Temporary support removal device for continuous beam pier top
Through the design of sliding, suspension and air suction devices, the safety hazards and resource occupation problems during the removal of temporary supports during bridge construction are solved, rapid and safe dismantling and recycling are achieved, and construction efficiency and resource utilization are improved.
Patent Information
- Application Number
- CN202111299761.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-11-04
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2041-11-04
AI Technical Summary
In bridge construction, the removal process of temporary supports has high safety risks and high resource usage. Especially in the construction of tall bridges, it is difficult to achieve efficient and safe removal and recycling of temporary supports with existing technology.
A temporary support removal device for the top of continuous beam piers is designed, including a sliding component, a suspension device and an air suction device. The sliding component is used to adjust the position. The suspension device lifts the debris bucket. The suction device absorbs and recovers debris. The positioning component assists. The removal of sealing bolts enables rapid disassembly and recycling.
It achieves rapid dismantling and recycling of temporary supports, improves construction efficiency, reduces construction costs, reduces safety risks, and saves social resources.
Smart Images

Figure CN113802469B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of construction equipment, in particular to a device for removing temporary supports on top of continuous beam piers. Background Art
[0002] With the increase in investment in infrastructure construction, the design of bridges has changed from the original span-by-span simple support to a continuous structure with a bridge deck and simple support. The continuous beams and slabs are supported by temporary supports. After the construction of the cast-in-place sections and wet joints between the beams and slabs is completed, the steel strands are tensioned, and the temporary supports are removed before pouring the bridge deck concrete, which is the bridge system conversion process. During the system conversion process, temporary supports need to be removed in advance. Temporary supports often adopt a sand box structure, and large machinery and manual labor are required during the removal process. Especially in the removal process of temporary supports on tall bridges, there are high safety risks and a great resource occupation rate. Summary of the invention
[0003] The purpose of the present invention is to solve the defects in the prior art.
[0004] In order to achieve the above object, the present invention adopts the following technical solutions:
[0005] A temporary support removal device for the continuous beam pier top, including a sliding assembly, a hanging device, an air suction device and a positioning assembly;
[0006] The sliding assembly comprises a sliding rail fixedly connected to the bottom of the bridge body, and a sliding block is slidably connected to the sliding rail;
[0007] The suspension device is fixed to the lower end surface of the slider and is used to hang the debris bucket;
[0008] The air suction device comprises an air suction device fixedly connected to the lower end surface of the slider, the air suction device is provided with an air suction pipe, and the air suction pipe is provided on the positioning assembly;
[0009] The positioning assembly comprises a first telescopic rod, a first movable plate, a second movable plate and a positioning claw connected in sequence, the first telescopic rod is fixed to the outer wall of the suction device or the bottom of the slider, the first movable plate is rotatably connected to the free end of the first telescopic rod, and the second movable plate is rotatably connected to the positioning claw disposed at an end of the second movable plate away from the first movable plate;
[0010] A positioning rod and an electric wrench are provided at the bottom of the second movable plate, the positioning rod is used to position the sealing bolt, and the electric wrench is provided on the second movable plate through a second telescopic rod and is adapted to the position of the positioning rod;
[0011] The end of the air intake pipe is matched with the position of the positioning rod.
[0012] Furthermore, there are a plurality of slide rails, which are fixed to the lower end surface of the bridge body by fixing bolts, and the plurality of slide rails are arranged in parallel.
[0013] Furthermore, there are a plurality of sliding blocks, and a mounting platform is provided at the bottom of the plurality of sliding blocks for mounting a suspension device and an air suction device.
[0014] Furthermore, the suspension device includes a rope shaft and a debris bucket, the rope shaft is arranged at the bottom of the mounting platform through a mounting frame, a rope is arranged on the rope shaft for hoisting the debris bucket, and the rope shaft is driven by a rope motor.
[0015] Furthermore, a debris inlet is provided at the bottom of the air suction device, and the debris inlet is provided above the opening direction of the debris barrel.
[0016] Furthermore, the first telescopic rod, the first movable plate and the second movable plate are all provided with an air intake pipe fixing frame for fixing the air intake pipe at the bottom.
[0017] Furthermore, the first telescopic rod is hinged to the first movable plate, a rotating motor is provided at the hinge position of the first telescopic rod and the first movable plate, the first movable plate is hinged to the second movable plate, and a return spring is provided at the hinge position of the first movable plate and the second movable plate.
[0018] Furthermore, an electric wrench mounting bracket is provided at the bottom of the second movable plate, and the electric wrench mounting bracket is connected to the electric wrench via a second telescopic rod.
[0019] Furthermore, the positioning rod includes a horizontal rod and a vertical rod, the vertical rod is fixedly connected to the lower end surface of the second movable plate, the horizontal rod is fixedly connected to the vertical rod, and the angle formed by the horizontal rod and the vertical rod corresponds to the working end of the electric wrench.
