Storage, petrochemical enterprise accident risk management method, system and device

By determining the risk value of accident consequences in petrochemical enterprises and implementing additional safety measures, the problems of unstable risk assessment and insufficient effectiveness of safety measures in the existing technology have been solved, and effective reduction of safety risks and elimination of hidden dangers have been achieved.

CN113554254BActive Publication Date: 2024-11-12CHINA PETROLEUM & CHEMICAL CORP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010329108.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-04-23
Publication Date
2024-11-12
Estimated Expiration
2040-04-23

AI Technical Summary

Technical Problem

In the safety risk classification and control methods of existing petrochemical enterprises, experience assessment leads to unstable risk assessment and insufficient effectiveness of safety measures, which poses safety risks.

Method used

By determining the risk value of the accident consequences, a risk value is generated based on the consequence level value and probability probability, and when the risk value exceeds the preset range, additional safety measures, including safety prevention and mitigation measures, are determined and implemented to generate critical actions and tasks.

Benefits of technology

Accurate risk assessment and optimization of safety measures have been achieved, the safety risks of petrochemical enterprises have been reduced, and the problems of lack of safety measures or insufficient effectiveness have been avoided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113554254B_ABST
    Figure CN113554254B_ABST
Patent Text Reader

Abstract

The present invention discloses a method, system and device for managing and controlling accident risks of storage devices and petrochemical enterprises, wherein the method comprises: respectively determining the risk value of each accident consequence of a risk event; the risk value is generated according to the consequence level value of the accident consequence and the probability of the possibility of the occurrence of the accident consequence; when the risk value of a certain accident consequence exceeds a preset interval, determining additional safety measures for adjusting the probability of the possibility and / or the consequence level value of the accident consequence, and calculating the risk reduction coefficient of the additional safety measures; generating corresponding key actions and tasks according to the additional safety measures. Through the present invention, the lack of safety measures or insufficient effectiveness can be avoided to reduce or eliminate the accident risks caused thereby.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of safety risk management, and in particular to a method, system and device for managing and controlling accident risks in storage devices and petrochemical enterprises. Background Art

[0002] The petrochemical industry involves a large amount of flammable, explosive, toxic or highly corrosive dangerous chemicals in its production, storage and transportation processes. Therefore, there are many safety risks in the petrochemical production, storage and transportation processes.

[0003] For the petrochemical industry, problems with the equipment itself, the management system, or personal negligence may lead to safety accidents. Since the petrochemical field is flammable, explosive, toxic and harmful, its danger and accident rate are relatively high, and the consequences are serious, which may not only cause huge damage to the environment and property, but also cause casualties.

[0004] At present, the general approach is to reduce the probability of risk events (also known as top events) through safety risk classification management and control, so as to achieve the goal of safe production.

[0005] After research, the inventor found that the prior art has at least the following defects:

[0006] In the process of implementing safety risk classification and control in the existing technology, a large number of empirical assessment methods are used to qualitatively describe the degree of risk. The results will be affected by the on-site subjective factors of the evaluators, which will lead to: on the one hand, it is impossible to obtain stable and accurate risk assessment results; on the other hand, the effectiveness of safety measures for hazardous sources and risk consequences cannot be accurately obtained. Therefore, there is a problem of missing safety measures or insufficient effectiveness, which in turn causes safety hazards in petrochemical enterprises.

[0007] The information disclosed in this background technology section is only intended to enhance the understanding of the overall background of the invention and should not be regarded as an acknowledgment or any form of suggestion that the information constitutes the prior art already known to a person skilled in the art. Summary of the invention

[0008] The purpose of the present invention is to avoid the lack of safety measures or insufficient effectiveness of petrochemical enterprises, so as to eliminate the potential safety hazards caused thereby.

[0009] The present invention provides a method for controlling accident risks in a petrochemical enterprise, comprising the steps of:

[0010] S11, respectively determining the risk value of each accident consequence of the risk event; the risk value is generated according to the consequence level value of the accident consequence and the probability of the possibility of the accident consequence occurring;

[0011] S12. When the risk value of a certain accident consequence exceeds a preset interval, determining additional safety measures for adjusting the probability of possibility and / or consequence level of the accident consequence;

[0012] S13. Generate corresponding key actions and tasks according to the additional security measures.

[0013] In the present invention, the risk value of each accident consequence of the risk event is determined separately, including:

[0014] S101. Determine in advance, based on the basic elements of the risk event, the hazard elements contained in each risk source that can induce the risk event;

[0015] S102, presetting measures effectiveness level evaluation rules, including: respectively setting effectiveness level values ​​of various safety precaution measures corresponding to each hazard factor, and respectively setting effectiveness level values ​​of various safety mitigation measures corresponding to each accident consequence;

[0016] S103, obtaining the current safety mitigation measures for the accident consequences, and the corresponding responsible departments and responsible persons, and obtaining the current safety prevention measures, corresponding responsible departments and responsible persons corresponding to the hazard factors associated with the accident consequences;

[0017] S104, determining the effectiveness level values ​​of the current safety mitigation measures and the current safety prevention measures for the accident consequences respectively according to a preset measure effectiveness level evaluation rule;

[0018] S105, determining a consequence level value of the accident consequence according to the effectiveness level value of the current safety mitigation measure, and determining a possibility probability of the accident consequence according to the effectiveness level value of the current safety precaution measure;

[0019] S106: Generate a risk value of the accident consequence according to the consequence level value and possibility probability of the accident consequence.

[0020] In the present invention, the preset measure effectiveness level evaluation rules include:

[0021] The effectiveness level value of each safety measure is set respectively, and the effectiveness correspondence relationship between each safety measure and its effectiveness level value is established and stored respectively;

[0022] According to the effectiveness correspondence, the effectiveness level value of the safety precaution measures of each hazardous factor associated with the accident consequence is determined.

