raw water pump 2, a sewage treatment pool 3, an MBR membrane filtration component, an aeration flushing component, a backwash component, a water production component and a sludge pump 9; the MBR membrane filtration component comprises at least two MBR membrane filtration units 4, each of which is arranged in the sewage treatment pool 3, and the detection head of the total liquid level sensor 1 extends into the sewage treatment pool 3;
[0055] The water inlet of the raw water pump 2 is connected to an external sewage source, and the water outlet is connected to a sewage treatment tank 3;
[0056] The aeration and flushing assembly includes a blower 5-1, an air filter 5-2, a first rotor flowmeter 5-3, a first pressure transmitter 5-4 and a first pressure gauge 5-5. The air outlet of the blower 5-1 extends into the bottom of the sewage treatment tank 3 through an aeration pipe. The outer end of the aeration pipe extending into the sewage treatment tank 3 is connected with a plurality of branch pipes, each of which extends to the bottom of each MBR membrane filter unit 4, and the outer end of each branch pipe is provided with an air outlet to aerate and flush the MBR membrane filter unit 4. The air filter 5-2, the first rotor flowmeter 5-3, the first pressure transmitter 5-4 and the first pressure gauge 5-5 are sequentially installed on the aeration pipe along the direction from the blower 5-1 to the sewage treatment tank 3;
[0057] The water production component includes a second pressure transmitter 6-1, a second pressure gauge 6-2, a water production control valve 6-3, a first water production pump 6-4, a second rotor flowmeter 6-5, an electromagnetic flowmeter 6-7, a turbidity meter 6-8 and a reused sewage tank 6-9, and the reused sewage tank 6-9 is connected to the water outlet of each MBR membrane filtration unit 4 through a water production pipeline. The second pressure transmitter 6-1, the second pressure gauge 6-2, the water production control valve 6-3, the first water production pump 6-4, the second rotor flowmeter 6-5, the electromagnetic flowmeter 6-7, and the turbidity meter 6-8 are sequentially installed on the water production pipeline from the MBR membrane filtration unit 4 to the reused sewage tank 6-9;
[0058] The backwash assembly includes a backwash tank water supply control valve 7-1, a backwash tank 7-2, a backwash pump 7-3, a third pressure gauge 7-5, a backwash control valve 7-4, a third liquid level sensor 7-6 and a third liquid level gauge 7-7. The liquid outlet of the backwash tank 7-2 is connected to the water production pipeline between the second pressure transmitter 6-1 and the second pressure gauge 6-2 through a backwash outlet pipeline. The backwash pump 7-3, the third pressure gauge 7-5 and the backwash control valve 7-4 are sequentially installed on the backwash outlet pipeline in the direction from the backwash tank 7-2 to the second pressure transmitter 6-1. The liquid inlet of the backwash tank 7-2 It is connected to the water production pipeline between the turbidity meter 6-8 and the reuse sewage tank 6-9 through the backwash water inlet pipeline, the backwash tank water supply control valve 7-1 is installed on the backwash water inlet pipeline between the backwash tank 7-2 and the turbidity meter 6-8, and the liquid inlet of the backwash tank 7-2 is also connected to the external water source; the detection head of the third liquid level sensor 7-6 is installed on the outer wall 7-2 of the backwash tank, and the position of the detection head of the third liquid level sensor 7-6 is 4-5cm higher than the liquid outlet of the backwash pump 7-3, and the third liquid level meter 7-7 is connected to the third liquid level sensor 7-6 to display the detection result of the third liquid level sensor 7-6;
[0059] One end of the sludge pump 9 extends into the bottom of the sewage treatment tank 3, and the other end is connected to the sludge recovery tank outside the sewage treatment tank 3;
[0060] The input end of the PLC controller is respectively connected to the total liquid level sensor 1, the third liquid level sensor 7-6, the first rotor flowmeter 5-3, the first pressure transmitter 5-4, the second pressure transmitter 6-1, the second rotor flowmeter 6-5, the electromagnetic flowmeter 6-7, and the switch-in-place signal line of the water production control valve 6-3, the switch-in-place signal line of the backwash tank water supply control valve 7-1, and the switch-in-place signal line of the backwash control valve 7-4 for signal collection; the output end of the PLC controller is respectively connected to the raw water pump 2, the mud pump 9, the blower 5-1, the first water production pump 6-4, the backwash pump 7-3, and the control line of the water production control valve 6-3, the control line of the backwash tank water supply control valve 7-1, and the control line of the backwash control valve 7-4 for control, wherein the control of the blower 5-1 by the PLC controller includes start-stop control and speed control to aerate and flush the MBR membrane filtration unit 4.
[0061] The submerged MBR membrane pool device also includes a dosing device, which includes a first drug storage tank 8-1, a second drug storage tank 8-2, a first dosing pump 8-3, a second dosing pump 8-4 and a pipeline mixer 8-5. The pipeline mixer 8-5 is installed on the backwash outlet pipeline between the backwash control valve 7-4 and the third pressure gauge 7-5. The liquid outlets of the first drug storage tank 8-1 and the second drug storage tank 8-2 are respectively connected to the pipeline mixer 8-5 through the first dosing pipeline and the second dosing pipeline. The first dosing pump 8-3 is installed on the first dosing pipeline between the first drug storage tank 8-1 and the pipeline mixer 8-5, and the second dosing pump 8-4 is installed on the second dosing pipeline between the second drug storage tank 8-2 and the pipeline mixer 8-5; the output end of the PLC controller is also respectively connected to the first dosing pump 8-3 and the second dosing pump 8-4 for control.
[0062] The dosing device also includes a dosing barrel pump 8-6, a second liquid level meter 8-7 and a second liquid level sensor 8-8. The dosing barrel pump 8-6 is connected to the liquid inlet of the second medicine storage tank 8-2 through a dosing delivery pipeline, and the external medicine barrel is connected to the dosing barrel pump 8-6 through a pipeline. The detection head of the second liquid level sensor 8-8 is installed on the outer wall of the second medicine storage tank 8-2, and the position of the second liquid level sensor 8-8 detection head is 4-5cm higher than the liquid outlet of the second dosing pump 8-4. The second liquid level meter 8-7 is connected to the second liquid level sensor 8-8 to display the detection result of the second liquid level sensor 8-8; the dosing device It also includes a first liquid level meter 8-9 and a first liquid level sensor 8-10. The external water source is connected to the liquid inlet of the first medicine storage tank 8-1 through a pipeline. The detection head of the first liquid level sensor 8-10 is installed on the outer wall of the first medicine storage tank 8-1, and the position of the detection head of the first liquid level sensor 8-10 is 4-5 cm higher than the liquid outlet of the first dosing pump 8-3. The first liquid level meter 8-9 is connected to the first liquid level sensor 8-10 to display the detection result of the first liquid level sensor 8-10; the input end of the PLC controller is also respectively connected to the first liquid level sensor 8-10 and the second liquid level sensor 8-8 for signal acquisition.
