A method for automatically producing a ring main unit
By connecting the various processes in the production process of the ring network cabinet and connecting them with the conveying mechanism, the automated production of the ring network cabinet is achieved, solving the problem of inefficiency caused by the mixed processes in the existing technology, and improving production efficiency and material management Neatness.
Patent Information
- Application Number
- CN202110849219.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-07-27
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2041-07-27
AI Technical Summary
During the production process of existing ring network cabinets, various processes are mixed and operators cannot proceed in an orderly manner, resulting in chaotic management and low work efficiency.
The automated production method is adopted to separate the processes and connect them through the conveying mechanism to ensure that each process is carried out at different stations, that each process does not interfere with each other, and that the materials are placed neatly according to the process. The specific steps include vertical cabinets, primary components in place, secondary lines improvement, mechanism room and cable room improvement, single-machine inspection and joint debugging, single-machine voltage resistance testing, cabinet assembly, general inspection and joint debugging and total voltage resistance testing.
The orderly progress of each process is achieved, the working efficiency is improved, the materials are stacked neatly, the interference between processes and transportation blockage is avoided, and the assembly production efficiency of the ring network cabinet is improved.
Smart Images

Figure CN113594944B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a production method in the field of ring network cabinets. Background Art
[0002] Ring main unit is a group of electrical equipment (high voltage switchgear) installed in a metal or non-metallic insulated cabinet or made into an assembled interval ring main unit. Its core part adopts load switches and fuses, which has the advantages of simple structure, small size, low price, improved power supply parameters and performance, and power supply safety. It is widely used in distribution stations and box-type substations in urban residential areas, high-rise buildings, large public buildings, factories and enterprises and other load centers. In the prior art, small and medium-sized ring main units basically adopt the traditional workshop plane transfer, material concentration, and process concentration of traditional production operation mode, so that in the production process, the various processes are mixed together, the operators cannot carry out their respective process operations in an orderly manner, the management is relatively chaotic, the work efficiency is low, and the site is messy. Summary of the invention
[0003] The purpose of the present invention is to provide an automatic production method for a ring main unit, which separates various processes without interfering with each other, has high work efficiency, and neatly stacks materials on site.
[0004] To achieve the above-mentioned purpose, the present invention provides an automatic production method for a ring main unit, comprising the following steps: step 1, erecting a cabinet; step 2, putting primary components in place; step 3, completing the secondary line; step 4, completing the mechanism room and the cable room; step 5, inspecting and debugging a single machine; step 6, conducting a single machine withstand voltage test; step 7, assembling cabinets; step 8, conducting a general inspection and debugging; step 9, conducting a general withstand voltage test; and step 10, completing before going offline.
[0005] Compared with the prior art, the beneficial effect of the present invention lies in that various processes are arranged at different workstations, which are connected with each other through a conveying mechanism, and the product of the previous workstation is transported to the next workstation for the next process after completion, so that each process is separated and the processes do not interfere with each other. Operators perform their own process operations, and materials are placed in their respective workstations and stacked neatly and orderly. The present invention can be used for the assembly production of ring network cabinets.
[0006] As a further improvement of the present invention, the specific contents of step 1 are as follows:
[0007] Step 1.1, transport the gas box, secondary box and cabinet sheet metal to the offline cabinet area;
[0008] Step 1.2, assemble the cabinet sheet metal to form a base;
[0009] Step 1.3, lift the gas box to the top of the base and connect and fix it;
[0010] Step 1.4, lift the secondary box to the top of the gas box and connect and fix it to form a complete cabinet.
[0011] As a further improvement of the present invention, the specific content of step 2 is as follows:
[0012] Put the components of the cabinet assembled in step 1 into place.
[0013] As a further improvement of the present invention, the specific content of step 3 is as follows:
[0014] Lift the cabinet with the primary components in place in step 3 to the on-line conveyor at the on-line station. The transfer trolley runs to the on-line conveyor at the on-line station. The on-line conveyor transports the cabinet to the transfer trolley, which is then transported to the secondary line conveyor at the secondary line improvement station. The operator performs the connection and improvement work on the secondary line on the cabinet.
[0015] When there are cabinets on the secondary line conveyor that have not been fully connected, the transfer trolley will transport the cabinets transferred from the on-line conveyor to the buffer conveyor after the on-line conveyor. After the cabinets on the secondary line conveyor are transferred to the next workstation, the transfer trolley will transport the cabinets on the buffer conveyor after the secondary line to the secondary line conveyor, and the operator will complete the connection of the secondary line on the cabinet.