[0023] In the present invention, the preset measure effectiveness level evaluation rules also include:

[0024] According to the effectiveness correspondence, the effectiveness level value of the safety mitigation measures associated with the accident consequences is determined.

[0025] In the present invention, the risk value is generated according to the consequence level value of the accident consequence and the probability of the possibility of causing the accident consequence to occur, including:

[0026] When evaluating the risk value of a certain accident consequence, the consequence level value and possibility probability of the accident consequence are substituted into a preset risk matrix table respectively, and the risk value of the accident consequence is determined according to the values ​​of the consequence level value and the possibility probability at the intersection of the rows and columns of the risk matrix table; the rows and columns of the risk matrix table are used to represent the consequence level value and the possibility probability respectively.

[0027] In the present invention, when the risk value of a certain accident consequence exceeds a preset interval, determining additional safety measures for adjusting the possibility probability and / or consequence level value of the accident consequence includes:

[0028] When the risk value of a certain accident consequence exceeds the upper limit of a preset interval, safety measures that can reduce the possibility probability and / or reduce the consequence level value are determined from a preset safety measures database as additional safety measures; the safety measures database includes multiple safety measures, and a corresponding relationship between the effectiveness of each safety measure and its effectiveness level value, and the safety measures include safety precautions and safety mitigation measures.

[0029] In the present invention, the key actions and tasks include:

[0030] The actions and / or tasks required to implement and / or realize the additional security measures, and the methods for implementing the actions and / or the tasks.

[0031] In another aspect of the present invention, a petrochemical enterprise accident risk management and control device is also provided, comprising:

[0032] A risk determination unit, used to respectively determine the risk value of each accident consequence of the risk event; the risk value is generated according to the consequence level value of the accident consequence and the probability of the possibility of causing the accident consequence to occur;

[0033] An additional measure unit, used to determine additional safety measures for adjusting the probability of possibility and / or consequence level value of a certain accident consequence when the risk value of the accident consequence exceeds a preset interval;

[0034] An action generation unit is used to generate corresponding key actions and tasks according to the additional security measures.

[0035] In the present invention, the risk determination unit includes:

[0036] The element determination module is used to determine the hazard elements contained in each hazard source that can induce a risk event in advance based on the basic elements of the risk event;

[0037] The effectiveness setting module is used to preset the effectiveness level evaluation rules of the measures, including: respectively setting the effectiveness level values ​​of various safety precaution measures corresponding to each hazard factor, and respectively setting the effectiveness level values ​​of various safety mitigation measures corresponding to each accident consequence;

[0038] A measures acquisition module is used to acquire the current safety mitigation measures for the accident consequences, and the corresponding responsible departments and persons, and to acquire the current safety prevention measures, corresponding responsible departments and persons corresponding to the hazard factors associated with the accident consequences;

[0039] An effectiveness evaluation module, used to determine the effectiveness level values ​​of the current safety mitigation measures and the current safety prevention measures of the accident consequences respectively according to a preset measure effectiveness level evaluation rule;

[0040] A consequence assessment module, configured to determine a consequence level value of the accident consequence according to the effectiveness level value of the current safety mitigation measure, and to determine a possibility probability of the accident consequence according to the effectiveness level value of the current safety precaution measure;

[0041] The risk value generating module is used to generate the risk value of the accident consequence according to the consequence level value and possibility probability of the accident consequence.

[0042] In the present invention, the preset measure effectiveness level evaluation rules include:

[0043] The effectiveness level value of each safety measure is set respectively, and the effectiveness correspondence relationship between each safety measure and its effectiveness level value is established and stored respectively;

[0044] According to the effectiveness correspondence, the effectiveness level value of the safety precaution measures of each hazardous factor associated with the accident consequence is determined.

[0045] In the present invention, the preset measure effectiveness level evaluation rules also include:

[0046] According to the effectiveness correspondence, the effectiveness level value of the safety mitigation measures associated with the accident consequences is determined.

[0047] In the present invention, the risk value is generated according to the consequence level value of the accident consequence and the probability of the possibility of causing the accident consequence to occur, including:

[0048] When evaluating the risk value of a certain accident consequence, the consequence level value and possibility probability of the accident consequence are substituted into a preset risk matrix table respectively, and the risk value of the accident consequence is determined according to the values ​​of the consequence level value and the possibility probability at the intersection of the rows and columns of the risk matrix table; the rows and columns of the risk matrix table are used to represent the consequence level value and the possibility probability respectively.

[0049] In the present invention, when the risk value of a certain accident consequence exceeds a preset interval, determining additional safety measures for adjusting the possibility probability and / or consequence level value of the accident consequence includes:

[0050] When the risk value of a certain accident consequence exceeds the upper limit of a preset interval, safety measures that can reduce the possibility probability and / or reduce the consequence level value are determined from a preset safety measures database as additional safety measures; the safety measures database includes multiple safety measures, and a corresponding relationship between the effectiveness of each safety measure and its effectiveness level value, and the safety measures include safety precautions and safety mitigation measures.

[0051] In the present invention, the key actions and tasks include:

[0052] The actions and / or tasks required to implement and / or realize the additional security measures, and the methods for implementing the actions and / or the tasks.

[0053] In another aspect of the present invention, a memory is provided, comprising a software program, wherein the software program is suitable for a processor to execute the steps of the above-mentioned petrochemical enterprise accident risk management method.

[0054] On the other hand, an embodiment of the present invention further provides a petrochemical enterprise accident risk management and control device, which includes a computer program stored in a memory, and the computer program includes program instructions. When the program instructions are executed by a computer, the computer executes the methods described in the above aspects and achieves the same technical effects.