[0063] The first medicine storage tank 8-1 is filled with a citric acid solution with a mass percentage concentration of 0.8-1.2% or a sulfuric acid solution or a hydrochloric acid solution with a mass percentage concentration of 0.3-0.5%, and the second medicine storage tank 8-2 is filled with a NaClO solution with a mass percentage concentration of 8-12%; the medicine barrel is filled with a NaClO solution with a mass percentage concentration of 8-12%.
[0064] The dosing device also includes a first safety valve 8-11, a first Y-type filter 8-12, a second safety valve 8-13, a second Y-type filter 8-14, a fourth pressure gauge 8-15 and a fifth pressure gauge 8-16; the first Y-type filter 8-12 is connected to the first dosing pipeline between the first drug storage tank 8-1 and the first dosing pump 8-3, the fourth pressure gauge 8-15 is connected to the first dosing pipeline between the first dosing pump 8-3 and the pipeline mixer 8-5, the first safety valve 8-11 is connected to the first drug storage tank 8-1 through one end of the pipeline, and the other end is connected to the first drug storage tank 8-1 through the first end of the pipeline. One end is connected to the first dosing pipeline between the fourth pressure gauge 8-15 and the pipeline mixer 8-5; the second Y-type filter 8-14 is connected to the second dosing pipeline between the second medicine storage tank 8-2 and the second dosing pump 8-4, the fifth pressure gauge 8-16 is connected to the second dosing pipeline between the second dosing pump 8-4 and the pipeline mixer 8-5, and the second safety valve 8-13 is connected to the second medicine storage tank 8-2 through one end of the pipeline, and the other end is connected to the second dosing pipeline between the fifth pressure gauge 8-16 and the pipeline mixer 8-5.
[0065] The water production component also includes a second water production pump 6-6 connected in parallel with the first water production pump 6-4 on the water production pipeline, and the output end of the PLC controller is also connected to the second water production pump 6-6 for control.
[0066] The method for treating sewage using the submerged MBR membrane pool device mainly comprises the following steps performed in sequence:
[0067] (1) Water intake process: the PLC controller turns on the raw water pump 2 to pump sewage from the external sewage source into the sewage treatment tank 3. When the total liquid level sensor 1 detects that the sewage water level reaches a predetermined water level, the PLC controller turns off the raw water pump 2 to stop water intake;
[0068] (2) Aeration and flushing process: The PLC controller turns on the blower 5-1, and the blower 5-1 generates compressed air. The compressed air is filtered by the air filter 5-2 and then introduced into the bottom of the sewage treatment tank 3 for aeration, so as to aerate and flush the MBR membrane filtration unit 4. The first rotor flowmeter 5-3 and the first pressure transmitter 5-4 respectively detect the air flow and pressure in the pipeline and feed them back to the PLC controller. The first pressure gauge 5-5 displays the pressure value. When the pressure exceeds the preset value, the PLC controller turns off the blower 5-1 and stops the aeration and flushing.
[0069] (3) Filtration and water production process: maintain the aeration and flushing process, and at the same time, the PLC controller opens the water production control valve 6-3, the first water production pump 6-4 and the backwash tank water supply control valve 7-1, and the sewage in the sewage treatment pool 3 is filtered by the MBR membrane filtration component and then sucked into the reuse sewage tank 6-9 and the backwash tank 7-2; the second pressure transmitter 6-1, the second rotor flowmeter 6-5, the electromagnetic flowmeter 6-7, and the turbidity meter 6-8 respectively monitor the water pressure, water production flow rate and turbidity information of the sewage in the pipeline after filtration, and send the information to the PLC controller, and the second pressure gauge 6-2 displays the water pressure value; when the water production time reaches the preset time or the water pressure exceeds the preset value, the PLC controller closes the water production control valve 6-3, the first water production pump 6-4 and the backwash tank water supply control valve 7-1;
[0070] (4) Backwashing process: When the PLC controller detects that the water production flow rate is less than a predetermined value or the second pressure transmitter 6-1 detects that the transmembrane pressure difference under the same filtration flow rate is greater than 14-16 kPa compared with the transmembrane pressure difference during initial stable operation, the aeration flushing process is started, the filtration and water production processes are stopped, and the PLC controller opens the backwashing control valve 7-4 and the backwashing pump 7-3 in sequence. The filtered recycled sewage in the backwash tank 7-2 is used to flush the MBR membrane filtration assembly in the reverse direction of sewage filtration through the backwashing outlet pipe; the third pressure gauge 7-5 displays the water pressure value in the backwashing outlet pipe, the third liquid level sensor 7-6 detects the liquid level in the backwash tank 7-2, and the third liquid level meter 7-7 displays the liquid level value; the backwashing process lasts for a preset time;
[0071] (5) Sludge discharge process: After the sewage is filtered through the MBR membrane filtration assembly, the sludge remaining is deposited at the bottom of the sewage treatment tank 3. The PLC controller starts the sludge discharge pump 9 to pump the sludge to the external sludge recovery tank.
[0072] When the backwashing process lasts for a preset time and stops, the water production flow rate at this time is still less than the preset value or the second pressure transmitter 6-1 detects that the transmembrane pressure difference at the same filtration flow rate is still greater than 14-16 kPa than the transmembrane pressure difference during the initial stable operation, the method for treating sewage by the submerged MBR membrane pool device also includes a dosing backwashing process: stopping water inlet, aeration, filtration and water production processes, the PLC controller opens the backwashing control valve 7-4, the backwashing pump 7-3 and the first dosing pump 8-3 in sequence, and the first drug storage tank After the solution in 8-1 is mixed with the recycled sewage flowing out of the backwash tank 7-2 at the pipeline mixer 8-5, the MBR membrane filter component is flushed against the sewage filtration direction through the backwash outlet pipe to clear and restore the membrane flux; then, the first dosing pump 8-3 is turned off, and the second dosing pump 8-4 is started. The solution in the second drug storage tank 8-2 is mixed with the recycled sewage flowing out of the backwash tank 7-2 at the pipeline mixer 8-5, and then the MBR membrane filter component is flushed against the sewage filtration direction through the pipeline to clear and restore the membrane flux.
[0073] The dosing backwashing process also includes a dosing process for the second drug storage tank 8-2: a NaClO solution with an external mass percentage of 8-12% is supplied to the second drug storage tank 8-2 through a dosing delivery pipeline by a dosing barrel pump 8-6, a second liquid level sensor 8-8 detects the liquid level in the second drug storage tank 8-2, and a second liquid level meter 8-7 displays the liquid level value. When the liquid level reaches a predetermined value, the dosing barrel pump stops pumping the drug solution into the dosing tank, and dosing stops.
[0074] The dosing backwash process also includes a dosing process for the first medicine storage tank 8-1: water from an external water source is added to the first medicine storage tank 8-1, and a predetermined amount of citric acid, sulfuric acid or hydrochloric acid is added to the first medicine storage tank 8-1. The first liquid level sensor 8-10 detects the liquid level in the first medicine storage tank 8-1, and the first liquid level meter 8-9 displays the liquid level value. When the liquid level reaches the predetermined value, stop adding water and stir evenly, thereby completing the dosing of the first medicine storage tank 8-1.
