A temperature cycle test system for ceramic products
Through the temperature cycle test system for ceramic products, the combination of the execution unit, heating unit, refrigeration unit and temperature monitoring unit is used to automatically adjust the temperature, which solves the problem of inaccurate temperature during ceramic firing, and improves the quality and firing of ceramic products Control and control.
Patent Information
- Application Number
- CN202110925555.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-08-12
- Publication Date
- 2025-01-03
- Estimated Expiration
- 2041-08-12
AI Technical Summary
The lack of effective temperature monitoring measures during ceramic firing process leads to inaccurate furnace temperature and affects the quality of ceramic products. In addition, traditional temperature measurement methods are based on single signals, making it difficult to choose the most suitable firing temperature.
Design a temperature cycle test system for ceramic products, including an execution unit, a heating unit, a refrigeration unit, a temperature monitoring unit and a control unit. By calculating the temperature spectrum difference and ratio, heating and refrigeration are automatically adjusted to achieve precise temperature control, and Select the most suitable firing temperature through multiple data acquisitions.
It improves the production quality of ceramic products and control of firing temperature, reduces the error rate, and achieves precision temperature control and energy saving.
Smart Images

Figure CN113640335B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of ceramic product production, in particular to a temperature cycle test system for ceramic products, and relates to a ceramic production temperature cycle technology. Background Art
[0002] During the ceramic firing process, it is often necessary to accurately control the temperature and air pressure in the kiln. Too high a kiln temperature or too high an air pressure will affect the quality of the finished ceramic products. However, the current kilns lack effective temperature monitoring measures, which causes ceramics to be fired for too long at inappropriate temperatures, resulting in product quality problems. There is a lack of effective monitoring and implementation measures. At the same time, traditional ceramic kiln temperature measurement often uses a single signal as the transmission data when detecting temperature, and has weak temperature control capabilities. For different ceramic products, it is impossible to select the most suitable firing temperature by comparing multiple data. Therefore, we need to propose a new design solution. Summary of the invention
[0003] The object of the present invention is to provide a temperature cycle test system for ceramic products.
[0004] The technical problems solved by the present invention are:
[0005] (1) How to specifically control the temperature through a heating signal or a cooling signal, cut off the power supply of the compressor and connect the power supply of the evaporator when receiving the heating signal, cut off the power supply of the condenser and connect the power supply of the heater after a first preset time, cut off the power supply of the evaporator and connect the power supply of the compressor when receiving the cooling signal, cut off the power supply of the heater and connect the power supply of the condenser after a second preset time, and transmit the signal to the staff in a timely manner so as to facilitate the subsequent process;
[0006] (2) How to select the most suitable firing temperature for different ceramic products, collect and compare multiple data, and fire the ceramic products at the appropriate temperature.
[0007] The purpose of the present invention can be achieved through the following technical solutions:
[0008] A temperature cycle test system for ceramic products, comprising an execution unit for changing temperature, a heating unit for generating a heating signal, a cooling unit for generating a cooling signal, a temperature monitoring unit for monitoring the temperature of the execution unit, and a control unit for generating an execution signal;
[0009] Among them, the control unit, the execution unit, the heating unit, the refrigeration unit and the temperature monitoring unit are all connected in communication. The control unit generates an execution signal based on the temperature of the execution unit and the temperature of the previous cycle. The heating unit and the refrigeration unit are both connected to the execution unit. The heater is used to heat the liquid delivered to the load device by the circulation system. The condenser is used to exchange heat with the plant water to condense the gas in the refrigeration system pipeline. When the compressor is working, the gas enters the condenser, and then enters the evaporator after condensation. After heat exchange in the evaporator, the temperature rises and finally returns to the compressor. The temperature control device realizes precise temperature control through different control methods of the load device under different states. Since the heater only works when the temperature rises rapidly and does not work in normal temperature control, the device achieves energy saving while realizing precise temperature control.
[0010] The heating unit and the cooling unit generate a heating signal or a cooling signal based on the received execution signal and send it to the execution unit. The execution unit performs temperature control based on the heating signal or the cooling signal. The temperature monitoring unit is connected to the execution unit to record the current cycle temperature.