[0020] Compared with the prior art, the present invention has the following beneficial effects:
[0021] The arrangement of the present invention realizes rapid dismantling and recycling of temporary supports, improves construction efficiency, reduces construction costs, saves social resources, and avoids the safety risks of dismantling and recycling temporary supports. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] The accompanying drawings are used to provide further understanding of the present invention and constitute a part of the specification. They are used to explain the present invention together with the embodiments of the present invention and do not constitute a limitation of the present invention.
[0023] Figure 1 This is a schematic diagram of the overall structure of the temporary support removal device for the continuous beam pier top proposed by the present invention;
[0024] Figure 2 This is a schematic diagram of the structure of the positioning assembly proposed by the present invention;
[0025] Figure 3 This is a schematic structural diagram of another angle positioning assembly proposed by the present invention.
[0026] In the figure: 1. Bridge body; 2. Fixing bolts; 3. Slide rails; 4. Slider; 5. Suction equipment; 6. Rope motor; 7. Rope shaft; 8. Debris delivery port; 9. Debris bucket; 10. First telescopic rod; 11. Suction pipe; 12. Second movable plate; 13. Positioning claw; 14. Temporary support; 15. Claw motor; 16. Positioning rod; 17. Sealing bolt; 18. Electric wrench; 19. Second telescopic rod; 20. Suction pipe fixing bracket; 21. First movable plate. DETAILED DESCRIPTION
[0027] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0028] In the description of the present invention, it is necessary to understand that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0029] Reference Figure 1-Figure 3 , a temporary support removal device for the continuous beam pier top, including a sliding assembly, a hanging device, an air suction device and a positioning assembly:
[0030] The sliding assembly is used to adjust the position of the dismantling device, including a slide rail 3 fixedly connected to the bottom of the bridge body 1, a slider 4 being slidably connected to the slide rail 3, a plurality of slide rails 3 fixedly arranged on the lower end surface of the bridge body 1 by fixing bolts 2, a plurality of slide rails 3 arranged in parallel, a plurality of sliders 4, and an installation platform is provided at the bottom of the plurality of sliders 4 for installing a suspension device and an air suction device.
[0031] The suspension device is used to hoist the debris bucket 9 and to pull the debris bucket down and up. The suspension device includes a rope shaft 7 and the debris bucket 9. The rope shaft 7 is arranged at the bottom of the installation platform through a mounting frame. A rope is arranged on the rope shaft 7 for hoisting the debris bucket 9. The rope shaft 7 is driven by a rope motor 6.
[0032] The suction device includes a suction device 5 fixedly connected to the lower end surface of the slider 4, and a suction pipe 11 is provided on the suction device 5, and the suction pipe 11 is provided on the positioning component; a debris delivery port 8 is provided at the bottom of the suction device 5, and the debris delivery port 8 is provided above the opening direction of the debris bucket 9; the suction device 5 absorbs the debris into the suction device 5 through the suction pipe 11, and when the amount of debris in the storage bin of the suction device 5 reaches a certain amount, the debris delivery port 8 is opened to allow the debris to fall into the debris bucket 9;
[0033] The positioning assembly includes a first telescopic rod 10, a first movable plate 21, a second movable plate 12 and a positioning claw 13 connected in sequence, the first telescopic rod 10 is fixed to the outer wall of the suction device 5 or the bottom of the slider 4, the first movable plate is rotatably connected to the free end of the first telescopic rod 10, the second movable plate 12 is rotatably connected to the first movable plate, and the positioning claw 13 is arranged at an end of the second movable plate 12 away from the first movable plate through a claw motor 15;
[0034] A positioning rod 16 and an electric wrench 18 are provided at the bottom of the second movable plate 12. The positioning rod 16 is used to position the sealing bolt 17. The electric wrench 18 is provided at the bottom of the second movable plate 12 through a second telescopic rod 19 and is adapted to the position of the positioning rod 16.
[0035] The first telescopic rod 10, the first movable plate 21 and the second movable plate 12 are all provided with an air intake pipe fixing frame 20 for fixing the air intake pipe 11 at the bottom. The air intake pipe 11 passes through the first telescopic rod 10, the first movable plate 21 and the air intake pipe fixing frame 20 at the bottom of the second movable plate 12 in sequence from the air intake device 5;
[0036] The first telescopic rod 10 is hinged to the first movable plate 21, and a rotating motor is provided at the hinge position of the first telescopic rod 10 and the first movable plate 21, wherein the rotating motor is fixedly connected to the first movable plate 21 and is used to drive the second movable plate 12 to rotate, and the first movable plate 21 and the second movable plate 12 are hinged, and a return spring (torsion spring) is provided at the hinge position of the first movable plate 21 and the second movable plate 12;
[0037] An electric wrench mounting frame is provided at the bottom of the second movable plate 12, and the electric wrench mounting frame is connected to the electric wrench 18 through the second telescopic rod 19. The positioning rod 16 includes a horizontal rod and a vertical rod. The vertical rod is fixedly connected to the lower end surface of the second movable plate 12, and the horizontal rod is fixedly connected to the vertical rod. The angle formed by the horizontal rod and the vertical rod corresponds to the working end of the electric wrench 18 and the end of the suction pipe 11.
