A fixed bed continuous upward suction gasification furnace power generation system for waste treatment

Through low-temperature pyrolysis incineration technology and fixed-bed continuous suction furnace power generation system, the low thermal energy utilization rate and pollution caused by high-temperature incineration are solved, efficient combustion of waste and comprehensive utilization of resources are achieved, and environmental pollution is reduced .

CN113390083BActive Publication Date: 2024-11-29HENAN HAIQI ENVIRONMENTAL PROTECTION TECH CO LTD
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202110602409.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-05-31
Publication Date
2024-11-29
Estimated Expiration
2041-05-31

AI Technical Summary

Technical Problem

Due to high temperature combustion, existing waste incinerators have low thermal energy utilization, high fly ash content in flue gas, difficult to treat harmlessly in the later stage, narrow application scope, and cannot effectively utilize and treat polluted gases in iron products and exhaust gases.

Method used

Using low-temperature pyrolysis incineration technology and fixed-bed continuous suction furnace power generation system, through low-temperature drying, pyrolysis and combustion, iron products are collected by magnetic rods, adjust the grate frame structure to discharge large pieces of residue, and use pyrolysis to produce Heat is used to generate electricity, and a flue gas treatment tower is installed to reduce environmental pollution.

Benefits of technology

The full combustion of garbage has been achieved, the thermal energy utilization rate has been improved, the flue gas purification cost has been reduced, the pollution has been reduced, and the scope of application has been expanded, avoiding resource waste and environmental pollution.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113390083B_ABST
    Figure CN113390083B_ABST
Patent Text Reader

Abstract

The invention discloses a fixed bed continuous upper suction gasification furnace power generation system for waste treatment, comprising a furnace body and a steam generation structure. By adopting a new process of low-temperature pyrolysis and incineration, garbage is dried, pyrolyzed and burned at low temperature in the furnace, thereby avoiding the above-mentioned disadvantages caused by high-temperature combustion, so that the garbage is fully burned, and non-combustible ash and the like are not smelted. Through the novel structure of the furnace, the furnace achieves a higher combustion efficiency on the basis of fully curbing the generation of harmful substances such as dioxins, polycyclic hydrocarbons, aldehydes, carbon dioxide, etc., and the iron products are collected by the arranged magnetic rods to prevent them from entering the interior of the furnace body. The adjustable grate structure is arranged to facilitate the discharge of larger pieces of residues, and the heat generated by pyrolysis can be used to generate electricity, thereby avoiding the waste of resources. Furthermore, the tail gas generated by pyrolysis can be more effectively treated to reduce the pollution caused to the environment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of gasifiers, and in particular to a fixed-bed continuous upward-intake gasifier power generation system for waste treatment. Background Art

[0002] Commonly used waste incinerators generally adopt high-temperature combustion methods, which not only improves the efficiency of the incinerator, but also decomposes harmful gases such as dioxins at high temperatures and treats them harmlessly.

[0003] However, due to high temperature combustion, the burning time of garbage in the furnace becomes shorter, resulting in the following disadvantages:

[0004] Firstly, due to high temperature combustion, heat exchange such as heat radiation and heat convection is improved, and at the same time, a considerable part of the available combustible materials and combustible gases are not used and are directly burned, thereby reducing the utilization rate of thermal energy. At the same time, in order to achieve full combustion, the air excess coefficient is large, which causes a high content of fly ash in the flue gas. A considerable part of dioxins and heavy metals are attached to the surface of fly ash, resulting in an increase in the cost of subsequent flue gas purification.

[0005] Secondly, due to high-temperature combustion, the ash, metal and other non-combustible materials in the garbage are in a molten state, and slag is produced during the cooling process. The slag is sometimes large in volume, which makes it difficult to discharge the slag. It is necessary to add a slag breaking mechanism, which increases the complexity of the furnace and increases the cost of furnace manufacturing and use. At the same time, due to high-temperature incineration and short incineration time, the slag is mixed with unburned combustible materials, which increases the difficulty of harmless treatment of the slag in the later stage.

[0006] Furthermore, since different types of garbage have different combustion characteristics and requirements, in order to maintain high-temperature combustion, there are different requirements for the furnace structure and process parameters, which narrows the scope of application of the furnace.

[0007] At the same time, since most of the waste contains iron products, it cannot be gasified. However, the feed end of the current gasifier lacks the function of collecting these iron products, and most of the current grates are fixed structures and cannot discharge large block residues, thus failing to meet people's needs.

[0008] Because a lot of heat is generated when waste is treated, most of the heat is not fully utilized, so a lot of heat energy is wasted, resulting in energy waste. Moreover, the garbage treated by pyrolysis in the furnace will also produce some polluted gases, but most of the current gasifiers lack exhaust gas treatment equipment. For this reason, we propose a fixed bed continuous upward suction gasifier power generation system for waste treatment. Summary of the invention

[0009] In order to overcome the shortcomings of the background technology, the present invention discloses a fixed-bed continuous upper suction gasification furnace power generation system for waste treatment. The present invention adopts a new process of low-temperature pyrolysis and incineration, and the garbage is dried, pyrolyzed and burned at low temperature in the furnace, thereby avoiding the above-mentioned disadvantages caused by high-temperature combustion, so that the garbage is fully burned, the heat energy is fully utilized, and the incombustible ash and the like are not smelted. At the same time, through the novel structure of the furnace, the furnace can still achieve a higher combustion efficiency on the basis of fully curbing the production of harmful substances such as dioxins, polycyclic hydrocarbons, aldehydes, carbon dioxide, etc. The magnetic rod is arranged to facilitate the collection of iron products to prevent them from entering the interior of the furnace body, and the adjustable grate structure is arranged to facilitate the discharge of larger pieces of residue, and the heat generated by pyrolysis can be used to generate electricity, thereby avoiding the waste of resources. Furthermore, the tail gas generated by pyrolysis can be more effectively treated to reduce the pollution to the environment.

