Auxiliary device and construction method for rapid positioning of curtain wall

By designing auxiliary devices for curtain walls, the problems of difficulty in laying and positioning and safety hazards in curtain wall construction are solved, and rapid and accurate line laying and positioning and installation efficiency are achieved, which is suitable for reuse of multiple projects.

CN113550608BActive Publication Date: 2024-11-12CHINA MCC5 GROUP CORP LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202110751796.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-07-02
Publication Date
2024-11-12
Estimated Expiration
2041-07-02

AI Technical Summary

Technical Problem

In the existing curtain wall construction technology, multiple surveyors are required to cooperate with the line positioning, and high-altitude operations are limited, and the line position is not systematic, resulting in an impact on the installation quality and an increase in safety risks.

Method used

Design an auxiliary device including main beam and cross beam. The main beam and cross beam are arranged crosswise. The main beam is fixed on the structural floor slab and is equipped with steel wire holes to facilitate fixing the steel wire. By installing this device, on-site operators can quickly and accurately Find the line laying positioning points to improve construction efficiency, and enhance structural stability through support beams and telescopic beams.

Benefits of technology

It realizes the rapid and efficient finding of line laying points in irregular and special-shaped curtain wall construction, improves installation efficiency and work efficiency, reduces safety hazards, and the device composition is simple, can be mass-produced and welded on site, and is suitable for multiple projects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113550608B_ABST
    Figure CN113550608B_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of curtain wall construction, and aims to solve the problems in the prior art that curtain wall construction (especially special-shaped curtain walls) requires a large number of surveyors to cooperate with line laying and positioning, line laying and positioning cannot be performed quickly, and the height of the floor is limited; the steel wires for line laying guidance are not systematic, and it is difficult to position the line laying points. An auxiliary device for rapid curtain wall positioning and a construction method are provided, wherein the auxiliary device for rapid curtain wall positioning comprises a main beam and a cross beam, the main beam and the cross beam are arranged in a cross shape, one end of the main beam is fixed to a structural floor slab, the other end of the main beam extends out of the structural floor slab, and a wire hole is provided at one end of the main beam extending out of the structural floor slab; the beneficial effects of the invention are: the steel wire is positioned according to the installation position of each main beam, so that the curtain wall components can be installed accurately and quickly, and the construction efficiency is improved; the structure is simple, and can be mass-produced in a factory, and can also be welded on site, and can also be disassembled after installation and recycled in the next project.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of curtain wall construction, and in particular to an auxiliary device and a construction method for rapid positioning of a curtain wall. Background Art

[0002] Today's construction industry is booming. The curtain wall shapes in urban high-rise and super-high-rise buildings are even more innovative, with more and more complex styles and increasing construction difficulty. In construction projects, the positioning of curtain wall frame points is the key to ensuring construction quality.

[0003] In the traditional construction process, the methods used are:

[0004] 1. When the floor is low, the on-site management personnel can use the total station to lay out and locate point by point based on the detailed drawing to assist the on-site workers in the installation.

[0005] Disadvantages: Professional surveyors are required to track the entire process. If multiple surfaces are being constructed at the same time, multiple surveyors are required to cooperate with the installation, and the workload of laying out the lines is large. As the number of floors increases, the positioning error of the laying out of the higher floors will increase due to environmental factors, which will directly affect the installation quality.

[0006] 2. Based on the floor axis grid positioning diagram, the management personnel use angle irons to fix the steel wires that run through the entire building outside the outer edge of the structure. On-site workers use the steel wires to locate and install the curtain wall frame components.

[0007] Disadvantages: The laying point is not systematic enough and positioning is difficult. When the operator is operating in the hanging basket, the operating space is limited and the wire may exceed the operating space, which brings safety hazards to the operator. Summary of the invention

[0008] The present invention aims to provide an auxiliary device and a construction method for rapid positioning of curtain walls, so as to solve the problems in the prior art that curtain wall construction requires a large number of surveyors to cooperate with line laying and positioning, line laying and positioning cannot be performed quickly, and is limited by the height of the floors; the steel wires for line laying guidance are not systematic, and the positioning of line laying points is difficult. In high-altitude operations, limited operating space is the biggest obstacle affecting the operators. If the line laying and positioning are not completed, the safety hazards of on-site construction operations will increase.

[0009] The embodiment of the present invention is achieved as follows:

[0010] An auxiliary device for rapid positioning of a curtain wall comprises a main beam and a cross beam, wherein the main beam and the cross beam are arranged in a cross shape, one end of the main beam is fixed to a structural floor slab, and the other end of the main beam extends out of the structural floor slab, and a wire hole is provided at one end of the main beam extending out of the structural floor slab.