[0038] When in use, the driving slider 4 is moved along the slide rail 3. After the positioning assembly is relative to the temporary support 14, the first telescopic rod 10 is driven to extend, and the opened positioning claw 13 is close to the temporary support 14, and the horizontal rod of the positioning rod 16 is ensured to be above or below the sealing bolt 17. The claw motor 15 is driven to control the claw to close, and then the rotating motor is driven to rotate. During this process, the length of the first telescopic rod 10 can be freely adjusted, and the first movable plate 21 and the second movable plate 12 rotate, driving the claw and the positioning rod 16 to move. After the horizontal rod and the vertical rod in the positioning rod 16 are against the sealing bolt 17 together, the second telescopic rod 19 is driven to extend, so that the electric wrench 18 cooperates with the sealing bolt 17 to make the sealing bolt 17 detach from the temporary support 14, and finally the suction pipe 11 is driven to remove the sand in the temporary support 14.
[0039] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A temporary support removal device for continuous beam pier top, characterized in that: It includes a sliding assembly, a suspension device, an air suction device and a positioning assembly; The sliding assembly comprises a sliding rail fixedly connected to the bottom of the bridge body, and a sliding block is slidably connected to the sliding rail; The suspension device is fixed to the lower end surface of the slider and is used to hang the debris bucket; The air suction device comprises an air suction device fixedly connected to the lower end surface of the slider, the air suction device is provided with an air suction pipe, and the air suction pipe is provided on the positioning assembly; The positioning assembly comprises a first telescopic rod, a first movable plate, a second movable plate and a positioning claw which are connected in sequence, wherein the first telescopic rod is fixed to the outer wall of the air suction device or the bottom of the slider, the first movable plate is rotatably connected to the free end of the first telescopic rod, the second movable plate is rotatably connected to the first movable plate, and the positioning claw is arranged at an end of the second movable plate away from the first movable plate; A positioning rod and an electric wrench are provided at the bottom of the second movable plate. The positioning rod is used to position the sealing bolt. The electric wrench is arranged on the second movable plate through a second telescopic rod and is adapted to the position of the positioning rod so that the sealing bolt (17) is separated from the temporary support (14), and finally the suction pipe (11) is driven to remove the sand in the temporary support (14); The end of the air intake pipe is adapted to the position of the positioning rod; A debris inlet is provided at the bottom of the air suction device, and the debris inlet is provided above the opening direction of the debris bucket; The first telescopic rod is hinged to the first movable plate, a rotating motor is arranged at the hinge position of the first telescopic rod and the first movable plate, the first movable plate is hinged to the second movable plate, a return spring is arranged at the hinge position of the first movable plate and the second movable plate.
2. The temporary support removal device for the continuous beam pier top according to claim 1 is characterized in that: There are a plurality of slide rails, which are fixed on the lower end surface of the bridge body by fixing bolts, and the plurality of slide rails are arranged in parallel.
3. The temporary support removal device for the continuous beam pier top according to claim 2 is characterized in that: There are a plurality of sliding blocks, and a mounting platform is arranged at the bottom of the plurality of sliding blocks for mounting a suspension device and an air suction device.
4. The temporary support removal device for the continuous beam pier top according to claim 3 is characterized in that: The suspension device comprises a rope shaft and a debris bucket. The rope shaft is arranged at the bottom of the installation platform through a mounting frame. A rope is arranged on the rope shaft for hanging the debris bucket. The rope shaft is driven by a rope motor.
5. The device for removing temporary supports on the top of continuous beam piers according to claim 1 is characterized in that: The first telescopic rod, the first movable plate and the second movable plate are all provided with an air intake pipe fixing frame at the bottom for fixing the air intake pipe.
6. The temporary support removal device for the continuous beam pier top according to claim 1 is characterized in that: An electric wrench mounting frame is arranged at the bottom of the second movable plate, and the electric wrench mounting frame is connected to the electric wrench through a second telescopic rod.
7. The device for removing temporary supports on the top of continuous beam piers according to claim 1, characterized in that: The positioning rod includes a horizontal rod and a vertical rod, the vertical rod is fixedly connected to the lower end surface of the second movable plate, the horizontal rod is fixedly connected to the vertical rod, and the angle formed by the horizontal rod and the vertical rod corresponds to the working end of the electric wrench.
Citation Information
Patent Citations
Continuous beam temporary support demolishs and recovery unit
CN208455490U
The invention discloses a bridge temporary support dismantling system
CN208884377U
Temporary support for bridge construction
CN212388376U
Shift method of bridge bearing of railroad
KR100865752B1