Thyristor switch automatic calibration and testing device and working method

The automatic calibration and testing device for thyristor switches addresses inefficiencies by providing precise voltage and current sampling, enhancing production efficiency and safety through early detection of defects.

CN113900000BActive Publication Date: 2024-12-03SHANG HAI XI XING TECH CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202111327279.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-11-10
Publication Date
2024-12-03
Estimated Expiration
2041-11-10

AI Technical Summary

Technical Problem

Existing thyristor switch calibration and testing methods are inefficient, leading to increased production costs and potential failures due to biased sampling and lack of zero and amplitude calibration, which can expand defects and reduce production efficiency.

Method used

An automatic calibration and testing device comprising a step-down transformer, control board, IO expansion board, host computer, and thyristor switch, with features like power supply, communication, and sampling units, allowing for precise voltage and current sampling and testing.

Benefits of technology

The device enables low-voltage testing to identify defective thyristor switches early, improving production efficiency and safety by ensuring accurate sampling and reducing the risk of expanded failures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113900000B_ABST
    Figure CN113900000B_ABST
Patent Text Reader

Abstract

The present invention provides a thyristor switch automatic calibration and testing device and working method, including: a step-down transformer, a control board, an IO expansion board, a host computer and a thyristor switch to be tested; the step-down transformer is connected to the control board, the control board is connected to the host computer; the control board is connected to the IO expansion board, the IO expansion board is connected to the thyristor switch to be tested; the thyristor switch to be tested is connected to the control board. This device is a low-voltage test performed before the thyristor switch is aged, which can effectively screen out defective products and will not cause the failure to expand, thereby improving production efficiency and greatly improving the safety of the test.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of thyristor switcher debugging, and in particular to an automatic calibration and testing device and a working method for a thyristor switcher. Background Art

[0002] With the development of power electronics technology and computer control technology, various new automatic and fast reactive compensation devices have emerged one after another. Thyristor switching capacitor (TSC) is a dynamic reactive compensation device widely used in distribution systems. As the main component of TSC, the market demand for thyristor switchers is also increasing. In the production process, it is necessary to calibrate the sampling of thyristor switchers and test their functions. Now manufacturers will install thyristor switchers on 400V test racks and perform cycle switching tests and aging tests on thyristor switchers. If defective thyristor switchers appear, the fault will expand under 400V voltage, and it will be impossible to repair and increase production costs. If the switcher requires voltage and current sampling and does not perform zero and amplitude calibration, the sampling will be biased. In order to reduce production costs and improve production efficiency, it is hoped to propose an automatic calibration and testing device for thyristor switchers.

[0003] Patent document CN202260461U relates to a circuit device, specifically a fault self-diagnosis device for a TSC reactive power compensation system. Its characteristics are: it includes a detection circuit (JC), a photoelectric isolation input module (IP), a photoelectric isolation output module (OP), a microprocessor (MCU), a bus circuit (BUS), and a relay module (JDQ).

[0004] Patent document CN113466653A discloses a multifunctional thyristor switching detection method, including step S1: the controller controls the switching of the corresponding capacitor group according to the set value of the capacitor capacity and the controller collects the output voltage of the three-phase electric voltage regulator in real time so that the output voltage of the three-phase electric voltage regulator reaches the set value; step S2: the normal working range detection of the switching device, the phase loss protection function detection, the inrush current limiting and the response time of the switching device, the switching function detection, the electrical life detection and the temperature rise detection are performed on the thyristor to be tested. Summary of the invention

[0005] In view of the defects in the prior art, the object of the present invention is to provide a thyristor switch automatic calibration and testing device and a working method.

[0006] According to the present invention, a thyristor switch automatic calibration and testing device includes: a step-down transformer, a control board, an IO expansion board, a host computer and a thyristor switch to be tested;

[0007] The step-down transformer is connected to the control board, and the control board is connected to the host computer;

[0008] The control board is connected to the IO expansion board, and the IO expansion board is connected to the thyristor switch under test;

[0009] The thyristor switch under test is connected to the control board.