[0055] Compared with the prior art, the present invention has the following beneficial effects:

[0056] The present invention first determines the risk value of each accident consequence of the risk event under the current safety measures (including safety precautions and safety mitigation measures); wherein the risk value in the present invention is generated according to the consequence level value of the accident consequence and the possibility probability of causing the accident consequence to occur; when the risk value of a certain accident consequence exceeds the preset interval, it means that the current safety measures are not sufficient to ensure that the safety risk of the enterprise is within a reasonable range. At this time, the present invention also determines additional safety measures for adjusting the possibility probability and / or consequence level value of the specific accident consequence; the additional safety measures added in the present invention can reduce the possibility probability and / or consequence level value of the accident consequence; and thus can make the risk value of the corresponding accident consequence within the preset interval, thereby reducing the risk level and risk value of the risk event, so as to reduce the safety risk of the enterprise; after determining the additional safety measures, the embodiment of the present invention also generates corresponding key actions and tasks according to the additional safety measures, thereby generating corresponding implementation plans and task allocation plans according to the actions and / or tasks required for implementing and realizing the additional safety measures, as well as the specific implementation methods of these actions and tasks.

[0057] It can be seen from the above that the present invention obtains a standard and unified accident risk assessment result by quantifying the consequence level value of the accident consequences and the possibility probability of the occurrence of the accident consequences, so as to accurately analyze whether the current safety measures are effective enough for risk events, and can formulate corresponding additional safety measures to improve the effect of risk management when the effectiveness is insufficient, thereby avoiding the lack of safety measures or insufficient effectiveness of petrochemical enterprises, thereby eliminating the safety hazards caused thereby.

[0058] The above description is only an overview of the technical solution of the present invention. In order to more clearly understand the technical means of the present invention and implement it according to the contents of the specification, and to make the above and other purposes, technical features and advantages of the present invention easier to understand, one or more preferred embodiments are listed below and described in detail with the accompanying drawings as follows. BRIEF DESCRIPTION OF THE DRAWINGS

[0059] Figure 1 It is a step diagram of the petrochemical enterprise accident risk control method described in the present invention;

[0060] Figure 2 is a schematic diagram of the top event analysis diagram described in the present invention;

[0061] Figure 3 It is a structural schematic diagram of the petrochemical enterprise accident risk control device of the present invention;

[0062] Figure 4 It is a structural schematic diagram of the accident risk management and control equipment for petrochemical enterprises described in the present invention. DETAILED DESCRIPTION

[0063] The specific implementation modes of the present invention are described in detail below in conjunction with the accompanying drawings, but it should be understood that the protection scope of the present invention is not limited by the specific implementation modes.

[0064] Unless explicitly stated otherwise, throughout the specification and claims, the term “comprise” or variations such as “include” or “comprising”, etc., will be understood to include the stated elements or components but not to exclude other elements or components.

[0065] In this document, for the convenience of description, spatial relative terms such as "below", "below", "down", "above", "above", "upper", etc. may be used to describe the relationship between one element or feature and another element or feature in the accompanying drawings. It should be understood that the spatial relative terms are intended to include different orientations of the object in use or operation in addition to the orientation depicted in the figure. For example, if the object in the figure is turned over, the element described as being "below" or "below" other elements or features will be oriented "above" the element or feature. Therefore, the exemplary term "below" can include both below and above. Objects may also have other orientations (rotated 90 degrees or other orientations) and the spatial relative terms used in this document should be interpreted accordingly.

[0066] In this document, the terms "first", "second", etc. are used to distinguish two different elements or parts, and are not used to limit a specific position or relative relationship. In other words, in some embodiments, the terms "first", "second", etc. can also be interchangeable.

[0067] Embodiment 1

[0068] In order to avoid the lack of safety measures or ineffectiveness of petrochemical enterprises and reduce or eliminate the resulting accident risks, such as Figure 1 As shown, in an embodiment of the present invention, a petrochemical enterprise accident risk management method is provided, comprising the steps of:

[0069] S11, respectively determining the risk value of each accident consequence of the risk event; the risk value is generated according to the consequence level value of the accident consequence and the probability of the possibility of the accident consequence occurring;

[0070] In the embodiment of the present invention, when determining the risk value of each accident consequence of the risk event, the consequence level value of the accident consequence and the probability of causing the accident consequence to occur are used as the basis; in practical applications, this can be achieved with the help of a risk matrix table as shown in Table 1, specifically:

[0071] When evaluating the risk value of a certain accident consequence, the consequence level value and possibility probability of the accident consequence are respectively substituted into the preset risk matrix table, and the risk value of the accident consequence is determined according to the value of the intersection of the consequence level value and the possibility probability in the rows and columns of the risk matrix table; the rows and columns of the risk matrix table are used to characterize the consequence level value and the possibility probability respectively. The rows of the risk matrix table shown in Table 1 are used to characterize the possibility probability, and the columns are used to characterize the consequence level value. For example, when the possibility probability of a certain accident consequence is 3, and the consequence level value is E, the value of the intersection of the consequence level value and the possibility probability in the rows and columns of the risk matrix table is 15, which is the risk value of the accident consequence.

[0072] Table 1

[0073]

[0074] It should be noted that the risk events in the embodiments of the present invention may also be referred to as top events. The concepts and methods in the Bow-tie analysis method may be referred to to determine the top events, as well as the relationship between the causes of the accidents, the pathways leading to the accidents, the consequences of the accidents, and the measures to prevent the accidents.

