Method and system for controlling the unloading of a material handling vehicle
By receiving the material level signal from the material processing device, the unloading target of the material carrier vehicle is determined, which solves the problems of low waiting and resource utilization efficiency of material carrier vehicles in construction sites, and improves the utilization rate of the material processing device and vehicle unloading efficiency.
Patent Information
- Application Number
- CN201980093046.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-03-04
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2039-03-04
AI Technical Summary
At a construction site, material carriers have problems of waiting and resource utilization efficiency when deciding whether to dump unprocessed materials directly into the material processing device or into a local storage area for later loading into the processing device.
By receiving the current level signal of the unprocessed material in the material processing device, determining whether the material level is below or above the threshold, it is determined whether the material carrier vehicle is directed to the material processing device or the local storage area for unloading, and avoiding material exhaustion and unnecessary material dumping.
The utilization rate of material processing equipment is improved, the material transfer task from the local storage area to the processing equipment is reduced, and the risk of vehicles waiting before the processing equipment is reduced.
Smart Images

Figure CN113490957B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a method and a system for controlling the unloading of at least a first material handling vehicle transporting a load of unprocessed material from a first location to a second location, wherein the second location comprises a first unloading target in the form of a material processing device and a second unloading target in the form of a local storage area for the unprocessed material.
[0002] The invention is particularly intended for use at construction sites where the material-carrying vehicle is a transporter or dump truck carrying rock fragments or the like and where the material processing device is a crusher. Background Art
[0003] Material carrying and loading machinery vehicles in the form of articulated haulers, wheel loaders, trucks and dump trucks are often used for loading and transporting material at construction sites etc. The load-receiving container of a hauler or dump truck can be loaded with unprocessed material (e.g. rock fragments), for example at a loading location, transport the material to another location and dump the material at a stockpile or into a material processing plant, for example into a buffer feeder of a crusher arranged to crush the rock fragments into smaller fragments.
[0004] Efficient production and utilization of equipment requires that material processing devices do not run out of unprocessed material and that vehicles do not have to wait in line to be loaded or unloaded. WO2015 / 065251 addresses this problem and proposes calculating the estimated arrival time of vehicles to a certain target destination, sending information between vehicles about the estimated arrival times of various vehicles, and adapting the speed of the vehicles to avoid waiting time or the crusher becoming empty and save energy / fuel (when reducing speed).
[0005] Although the method disclosed in WO2015 / 065251 appears useful and may solve some problems associated with the control of vehicles and equipment on a construction site, there is still a need for improvement. For example, a problem not solved in WO2015 / 065251 is that there is a local buffer storage area of unprocessed material arranged in association with a material processing device, and it is necessary to decide at a certain point in time whether the vehicle should be directed to dump its material directly into the processing device (which may result in the vehicle having to wait in a queue before dumping), or whether the vehicle should be directed to dump its material at the local storage area for later loading into the processing device (which requires additional resources, such as a local wheel loader involving moving material from the local storage area to the processing device). Summary of the invention
[0006] The object of the present invention is to provide a method and system for controlling the unloading of at least a first material carrier vehicle that transports unprocessed material from a first location to a second location, wherein the second location includes a first unloading target in the form of a material processing device and a second unloading target in the form of a local storage area for the unprocessed material, and the method / system has the potential to further improve the production efficiency and utilization rate of the equipment.
[0007] According to a first aspect of the present invention, the object is achieved by a method as described below. According to a second aspect of the present invention, the object is achieved by a system as described below. According to a further aspect of the present invention, the object is solved by a computer-related project as described below.
[0008] A first aspect of the present invention relates to a method for controlling the unloading of at least a first material handling vehicle transporting a load of unprocessed material from a first location to a second location, wherein the second location comprises a first unloading target in the form of a material processing device and a second unloading target in the form of a local storage area for the unprocessed material.
[0009] As mentioned and indicated above, the present invention is particularly intended for use at construction sites, where the material-carrying vehicles are transport vehicles or dump trucks carrying rock fragments or the like, and where the distance between the first location and the second location is much longer than the distance between the first unloading target and the second unloading target. Typically, the distance between the first location and the second location is several kilometers, while the distance between the first unloading target and the second unloading target is in the range of about 20m to 100m. Furthermore, the local storage area serves as a local buffer for the processing device, whereupon the unprocessed material (typically rock fragments) dumped at the local storage area is intended for use in the processing device.
[0010] The method comprises the following steps:
[0011] - receiving a signal indicative of a current level of unprocessed material contained in a material processing device;
[0012] - determining, based at least on the signal indicating the current level of unprocessed material contained in the material processing device, whether an estimated level of unprocessed material contained in the material processing device at an estimated arrival time of the first material carrier vehicle at the material processing device is below or above a first threshold value; and
[0013] - directing the first material carrier vehicle towards a first unloading destination for unloading at the material processing device when the estimated level of unprocessed material contained in the material processing device is below a first threshold value; or
[0014] - When the estimated material level of the unprocessed material contained in the material processing device is above a first threshold value, directing the first material transport vehicle towards a second unloading destination for unloading at the local material storage area.
[0015] Simply put, the method reduces the risk of the processing unit running out of material, it reduces the amount of material that has to be dumped at the local storage area, which in turn results in a reduction in work for, for example, local loader vehicles that have the task of transferring material from the local storage area to the processing unit, and it reduces the risk of vehicles having to wait in queues at the processing unit before being allowed to dump their material.