[0010] Preferably, the step-down transformer is connected to a circuit breaker;

[0011] The circuit breaker is connected to a power input terminal, and the power output terminal is connected to the control board.

[0012] Preferably, the thyristor switch to be tested is installed in plurality;

[0013] The input ends of the plurality of thyristor switches under test are connected in parallel and then connected to the control board, and the output ends of the plurality of thyristor switches under test are connected in parallel and then connected to the control board and the contactor.

[0014] Preferably, the contactor is connected to a capacitor, and the capacitor is connected to the step-down transformer.

[0015] Preferably, a power supply unit, a capacitor discharge unit, a communication unit, an IO unit, a sampling unit, a switch input and output port switching unit and a central processing unit are installed on the control board.

[0016] Preferably, the communication unit is provided with a plurality of 485 signal ports and is connected to the host computer and the thyristor switch under test.

[0017] Preferably, the IO unit is provided with a plurality of IO ports and is connected to the contactor and the thyristor switch to be tested.

[0018] Preferably, the host computer is connected to the control board via a serial port.

[0019] Preferably, the step-down transformer output is three-phase four-wire, and the step-down transformer ports include A, B, C, and N;

[0020] The output end of the thyristor switcher under test and the input end of the thyristor switcher under test are allowed to be switched and connected to any port A, B, C, N of the step-down transformer through the switcher input-output port switching unit.

[0021] Preferably, the present invention also provides a working method of the thyristor switch automatic calibration and testing device, comprising the following steps:

[0022] Step S1, start the host computer, close the circuit breaker, and the step-down transformer, the control panel and the power supply start working;

[0023] Step S2, zeroing the voltage of the thyristor switch under test;

[0024] Step S3, performing a circuit breaker test on the thyristor switch under test;

[0025] Step S4, amplitude modulation of the voltage of the thyristor switch under test;

[0026] Step S5, performing IO test, switching test and current amplitude modulation of the thyristor switch under test;

[0027] Step S6, repeating step S5 to test the remaining thyristor switches to be tested;

[0028] In step S2, the following steps are included:

[0029] Step S21, the host computer transmits instructions to the control board through the 485 signal port, and the output end of the thyristor switch under test and the input end of the thyristor switch under test are connected to the output port N of the step-down transformer;

[0030] Step S22, the host computer reads a plurality of three-phase mains voltage sampling values, three-phase switch voltage sampling values ​​and three-phase current sampling values ​​of the thyristor switch under test through the serial port;

[0031] Step S23, calculating a first average value of the three-phase mains voltage sampling values, the three-phase switch voltage sampling values ​​and the three-phase current sampling values, wherein the inverse value of the first average value is a zero adjustment value;

[0032] Step S24, the host computer maintains the zero adjustment value and transmits it to the control board through the 485 signal port;

[0033] The control board writes a plurality of the thyristor switches under test through the 485 signal port;

[0034] In step S3, the following steps are included:

[0035] Step S31, the host computer transmits instructions to the control board through the 485 signal port, and the input end of the thyristor switch under test is connected to the output ports A, B, and C of the step-down transformer;

[0036] The output end of the thyristor switch under test is suspended, and the contactor is closed;

[0037] Step S32, the host computer transmits instructions to the control board through the 485 signal port, and the capacitor discharge unit discharges the capacitor;

[0038] Step S33, the control board reads the switch voltage of the thyristor switch under test;

[0039] Step S34, calculating a second average value of the switch voltage, when the second average value exceeds the limit, the thyristor switch under test is short-circuited and the test is stopped, when the second average value does not exceed the limit, the thyristor switch under test is short-circuited and the test passes;

[0040] In step S4, the following steps are included:

[0041] Step S41, the host computer transmits instructions to the control board through the 485 signal port, and the input end of the thyristor switch under test is connected to the output ports A, B, and C of the step-down transformer;