[0010] In order to achieve the above-mentioned object of the invention, the present invention adopts the following technical scheme:

[0011] A fixed bed continuous upper suction gasification furnace power generation system for waste treatment, comprising a furnace body and a steam generating structure, wherein a dispersion rack is installed inside the furnace body, an exhaust port is provided at the top of the furnace body, a storage bin is installed at the bottom of the furnace body, a feed pipe is installed at the side of the furnace body, a grate rack is installed at the position of the bottom end of the furnace body corresponding to the storage bin, an air intake channel is provided inside the storage bin below the grate rack, a grate rack regulating power is installed at the bottom end of the air intake channel, a slag discharge structure is installed on the side of the bottom end of the storage bin, a feed bin is installed at the top of the feed pipe, a pushing structure is installed at the position of the feed bin corresponding to the feed pipe, and a combustion-supporting gas air intake structure and an excess secondary air power structure are installed on the side of the furnace body;

[0012] The steam generating structure is connected to a steam power generation structure, and the steam power generation structure includes a low-pressure steam turbine, a high- and medium-pressure steam turbine, and an engine. The low-pressure steam turbine, the high- and medium-pressure steam turbine, and the engine are connected via a transmission shaft. A water tank is installed at the bottom of the low-pressure steam turbine, a condenser is installed inside the water tank, and a water outlet pipe is installed on the side of the water tank. An air guide pipe is connected between the low-pressure steam turbine and the high- and medium-pressure steam turbines, and the top of the air guide pipe is connected to a low-pressure steam inlet pipe. The top of the high- and medium-pressure steam turbines is sequentially installed with a high- and medium-pressure reflux pipe, a high-pressure steam inlet pipe, and a medium-pressure steam inlet pipe;

[0013] The steam generating structure comprises a water pump 1, the water outlet pipe is connected to the water pump 1 through a condensate inlet pipe, a condensate preheating pipe is connected to the water outlet end of the water pump 1, the condensate preheating pipe is arranged above the interior of the furnace body, and the condensate preheating pipe is connected to a condensate discharge pipe;

[0014] The condensate discharge pipe is connected with a low-pressure steam drum, a water pump 2 and a water pump 3 in sequence, the low-pressure steam drum is connected with a low-pressure evaporator and a low-pressure superheater, the low-pressure evaporator and the low-pressure superheater are both arranged below the condensate preheating pipe inside the furnace body, the low-pressure superheater is connected with a low-pressure steam inlet pipe through a pipeline, the water pump 2 is connected with a medium-pressure steam drum through a pipeline, the medium-pressure steam drum is connected with a medium-pressure evaporator and a medium-pressure superheater, the medium-pressure superheater is also connected with a reflux conduit, the medium-pressure evaporator, the medium-pressure superheater and the reflux conduit are all arranged below the low-pressure superheater inside the furnace body, the reflux conduit is connected with a high- and medium-pressure reflux pipe through a pipeline, the medium-pressure superheater is connected with a medium-pressure steam inlet pipe through a pipeline, the water pump 3 is connected with a high-pressure steam drum, the high-pressure steam drum is connected with a high-pressure evaporator and a high-pressure superheater, the high-pressure evaporator and the high-pressure superheater are arranged below the dispersion rack, and the high-pressure superheater is connected with a high-pressure steam inlet pipe through a pipeline;

[0015] The top end of the exhaust port is connected to a flue gas treatment tower via a U-shaped tube, and the flue gas treatment tower is connected to a chimney via a conduit.

[0016] The dispersion rack comprises a fixed plate installed inside the furnace body, a dispersion plate is installed on the top of the fixed plate, and the dispersion plate is arranged in a mesh structure.

[0017] An inclined channel is provided inside the storage bin, a slag discharge pipe is installed at the lowest end of the inclined channel, the slag discharge structure includes a slag discharge motor arranged on the slag discharge pipe, the output shaft of the slag discharge motor passes through and extends to the inside of the slag discharge pipe and is connected to a spiral conveyor frame, and a slag discharge port is installed at the bottom end of the slag discharge pipe.

[0018] The grate frame includes a bottom ring arranged at the bottom end of the furnace body, the bottom ring is connected to the top ring through a connecting ring, the bottom ends of the top ring and the connecting ring are both equipped with connecting rods, through holes are opened on the bottom ring and the connecting ring at positions corresponding to the connecting rods, and the bottom end of the connecting rod is arranged below the through hole.

[0019] The grate rack adjusting power includes an installation cavity arranged at the bottom end of the storage bin, a grate rack power motor is installed at the bottom end of the installation cavity, an outer tube is installed at the top end of the output shaft of the grate rack power motor, the internal thread of the outer tube is connected with a screw rod, the top end of the screw rod is connected to the bottom end of the top ring through a connecting rod, an inclined hole is installed inside the air inlet channel, and a blocking platform is installed on the connecting rod corresponding to the inclined hole.

[0020] A feed port is provided at the top of the feed bin, a crushing motor is installed on the side of the feed bin, an output shaft of the crushing motor passes through and extends into the interior of the feed bin and is connected to a crushing roller group, and the other end of the crushing roller group is connected via a gear connection structure.

[0021] The pushing structure includes a triangular plate installed inside the feed bin, the triangular plate is arranged below the crushing roller group, and a push head is connected to the surface of the triangular plate corresponding to the feed pipe through an electric push rod, and the push head is arranged tangent to the inner wall of the feed pipe.

[0022] A mounting hole is provided on the side of the feed bin below the crushing roller group, a mounting column is connected to the internal thread of the mounting hole, a magnetic bar is installed on the surface of the mounting column corresponding to the feed pipe, a conical partition is installed at the bottom end of the feed bin, a drain pipe is installed on the feed bin below the conical partition, an evaporation tank is provided at the top of the storage bin, and the bottom end of the drain pipe is arranged inside the evaporation tank.

