Multi-field coupled ore-drawing vibration simulation experimental device and experimental method
By designing a multi-field coupled ore-running vibration simulation experimental device, and combining blasting vibration and seepage water pressure, the problem of simulating the movement law of ore, rock and loess layers in caving mining was solved, and the analysis of prevention or mitigation of mudslide disasters was realized.
Patent Information
- Application Number
- CN202111016198.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-08-31
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2041-08-31
AI Technical Summary
Existing technologies are unable to effectively simulate the movement patterns of ore, rock, and loess layers during caving mining, especially under the coupled conditions of seepage and blasting vibration, which makes it difficult to prevent water and mud inrush disasters.
Design a multi-field coupled ore-feeding vibration simulation experimental device, including a vibration loading module, an inlet module and a seepage box, combined with a blasting vibration module, to observe the movement patterns of ore, rock and loess by simulating blasting vibration and seepage water pressure.
It enables effective simulation of ore, rock, and loess layers during caving mining, and provides stress state analysis under the coupled conditions of seepage and blasting vibration, helping to prevent or mitigate mudslide disasters in underground mining.
Smart Images

Figure CN113624674B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of mining, and in particular to a multi-field coupling ore-drawing vibration simulation experimental device and an experimental method. Background Art
[0002] Water and mud inrush disaster is a common geological disaster in mines and tunnels. Water and mud inrush disasters are usually characterized by suddenness, high flow rate, high pressure, and strong destructiveness, which bring great harm to engineering activities such as tunnel construction and mining. Underground mines using caving mining are prone to such accidents during the ore discharge process. When caving mining is adopted, the distribution characteristics of ore rock during the ore discharge process in the stope are: the upper part is the covering layer, and the lower part is the caving ore layer. Under normal circumstances, the covering layer can be divided into two layers: the upper layer is loess, sand and gravel, etc., and the lower layer is gravel. When it rains, rainwater gradually penetrates into the soil layer and carries mud and sand into the gravel layer. Because the loess has fine grain size, when there is little water, the fine-grained loess flows faster during the mining and ore discharge process, and it is very easy to flow quickly to the ore discharge port along the gaps between waste rock or ore; when there is a lot of water, the loess turns into yellow mud when it meets water, and the pores, cracks, joints, etc. also become yellow mud storage places and migration channels, resulting in mechanical behavior of the rock mass that is different from that when there is little water. Due to the disturbance of engineering construction and mining such as blasting, the rock mass is weakened and damaged, which further increases the contact area between water and rock. At the same time, the mining stress is added to the surrounding rock as a secondary stress field during excavation disturbance, which changes the stress state of the surrounding rock and causes changes in the water-rock coupling environment. In particular, when the blasting collapses the mine, the mud and water seepage field of the surrounding rock will change dynamically under the action of the impact load. Therefore, according to the characteristics of the caving mining structure, it is necessary to study the ore-laying simulation vibration test device that simulates the movement of ore and rock caused by blasting collapse vibration, and take the mine covered with loess layer on the ore body and caving method as the basic prototype, simulate the movement process of loess layer and gravel layer during the ore-laying process under the environment of stress field, seepage field and blasting mining disturbance, and explore the law of mud burst. Summary of the invention
[0003] In order to solve the above technical problems, the present invention provides a multi-field coupling ore-drawing vibration simulation experimental device with a simple structure, and provides a multi-field coupling ore-drawing vibration simulation experimental method.
[0004] The technical solution of the present invention to solve the above problems is: a multi-field coupled ore-feeding vibration simulation experimental device, comprising a vibration loading module, an inlet module, and a seepage box; the vibration loading module is located at the bottom and is driven by a motor to vibrate; the inlet module is arranged on the vibration loading module, the inlet module is an iron box, a plurality of inlets are arranged at the bottom of the box, the front end of the inlet is a mine outlet, and ore, rock and loess layers are sequentially installed above the inlet in the box; the seepage box is arranged on the inlet module, the seepage box is filled with water and the water pressure is adjustable.
[0005] The above-mentioned multi-field coupled mining vibration simulation experimental device has a blasting vibration module for simulating blasting vibration in the box, and the blasting vibration module includes a vibration block installed on the access road. A number of blast holes are distributed in a fan shape on the vibration block, and each blast hole is loaded with explosives.
[0006] In the above-mentioned multi-field coupled ore-drawing vibration simulation experimental device, the number of blastholes on the vibration block is 5, and the angles between the axes of the blastholes and the horizontal plane are 66°, 78°, 90°, 78°, and 66° respectively.