[0042] The output end of the thyristor switch under test is connected to the output port N of the step-down transformer, and the contactor is disconnected;

[0043] Step S42, the control board samples the three-phase voltage through the sampling unit to calculate the first effective value of the three-phase voltage;

[0044] Reading a plurality of three-phase voltage sampling values ​​of the thyristor switch under test and three-phase switch voltage sampling values, and calculating a second effective value;

[0045] Step S43, the voltage sampling calibration coefficient of the thyristor switch under test is the ratio of the first effective value to the second effective value;

[0046] Step S44, the host computer maintains the voltage sampling calibration coefficient, and the control board writes the calibration coefficient into the plurality of thyristor switches under test;

[0047] In step S5, the following steps are included:

[0048] Step S51, the host computer transmits instructions to the control board through the 485 signal port, and the input end of the thyristor switch under test is connected to the output ports A, B, and C of the step-down transformer;

[0049] The output end of the thyristor switch under test is suspended, and the contactor is closed;

[0050] Step S52, the control board sends a switch-on instruction to one of the thyristor switch IO ports under test and reads the state of the IO port through the 485 signal port to determine whether the IO port is normal;

[0051] Step S53, the control board reads the fault status of the thyristor switch under test through the 485 signal port, and if there is no fault, it is put into normal operation;

[0052] Step S54, the control board samples the three-phase current through the sampling unit to calculate the third effective value;

[0053] Read the sum of the three-phase current sampling values ​​of the thyristor switch under test, and calculate the fourth effective value;

[0054] Step S55, the current sampling calibration coefficient of the thyristor switch under test is the ratio of the third effective value to the fourth effective value;

[0055] Step S56, the control board sends a cut-off instruction to the IO port of the thyristor switch under test and reads the state of the IO port through the 485 signal port to determine whether the IO port is normal.

[0056] Preferably, the number of the 485 signal ports is 6 and the number of the IO ports is 16.

[0057] Preferably, the thyristor switch under test collects input voltage, switch voltage and switch current through the sampling unit.

[0058] Preferably, the control board expands 485 signals and IO signals through the IO expansion board.

[0059] Compared with the prior art, the present invention has the following beneficial effects:

[0060] 1. This device is a low-voltage test performed before the thyristor switch ages, which can effectively screen out defective products without causing the failure to expand, thus improving production efficiency and greatly improving the safety of the test;

[0061] 2. Calibrated voltage and current sampling can improve the sampling accuracy of thyristor current and voltage. BRIEF DESCRIPTION OF THE DRAWINGS

[0062] Other features, objects and advantages of the present invention will become more apparent from the detailed description of non-limiting embodiments made with reference to the following drawings:

[0063] Figure 1 It is a schematic diagram of the three-dimensional structure of the automatic calibration and testing device for thyristor switch;

[0064] Figure 2 This is the main view of the automatic calibration and testing device for thyristor switchers;

[0065] Figure 3 Electrical schematic diagram of automatic calibration and testing device for thyristor switch;

[0066] Figure 4 This is a schematic diagram of the control panel structure;

[0067] Figure 5 It is the working method principle diagram;

[0068] As shown in the figure:

[0069] DETAILED DESCRIPTION

[0070] The present invention is described in detail below in conjunction with specific embodiments. The following embodiments will help those skilled in the art to further understand the present invention, but are not intended to limit the present invention in any form. It should be noted that, for those of ordinary skill in the art, several changes and improvements can also be made without departing from the concept of the present invention. These all belong to the protection scope of the present invention.