[0011] Furthermore, the current cycle temperature is specifically a temperature spectrum difference within a preset time period, wherein the temperature spectrum difference is the difference between the highest temperature within the preset time period and the temperature with the highest frequency of occurrence, the previous cycle temperature is specifically a temperature spectrum difference within the previous preset time period, and the execution signal includes a first execution signal and a second execution signal, and the control unit generates an execution signal based on the temperature of the execution unit and the previous cycle temperature, specifically including the following steps: obtaining the current round temperature and the previous cycle temperature; calculating the cycle difference between the current round temperature and the previous cycle temperature, and the sum of the cycle difference and the highest temperature in the current round temperature; judging whether the ratio of the cycle difference to the sum of the highest temperature in the current round temperature to the highest temperature in the previous cycle temperature satisfies a preset relationship, and if so, a first execution signal is generated, otherwise, a second execution signal is generated.
[0012] Furthermore, the preset relationship is specifically:
[0013] If the ratio is <1.1, a first execution signal is generated;
[0014] If the ratio is ≥1.1, a second execution signal is generated;
[0015] The first execution signal is first encoded by a first encoder, and the heating unit includes a first decoder, which is used to decode the first encoding; the second execution signal is second encoded by a second encoder, and the refrigeration unit includes a second decoder, which is used to decode the second encoding.
[0016] Furthermore, the execution unit includes a heater, an evaporator, a heat exchanger, a compressor and a condenser, wherein the heater and the condenser are both connected to the heat exchanger, the heat exchanger is connected to the load device, the compressor is connected to the condenser, the evaporator is connected to the heater, and the execution unit performs temperature control based on the heating signal or the cooling signal specifically as follows:
[0017] When a heating signal is received, the power supply of the compressor is cut off and the power supply of the evaporator is connected. After the first preset time, the power supply of the condenser is cut off and the power supply of the heater is connected. When a cooling signal is received, the power supply of the evaporator is cut off and the power supply of the compressor is connected. After the second preset time, the power supply of the heater is cut off and the power supply of the condenser is connected. The first preset time is the sum of the time required for heater preheating and self-testing; the second preset time is the sum of the time required for condenser precooling and self-testing.
[0018] Compared with the prior art, the present invention has the following beneficial effects:
[0019] (1) By setting a temperature monitoring unit and a control unit, the cycle difference between the current round of temperature and the previous cycle of temperature, as well as the sum of the cycle difference and the highest temperature in the current round of temperature are calculated; it is determined whether the ratio of the sum of the cycle difference and the highest temperature in the current round of temperature to the highest temperature in the previous cycle of temperature satisfies a preset relationship. If it satisfies the preset relationship, a heating signal is executed to cut off the condenser power supply and turn on the heater power supply; if it does not satisfy the preset relationship, a cooling signal is executed to cut off the heater power supply and turn on the condenser power supply; by automatically adjusting heating and cooling, the firing temperature of ceramic products is controlled, the error rate of ceramic products is reduced, and the production quality of ceramic products is improved;
[0020] (2) By measuring the temperature of multiple cycles and selecting the appropriate temperature, the firing temperature of ceramic products is controlled during the heating process, and the most suitable firing temperature is selected to improve the control over the firing of ceramic products. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] In order to facilitate understanding by those skilled in the art, the present invention is further described below with reference to the accompanying drawings.
[0022] Figure 1 It is a flow chart of the temperature cycle test system of the present invention;
[0023] Figure 2 This is a diagram of the temperature cycle test method of the present invention. DETAILED DESCRIPTION
[0024] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined invention purpose, the specific implementation mode, structure, characteristics and effects of the present invention are described in detail below in combination with the accompanying drawings and preferred embodiments.