[0023] The combustion-supporting gas air inlet structure includes a fan 1, which is connected to a connecting pipe 1 through a preheating pipe 1, and the preheating pipe 1 is arranged inside the furnace body above the dispersion rack. The air outlet of the connecting pipe 1 is arranged in the air inlet channel. The excess secondary wind power structure includes a fan 2, which is connected to a dispersion pipe through a preheating pipe 2, and the preheating pipe 2 is also arranged inside the furnace body above the dispersion rack. The air outlet of the dispersion pipe is arranged in the furnace body between the grate rack and the dispersion rack.

[0024] A first drainage fan is installed inside the U-shaped tube, a second drainage fan is installed inside the chimney above the duct, and an exhaust port is installed at the top of the chimney;

[0025] A conical frame is installed inside the flue gas treatment tower above the conduit, and a collecting bin is installed outside the flue gas treatment tower outside the conical frame. A conical opening is provided at the top of the collecting bin, and a liquid storage tank is provided inside the collecting bin. The bottom end of the conical opening is connected with the liquid storage tank through a liquid inlet tank. An inner water storage tank is provided inside the conical frame, and a connecting pipe is provided between the inner water storage tank and the liquid storage tank. An outer overflow tank is provided on the inner wall of the liquid storage tank, and an inner overflow tank is provided at the top of the water storage tank. The outer overflow tank and the inner overflow tank are provided at the same height.

[0026] A funnel-shaped collecting frame is installed inside the flue gas treatment tower below the conduit, and a mounting hole is provided on the funnel-shaped collecting frame. A sewage discharge hole is provided at the bottom of the flue gas treatment tower at a position corresponding to the mounting hole. A closed pipe is connected to the internal thread of the sewage discharge hole and the mounting hole, and a filter screen is installed on the closed pipe between the sewage discharge hole and the mounting hole.

[0027] An outwardly protruding baffle is installed at the top end of the conduit close to the flue gas treatment tower, and a waterproof plate is installed at the bottom end of the conduit close to the chimney.

[0028] Due to the adoption of the above technical solution, the present invention has the following beneficial effects:

[0029] The fixed bed continuous upward suction gasification furnace power generation system for waste treatment of the present invention adopts a tower-shaped adjustable grate frame, which increases the contact area with the combustion objects in the furnace compared with the common flat grate, that is, increases the air intake area, which helps to evenly intake air to all parts of the garbage, so that the solid residues of the garbage can be burned everywhere;

[0030] The primary air intake is the preheated air blown in from the bottom of the furnace. Due to the low temperature combustion, the combustion speed is slow, especially for the solid residues in the ember combustion layer and the final combustion layer, the combustion conditions are poor. If they encounter cold air, they are likely to be extinguished and the combustion is terminated, leaving more combustibles in the ash. Therefore, hot air is blown in to create a good combustion atmosphere to ensure that the solid residues of the garbage can be completely burned. At the same time, it also makes the control of the low-temperature and slow combustion of the entire garbage simple and easy;

[0031] The large amount of flue gas generated from garbage drying, pyrolysis and combustion is quickly brought into the secondary combustion chamber by blowing in excessive secondary air, so that it can be burned in the secondary combustion chamber. This method allows the flue gas and solid residue to be burned separately, effectively controls the ambient temperature of the garbage solid residue combustion, and achieves the purpose of low-temperature combustion;

[0032] A mesh partition is set in the middle of the furnace to allow smoke to pass smoothly and prevent heat conduction such as heat radiation;

[0033] The installed detachable magnetic rod can adsorb and collect the iron products dropped from the crushing roller group, thereby effectively preventing the iron products from entering the interior of the furnace body. The conical partition allows the sewage to enter the evaporation tank along the drain pipe for treatment, thereby effectively reducing the water entering the furnace body and reducing the generation of water vapor inside the furnace body. By controlling the operation of the grate power motor, the distance between the bottom ring, top ring and connecting ring inside the grate can be adjusted, thereby facilitating the discharge of larger residues.

[0034] The heat generated by pyrolysis can be used to generate electricity, thereby avoiding the waste of resources. Furthermore, the tail gas generated by pyrolysis can be treated more effectively to reduce the pollution to the environment. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] Figure 1 It is a schematic diagram of the three-dimensional structure of the present invention;

[0036] Figure 2 It is a schematic diagram of the three-dimensional side structure of the present invention;

[0037] Figure 3 is a first cross-sectional view of the present invention;

[0038] Figure 4 is a second cross-sectional view of the present invention;

[0039] Figure 5 This is a partial enlarged view of the A1 end of the present invention;

[0040] 1. Furnace body; 2. Dispersion rack; 3. Exhaust port; 4. Storage bin; 5. Feed pipe; 6. Grate rack; 7. Air inlet channel; 8. Grate rack adjustment power; 9. Slag discharge structure; 10. Feed bin; 11. Pushing structure; 12. Combustion gas air inlet structure; 13. Excess secondary air power structure; 14. Fixed plate; 15. Dispersion plate; 16. Inclined channel; 17. Slag discharge pipe; 18. Slag discharge motor; 19. Slag discharge port; 20. Screw conveyor; 21. Bottom ring; 22. Top ring; 23. Connecting ring; 24. Connecting rod; 25. Through hole; 26. Connecting rod; 27. Screw; 28. Inclined hole; 29. Blocking table; 30. Mounting chamber; 31. Grate power motor; 32. Outer tube; 33. Feeding port; 34. Crushing motor; 35. Crushing roller group; 36. Gear connection structure; 37. Triangular plate; 38. Electric push rod; 39. Push head; 40. Mounting hole; 41. Mounting column; 42. Magnetic rod; 43. Conical screen; 44. Drain pipe; 45. Evaporation tank; 46. Fan 1; 47. Preheating tube 1; 48. Connecting tube 1; 49. Fan 2; 50. Preheating tube 2; 51. Dispersion tube; 52. Steam generation structure; 53. Steam power generation structure; 54. U-shaped tube; 55. Flue gas Treatment tower; 56, duct; 57, chimney; 58, low-pressure steam turbine; 59, high- and medium-pressure steam turbine; 60, engine; 61, transmission shaft; 62, water tank; 63, condenser; 64, water outlet pipe; 65, air guide pipe; 66, low-pressure steam inlet pipe; 67, high- and medium-pressure return pipe; 68, high-pressure steam inlet pipe; 69, medium-pressure steam inlet pipe; 70, condensate inlet pipe; 71, water pump 1; 72, condensate preheating pipe; 73, condensate discharge pipe; 74, low-pressure steam drum; 75, low-pressure evaporator; 76, low-pressure superheater; 77, water pump 2; 78, medium-pressure steam drum; 79, medium high-pressure evaporator; 80. medium-pressure superheater; 81. reflux duct; 82. water pump three; 83. high-pressure steam drum; 84. high-pressure evaporator; 85. high-pressure superheater; 86. drainage fan one; 87. conical frame; 88. collecting bin; 89. conical opening; 90. liquid inlet tank; 91. liquid storage tank; 92. inner water storage tank; 93. outer overflow tank; 94. inner overflow tank; 95. connecting pipe; 96. funnel-shaped collecting rack; 97. mounting hole; 98. drain hole; 99. closed pipe; 100. filter screen; 101. external baffle; 102. waterproof board; 103. exhaust port; 104. drainage fan two. DETAILED DESCRIPTION