[0071] Example 1

[0072] like Figures 1 to 3 As shown, a thyristor switch automatic calibration and testing device includes: a step-down transformer 1, a control board 2, an IO expansion board 3, a circuit breaker 4, a contactor 5, a host computer 6, a power supply 7, a thyristor switch 8 to be tested, and a capacitor 9; the step-down transformer 1 is connected to the control board 2, the control board 2 is connected to the host computer 6, the control board 2 is connected to the IO expansion board 3, the IO expansion board 3 is connected to the thyristor switch 8 to be tested, and the thyristor switch 8 to be tested is connected to the control board 2. A plurality of thyristor switches 8 to be tested are installed, and the input ends of the plurality of thyristor switches 8 to be tested are connected in parallel to the control board 2, and the output ends of the plurality of thyristor switches to be tested are connected in parallel to the control board 2 and the contactor 5, the contactor 5 is connected to the capacitor 9, and the capacitor 9 is connected to the step-down transformer 1. The step-down transformer 1 is connected to the circuit breaker 4, the circuit breaker 4 is connected to the input end of the power supply 7, the output end of the power supply 7 is connected to the control board 2, and the host computer 6 is connected to the control board 2 through a serial port.

[0073] like Figure 4 As shown, the control board 2 is equipped with a power supply unit 21, a capacitor discharge unit 22, a communication unit 23, an IO unit 24, a sampling unit 25, a switch input and output port switching unit 26 and a central processing unit 27. The communication unit 23 is provided with a plurality of 485 signal ports and connected to the host computer 6 and the thyristor switch 8 under test, and the IO unit 24 is provided with a plurality of IO ports and connected to the contactor 5 and the thyristor switch 8 under test. The step-down transformer 1 includes output ports A, B, C, and N, and the output end of the thyristor switch 8 under test and the input end of the thyristor switch 8 under test are allowed to be switched to any output port A, B, C, and N through the switch input and output port switching unit 26.

[0074] like Figure 5As shown, the present embodiment also provides a working method of a thyristor switch automatic calibration and testing device, comprising the following steps: step S1, starting the host computer 6, closing the circuit breaker 4, and starting the step-down transformer 1, the control board 2 and the power supply 7 to work; step S2, zeroing the voltage of the thyristor switch 8 under test; step S3, performing a circuit breaker test on the thyristor switch 8 under test; step S4, amplitude modulation of the voltage of the thyristor switch 8 under test; step S5, performing an IO test, a switching test and current amplitude modulation on the thyristor switch 8 under test; step S6, repeating step S5 to test the remaining thyristor switches 8 under test;

[0075] In step S2, the following steps are included: step S21, the host computer 6 transmits instructions to the control board 2 through the 485 signal port, and the output end of the thyristor switch 8 under test and the input end of the thyristor switch 8 under test are connected to the output port N of the step-down transformer 1; step S22, the host computer 6 reads a plurality of three-phase mains voltage sampling values, three-phase switch voltage sampling values ​​and three-phase current sampling values ​​of the thyristor switch 8 under test through the serial port; step S23, calculates the first average value of the three-phase mains voltage sampling values, the three-phase switch voltage sampling values ​​and the three-phase current sampling values, and the inverse value of the first average value is the zero value; step S24, the host computer 6 keeps the zero value and transmits it to the control board 2 through the 485 signal port, and the control board 2 writes a plurality of thyristor switches under test 8 through the 485 signal port;

[0076] In step S3, the following steps are included: step S31, the host computer 6 transmits instructions to the control board 2 through the 485 signal port, and the input end of the thyristor switch 8 under test is connected to the output ports A, B, and C of the step-down transformer 1; the output end of the thyristor switch 8 under test is suspended, and the contactor 5 is closed; step S32, the host computer 6 transmits instructions to the control board 2 through the 485 signal port, and the capacitor discharge unit 22 discharges the capacitor 9; step S33, the control board 2 reads the switch voltage of the thyristor switch 8 under test; step S34, calculates the second average value of the switch voltage, when the second average value exceeds the limit, the thyristor switch under test is short-circuited and the test is stopped, when the second average value does not exceed the limit, the thyristor switch under test is short-circuited, and the test passes;