[0075] Example 2
[0076] The submerged MBR membrane pool device of the present invention comprises a PLC controller, a total liquid level sensor 1, a raw water pump 2, a sewage treatment pool 3, an MBR membrane filtration component, an aeration flushing component, a backwash component, a water production component and a sludge pump 9; the MBR membrane filtration component comprises at least two MBR membrane filtration units 4, each of which is arranged in the sewage treatment pool 3, and the detection head of the total liquid level sensor 1 extends into the sewage treatment pool 3;
[0077] The water inlet of the raw water pump 2 is connected to an external sewage source, and the water outlet is connected to a sewage treatment tank 3;
[0078] The aeration and flushing assembly includes a blower 5-1, an air filter 5-2, a first rotor flowmeter 5-3, a first pressure transmitter 5-4 and a first pressure gauge 5-5. The air outlet of the blower 5-1 extends into the bottom of the sewage treatment tank 3 through an aeration pipe. The outer end of the aeration pipe extending into the sewage treatment tank 3 is connected with a plurality of branch pipes, each of which extends to the bottom of each MBR membrane filter unit 4, and the outer end of each branch pipe is provided with an air outlet to aerate and flush the MBR membrane filter unit 4. The air filter 5-2, the first rotor flowmeter 5-3, the first pressure transmitter 5-4 and the first pressure gauge 5-5 are sequentially installed on the aeration pipe along the direction from the blower 5-1 to the sewage treatment tank 3;
[0079] The water production component includes a second pressure transmitter 6-1, a second pressure gauge 6-2, a water production control valve 6-3, a first water production pump 6-4, a second rotor flowmeter 6-5, an electromagnetic flowmeter 6-7, a turbidity meter 6-8 and a reused sewage tank 6-9, and the reused sewage tank 6-9 is connected to the water outlet of each MBR membrane filtration unit 4 through a water production pipeline. The second pressure transmitter 6-1, the second pressure gauge 6-2, the water production control valve 6-3, the first water production pump 6-4, the second rotor flowmeter 6-5, the electromagnetic flowmeter 6-7, and the turbidity meter 6-8 are sequentially installed on the water production pipeline from the MBR membrane filtration unit 4 to the reused sewage tank 6-9;
[0080] The backwash assembly includes a backwash tank water supply control valve 7-1, a backwash tank 7-2, a backwash pump 7-3, a third pressure gauge 7-5, a backwash control valve 7-4, a third liquid level sensor 7-6 and a third liquid level gauge 7-7. The liquid outlet of the backwash tank 7-2 is connected to the water production pipeline between the second pressure transmitter 6-1 and the second pressure gauge 6-2 through a backwash outlet pipeline. The backwash pump 7-3, the third pressure gauge 7-5 and the backwash control valve 7-4 are sequentially installed on the backwash outlet pipeline in the direction from the backwash tank 7-2 to the second pressure transmitter 6-1. The liquid inlet of the backwash tank 7-2 It is connected to the water production pipeline between the turbidity meter 6-8 and the reuse sewage tank 6-9 through the backwash water inlet pipeline, the backwash tank water supply control valve 7-1 is installed on the backwash water inlet pipeline between the backwash tank 7-2 and the turbidity meter 6-8, and the liquid inlet of the backwash tank 7-2 is also connected to the external water source; the detection head of the third liquid level sensor 7-6 is installed on the outer wall 7-2 of the backwash tank, and the position of the detection head of the third liquid level sensor 7-6 is 4-5cm higher than the liquid outlet of the backwash pump 7-3, and the third liquid level meter 7-7 is connected to the third liquid level sensor 7-6 to display the detection result of the third liquid level sensor 7-6;
[0081] One end of the sludge pump 9 extends into the bottom of the sewage treatment tank 3, and the other end is connected to the sludge recovery tank outside the sewage treatment tank 3;
[0082] The input end of the PLC controller is respectively connected to the total liquid level sensor 1, the third liquid level sensor 7-6, the first rotor flowmeter 5-3, the first pressure transmitter 5-4, the second pressure transmitter 6-1, the second rotor flowmeter 6-5, the electromagnetic flowmeter 6-7, and the switch-in-place signal line of the water production control valve 6-3, the switch-in-place signal line of the backwash tank water supply control valve 7-1, and the switch-in-place signal line of the backwash control valve 7-4 for signal collection; the output end of the PLC controller is respectively connected to the raw water pump 2, the mud pump 9, the blower 5-1, the first water production pump 6-4, the backwash pump 7-3, and the control line of the water production control valve 6-3, the control line of the backwash tank water supply control valve 7-1, and the control line of the backwash control valve 7-4 for control, wherein the control of the blower 5-1 by the PLC controller includes start-stop control and speed control to aerate and flush the MBR membrane filtration unit 4.
[0083] The submerged MBR membrane pool device also includes a dosing device, which includes a first drug storage tank 8-1, a second drug storage tank 8-2, a first dosing pump 8-3, a second dosing pump 8-4 and a pipeline mixer 8-5. The pipeline mixer 8-5 is installed on the backwash outlet pipeline between the backwash control valve 7-4 and the third pressure gauge 7-5. The liquid outlets of the first drug storage tank 8-1 and the second drug storage tank 8-2 are respectively connected to the pipeline mixer 8-5 through the first dosing pipeline and the second dosing pipeline. The first dosing pump 8-3 is installed on the first dosing pipeline between the first drug storage tank 8-1 and the pipeline mixer 8-5, and the second dosing pump 8-4 is installed on the second dosing pipeline between the second drug storage tank 8-2 and the pipeline mixer 8-5; the output end of the PLC controller is also respectively connected to the first dosing pump 8-3 and the second dosing pump 8-4 for control.
[0084] The dosing device also includes a dosing barrel pump 8-6, a second liquid level meter 8-7 and a second liquid level sensor 8-8. The dosing barrel pump 8-6 is connected to the liquid inlet of the second medicine storage tank 8-2 through a dosing delivery pipeline, and the external medicine barrel is connected to the dosing barrel pump 8-6 through a pipeline. The detection head of the second liquid level sensor 8-8 is installed on the outer wall of the second medicine storage tank 8-2, and the position of the second liquid level sensor 8-8 detection head is 4-5cm higher than the liquid outlet of the second dosing pump 8-4. The second liquid level meter 8-7 is connected to the second liquid level sensor 8-8 to display the detection result of the second liquid level sensor 8-8; the dosing device It also includes a first liquid level meter 8-9 and a first liquid level sensor 8-10. The external water source is connected to the liquid inlet of the first medicine storage tank 8-1 through a pipeline. The detection head of the first liquid level sensor 8-10 is installed on the outer wall of the first medicine storage tank 8-1, and the position of the detection head of the first liquid level sensor 8-10 is 4-5 cm higher than the liquid outlet of the first dosing pump 8-3. The first liquid level meter 8-9 is connected to the first liquid level sensor 8-10 to display the detection result of the first liquid level sensor 8-10; the input end of the PLC controller is also respectively connected to the first liquid level sensor 8-10 and the second liquid level sensor 8-8 for signal acquisition.