[0016] The level of unprocessed material contained in a material processing device refers to the amount of material that has been dumped directly or indirectly into the processing device but has not yet been processed (for example, rock fragments dumped into the buffer feeder of a crusher but have not yet been crushed).
[0017] The first threshold value of the material level can be set as an upper limit value that does not allow additional unprocessed material to be dumped into the material processing device (the feeder of the material processing device). That is, when the material level is above the first threshold value, the processing device is "full" and the vehicle arriving at the processing device must wait after arriving but before being allowed to unload its material. If the material level is above the first threshold value, or the material level will be above the first threshold value when the vehicle is expected to arrive at the processing device, the vehicle is instead directed to the local storage area to avoid waiting time at the processing machine. On the other hand, if the material level is below or will be below the first threshold value, the vehicle is directed to the processing device in order to avoid unnecessary dumping at the local storage area.
[0018] The signal related to the current level of the material may contain information obtained by a level sensor arranged on the processing device and may be sent from a transmitter arranged on the processing device in connection with the sensor and suitable for sending wireless signals. However, as described below, other possibilities for obtaining the current level of the material are also possible.
[0019] The material level signal may be received by a receiver connected to a control unit, the control unit being configured to process the signal and determine whether the material level is below or above a threshold value and based thereon decide towards which unloading target the vehicle should be directed. The receiver and the control unit may be arranged on board the first material carrier vehicle so as to form a distributed system, but a central control system may alternatively be used, in which case control signals regarding the selected unloading target may be sent to the vehicle.
[0020] In one embodiment, the method includes the steps of: receiving a signal indicating a current geographic location of a first material carrier vehicle; determining a distance between the first material carrier vehicle and the material processing device based on the current geographic location of the first material carrier vehicle and information about available routes and the geographic location of the material processing device; and determining an estimated arrival time of the first material carrier vehicle at the material processing device based on the distance between the first material carrier vehicle and the material processing device and an expected average speed of the first material carrier vehicle.
[0021] It is known per se how to determine the geographical location (eg by GPS), distance, estimated time of arrival etc. The expected average speed may be a default speed that is usually used or an average speed calculated based on previous data.
[0022] In one embodiment, the method includes the steps of: providing information indicative of an expected processing rate of a material processing device; and determining an estimated material level of unprocessed material contained in the material processing device at an estimated arrival time of a first material carrier vehicle at the material processing device based on the expected processing rate of the material processing device.
[0023] The expected processing rate may be a preset standard or average processing rate for the material crushing device, which is information that may be pre-stored in a memory accessible to the control unit. Such stored information may be considered to have been previously received (associated with the term "received"). Alternatively, the expected processing rate may be based on the measured (weighed) amount of processed material during the measurement period (e.g., by using a scale at / under the conveyor belt at the outlet of the material crushing device), or it may be obtained from the average early dumping rate at the processing device (e.g., by keeping track of the weight of each individual early dumped material, calculating the total weight dumped between two time points at which the material level of unprocessed material contained in the material processing device is the same, and dividing the total weight dumped by the time between the two time points).
[0024] In one embodiment, the estimated material level of the unprocessed material is set as the current material level of the unprocessed material, and the estimated arrival time of the first material carrier vehicle is set as the current time point, wherein the step of determining whether the estimated material level of the unprocessed material contained in the material processing device at the estimated arrival time of the first material carrier vehicle at the material processing device is lower than or higher than a first threshold value is performed by determining whether the current material level of the unprocessed material contained in the material processing device is lower than or higher than the first threshold value.
[0025] This simple form of determination step is useful, for example, when a first material-carrying vehicle is approaching a material processing device and will arrive at the processing device within a short time interval during which the level of unprocessed material will change only slightly, and when it is known or can be assumed that there are no further material-carrying vehicles ahead of the first material-carrying vehicle (where, if there were any, the further vehicles would unload at the material processing device before the first vehicle).
[0026] In one embodiment, the method includes the steps of determining whether a second material carrier vehicle that also transports material of unprocessed material to a second location is ahead of the first material carrier vehicle and has been directed toward a first unloading destination for unloading at the material processing device; and, when so, receiving a signal indicative of an amount of material to be unloaded to the material processing device by the second material carrier vehicle; and, when determining whether an estimated level of unprocessed material contained in the material processing device is below or above a first threshold at an estimated arrival time of the first material carrier vehicle at the material processing device, including the material to be unloaded to the material processing device by the second material carrier vehicle.
[0027] The amount (weight) of the material of the second vehicle can be known by keeping track of the weight of each individual material (because all materials are usually weighed and the weight information can be sent to other vehicles or a central control system); or if all materials have substantially the same weight, setting a default value for all materials.
[0028] In one embodiment, the method includes the following steps: determining an estimated arrival time of a third material carrier vehicle at the material processing device, the third material carrier vehicle also transporting material of unprocessed material to the second location or to transport material of unprocessed material to the second location, and the third material carrier vehicle is the next material carrier vehicle to arrive at the second location after the first material carrier vehicle; for a case where the material of the first material carrier vehicle is not unloaded at the material processing device, determining whether an estimated material level of the unprocessed material contained in the material processing device at the estimated arrival time of the third material carrier vehicle at the material processing device is lower than a second threshold value; and, when the third material carrier vehicle is unloaded at the material processing device, determining whether an estimated material level of the unprocessed material contained in the material processing device is lower than a second threshold value. When the estimated material level of the unprocessed materials in the material processing device at the estimated arrival time of the first material carrier vehicle arriving at the material processing device is lower than a second threshold, the first material carrier vehicle is guided toward the first unloading target to unload at the material processing device, even if the estimated material level of the unprocessed materials in the material processing device at the estimated arrival time of the first material carrier vehicle arriving at the material processing device is higher than the first threshold; or, when the estimated material level of the unprocessed materials in the material processing device is higher than the second threshold at the estimated arrival time of the third material carrier vehicle arriving at the material processing device, the first material carrier vehicle is guided toward the second unloading target to unload at the local material storage area.