[0041] The present invention can be explained in detail by the following examples, and the purpose of disclosing the present invention is to protect all technical improvements within the scope of the present invention.

[0042] Combined with Figures 1 to 5 The fixed bed continuous upper suction gasification furnace power generation system for waste treatment comprises a furnace body 1 and a steam generating structure 52. A dispersion rack 2 is installed inside the furnace body 1 to facilitate the gas diversion inside the furnace body 1. An exhaust port 3 is provided at the top of the furnace body 1. A storage bin 4 is installed at the bottom of the furnace body 1 to facilitate the storage of slag. A feed pipe 5 is installed on the side of the furnace body 1. A grate rack 6 is installed at the position of the storage bin 4 at the bottom of the furnace body 1. An air intake channel 7 is provided inside the storage bin 4 below the grate rack 6. A grate rack regulating power 8 is installed at the bottom end of the air intake channel 7. The grate The frame adjusting power 8 is used to adjust the grate frame 6, a slag discharge structure 9 is installed on the bottom side of the storage bin 4 to facilitate the discharge of residue, a feed bin 10 is installed on the top of the feed pipe 5, and a pushing structure 11 is installed at the position of the feed bin 10 corresponding to the feed pipe 5. The pushing structure 11 can not only push the material but also close the feed pipe 5. A combustion-supporting gas air inlet structure 12 and an excess secondary wind power structure 13 are installed on the side of the furnace body 1. The combustion-supporting gas air inlet structure 12 and the excess secondary wind power structure 13 are used to facilitate the transmission of wind power to the interior of the furnace body 1.

[0043] The steam generating structure 52 is connected to a steam power generation structure 53, and the steam power generation structure 53 includes a low-pressure steam turbine 58, a high- and medium-pressure steam turbine 59, and an engine 60. The low-pressure steam turbine 58 and the high- and medium-pressure steam turbine 59 are driven to rotate by steam, thereby driving the engine 60 to rotate, so as to generate electricity. The low-pressure steam turbine 58, the high- and medium-pressure steam turbine 59, and the engine 60 are connected by a transmission shaft 61. A water tank 62 is installed at the bottom end of the low-pressure steam turbine 58, and a condenser 63 is installed inside the water tank 62. The steam in the water tank 62 is cooled by the condenser 63, so that it can be used again. A water outlet pipe 64 is installed on the side of the water tank 62. An air guide pipe 65 is connected between the low-pressure steam turbine 58 and the high- and medium-pressure steam turbine 59. The top of the air guide pipe 65 is connected to a low-pressure steam inlet pipe 66, so that the steam used in the high- and medium-pressure steam turbine 59 can enter the low-pressure steam turbine 58 along the air guide pipe 65, thereby driving the low-pressure steam turbine 58 to do work. The top of the high- and medium-pressure steam turbine 59 is sequentially installed with a high- and medium-pressure return pipe 67, a high-pressure steam inlet pipe 68 and a medium-pressure steam inlet pipe 69; the high- and medium-pressure return pipe 67 facilitates the steam in the high- and medium-pressure steam turbine 59 to return to the medium-pressure superheater 80 for heating, so that it can be used again;

[0044] The steam generating structure 52 includes a water pump 71, the water outlet pipe 64 is connected to the water pump 71 through a condensate inlet pipe 70, the water outlet end of the water pump 71 is connected to a condensate preheating pipe 72, the condensate preheating pipe 72 is arranged above the interior of the furnace body 1, and the condensate preheating pipe 72 is connected to a condensate discharge pipe 73; the water in the water tank 62 can enter the steam generating structure 52 installed inside the furnace body 1 through the operation of the water pump 71, thereby generating steam;

[0045] The condensate discharge pipe 73 is connected to a low-pressure steam drum 74, a water pump 2 77 and a water pump 3 82 in sequence. The low-pressure steam drum 74 is connected to a low-pressure evaporator 75 and a low-pressure superheater 76. The low-pressure evaporator 75 and the low-pressure superheater 76 are both arranged below the condensate preheating pipe 72 inside the furnace body 1. The low-pressure superheater 76 is connected to the low-pressure steam inlet pipe 66 through a pipeline. The water pump 2 77 is connected to a medium-pressure steam drum 78 through a pipeline. The medium-pressure steam drum 78 is connected to a medium-pressure evaporator 79 and a medium-pressure superheater 80. The medium-pressure superheater 80 is also connected to a reflux conduit 81. The medium-pressure evaporator 79, the medium-pressure superheater 80 and the reflux conduit 81 are all arranged below the low-pressure superheater 76 inside the furnace body 1. The return conduit 81 is connected to the high and medium pressure return pipes 67 through a pipeline, the medium pressure superheater 80 is connected to the medium pressure steam inlet pipe 69 through a pipeline, the water pump 3 82 is connected to the high pressure steam drum 83, the high pressure steam drum 83 is connected to the high pressure evaporator 84 and the high pressure superheater 85, the high pressure evaporator 84 and the high pressure superheater 85 are arranged below the dispersion rack 2, and the high pressure superheater 85 is connected to the high pressure steam inlet pipe 68 through a pipeline; water is passed into the low pressure evaporator 75, the low pressure superheater 76, the medium pressure evaporator 79, the medium pressure superheater 80, the high pressure evaporator 84, and the high pressure superheater 85, thereby heating them simultaneously, thereby generating steam, and then passing it into the steam power generation structure 53 to perform power generation operations;