[0011] Since the main beam is fixed on the structural floor, one end of the main beam is provided with a wire hole for fixing the wire, so the wire can be positioned according to the installation position of each main beam, thereby facilitating the accurate and rapid installation of curtain wall components. In particular, when used in the construction of irregular and special-shaped curtain walls, the positioning point for laying out the lines can be found quickly and efficiently, thereby improving the construction efficiency.

[0012] By installing the auxiliary device for rapid positioning of curtain walls described in the present invention, on-site workers can quickly find the coordinate points of the line setting while safely constructing, thereby improving installation efficiency and work efficiency. In addition, the auxiliary device for rapid positioning of curtain walls described in the present invention has relatively simple components, can be mass-produced in factories, can also be welded on-site, can also be disassembled after installation, and can be recycled in the next project.

[0013] In one embodiment:

[0014] The main beam is provided with a fixing hole, in which a bolt is installed, and the bolt is implanted in the structural floor slab, so as to fix the main beam on the structural floor slab.

[0015] In one embodiment:

[0016] A steel wire clamp is arranged in the steel wire hole, and the steel wire clamp is used for fixing the steel wire.

[0017] In one embodiment:

[0018] A supporting beam is provided below the main beam, and a triangular structure is formed between the supporting beam, the main beam and the structural floor.

[0019] The support beam is used to support the main beam, share its force, and avoid damage to the part of the main beam that cantilevers out of the structural floor.

[0020] In one embodiment:

[0021] A right triangle structure is formed between the support beam, the main beam and the structural floor, and the support beam is the hypotenuse of the right triangle.

[0022] The triangular structure is stable, and the supporting beams provide good support to the main beams.

[0023] In one embodiment:

[0024] The structural floor is provided with embedded parts, and the support beam is fixedly connected to the embedded parts.

[0025] The connection strength between the support beam and the embedded parts is large, and the overall structure formed has high stability.

[0026] In one embodiment:

[0027] The support beam is a channel steel, and the support beam is welded to the embedded part.

[0028] In one embodiment:

[0029] A steel plate is also provided between the support beam and the main beam, and the steel plate is arranged parallel to the embedded parts.

[0030] The main beam is further supported and the support beam is reinforced to increase the connection strength between the support beam and the main beam.

[0031] In one embodiment:

[0032] The main beam is connected with a telescopic beam, the telescopic beam is provided with a plurality of adjustment holes, and the main beam is provided with mounting holes corresponding to the adjustment holes; the telescopic beam extends out of the main beam, and the wire hole is provided at the end of the telescopic beam.

[0033] By installing bolts in the adjustment hole and the mounting hole, the main beam can be connected to the telescopic beam, and by changing the adjustment hole and aligning different adjustment holes with the mounting hole, the telescopic beam can be changed to lengthen the main beam. When the main beam is connected to the telescopic beam, the wire hole is set at the end of the telescopic beam.

[0034] In one embodiment:

[0035] The main beam and the telescopic beam are both groove-shaped structures. The width of the telescopic beam is smaller than that of the main beam. The telescopic beam can slide inside the main beam. By aligning different adjustment holes on the telescopic beam with the mounting holes of the main beam and passing bolts through the adjustment holes and the mounting holes, the telescopic beam can be adjusted to lengthen the length of the main beam to adapt to different working conditions.

[0036] In one embodiment:

[0037] The main beam and the telescopic beam are both channel steels.

[0038] The materials are easy to obtain and the cost is low, and the two can be used in conjunction with each other to form a structure that can slide against each other, so as to facilitate changing the length of the telescopic beam extending from the main beam.

[0039] In one embodiment:

[0040] A fixing piece is installed on the main beam, and the cross beam is connected to the fixing piece.

[0041] The installation position of the fixing member on the main beam is selected according to the needs, so as to adjust the position of the cross beam and change the distance between the cross beam and the structural floor.

[0042] In one embodiment:

[0043] The main beams and the cross beams are multiple groups, all the main beams are fixedly connected to the structural floor, and two adjacent cross beams are fixedly connected.

[0044] In the same layer, a plurality of the main beams are fixed on the structural floor, and the adjacent cross beams are connected in sequence to establish transverse connections, so that all the main beams and cross beams in the same layer are connected into a whole, which increases the stability of the structure on the one hand and facilitates precise positioning on the other.

[0045] According to construction needs, the above structure can be installed on multiple floors. Installing the entire structure allows on-site workers to quickly find the coordinate points for laying out lines while safely constructing, thereby improving installation efficiency and work efficiency.