[0029] The purpose of this is that even if the material level in the processing device is expected to be above the first threshold at the expected arrival time of the first vehicle, it may take a long time before the next vehicle (the third vehicle) arrives at the processing device, and in this case, it is still desirable to direct the first vehicle to the processing device to avoid or reduce the risk that the processing device will run out of material before the third vehicle arrives, even if the first vehicle may have to wait for a period of time before being allowed to dump its material. For the sake of overall production efficiency, it is usually better for a vehicle to spend some time waiting to unload than to run out of material at the processing device.
[0030] In one embodiment, the method is performed at the latest when the first material carrier vehicle has arrived at a destination decision point, wherein the destination decision point is closer to the second location than to the first location, and wherein the destination decision point is located at or near a branch point at which a path toward the second location branches off and forms separate paths for reaching the first unloading destination and the second unloading destination, so that the first material carrier vehicle must be guided at the branch point towards the material processing device or towards the local storage area.
[0031] In one embodiment, the method is performed when the first material handling vehicle has arrived at or is about to arrive at a destination decision point.
[0032] In one embodiment, the method is performed when the first material carrier vehicle has arrived at or is about to arrive at the destination decision point.
[0033] The method may be performed while the first vehicle is moving away from the destination decision point, and may be performed more or less continuously to obtain preliminary results and make preliminary decisions. When the vehicle has reached the destination decision point, a final decision is preferably made as to where to direct the vehicle and dump the material. Typically, the distance between the destination decision point and the processing device and / or the local storage area is ≤ 10% of the distance between the first location and the second location.
[0034] In one embodiment, the information indicating the current level of the unprocessed material contained in the material processing device is obtained from a level sensor arranged in the material processing device. The level sensor may be arranged in a feeder of the processing device.
[0035] This material level information can be sent by wireless means from a transmitter connected to a sensor arranged at the processing device to a receiver on the material carrier vehicle (or a central control system). As an alternative to the sensor, information related to the current material level can be obtained from calculations involving: i) the total amount (weight) of unprocessed material dumped into the processing device between the starting time point and the current time point (each vehicle can send a signal indicating the weight of the material it has unloaded or will unload at the processing device); ii) the total amount of material processed during the same time period (which can be calculated based on a given expected processing rate or can be obtained from measurements (weighing) of the amount of material processed); and iii) the reference material level of the material at the starting time point. The information required for such calculations can be sent to a receiver on the vehicle, and a control unit connected to the receiver can perform these calculations.
[0036] In an embodiment, the method comprises the step of adapting the speed of the first material carrier vehicle in order to adapt an estimated arrival time of the first material carrier vehicle at the material processing device.
[0037] If it is determined in time before the first material handling vehicle arrives at the second location whether the estimated level of material will be below the first threshold (and only a preliminary decision is made as to how to direct the vehicle), it is possible to increase or decrease the speed of the vehicle and thus adapt the estimated arrival time to be earlier or later in time than the initial estimated arrival time. Another determination can then be performed with the new faster or slower expected speed.
[0038] Vehicle speed adaptation can be used for various optimizations. One example is to reduce energy / fuel consumption as much as possible, and therefore reduce the vehicle speed so that the unprocessed material is always (or as often as possible within a reasonable range) unloaded at the material processing device, and therefore make the speed slow enough to allow the estimated material level to be below the first threshold when making the final decision on where to guide the vehicle (i.e., to the processing device or to the local storage area). Another example is to increase productivity as much as possible (tons transported per hour from the first location to the second location), and therefore increase the vehicle speed as much as possible within a reasonable range, and unload at the processing device or local storage area. The vehicle speed can also be adapted to other situations, such as unloading only at the processing device because the local storage area is full, or unloading only at the local storage area because the processing device stops for some reason.
[0039] In one embodiment, the material processing device is a crusher device configured to crush rock fragments into smaller fragments. In this case, the uncrushed rock fragments form unprocessed material. Alternatively, the material processing device can be, for example, a mixing facility or load pockets that can handle or process rock fragments or other materials. It should be noted that the term "processing device" is used in this disclosure so as to also cover mixing facilities, load pockets, etc.
[0040] In one embodiment, the first material carrying vehicle is a transport vehicle or a dump truck having a material bucket adapted to receive material in the form of rock fragments, gravel, sand, or the like.
[0041] In one embodiment, the method includes the following steps: receiving a signal indicating a current material level of unprocessed material contained in a material processing device by a receiver configured to receive a wireless signal and arranged on a first material carrier vehicle; determining whether an estimated material level of the unprocessed material contained in the material processing device is below or above a first threshold value at an estimated arrival time of the first material carrier vehicle at the material processing device by a control unit arranged on the first material carrier vehicle and connected to the receiver; and guiding the first material carrier vehicle toward a first unloading destination or a second unloading destination by the control unit according to the estimated material level of the material.
[0042] The step of directing the vehicle towards the first or second unloading destination may be indicating on a display to the driver of the vehicle which unloading destination to go to, or may be actually controlling the vehicle and steering the vehicle to the selected unloading destination for an autonomous material handling vehicle.