[0085] The first medicine storage tank 8-1 is filled with a citric acid solution with a mass percentage concentration of 0.8-1.2% or a sulfuric acid solution or a hydrochloric acid solution with a mass percentage concentration of 0.3-0.5%, and the second medicine storage tank 8-2 is filled with a NaClO solution with a mass percentage concentration of 8-12%; the medicine barrel is filled with a NaClO solution with a mass percentage concentration of 8-12%.
[0086] The dosing device also includes a first safety valve 8-11, a first Y-type filter 8-12, a second safety valve 8-13, a second Y-type filter 8-14, a fourth pressure gauge 8-15 and a fifth pressure gauge 8-16; the first Y-type filter 8-12 is connected to the first dosing pipeline between the first drug storage tank 8-1 and the first dosing pump 8-3, the fourth pressure gauge 8-15 is connected to the first dosing pipeline between the first dosing pump 8-3 and the pipeline mixer 8-5, the first safety valve 8-11 is connected to the first drug storage tank 8-1 through one end of the pipeline, and the other end is connected to the first drug storage tank 8-1 through the first end of the pipeline. One end is connected to the first dosing pipeline between the fourth pressure gauge 8-15 and the pipeline mixer 8-5; the second Y-type filter 8-14 is connected to the second dosing pipeline between the second medicine storage tank 8-2 and the second dosing pump 8-4, the fifth pressure gauge 8-16 is connected to the second dosing pipeline between the second dosing pump 8-4 and the pipeline mixer 8-5, and the second safety valve 8-13 is connected to the second medicine storage tank 8-2 through one end of the pipeline, and the other end is connected to the second dosing pipeline between the fifth pressure gauge 8-16 and the pipeline mixer 8-5.
[0087] The water production component also includes a second water production pump 6-6 connected in parallel with the first water production pump 6-4 on the water production pipeline, and the output end of the PLC controller is also connected to the second water production pump 6-6 for control.
[0088] The method for treating sewage using the submerged MBR membrane pool device mainly comprises the following steps performed in sequence:
[0089] (1) Water intake process: the PLC controller turns on the raw water pump 2 to pump sewage from the external sewage source into the sewage treatment tank 3. When the total liquid level sensor 1 detects that the sewage water level reaches a predetermined water level, the PLC controller turns off the raw water pump 2 to stop water intake;
[0090] (2) Aeration and flushing process: The PLC controller turns on the blower 5-1, and the blower 5-1 generates compressed air. The compressed air is filtered by the air filter 5-2 and then introduced into the bottom of the sewage treatment tank 3 to aerate and flush the MBR membrane filtration unit 4. The first rotor flowmeter 5-3 and the first pressure transmitter 5-4 respectively detect the air flow and pressure in the pipeline and feed them back to the PLC controller. The first pressure gauge 5-5 displays the pressure value. When the pressure exceeds the preset value, the PLC controller turns off the blower 5-1 and stops the aeration and flushing.
[0091] (3) Filtration and water production process: maintain the aeration and flushing process, and at the same time, the PLC controller opens the water production control valve 6-3, the first water production pump 6-4 and the backwash tank water supply control valve 7-1, and the sewage in the sewage treatment pool 3 is filtered by the MBR membrane filtration component and then sucked into the reuse sewage tank 6-9 and the backwash tank 7-2; the second pressure transmitter 6-1, the second rotor flowmeter 6-5, the electromagnetic flowmeter 6-7, and the turbidity meter 6-8 respectively monitor the water pressure, water production flow rate and turbidity information of the sewage in the pipeline after filtration, and send the information to the PLC controller, and the second pressure gauge 6-2 displays the water pressure value; when the water production time reaches the preset time or the water pressure exceeds the preset value, the PLC controller closes the water production control valve 6-3, the first water production pump 6-4 and the backwash tank water supply control valve 7-1;
[0092] (4) Backwashing process: When the PLC controller detects that the water production flow rate is less than a predetermined value or the second pressure transmitter 6-1 detects that the transmembrane pressure difference under the same filtration flow rate is greater than 14-16 kPa compared with the transmembrane pressure difference during initial stable operation, the aeration flushing process is started, the filtration and water production processes are stopped, and the PLC controller opens the backwashing control valve 7-4 and the backwashing pump 7-3 in sequence. The filtered recycled sewage in the backwash tank 7-2 is used to flush the MBR membrane filtration assembly in the reverse direction of sewage filtration through the backwashing outlet pipe; the third pressure gauge 7-5 displays the water pressure value in the backwashing outlet pipe, the third liquid level sensor 7-6 detects the liquid level in the backwash tank 7-2, and the third liquid level meter 7-7 displays the liquid level value; the backwashing process lasts for a preset time;
[0093] (5) Sludge discharge process: After the sewage is filtered through the MBR membrane filtration assembly, the sludge remaining is deposited at the bottom of the sewage treatment tank 3. The PLC controller starts the sludge discharge pump 9 to pump the sludge to the external sludge recovery tank.
[0094] When the backwash process lasts for a preset time and stops, and the water production flow rate at this time is still less than the predetermined value or the second pressure transmitter 6-1 detects that the transmembrane pressure difference at the same filtration flow rate is still greater than 14-16 kPa compared with the transmembrane pressure difference during initial stable operation, the method for sewage treatment by the submerged MBR membrane pool device also includes a dosing backwash process: stopping water inlet, aeration, filtration and water production processes, the PLC controller opens the backwash control valve 7-4, the backwash pump 7-3 and the second dosing pump 8-4 in sequence, and the solution in the second drug storage tank 8-2 is mixed with the recycled sewage flowing out of the backwash tank 7-2 at the pipeline mixer 8-5, and then the MBR membrane filtration component is dosing and injected through the backwash outlet pipeline in the opposite direction of sewage filtration. Each time the dosing injection time is up, the PLC controls the backwash pump 7-3 and the first dosing pump 8-3 or the second dosing pump 8-4 to close, and the PLC controls the backwash valve 7-4 to close after a delay of 3-5 seconds, and the drug solution immersion timing is started. When the timing time is up, the PLC controls the blower 5-1 to open for aeration. When the aeration timing time is up, the PLC turns off the blower to clear and restore the membrane flux; then, the second dosing pump 8-4 is turned off, and the first dosing pump 8-3 is started. The solution in the first drug storage tank 8-1 is mixed with the recycled sewage flowing out of the backwash tank 7-2 at the pipeline mixer 8-5, and then injected into the MBR membrane filtration component through the pipeline against the sewage filtration direction. Each time the dosing injection time is up, PLC controls the backwash pump 7-3 and the first dosing pump 8-3 or the second dosing pump 8-4 to close, delays 3-5 seconds, and PLC controls the backwash valve 7-4 to close, and enters the liquid immersion timing. When the timing time is up, PLC controls the blower 5-1 to open for aeration. When the aeration timing time is up, PLC turns off the blower to dredge and restore the membrane flux.