[0007] In the above-mentioned multi-field coupled ore-drawing vibration simulation experimental device, the tunnel roof of each approach in the approach module adopts a pull-out structure.
[0008] A multi-field coupled ore-drawing vibration simulation experimental method comprises the following steps:
[0009] Step 1: Make the access module in proportion, place ore and rock inside the box based on the actual situation of the mine, and cover the ore and rock with a loess layer;
[0010] Step 2: The access module works alone, and the ore-releasing step distance is set so that the ore, rock and loess layers are released in batches according to the step distance. Each time the ore is released, the tunnel roof is pulled out by one step distance, which is equivalent to completing a mine collapse blasting. The ore, rock and loess in the box enter the tunnel in turn, and the ore, rock and loess in the tunnel are shoveled out with a shovel to simulate the on-site mining process, and the volume and weight of the ore, rock and loess in the ore are counted, and the movement law of the ore, rock and loess is observed;
[0011] Step 3: The inlet module and the seepage box work together. The seepage box is placed on the upper part of the box. The seepage box is filled with water. The water pressure is adjusted by the pressure valve to load different intensities of seepage water pressure to simulate the ore-extraction process under the seepage water pressure.
[0012] Step 4: The access module and the blasting vibration module work together, placing explosives in each blast hole on the vibration block, installing the blasting vibration module on the access, igniting the explosives, simulating the blasting vibration ore-laying process, and observing the impact on the ore and rock in the adjacent step distance;
[0013] Step 5: The route module, seepage box, and blasting vibration module work together to simulate the ore-drawing process under seepage water pressure and blasting vibration;
[0014] Step 6: Place the access module on the vibration loading module, cooperate with any of the working conditions in steps 2 to 5, start the motor, simulate mechanical vibration, and when the access module is mining as usual, observe and count the different proportions of ore, rock and loess shoveled out, and explore the influence of mechanical vibration on the movement law of ore, rock and loess.
[0015] In the above-mentioned multi-field coupled mining vibration simulation experimental method, in the step four, the blasting vibration module is 90 mm thick and is cast and solidified through a mold with sand, white cement and water in a volume ratio of 1:2:1. The edge angle of the mold is 54°, and 5 φ28 mm steel bars are placed in the middle of the mold, with angles of 66°, 78°, 90°, 78° and 66° respectively. After the cement and sand mixture is cast and formed, the steel bars are pulled out after 4 hours to form 5 blast holes; after the cement is completely solidified, the blasting vibration module is completed.
[0016] In the above-mentioned multi-field coupled mining vibration simulation experimental method, in step six, according to the blasting vibration frequency, the vibration loading module frequency is set to 5 levels: 50Hz, 100Hz, 150Hz, 200Hz, 250Hz; the amplitude is set to: 0.5mm / s, 1 mm / s, 1.5mm / s, 2 mm / s, 2.5 mm / s.
[0017] The beneficial effects of the present invention are as follows: the present invention can directly simulate the ore rock and loess releasing process of caving mining, and can load seepage water pressure above the ore rock through the seepage box, simulate the blasting construction through the blasting vibration module, and realize the coupled loading of seepage water pressure and blasting vibration, so as to better simulate the stress state and ore rock releasing law of the ore rock under the joint action of seepage water pressure, blasting vibration and ground stress in the caving mining process, analyze the disintegration process and particle size distribution law of loess blocks on the upper part of the ore body, analyze the propagation law of vibration waves in the dispersed medium and the mechanical behavior of the dispersed body in the vibration field, analyze the flow dynamics behavior of the loess gravel covering layer, and provide theoretical guidance for preventing or reducing the water seepage and mud disasters in underground mining. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a schematic diagram of the structure of the experimental device of the present invention.
[0019] Figure 2 This is a schematic diagram of the structure without the blasting vibration module.
[0020] Figure 3 for Figure 1 Schematic diagram of the structure of the central access module.
[0021] Figure 4 for Figure 1 Dimensional diagram of the central access module. DETAILED DESCRIPTION
[0022] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0023] like Figure 1As shown, a multi-field coupled ore-drawing vibration simulation experimental device comprises a vibration loading module 1, an inlet module 2 and a seepage box 3; the vibration loading module 1 is located at the bottom and driven by a motor to vibrate; the inlet module 2 is arranged on the vibration loading module 1, the inlet module 2 is an iron box 5, a plurality of inlets 4 are arranged at the bottom of the box 5, the front end of the inlet 4 is a mine outlet, and the tunnel roof of each inlet 4 adopts a pull-out structure; ore, rock and loess layers are sequentially installed above the inlet 4 in the box 5; the seepage box 3 is arranged on the inlet module 2, and the seepage box 3 is filled with water and the water pressure is adjustable.