[0043] Alternatively, the method may involve a central control system configured to receive a signal related to the current level of material and determine towards which unloading target the vehicle should be directed. The control signal may then be sent to the vehicle, for example in the form of a display indication to the driver or a steering signal to the autonomous vehicle.
[0044] Preferably, each material handling vehicle involved in the method is provided with both a receiver and a transmitter, not only for receiving information about the level of unprocessed material in the processing plant, but also for receiving and sending information about the geographical location of the vehicle itself and other vehicles, material weight, speed, etc. Such receivers and transmitters are preferably connected to an on-board control unit, which is able to determine not only the arrival times of the various vehicles and control where to unload, but also to control speed, navigation, unloading, etc. (via driver input for conventional vehicles and directly for autonomous vehicles).
[0045] In one embodiment, the first threshold value of the material level of the unprocessed material contained in the material processing device is an upper limit value that does not allow additional unprocessed material to be dumped into the material processing device.
[0046] In one embodiment, the second threshold value of the material level of the unprocessed material contained in the material processing device is a lower limit value indicating that the material processing device has run out of or is about to run out of unprocessed material.
[0047] The system of the present invention relates to a system for controlling the unloading of at least a first material carrier vehicle that transports a load of unprocessed material from a first location to a second location, wherein the second location includes a first unloading target in the form of a material processing device and a second unloading target in the form of a local storage area for the unprocessed material.
[0048] The system is configured to:
[0049] - receiving a signal indicative of a current level of unprocessed material contained in a material processing device;
[0050] - determining, based at least on the signal indicating the current level of unprocessed material contained in the material processing device, whether an estimated level of unprocessed material contained in the material processing device at an estimated arrival time of the first material carrier vehicle at the material processing device is below or above a first threshold value; and
[0051] - directing the first material carrier vehicle towards a first unloading destination for unloading at the material processing device when the estimated level of unprocessed material contained in the material processing device is below a first threshold value; or
[0052] - When the estimated material level of the unprocessed material contained in the material processing device is above a first threshold value, directing the first material transport vehicle towards a second unloading destination for unloading at the local material storage area.
[0053] In one embodiment, the first material carrier vehicle is provided with a receiver configured to receive a wireless signal indicating a current material level of unprocessed material contained in the material processing device, and wherein the first material carrier vehicle is provided with a control unit connected to the receiver, the control unit being configured to: determine whether an estimated material level of the unprocessed material contained in the material processing device is below or above a first threshold at an estimated arrival time of the first material carrier vehicle at the material processing device; and guide the first material carrier vehicle towards a first unloading destination or a second unloading destination according to the estimated material level of the material.
[0054] In an embodiment, the first material handling vehicle is provided with a transmitter configured to send information at least about its geographical location to other material handling vehicles and / or the central control system.
[0055] In one embodiment, the first material carrying vehicle is a transport vehicle or a dump truck having a material bucket adapted to receive material in the form of rock fragments, gravel, sand, or the like.
[0056] The computer-related projects involve:
[0057] A computer program product comprises program code components for executing the steps of the above method when the program is run on a computer.
[0058] A computer readable medium carries a computer program, wherein the computer program includes program code components for executing the steps of the above method when the program product is run on a computer.
[0059] A control unit is provided for controlling the operation of a material handling vehicle, the control unit being configured to perform the steps of the above method.
[0060] Further advantages and advantageous features of the invention are disclosed in the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0061] With reference to the accompanying drawings, below follows a more detailed description of embodiments of the invention cited as examples.
[0062] In these figures:
[0063] Figure 1 An example of a material handling vehicle in the form of an articulated hauler is shown.
[0064] Figure 2 A schematic diagram of an embodiment of a system according to the invention is shown.
[0065] Figure 3 A flow chart of a method according to the invention is shown.
[0066] Figure 4 A flow chart showing a variant of the method according to the invention is shown. DETAILED DESCRIPTION
[0067] Figure 1 An example of a material handling vehicle 1, 2, 3 in the form of an articulated hauler is shown, provided with a receiver and transmitter 11, a control unit 12 and a material hopper 4 adapted to receive material in the form of rock fragments, gravel, sand, etc. The receiver / transmitter 11 is configured to receive various wireless signals, for example signals indicative of: a material processing device 7 (see Figure 2), the current position and speed of other material transporting vehicles, the weight of materials transported by other vehicles, etc. The receiver / transmitter 11 is further configured to send information about the geographical location, speed, weight of materials, etc. associated with the vehicle on which the receiver / transmitter is arranged to other material transporting vehicles.
[0068] The material handling vehicles 1, 2, 3 are further provided with a control unit 12 connected to the receiver / transmitter 11, wherein the control unit 12 is arranged to control the reception and transmission of signals to and from the receiver / transmitter 11. The control unit 12 is further configured to perform various calculations and comparisons in order to estimate the arrival times of the various vehicles at the material processing device and to determine whether the estimated level of unprocessed material contained in the material processing device 7 is below or above a certain threshold at a certain point in time. The control unit 12 is further configured to control the operation of the material handling vehicles 1, 2, 3, including guiding the material handling vehicles 1, 2, 3 towards the first unloading destination or the second unloading destination according to various inputs, wherein the guidance may be of an indirect type for conventional vehicles (e.g. an indication on a display to inform the driver) or may be a direct steering command for an autonomous vehicle.