[0075] Furthermore, in the embodiment of the present invention, the specific steps of determining the risk value of each accident consequence of the risk event may include:

[0076] S101. Determine in advance, based on the basic elements of the risk event, the hazard elements contained in each risk source that can induce the risk event;

[0077] The basic elements of a dangerous event in the embodiment of the present invention may include a dangerous event, a hazard source, the type, name and main content of a risk event, etc. The embodiment of the present invention takes the leakage of a large floating roof tank as an example of a risk event; specifically, if the leakage of a floating roof tank is divided into multiple situations, the basic elements of a dangerous event may be a liquid level indication failure, a tank burst caused by misoperation during process switching, a central drain pipe blockage and other dangerous events.

[0078] In order to conduct a comprehensive assessment and analysis of the consequences of each accident of a risk event, it is necessary to collect and obtain the various hazard factors contained in each hazard source that can induce a risk event. In practical applications, the hazard event factors existing in the production activities of the unit can be analyzed through safety checklists, brainstorming (group discussion), accident case discussion and rapid scanning of major risks (SCM), so as to count the hazardous events that may lead to production accidents and obtain comprehensive hazard factors.

[0079] In practical applications, reference Figure 2As shown in the top event analysis diagram, a risk event may include multiple accident consequences. For example, the leakage of a large floating roof tank as a risk event may cause a fire in the fire dike, and an uncontrolled flowing fire caused by crude oil flowing out of the fire dike. The impact of each accident consequence can be further divided into multiple aspects, such as personal injury impact, property loss impact, social impact and environmental impact, etc. Figure 2 In this article, we take the accident consequences including the above four aspects as an example.

[0080] S102, presetting measures effectiveness level evaluation rules, including: respectively setting effectiveness level values ​​of various safety precaution measures corresponding to each hazard factor, and respectively setting effectiveness level values ​​of various safety mitigation measures corresponding to each accident consequence;

[0081] In the embodiment of the present invention, various security measures (including security precautions and security mitigation measures) are scored for effectiveness level values, that is, the effectiveness level value of each security measure is determined; in practical applications, the effectiveness correspondence between each security measure and its effectiveness level value can be established and stored; specifically, it can be:

[0082] The effectiveness level value of each safety measure is set respectively, and the effectiveness correspondence relationship between each safety measure and its effectiveness level value is established and stored respectively;

[0083] According to the effectiveness correspondence, the effectiveness level value of the safety precaution measures of each hazardous factor associated with the accident consequence is determined.

[0084] According to the effectiveness correspondence, the effectiveness level value of the safety mitigation measures associated with the accident consequences is determined.

[0085] In practical applications, the safety measures in the embodiments of the present invention may include high liquid level alarm and personnel response, high liquid level interlock tank shut-off valve, etc. Mitigation measures include combustible gas alarm and personnel response, fire dikes / dikes, etc. Among them, safety measures used to reduce the possibility of accident consequences are called safety precautions; safety measures used to reduce the severity of accidents and / or accident losses after accidents occur are called safety mitigation measures.

[0086] It should be noted that, in the embodiment of the present invention, for different accident consequences, the effectiveness level values ​​of the safety precautions corresponding to different hazard factors are also different; that is, even if it is the same safety precaution, its effectiveness level value is likely to be different in different accident consequences or when used to deal with different hazard factors.

[0087] S103, obtaining the current safety mitigation measures for the accident consequences, and the corresponding responsible departments and responsible persons, and obtaining the current safety prevention measures, corresponding responsible departments and responsible persons corresponding to the hazard factors associated with the accident consequences;

[0088] In order to evaluate whether the current safety measures are sufficiently effective, the embodiment of the present invention needs to obtain the safety measures before each accident consequence of the risk event respectively.

[0089] S104, determining the effectiveness level values ​​of the current safety mitigation measures and the current safety prevention measures for the accident consequences respectively according to a preset measure effectiveness level evaluation rule;

[0090] After the effectiveness correspondence that complies with the preset measure effectiveness level evaluation rules is established and stored, the effectiveness level values ​​of the current safety mitigation measures and the current safety precautions can be determined according to the effectiveness correspondence.

[0091] Taking the risk event of leakage of a large floating roof tank as an example, the following describes the setting examples of the effectiveness level values ​​of various safety precautions corresponding to the hazard factors in the embodiment of the present invention (see Table 2 for details), as well as the setting examples of the effectiveness level values ​​of various safety mitigation measures corresponding to the accident consequences (see Table 3 for details).

[0092] Table 2:

[0093]

[0094] Table 3:

[0095]

[0096] According to Tables 2 and 3, it can be seen that the safety precautions corresponding to the hazard factor process switching misoperation include high liquid level alarm and personnel response (effectiveness level value is 0.1) and high liquid level interlock tank inlet shut-off valve (effectiveness level value is 0.1);

[0097] The safety precautions corresponding to the failure of the liquid level indication of the hazardous factor include the high-level interlock tank inlet shut-off valve (effectiveness level value is 0.1);

[0098] The safety precautions corresponding to the hazard factor of central drain pipe blockage include high liquid level alarm and personnel response (effectiveness level value 0.1) and high liquid level interlock tank inlet shut-off valve (effectiveness level value 0.1);

[0099] The safety mitigation measures corresponding to the fire in the pool of the fire dike as a consequence of the accident include combustible gas alarm and personnel response (effectiveness level value is 0.1);

[0100] The safety mitigation measures corresponding to the uncontrolled flowing fire with accident consequences include combustible gas alarm and personnel response (effectiveness level value is 0.1) and tank area fire dike (effectiveness level value is 0.01).

