A production mold for prefabricated beam with wall and mold manufacturing method
By designing a prefabricated beam wall mold including beam reinforced cage, closing mesh, fixed frame and mesh cage, the problems of high cost and long processing cycle of existing mold materials are solved, and the cost of mold materials and the improvement of production efficiency are achieved.
Patent Information
- Application Number
- CN202110642377.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-06-09
- Publication Date
- 2025-03-14
- Estimated Expiration
- 2041-06-09
AI Technical Summary
The existing prefabricated beam and wall mold materials are costly, have long processing cycles, many processes and large weights, which are not conducive to later transportation, installation and production.
A prefabricated beam and wall production mold is designed, including beam reinforced cages, closing mesh, fixed frames and mesh cages. By simplifying the process and optimizing the structure, the material cost and processing complexity of the mold are reduced.
It realizes the reduction of mold material costs, simplifies processing processes, reduces weight, is conducive to the improvement of transportation, installation and production efficiency, reduces labor costs, and improves the utilization rate and versatility of molds.
Smart Images

Figure CN113369426B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of prefabricated buildings, and in particular to a production mould for a prefabricated beam with a wall and a mould manufacturing method. Background Art
[0002] In the production of prefabricated components, most prefabricated companies use sidewall molds for prefabricated beams and walls, which are basically made of steel plate bending or steel and aluminum cutting. The mold material cost is high and the processing cycle is long. After the bending is completed, in order to ensure the roughness of the wall surface around the beam and wall, it is necessary to add a water-washed surface or install patterned plates and other materials inside the mold. There are many processing steps and the mold is heavy, which is very unfavorable for the transportation, installation and production of the mold in the later stage. In addition, the sidewall reinforcement opening processing of the prefabricated beam and wall mold mostly adopts the long hole process. This process has high requirements on the accuracy of beam stirrup binding and the size of the reinforcement opening must be larger than the size of the beam stirrup so that the beam stirrup can be smoothly installed in place. This leads to difficulties in positioning and installing the steel cage in the later production of components and it is easy to cause the problem of concrete leakage. Therefore, it is necessary to manually adjust the stirrup spacing and concrete plugging operations, which increases labor costs and reduces production efficiency. In addition, for low-rise prefabricated buildings, the mold turnover rate is greatly reduced, thereby greatly increasing the proportion of mold costs, which is not conducive to the cost control of prefabricated buildings. With the rapid development of prefabricated buildings, this problem needs to be solved urgently. Summary of the invention
[0003] The purpose of the present invention is to provide a production mold for a prefabricated beam with wall and a mold manufacturing method to solve the problems of high cost of existing mold materials, long processing cycle, multiple processes, large weight, and inconvenience in later transportation, installation and production.
[0004] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a production mold for a prefabricated beam with wall comprises a beam reinforcement cage, an upper closing net, a lower closing net, a left closing net, a right closing net, an upper fixed square frame, a lower fixed square frame, and a mesh cage, the stirrups of the beam reinforcement cage pass through the upper closing net and are tied and fixed with the upper closing net, the upper closing net is also tied and fixed with the positioning steel bars of the beam reinforcement cage, the upper fixed square frame is arranged and fixed in parallel with the lower fixed frame, the stirrups of the beam reinforcement cage are inserted between the upper fixed frame and the lower fixed frame, and the upper closing net is closely attached to the upper fixed frame and the lower fixed frame. The upper part of the frame is fixed, and the two ends of the bottom reinforcement of the beam reinforcement cage pass through the left closing net and the right closing net respectively. The left closing net is fixed tightly to the left side of the upper fixed frame and the lower fixed frame, and the right closing net is fixed tightly to the right side of the upper fixed frame and the lower fixed frame. The lower closing net is fixed tightly to the lower part of the upper fixed frame and the lower fixed frame. The mesh cage is placed in a frame composed of the upper fixed frame, the lower fixed frame and the upper closing net, the lower closing net, the left closing net and the right closing net, and is fixedly connected to the beam reinforcement cage, the lower closing net, the left closing net and the right closing net.