[0016] In this way, the cabinet with the primary components in place can be transported to the transfer cart via the on-line conveyor, and then to the secondary line conveyor via the transfer cart. The two processes are separated from each other and do not interfere with each other. Even if the secondary line conveyor is full, there is a buffer conveyor after the secondary line as an alternative to place the cabinet with the primary components in place, avoiding transportation congestion due to the completion speed between processes.
[0017] As a further improvement of the present invention, the specific content of step 4 is as follows:
[0018] Move the transfer trolley to the secondary line conveyor, and the secondary line conveyor will transport the cabinet after the secondary line connection is completed in step 3 to the transfer trolley, and then transport it to the secondary improvement conveyor on the secondary improvement station by the transfer trolley, and the operator will improve the mechanism room and cable room on the cabinet;
[0019] When the conveyor after secondary improvement has cabinets with unfinished mechanism rooms and cable rooms, the transfer trolley will transport the cabinets transferred from the secondary line conveyor to the buffer conveyor after secondary improvement. After the cabinets on the conveyor after secondary improvement are transferred to the next workstation, the transfer trolley will transport the cabinets on the buffer conveyor after secondary improvement to the conveyor after secondary improvement, and the operator will perform the improvement work on the mechanism room and cable room on the cabinet.
[0020] In this way, the cabinet body after the secondary line is completed can be transported to the transfer trolley through the secondary line conveyor, and then transported to the conveyor after the secondary improvement through the transfer trolley. The two processes are separated from each other and do not interfere with each other. Even if the conveyor after the secondary improvement is full, there is a buffer conveyor after the secondary improvement as an alternative to place the cabinet body after the secondary line, so as to avoid the problem of transportation congestion caused by the completion speed between processes.
[0021] As a further improvement of the present invention, the specific content of step 5 is as follows:
[0022] Move the transfer trolley to the secondary improvement conveyor, and the secondary improvement conveyor will transport the improved cabinets in the mechanism room and cable room in step 4 to the transfer trolley, and then transport them to the quality inspection conveyor on the single machine quality inspection station by the transfer trolley, and the quality inspectors will conduct single machine inspection and debugging;
[0023] If the inspection is qualified, it will be sent to the next workstation; if the inspection is unqualified, the unqualified cabinet will be transferred to the abnormal offline conveyor by the transfer car, and then lifted away by the crane for rework.
[0024] In this way, the improved cabinets in the mechanism room and cable room can be transported to the transfer cart through the secondary improvement conveyor, and then to the quality inspection conveyor for inspection and debugging of single electrical cabinets. The two processes are separated from each other and do not interfere with each other. The quality inspection conveyor is relatively long and can hold two electrical cabinets for quality inspection. There are three quality inspection conveyors to avoid the problem of the cabinet being unable to accommodate the cabinet. If unqualified electrical cabinets are found, they will be transferred by the quality inspection conveyor to the transfer cart, and then transferred to the abnormal offline conveyor, and lifted away by the crane for rework, ensuring that unqualified and qualified products are distinguished and transported to different workstations.
[0025] As a further improvement of the present invention, the specific content of step 6 is as follows:
[0026] Move the transfer trolley to the quality inspection conveyor, and transport the cabinets that have passed the quality inspection in step 5 to the pneumatic double-door of the single-machine withstand voltage test station via the quality inspection conveyor. The pneumatic double-door is opened, and the cabinets are transported to the single-machine withstand voltage test conveyor of the single-machine withstand voltage test station via the transfer trolley through the pneumatic double-door, and the test personnel conduct the single-machine withstand voltage test;
[0027] If the test is qualified, it will be sent to the next workstation; if the test is unqualified, the unqualified cabinet will be transferred to the abnormal offline conveyor by the transfer car, and then lifted away by the crane for rework.
[0028] In this way, the cabinet that has passed the quality inspection can be transported to the transfer cart through the quality inspection conveyor, and then transported to the single-machine pressure test conveyor for pressure testing of a single electrical cabinet. The two processes are separated from each other and do not interfere with each other. If an unqualified electrical cabinet is found, it will be transferred from the single-machine pressure test conveyor to the transfer cart, and then transferred to the abnormal offline conveyor, and lifted away by the crane for rework, ensuring that unqualified and qualified products are distinguished and transported to different workstations.