[0046] The top of the exhaust port 3 is connected to a flue gas treatment tower 55 via a U-shaped tube 54 , and the flue gas treatment tower 55 is connected to a chimney 57 via a conduit 56 .

[0047] Preferably, the dispersion rack 2 includes a fixed plate 14 installed inside the furnace body 1, a dispersion plate 15 is installed on the top of the fixed plate 14, and the dispersion plate 15 is configured as a mesh structure so that the airflow passing through the dispersion plate 15 can flow more evenly.

[0048] Preferably: an inclined channel 16 is opened inside the storage bin 4, and the residue falls into the inclined channel 16, and then reaches the inside of the slag discharge pipe 17 along the inclined channel 16. The slag discharge pipe 17 is installed at the lowest end of the inclined channel 16, and the slag discharge structure 9 includes a slag discharge motor 18 arranged on the slag discharge pipe 17. The output shaft of the slag discharge motor 18 passes through and extends to the inside of the slag discharge pipe 17 and is connected to a spiral conveyor frame 20. A slag discharge port 19 is installed at the bottom end of the slag discharge pipe 17. The spiral conveyor frame 20 is driven to rotate by the operation of the slag discharge motor 18, so that the residue can be discharged from the position of the slag discharge port 19.

[0049] Preferably: the grate frame 6 includes a bottom ring 21 arranged at the bottom end of the furnace body 1, the bottom ring 21 is connected to the top ring 22 through a connecting ring 23, the bottom ends of the top ring 22 and the connecting ring 23 are both installed with connecting rods 24, through holes 25 are opened at the positions of the bottom ring 21 and the connecting ring 23 corresponding to the connecting rod 24, and the bottom end of the connecting rod 24 is arranged below the through hole 25, so that the grate frame 6 can adjust the distance between the bottom ring 21 and the connecting ring 23 and the distance between the connecting ring 23 and the top ring 22 according to the needs of use, thereby facilitating the passage of larger residues through the gap inside the grate frame 6.

[0050] Preferably, the grate adjustment power 8 includes an installation cavity 30 arranged at the bottom end of the storage bin 4, a grate power motor 31 is installed at the bottom end of the installation cavity 30, an outer tube 32 is installed at the top end of the output shaft of the grate power motor 31, the inner thread of the outer tube 32 is connected with a screw 27, the top end of the screw 27 is connected to the bottom end of the top ring 22 through a connecting rod 26, and the grate power motor 31 drives the outer tube 32 to rotate when it works, thereby facilitating the adjustment of the height of the screw 27 inside the outer tube 32, and the position of the top ring 22 is adjusted under the drive of the connecting rod 26, an inclined hole 28 is installed inside the air inlet channel 7, and a blocking platform 29 is installed on the connecting rod 26 corresponding to the inclined hole 28, and a plurality of holes are opened inside the blocking platform 29 to facilitate the passage of airflow, which mainly prevents residues from blocking the air inlet channel 7, and when the top ring 22 is raised, the blocking platform 29 rises accordingly, thereby pushing the residues entering the air inlet channel 7 to the outside of the air inlet channel 7.

[0051] Preferably: a feed port 33 is opened at the top of the feed bin 10, and a crushing motor 34 is installed on the side of the feed bin 10. The output shaft of the crushing motor 34 passes through and extends into the interior of the feed bin 10 and is connected to a crushing roller group 35. The crushing roller group 35 is two crushing rollers that roll against each other. The materials entering the feed bin 10 are processed by these crushing rollers. The other end of the crushing roller group 35 is connected by a gear connection structure 36.

[0052] Preferably: the pushing structure 11 includes a triangular plate 37 installed inside the feed bin 10. The setting of the triangular plate 37 can effectively prevent the accumulation of materials. The triangular plate 37 is arranged below the crushing roller group 35. The surface of the triangular plate 37 corresponding to the feed pipe 5 is connected to a push head 39 through an electric push rod 38. The push head 39 is arranged tangent to the inner wall of the feed pipe 5. The electric push rod 38 performs reciprocating operation, thereby driving the push head 39 to move, thereby adding the material from the feed bin 10 to the inside of the feed pipe 5.

[0053] Preferably: a mounting hole 40 is provided on the side of the feed bin 10 below the crushing roller group 35, and a mounting column 41 is connected to the internal thread of the mounting hole 40, and a magnetic rod 42 is installed on the surface of the mounting column 41 corresponding to the feed pipe 5, and the magnetic rod 42 is convenient for collecting iron products in the waste, and a conical partition 43 is installed at the bottom end of the feed bin 10, and a drain pipe 44 is installed on the feed bin 10 below the conical partition 43, and an evaporation tank 45 is provided at the top of the storage bin 4, and the bottom end of the drain pipe 44 is arranged inside the evaporation tank 45, and the sewage passes through the conical partition 43 and then reaches the evaporation tank 45 along the drain pipe 44, thereby evaporating the sewage.