[0005] Preferably, two long sides of the upper closing net are respectively provided with stirrup notches, and the stirrups of the beam reinforcement cage are inserted into the stirrup notches of the upper closing net.
[0006] Preferably, the left closing net and the right closing net are respectively provided with bottom reinforcement notches, and the two ends of the bottom reinforcement of the beam reinforcement cage are respectively inserted into the bottom reinforcement notches of the left closing net and the right closing net.
[0007] Preferably, it also includes a fixed pressure iron, the fixed pressure iron has a first concave card and a second concave card, the upper fixed square frame is clamped on the first concave card, and the lower fixed square frame is clamped on the second concave card.
[0008] Preferably, the upper fixed frame and the lower fixed frame are provided with magnets, and the upper closing net, the lower closing net, the left closing net and the right closing net are adsorbed on the upper fixed frame and the lower fixed frame through the magnets.
[0009] Preferably, the mesh cage consists of two meshes and three grids, and the three grids are respectively tied and fixed to the left closing net, the right closing net, and the lower closing net; the two meshes are arranged in parallel, and the left, right and lower sides are fixed to the grids, and the upper side is fixed to the beam reinforcement cage.
[0010] The present invention also provides a method for manufacturing a production mold for a prefabricated beam with wall, which comprises the following steps in sequence:
[0011] S1. Tie and shape the beam reinforcement cage according to the drawings, determine the arrangement spacing of the stirrups, process the upper closing net according to the arrangement spacing of the stirrups, and tie and fix the upper closing net with the stirrups and positioning steel bars of the beam reinforcement cage;
[0012] S2, the upper square tube of the upper fixed square frame is arranged parallel to and fixed to the upper square tube of the lower fixed square frame, the stirrups of the beam reinforcement cage tied with the upper closing net are passed between the upper square tube of the upper fixed square frame and the upper square tube of the lower fixed square frame, and the upper closing net is fixed closely to the upper square tube of the upper fixed square frame and the upper square tube of the lower fixed square frame;
[0013] S3. Process the left and right closing nets according to the position of the bottom reinforcement. The two ends of the bottom reinforcement of the beam reinforcement cage pass through the left and right closing nets respectively. The left square tube, right square tube and lower square tube of the lower fixed frame are positioned and fixed. Then the left square tube, right square tube and lower square tube of the upper fixed frame are fixed to the left square tube, right square tube and lower square tube of the lower fixed frame respectively. The left closing net is fixed closely to the left square tube of the upper fixed frame and the left square tube of the lower fixed frame. The right closing net is fixed closely to the right square tube of the upper fixed frame and the right square tube of the lower fixed frame. The lower closing net is fixed closely to the lower square tube of the upper fixed frame and the lower square tube of the lower fixed frame.
[0014] S4. Place the mesh cage in a frame consisting of an upper fixed frame, a lower fixed frame, and upper closing nets, lower closing nets, left closing nets, and right closing nets, and fix it to the beam reinforcement cage, lower closing nets, left closing nets, and right closing nets.
[0015] Preferably, in step 1, the method for processing the upper closing net according to the arrangement spacing of the stirrups is to cut the upper closing net according to the length and width of the beam, and cut stirrup notches on the two long sides of the upper closing net according to the arrangement spacing of the stirrups.
[0016] Preferably, the method for processing the left closing net and the right closing net according to the position of the bottom rib in step 3 is to cut the left closing net and the right closing net according to the height of the upper fixed frame and the lower fixed frame and the distance between the upper fixed frame and the lower fixed frame, and cut the bottom rib notches on the two long sides of the left closing net and the right closing net according to the position of the bottom rib.
[0017] Preferably, the processing method of the mesh cage in step 4 is to first position the lower mesh, then place three grids at the positions of the left closing net, the right closing net, and the lower closing net, and fix the lower mesh to the three closing nets, and then place the upper mesh and the lower mesh in parallel and fix them to the three grids.