[0029] As a further improvement of the present invention, the specific content of step 7 is as follows:
[0030] Move the transfer trolley to the pneumatic double door of the single-machine pressure test station, open the start double door of the single-machine pressure test station, and transport the cabinet that has passed the test in step 6 to the transfer trolley through the single-machine pressure test conveyor. The above cabinet is transported to the cabinet assembly offline conveyor of the cabinet assembly offline station by the transfer trolley, and the base for cabinet assembly is transported to the cabinet assembly counter conveyor by a crane, and then the above cabinet is hoisted to the base. After assembling multiple cabinets on the base, cover the outer shell on the outside of the assembled multiple cabinets to complete the cabinet assembly process.
[0031] In this way, the single-machine voltage withstand test station and the cabinet assembly offline station are separated without interfering with each other. After the qualified single electrical cabinet is transported to the cabinet assembly offline station, it is assembled, and multiple electrical cabinets are assembled into a whole and then transported to the next station.
[0032] As a further improvement of the present invention, the specific content of step 8 is as follows:
[0033] In step 7, the assembled electrical cabinet is sent to the joint debugging conveyor at the general inspection and joint debugging station through the assembly counter conveyor. The tester conducts a general inspection and joint debugging on the assembled electrical cabinet. Regardless of whether the inspection result is qualified or not, it will be transported to the next station.
[0034] In this way, the general inspection and joint debugging workstation and the cabinet assembly and offline workstation are separated and do not interfere with each other. The electrical cabinets after the general inspection and joint debugging, whether qualified or not, will be transported to the next workstation for centralized processing by the next workstation.
[0035] As a further improvement of the present invention, the specific content of step 9 is as follows:
[0036] The electrical cabinet inspected in step 8 is directly sent to the online voltage test station through the joint adjustment conveyor, the pneumatic double door at the front end of the online voltage test station is opened, and the pneumatic double door at the front end of the electrical cabinet falls on the online voltage test conveyor of the online voltage test station. If it is an electrical cabinet that fails to be debugged in step 8, it will be directly transported out by the online voltage test conveyor for rework. If the electrical cabinet passes the debugging in step 8, the tester will conduct an online voltage test. After the test is passed, the pneumatic double door at the rear end of the online voltage test station will be opened, and the tested electrical cabinet will be sent out of the pneumatic double door at the rear end through the online voltage test conveyor; when the test is qualified, the qualified electrical cabinet will be hoisted to the qualified product area. If the test is unqualified, the crane will hoist it away for rework.
[0037] In this way, the joint debugging and voltage withstand test are separated and do not interfere with each other. The qualified and unqualified products of the online voltage withstand test are transported separately and will not be mixed with each other, thus avoiding mistakes. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] Figure 1 This is a distribution diagram of each workstation of the present invention.
[0039] Figure 2 It is a schematic diagram of the structure of the online withstand voltage test station of the present invention.
[0040] Figure 3 It is a schematic diagram of the structure of a single-machine withstand voltage test station of the present invention.
[0041] Among them, 1 transfer conveyor line, 2 cabinet offline conveyor, 3 counter conveyor, 4 cabinet offline workstation, 5 joint adjustment conveyor, 6 general inspection joint adjustment workstation, 7 online withstand voltage test workstation, 8 online withstand voltage test conveyor, 9 buffer conveyor after secondary improvement, 10 control panel, 11 abnormal offline conveyor, 12 online buffer conveyor, 13 online conveyor, 14 online workstation, 15 transfer trolley, 16 offline cabinet area, 17 secondary line improvement workstation, 18 secondary line conveyor, 19 secondary improvement workstation, 20 secondary improvement conveyor, 21 single machine quality inspection workstation, 22 quality inspection conveyor, 23 single machine withstand voltage test workstation, 24 non-assembled cabinet offline conveyor, 25 online withstand voltage test room, 26 pneumatic double door, 27 grounding copper rod point, 28 power supply, 29 manual single door, 30 single machine withstand voltage test room, 31 single machine withstand voltage test conveyor. DETAILED DESCRIPTION
[0042] The present invention is further described below in conjunction with the accompanying drawings:
[0043] like Figure 1-3 The method for automatically producing a ring main unit shown comprises the following steps:
[0044] Step 1, cabinet:
[0045] Step 1.1, transport the gas box, secondary box and cabinet sheet metal to the offline cabinet area 16;
[0046] Step 1.2, assemble the cabinet sheet metal to form a base;
[0047] Step 1.3, lift the gas box to the top of the base and connect and fix it;
[0048] Step 1.4, lift the secondary box to the top of the gas box and connect and fix it to form a complete cabinet.
