A cofferdam device for water conservancy construction

By introducing sliding connections and automatic drainage systems for water level sensors into the water conservancy construction cofferdam device, the problems of existing devices are solved, poor sealing and manual observation of water level are achieved, and more efficient construction and automated drainage are achieved.

CN113897985BActive Publication Date: 2024-11-12ZHEJIANG DESIGN INST OF WATER CONSERVANCY & HYDROELECTRIC POWER
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111176295.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-10-09
Publication Date
2024-11-12
Estimated Expiration
2041-10-09

AI Technical Summary

Technical Problem

The existing water conservancy construction cofferdam equipment is troublesome during installation and disassembly, the materials are wasted and the sealing is not high, and the internal water level observation relies on labor, which consumes personnel's energy.

Method used

A cofferdam device including pipe body, threaded rod, semi-ring, water pump, water level sensor and controller was designed. It is integrated through the sliding connection of T-plate to increase sealing, and the water level sensor is used to automatically start the water pump for drainage. .

Benefits of technology

It improves the sealing and automatic drainage capacity of the device, reduces the labor intensity of staff, and improves construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113897985B_ABST
    Figure CN113897985B_ABST
Patent Text Reader

Abstract

The present invention discloses a water conservancy construction cofferdam device, comprising a pipe body, the upper surface of the pipe body is symmetrically threaded with two threaded rods, the upper surfaces of the two threaded rods are both threaded with a first semicircular ring, the inner side wall of the pipe body is welded with a plate body, the upper surface of the plate body is welded with a water pump, the water inlet of the water pump is connected with a first water inlet pipe, the water outlet of the water pump is connected with a first water outlet pipe, the inner side wall of one of the first semicircular rings is installed with a water level sensor, and the lower surface of the water level sensor is installed with a controller. The present invention slides a T-shaped plate inside a first groove, and opens a second groove inside the first semicircular ring, so that the T-shaped plate is moved to the inside of the second groove with the help of a handle, thereby realizing the integration of the device after installation, increasing the sealing of the device, and installing a water level sensor inside the first semicircular ring. When a certain water level is reached, the water pump is started by the controller to automatically drain water, thereby reducing the energy consumption of the staff.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of water conservancy construction cofferdams, in particular to a water conservancy construction cofferdam device. Background Art

[0002] Cofferdam refers to a temporary enclosure structure built for the construction of permanent water conservancy facilities in water conservancy project construction. Its function is to prevent water and soil from entering the construction site of the building so that drainage can be carried out in the cofferdam, foundation pits can be excavated, and buildings can be built. Cofferdams are generally used in hydraulic structures. Except as part of formal buildings, they are generally dismantled after use. The height of the cofferdam is higher than the highest water level that may occur during the construction period. Its function is to prevent water and water, and to support the pit wall of the foundation pit.

[0003] The existing cofferdam device is made of large steel plates, which is troublesome to install and disassemble. If it is completely welded, it can only be used once, resulting in material waste. There are gaps between the steel plates after installation, resulting in low sealing of the cofferdam device. In addition, the water content inside the existing cofferdam device is observed manually, which consumes the energy of the staff. Summary of the invention

[0004] The object of the present invention is to provide a water conservancy construction cofferdam device to solve the problems existing in the above-mentioned background technology.

[0005] To achieve the above object, the present invention provides the following technical solutions:

[0006] A water conservancy construction cofferdam device comprises a pipe body, the upper surface of which is symmetrically threaded with two threaded rods, the upper surfaces of the two threaded rods are both threaded with a first semicircular ring, the inner side wall of the pipe body is fixedly connected with a plate body, the upper surface of the plate body is fixedly connected with a water pump, the water inlet of the water pump is connected with a first water inlet pipe, the water outlet of the water pump is connected with a first water outlet pipe, a water level sensor is installed on the inner side wall of the first semicircular ring, a controller is installed on the lower surface of the water level sensor, a baffle is fixedly connected to the inner side wall of the first semicircular ring, a first groove is provided on the inner side wall of the first semicircular ring and located on one side of the baffle, a T-shaped plate is slidably connected to the inner side wall of the first groove, and a second groove is provided on the inner side wall of the first semicircular ring and located on the other side of the baffle.

[0007] Preferably, four second semicircular rings are attached to the outer side wall of the first semicircular ring, and adjacent sides of every two second semicircular rings are threadedly connected with a hinge.

[0008] Preferably, a connecting plate is hingedly connected to one side of the second semicircular ring away from the hinge via a pin, and the connecting plate is threadedly connected to the front surface of another second semicircular ring via a second bolt.

[0009] Preferably, the outer wall of the tube body is uniformly penetrated by a second water outlet pipe, and a one-way valve is installed on the upper surface of the second water outlet pipe.

[0010] Preferably: a handle is fixedly connected to the repelling side of the two T-shaped plates; a through hole is opened on the adjacent side of the two first semicircular rings, and the outer wall of the handle passes through the inner wall of the through hole; and a first bolt is threadedly connected to the adjacent side of the two second semicircular rings.