[0018] The beneficial effects of the present invention are:
[0019] The production mold of the patented prefabricated beam with wall can replace the traditional steel plate bending or steel and aluminum cutting mold, and the price of the mold material is lower than that of steel plate, steel and aluminum, which reduces the mold material cost;
[0020] The closing net is easy to process and can be directly processed with simple tools. The processing cycle is short, the process is few, and the weight is light, which is conducive to the processing and production of workers and the subsequent transportation, installation and production;
[0021] When processing the closing net, only the stirrups and bottom bars that pass through the closing net need to be cut, and the opening area is reduced, which solves the problem of concrete leakage during component production, reduces labor costs, and greatly improves production efficiency;
[0022] For low-rise prefabricated buildings, there is no need to process traditional molds. The new molds can be recycled by simply adjusting the length of the fixed square tube according to the external dimensions of different components, which greatly improves the utilization rate and versatility of the molds, solves the problem of reduced mold turnover rate, reduces the proportion of mold costs, and is conducive to production cost control;
[0023] And due to the special structural structure of the closing net, after the concrete is poured, it will precipitate out from the inside to the outside and match the rough surface of the closing net. The roughness of the end face of the produced wall panel can reach more than 80%, thereby eliminating the production process of adding water-washed surfaces or installing patterned plates and other materials inside the mold in the later stage, greatly saving the labor cost and material cost of producing components and promoting the good development of prefabricated buildings. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a schematic diagram of the overall structure of the production mold for prefabricated beams with walls;
[0025] Figure 2 It is the structural diagram of the beam reinforcement cage;
[0026] Figure 3 It is a schematic diagram of the structure of the upper fixed frame and the lower fixed frame;
[0027] Figure 4 It is a top view of the upper closing net;
[0028] Figure 5 It is a top view of the closing net on the left side;
[0029] Figure 6 A three-dimensional diagram of a fixed weight;
[0030] Figure 7 This is a three-dimensional picture of the mesh cage. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Beam reinforcement cage 1, upper closing mesh 2, lower closing mesh 3, left closing mesh 4, right closing mesh 5, upper fixed frame 6, lower fixed frame 7, mesh cage 8, fixed weight 9, stirrups 11, bottom reinforcement 12, positioning reinforcement 13, stirrup notches 21, bottom reinforcement notches 45, magnet 67, mesh 81, three grids 82, first concave card 91, second concave card 92. DETAILED DESCRIPTION
[0033] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0034] Example
[0035] Reference Figure 1 The present embodiment provides a production mold for a prefabricated beam with wall, including a beam reinforcement cage 1, an upper closing net 2, a lower closing net 3, a left closing net 4, a right closing net 5, an upper fixed frame 6, a lower fixed frame 7, and a mesh cage 8. The beam reinforcement cage 1 is as shown in Figure 2 As shown, the beam reinforcement cage 1 has a plurality of stirrups 11, two bottom bars 12 and a positioning steel bar 13. The stirrups 11 are arranged at a certain interval. The stirrups 11 pass through the upper closing net 2 and are tied and fixed with the upper closing net 2. The upper closing net 2 is also tied and fixed with the positioning steel bars 13 of the beam reinforcement cage 11. The positioning steel bars 13 play a role in limiting the upper closing net 2. Figure 3 The upper fixed frame 6 is arranged and fixed in parallel with the lower fixed frame 7, the stirrups 11 of the beam reinforcement cage 1 are inserted between the upper fixed frame 6 and the lower fixed frame 7, and the upper closing net 2 is fixed tightly against the upper part of the upper fixed frame 6 and the lower fixed frame 7. The two ends of the bottom reinforcement 12 of the beam reinforcement cage 1 pass through the left closing net 4 and the right closing net 5 respectively, the left closing net 4 is fixed closely to the left side of the upper fixed frame 6 and the lower fixed frame 7, the right closing net 5 is fixed closely to the right side of the upper fixed frame 6 and the lower fixed frame 7, the lower closing net 3 is fixed closely to the lower part of the upper fixed frame 6 and the lower fixed frame 7, the mesh cage 8 is placed in a frame composed of the upper fixed frame 6, the lower fixed frame 7 and the upper closing net 2, the lower closing net 3, the left closing net 4, and the right closing net 5, and is fixedly connected to the beam reinforcement cage 1, the lower closing net 3, the left closing net 4, and the right closing net 5.