[0049] Step 2, put the primary components in place:
[0050] Put the components of the cabinet assembled in step 1 into place.
[0051] Step 3, secondary line improvement: lift the cabinet with the primary components in place in step 3 to the on-line conveyor 13 on the on-line station 14, and the transfer trolley 15 runs to the on-line conveyor 13 of the on-line station 14. The on-line conveyor 13 transports the cabinet to the transfer trolley 15, and the transfer trolley 15 transports it to the secondary line conveyor 18 on the secondary line improvement station 17, and the operator performs the connection and improvement work of the secondary line on the cabinet;
[0052] When the secondary line conveyor 18 has cabinets that have not been fully connected, the transfer trolley 15 will transport the cabinets transferred from the on-line conveyor 13 to the buffer conveyor 12 after the on-line. After the cabinets on the secondary line conveyor 18 are transferred to the next workstation, the transfer trolley 15 will transport the cabinets on the buffer conveyor after the secondary line to the secondary line conveyor 18, and the operator will complete the connection of the secondary line on the cabinet.
[0053] Step 4: Complete the mechanism room and cable room:
[0054] Move the transfer trolley 15 to the secondary line conveyor 18, and the secondary line conveyor 18 transports the cabinet after the secondary line connection is completed in step 3 to the transfer trolley 15, and then transports it to the secondary improvement conveyor 20 on the secondary improvement station 19 through the transfer trolley 15, and the operator improves the mechanism room and cable room on the cabinet;
[0055] When the secondary improvement conveyor 20 has a cabinet whose mechanism room and cable room have not been completed, the transfer trolley 15 will transport the cabinet transferred from the secondary line conveyor 18 to the secondary improvement buffer conveyor 9. After the cabinet on the secondary improvement conveyor 20 is transferred to the next workstation, the transfer trolley 15 will send the cabinet on the secondary improvement buffer conveyor 9 to the secondary improvement conveyor 20, and the operator will perform the improvement work on the mechanism room and cable room on the cabinet.
[0056] Step 5, single machine inspection and debugging: Move the transfer trolley 15 to the secondary improvement conveyor 20, and the secondary improvement conveyor 20 will transport the cabinets of the mechanism room and the cable room after improvement in step 4 to the transfer trolley 15, and then transport them to the quality inspection conveyor 22 on the single machine quality inspection station 21 through the transfer trolley 15, and the quality inspectors will conduct single machine inspection and debugging;
[0057] If the inspection is qualified, it is sent to the next workstation; if the inspection is unqualified, the unqualified cabinet is transferred to the abnormal offline conveyor 11 by the transfer car 15, and then lifted away by the crane for rework.
[0058] Step 6, single machine withstand voltage test:
[0059] Move the transfer trolley 15 to the quality inspection conveyor 22, and transport the cabinets that have passed the quality inspection in step 5 to the pneumatic double-opening door 26 of the single-machine withstand voltage test station 23 via the quality inspection conveyor 22. The pneumatic double-opening door 26 is opened, and the cabinets are transported to the single-machine withstand voltage test conveyor 31 of the single-machine withstand voltage test station 23 via the transfer trolley 15 through the pneumatic double-opening door 26, and the test personnel conduct the single-machine withstand voltage test;
[0060] If the test is qualified, it is sent to the next workstation; if the test is unqualified, the unqualified cabinet is transferred to the abnormal offline conveyor 11 by the transfer car 15, and then lifted away by the crane for rework.
[0061] Step 7, assemble the cabinet:
[0062] Move the transfer trolley 15 to the pneumatic double door 26 of the single-machine pressure test station 23, open the start double door of the single-machine pressure test station 23, and transport the cabinet body that has passed the test in step 6 to the transfer trolley 15 through the single-machine pressure test conveyor 31. The above cabinet body is transported to the cabinet assembly offline conveyor 2 of the cabinet assembly offline station 4 by the transfer trolley 15, and the base for cabinet assembly is transported to the cabinet assembly counter conveyor 3 by a crane, and then the above cabinet body is hoisted to the base. After assembling multiple cabinets on the base, the outer shell is covered on the outside of the assembled multiple cabinets to complete the cabinet assembly process.