[0025] See also Figure 1 As shown, a temperature cycle test system for ceramic products includes an execution unit for changing temperature, a heating unit for generating a heating signal, a refrigeration unit for generating a refrigeration signal, a temperature monitoring unit for monitoring the temperature of the execution unit, and a control unit for generating an execution signal; wherein the control unit, the execution unit, the heating unit, the refrigeration unit, and the temperature monitoring unit are all connected in communication, and the signal is transmitted in the connection;
[0026] The control unit generates an execution signal based on the temperature of the execution unit and the temperature of the previous cycle. The heating unit and the refrigeration unit are both connected to the execution unit. The heating unit and the refrigeration unit generate a heating signal or a cooling signal based on the received execution signal and send it to the execution unit. The execution unit performs temperature control based on the heating signal or the cooling signal. The temperature monitoring unit is connected to the execution unit to record the current cycle temperature.
[0027] The current cycle temperature is specifically the temperature spectrum difference within a preset time period, wherein the temperature spectrum difference is the difference between the highest temperature within the preset time period and the temperature with the highest frequency of occurrence, the previous cycle temperature is specifically the temperature spectrum difference within the previous preset time period, and the execution signal includes a first execution signal and a second execution signal. The control unit generates an execution signal based on the temperature of the execution unit and the previous cycle temperature, and specifically includes the following steps: obtaining the current round temperature and the previous cycle temperature; calculating the cycle difference between the current round temperature and the previous cycle temperature, and the sum of the cycle difference and the highest temperature in the current round temperature; judging whether the ratio of the cycle difference to the sum of the highest temperature in the current round temperature to the highest temperature in the previous cycle temperature satisfies the preset relationship, and if so, generates a first execution signal, otherwise, generates a second execution signal.
[0028] The preset relationship is as follows:
[0029] If the ratio is <1.1, a first execution signal is generated;
[0030] If the ratio is ≥1.1, a second execution signal is generated;
[0031] The first execution signal is first encoded by a first encoder, and the heating unit includes a first decoder, which is used to decode the first encoding; the second execution signal is second encoded by a second encoder, and the refrigeration unit includes a second decoder, which is used to decode the second encoding.
[0032] The execution unit includes a heater, an evaporator, a heat exchanger, a compressor and a condenser, wherein the heater and the condenser are both connected to the heat exchanger, the heat exchanger is connected to the load equipment, the compressor is connected to the condenser, and the evaporator is connected to the heater. The heater is used to heat the liquid transported to the load equipment by the circulation system, and the condenser is used to exchange heat with the plant water to condense the gas in the refrigeration system pipeline. When the compressor is working, the gas enters the condenser, and then enters the evaporator after condensation. After heat exchange in the evaporator, the temperature rises and finally returns to the compressor. The temperature control device realizes precise temperature control through different control methods of the load equipment under different states. Since the heater only works when the temperature rises rapidly and does not work in normal temperature control, the device achieves energy saving while realizing precise temperature control.
[0033] The execution unit performs temperature control based on the heating signal or the cooling signal as follows:
[0034] When a heating signal is received, the power supply of the compressor is cut off and the power supply of the evaporator is connected. After the first preset time, the power supply of the condenser is cut off and the power supply of the heater is connected. When a cooling signal is received, the power supply of the evaporator is cut off and the power supply of the compressor is connected. After the second preset time, the power supply of the heater is cut off and the power supply of the condenser is connected. The first preset time is the sum of the time required for heater preheating and self-testing; the second preset time is the sum of the time required for condenser precooling and self-testing.
[0035] See also Figure 2 As shown, the present invention also provides a temperature cycle test method for ceramic products, the method comprising the following steps:
[0036] Step A1, initialization is performed so that S1 is equal to the temperature value of the previous cycle of the target temperature value SV; the purpose of the initialization is to save the temperature value of the previous cycle of the target temperature value SV in S1, so that S1 = SV;
[0037] Step A2, obtaining a real-time target temperature value SV;
[0038] Step A3, calculating the difference Esv between the target temperature value SV and S1, Esv = SV - S1;
[0039] The main purpose of judging the specific relationship between the target temperature value SV and S1 here is to determine whether cooling control or heating control is required;
[0040] Step A4, determining the relationship between the difference Esv and the corresponding value range;
[0041] Step A5, executing a temperature control method corresponding to the numerical range;
[0042] The relationship between the difference Esv and the corresponding value range is judged to determine whether the temperature control mode is cooling control or heating control;
[0043] Step A6, generating different signals according to whether the value is less than 1.1;
[0044] Step A7, if the difference Esv<1.1, when a heating signal is received, the power supply of the compressor is cut off and the power supply of the evaporator is turned on. After the first preset time, the power supply of the condenser is cut off and the power supply of the heater is turned on;
[0045] If the difference Esv≥1.1, when a cooling signal is received, the evaporator power is cut off and the compressor power is turned on. After a second preset time, the heater power is cut off and the condenser power is turned on.