[0069] The control unit 12 may include a microprocessor, a microcontroller, a programmable digital signal processor, or another programmable device. The control unit may also include or alternatively include an application specific integrated circuit, a programmable gate array or programmable array logic, a programmable logic device, or a digital signal processor. In the case where the control unit includes a programmable device (such as the above-mentioned microprocessor, microcontroller, or programmable digital signal processor), the processor may also include computer executable code that controls the operation of the programmable device.
[0070] Figure 2 A schematic diagram of an embodiment of a system 20 for controlling the unloading of at least a first material carrier vehicle 1 transporting material of unprocessed material 9 from a first location 5 to a second location 6, wherein the second location 6 comprises a first unloading target in the form of a material processing device 7 and a second unloading target in the form of a local material storage area 8 for the unprocessed material. The local material storage area 8 serves as a local buffer for the material processing device 7. A loader vehicle or other equipment (not shown) may be arranged to transport the unprocessed material from the storage area 8 to the processing device 7.
[0071] As mentioned above, Figure 2 It is schematic and in practice the distance between the first location 5 and the second location 6 is typically a few kilometers, and the distance between the processing device 7 and the local storage area 8 may be about 20m to 100m.
[0072] Figure 2Also shown is a destination decision point 10, which is closer to the second location 6 than to the first location 5. Figure 2 As shown, the destination decision point 10 is located at a branch point, at which the path toward the second location 6 branches off and forms separate paths for reaching the first unloading destination and the second unloading destination, so that the first material carrier vehicle 1 must be guided at the branch point toward the material processing device 7 or toward the local material storage area 8. When the material carrier vehicles 1, 2, 3 reach the location of the decision point 10 at the latest, it should be decided whether to guide the vehicles toward the processing device 7 or toward the local material storage area 8. The decision point 10 can be located, for example, 100m to 200m away from the processing device 7 and the local material storage area 8 (or, for example, can be close to the local material storage area 8 and about a few hundred meters away from the processing device 7).
[0073] The first position 5 forms the loading position and for the purpose of illustrating this point, Figure 2 A loading vehicle in the form of an excavator 51 and a loading area 52 are shown.
[0074] In addition to the first material carrier vehicle 1, Figure 2 A second material carrier vehicle 2 and a third material carrier vehicle 3 are also shown, wherein each vehicle 1, 2, 3 carries material of unprocessed material 9 and moves from a loading position 5 towards said unloading target in a second (unloading) position 6. Each of these first, second and third material carrier vehicles 1, 2, 3 corresponds to Figure 1 The vehicles illustrated in the example, that is, in this example, all the material transport vehicles 1, 2, 3 are identical. It should be noted that the first vehicle 1 is shown here as Figure 2 The middle vehicle among the three vehicles.
[0075] The second vehicle 2 has passed the destination decision point 10 and has been directed towards the material processing device 7, while the first vehicle 1 and the third vehicle 3 are on their way towards the second location 6 and the decision point 10. Again, it should be noted that Figure 2 For illustration only, the relative sizes of the vehicles 1, 2, 3, 51 have been exaggerated. In practice, the loading and unloading locations 5 and 6 are typically much larger than the vehicles 1, 2, 3, 51, and the distances between the material handling vehicles 1, 2, 3 may be greater than 1. Figure 2 The impression is much greater. In addition, Figure 2 The second vehicle 2 is shown on its way to the first unloading destination for unloading at the processing device 7, but the final distance that the vehicle would normally move backwards before unloading is not shown.
[0076] A level sensor 71 is arranged in the material processing device 7. The level sensor 71 measures the level of unprocessed material in a feeder (not shown) of the processing device 7. The level sensor 71 is connected to a transmitter (denoted by the same reference numeral 71 as the sensor) which is capable of transmitting a signal including information about the current level of the material in the feeder of the processing device 7, and this signal can be received by the receiver 11 of each of the vehicles 1, 2, 3. Therefore, information indicating the current level of the unprocessed material contained in the material processing device 7 can be obtained from the level sensor 71 arranged in the material processing device 7.
[0077] Figure 3 The general form of a method for controlling a system 20 is shown, the method comprising the following steps:
[0078] S1 - receiving a signal indicating the current level of unprocessed material contained in the material processing device 7;
[0079] S2-determining, at least based on the signal indicating the current level of the unprocessed material contained in the material processing device 7, whether the estimated level of the unprocessed material contained in the material processing device 7 at the estimated arrival time of the first material carrier vehicle 1 at the material processing device 7 is below or above a first threshold value; and,
[0080] S3 - when the estimated material level of the unprocessed material contained in the material processing device 7 is below a first threshold, directing the first material carrier vehicle 1 towards a first unloading target for unloading at the material processing device 7; or
[0081] S4 - when the estimated material level of the unprocessed material contained in the material processing device 7 is higher than the first threshold value, guiding the first material carrier vehicle 1 towards the second unloading target to unload at the local material storage area 8 .
[0082] In this case, a first threshold value of the material level of the unprocessed material contained in the material processing device 7 is set as an upper limit value that does not allow additional unprocessed material to be dumped into the material processing device 7. If the material level is above the upper limit value, it is necessary to wait until the material level drops to the upper limit value or below before being allowed to dump more material into the processing device 7, so that in order to avoid the waiting time when the material level is above the first threshold value, it is usually decided to guide the first vehicle toward the local storage area 8 and dump the material in the local storage area 8.
[0083] The method is performed when the first material carrier vehicle 1 has arrived or is about to arrive at the destination decision point 10. The method is also performed before the first material carrier vehicle 1 has arrived or is about to arrive at the destination decision point 10 in order to obtain preliminary results and make preliminary decisions.