[0063] Step 8, general inspection and joint debugging:
[0064] In step 7, the assembled electrical cabinet is sent to the joint debugging conveyor 5 at the general inspection and joint debugging station 6 through the assembly counter conveyor 3. The tester performs a general inspection and joint debugging on the assembled electrical cabinet. Regardless of whether the inspection result is qualified or not, it will be transported to the next station.
[0065] Step 9, total withstand voltage test:
[0066] The electrical cabinet after inspection in step 8 is directly sent to the online voltage test station 7 through the joint adjustment conveyor 5, the pneumatic double door 26 at the front end of the online voltage test station 7 is opened, and the electrical cabinet enters the pneumatic double door 26 at the front end and falls on the online voltage test conveyor 8 of the online voltage test station 7. If it is an electrical cabinet that fails the debugging in step 8, it will be directly transported out by the online voltage test conveyor 8 and reworked. If the electrical cabinet passes the debugging in step 8, the tester will perform an online voltage test. After the test is passed, the pneumatic double door 26 at the rear end of the online voltage test station 7 will be opened, and the tested electrical cabinet will be sent out of the pneumatic double door 26 at the rear end through the online voltage test conveyor 8; when the test is qualified, the qualified electrical cabinet will be hoisted to the qualified product area. If the test is unqualified, the crane will hoist it away for rework.
[0067] Step 10, complete before going offline.
[0068] In the present invention, each workstation is arranged on both sides of the transfer conveyor line 1, and two transfer carts 15 are provided, one for transporting the front half of the transfer conveyor line 1, and the other for transporting the back half of the transfer conveyor line 1, so as to avoid the problem of untimely transportation between the workstations due to the transfer conveyor line 1 being too long.
[0069] The conveyors of each workstation are close to both sides of the transfer conveyor line 1 and can be docked with the transfer trolley 15. The conveyors on each workstation are provided with a control panel 10. The corresponding conveyors and transfer trolleys 15 are started through the control panel 10, so that the transfer trolleys 15 move along the transfer conveyor line 1 to the corresponding conveyors. The conveyors transfer the products placed on them to the transfer trolleys 15, and the transfer trolleys 15 transport the products to the conveyors corresponding to the next workstations. During the entire operation process, the products are fixed on the pallets, and the pallets are hoisted on the conveyors. All operations are performed on the conveyors at the corresponding workstations, which makes the operation more convenient, reduces unnecessary hoisting and operation, and saves time and effort.
[0070] During operation, the gas box, cabinet sheet metal and secondary box are assembled into a complete cabinet body in the offline cabinet area 16, and the cabinet body and the pallet are lifted and fixed. Then the cabinet body and the pallet are transported to the online station 14, and the operation of placing the primary components is carried out. The connected cabinet body and the pallet are lifted to the online conveyor 13. By operating the control panel 10, the transfer trolley 15 is dispatched to be in the same horizontal direction as the online conveyor 13. The cabinet out button on the control panel 10 is pressed to start the online conveyor 13, and the cabinet body is transported to the transfer trolley 15. The transfer trolley arranges the cabinet body according to the established logic. The cabinets are transported to the corresponding vacant secondary line conveyor 18 in the secondary line improvement station 17 in sequence. The operator of the secondary line improvement station 17 starts the secondary line conveyor 18 through the control panel 10 in the station to receive the cabinets on the transfer trolley 15. Then the operator completes the secondary line connection on the cabinet. If there is no vacant space on the secondary line conveyor 18 at the secondary line improvement station 17, the transfer trolley 15 will transfer the cabinets received from the online conveyor 13 to the buffer conveyor 12 after the online conveyor 13 is temporarily stored, and then transfer back to the secondary line conveyor 18 when there is a vacant space on the secondary line conveyor 18.
[0071] After the secondary line connection is completed, the operator dispatches the transfer trolley 15 through the control panel 10, and transports the cabinet with the completed secondary line to the secondary improvement conveyor 20 on the secondary improvement station 19 through the transfer trolley 15, and the operator performs the improvement work in the mechanism room and cable room of the cabinet; if there is no vacancy on the secondary improvement conveyor 20, the transfer trolley 15 will transfer the cabinet to the secondary improvement buffer conveyor 9 for temporary storage, and wait until the secondary improvement conveyor 20 is empty, and then it will be transferred back by the transfer trolley 15.