[0077] In step S4, the following steps are included: step S41, the host computer 6 transmits instructions to the control board 2 through the 485 signal port, the input end of the thyristor switch 8 under test is connected to the output ports A, B, and C of the step-down transformer 1; the output end of the thyristor switch 8 under test is connected to the output port N of the step-down transformer 1, and the contactor 5 is disconnected; step S42, the control board 2 samples the three-phase voltage through the sampling unit 25, and calculates the first effective value of the three-phase voltage; reads a plurality of three-phase voltage sampling values ​​and three-phase switch voltage sampling values ​​of the thyristor switch 8 under test, and calculates the second effective value; step S43, the voltage sampling calibration coefficient of the thyristor switch 8 under test is the ratio of the first effective value to the second effective value; step S44, the host computer 6 maintains the voltage sampling calibration coefficient, and the control board 2 writes the calibration coefficient into a plurality of thyristor switches under test 8;

[0078] In step S5, the following steps are included: step S51, the host computer 6 transmits instructions to the control board 2 through the 485 signal port, the input end of the thyristor switch 8 under test is connected to the output ports A, B, and C of the step-down transformer 1; the output end of the thyristor switch 8 under test is suspended, and the contactor 5 is closed; step S52, the control board 2 sends an input instruction to one of the thyristor switches 8 under test IO ports and reads the IO port status through the 485 signal port to determine whether the IO port is normal; step S53, the control board 2 reads the thyristor switch 8 under test through the 485 signal port The thyristor switch 8 is in fault state, and if there is no fault, it is put into normal operation; step S54, the control board 2 samples the three-phase current through the sampling unit 25, and calculates the third effective value; reads the sum of the three-phase current sampling values ​​of multiple thyristor switches 8 under test, and calculates the fourth effective value; step S55, the current sampling calibration coefficient of the thyristor switch 8 under test is the ratio of the third effective value to the fourth effective value; step S56, the control board 2 sends a removal instruction to the IO port of the thyristor switch 8 under test and reads the IO port status through the 485 signal port to determine whether the IO port is normal.

[0079] Example 2

[0080] Embodiment 2 is a preferred example of the embodiments.

[0081] like Figure 1 and Figure 2 As shown, this embodiment includes a step-down transformer 1, a control board 2, an IO expansion board 3, a circuit breaker 4, a contactor 5, a host computer 6, a power supply 7, a thyristor switch 8 to be tested, and a capacitor 9.

[0082] The circuit breaker 4 is connected to the step-down transformer 1, the step-down transformer 1 is connected to the control board 2, the upper computer 6 is connected to the control board 2 through the serial port, the input end of the power supply 7 is connected to the circuit breaker 4, the output end of the power supply 7 is connected to the control board 2, the IO expansion board 3 is connected to the control board 2, the IO expansion board 3 expands the 485 signal and IO signal transmitted from the control board 2, and is connected one by one with the IO ports and 485 signal ports of the five thyristor switches 8 to be tested; the input ends of the five thyristor switches 8 to be tested are connected to the control board 2 after being connected in parallel, the output ends of the thyristor switches 8 to be tested are connected to the control board 2 and the contactor 5 after being connected in parallel, the contactor 5 is connected to the capacitor 9, and the capacitor 9 is connected to the step-down transformer 1.

[0083] like Figure 4 As shown, the control board 2 includes: a power supply unit 21, a capacitor discharge unit 22, a communication unit 23, an IO unit 24, a sampling unit 25, a switch input and output port switching unit 26 and a central processing unit 27. The communication unit 23 has six 485 signal ports, which are respectively connected to the host computer 6 and the five thyristor switches 8 to be tested. The IO unit 24 includes sixteen IO ports, which are used for controlling the five thyristor switches 8 to be tested and the contactor 5. The sampling unit 25 includes input voltage collection, switch voltage collection, and switch current collection of the thyristor switches 8 to be tested, and the collected data is used as a reference for sampling and calibration of the thyristor switches 8 to be tested. The switch input and output port switching unit 26 can connect the input end of the thyristor switch 8 to be tested and the output end of the thyristor switch 8 to be tested on the control board 2 to the output ports A, B, C, and N of the step-down transformer 1 at will, for voltage zeroing and amplitude modulation.