[0024] The box 5 is provided with a blasting vibration module for simulating blasting vibration, and the blasting vibration module includes a vibration block 6, which is installed on the access road 4. Five blast holes 7 are distributed in a fan shape on the vibration block 6, and explosives are loaded in each blast hole 7. The angles between the axes of the blast holes 7 and the horizontal plane are 66°, 78°, 90°, 78°, and 66° respectively.
[0025] Before the experiment, the site conditions of the mining site were determined first. The ore body was mined by the pillarless sublevel caving method. The current mining level is -50m, the sublevel height is 12m, and the ore body is covered with nearly 20m thick waste rock and loess layer. 4 access routes are arranged along the direction of the ore body, and three access routes are arranged in each level, with an access spacing of 10m. A block is divided every 50m, and the width of the block is equal to the horizontal thickness of the ore body, which is 30m on average. The mining access route is a 1 / 4 three-center arch with specifications of width × height = 3.6m × 3m, and 3‰ uphill excavation. The fan-shaped medium-deep hole blasting is used to drop the ore, with 7 rows of blast holes with a face angle of 90° and a side hole angle of 54°. The inclination angle of the funnel wing is 54°; one row of blast holes is caved each time, and the row spacing is 1.8m. The T4G machine is used to mine, with a bucket volume of 0.3m3, a storage bin volume of 1.80m3, and a shoveling depth of about 0.5m.
[0026] A multi-field coupled ore-drawing vibration simulation experimental method comprises the following steps:
[0027] Step 1: Produce the access module 2 in proportion. Considering factors such as indoor space and model weight, the simulation ratio of the model is selected as C. L =20, that is, make a 1:20 iron model and reinforce it with angle steel around it, such as Figure 3 , Figure 4 As shown, the 3 approaches to the mining site are simulated, and the ore body ore-drawing process with 4 steps in each approach. Model specifications of the approach module 2: length × width × height = 1370 × 390 × 815 mm 3 , the distance between the accesses is 500mm, and the iron sheet of the model box 5 is about 15mm thick. Model access: width × height = 180mm × 150mm; the arc length of the three-center arch of the tunnel roof is 210mm, made of movable iron sheet, and can be pulled; based on the actual situation of the mining site, ore and rock are placed inside the box 5, and the loess layer is covered on the top of the ore and rock.
[0028] Step 2: The access module 2 works alone, and the ore-releasing step distance is set to 90 mm, so that the loaded ore, rock and loess layers are released in batches according to the step distance. Each time the ore is released, the tunnel roof is pulled out by one step distance, which is equivalent to completing a mine collapse blasting. The ore, rock and loess in the box 5 enter the tunnel in turn, and the ore, rock and loess in the tunnel are shoveled out with a shovel to simulate the on-site mining process, and the volume and weight of the ore, rock and loess in the ore are counted, and the movement law of the ore, rock and loess is observed. High-strength bulletproof tempered glass observation windows are installed on the front and back upper parts of the model box 5 to facilitate monitoring the movement of the ore, rock and loess layer.
[0029] Step 3: The inlet module 2 and the seepage box 3 work together. The seepage box 3 is placed on the upper part of the box body 5. The seepage box 3 is filled with water. The water pressure is adjusted by the pressure valve to load different intensities of seepage water pressure to simulate the mining process under the seepage water pressure.
[0030] Step 4: The access module 2 works together with the blasting vibration module. Explosives (can be replaced by firecrackers) are placed in each blast hole 7 on the vibration block 6. The blasting vibration module is installed on the access 4, and the explosives are ignited to simulate the blasting vibration ore-releasing process and observe the impact on the ore and rock in adjacent steps.
[0031] Fan-shaped medium-deep hole blasting is used on site. The face angle of the blast holes is 90°, the side hole angle is 54°, the blasting vibration module is 90mm thick, and it is made of sand, gravel, white cement and water in a volume ratio of 1:2:1 through casting and solidification through a mold. The side angle of the mold is 54°, and 5 φ28mm steel bars are placed in the middle of the mold, with angles of 66°, 78°, 90°, 78°, and 66° respectively. After the cement and sand and gravel mixture is cast and formed, the steel bars are pulled out after 4 hours to form 5 blast holes 7; after the cement is completely solidified, the blasting vibration module is completed.
[0032] Step 5: The access module 2, the seepage box 3, and the blasting vibration module work together to simulate the ore-dropping process under the seepage water pressure and blasting vibration.