[0046] In one embodiment:

[0047] Connecting pieces are provided at both ends of the crossbeam to facilitate connecting the crossbeams on both sides.

[0048] A construction method for rapid positioning of a curtain wall comprises the following steps:

[0049] S1: Determine the positioning points of the curtain wall loop according to the construction drawings;

[0050] S2: Determine the number of floors where the auxiliary device for rapid positioning of the curtain wall is installed at intervals according to the floor height and the number of floors;

[0051] S3: determining the installation position of the auxiliary device for rapid curtain wall positioning according to the layout positioning points in S1 on the floor using a layout positioning device, and installing a complete set of the auxiliary device for rapid curtain wall positioning;

[0052] S4: fix the steel wire in the steel wire hole;

[0053] S5: Install curtain wall components according to the coordinate data information of each steel wire.

[0054] The construction method for rapid positioning of curtain walls of the present invention can accurately locate the X and Y coordinate data information of the plane of the steel wire by installing the auxiliary device for rapid positioning of curtain walls in place and then fixing the steel wire in the steel wire hole, and then provide a reference position for installing the spatial coordinate points of the curtain wall components, so that on-site workers can quickly find the coordinate points for laying out the lines while safely constructing, thereby improving installation efficiency and work efficiency; the construction steps are simple and easy to operate, which can improve efficiency and shorten construction period.

[0055] In one embodiment:

[0056] In S1: determining the curtain wall loop layout positioning points includes determining the X and Y coordinates of the steel wire plane.

[0057] In one embodiment:

[0058] In S2: the auxiliary device for rapid positioning of the curtain wall is installed every 4-6 floors.

[0059] In one embodiment:

[0060] In S5, during the installation of curtain wall components, the workers' installation coordinate points are reviewed by measuring equipment.

[0061] It is convenient for management personnel to check and ensure the accuracy and precision of curtain wall component installation.

[0062] In one embodiment:

[0063] The line-setting and positioning equipment may be a total station.

[0064] In one embodiment:

[0065] When determining the construction plan and drawing the positioning points for laying out the lines, the positioning points are set at 100 mm from the outer edge of the curtain wall. This can facilitate the operation of workers and avoid conflicts between the auxiliary device or steel wire used for rapid positioning of the curtain wall and the hanging basket during upper and lower construction.

[0066] In one embodiment:

[0067] In S3: after the auxiliary device for rapid positioning of the curtain wall is installed, the corresponding auxiliary device for rapid positioning of the curtain wall is numbered, and the number is marked on the auxiliary device for rapid positioning of the curtain wall, so that the operating personnel can understand the coordinate data corresponding to each auxiliary device for rapid positioning of the curtain wall.

[0068] In summary, due to the adoption of the above technical solution, the beneficial effects of the auxiliary device for rapid positioning of curtain walls according to the present invention are:

[0069] 1. Since the main beam is fixed on the structural floor, one end of the main beam is provided with a wire hole for installing the wire. Therefore, the wire can be positioned according to the installation position of each main beam, so that the curtain wall components can be installed accurately and quickly. Especially in the construction process of irregular and special-shaped curtain walls, it can quickly and efficiently find the positioning point for laying out the line, thereby improving the construction efficiency.

[0070] 2. By installing the auxiliary device for rapid positioning of curtain walls described in the present invention, on-site workers can quickly find the coordinate points of the line while safely constructing, thereby improving installation efficiency and work efficiency. In addition, the auxiliary device for rapid positioning of curtain walls described in the present invention has relatively simple components, can be mass-produced in factories, can also be welded on-site, can be disassembled after installation, and can be recycled in the next project.

[0071] 3. Support beams are provided to support the main beam, share its force, increase the stability of the structure, and avoid damage to the part of the main beam that cantilevers out of the structural floor.

[0072] 4. A telescopic beam is provided, and the length of the main beam can be extended by adjusting the telescopic beam to adapt to different working conditions.

[0073] The beneficial effects of the construction method for rapid positioning of curtain walls described in the present invention are:

[0074] By installing the auxiliary device for rapid positioning of the curtain wall in place and then fixing the steel wire in the steel wire hole, the X and Y coordinate data information of the steel wire plane can be accurately located, and then a reference position is provided for installing the spatial coordinate points of the curtain wall components, so that on-site workers can quickly find the layout coordinate points while safely constructing, thereby improving installation efficiency and work efficiency; the construction steps are simple and easy to operate, which can improve efficiency and shorten construction period. BRIEF DESCRIPTION OF THE DRAWINGS

[0075] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings mentioned in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0076] Figure 1 This is a plan view of the auxiliary device for rapid positioning of curtain walls according to the present invention.