[0084] The method may include the following steps which may be considered to be included in a variation of step S2:
[0085] S21 - receiving a signal indicating the current geographical location of the first material carrier vehicle 1;
[0086] S22 - determining the distance between the first material carrier vehicle 1 and the material processing device 7 based on the current geographical location of the first material carrier vehicle 1 and the information about the available routes and the geographical location of the material processing device 7; and
[0087] S23 - determining an estimated arrival time of the first material carrier vehicle 1 at the material processing device 7 based on the distance between the first material carrier vehicle 1 and the material processing device 7 and the expected average speed of the first material carrier vehicle 1 .
[0088] Steps S21 to S23 may be performed, for example, by providing the first vehicle 1 with a GPS system; storing data about available routes (in this case there may be only one single route), the geographical location of the material processing device 7 and the expected average speed (which may be a preset default speed) in a memory accessible to the control unit 12; and configuring the control unit 12 to calculate said estimated arrival time. All this is known per se.
[0089] The method may further comprise the following steps which may be considered to be included in another variant of step S2:
[0090] S24 - providing information indicative of the expected processing rate of the material processing device 7, and
[0091] S25 —determine an estimated level of unprocessed material contained in the material processing installation 7 at the estimated arrival time of the first material carrier vehicle 1 at the material processing installation 7 based on the expected processing rate of the material processing installation 7 .
[0092] The expected processing rate may be a preset standard or average processing rate of the material crushing device 7 (eg given in tonnes / hour), and may be pre-stored in a memory accessible to the control unit 12 .
[0093] In particular, when the first material carrier vehicle 1 is close to the destination decision point 10, when the decision point 10 is relatively close to the processing device 7 and when there are no other material carrier vehicles in front of the first material carrier vehicle 1 (however, in Figure 2In the case where the additional material carrier vehicle is in the form of a second vehicle 2), the estimated material level of the unprocessed material can be set to the current material level of the unprocessed material, and the estimated arrival time of the first material carrier vehicle 1 can be set to the current time point without losing much accuracy. Then, steps S21 to S25 can be omitted, and step S2 can be simplified, because determining whether the estimated material level of the unprocessed material contained in the material processing device 7 at the estimated arrival time of the first material carrier vehicle 1 to the material processing device 7 is below or above the first threshold value can be performed by determining whether the current material level of the unprocessed material contained in the material processing device 7 is below or above the first threshold value.
[0094] In order to take into account another material carrier vehicle ahead of the first material carrier vehicle 1, the method may comprise the following steps which may be considered to be included in a further variant of step S2:
[0095] S26-Determine whether a second material carrier vehicle 2 that also transports material of unprocessed material to a second location 6 is ahead of the first material carrier vehicle 1 and has been directed toward the first unloading destination for unloading at the material processing device 7 ( Figure 2 This has been shown to be the case); and, when this is the case,
[0096] S27—receiving a signal indicative of the amount of material to be unloaded by the second material carrier vehicle 2 to the material processing device 7; and
[0097] S28—When determining whether the estimated material level of unprocessed material contained in the material processing device 7 is below or above a first threshold at the estimated arrival time of the first material carrier vehicle 1 at the material processing device 7, the material to be unloaded to the material processing device 7 by the second material carrier vehicle 2 is included.
[0098] As described above, the second vehicle 2 may send information about its location and the weight of its material to the first vehicle 1. By including the material to be dumped by the second vehicle 2 in step S28, it is possible to direct the first vehicle 1 towards the local storage area 8 rather than towards the processing device 7 even if the current level of the material is below the first threshold (for example, if it is calculated that the material to be dumped by the second vehicle 2 will raise the material level above the first threshold).
[0099] Figure 3 It is also shown that some or all of steps S21 to S28 may be included in step S2.
[0100] In order to take into account a further material carrier vehicle following the first material carrier vehicle 1, the method may comprise the following steps, which are preferably performed if it is determined in step S2 that the material level is above a first threshold value, but which need not be performed if the material level is below this threshold value (since in this case the first material carrier vehicle 1 is directed to the processing device 7 anyway):
[0101] S51-determining the estimated arrival time of the third material carrier vehicle 3 at the material processing device 7, which third material carrier vehicle 3 also transports material of unprocessed material to the second location 6 or is to transport material of unprocessed material to the second location 6 and is the next material carrier vehicle to arrive at the second location 6 after the first material carrier vehicle 1;
[0102] S52 - for the case where the material of the first material carrier vehicle 1 is not unloaded at the material processing device 7, determining whether the estimated material level of the unprocessed material contained in the material processing device 7 at the estimated arrival time of the third material carrier vehicle 3 at the material processing device 7 is below a second threshold; and
[0103] S53-when the estimated material level of the unprocessed material contained in the material processing device 7 is lower than the second threshold value at the estimated arrival time of the third material carrier vehicle 3 at the material processing device 7, directing the first material carrier vehicle 1 toward the first unloading destination to unload at the material processing device 7, even if the estimated material level of the unprocessed material contained in the material processing device 7 is higher than the first threshold value at the estimated arrival time of the first material carrier vehicle 1 at the material processing device 7; or
[0104] S54 - when the estimated material level of the unprocessed material contained in the material processing device 7 is higher than the second threshold at the estimated arrival time of the third material carrier vehicle 3 at the material processing device 7 , the first material carrier vehicle 1 is guided towards the second unloading target to unload at the local material storage area 8 .
[0105] Figure 4 A variant of the method comprising steps S51 to S54 is shown.