[0046] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Although the present invention has been disclosed as a preferred embodiment as above, it is not used to limit the present invention. Any technical personnel in this field can make some changes or modify the technical contents disclosed above into equivalent embodiments without departing from the scope of the technical solution of the present invention. However, any brief modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solution of the present invention are still within the scope of the technical solution of the present invention.
Claims
1. A temperature cycle test system for ceramic products, characterized in that: It includes an execution unit for changing the temperature, a heating unit for generating a heating signal, a cooling unit for generating a cooling signal, a temperature monitoring unit for monitoring the temperature of the execution unit, and a control unit for generating an execution signal; Among them, the control unit, the execution unit, the heating unit, the refrigeration unit and the temperature monitoring unit are all connected in communication, the control unit generates an execution signal based on the temperature of the execution unit and the temperature of the previous cycle, the heating unit and the refrigeration unit are both connected to the execution unit, the heating unit and the refrigeration unit generate a heating signal or a refrigeration signal based on the received execution signal and send it to the execution unit, the execution unit performs temperature control based on the heating signal or the refrigeration signal, and the temperature monitoring unit is connected to the execution unit to record the temperature of the current cycle; The execution unit performs temperature control based on the heating signal or the cooling signal as follows: When a heating signal is received, the power supply to the compressor is cut off and the power supply to the evaporator is turned on. After a first preset time, the power supply to the condenser is cut off and the power supply to the heater is turned on. When receiving a cooling signal, the evaporator power supply is cut off and the compressor power supply is turned on. After a second preset time, the heater power supply is cut off and the condenser power supply is turned on. The first preset time is the sum of the time required for heater preheating and self-testing, and the second preset time is the sum of the time required for condenser precooling and self-testing; The current period temperature is specifically the temperature spectrum difference within the preset time period, wherein the temperature spectrum difference is the difference between the highest temperature and the most frequently occurring temperature within the preset time period; The last cycle temperature is specifically a temperature spectrum difference in the last preset time period, and the execution signal includes a first execution signal and a second execution signal; The control unit generates an execution signal based on the temperature of the execution unit and the temperature of the previous cycle, which specifically includes the following steps: Get the current round temperature and the previous cycle temperature; Calculate the cycle difference between the current temperature and the previous temperature, as well as the sum of the cycle difference and the highest temperature in the current temperature; Determine whether the ratio of the cycle difference to the sum of the highest temperature in the current cycle of temperature and the highest temperature in the previous cycle of temperature satisfies a preset relationship, and if so, generate a first execution signal, otherwise, generate a second execution signal; The preset relationship is as follows: If the ratio is <1.1, a first execution signal is generated; If the ratio is ≥1.1, a second execution signal is generated.
2. A temperature cycle test system for ceramic products according to claim 1, characterized in that: The first execution signal is first encoded by a first encoder, and the heating unit includes a first decoder, which is used for decoding the first encoding; The second execution signal is second-encoded by a second encoder, and the refrigeration unit includes a second decoder, which is used for decoding the second code.
3. A temperature cycle test system for ceramic products according to claim 1, characterized in that: The execution unit includes a heater, an evaporator, a heat exchanger, a compressor and a condenser, wherein the heater and the condenser are both connected to the heat exchanger, the heat exchanger is connected to the load device, the compressor is connected to the condenser, and the evaporator is connected to the heater.