[0036] As a preferred implementation of this embodiment, refer to Figure 4The two long sides of the upper closing net 2 are respectively provided with stirrup notches 21, and the stirrups 11 of the beam reinforcement cage 1 are inserted into the stirrup notches 21 of the upper closing net 2. Figure 2 It can be seen that the number of stirrup notches 21 is twice that of stirrups.
[0037] As a preferred implementation of this embodiment, refer to Figure 5 The left closing net 4 and the right closing net 5 are respectively provided with two bottom reinforcement notches 45 , and the two ends of the bottom reinforcement 13 of the beam reinforcement cage 1 are respectively inserted into the bottom reinforcement notches 45 of the left closing net 4 and the right closing net 5 .
[0038] As a preferred implementation of this embodiment, refer to Figure 6 , further comprising a fixed pressure iron 9, wherein the fixed pressure iron 9 has a first concave card 91 and a second concave card 92, such as Figure 3 As shown, there are multiple fixed irons 9, and the upper fixed frame 6 and the lower fixed frame 7 are fixed by the fixed irons 9. The square tube of the upper fixed frame 6 is clamped on the first concave clamp 91, and the square tube of the lower fixed frame 7 is clamped on the second concave clamp 92.
[0039] As a preferred implementation of this embodiment, refer to Figure 3 The upper fixed frame 6 and the lower fixed frame 7 are provided with magnets 67 , and the upper closing net 2 , the lower closing net 3 , the left closing net 4 , and the right closing net 5 are adsorbed on the upper fixed frame 6 and the lower fixed frame 7 through the magnets 67 .
[0040] As a preferred implementation of this embodiment, refer to Figure 7 The mesh cage 8 is composed of two meshes 81 (including an upper mesh and a lower mesh) and three grids 82. The three grids 82 are respectively tied and fixed to the left closing net 4, the right closing net 5, and the lower closing net 3; the two meshes 81 are arranged in parallel, and the left, right and lower sides are fixed to the grids 82, and the upper side is fixed to the beam reinforcement cage 1.
[0041] The present invention also provides a method for manufacturing a production mold for a prefabricated beam with a wall, which comprises the following steps in sequence:
[0042] S1, according to the drawings, the beam reinforcement cage 1 is tied and formed, the arrangement spacing of the stirrups 11 is determined, the upper closing net 2 is processed according to the arrangement spacing of the stirrups 11, and the upper closing net 2 is tied and fixed with the stirrups 11 and the positioning steel bars 13 of the beam reinforcement cage 1;
[0043] S2, the upper square tube of the upper fixed square frame 6 is arranged parallel to and fixed to the upper square tube of the lower fixed square frame 7, the stirrups 11 of the beam reinforcement cage 1 with the upper closing net 2 tied are passed between the upper square tube of the upper fixed square frame 6 and the upper square tube of the lower fixed square frame 7, and the upper closing net 2 is fixed closely to the upper square tube of the upper fixed square frame 6 and the upper square tube of the lower fixed square frame 7;
[0044] S3, according to the position of the bottom reinforcement 12, the left closing net 4 and the right closing net 5 are processed, the two ends of the bottom reinforcement 12 of the beam reinforcement cage 1 pass through the left closing net 4 and the right closing net 5 respectively, the left square tube, the right square tube and the lower square tube of the lower fixed frame 7 are positioned and fixed, and then the left square tube, the right square tube and the lower square tube of the upper fixed frame 6 are respectively fixed to the left square tube, the right square tube and the lower square tube of the lower fixed frame 7, the left closing net 4 is fixed closely to the left square tube of the upper fixed frame 6 and the left square tube of the lower fixed frame 7, the right closing net 5 is fixed closely to the right square tube of the upper fixed frame 6 and the right square tube of the lower fixed frame 7, and the lower closing net 3 is fixed closely to the lower square tube of the upper fixed frame 6 and the lower square tube of the lower fixed frame 7;
[0045] S4. Place the mesh cage 8 in a frame consisting of an upper fixed frame 6, a lower fixed frame 7, an upper closing net 2, a lower closing net 3, a left closing net 4, and a right closing net 5, and fix it to the beam reinforcement cage 1, the lower closing net 3, the left closing net 4, and the right closing net 5.