[0106] In this case, the second threshold value of the material level of the unprocessed material contained in the material processing device 7 is set to a lower limit value indicating that the material processing device has run out of or is about to run out of unprocessed material.
[0107] If there is a relatively long distance (longer than the distance shown in the figure) between the first vehicle 1 and the third vehicle 3 Figure 2), or at least if a relatively long period of time will pass before the third vehicle 3 arrives, then according to step S53, the first vehicle 1 can be directed towards the processing device 7 even if the current level or estimated level of unprocessed material contained in the material processing device 7 is above the first threshold value at the estimated arrival time of the first material carrier vehicle 1 at the material processing device 7. In this way, the first vehicle 1 may need to wait for some time before unloading at the processing device 7, but this is usually better than taking the risk that the processing device 7 runs out of material before the third vehicle 3 arrives.
[0108] It should be understood that the present invention is not limited to the embodiments described above and shown in the drawings; rather, those skilled in the art will recognize that many modifications and variations are possible within the scope of the present invention.
Claims
1. A method for controlling the unloading of at least a first material carrier vehicle transporting a load of unprocessed material from a first location to a second location, in, The second location includes a first unloading target in the form of a material processing device and a second unloading target in the form of a local storage area for unprocessed material, Features The method comprises the following steps: - receiving a signal indicative of a current level of unprocessed material contained in said material processing device; - determining, based at least on the signal indicative of the current level of unprocessed material contained in the material processing device, whether an estimated level of unprocessed material contained in the material processing device at an estimated arrival time of the first material handling vehicle at the material processing device is below or above a first threshold value; and - directing the first material handling vehicle towards the first unloading destination for unloading at the material processing device when the estimated level of unprocessed material contained in the material processing device is below the first threshold value; or - when the estimated material level of unprocessed material contained in the material processing device is above the first threshold, directing the first material transport vehicle towards the second unloading target for unloading at the local material storage area, Wherein, the method comprises the following steps: - determining an estimated arrival time of a third material carrier vehicle at the material processing installation, the third material carrier vehicle also transporting material of unprocessed material to the second location or to be transporting material of unprocessed material to the second location and the third material carrier vehicle being the next material carrier vehicle to arrive at the second location after the first material carrier vehicle; - in the case where the material of the first material carrier vehicle is not unloaded at the material processing device, determining whether the estimated material level of the unprocessed material contained in the material processing device at the estimated arrival time of the third material carrier vehicle at the material processing device is below a second threshold; and - when the estimated level of unprocessed material contained in the material processing device at the estimated arrival time of the third material carrier vehicle at the material processing device is lower than the second threshold, directing the first material carrier vehicle toward the first unloading destination to unload at the material processing device, even if the estimated level of unprocessed material contained in the material processing device at the estimated arrival time of the first material carrier vehicle at the material processing device is higher than the first threshold; or - when the estimated material level of unprocessed material contained in the material processing device is above the second threshold at the estimated arrival time of the third material carrier vehicle at the material processing device, guiding the first material carrier vehicle towards the second unloading target to unload at the local material storage area.
2. The method according to claim 1, in, The method comprises the following steps: - receiving a signal indicative of the current geographical location of the first material handling vehicle; - determining a distance between the first material handling vehicle and the material processing device based on the current geographical location of the first material handling vehicle and information about available routes and the geographical location of the material processing device; and - determining the estimated arrival time of the first material carrying vehicle at the material processing installation based on the distance between the first material carrying vehicle and the material processing installation and an expected average speed of the first material carrying vehicle.
3. The method according to claim 1 or 2, in, The method comprises the following steps: - providing information indicative of an expected processing rate of said material processing device, and - determining the estimated level of unprocessed material contained in the material processing installation at the estimated arrival time of the first material carrier vehicle at the material processing installation based on the expected processing rate of the material processing installation.
4. The method according to claim 1, in, The estimated material level of unprocessed material is set as the current material level of unprocessed material, and wherein the estimated arrival time of the first material carrier vehicle is set as the current time point, wherein the step of determining whether the estimated material level of unprocessed material contained in the material processing device at the estimated arrival time of the first material carrier vehicle at the material processing device is below or above the first threshold value is performed by: - determining whether the current level of unprocessed material contained in the material processing device is below or above the first threshold value.
5. The method according to any one of claims 1 to 2 and 4, in, The method comprises the following steps: - determining whether a second material handling vehicle also transporting material of unprocessed material to the second location is ahead of the first material handling vehicle and has been directed toward the first unloading destination for unloading at the material processing device; and, when so, - receiving a signal indicative of an amount of material to be unloaded by the second material handling vehicle to the material processing plant; and - when determining whether the estimated level of unprocessed material contained in the material processing device at the estimated arrival time of the first material carrier vehicle at the material processing device is below or above the first threshold, including the material to be unloaded to the material processing device by the second material carrier vehicle.
6. The method according to any one of claims 1 to 2 and 4, in, The method is performed at the latest when the first material transport vehicle has reached a destination decision point, wherein the destination decision point is closer to the second location than to the first location, and wherein the destination decision point is located at or near a branch point at which a path toward the second location branches off and forms separate paths for reaching the first unloading destination and the second unloading destination, so that the first material transport vehicle must be guided toward the material processing device or toward the local storage area at the branch point.
7. The method according to claim 6, in, The method is executed when the first material transport vehicle has arrived at or is about to arrive at the destination decision point.
8. The method according to claim 6, in, The method is performed before the first material handling vehicle has arrived at or is about to arrive at the destination decision point.