[0095] The dosing backwashing process also includes a dosing process for the second drug storage tank 8-2: a NaClO solution with an external mass percentage of 8-12% is supplied to the second drug storage tank 8-2 through a dosing delivery pipeline by a dosing barrel pump 8-6, a second liquid level sensor 8-8 detects the liquid level in the second drug storage tank 8-2, and a second liquid level meter 8-7 displays the liquid level value. When the liquid level reaches a predetermined value, the dosing barrel pump stops pumping the drug solution into the dosing tank, and dosing stops.
[0096] The dosing backwash process also includes a dosing process for the first medicine storage tank 8-1: water from an external water source is added to the first medicine storage tank 8-1, and a predetermined amount of citric acid, sulfuric acid or hydrochloric acid is added to the first medicine storage tank 8-1. The first liquid level sensor 8-10 detects the liquid level in the first medicine storage tank 8-1, and the first liquid level meter 8-9 displays the liquid level value. When the liquid level reaches the predetermined value, stop adding water and stir evenly, thereby completing the dosing of the first medicine storage tank 8-1.
[0097] Example 3
[0098] The submerged MBR membrane pool device of the present invention comprises a PLC controller, a total liquid level sensor 1, a raw water pump 2, a sewage treatment pool 3, an MBR membrane filtration component, an aeration flushing component, a backwash component, a water production component and a sludge pump 9; the MBR membrane filtration component comprises at least two MBR membrane filtration units 4, each of which is arranged in the sewage treatment pool 3, and the detection head of the total liquid level sensor 1 extends into the sewage treatment pool 3;
[0099] The water inlet of the raw water pump 2 is connected to an external sewage source, and the water outlet is connected to a sewage treatment tank 3;
[0100] The aeration and flushing assembly includes a blower 5-1, an air filter 5-2, a first rotor flowmeter 5-3, a first pressure transmitter 5-4 and a first pressure gauge 5-5. The air outlet of the blower 5-1 extends into the bottom of the sewage treatment tank 3 through an aeration pipe. The outer end of the aeration pipe extending into the sewage treatment tank 3 is connected with a plurality of branch pipes, each of which extends to the bottom of each MBR membrane filter unit 4, and the outer end of each branch pipe is provided with an air outlet to aerate and flush the MBR membrane filter unit 4. The air filter 5-2, the first rotor flowmeter 5-3, the first pressure transmitter 5-4 and the first pressure gauge 5-5 are sequentially installed on the aeration pipe along the direction from the blower 5-1 to the sewage treatment tank 3;
[0101] The water production component includes a second pressure transmitter 6-1, a second pressure gauge 6-2, a water production control valve 6-3, a first water production pump 6-4, a second rotor flowmeter 6-5, an electromagnetic flowmeter 6-7, a turbidity meter 6-8 and a reused sewage tank 6-9, and the reused sewage tank 6-9 is connected to the water outlet of each MBR membrane filtration unit 4 through a water production pipeline. The second pressure transmitter 6-1, the second pressure gauge 6-2, the water production control valve 6-3, the first water production pump 6-4, the second rotor flowmeter 6-5, the electromagnetic flowmeter 6-7, and the turbidity meter 6-8 are sequentially installed on the water production pipeline from the MBR membrane filtration unit 4 to the reused sewage tank 6-9;
[0102] The backwash assembly includes a backwash tank water supply control valve 7-1, a backwash tank 7-2, a backwash pump 7-3, a third pressure gauge 7-5, a backwash control valve 7-4, a third liquid level sensor 7-6 and a third liquid level gauge 7-7. The liquid outlet of the backwash tank 7-2 is connected to the water production pipeline between the second pressure transmitter 6-1 and the second pressure gauge 6-2 through a backwash outlet pipeline. The backwash pump 7-3, the third pressure gauge 7-5 and the backwash control valve 7-4 are sequentially installed on the backwash outlet pipeline in the direction from the backwash tank 7-2 to the second pressure transmitter 6-1. The liquid inlet of the backwash tank 7-2 It is connected to the water production pipeline between the turbidity meter 6-8 and the reuse sewage tank 6-9 through the backwash water inlet pipeline, the backwash tank water supply control valve 7-1 is installed on the backwash water inlet pipeline between the backwash tank 7-2 and the turbidity meter 6-8, and the liquid inlet of the backwash tank 7-2 is also connected to the external water source; the detection head of the third liquid level sensor 7-6 is installed on the outer wall 7-2 of the backwash tank, and the position of the detection head of the third liquid level sensor 7-6 is 4-5cm higher than the liquid outlet of the backwash pump 7-3, and the third liquid level meter 7-7 is connected to the third liquid level sensor 7-6 to display the detection result of the third liquid level sensor 7-6;
[0103] One end of the sludge pump 9 extends into the bottom of the sewage treatment tank 3, and the other end is connected to the sludge recovery tank outside the sewage treatment tank 3;
[0104] The input end of the PLC controller is respectively connected to the total liquid level sensor 1, the third liquid level sensor 7-6, the first rotor flowmeter 5-3, the first pressure transmitter 5-4, the second pressure transmitter 6-1, the second rotor flowmeter 6-5, the electromagnetic flowmeter 6-7, and the switch position signal line of the water production control valve 6-3, the switch position signal line of the backwash tank water supply control valve 7-1, and the switch position signal line of the backwash control valve 7-4 for signal collection; the output end of the PLC controller is respectively connected to the raw water pump 2, the mud pump 9, the blower 5-1, the first water production pump 6-4, the backwash pump 7-3, and the control line of the water production control valve 6-3, the control line of the backwash tank water supply control valve 7-1, and the control line of the backwash control valve 7-4 for control, wherein the control of the blower 5-1 by the PLC controller includes start-stop control and speed control to aerate and flush the MBR membrane filtration unit 4. 。
[0105] The water production component also includes a second water production pump 6-6 connected in parallel with the first water production pump 6-4 on the water production pipeline, and the output end of the PLC controller is also connected to the second water production pump 6-6 for control.
[0106] The method for treating sewage using the submerged MBR membrane pool device mainly comprises the following steps performed in sequence:
[0107] (1) Water intake process: the PLC controller turns on the raw water pump 2 to pump sewage from the external sewage source into the sewage treatment tank 3. When the total liquid level sensor 1 detects that the sewage water level reaches a predetermined water level, the PLC controller turns off the raw water pump 2 to stop water intake;
[0108] (2) Aeration and flushing process: The PLC controller turns on the blower 5-1, and the blower 5-1 generates compressed air. The compressed air is filtered by the air filter 5-2 and then introduced into the bottom of the sewage treatment tank 3 to perform aeration and flushing on the MBR membrane filtration unit 4. The first rotor flowmeter 5-3 and the first pressure transmitter 5-4 respectively detect the air flow and pressure in the pipeline and feed them back to the PLC controller. The first pressure gauge 5-5 displays the pressure value. When the pressure exceeds the preset value, the PLC controller turns off the blower 5-1 and stops aeration and flushing.