[0101] S105, determining a consequence level value of the accident consequence according to the effectiveness level value of the current safety mitigation measure, and determining a probability of possibility (i.e., PFDs) of the accident consequence according to the effectiveness level value of the current safety precaution measure;

[0102] Generally speaking, an accident consequence may include multiple safety precautions for reducing the possibility of the occurrence of the accident consequence. By combining the effectiveness level values ​​of the current various safety precautions, the possibility probability of the accident consequence can be generated; similarly, by combining the effectiveness level values ​​of the current various safety mitigation measures, the consequence level value of the accident consequence can be generated.

[0103] Referring to Table 2 and Table 3, it can be seen that according to the effectiveness level values ​​corresponding to each safety mitigation measure, it can be concluded that the probability of process switching misoperation is 0.1; the probability of liquid level indication failure is 0.1; and the probability of central drain pipe blockage is 0.01.

[0104] The consequence level value of a pool fire within a firebreak is D; the consequence level value of an uncontrolled flowing fire is E.

[0105] S106: Generate a risk value of the accident consequence according to the consequence level value and possibility probability of the accident consequence.

[0106] In the embodiment of the present invention, a risk event may include multiple accident consequences, and the risk value of the risk event may be determined by the risk value of the accident consequence with the highest risk value. The risk value of each accident consequence may be generated according to the consequence level value and possibility probability of the accident consequence.

[0107] In practical applications, we can first determine the risk value of each accident consequence of the top event when there are no safety measures as basic data; then obtain the initial risk value of the top event; then, determine the current risk value of each accident consequence of the top event based on the safety measures currently being adopted. Among them, the initial consequence level value of each accident consequence can be estimated by experience or determined by CFD simulation of the consequence impact range.

[0108] In practical applications, the risk value of the accident consequence can be generated by a risk matrix table as shown in Table 1, that is, the consequence level value and the possibility probability of the accident consequence are respectively substituted into the preset risk matrix table, and the risk value of the accident consequence is determined according to the value of the intersection of the consequence level value and the possibility probability in the table row and table column of the risk matrix table. Specifically, after obtaining the risk values ​​of each impact aspect of the accident consequence according to the risk matrix table in Table 1, the highest value among them is taken as the risk value of the accident consequence; and after obtaining the risk values ​​of each accident consequence included in a risk event, the accident consequence with the highest risk value can be taken to determine the risk value of the risk event.

[0109] Combining Table 2 and Table 3, Table 4 shows a specific example of determining the risk value when the risk event is a large floating roof tank leakage.

[0110] Figure 2 In the figure, the process and results of analyzing the risk value of risk events in three different situations are shown, where "initial" means the situation without any safety measures, "current" means the situation under the existing safety measures, and "final" means the situation after additional safety measures are taken;

[0111] The four level values ​​in each column of the initial, current and final items represent the risk values ​​of the four impact aspects, such as: Figure 2 In It means that without taking any safety measures, the risk levels of risk events in four aspects are E7, D7, C7 and C7 respectively. According to the risk matrix, the risk values ​​of each aspect are 68, 55, 23 and 23 respectively. Taking the highest value, it can be known that the initial risk value of the risk event is 68. Similarly, in the two cases of "now" and "finally", similar methods can be used to determine the risk value of accident consequences or the risk value of risk events.

[0112] Table 4:

[0113]

[0114] S12. When the risk value of a certain accident consequence exceeds a preset interval, determining additional safety measures for adjusting the probability of possibility and / or consequence level of the accident consequence;

[0115] When the risk value of a certain accident consequence exceeds a preset interval, determining additional safety measures for adjusting the possibility probability and / or consequence level value of the accident consequence includes:

[0116] When the risk value of a certain accident consequence exceeds the upper limit of a preset interval, safety measures that can reduce the possibility probability and / or reduce the consequence level value are determined from a preset safety measures database as additional safety measures; the safety measures database includes multiple safety measures, and a corresponding relationship between the effectiveness of each safety measure and its effectiveness level value, and the safety measures include safety precautions and safety mitigation measures.

[0117] Taking the risk matrix shown in Table 1 as an example, in Table 1, when the risk value is less than 20, it is considered that the current risk is in an acceptable range, and no additional safety measures are needed at this time; when the risk value is greater than 20, it is considered that the current risk is too large, and it is necessary to add additional safety measures to reduce the possibility probability and / or reduce the consequence level value, thereby reducing the risk value generated according to the consequence level value and the possibility probability to within the preset range, so as to achieve the purpose of effectively reducing safety risks.

[0118] In practical applications, additional safety measures may specifically include emergency alerts and manual evacuation, leakage monitoring, oil interception, monitoring instruments and protective equipment for corresponding hazardous factors or accident consequences.

[0119] It can be seen from the evaluation in Table 4 that when no safety measures are taken, the initial risk level of leakage of a large floating roof crude oil tank is E7 (corresponding to a risk value of 68); when the existing safety measures remain effective, the current risk level is D5 (corresponding to a risk value of 25), which is a relatively large level and an unacceptable risk. After taking additional safety measures (the embodiment of the present invention takes the additional safety measure of adding a liquid level high interlock cut-off emergency cut-off valve to the SIS system as an example), the risk level is reduced to D4 (corresponding to a risk value of 17), which is a general risk.

[0120] It should be noted that, in practical applications, the preset interval of the risk value can be set by those skilled in the art according to actual conditions, and is not specifically limited here.

[0121] S13. Generate corresponding key actions and tasks according to the additional security measures.

[0122] The key actions and tasks include the actions and / or tasks required to implement and / or realize the additional security measures, as well as the methods for implementing the actions and / or tasks.

[0123] After determining the additional security measures that can effectively reduce security risks, the embodiment of the present invention can also generate corresponding key actions and tasks based on the additional security measures, so as to list the specific plans for implementing the additional security measures and assign them to the corresponding responsible personnel.