[0084] like Figure 5 The embodiment shown in the figure also discloses a switching method based on the above high-voltage thyristor switching capacitor device, comprising the following steps:

[0085] Step 1, start the host computer 6;

[0086] Step 2: manually close the circuit breaker 4, and the step-down transformer 1, the power supply 7, and the control panel 2 start working;

[0087] Step 3, voltage zeroing of the thyristor switch 8 under test, this step can be subdivided into the following steps: Step 1, the host computer 6 sends a command to the control board 2 through 485 communication, and controls the input and output ports of the thyristor switch 8 under test to be connected to the output port N; Step 2, read the three-phase mains voltage sampling values, three-phase switch voltage sampling values, and three-phase current sampling values ​​of the five thyristor switches under test 8 through the serial port; Step 3, calculate the first average value, and the zeroing value is the value after the first average value is inverted; Step 4, the host computer 6 keeps the zeroing data and sends it to the control board 2 through 485 communication, and the control board 2 writes it into the five thyristor switches under test 8 respectively through 485 communication;

[0088] Step 4, open circuit test of the thyristor switcher 8 under test, this step can be subdivided into the following steps: Step 1, the host computer 6 sends instructions to the control board 2 through 485 communication, and controls the input end of the thyristor switcher 8 under test to be connected to the output ports A, B, and C of the step-down transformer 1 respectively, and the output end of the thyristor switcher 8 under test is suspended, and the contactor 5 is closed; Step 2, the host computer 6 sends instructions to the control board 2 through 485 communication, and controls the capacitor discharge unit 22 to discharge the capacitor 9; Step 3, the control board 2 reads the switching voltages of the five thyristor switches under test 8; Step 4, calculate the second average value of all switching voltages. If the second average value exceeds the limit, the thyristor switcher under test is short-circuited, and the test is stopped after the alarm. If the second average value does not exceed the limit, the thyristor switcher under test is open-circuited, and the test passes;

[0089] Step 5, voltage amplitude modulation, this step can be subdivided into the following steps: Step 1, the host computer 6 sends a command to the control board 2 through 485 communication, controls the input end of the thyristor switch 8 under test to be connected to the output ports A, B, and C of the step-down transformer 1 respectively, and the output end of the thyristor switch 8 under test is connected to the output port N, and disconnects the contactor 5; Step 2, the control board 2 samples the three-phase voltage through the sampling unit 25, and calculates the first effective value of the three-phase voltage; Step 3, reads the three-phase voltage sampling and the three-phase switch voltage sampling of the five thyristor switches under test 8, and calculates the second effective value; Step 4, calculates the ratio of the first effective value to the second effective value, which is the voltage sampling calibration coefficient of the thyristor switch 8 under test; Step 5, the host computer 6 reads and keeps the voltage sampling calibration coefficient, and the control board 2 writes the coefficient into the five thyristor switches under test 8;

[0090] Step 6, IO test, switching test and current amplitude modulation of the thyristor switch 8 under test: Step 1, the host computer 6 sends a command to the control board 2 through 485 communication, controls the input end of the thyristor switch 8 under test to be connected to the output ports A, B, and C of the step-down transformer 1 respectively, and the output end of the thyristor switch 8 under test is suspended, and the contactor 5 is closed; Step 2, the control board 2 sends a start-up command to the IO port of the thyristor switch 8 under test No. 1, reads the IO port status through 485 communication, and determines whether the IO port is normal; Step 3, the control board 2 reads No. 1 through 485 communication The fault state of the thyristor switch 8 under test, if there is no fault, it is put into normal operation; Step 4: the control board 2 samples the three-phase current through the sampling unit 25 and calculates the third effective value; Step 5, read the three-phase current samples of the five thyristor switches under test 8 to calculate the fourth effective value; Step 6, calculate the ratio of the third effective value and the fourth effective value, which is the current sampling calibration coefficient of the thyristor switch 8 under test; Step 7, the control board 2 sends a removal command to the IO port of the thyristor switch 8 under test No. 1, reads the IO port status through 485 communication, and determines whether the IO port is normal;

[0091] Step 7: Repeat the test of step 6 for the remaining four thyristor switches 8 to be tested.

