A test device and test method for simulating pull-out failure of a seabed anchor plate in a plane

By designing a test device that simulates the drawing failure of the subsea anchor plate in the plane, the vertical, horizontal and tilt pulling test of the anchor plate is achieved using pulley components and slip rails, which solves the problem that existing devices cannot conduct arbitrary angle tests, revealing that The anchor plate resistance and bearing capacity law of anchor plate under different buried angles has been guided, and the accuracy and economicality of the test have been improved.

CN113916663BActive Publication Date: 2024-11-22ZHEJIANG UNIV CITY COLLEGE
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111431236.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-11-29
Publication Date
2024-11-22
Estimated Expiration
2041-11-29

AI Technical Summary

Technical Problem

The existing anchor plate pulling test device cannot perform anchor plate pulling test at any buried angle, which limits the in-depth study of the anchor plate pulling bearing capacity and its exertion mechanism, especially the data comparability and rules under tilt buried conditions. analyze.

Method used

A test device that simulates the drawing failure of subsea anchor plates in the plane is designed, including a support frame, a model box and a winch. The vertical, horizontal and tilt pulling tests of the anchor plates are realized through pulley assembly and slip rail, combined with laser displacement. The sensor and camera capture soil sample deformation in real time, and can perform anchor plate pulling tests at any angle of 0°-90°.

Benefits of technology

The anchor plate failure mode and the mechanism of pull-up bearing capacity under different buried angles were realized, and the influence of anchor plate buried parameters and soil parameters on the ultimate pull-up bearing capacity was obtained, and the anchor plate engineering design was guided. Moreover, the test equipment is unified and flexible, saving test expenses and improving accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113916663B_ABST
    Figure CN113916663B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of anchor plate experiments, and in particular to a test device and test method for simulating pull-out failure of a submarine anchor plate in a plane, wherein the test device for pull-out failure of a submarine anchor plate comprises a support frame, a model box and a winch, the support frame comprises a horizontal top plate and a vertical support plate, a longitudinal sliding track is arranged in the longitudinal slit, a pulley assembly is slidably matched on the longitudinal sliding track, the steel strand led out of the winch passes through the longitudinal slit and then bypasses the first pulley assembly and the second pulley assembly in sequence and then is connected to the anchor plate, and the first pulley assembly is relatively fixed to the horizontal top plate. The test device for pull-out failure of a submarine anchor plate of the present application can realize vertical pull-out test and inclined pull-out test of the anchor plate, reveal the failure mode and pull-out bearing capacity exertion mechanism of the anchor plate under different burial angles, obtain the influence law and exertion process of anchor plate burial parameters and soil parameters on the ultimate pull-out bearing capacity of the anchor plate, so as to achieve the purpose of guiding the engineering design of the anchor plate.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of anchor plate experiments, in particular to an experimental device and an experimental method for simulating the pull-out failure of a seabed anchor plate in a plane. Background Art

[0002] The anchor plate foundation has the advantages of simple structure, convenient construction and good economy, so it is widely used in projects such as slopes, retaining walls and signal towers. In particular, my country's marine economy has developed rapidly in recent years, and a large number of marine projects represented by offshore drilling platforms and submarine oil and gas pipelines have been built. These projects also generally adopt anchor plate foundations, and new anchor plates such as suction anchors, penetration anchors and normal bearing anchors have been developed. As a pull-out component, the anchor plate mainly provides pull-out resistance along the direction of the pull rod. Taking the offshore drilling platform as an example, the working principle of the anchor plate is as follows: Under the buoyancy of seawater, the offshore drilling platform generally shows a vertical pull-out trend, and the pull-out force is transmitted to the lower deep-buried anchor plate through the pull rod connected to it, and then dispersed by the anchor plate to the surrounding seabed, thereby playing the role of anchoring the upper offshore drilling platform to the seabed. The pull-out resistance of the anchor plate is closely related to the burial angle. For example, when the anchor plate is buried horizontally, it provides vertical pull-out resistance for the structure; when it is buried vertically, it provides horizontal pull-out resistance for the structure; when it is buried between the two, it provides both horizontal and vertical pull-out resistance. It can be seen that the determination of the ultimate pull-out bearing capacity at different buried angles based on the stress characteristics of the structure is the key to the design of the anchor plate engineering.

[0003] However, at present, research on the pull-out bearing capacity of anchor plates at different burial angles (especially inclined burial) is relatively rare. In particular, when the burial angle changes, the pull-out failure mechanism of the anchor plate and its relationship with the geometric size and shape of the anchor plate, the characteristics of the soil around the anchor, etc. are not very clear, which limits the promotion and application of anchor plate foundations in projects with more complex stress. Therefore, it is necessary to conduct in-depth research on the pull-out bearing capacity of anchor plates at different burial angles. Because the process is clear and intuitive, and the results are true and reliable, indoor model tests have become the most commonly used means of this type of research. Experimental research must have a test device that matches the test conditions to be carried out, but the existing anchor plate pull-out test device does not have this capability. The specific shortcomings are as follows:

[0004] (1) The existing test equipment is only designed for specific working conditions of horizontal or vertical burial, and cannot realize the anchor plate pull-out test at any burial angle;

[0005] (2) Using the existing design ideas, only an anchor plate pull-out test device that can be used to carry out a certain buried angle can be obtained. It is not convenient to analyze the pull-out bearing capacity of the anchor plate and its mechanism under different buried angles. In addition, due to the difference in the test devices, that is, the control variables are not unique, the test data of each working condition are not comparable. Summary of the invention

[0006] The purpose of the present invention is to provide a test device and a test method for simulating the pull-out failure of a submarine anchor plate in a plane, in view of the problem in the prior art that the existing test device is unable to perform an inclined pull-out test on an anchor plate, and capable of performing an inclined pull-out test on an anchor plate, thereby revealing the failure mode and pull-out bearing capacity mechanism of the anchor plate under different burial angles, and obtaining the influence law and process of the anchor plate burial parameters and soil parameters on the ultimate pull-out bearing capacity of the anchor plate, so as to achieve the purpose of guiding the design of anchor plate engineering.