[0072] After a single electrical cabinet is assembled, the operator dispatches the transfer cart 15 through the control panel 10, and the conveyor 20 after secondary improvement transports it to the transfer cart 15, and then the transfer cart 15 transfers it to the quality inspection conveyor 22. The quality inspection conveyor 22 is relatively long and can accommodate two single electrical cabinets for inspection and debugging at the same time. If the inspection and debugging are unqualified, the operator dispatches the transfer cart 15 through the control panel 10 to transfer the unqualified electrical cabinet to the abnormal offline conveyor 11, and the abnormal offline conveyor 11 receives the unqualified electrical cabinet, and finally a crane lifts it to the rework station for rework; if the inspection is qualified, the qualified single electrical cabinet is transferred to the single-machine voltage withstand test station 23 by the transfer cart 15.
[0073] A closed single-machine withstand voltage test room 30 is provided at the single-machine withstand voltage test station 23, so that the withstand voltage test can be conducted without external interference, which is safe and reliable; a pneumatic double-opening door 26 is provided on the side of the single-machine withstand voltage test room 30 close to the transfer conveyor line 1, and a manual single-opening door 29 is provided on the opposite side, and a single-machine withstand voltage test conveyor 31 is provided in conjunction with the pneumatic double-opening door 26, and a power supply 28 and a grounding copper rod point 27 are respectively provided on both sides of the single-machine withstand voltage test conveyor 31, which is convenient for connection testing; the tester is manually opened through the single-opening door 29 Entering and exiting the single-machine pressure test room 30, the single electrical cabinet to be tested enters and exits the single-machine pressure test room 30 through the pneumatic double-opening door 26; if the test result is unqualified, it will be transferred to the abnormal offline conveyor 11 by the transfer trolley 15, and lifted away by the crane for rework; if the test result is qualified and there is no need to perform cabinet assembly operation, the single electrical cabinet will be directly transferred to the non-assembly cabinet offline conveyor 242 by the transfer trolley 15, and lifted away by the crane to the finished product area for placement. If cabinet assembly operation is required, it will be transferred to the assembly cabinet offline conveyor 2 of the assembly cabinet offline station 4 by the transfer trolley 15.
[0074] Cabinet assembly means assembling multiple single electrical cabinets that have passed the test side by side on a base. First, lift the base onto the assembly counter conveyor 3, and then use a crane to lift the single electrical cabinet from the assembly counter offline conveyor 2 and remove the pallet. Then, lift it onto the base and fix the remaining bases. The assembled electrical cabinets are transported to the joint debugging conveyor 5 via the assembly counter conveyor 3. The inspection personnel will perform online debugging on the multiple electrical cabinets after the assembly. Regardless of whether the debugging results are qualified or not, the electrical cabinets are transported by the joint debugging conveyor 5 to the pneumatic double door 26 of the online pressure test room 25.
[0075] An enclosed online withstand voltage test room 25 is provided at the online withstand voltage test station 7, so that the withstand voltage test can be conducted without external interference, which is safe and reliable; a pneumatic double-opening door 26 is provided on the front side of the online withstand voltage test room 25 close to the joint adjustment conveyor 5, and a manual single-opening door 29 and a start double-opening door are provided on the opposite rear side, and an online withstand voltage test conveyor 8 is provided in conjunction with the two pneumatic double-opening doors 26, and a power supply 28 and a grounding copper rod point 27 are provided on the same side of the online withstand voltage test conveyor 8, which is convenient for connection testing; the pneumatic double-opening door 26 on the front side is opened, and the electrical cabinet is opened from The joint adjustment conveyor 5 transports to the online voltage withstand test conveyor 8. If the joint adjustment of the previous process fails, it will be directly transported out from the starting double doors on the rear side by the online voltage withstand test conveyor 8, and lifted by a crane to a specially opened rework station for rework; the electrical cabinet that has passed the joint adjustment of the previous process is connected to the power supply 28 and the grounding copper rod point 27 for an online voltage withstand test. If the test fails, it will be transported out from the starting double doors on the rear side and lifted by a crane to a specially opened rework station for rework; if the test is qualified, it will be transported out from the starting double doors on the rear side and lifted by a crane to the qualified product area for placement.