[0011] Preferably: the inner side wall of the first semicircular ring is provided with a reinforcement layer.

[0012] The beneficial effects of the present invention are:

[0013] The present invention enables a T-shaped plate to slide inside a first groove and opens a second groove inside a first semicircular ring, so that the T-shaped plate can be moved into the second groove with the help of a handle, thereby realizing the integration of the device after installation and increasing the sealing performance of the device. A water level sensor is installed inside the first semicircular ring, and when a certain water level is reached, a water pump is started by a controller to automatically drain the water, thereby reducing the energy consumption of the staff. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a schematic diagram of the elevation structure of the present invention;

[0015] Figure 2 It is a schematic diagram of the cross-sectional structure of the present invention;

[0016] Figure 3 It is a schematic diagram of the top structure of the present invention.

[0017] In the figure: 1. pipe body; 2. first semicircular ring; 3. second semicircular ring; 4. first bolt; 5. connecting plate; 6. second bolt; 7. reinforcement layer; 8. first groove; 9. T-plate; 10. second groove; 11. threaded rod; 12. plate body; 13. water pump; 14. first water inlet pipe; 15. first water outlet pipe; 16. water level sensor; 17. controller; 18. second water outlet pipe; 19. handle; 20. one-way valve; 21. through hole; 22. hinge; 23. baffle. DETAILED DESCRIPTION

[0018] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention. Example

[0019] See also Figure 1-3The present invention discloses a water conservancy construction cofferdam device, comprising a pipe body 1, the upper surface of the pipe body 1 is symmetrically threaded with two threaded rods 11, the upper surfaces of the two threaded rods 11 are both threaded with a first semicircular ring 2, the inner wall of the pipe body 1 is welded with a plate body 12, the upper surface of the plate body 12 is welded with a water pump 13, the water inlet of the water pump 13 is connected with a first water inlet pipe 14, the water outlet of the water pump 13 is connected with a first water outlet pipe 15, a water level sensor 16 is installed on the inner wall of one of the first semicircular rings 2, a controller 17 is installed on the lower surface of the water level sensor 16, a baffle 23 is welded on the inner wall of the first semicircular ring 2, a first groove 8 is opened on the inner wall of the first semicircular ring 2 and located on one side of the baffle 23, a T-shaped plate 9 is slidably connected to the inner wall of the first groove 8, and a second groove 10 is opened on the inner wall of the first semicircular ring 2 and located on the other side of the baffle 23.

[0020] Furthermore, four second semicircular rings 3 are attached to the outer wall of the first semicircular ring 2 , and a hinge 22 is threadedly connected between each two adjacent second semicircular rings 3 . By setting the hinge 22 , the two second semicircular rings 3 are connected.

[0021] Furthermore: one side of one of the second semicircular rings 3 away from the hinge 22 is hinged with a connecting plate 5 through a pin shaft, and the connecting plate 5 is threadedly connected to the front surface of the other second semicircular ring 3 through a second bolt 6. Through the set connecting plate 5, the second semicircular rings 3 can be connected to each other, thereby achieving the integrity of the second semicircular rings 3 when in use.

[0022] Furthermore: a second water outlet pipe 18 is evenly penetrated through the outer wall of the pipe body 1, and a one-way valve 20 is installed on the upper surface of the second water outlet pipe 18. Through the second water outlet pipe 18, when the amount of water inside the device is large, the drainage rate is increased, and the one-way valve 20 installed on the second water outlet pipe 18 can control the drainage flow of the second water outlet pipe 18 by starting and stopping the one-way valve 20.

[0023] Furthermore, a handle 19 is welded on one side of the two T-shaped plates 9 that repel each other. The handle 19 can drive the T-shaped plate 9 to slide through the through hole 21 and along the first groove 8 to the inside of the second groove 10, thereby achieving the connection of the first semicircular ring 2. A through hole 21 is opened on one side adjacent to the two first semicircular rings 2, and the outer wall of the handle 19 penetrates the inner wall of the through hole 21. Through the through hole 21, it is convenient for the staff to use the handle 19 to work.

[0024] Furthermore, the adjacent sides of the two second semicircular rings 3 are threadedly connected with the first bolts 4, and the second semicircular rings 3 are connected to each other through the first bolts 4, thereby enhancing the stability of the second semicircular rings 3 and improving the fixity of the device.

[0025] Furthermore: the inner wall of the first semicircular ring 2 is provided with a reinforcement layer 7, and the sealing performance of the device is increased by providing the reinforcement layer 7.

[0026] Furthermore, a switch group for controlling the start and stop of the water pump 13 is installed on one side of the first semicircular ring 2 , and the switch group is connected to the external mains to supply power to the water pump 13 .

[0027] Furthermore: the model of the water pump 13 is ISG100-125.

[0028] In this embodiment: the model of the water level sensor 16 is GLT500.