[0077] Figure 2 This is a front view of the auxiliary device for rapid positioning of curtain walls according to the present invention.

[0078] Figure 3 The figure is a side view of the auxiliary device for rapid positioning of curtain walls according to the present invention.

[0079] Figure 4 It is a front view of the wire clamp described in the present invention.

[0080] Figure 5 for Figure 4 Bottom view of .

[0081] Icons: 1-main beam; 11-wire hole; 2-cross beam; 21-connecting part; 3-telescopic beam; 31-adjustment hole; 4-embedded parts; 5-fixing parts; 6-wire clamp; 7-steel wire; 8-support beam; 9-steel plate. DETAILED DESCRIPTION

[0082] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0083] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0084] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0085] Example

[0086] See also Figure 1-Figure 5 This embodiment proposes an auxiliary device for rapid positioning of curtain walls, including a main beam 1 and a cross beam 2. The main beam 1 and the cross beam 2 are perpendicular to each other and arranged in a cross pattern. One end of the main beam 1 is fixed to the structural floor. Specifically, a fixing hole is provided on the main beam 1, and an M14 bolt is installed in the fixing hole. The M14 bolt is implanted in the structural floor. The other end of the main beam 1 extends out of the structural floor to form a cantilever structure. A fixing member 5 is installed on the main beam 1, and the cross beam 2 is connected to the fixing member 5. The cross beam 2 is located above the main beam 1.

[0087] A support beam 8 is provided below the main beam 1, one end of the support beam 8 is fixed to the main beam 1, and the other end is fixed to the structural floor. The support beam 8 forms a right-angled triangle structure with the main beam 1 and the side of the structural floor. The support beam 8 serves as the hypotenuse of the right-angled triangle, and the main beam 1 and the side of the structural floor serve as the two right-angled sides of the right-angled triangle.

[0088] The structural floor is provided with embedded parts 4, and the support beam 8 is fixedly connected to the embedded parts 4. The support beam 8 is a channel steel, and the embedded parts 4 can be embedded steel plates, and the support beam 8 is welded to the embedded parts 4.

[0089] A steel plate 9 is further provided between the support beam 8 and the main beam 1, and the steel plate 9 is arranged parallel to the embedded part 4 to further support the main beam 1, reinforce the support beam 8, and increase the connection strength between the support beam 8 and the main beam 1. In this embodiment, the thickness of the steel plate 9 is 5 mm.

[0090] The main beam 1 is connected to a telescopic beam 3 , a plurality of adjustment holes 31 are provided on the telescopic beam 3 , and mounting holes corresponding to the adjustment holes 31 are provided on the main beam 1 .

[0091] The main beam 1 and the telescopic beam 3 are both groove-shaped structures. The width of the telescopic beam 3 is smaller than that of the main beam 1. The telescopic beam 3 can slide in the main beam 1. By aligning the different adjustment holes 31 on the telescopic beam 3 with the mounting holes of the main beam 1, and then passing the M12 bolts through the adjustment holes 31 and the mounting holes, the telescopic beam 3 can be adjusted to lengthen the length of the main beam 1 to adapt to different working conditions.

[0092] In this embodiment, the main beam 1 and the telescopic beam 3 are channel steels.

[0093] The end of the telescopic beam 3 is provided with a wire hole 11, and a wire clamp 6 is provided in the wire hole 11. The wire clamp 6 is used to fix the wire 7. Figure 5 The wire clamp 6 includes two clamp units of the same size, which are used in combination. When the two clamp units are buckled together, there is a channel in the middle for the steel wire 7 to pass through. The two clamp units are buckled together to facilitate the fixing of the steel wire 7 and the operation is relatively convenient.

[0094] The main beams 1 and the cross beams 2 are multiple groups, all of the main beams 1 are fixedly connected to the structural floor, and two adjacent cross beams 2 are fixedly connected. Connectors 21 are provided at both ends of the cross beams 2 to facilitate connecting the cross beams 2 on both sides. Specifically, the connector 21 includes a connecting plate and bolts. Holes are opened on the ends of the cross beams 2 and the connecting plates, and M8 bolts are installed to fix the connecting plates on the cross beams 2, thereby connecting the two cross beams 2.

[0095] In the same layer, multiple main beams 1 are fixed on the structural floor, and adjacent cross beams 2 are connected in sequence to establish transverse connections, so that all main beams 1 and cross beams 2 in the same layer are connected into a whole, which increases the stability of the structure on the one hand and facilitates precise positioning on the other.