[0124] In practical applications, the key actions and tasks table in the embodiment of the present invention may be expressed as shown in Table 5:

[0125] Table 5

[0126]

[0127]

[0128] In summary, the embodiment of the present invention first determines the risk value of each accident consequence of the risk event under the current safety measures (including safety precautions and safety mitigation measures); wherein, the risk value in the embodiment of the present invention is generated according to the consequence level value of the accident consequence and the possibility probability of causing the accident consequence to occur; when the risk value of a certain accident consequence exceeds the preset interval, it means that the current safety measures are not sufficient to ensure that the safety risk of the enterprise is within a reasonable range. At this time, the embodiment of the present invention also determines additional safety measures for adjusting the possibility probability and / or consequence level value of the specific accident consequence; the additional safety measures added in the embodiment of the present invention can reduce the possibility probability and / or consequence level value of the accident consequence; and thus can make the risk value of the corresponding accident consequence within the preset interval, thereby reducing the risk level and risk value of the risk event, so as to reduce the safety risk of the enterprise; after determining the additional safety measures, the embodiment of the present invention also generates corresponding key actions and tasks according to the additional safety measures, thereby generating corresponding implementation plans and task allocation plans according to the actions and / or tasks required for implementing and realizing the additional safety measures, as well as the specific implementation methods of these actions and tasks.

[0129] It can be seen from the above that the embodiment of the present invention obtains a standard and unified accident risk assessment result by quantifying the consequence level value of the accident consequence and the possibility probability of the accident consequence occurring, so as to accurately analyze whether the current safety measures are sufficiently effective for risk events, and can formulate corresponding additional safety measures to improve the effect of risk management when the effectiveness is insufficient, thereby avoiding the lack of safety measures or insufficient effectiveness of petrochemical enterprises, thereby eliminating the resulting safety hazards.

[0130] Embodiment 2

[0131] In another aspect of the embodiment of the present invention, a petrochemical enterprise accident risk management and control device is also provided. Figure 3 The schematic diagram of the structure of the petrochemical enterprise accident risk control device provided by the embodiment of the present invention is shown. The petrochemical enterprise accident risk control device is Figure 1 The device corresponding to the petrochemical enterprise accident risk control method described in the corresponding embodiment, that is, the virtual device is used to implement Figure 1In the corresponding embodiment of the petrochemical enterprise accident risk management method, each virtual module constituting the petrochemical enterprise accident risk management device can be executed by an electronic device, such as a network device, a terminal device, or a server. Specifically, the petrochemical enterprise accident risk management device in the embodiment of the present invention includes:

[0132] The risk determination unit 01 is used to respectively determine the risk value of each accident consequence of the risk event; the risk value is generated according to the consequence level value of the accident consequence and the probability of the possibility of the accident consequence occurring;

[0133] The additional measures unit 02 is used to determine additional safety measures for adjusting the probability of possibility and / or consequence level of a certain accident consequence when the risk value of the accident consequence exceeds a preset interval;

[0134] The action generation unit 03 is used to generate corresponding key actions and tasks according to the additional security measures.

[0135] Since the working principle and beneficial effects of the petrochemical enterprise accident risk control device in the embodiment of the present invention have been Figure 1 The corresponding petrochemical enterprise accident risk management methods are also recorded and explained, so they can be referenced by each other and will not be repeated here.

[0136] Embodiment 3

[0137] Based on the second embodiment, the risk determination unit 01 in the embodiment of the present invention may specifically include:

[0138] The element determination module is used to determine the hazard elements contained in each hazard source that can induce a risk event in advance based on the basic elements of the risk event;

[0139] The effectiveness setting module is used to preset the effectiveness level evaluation rules of the measures, including: respectively setting the effectiveness level values ​​of various safety precaution measures corresponding to each hazard factor, and respectively setting the effectiveness level values ​​of various safety mitigation measures corresponding to each accident consequence;

[0140] A measures acquisition module is used to acquire the current safety mitigation measures for the accident consequences, and the corresponding responsible departments and persons, and to acquire the current safety prevention measures, corresponding responsible departments and persons corresponding to the hazard factors associated with the accident consequences;

[0141] An effectiveness evaluation module, used to determine the effectiveness level values ​​of the current safety mitigation measures and the current safety prevention measures of the accident consequences respectively according to a preset measure effectiveness level evaluation rule;

[0142] A consequence assessment module, configured to determine a consequence level value of the accident consequence according to the effectiveness level value of the current safety mitigation measure, and to determine a possibility probability of the accident consequence according to the effectiveness level value of the current safety precaution measure;

[0143] The risk value generating module is used to generate the risk value of the accident consequence according to the consequence level value and possibility probability of the accident consequence.

[0144] Similarly, the working principle and beneficial effects of the petrochemical enterprise accident risk control device in the embodiment of the present invention have also been Figure 1 The corresponding petrochemical enterprise accident risk management methods are also recorded and explained, so they can be referenced by each other and will not be repeated here.

[0145] Embodiment 4

[0146] In an embodiment of the present invention, a memory is further provided, wherein the memory includes a software program, and the software program is suitable for the processor to execute Figure 1 The corresponding steps in the petrochemical enterprise accident risk management method.

[0147] The embodiments of the present invention can be implemented by means of a software program, that is, by writing a program for implementing Figure 1 The corresponding software program (and instruction set) for each step in the petrochemical enterprise accident risk management method, the software program is stored in a storage device, and the storage device is arranged in a computer device, so that the software program can be called by the processor of the computer device to achieve the purpose of the embodiment of the present invention.

[0148] Embodiment 5

[0149] In an embodiment of the present invention, a petrochemical enterprise accident risk management and control device is also provided. The memory included in the petrochemical enterprise accident risk management and control device includes a corresponding computer program product. When the program instructions included in the computer program product are executed by a computer, the computer can execute the petrochemical enterprise accident risk management and control methods described in the above aspects and achieve the same technical effects.