[0054] Preferably: the combustion-supporting gas air inlet structure 12 includes a fan 46, which is connected to a connecting pipe 48 through a preheating pipe 47, and the preheating pipe 47 is arranged inside the furnace body 1 above the dispersion rack 2. The air outlet of the connecting pipe 48 is arranged in the air inlet channel 7, and the heat in the flue gas is used to preheat the combustion-supporting air added by the fan 46, thereby improving the utilization rate of resources. The excess secondary wind power structure 13 includes a fan 49, which is connected to a dispersion pipe 51 through a preheating pipe 50, and the preheating pipe 50 is also arranged inside the furnace body 1 above the dispersion rack 2, and the air outlet of the dispersion pipe 51 is arranged in the furnace body 1 between the grate rack 6 and the dispersion rack 2. Through the operation of the fan 49, secondary air is supplied to the interior of the furnace body 1, thereby ensuring the combustion effect inside the furnace body 1.

[0055] Preferably: a draft fan 86 is installed inside the U-shaped tube 54, a draft fan 104 is installed inside the chimney 57 above the duct 56, and an exhaust port 103 is installed at the top of the chimney 57; the draft fan 86 and the draft fan 104 work, so that the flue gas flows along the direction of the U-shaped tube 54, the flue gas treatment tower 55, the duct 56, and the chimney 57.

[0056] A conical frame 87 is installed inside the flue gas treatment tower 55 above the conical frame 87, and a collecting bin 88 is installed outside the flue gas treatment tower 55 outside the conical frame 87. A conical opening 89 is provided at the top of the collecting bin 88, and a liquid storage tank 91 is provided inside the collecting bin 88. The bottom end of the conical opening 89 is connected with the liquid storage tank 91 through a liquid inlet tank 90. ​​An inner water storage tank 92 is provided inside the conical frame 87, and a connecting pipe 95 is provided between the inner water storage tank 92 and the liquid storage tank 91. An outer overflow tank 93 is provided on the inner wall of the liquid storage tank 91, and an inner overflow tank 94 is provided at the top of the water storage tank 92. The outer overflow tank 93 and the inner overflow tank 94 are arranged at the same height; water overflows from the outer overflow tank 93 and the inner overflow tank 94 to form a water film, thereby treating dust and other harmful substances in the flue gas;

[0057] A funnel-shaped collecting frame 96 is installed inside the flue gas treatment tower 55 below the conduit 56. A mounting hole 97 is provided on the funnel-shaped collecting frame 96. A drain hole 98 is provided at the bottom of the flue gas treatment tower 55 at a position corresponding to the mounting hole 97. A closed pipe 99 is connected to the drain hole 98 and the mounting hole 97 through internal threads. A filter screen 100 is installed on the closed pipe 99 between the drain hole 98 and the mounting hole 97. Water is filtered through the filter screen 100 so that the water can be reused. The filtered water in the flue gas treatment tower 55 enters the liquid storage tank 91 again under the action of the water pump to be utilized.

[0058] An outwardly protruding baffle 101 is installed at the top end of the conduit 56 close to the flue gas treatment tower 55, and a waterproof plate 102 is installed at the bottom end of the conduit 56 close to the chimney 57. The setting of the baffle 101 and the waterproof plate 102 can prevent water from entering the chimney 57 through the conduit 56.

[0059] Embodiment 1, a fixed bed continuous upward suction gasification furnace power generation system for waste treatment, when in use, the waste to be treated is added to the inside of the feed bin 10, and then the crushing motor 34 is operated to crush the waste, the iron products in the waste are collected by the magnetic rod 42, and then the electric push rod 38 is operated to reciprocate, thereby adding the waste to the inside of the feed pipe 5, and the material enters the inside of the furnace body 1 along the feed pipe 5. The waste entering the furnace body 1 forms a combustion layer at the bottom end of the furnace body 1, and an oxidation layer, a heat connection layer and a drying layer are formed above the combustion layer in sequence. The water vapor, volatile gas and garbage generated by the waste during drying are decomposed in the pyrolysis layer. The combustible mixed gas, collectively referred to as flue gas, enters the secondary combustion chamber together with the air in the dispersion pipe 51 for combustion, and the solid residue after pyrolysis burns slowly in the combustion layer, and the unburned combustible material forms an ember combustion layer and a bottom combustion layer below the combustion layer to burn. Because the combustion time is long, all combustible materials are eventually burned out, and H2, CO, CH4, etc. generated during combustion The combustible gas rises into the secondary combustion chamber for combustion. The burnt ash and other incombustible materials are always in a low-temperature combustion atmosphere, so they will not melt and form slag. They can be easily discharged into the ash hopper through the grate, and then the ash will be used for subsequent treatment. Since the flue gas and solid residue are burned separately, the heat energy generated by the combustion of the flue gas in the secondary combustion chamber is sent to the boiler and other heat-using equipment for utilization, which has little effect on the furnace temperature of the garbage incinerator. The combustion of solid residue adopts low-pressure, low-air volume ultra-low air combustion control technology to maintain the entire garbage pyrolysis incineration integrated furnace. The temperature operation of the process is controlled by controlling the operation of the grate power motor 31, thereby rotating the outer tube 32, thereby adjusting the height of the screw 27, thereby adjusting the gap between the bottom ring 21 and the connecting ring 23 and the gap between the top ring 22 and the connecting ring 23, thereby facilitating the discharge of larger residues, and the residues reach the position of the slag discharge pipe 17 along the inclined channel 16, and then the slag discharge motor 18 drives the spiral conveyor frame 20 to rotate, and under the action of the spiral conveyor frame 20, the residues are discharged from the position of the slag discharge port 19;

[0060] Under the action of the water pump 71, the water in the water tank 62 enters the condensate preheating pipe 72 and the condensate discharge pipe 73, and then enters the low-pressure steam drum 74, the medium-pressure steam drum 78 and the high-pressure steam drum 83 in sequence, and then passes through the low-pressure evaporator 75, the low-pressure superheater 76, the medium-pressure evaporator 79, the medium-pressure superheater 80, the high-pressure evaporator 84, and the high-pressure superheater 85, thereby generating low-pressure, medium-pressure and high-pressure steam, and then enters the steam power generation structure 53 along the pipeline, thereby driving the low-pressure steam turbine 58 and the high- and medium-pressure steam turbines 59 to rotate, thereby performing power generation operations;

[0061] The exhaust gas discharged from the exhaust port 3 flows along the U-tube 54, the flue gas treatment tower 55, the duct 56 and the chimney 57 under the action of the drainage fan 1 86 and the drainage fan 2 104. When the flue gas passes through the flue gas treatment tower 55, the interior of the liquid storage tank 91 is filled with water under the action of the external water pump, and then overflows from the outer overflow groove 93 and the inner overflow groove 94, thereby forming a water film, thereby adsorbing harmful substances in the passing flue gas, and the water is collected in the funnel-shaped collection rack 96, and then filtered by the filter net 100 and returned to the interior of the liquid storage tank 91 along the pipeline under the action of the external water pump for reuse.