[0096] According to construction needs, the above structure can be installed on multiple floors. Installing the entire structure allows on-site workers to quickly find the coordinate points for laying out lines while safely constructing, thereby improving installation efficiency and work efficiency.

[0097] The dimensions of the main beam 1 , the cross beam 2 and the telescopic beam 3 are all customized according to actual conditions on site.

[0098] A construction method for rapid positioning of a curtain wall comprises the following steps:

[0099] S1: According to the construction drawings, determine the curtain wall loop line positioning points (X and Y coordinates of the steel wire plane);

[0100] S2: According to the floor height and number of floors, determine every few floors (it is recommended to be every 4-6 floors) to install the auxiliary device for rapid positioning of the curtain wall;

[0101] S3: Determine the installation position of the auxiliary device for rapid curtain wall positioning according to the layout positioning points in S1 on the floor using a total station or other layout positioning equipment, and install the entire set of the auxiliary device for rapid curtain wall positioning;

[0102] S4: Fix the steel wire 7 in the steel wire hole 11;

[0103] S5: Install the curtain wall components according to the coordinate data information of each steel wire 7. During the installation of the curtain wall components, the workers' installation coordinate points are checked by measuring equipment.

[0104] By installing the auxiliary device for rapid positioning of the curtain wall in place and then fixing the steel wire 7 in the steel wire hole 11, the X and Y coordinate data information of the steel wire 7 plane can be accurately located, and then a reference position is provided for the installation of the spatial coordinate point of the curtain wall component, so that on-site workers can quickly find the coordinate point of the line laying while safely constructing, thereby improving the installation efficiency and work efficiency; the construction steps are simple and easy to operate, which can improve efficiency and shorten the construction period.

[0105] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. An auxiliary device for rapid positioning of curtain walls, Features: It comprises a main beam (1) and a cross beam (2), wherein the main beam (1) and the cross beam (2) are arranged in a cross shape, one end of the main beam (1) is fixed to the structural floor slab, the other end of the main beam (1) is arranged to extend out of the structural floor slab, and the end of the main beam (1) extending out of the structural floor slab is provided with a wire hole (11); A steel wire clamp (6) is provided in the steel wire hole (11), and the steel wire clamp (6) is used to fix the steel wire (7); A support beam (8) is provided below the main beam (1), and a triangular structure is formed between the support beam (8), the main beam (1) and the structural floor slab; The structural floor is provided with embedded parts (4), and the support beam (8) is fixedly connected to the embedded parts (4); A steel plate (9) is further provided between the support beam (8) and the main beam (1), and the steel plate (9) is arranged parallel to the embedded part (4); The main beam (1) is connected to a telescopic beam (3), the telescopic beam (3) is provided with a plurality of adjustment holes (31), and the main beam (1) is provided with mounting holes corresponding to the adjustment holes (31); the telescopic beam (3) is arranged to extend out of the main beam (1), and the steel wire hole (11) is arranged at an end of the telescopic beam (3); A fixing member (5) is installed on the main beam (1), and the cross beam (2) is connected to the fixing member (5); The main beams (1) and the cross beams (2) are provided in multiple groups, all the main beams (1) are fixedly connected to the structural floor slab, and two adjacent cross beams (2) are fixedly connected to each other.

2. A construction method for rapid positioning of curtain walls, Features: The following steps are involved: S1: Determine the positioning points of the curtain wall loop according to the construction drawings; S2: Determine the number of floors where the auxiliary device for rapid positioning of curtain walls according to claim 1 is installed at intervals according to the floor height and the number of floors; S3: determining the installation position of the auxiliary device for rapid curtain wall positioning according to the layout positioning points in S1 on the floor using a layout positioning device, and installing a complete set of the auxiliary device for rapid curtain wall positioning; S4: fixing the steel wire (7) in the steel wire hole (11); S5: Install curtain wall components according to the coordinate data information of each steel wire (7).

3. The construction method for rapid positioning of curtain walls according to claim 2, Features: In S5, during the installation of curtain wall components, the workers' installation coordinate points are reviewed by measuring equipment.

Citation Information

Patent Citations

  • Rapid construction technology of glass curtain wall

    CN111287369A

  • Construction method of large-span double-sided arc-shaped aluminum plate curtain wall

    CN112431420A

  • Auxiliary device for quickly positioning curtain wall

    CN216109803U

  • Suspending jig of outer wall member

    JP1996144530A

  • Method and implement for constructing wall panel

    JP2006307525A