[0109] (3) Filtration and water production process: maintain the aeration and flushing process, and at the same time, the PLC controller opens the water production control valve 6-3, the first water production pump 6-4 and the backwash tank water supply control valve 7-1, and the sewage in the sewage treatment pool 3 is filtered by the MBR membrane filtration component and then sucked into the reuse sewage tank 6-9 and the backwash tank 7-2; the second pressure transmitter 6-1, the second rotor flowmeter 6-5, the electromagnetic flowmeter 6-7, and the turbidity meter 6-8 respectively monitor the water pressure, water production flow rate and turbidity information of the sewage in the pipeline after filtration, and send the information to the PLC controller, and the second pressure gauge 6-2 displays the water pressure value; when the water production time reaches the preset time or the water pressure exceeds the preset value, the PLC controller closes the water production control valve 6-3, the first water production pump 6-4 and the backwash tank water supply control valve 7-1;
[0110] (4) Backwashing process: When the PLC controller detects that the water production flow rate is less than a predetermined value or the second pressure transmitter 6-1 detects that the transmembrane pressure difference under the same filtration flow rate is greater than 14-16 kPa compared with the transmembrane pressure difference during initial stable operation, the aeration flushing process is started, the filtration and water production processes are stopped, and the PLC controller opens the backwashing control valve 7-4 and the backwashing pump 7-3 in sequence. The filtered recycled sewage in the backwash tank 7-2 is used to flush the MBR membrane filtration assembly in the reverse direction of sewage filtration through the backwashing outlet pipe; the third pressure gauge 7-5 displays the water pressure value in the backwashing outlet pipe, the third liquid level sensor 7-6 detects the liquid level in the backwash tank 7-2, and the third liquid level meter 7-7 displays the liquid level value; the backwashing process lasts for a preset time;
[0111] (5) Sludge discharge process: After the sewage is filtered through the MBR membrane filtration assembly, the sludge remaining is deposited at the bottom of the sewage treatment tank 3. The PLC controller starts the sludge discharge pump 9 to pump the sludge to the external sludge recovery tank.
[0112] When the backwash process lasts for a preset time and stops, and the water production flow rate at this time is still less than the predetermined value or the second pressure transmitter 6-1 detects that the transmembrane pressure difference at the same filtration flow rate is still greater than 14-16 kPa compared with the transmembrane pressure difference during initial stable operation, the method for sewage treatment by the submerged MBR membrane pool device also includes a dosing backwash process: stopping water inlet, aeration, filtration and water production processes, the PLC controller opens the backwash control valve 7-4, the backwash pump 7-3 and the second dosing pump 8-4 in sequence, and the solution in the second drug storage tank 8-2 is mixed with the recycled sewage flowing out of the backwash tank 7-2 at the pipeline mixer 8-5, and then the MBR membrane filtration component is dosing and injected through the backwash outlet pipeline in the opposite direction of sewage filtration. Each time the dosing injection time is up, the PLC controls the backwash pump 7-3 and the first dosing pump 8-3 or the second dosing pump 8-4 to close, and the PLC controls the backwash valve 7-4 to close after a delay of 3-5 seconds, and the drug solution immersion timing is started. When the timing time is up, the PLC controls the blower 5-1 to open for aeration. When the aeration timing time is up, the PLC turns off the blower to clear and restore the membrane flux; then, the second dosing pump 8-4 is turned off, and the first dosing pump 8-3 is started. The solution in the first drug storage tank 8-1 is mixed with the recycled sewage flowing out of the backwash tank 7-2 at the pipeline mixer 8-5, and then injected into the MBR membrane filtration component through the pipeline against the sewage filtration direction. Each time the dosing injection time is up, PLC controls the backwash pump 7-3 and the first dosing pump 8-3 or the second dosing pump 8-4 to close, delays 3-5 seconds, and PLC controls the backwash valve 7-4 to close, and enters the liquid immersion timing. When the timing time is up, PLC controls the blower 5-1 to open for aeration. When the aeration timing time is up, PLC turns off the blower to dredge and restore the membrane flux.
[0113] The dosing backwashing process also includes a dosing process for the second drug storage tank 8-2: a NaClO solution with an external mass percentage of 8-12% is supplied to the second drug storage tank 8-2 through a dosing delivery pipeline by a dosing barrel pump 8-6, a second liquid level sensor 8-8 detects the liquid level in the second drug storage tank 8-2, and a second liquid level meter 8-7 displays the liquid level value. When the liquid level reaches a predetermined value, the dosing barrel pump stops pumping the drug solution into the dosing tank, and dosing stops.
[0114] The dosing backwash process also includes a dosing process for the first medicine storage tank 8-1: water from an external water source is added to the first medicine storage tank 8-1, and a predetermined amount of citric acid, sulfuric acid or hydrochloric acid is added to the first medicine storage tank 8-1. The first liquid level sensor 8-10 detects the liquid level in the first medicine storage tank 8-1, and the first liquid level meter 8-9 displays the liquid level value. When the liquid level reaches the predetermined value, stop adding water and stir evenly, thereby completing the dosing of the first medicine storage tank 8-1.
[0115] Source information of some devices involved in each embodiment:
[0116] PLC controller: Siemens S7-300;
[0117] MBR membrane filtration components: Kubota SD / ES / FS, Toray TMR140 or Menon SMM.
[0118] Experimental data:
[0119] Test object: The water volume of the sewage reuse system is 400-500m 3 / d, the processing capacity of the water treatment equipment is 20m 3 / h.
[0120] Detection method: After the above-mentioned sewage reuse system is put into operation, sampling and detection are carried out in accordance with the "Water and Wastewater Detection and Analysis Methods" (Fourth Edition) compiled by the State Environmental Protection Agency and the document "Optimization Experimental Research on Flat Membrane Bioreactor Treatment of Domestic Sewage".
[0121] Control sample: the existing sewage treatment process using the secondary sedimentation tank, for details, see the multi-mode AAO process used in the document "Analysis and Optimal Control of Treatment Effects of Multi-mode AAO Process in Large Sewage Plants".
[0122] Table 1 Water quality test results after sewage treatment using the equipment and methods of each embodiment of this case
[0123]
[0124] The effluent water quality indexes of the sewage treated by the submerged MBR membrane tank device and the sewage treatment method using the device are better than those in GB / T19923, and the suspended solids, turbidity, CODcr, ammonia nitrogen, total phosphorus and chloride ion indexes are greatly improved compared with the sewage treated by the existing sewage treatment process using the secondary sedimentation tank. In addition, the sludge concentration is higher than the control sample, and the sludge load is lower than the control sample, and the sewage treatment effect is high.
[0125] The submerged MBR membrane pool device and the method for sewage treatment using the same described in the present invention are not limited to the above-mentioned embodiments. Any improvement or replacement based on the principle of the present invention should be within the protection scope of the present invention.