[0076] The whole operation process is divided into two modes, one is automatic mode and the other is manual mode. In the automatic mode, fixed logic automatic control is adopted. Starting from the online station 14, the operator presses the cabinet button on the control panel 10, and the transfer cart 15 comes to the online conveyor 13 according to the set logic sequence, and is connected to the electrical cabinet from the online conveyor 13. The logic program is used to determine whether there is a vacant position on the next station. If there is, it is directly sent to the secondary line conveyor 18 with a vacant position. If there is no vacant position on the secondary line conveyor 18, the electrical cabinet is directly sent to the buffer conveyor 12 after the online operation for temporary storage by intelligent identification. Once there is a vacant position on the secondary line conveyor 18, the electrical cabinet on the buffer station after the online operation is preferentially transferred to the secondary line conveyor 18 through the transfer cart 15. ; When there is a vacant space on the conveyor 20 after secondary improvement, the transfer cart 15 directly transfers the electrical cabinet of the previous station to the conveyor 20 after secondary improvement with a vacant space. If there is no vacant space, the transfer cart 15 transports the electrical cabinet to the corresponding buffer conveyor 9 after secondary improvement for temporary storage. When there is a vacant space on the conveyor 20 after secondary improvement, the transfer cart transfers the electrical cabinet of the buffer conveyor 9 after secondary improvement to the conveyor 20 after secondary improvement with a vacant space; and the electrical cabinet sent out from the conveyor 20 after secondary improvement is automatically transferred from the single-machine quality inspection station 21, the single-machine withstand voltage test station 23, the cabinet assembly offline station 4, the general inspection and joint adjustment station 6, and the online withstand voltage test station 7 in accordance with the set procedures.
[0077] In manual mode, the entry and exit of the electrical cabinet at each workstation requires the operator to operate the control panel 10. The operator at the previous workstation presses the cabinet exit key on the control panel 10, and the transfer trolley 15 comes to the conveyor corresponding to the workstation and takes the electrical cabinet. If the operator at the next workstation does not press the cabinet entry key, the transfer trolley 15 will transfer the electrical cabinet to the corresponding buffer conveyor for temporary storage, waiting for the operator at the next workstation to press the cabinet entry key, and then the transfer trolley 15 will deliver the electrical cabinet on the buffer conveyor to the conveyor corresponding to the next workstation; for a single machine The quality inspection station 21, the single-machine withstand voltage test station 23, the cabinet assembly offline station 4, the general inspection and joint adjustment station 6, and the online withstand voltage test station 7, these stations without buffer conveyors, are operated by the operators at each station to operate the control panel 10 to control the entry and exit of the electrical cabinets. Since the single-machine quality inspection station 21 has three quality inspection conveyors 22, each of which can accommodate two electrical cabinets, one or two of them can be used as buffer conveyors to temporarily store the electrical cabinets transmitted from the previous station, so as to avoid the next station not having time to process them, resulting in no place to temporarily store the electrical cabinets and blocking the entire production line.
[0078] The present invention can separate the workstations of each process in the production process of the electrical cabinet. Different processes are in different workstations without interfering with each other. The product of the previous process is transferred to the next process through the conveyor and the transfer trolley 15, which ensures that each process can be carried out in an orderly manner, and the required materials are also placed separately according to the requirements of each process and will not be mixed together, which greatly improves the production efficiency and avoids idle waste of personnel.
[0079] The present invention is not limited to the above-mentioned embodiments. On the basis of the technical solution disclosed herein, technicians in this field can make some substitutions and deformations to some technical features therein according to the disclosed technical content without creative labor, and these substitutions and deformations are all within the protection scope of the present invention.