[0062] The parts of the present invention that are not described in detail are prior art. Although the present invention is specifically demonstrated and introduced in conjunction with the preferred implementation scheme, there are many methods and approaches to specifically implement the technical solution. The above is only a preferred implementation scheme of the present invention, but technical personnel in the relevant field should understand that various changes can be made to the present invention in form and details without departing from the spirit and scope of the present invention as defined in the attached claims, and all of them are within the scope of protection of the present invention.

Claims

1. A fixed bed continuous upward suction gasification furnace power generation system for waste treatment, comprising a furnace body (1) and a steam generating structure (52), characterized in that: A dispersion rack (2) is installed inside the furnace body (1), an exhaust port (3) is provided at the top of the furnace body (1), a storage bin (4) is installed at the bottom of the furnace body (1), a feed pipe (5) is installed on the side of the furnace body (1), a grate rack (6) is installed at the bottom of the furnace body (1) at a position corresponding to the storage bin (4), an air intake channel (7) is provided inside the storage bin (4) below the grate rack (6), a grate rack regulating power (8) is installed at the bottom of the air intake channel (7), a slag discharge structure (9) is installed on the side of the bottom of the storage bin (4), a feed bin (10) is installed at the top of the feed pipe (5), a push structure (11) is installed inside the feed bin (10) at a position corresponding to the feed pipe (5), and a combustion-supporting gas air intake structure (12) and an excess secondary air power structure (13) are installed on the side of the furnace body (1); The steam generating structure (52) is connected to a steam power generation structure (53), the steam power generation structure (53) comprising a low-pressure steam turbine (58), a high- and medium-pressure steam turbine (59), and an engine (60), the low-pressure steam turbine (58), the high- and medium-pressure steam turbine (59), and the engine (60) being connected via a transmission shaft (61), a water tank (62) being installed at the bottom end of the low-pressure steam turbine (58), a condenser (63) being installed inside the water tank (62), a water outlet pipe (64) being installed on the side of the water tank (62), an air guide pipe (65) being connected between the low-pressure steam turbine (58) and the high- and medium-pressure steam turbine (59), the top end of the air guide pipe (65) being connected to a low-pressure steam inlet pipe (66), and the top end of the high- and medium-pressure steam turbine (59) being installed in sequence with a high- and medium-pressure return pipe (67), a high-pressure steam inlet pipe (68), and a medium-pressure steam inlet pipe (69); The steam generating structure (52) comprises a water pump (71); the water outlet pipe (64) is connected to the water pump (71) via a condensate inlet pipe (70); a condensate preheating pipe (72) is connected to the water outlet of the water pump (71); the condensate preheating pipe (72) is arranged above the interior of the furnace body (1); and the condensate preheating pipe (72) is connected to a condensate discharge pipe (73); The condensate discharge pipe (73) is connected to a low-pressure steam drum (74), a second water pump (77) and a third water pump (82) in sequence; the low-pressure steam drum (74) is connected to a low-pressure evaporator (75) and a low-pressure superheater (76); the low-pressure evaporator (75) and the low-pressure superheater (76) are both arranged below the condensate preheating pipe (72) inside the furnace body (1); the low-pressure superheater (76) is connected to the low-pressure steam inlet pipe (66) via a pipeline; the second water pump (77) is connected to a medium-pressure steam drum (78) via a pipeline; the medium-pressure steam drum (78) is connected to a medium-pressure evaporator (79) and a medium-pressure superheater (80); the medium-pressure superheater (80) is also connected to a reflux conduit. (81), the medium-pressure evaporator (79), the medium-pressure superheater (80), and the return conduit (81) are all arranged below the low-pressure superheater (76) inside the furnace body (1), the return conduit (81) is connected to the high- and medium-pressure return pipes (67) through a pipeline, the medium-pressure superheater (80) is connected to the medium-pressure steam inlet pipe (69) through a pipeline, the water pump three (82) is connected to the high-pressure steam drum (83), the high-pressure steam drum (83) is connected to the high-pressure evaporator (84) and the high-pressure superheater (85), the high-pressure evaporator (84) and the high-pressure superheater (85) are arranged below the dispersion rack (2), and the high-pressure superheater (85) is connected to the high-pressure steam inlet pipe (68) through a pipeline; The top end of the exhaust port (3) is connected to a flue gas treatment tower (55) via a U-shaped tube (54), and the flue gas treatment tower (55) is connected to a chimney (57) via a conduit (56); The grate frame (6) comprises a bottom ring (21) arranged at the bottom end of the furnace body (1); the bottom ring (21) is connected to a top ring (22) via a connecting ring (23); a connecting rod (24) is installed at the bottom ends of the top ring (22) and the connecting ring (23); through holes (25) are provided on the bottom ring (21) and the connecting ring (23) at positions corresponding to the connecting rod (24); and the bottom end of the connecting rod (24) is arranged below the through hole (25); The grate regulating power (8) comprises an installation cavity (30) arranged at the bottom end of the storage bin (4); a grate power motor (31) is installed at the bottom end of the installation cavity (30); an outer tube (32) is installed at the top end of the output shaft of the grate power motor (31); a screw rod (27) is connected to the inner thread of the outer tube (32); the top end of the screw rod (27) is connected to the bottom end of the top ring (22) via a connecting rod (26); an inclined hole (28) is installed inside the air inlet passage (7); and a blocking platform (29) is installed on the connecting rod (26) corresponding to the inclined hole (28).