9. The method according to any one of claims 1 to 2 and 4, in, The information indicative of the current level of unprocessed material contained in the material processing device is obtained from a level sensor arranged in the material processing device.
10. The method according to any one of claims 1 to 2 and 4, in, The method comprises the following steps: - adapting the speed of the first material carrying vehicle in order to adapt the estimated arrival time of the first material carrying vehicle at the material processing installation.
11. The method according to any one of claims 1 to 2 and 4, in, The material processing device is a crusher device configured to crush rock fragments into smaller fragments.
12. The method according to any one of claims 1 to 2 and 4, in, The first material carrying vehicle is a transport vehicle or a dump truck provided with a material bucket, and the material bucket is suitable for receiving materials in the form of rock fragments, gravel, and sand.
13. The method according to any one of claims 1 to 2 and 4, in, The method comprises the following steps: - receiving, by means of a receiver configured to receive wireless signals and arranged on said first material handling vehicle, a signal indicative of said current level of unprocessed material contained in said material processing device; - determining, by means of a control unit arranged on board the first material carrier vehicle and connected to the receiver, whether the estimated level of unprocessed material contained in the material processing installation at the estimated arrival time of the first material carrier vehicle at the material processing installation is below or above the first threshold value; and - directing the first material carrying vehicle towards the first unloading destination or the second unloading destination by the control unit according to the estimated material level of the material.
14. The method according to any one of claims 1 to 2 and 4, in, The first threshold value of the material level of the unprocessed material contained in the material processing device is an upper limit value that does not allow additional unprocessed material to be dumped into the material processing device.
15. The method according to any one of claims 1 to 2 and 4, in, The second threshold value of the material level of the unprocessed material contained in the material processing device is a lower limit value indicating that the material processing device has run out of unprocessed material or is about to run out of unprocessed material.
16. A system for controlling the unloading of at least a first material carrier vehicle transporting a load of unprocessed material from a first location to a second location, in, The second location includes a first unloading target in the form of a material processing device and a second unloading target in the form of a local storage area for unprocessed material, Features The system is configured to: - receiving a signal indicative of a current level of unprocessed material contained in said material processing device; - determining, based at least on the signal indicative of the current level of unprocessed material contained in the material processing device, whether an estimated level of unprocessed material contained in the material processing device at an estimated arrival time of the first material handling vehicle at the material processing device is below or above a first threshold value; and - directing the first material handling vehicle towards the first unloading destination for unloading at the material processing device when the estimated level of unprocessed material contained in the material processing device is below the first threshold value; or - when the estimated material level of unprocessed material contained in the material processing device is above the first threshold, directing the first material transport vehicle towards the second unloading target for unloading at the local material storage area, Wherein, the system is configured as follows: - determining an estimated arrival time of a third material carrier vehicle at the material processing installation, the third material carrier vehicle also transporting material of unprocessed material to the second location or to be transporting material of unprocessed material to the second location and the third material carrier vehicle being the next material carrier vehicle to arrive at the second location after the first material carrier vehicle; - in the case where the material of the first material carrier vehicle is not unloaded at the material processing device, determining whether the estimated material level of the unprocessed material contained in the material processing device at the estimated arrival time of the third material carrier vehicle at the material processing device is below a second threshold; and - when the estimated level of unprocessed material contained in the material processing device at the estimated arrival time of the third material carrier vehicle at the material processing device is lower than the second threshold, directing the first material carrier vehicle toward the first unloading destination to unload at the material processing device, even if the estimated level of unprocessed material contained in the material processing device at the estimated arrival time of the first material carrier vehicle at the material processing device is higher than the first threshold; or - when the estimated material level of unprocessed material contained in the material processing device is above the second threshold at the estimated arrival time of the third material carrier vehicle at the material processing device, guiding the first material carrier vehicle towards the second unloading target to unload at the local material storage area.
17. The system according to claim 16, in, The first material handling vehicle is provided with a receiver, the receiver being configured to receive a wireless signal indicating the current material level of the unprocessed material contained in the material processing device, and wherein the first material handling vehicle is provided with a control unit connected to the receiver, the control unit being configured to: determine whether the estimated material level of the unprocessed material contained in the material processing device is lower or higher than the first threshold value at the estimated arrival time of the first material handling vehicle at the material processing device; and guide the first material handling vehicle toward the first unloading target or the second unloading target according to the estimated material level of the material.
18. The system according to claim 16 or 17, in, The first material handling vehicle is provided with a transmitter configured to send information at least about the geographical location of the first material handling vehicle to other material handling vehicles and / or a central control system.
19. The system according to claim 16 or 17, in, The first material carrying vehicle is a transport vehicle or a dump truck provided with a material bucket, and the material bucket is suitable for receiving materials in the form of rock fragments, gravel, and sand.
20. A computer readable medium carrying a computer program comprising program code means for performing the steps of the method of any one of claims 1 to 15 when the computer program is run on a computer.
21. A control unit for controlling the operation of a material handling vehicle, the control unit being configured to perform the steps of the method according to any one of claims 1 to 15.
Citation Information
Patent Citations
System for calculating desired estimated time of arrival
WO2015065251A1
A method for operating a transport vehicle, a transport vehicle, a method for controllling operation of a work site and a work site system
CN102066885A
Method and device for dispatching transport vehicles in mixing plant
CN104573944A
System for calculating desired estimated time of arrival
CN105900031A
Vehicle dispatching method and vehicle dispatching server
CN109191826A