[0150] Figure 4 Schematic diagram of the hardware structure of the petrochemical enterprise accident risk management and control device as an electronic device according to an embodiment of the present invention. Figure 4 As shown, the device includes one or more processors 610, a bus 630, and a memory 620. Taking one processor 610 as an example, the device may also include: an input device 640, and an output device 650.

[0151] The processor 610, the memory 620, the input device 640 and the output device 650 may be connected via a bus or other means. Figure 4The connection via bus 630 is taken as an example.

[0152] The memory 620 is a non-transitory computer-readable storage medium that can be used to store non-transitory software programs, non-transitory computer executable programs, and modules. The processor 610 executes various functional applications and data processing of the electronic device by running the non-transitory software programs, instructions, and modules stored in the memory 620, that is, the processing method of the above method embodiment is implemented.

[0153] The memory 620 may include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function; the data storage area may store data, etc. In addition, the memory 620 may include a high-speed random access memory, and may also include a non-transitory memory, such as at least one disk storage device, a flash memory device, or other non-transitory solid-state storage device. In some embodiments, the memory 620 may optionally include a memory remotely arranged relative to the processor 610, and these remote memories may be connected to the processing device via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0154] The input device 640 can receive input digital or character information and generate signal input. The output device 650 can include a display device such as a display screen.

[0155] The one or more modules are stored in the memory 620, and when executed by the one or more processors 610, perform:

[0156] S11, respectively determining the risk value of each accident consequence of the risk event; the risk value is generated according to the consequence level value of the accident consequence and the probability of the possibility of the accident consequence occurring;

[0157] S12. When the risk value of a certain accident consequence exceeds a preset interval, determining additional safety measures for adjusting the probability of possibility and / or consequence level of the accident consequence;

[0158] S13. Generate corresponding key actions and tasks according to the additional security measures.

[0159] Preferably, the step of respectively determining the risk value of each accident consequence of the risk event includes:

[0160] S101. Determine in advance, based on the basic elements of the risk event, the hazard elements contained in each risk source that can induce the risk event;

[0161] S102, presetting measures effectiveness level evaluation rules, including: respectively setting effectiveness level values ​​of various safety precaution measures corresponding to each hazard factor, and respectively setting effectiveness level values ​​of various safety mitigation measures corresponding to each accident consequence;

[0162] S103, obtaining the current safety mitigation measures for the accident consequences, and the corresponding responsible departments and responsible persons, and obtaining the current safety prevention measures, corresponding responsible departments and responsible persons corresponding to the hazard factors associated with the accident consequences;

[0163] S104, determining the effectiveness level values ​​of the current safety mitigation measures and the current safety prevention measures for the accident consequences respectively according to a preset measure effectiveness level evaluation rule;

[0164] S105, determining a consequence level value of the accident consequence according to the effectiveness level value of the current safety mitigation measure, and determining a possibility probability of the accident consequence according to the effectiveness level value of the current safety precaution measure;

[0165] S106: Generate a risk value of the accident consequence according to the consequence level value and possibility probability of the accident consequence.

[0166] The above product can execute the method provided by the embodiment of the present invention, and has the functional modules and beneficial effects corresponding to the execution method. For technical details not described in detail in this embodiment, please refer to the methods provided by other embodiments of the present invention.

[0167] In the several embodiments provided by the present invention, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be an indirect coupling or communication connection through some interfaces, devices or units, which can be electrical, mechanical or other forms.

[0168] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0169] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0170] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention is essentially or the part that contributes to the prior art or all or part of the technical solution can be embodied in the form of a software product. The computer software product is stored in a storage device, including several instructions to enable a computer device (which can be a personal computer, server, or network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage device includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), ReRAM, MRAM, PCM, NAND Flash, NOR Flash, Memristor, disk or optical disk and other media that can store program codes.

[0171] As described above, the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features thereof may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A petrochemical enterprise accident risk management method, characterized in that: Includes steps: S11, respectively determining the risk value of each accident consequence of the risk event; the risk value is generated according to the consequence level value of the accident consequence and the probability of the possibility of the accident consequence occurring; S12. When the risk value of a certain accident consequence exceeds a preset interval, determining additional safety measures for adjusting the probability of the accident consequence and / or the consequence level value, including: When the risk value of a certain accident consequence exceeds the upper limit of a preset interval, a safety measure capable of reducing the possibility probability and / or reducing the consequence level value is determined from a preset safety measure database as an additional safety measure; the safety measure database includes a plurality of safety measures, and a validity correspondence between each safety measure and its validity level value, and the safety measures include safety precautions and safety mitigation measures; S13. Generate corresponding key actions and tasks according to the additional security measures.

2. The petrochemical enterprise accident risk management method according to claim 1, characterized in that: The risk value of each accident consequence of the risk event is determined separately, including: S101. Determine in advance, based on the basic elements of the risk event, the hazard elements contained in each risk source that can induce the risk event; S102, presetting measures effectiveness level evaluation rules, including: respectively setting effectiveness level values ​​of various safety precaution measures corresponding to each hazard factor, and respectively setting effectiveness level values ​​of various safety mitigation measures corresponding to each accident consequence; S103, obtaining the current safety mitigation measures for the accident consequences, and the corresponding responsible departments and responsible persons, and obtaining the current safety prevention measures, corresponding responsible departments and responsible persons corresponding to the hazard factors associated with the accident consequences; S104, determining the effectiveness level values ​​of the current safety mitigation measures and the current safety prevention measures for the accident consequences respectively according to a preset measure effectiveness level evaluation rule; S105, determining a consequence level value of the accident consequence according to the effectiveness level value of the current safety mitigation measure, and determining a possibility probability of the accident consequence according to the effectiveness level value of the current safety precaution measure; S106: Generate a risk value of the accident consequence according to the consequence level value and possibility probability of the accident consequence.