[0046] As a preferred implementation manner of this embodiment, the method for processing the upper closing net 2 according to the arrangement spacing of the stirrups 11 in step 1 is to cut the upper closing net 2 according to the length and width of the beam, and cut stirrup notches 21 on the two long sides of the upper closing net 2 according to the arrangement spacing of the stirrups 11.
[0047] As a preferred implementation manner of this embodiment, the method for processing the left closing net 4 and the right closing net 5 according to the position of the bottom rib 12 in step 3 is to cut the left closing net 4 and the right closing net 5 according to the height of the upper fixed frame 6 and the lower fixed frame 7 and the distance between the upper fixed frame 6 and the lower fixed frame 7, and cut the bottom rib notches 45 on the two long sides of the left closing net 4 and the right closing net 5 according to the position of the bottom rib 12.
[0048] As a preferred implementation mode of this embodiment, the processing method of the mesh cage 8 in step 4 is to first position the lower mesh, and then place the three grids 82 at the positions of the left closing net 4, the right closing net 5, and the lower closing net 3, and fix the lower mesh to the three closing nets, and then place the upper mesh and the lower mesh in parallel and fix them to the three grids 82.
[0049] The manufacturing method of this embodiment is used to process Figure 1 The production mould of the precast beam with walls shown is then ready for concrete pouring.
[0050] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A production mold for prefabricated beams with walls, characterized in that: It includes a beam reinforcement cage, an upper closing net, a lower closing net, a left closing net, a right closing net, an upper fixed frame, a lower fixed frame, and a mesh cage. The stirrups of the beam reinforcement cage pass through the upper closing net and are tied and fixed with the upper closing net. The upper closing net is also tied and fixed with the positioning steel bars of the beam reinforcement cage. The upper fixed frame is arranged and fixed in parallel with the lower fixed frame. The stirrups of the beam reinforcement cage are inserted between the upper fixed frame and the lower fixed frame, and the upper closing net is fixed tightly against the upper part of the upper fixed frame and the lower fixed frame. The bottom of the beam reinforcement cage The two ends of the reinforcement pass through the left closing net and the right closing net respectively, the left closing net is fixed tightly to the left side of the upper fixed frame and the lower fixed frame, the right closing net is fixed tightly to the right side of the upper fixed frame and the lower fixed frame, the lower closing net is fixed tightly to the lower part of the upper fixed frame and the lower fixed frame, the mesh cage is placed in a frame composed of the upper fixed frame, the lower fixed frame and the upper closing net, the lower closing net, the left closing net and the right closing net, and is fixedly connected to the beam reinforcement cage, the lower closing net, the left closing net and the right closing net.
2. The production mold for prefabricated beam with wall according to claim 1, characterized in that: The two long sides of the upper closing net are respectively provided with stirrup notches, and the stirrups of the beam reinforcement cage are inserted into the stirrup notches of the upper closing net.
3. The production mold for prefabricated beam with wall according to claim 1, characterized in that: Bottom reinforcement notches are respectively opened on the left closing net and the right closing net, and the two ends of the bottom reinforcement of the beam reinforcement cage are respectively inserted into the bottom reinforcement notches of the left closing net and the right closing net.