[0092] Those skilled in the art know that, in addition to realizing the system and its various devices, modules, and units provided by the present invention in a purely computer-readable program code, it is entirely possible to realize the same functions in the form of logic gates, switches, application-specific integrated circuits, programmable logic controllers, and embedded microcontrollers by logically programming the method steps. Therefore, the system and its various devices, modules, and units provided by the present invention can be considered as a hardware component, and the devices, modules, and units included therein for realizing various functions can also be regarded as structures within the hardware component; the devices, modules, and units for realizing various functions can also be regarded as both software modules for realizing the method and structures within the hardware component.

[0093] In the description of the present application, it should be understood that the terms "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0094] The above describes the specific embodiments of the present invention. It should be understood that the present invention is not limited to the above specific embodiments, and those skilled in the art can make various changes or modifications within the scope of the claims, which does not affect the essence of the present invention. In the absence of conflict, the embodiments of the present application and the features in the embodiments can be combined with each other arbitrarily.

Claims

1. A thyristor switch automatic calibration and testing device, characterized in that: include: A step-down transformer (1), a control board (2), an IO expansion board (3), a host computer (6), and a thyristor switch (8) to be tested; The step-down transformer (1) is connected to the control board (2), and the control board (2) is connected to the host computer (6); The control board (2) is connected to the IO expansion board (3), and the IO expansion board (3) is connected to the thyristor switch (8) to be tested; The thyristor switch (8) to be tested is connected to the control board (2); The step-down transformer (1) is connected to a circuit breaker (4); The input ends of a plurality of the thyristor switches (8) to be tested are connected in parallel and then connected to the control board (2); the output ends of a plurality of the thyristor switches (8) to be tested are connected in parallel and then connected to the control board (2) and the contactor (5); The contactor (5) is connected to a capacitor (9), and the capacitor (9) is connected to the step-down transformer (1); The control panel (2) is equipped with a power supply unit (21), a capacitor discharge unit (22), a communication unit (23), an IO unit (24), a sampling unit (25), a switch input and output port switching unit (26), and a central processing unit (27); The communication unit (23) is provided with a plurality of 485 signal ports and is connected to the host computer (6) and the thyristor switch (8) to be tested; The circuit breaker (4) is connected to the input end of the power supply (7), and the output end of the power supply (7) is connected to the control board (2); The thyristor switch (8) to be tested is installed in plurality; The IO unit (24) is provided with a plurality of IO ports and is connected to the contactor (5) and the thyristor switch (8) to be tested; The host computer (6) is connected to the control board (2) via a serial port; The output of the step-down transformer (1) is three-phase four-wire, and the ports of the step-down transformer (1) include A, B, C, and N; The output end of the thyristor switcher (8) under test and the input end of the thyristor switcher (8) under test are allowed to be switched to any one of the ports A, B, C, and N of the step-down transformer (1) through the switcher input / output port switching unit (26); The working method of the thyristor switch automatic calibration and testing device comprises the following steps: Step S1, starting the host computer (6), closing the circuit breaker (4), and operating the step-down transformer (1), the control panel (2) and the power supply (7); Step S2, adjusting the voltage of the thyristor switch (8) to be tested to zero; Step S3, performing a circuit breaker test on the thyristor switch (8) under test; Step S4, modulating the voltage of the thyristor switch (8) under test; Step S5, performing an IO test, a switching test and a current amplitude modulation on the thyristor switcher (8) under test; Step S6, repeating step S5 to test the remaining thyristor switches (8) to be tested; In step S2, the following steps are included: Step S21, the host computer (6) transmits instructions to the control board (2) through the 485 signal port, and the output end of the