3. The petrochemical enterprise accident risk management method according to claim 2, characterized in that: The preset measure effectiveness level evaluation rules include: The effectiveness level value of each safety measure is set respectively, and the effectiveness correspondence relationship between each safety measure and its effectiveness level value is established and stored respectively; According to the effectiveness correspondence, the effectiveness level value of the safety precaution measures of each hazardous factor associated with the accident consequence is determined.

4. The petrochemical enterprise accident risk management method according to claim 3, characterized in that: The preset measure effectiveness level evaluation rules also include: According to the effectiveness correspondence, the effectiveness level value of the safety mitigation measures associated with the accident consequences is determined.

5. The petrochemical enterprise accident risk management method according to claim 4, characterized in that: The risk value is generated according to the consequence level value of the accident consequence and the probability of the possibility of the accident consequence occurring, including: When evaluating the risk value of a certain accident consequence, the consequence level value and possibility probability of the accident consequence are substituted into a preset risk matrix table respectively, and the risk value of the accident consequence is determined according to the values ​​of the consequence level value and the possibility probability at the intersection of the rows and columns of the risk matrix table; the rows and columns of the risk matrix table are used to represent the consequence level value and the possibility probability respectively.

6. The petrochemical enterprise accident risk management method according to claim 5, characterized in that: The key actions and tasks described include: The actions and / or tasks required to implement and / or realize the additional security measures, and the methods for implementing the actions and / or the tasks.

7. A petrochemical enterprise accident risk management and control device, characterized in that: include: A risk determination unit, used to determine the risk value of each accident consequence of a risk event respectively; The risk value is generated according to the consequence level value of the accident consequence and the probability of the possibility of the accident consequence occurring; The additional measures unit is used to determine additional safety measures for adjusting the probability of possibility and / or consequence level of a certain accident consequence when the risk value of the accident consequence exceeds a preset interval, including: When the risk value of a certain accident consequence exceeds the upper limit of a preset interval, a safety measure capable of reducing the possibility probability and / or reducing the consequence level value is determined from a preset safety measure database as an additional safety measure; the safety measure database includes a plurality of safety measures, and a validity correspondence between each safety measure and its validity level value, and the safety measures include safety precautions and safety mitigation measures; An action generation unit is used to generate corresponding key actions and tasks according to the additional security measures.

8. The petrochemical enterprise accident risk management and control device according to claim 7, characterized in that: The risk determination unit comprises: The element determination module is used to determine the hazard elements contained in each hazard source that can induce a risk event in advance based on the basic elements of the risk event; The effectiveness setting module is used to preset the effectiveness level evaluation rules of the measures, including: respectively setting the effectiveness level values ​​of various safety precaution measures corresponding to each hazard factor, and respectively setting the effectiveness level values ​​of various safety mitigation measures corresponding to each accident consequence; A measures acquisition module is used to acquire the current safety mitigation measures for the accident consequences, and the corresponding responsible departments and persons, and to acquire the current safety prevention measures, corresponding responsible departments and persons corresponding to the hazard factors associated with the accident consequences; An effectiveness evaluation module, used to determine the effectiveness level values ​​of the current safety mitigation measures and the current safety precaution measures of the accident consequences respectively according to a preset measure effectiveness level evaluation rule; A consequence assessment module, configured to determine a consequence level value of the accident consequence according to the effectiveness level value of the current safety mitigation measure, and to determine a possibility probability of the accident consequence according to the effectiveness level value of the current safety precaution measure; The risk value generating module is used to generate the risk value of the accident consequence according to the consequence level value and possibility probability of the accident consequence.

9. The petrochemical enterprise accident risk management and control device according to claim 8, characterized in that: The preset measure effectiveness level evaluation rules include: The effectiveness level value of each safety measure is set respectively, and the effectiveness correspondence relationship between each safety measure and its effectiveness level value is established and stored respectively; According to the effectiveness correspondence, the effectiveness level value of the safety precaution measures of each hazardous factor associated with the accident consequence is determined.

10. The petrochemical enterprise accident risk management and control device according to claim 9, characterized in that: The preset measure effectiveness level evaluation rules also include: According to the effectiveness correspondence, the effectiveness level value of the safety mitigation measures associated with the accident consequences is determined.

11. The petrochemical enterprise accident risk management and control device according to claim 10, characterized in that: The risk value is generated according to the consequence level value of the accident consequence and the probability of the possibility of the accident consequence occurring, including: When evaluating the risk value of a certain accident consequence, the consequence level value and possibility probability of the accident consequence are substituted into a preset risk matrix table respectively, and the risk value of the accident consequence is determined according to the values ​​of the consequence level value and the possibility probability at the intersection of the rows and columns of the risk matrix table; the rows and columns of the risk matrix table are used to represent the consequence level value and the possibility probability respectively.

12. The petrochemical enterprise accident risk management and control device according to claim 11, characterized in that: The key actions and tasks described include: The actions and / or tasks required to implement and / or realize the additional security measures, and the methods for implementing the actions and / or the tasks.

13. A memory, characterized in that: It comprises a software program, which is suitable for a processor to execute the steps of the petrochemical enterprise accident risk management method as claimed in any one of claims 1 to 6.

14. A petrochemical enterprise accident risk management and control device, characterized in that: comprising a bus, a processor and a memory as claimed in claim 13; The bus is used to connect the memory and the processor; The processor is configured to execute an instruction set in the memory.