4. The production mold for prefabricated beam with wall according to claim 1, characterized in that: It also includes a fixed pressure iron, which has a first concave card and a second concave card. The upper fixed square frame is clamped on the first concave card, and the lower fixed square frame is clamped on the second concave card.
5. The production mold for prefabricated beam with wall according to claim 1, characterized in that: The upper fixed square frame and the lower fixed square frame are provided with magnets, and the upper closing net, the lower closing net, the left closing net and the right closing net are adsorbed on the upper fixed square frame and the lower fixed frame through the magnets.
6. The production mold for prefabricated beam with wall according to claim 1, characterized in that: The mesh cage is composed of two meshes and three grids, and the three grids are respectively tied and fixed to the left closing net, the right closing net, and the lower closing net; the two meshes are arranged in parallel, and the left, right and lower sides are fixed to the grids, and the upper side is fixed to the beam reinforcement cage.
7. A method for manufacturing a production mold for a prefabricated beam with wall, characterized in that: The steps are as follows: S1. Tie and shape the beam reinforcement cage according to the drawings, determine the arrangement spacing of the stirrups, process the upper closing net according to the arrangement spacing of the stirrups, and tie and fix the upper closing net with the stirrups and positioning steel bars of the beam reinforcement cage; S2, the upper square tube of the upper fixed square frame is arranged parallel to and fixed to the upper square tube of the lower fixed square frame, the stirrups of the beam reinforcement cage tied with the upper closing net are passed between the upper square tube of the upper fixed square frame and the upper square tube of the lower fixed square frame, and the upper closing net is fixed closely to the upper square tube of the upper fixed square frame and the upper square tube of the lower fixed square frame; S3. Process the left and right closing nets according to the position of the bottom reinforcement. The two ends of the bottom reinforcement of the beam reinforcement cage pass through the left and right closing nets respectively. The left square tube, right square tube and lower square tube of the lower fixed frame are positioned and fixed. Then the left square tube, right square tube and lower square tube of the upper fixed frame are fixed to the left square tube, right square tube and lower square tube of the lower fixed frame respectively. The left closing net is fixed closely to the left square tube of the upper fixed frame and the left square tube of the lower fixed frame. The right closing net is fixed closely to the right square tube of the upper fixed frame and the right square tube of the lower fixed frame. The lower closing net is fixed closely to the lower square tube of the upper fixed frame and the lower square tube of the lower fixed frame. S4. Place the mesh cage in a frame consisting of an upper fixed frame, a lower fixed frame, and upper closing nets, lower closing nets, left closing nets, and right closing nets, and fix it to the beam reinforcement cage, lower closing nets, left closing nets, and right closing nets.
8. The method for manufacturing a production mold for a prefabricated beam with wall according to claim 7, characterized in that: The method for processing the upper closing mesh according to the arrangement spacing of the stirrups in step 1 is to cut the upper closing mesh according to the length and width of the beam, and cut stirrup notches on the two long sides of the upper closing mesh according to the arrangement spacing of the stirrups.
9. The method for manufacturing a production mold for a prefabricated beam with wall according to claim 7, characterized in that: The method for processing the left and right closing meshes according to the position of the bottom ribs in step 3 is to cut the left and right closing meshes according to the heights of the upper and lower fixed frames and the distance between the upper and lower fixed frames, and cut out bottom rib notches on the two long sides of the left and right closing meshes according to the position of the bottom ribs.
10. The method for manufacturing a production mold for a prefabricated beam with wall according to claim 7, characterized in that: The processing method of the mesh cage in step 4 is to first position the lower mesh, then place the three grids on the positions of the left closing net, the right closing net, and the lower closing net, and fix the lower mesh to the three closing nets, and then place the upper mesh and the lower mesh in parallel and fix them to the three grids.
Citation Information
Patent Citations
Novel production mold for precast beam with wall
CN215033217U