Claims
1. A submerged MBR membrane pool device, characterized in that: The invention comprises a PLC controller, a total liquid level sensor (1), a raw water pump (2), a sewage treatment tank (3), an MBR membrane filtration component, an aeration and flushing component, a backwash component, a water production component and a sludge pump (9); the MBR membrane filtration component comprises at least two MBR membrane filtration units (4), each of which is arranged in the sewage treatment tank (3); and a detection head of the total liquid level sensor (1) extends into the sewage treatment tank (3); The water inlet of the raw water pump (2) is connected to an external sewage source, and the water outlet is connected to a sewage treatment tank (3); The aeration and flushing assembly comprises a blower (5-1), an air filter (5-2), a first rotor flowmeter (5-3), a first pressure transmitter (5-4) and a first pressure gauge (5-5); an air outlet of the blower (5-1) extends into the bottom of the sewage treatment tank (3) through an aeration pipe; the outer end of the aeration pipe extending into the sewage treatment tank (3) is connected to a plurality of branch pipes; each branch pipe extends to the bottom of each MBR membrane filter unit (4); and the outer end of each branch pipe is provided with an air outlet for aeration and flushing the MBR membrane filter unit (4); the air filter (5-2), the first rotor flowmeter (5-3), the first pressure transmitter (5-4) and the first pressure gauge (5-5) are sequentially installed on the aeration pipe along the direction from the blower (5-1) to the sewage treatment tank (3); The water production component comprises a second pressure transmitter (6-1), a second pressure gauge (6-2), a water production control valve (6-3), a first water production pump (6-4), a second rotor flowmeter (6-5), an electromagnetic flowmeter (6-7), a turbidity meter (6-8) and a reused sewage tank (6-9); the reused sewage tank (6-9) is connected to the water outlet of each MBR membrane filtration unit (4) through a water production pipeline; the second pressure transmitter (6-1), the second pressure gauge (6-2), the water production control valve (6-3), the first water production pump (6-4), the second rotor flowmeter (6-5), the electromagnetic flowmeter (6-7) and the turbidity meter (6-8) are sequentially installed on the water production pipeline in a direction from the MBR membrane filtration unit (4) to the reused sewage tank (6-9); The backwash assembly comprises a backwash tank water replenishment control valve (7-1), a backwash tank (7-2), a backwash pump (7-3), a third pressure gauge (7-5), a backwash control valve (7-4), a third liquid level sensor (7-6) and a third liquid level gauge (7-7); the liquid outlet of the backwash tank (7-2) is connected to a water production pipeline located between a second pressure transmitter (6-1) and a second pressure gauge (6-2) through a backwash outlet pipeline; the backwash pump (7-3), the third pressure gauge (7-5) and the backwash control valve (7-4) are sequentially installed on the backwash outlet pipeline in a direction from the backwash tank (7-2) to the second pressure transmitter (6-1); The liquid inlet is connected to a water production pipeline located between the turbidity meter (6-8) and the reuse sewage tank (6-9) through a backwash water inlet pipeline; the backwash tank water replenishment control valve (7-1) is installed on the backwash water inlet pipeline located between the backwash tank (7-2) and the turbidity meter (6-8); the liquid inlet of the backwash tank (7-2) is also connected to an external water source; the detection head of the third liquid level sensor (7-6) is installed on the outer wall (7-2) of the backwash tank, and the position of the detection head of the third liquid level sensor (7-6) is 4-5 cm higher than the liquid outlet of the backwash pump (7-3); the third liquid level meter (7-7) is connected to the third liquid level sensor (7-6) to display the detection result of the third liquid level sensor (7-6); One end of the sludge pump (9) extends into the bottom of the sewage treatment tank (3), and the other end is connected to a sludge recovery tank located outside the sewage treatment tank (3); The input end of the PLC controller is respectively connected to the total liquid level sensor (1), the third liquid level sensor (7-6), the first rotor flowmeter (5-3), the first pressure transmitter (5-4), the second pressure transmitter (6-1), the second rotor flowmeter (6-5), the electromagnetic flowmeter (6-7), the turbidity meter (6-8), and the switch position signal line of the water production control valve (6-3), the switch position signal line of the backwash tank water supply control valve (7-1) and the switch position signal line of the backwash control valve (7-4). The output end of the PLC controller is respectively connected to the raw water pump (2), the sludge pump (9), the blower (5-1), the first water production pump (6-4), the backwash pump (7-3), and the control line of the water production control valve (6-3), the control line of the backwash tank water supply control valve (7-1) and the control line of the backwash control valve (7-4) for control, wherein the control of the blower (5-1) by the PLC controller includes start-stop control and speed control to aerate and flush the MBR membrane filtration unit (4); The submerged MBR membrane pool device also includes a dosing device, which includes a first drug storage tank (8-1), a second drug storage tank (8-2), a first dosing pump (8-3), a second dosing pump (8-4) and a pipeline mixer (8-5). The pipeline mixer (8-5) is installed on the backwash outlet pipeline between the backwash control valve (7-4) and the third pressure gauge (7-5). The liquid outlets of the first drug storage tank (8-1) and the second drug storage tank (8-2) are respectively connected through the first dosing pipe. The first dosing pipeline and the second dosing pipeline are connected to the pipeline mixer (8-5), the first dosing pump (8-3) is installed on the first dosing pipeline between the first drug storage tank (8-1) and the pipeline mixer (8-5), and the second dosing pump (8-4) is installed on the second dosing pipeline between the second drug storage tank (8-2) and the pipeline mixer (8-5); the output end of the PLC controller is also respectively connected to the first dosing pump (8-3) and the second dosing pump (8-4) for control.
2. The submerged MBR membrane pool device according to claim 1, characterized in that: The dosing device further comprises a dosing barrel pump (8-6), a second liquid level gauge (8-7) and a second liquid level sensor (8-8); the dosing barrel pump (8-6) is connected to the liquid inlet of the second medicine storage tank (8-2) via a dosing delivery pipeline; an external medicine barrel is connected to the dosing barrel pump (8-6) via a pipeline; a detection head of the second liquid level sensor (8-8) is installed on the outer wall of the second medicine storage tank (8-2); and the position of the detection head of the second liquid level sensor (8-8) is 4-5 cm higher than the liquid outlet of the second dosing pump (8-4); the second liquid level gauge (8-7) is connected to the second liquid level sensor (8-8) to display the detection result of the second liquid level sensor (8-8); the dosing device The device also includes a first liquid level meter (8-9) and a first liquid level sensor (8-10); an external water source is connected to the liquid inlet of the first medicine storage tank (8-1) through a pipeline; a detection head of the first liquid level sensor (8-10) is installed on the outer wall of the first medicine storage tank (8-1), and the position of the detection head of the first liquid level sensor (8-10) is 4-5 cm higher than the liquid outlet of the first dosing pump (8-3); the first liquid level meter (8-9) is connected to the first liquid level sensor (8-10) to display the detection result of the first liquid level sensor (8-10); and the input end of the PLC controller is also respectively connected to the first liquid level sensor (8-10) and the second liquid level sensor (8-8) to collect signals.
3. The submerged MBR membrane pool device according to claim 2, characterized in that: The first medicine storage tank (8-1) contains a citric acid solution with a mass percentage concentration of 0.8-1.2% or a sulfuric acid solution or a hydrochloric acid solution with a mass percentage concentration of 0.3-0.5%, and the second medicine storage tank (8-2) contains a NaClO solution with a mass percentage concentration of 8-12%; the medicine barrel contains a NaClO solution with a mass percentage concentration of 8-12%.