2. A fixed bed continuous upward suction gasification furnace power generation system for waste treatment according to claim 1, characterized in that: The dispersion rack (2) comprises a fixed plate (14) installed inside the furnace body (1), a dispersion plate (15) is installed on the top of the fixed plate (14), and the dispersion plate (15) is configured as a mesh structure.

3. The fixed bed continuous upward-intake gasification furnace power generation system for waste treatment according to claim 1 is characterized by: An inclined channel (16) is provided inside the storage bin (4), a slag discharge pipe (17) is installed at the lowest end of the inclined channel (16), the slag discharge structure (9) comprises a slag discharge motor (18) arranged on the slag discharge pipe (17), an output shaft of the slag discharge motor (18) passes through and extends into the interior of the slag discharge pipe (17) and is connected to a spiral conveyor frame (20), and a slag discharge port (19) is installed at the bottom end of the slag discharge pipe (17).

4. The fixed bed continuous upward-intake gasification furnace power generation system for waste treatment according to claim 1 is characterized by: A feed port (33) is provided at the top of the feed bin (10), a pulverizing motor (34) is installed on the side of the feed bin (10), an output shaft of the pulverizing motor (34) passes through and extends into the interior of the feed bin (10) and is connected to a pulverizing roller group (35), and the other end of the pulverizing roller group (35) is connected via a gear connection structure (36).

5. The fixed bed continuous upward suction gasification furnace power generation system for waste treatment according to claim 1 is characterized by: The pushing structure (11) comprises a triangular plate (37) installed inside the feed bin (10), the triangular plate (37) being arranged below the crushing roller group (35), and a pushing head (39) being connected to the surface of the triangular plate (37) corresponding to the feed pipe (5) via an electric push rod (38), and the pushing head (39) being arranged tangentially to the inner wall of the feed pipe (5).

6. A fixed bed continuous upward suction gasification furnace power generation system for waste treatment according to claim 4, characterized in that: A mounting hole (40) is provided on the side of the feed bin (10) below the crushing roller group (35); a mounting column (41) is connected to the inner thread of the mounting hole (40); a magnetic rod (42) is installed on the surface of the mounting column (41) corresponding to the feed pipe (5); a conical partition (43) is installed at the bottom end of the feed bin (10); a drainage pipe (44) is installed on the feed bin (10) below the conical partition (43); an evaporation tank (45) is provided at the top end of the storage bin (4); and the bottom end of the drainage pipe (44) is arranged inside the evaporation tank (45).

7. The fixed bed continuous upward-intake gasification furnace power generation system for waste treatment according to claim 1 is characterized by: The combustion-supporting gas air inlet structure (12) comprises a fan 1 (46), the fan 1 (46) being connected to a connecting pipe 1 (48) via a preheating pipe 1 (47), the preheating pipe 1 (47) being arranged inside the furnace body (1) above the dispersion rack (2), and an air outlet of the connecting pipe 1 (48) being arranged inside the air inlet passage (7); the excess secondary air power structure (13) comprises a fan 2 (49), the fan 2 (49) being connected to a dispersion pipe (51) via a preheating pipe 2 (50), the preheating pipe 2 (50) being also arranged inside the furnace body (1) above the dispersion rack (2), and an air outlet of the dispersion pipe (51) being arranged inside the furnace body (1) between the grate rack (6) and the dispersion rack (2).

8. The fixed bed continuous upward-intake gasification furnace power generation system for waste treatment according to claim 1 is characterized by: A first drainage fan (86) is installed inside the U-shaped tube (54), a second drainage fan (104) is installed inside the chimney (57) above the duct (56), and an exhaust port (103) is installed at the top of the chimney (57); A conical frame (87) is installed inside the flue gas treatment tower (55) above the conical frame (87), and a collecting bin (88) is installed outside the flue gas treatment tower (55) outside the conical frame (87). A conical opening (89) is provided at the top of the collecting bin (88), and a liquid storage tank (91) is provided inside the collecting bin (88). The bottom end of the conical opening (89) is connected to the liquid storage tank (91) via a liquid inlet tank (90). An inner water storage tank (92) is provided inside the conical frame (87), and a connecting pipe (95) is provided between the inner water storage tank (92) and the liquid storage tank (91). An outer overflow tank (93) is provided on the inner wall of the liquid storage tank (91), and an inner overflow tank (94) is provided at the top of the water storage tank (92). The outer overflow tank (93) and the inner overflow tank (94) are arranged at the same height. A funnel-shaped collecting frame (96) is installed inside the flue gas treatment tower (55) below the duct (56), a mounting hole (97) is provided on the funnel-shaped collecting frame (96), a sewage discharge hole (98) is provided at a position corresponding to the mounting hole (97) at the bottom end of the flue gas treatment tower (55), a closed tube (99) is connected to the internal thread of the sewage discharge hole (98) and the mounting hole (97), and a filter screen (100) is installed on the closed tube (99) between the sewage discharge hole (98) and the mounting hole (97); An outwardly protruding baffle (101) is installed at the top end of the conduit (56) on the side close to the flue gas treatment tower (55), and a waterproof plate (102) is installed at the bottom end of the conduit (56) on the side close to the chimney (57).

Citation Information

Patent Citations

  • Combustion system of vertical incinerator for household refuse suitable for power generation and control method thereof

    CN101963356A

  • Multi-steam turbine combined power generation type ultra-supercritical unit

    CN104358596A

  • Composite biomass graded gasification furnace

    CN105861071A

  • Integrated fixed bed garbage efficient gasification combustion furnace

    CN110906337A

  • Rotary distribution dry deslagging household waste pyrolysis gasifier

    CN111473335A