[0033] Step 6: Place the access module 2 on the vibration loading module 1, cooperate with any working condition in steps 2 to 5, start the motor, simulate mechanical vibration, and when the access module 2 is mining as usual, observe and count the different proportions of ore, rock and loess shoveled out, and explore the influence of mechanical vibration on the movement law of ore, rock and loess.
[0034] According to the blasting vibration frequency, the frequency of vibration loading module 1 is set to 5 levels: 50 Hz, 100 Hz, 150 Hz, 200 Hz, and 250 Hz; the amplitude is set to: 0.5 mm / s, 1 mm / s, 1.5 mm / s, 2 mm / s, and 2.5 mm / s.
Claims
1. A multi-field coupling ore-drawing vibration simulation experimental method is implemented based on a multi-field coupling ore-drawing vibration simulation experimental device, characterized in that: The multi-field coupled ore-drawing vibration simulation experimental device includes a vibration loading module, an inlet module, and a seepage box; the vibration loading module is located at the bottom and is driven by a motor to vibrate; the inlet module is arranged on the vibration loading module, the inlet module is an iron box, a plurality of inlets are arranged at the bottom of the box, the front end of the inlet is a mine outlet, and the box is filled with ore, rock and loess layers above the inlet in sequence; the seepage box is arranged on the inlet module, the seepage box is filled with water and the water pressure is adjustable; The box body is provided with a blasting vibration module for simulating blasting vibration, the blasting vibration module comprises a vibration block, the vibration block is installed on the access road, a plurality of blast holes are distributed on the vibration block in a fan shape, and each blast hole is filled with explosives; The experimental method includes the following steps: Step 1: Make the access module in proportion, place ore and rock inside the box based on the actual situation of the mine, and cover the ore and rock with a loess layer; Step 2: The access module works alone, and the ore-releasing step distance is set so that the ore, rock and loess layers are released in batches according to the step distance. Each time the ore is released, the tunnel roof is pulled out by one step distance, which is equivalent to completing a mine collapse blasting. The ore, rock and loess in the box enter the tunnel in turn, and the ore, rock and loess in the tunnel are shoveled out with a shovel to simulate the on-site mining process, and the volume and weight of the ore, rock and loess in the ore are counted, and the movement law of the ore, rock and loess is observed; Step 3: The inlet module and the seepage box work together. The seepage box is placed on the upper part of the box. The seepage box is filled with water. The water pressure is adjusted by the pressure valve to load different intensities of seepage water pressure to simulate the ore-extraction process under the seepage water pressure. Step 4: The access module and the blasting vibration module work together, placing explosives in each blast hole on the vibration block, installing the blasting vibration module on the access, igniting the explosives, simulating the blasting vibration ore-laying process, and observing the impact on the ore and rock in the adjacent step distance; Step 5: The route module, seepage box, and blasting vibration module work together to simulate the ore-drawing process under seepage water pressure and blasting vibration; Step 6: Place the access module on the vibration loading module, cooperate with any of the working conditions in steps 2 to 5, start the motor, simulate mechanical vibration, and when the access module is mining as usual, observe and count the different proportions of ore, rock and loess shoveled out, and explore the influence of mechanical vibration on the movement law of ore, rock and loess.
2. The multi-field coupled ore drawing vibration simulation experimental method according to claim 1, characterized in that: There are 5 blast holes on the vibration block, and the angles between the axes of the blast holes and the horizontal plane are 66°, 78°, 90°, 78°, and 66° respectively.
3. The multi-field coupled ore drawing vibration simulation experimental method according to claim 2 is characterized in that: The top plate of each access road in the access module adopts a removable structure.
4. The multi-field coupled ore drawing vibration simulation experimental method according to claim 1 is characterized in that: In the step 4, the blasting vibration module is 90 mm thick and is formed by pouring and solidifying sand, gravel, white cement and water in a volume ratio of 1:2:1 through a mold. The corner of the mold is 54°. Five φ28 mm steel bars are placed in the middle of the mold, and the angles are 66°, 78°, 90°, 78° and 66° respectively. After the cement and sand mixture is poured into shape, the steel bars are pulled out after 4 hours to form five blast holes. After the cement is completely solidified, the blasting vibration module is completed.
5. The multi-field coupled ore drawing vibration simulation experimental method according to claim 1, characterized in that: In step six, according to the blasting vibration frequency, the vibration loading module frequency is set to 5 levels: 50 Hz, 100 Hz, 150 Hz, 200 Hz, 250 Hz; the amplitude is set to: 0.5 mm / s, 1 mm / s, 1.5 mm / s, 2 mm / s, 2.5 mm / s.