4. The submerged MBR membrane pool device according to claim 1, characterized in that: The dosing device further comprises a first safety valve (8-11), a first Y-type filter (8-12), a second safety valve (8-13), a second Y-type filter (8-14), a fourth pressure gauge (8-15) and a fifth pressure gauge (8-16); the first Y-type filter (8-12) is connected to a first dosing pipeline between the first drug storage tank (8-1) and the first dosing pump (8-3), the fourth pressure gauge (8-15) is connected to the first dosing pipeline between the first dosing pump (8-3) and the pipeline mixer (8-5), and the first safety valve (8-11) is connected to the first drug storage tank (8-1) through one end of the pipeline. , and the other end is connected to the first dosing pipeline located between the fourth pressure gauge (8-15) and the pipeline mixer (8-5); the second Y-type filter (8-14) is connected to the second dosing pipeline located between the second drug storage tank (8-2) and the second dosing pump (8-4); the fifth pressure gauge (8-16) is connected to the second dosing pipeline located between the second dosing pump (8-4) and the pipeline mixer (8-5); the second safety valve (8-13) is connected to the second drug storage tank (8-2) through one end of the pipeline, and the other end is connected to the second dosing pipeline located between the fifth pressure gauge (8-16) and the pipeline mixer (8-5).
5. The submerged MBR membrane pool device according to claim 1, characterized in that: The water production component also includes a second water production pump (6-6) connected in parallel with the first water production pump (6-4) on the water production pipeline, and the output end of the PLC controller is also connected to the second water production pump (6-6) for control.
6. A method for treating sewage using the submerged MBR membrane pool device according to any one of claims 1 to 5, characterized in that: It mainly includes the following steps in order: (1) Water intake process: the PLC controller starts the raw water pump (2) to pump sewage from the external sewage source into the sewage treatment tank (3). When the total liquid level sensor (1) detects that the sewage water level reaches a predetermined water level value, the PLC controller turns off the raw water pump (2) to stop water intake; (2) Aeration and flushing process: the PLC controller turns on the blower (5-1), and the blower (5-1) generates compressed air. The compressed air is filtered by the air filter (5-2) and then introduced into the bottom of the sewage treatment pool (3), so as to aerate and flush the MBR membrane filtration unit (4). The first rotor flowmeter (5-3) and the first pressure transmitter (5-4) respectively detect the air flow and pressure in the pipeline and feed them back to the PLC controller. The first pressure gauge (5-5) displays the pressure value. When the pressure exceeds a preset value, the PLC controller turns off the blower (5-1) and stops the aeration and flushing. (3) Filtration and water production process: the aeration and flushing process is maintained, and at the same time, the PLC controller opens the water production control valve (6-3), the first water production pump (6-4) and the backwash tank water supply control valve (7-1), and the sewage in the sewage treatment pool (3) is filtered by the MBR membrane filtration component and then sucked into the reuse sewage tank (6-9) and the backwash tank (7-2); the second pressure transmitter (6-1), the second rotor flowmeter (6-5), the electromagnetic flowmeter (6-7), and the turbidity meter (6-8) respectively monitor the water pressure, water production flow rate and turbidity information of the sewage in the pipeline after filtration, and send the information to the PLC controller, and the second pressure gauge (6-2) displays the water pressure value; when the water production time reaches the preset time or the water pressure exceeds the preset value, the PLC controller closes the water production control valve (6-3), the first water production pump (6-4) and the backwash tank water supply control valve (7-1); (4) Backwashing process: When the PLC controller detects that the water production flow rate is less than a predetermined value or the second pressure transmitter (6-1) detects that the transmembrane pressure difference under the same filtration flow rate is greater than 14-16 kPa compared with the transmembrane pressure difference during initial stable operation, the aeration flushing process is started, the filtration and water production processes are stopped, and the PLC controller opens the backwashing control valve (7-4) and the backwashing pump (7-3) in sequence, and the filtered recycled sewage in the backwash tank (7-2) is flushed against the sewage filtration direction through the backwashing outlet pipe to the MBR membrane filtration component; the third pressure gauge (7-5) displays the water pressure value in the backwashing outlet pipe, the third liquid level sensor (7-6) detects the liquid level in the backwash tank (7-2), and the third liquid level meter (7-7) displays the liquid level value; the backwashing process lasts for a preset time period; (5) Sludge discharge process: After the sewage is filtered through the MBR membrane filtration module, the sludge left behind accumulates at the bottom of the sewage treatment tank (3). The PLC controller starts the sludge discharge pump (9) to pump the sludge to an external sludge recovery tank; When the backwashing process lasts for a preset time and stops, the water production flow rate at this time is still less than the predetermined value or the second pressure transmitter (6-1) detects that the transmembrane pressure difference at the same filtration flow rate is still greater than 14-16 kPa compared with the transmembrane pressure difference during initial stable operation, the method for treating sewage by the submerged MBR membrane pool device also includes a dosing backwashing process: stopping water inlet, aeration flushing, filtration and water production processes, the PLC controller sequentially opens the backwashing control valve (7-4), the backwashing pump (7-3) and the first dosing pump (8-3) or the second dosing pump (8-4), the solution in the first drug storage tank (8-1) or the solution in the second drug storage tank (8-2) After the liquid is mixed with the recycled sewage flowing out of the backwash tank (7-2) at the pipeline mixer (8-5), the MBR membrane filter components are flushed in the reverse direction of the sewage filtration through the backwash outlet pipeline to dredge and restore the membrane flux; thereafter, the first dosing pump (8-3) or the second dosing pump (8-4) is turned off, the second dosing pump (8-4) or the first dosing pump (8-3) is started, the solution in the second drug storage tank (8-2) or the solution in the first drug storage tank (8-1) is mixed with the recycled sewage flowing out of the backwash tank (7-2) at the pipeline mixer (8-5), and then the MBR membrane filter components are flushed in the reverse direction of the sewage filtration through the pipeline to dredge and restore the membrane flux.
7. The method for treating sewage using a submerged MBR membrane pool device according to claim 6, characterized in that: The dosing backwashing process also includes a second drug storage tank (8-2) dosing process: a NaClO solution with an external mass percentage of 8-12% is supplied to the second drug storage tank (8-2) through a dosing barrel pump (8-6) through a dosing delivery pipeline, a second liquid level sensor (8-8) detects the liquid level in the second drug storage tank (8-2), and a second liquid level meter (8-7) displays the liquid level value; when the liquid level reaches a predetermined value, the dosing barrel pump stops pumping the drug solution into the dosing tank, and dosing stops.
8. The method for treating sewage using a submerged MBR membrane pool device according to claim 6, characterized in that: The dosing backwashing process also includes a first drug storage tank (8-1) dosing process: water from an external water source is added to the first drug storage tank (8-1), and a predetermined amount of citric acid, sulfuric acid or hydrochloric acid is added to the first drug storage tank (8-1), a first liquid level sensor (8-10) detects the liquid level in the first drug storage tank (8-1), and a first liquid level meter (8-9) displays the liquid level value. When the liquid level reaches a predetermined value, water is stopped from entering and stirred evenly, thereby completing the dosing of the first drug storage tank (8-1).