Claims
1. A method for automatically producing a ring main unit, characterized in that: The following steps are involved: Step 1, cabinet; Step 1.1, transport the gas box, secondary box and cabinet sheet metal to the offline cabinet area; Step 1.2, assemble the cabinet sheet metal to form a base; Step 1.3, lift the gas box to the top of the base and connect and fix it; Step 1.4, hoist the secondary box to the top of the gas box and connect and fix it to form a complete cabinet; Step 2, put the primary components in place; Place the components of the cabinet assembled in step 1 in place; Step 3, secondary line improvement; Lift the cabinet with the primary components in place in step 3 to the on-line conveyor at the on-line station. The transfer trolley runs to the on-line conveyor at the on-line station. The on-line conveyor transports the cabinet to the transfer trolley, which is then transported to the secondary line conveyor at the secondary line improvement station. The operator performs the connection and improvement work on the secondary line on the cabinet. When there are cabinets that have not been connected yet on the secondary line conveyor, the transfer trolley will transport the cabinets transferred from the on-line conveyor to the buffer conveyor after the on-line conveyor. After the cabinets on the secondary line conveyor are transferred to the next workstation, the transfer trolley will then transport the cabinets on the buffer conveyor after the secondary line to the secondary line conveyor, and the operator will complete the connection of the secondary line on the cabinet; Step 4: Complete the mechanism room and cable room; Move the transfer trolley to the secondary line conveyor, and the secondary line conveyor will transport the cabinet after the secondary line connection is completed in step 3 to the transfer trolley, and then transport it to the secondary improvement conveyor on the secondary improvement station by the transfer trolley, and the operator will improve the mechanism room and cable room on the cabinet; When the conveyor after secondary improvement has cabinets that have not yet completed the mechanism room and cable room, the transfer trolley will transport the cabinets transferred from the secondary line conveyor to the buffer conveyor after secondary improvement. After the cabinets on the conveyor after secondary improvement are transferred to the next workstation, the transfer trolley will then transport the cabinets on the buffer conveyor after secondary improvement to the conveyor after secondary improvement, and the operator will perform the improvement work on the mechanism room and cable room on the cabinet; Step 5: Single machine inspection and debugging; Move the transfer trolley to the secondary improvement conveyor, and the secondary improvement conveyor will transport the improved cabinets in the mechanism room and cable room in step 4 to the transfer trolley, and then transport them to the quality inspection conveyor on the single machine quality inspection station by the transfer trolley, and the quality inspectors will conduct single machine inspection and debugging; If the inspection is qualified, it will be sent to the next station; If the inspection fails, the unqualified cabinet will be transferred to the abnormal offline conveyor by the transfer car, and then lifted away by the crane for rework; Step 6: Single machine withstand voltage test; Move the transfer trolley to the quality inspection conveyor, and transport the cabinet that has passed the quality inspection in step 5 to the pneumatic double door of the single-machine withstand voltage test station via the quality inspection conveyor. The pneumatic double door is opened, and the cabinet is transported to the single-machine withstand voltage test conveyor of the single-machine withstand voltage test station via the transfer trolley through the pneumatic double door, and the tester performs the single-machine withstand voltage test; If the test is qualified, it will be sent to the next workstation; if the test is unqualified, the unqualified cabinet will be transferred to the abnormal offline conveyor by the transfer car, and then lifted away by the crane for rework; Step 7, assemble the cabinet; Step 8: Overall inspection and joint debugging; Step 9, total withstand voltage test; Step 10, complete before going offline.
2. The automatic production method of a ring main unit according to claim 1, characterized in that: The specific content of step 7 is as follows: Move the transfer trolley to the pneumatic double door of the single-machine pressure test station, open the start double door of the single-machine pressure test station, and transport the cabinet that has passed the test in step 6 to the transfer trolley through the single-machine pressure test conveyor. The above cabinet is transported to the cabinet assembly offline conveyor of the cabinet assembly offline station by the transfer trolley, and the base for cabinet assembly is transported to the cabinet assembly counter conveyor by a crane, and then the above cabinet is hoisted to the base. After assembling multiple cabinets on the base, cover the outer shell on the outside of the assembled multiple cabinets to complete the cabinet assembly process.
3. The automatic production method of a ring main unit according to claim 2 is characterized in that: The specific contents of step 8 are as follows: In step 7, the assembled electrical cabinet is sent to the joint debugging conveyor at the general inspection and joint debugging station through the assembly counter conveyor. The tester conducts a general inspection and joint debugging on the assembled electrical cabinet. Regardless of whether the inspection result is qualified or not, it will be transported to the next station.
4. The automatic production method of a ring main unit according to claim 3 is characterized in that: The specific content of step 9 is as follows: The electrical cabinet inspected in step 8 is directly sent to the online voltage withstand test station through the joint adjustment conveyor, the pneumatic double door at the front end of the online voltage withstand test station is opened, and the pneumatic double door at the front end of the electrical cabinet falls on the online voltage withstand test conveyor of the online voltage withstand test station. If it is an electrical cabinet that fails to be debugged in step 8, it will be directly transported out by the online voltage withstand test conveyor for rework. If the electrical cabinet passes the debugging in step 8, the tester will conduct an online voltage withstand test. After the test is passed, the pneumatic double door at the rear end of the online voltage withstand test station will be opened, and the tested electrical cabinet will be sent out of the pneumatic double door at the rear end through the online voltage withstand test conveyor; when the test is qualified, the qualified electrical cabinet will be hoisted to the qualified product area. If the test is unqualified, the crane will hoist it away for rework.