[0029] The working principle of the present invention is as follows: when in use, the staff fixes the pipe body 1 at the position where the cofferdam needs to be constructed, connects the first semicircular ring 2 to the pipe body 1 through the threaded rod 11, and uses the handle 19 to slide the T-shaped plate 9 sliding inside the first groove 8 into the inside of the second groove 10 using the opened through hole 21, thereby realizing the connection between the two first semicircular rings 2, improving the integration of the device itself, and strengthening the sealing of the device. The reinforcement layer 7 inside the first semicircular ring 2 is made of acrylic waterproof material. The acrylic waterproof material is environmentally friendly and non-toxic. It is a polymer latex composed of imported epoxy resin modified latex, acrylic emulsion and polyacrylate, synthetic rubber, various emulsifiers, modified latex, etc. It has a long service life, is easy to construct, can be soaked for a long time, and has good corrosion resistance, durability, impermeability, compactness, extremely high adhesion, and waterproof and anti-corrosion effects. After the first semicircular ring 2 is connected to the pipe body 1, it is reinforced by the second semicircular ring 3, and the fracture between the two second semicircular rings 3 is connected by the connecting plate 5 through the second bolt 6 to reinforce the device, and the two second semicircular rings 3 are connected by the first bolt 4 to increase the stability between the second semicircular rings 3. The water volume inside the device is detected in real time by the installed water level sensor 16. When the water volume reaches the first threshold detected by the water level sensor 16, the water pump 13 is started by the controller 17, and the water volume inside the device is discharged by the first water inlet pipe 14 and the first water outlet pipe 15. When the water volume reaches the second threshold detected by the water level sensor 16, the staff needs to drain the water inside the device through the second water outlet pipe 18 by opening the one-way valve 20, and the one-way valve 20 can open and close the second water outlet pipe 18 in real time.

[0030] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A water conservancy construction cofferdam device, comprising a pipe body (1), characterized in that: The upper surface of the tube body (1) is symmetrically threadedly connected to two threaded rods (11), the upper surfaces of the two threaded rods (11) are both threadedly connected to a first semicircular ring (2), the inner side wall of the tube body (1) is fixedly connected to a plate body (12), the upper surface of the plate body (12) is fixedly connected to a water pump (13), the water inlet of the water pump (13) is connected to a first water inlet pipe (14), the water outlet of the water pump (13) is connected to a first water outlet pipe (15), and the inner side of one of the first semicircular rings (2) is connected to a first water inlet pipe (14). A water level sensor (16) is mounted on the wall, a controller (17) is mounted on the lower surface of the water level sensor (16), a baffle (23) is fixedly connected to the inner wall of the first semicircular ring (2), a first groove (8) is provided on the inner wall of the first semicircular ring (2) and located on one side of the baffle (23), a T-shaped plate (9) is slidably connected to the inner wall of the first groove (8), and a second groove (10) is provided on the inner wall of the first semicircular ring (2) and located on the other side of the baffle (23); Four second semicircular rings (3) are attached to the outer side wall of the first semicircular ring (2), and a hinge (22) is threadedly connected on adjacent sides of every two second semicircular rings (3); A connecting plate (5) is hingedly connected to a side of a second semicircular ring (3) away from the hinge (22) via a pin, and the connecting plate (5) is threadedly connected to the front surface of another second semicircular ring (3) via a second bolt (6); The outer wall of the tube body (1) is uniformly penetrated by a second water outlet pipe (18), and a one-way valve (20) is installed on the upper surface of the second water outlet pipe (18); A handle (19) is welded on the repelling side of the two T-shaped plates (9); a through hole (21) is opened on the adjacent side of the two first semicircular rings (2), and the outer wall of the handle (19) penetrates the inner wall of the through hole (21); The adjacent sides of the two second semicircular rings (3) are threadedly connected with first bolts (4); The inner side wall of the first semicircular ring (2) is provided with a reinforcement layer (7); The working principle of the water conservancy construction cofferdam device is as follows: when in use, the staff fixes the pipe body (1) at the position where the cofferdam needs to be constructed, connects the first semicircular ring (2) to the pipe body (1) through the threaded rod (11), and uses the handle (19) to slide the T-shaped plate (9) sliding inside the first groove (8) into the inside of the second groove (10) through the opened through hole (21), thereby realizing the connection between the two first semicircular rings (2); after the first semicircular ring (2) and the pipe body (1) are connected, they are reinforced by the second semicircular ring (3), and the fracture between the two second semicircular rings (3) is connected by the connecting plate (5) through the second bolt (6), thereby reinforcing the device, and using the first bolt (4 ) connects the two second semicircular rings (3), thereby increasing the stability between the second semicircular rings (3); the water volume inside the device is detected in real time by means of the installed water level sensor (16); when the water volume reaches a first threshold value detected by the water level sensor (16), the water pump (13) is started by means of the controller (17); the water volume inside the device is discharged by means of the first water inlet pipe (14) and the first water outlet pipe (15); when the water volume reaches a second threshold value detected by the water level sensor (16), the staff needs to discharge the water volume inside the device through the second water outlet pipe (18) by opening the one-way valve (20); and the one-way valve (20) can open and close the second water outlet pipe (18) in real time.