thyristor switch (8) under test and the input end of the thyristor switch (8) under test are connected to the output port N of the step-down transformer (1); Step S22, the host computer (6) reads a plurality of three-phase mains voltage sampling values, three-phase switch voltage sampling values ​​and three-phase current sampling values ​​of the thyristor switch (8) under test through the serial port; Step S23, calculating a first average value of the three-phase mains voltage sampling values, the three-phase switch voltage sampling values ​​and the three-phase current sampling values, wherein the inverse value of the first average value is a zero adjustment value; Step S24, the host computer (6) maintains the zero adjustment value and transmits it to the control board (2) through the 485 signal port; The control board (2) writes a plurality of the thyristor switches (8) to be tested via the 485 signal port; In step S3, the following steps are included: Step S31, the host computer (6) transmits instructions to the control board (2) through the 485 signal port, and the input end of the thyristor switch (8) under test is connected to the output ports A, B, and C of the step-down transformer (1); The output end of the thyristor switch (8) under test is suspended, and the contactor (5) is closed; Step S32, the host computer (6) transmits instructions to the control board (2) through the 485 signal port, and the capacitor discharge unit (22) discharges the capacitor (9); Step S33, the control board (2) reads the switch voltage of the thyristor switch (8) under test; Step S34, calculating a second average value of the switch voltage; when the second average value exceeds a limit, the thyristor switch (8) under test is short-circuited and the test is stopped; when the second average value does not exceed a limit, the thyristor switch under test is disconnected and the test passes; In step S4, the following steps are included: Step S41, the host computer (6) transmits instructions to the control board (2) through the 485 signal port, and the input end of the thyristor switch (8) under test is connected to the output ports A, B, and C of the step-down transformer (1); The output end of the thyristor switch (8) under test is connected to the output port N of the step-down transformer (1), and the contactor (5) is disconnected; Step S42, the control board (2) samples the three-phase voltage through the sampling unit (25) and calculates a first effective value of the three-phase voltage; Reading a plurality of three-phase voltage sampling values ​​and three-phase switch voltage sampling values ​​of the thyristor switch (8) under test, and calculating a second effective value; Step S43, the voltage sampling calibration coefficient of the thyristor switch (8) under test is the ratio of the first effective value to the second effective value; Step S44, the host computer (6) maintains the voltage sampling calibration coefficient, and the control board (2) writes the calibration coefficient into the plurality of thyristor switches (8) under test; In step S5, the following steps are included: Step S51, the host computer (6) transmits instructions to the control board (2) through the 485 signal port, and the input end of the thyristor switch (8) under test is connected to the output ports A, B, and C of the step-down transformer (1); The output end of the thyristor switch (8) under test is suspended, and the contactor (5) is closed; Step S52, the control board (2) sends a switch-on instruction to one of the IO ports of the thyristor switch (8) under test and reads the state of the IO port through the 485 signal port to determine whether the IO port is normal; Step S53, the control board (2) reads the fault status of the thyristor switch (8) under test through the 485 signal port, and if there is no fault, the control board (2) operates normally; Step S54, the control board (2) samples the three-phase current through the sampling unit (25) and calculates a third effective value; Reading the sum of the three-phase current sampling values ​​of the plurality of thyristor switches (8) under test, and calculating a fourth effective value; Step S55, the current sampling calibration coefficient of the thyristor switch (8) under test is the ratio of the third effective value to the fourth effective value; Step S56: the control board (2) sends a cut-off instruction to the IO port of the thyristor switch (8) under test and reads the state of the IO port through the 485 signal port to determine whether the IO port is normal.

Citation Information

Patent Citations

  • Thyristor switched capacitor intelligent self-diagnosis device

    CN202260461U

  • Multifunctional thyristor fling-cut switch detection method

    CN113466653A

  • Thyristor switching device testing device

    CN216387241U