[0007] In order to achieve the above object, the technical solution adopted by the present invention is:

[0008] A test device for simulating the pull-out failure of a submarine anchor plate in a plane, comprising a support frame, a model box and a winch, a soil sample is placed in the model box, an anchor plate is buried in the soil sample, the support frame comprises a horizontal top plate and a vertical support plate for supporting the horizontal top plate, the model box is located below the horizontal top plate, a longitudinal slit penetrating the horizontal top plate is horizontally arranged on the upper edge of the horizontal top plate, one end of the longitudinal slit passes through one side of the horizontal top plate, a longitudinal sliding track is horizontally arranged on the inner edge of the longitudinal slit, at least two pulley assemblies are slidably matched on the longitudinal sliding track, wherein the two pulley assemblies are respectively defined as a first pulley assembly and a second pulley assembly, the winch is connected to the top of the horizontal top plate, the steel strand led out of the winch passes through the longitudinal slit and then bypasses the first pulley assembly and the second pulley assembly in turn to be connected to the anchor plate, and the pulley assembly can be relatively fixed to the horizontal top plate.

[0009] The present application describes a test device for simulating the pull-out failure of a submarine anchor plate in a plane. The upper portion of the horizontal top plate is horizontally provided with a longitudinal slit penetrating the horizontal top plate. One end of the longitudinal slit passes through one side of the horizontal top plate. The longitudinal sliding track is provided in the longitudinal slit, so that the pulley assembly can be installed into the longitudinal slit and slide with the longitudinal sliding track. At least two pulley assemblies slide with the longitudinal sliding track. During the test, the first pulley assembly and the second pulley assembly are first set at the target position, and then the first pulley assembly and the second pulley assembly are The second pulley assembly is relatively fixed to the horizontal top plate. When other angle tests are performed, the second pulley assembly is relatively loosened from the horizontal top plate, and the second pulley assembly is slidably matched with the longitudinal sliding track to change position. Then the second pulley assembly is relatively fixed to the horizontal top plate to realize the vertical pull-out test and the inclined pull-out test of the anchor plate, thereby revealing the anchor plate failure mode and pull-out bearing capacity mechanism under different burial angles, and the influence law and process of the anchor plate burial parameters and soil parameters on the ultimate pull-out bearing capacity of the anchor plate can be obtained, so as to achieve the purpose of guiding the engineering design of the anchor plate.

[0010] Preferably, the pulley assembly includes a first pulley that slides with the longitudinal sliding track, the lower end of the first pulley is connected to the first pulley frame, the first pulley frame is provided with a pulley, the upper end of the first pulley is connected to the first screw rod, the first screw rod passes through the longitudinal slit, and is fixed to the upper surface of the horizontal top plate by a first pad and a first nut. When the pulley assembly is relatively fixed to the horizontal top plate, the first pad and the first pulley frame clamp the horizontal top plate from both sides of the horizontal top plate.

[0011] Preferably, it also includes a third pulley assembly, which is connected to the side wall of the model box and can slide with the side wall vertically along the side wall. The third pulley assembly can be fixed relative to the side wall. The steel strand led out of the winch passes through the longitudinal slit and then bypasses the first pulley assembly, the second pulley assembly and the third pulley assembly in turn to be connected to the anchor plate.

[0012] Preferably, a vertical slit penetrating the side wall is vertically arranged on the side wall of the model box, the lower end of the vertical slit corresponds to the maximum burial depth of the anchor plate, vertical sliding tracks are arranged on both sides of the vertical slit, the third pulley assembly includes a second pulley frame, a second pulley is connected to the second pulley frame, the second pulley is slidably matched with the vertical sliding track, the second pulley frame is connected to a second screw and a third pulley, one end of the second screw passes through the vertical slit, and is fixed to the side wall by a second pad and a second nut, and when the third pulley assembly is relatively fixed to the side wall, the second pad and the second pulley frame clamp the side wall from both sides of the thickness of the side wall.

[0013] A third pulley assembly is arranged through the side wall of the model box. During the test, the steel strand led out from the winch passes through the longitudinal slit and then bypasses the first pulley assembly and the second pulley assembly in sequence to be connected to the anchor plate, or the steel strand led out from the winch passes through the longitudinal slit and then bypasses the first pulley assembly, the second pulley assembly and the third pulley assembly in sequence to be connected to the anchor plate, so as to realize horizontal pull-out test, vertical pull-out test and inclined pull-out test of the anchor plate, thereby revealing the failure mode and pull-out bearing capacity mechanism of the anchor plate under different burial angles, and obtaining the influence law and process of the anchor plate burial parameters and soil parameters on the ultimate pull-out bearing capacity of the anchor plate, so as to achieve the purpose of guiding the engineering design of the anchor plate.

[0014] Preferably, a vertical hole is provided at the bottom of the vertical support plate, and the vertical hole is matched with an expansion first nut for fixing the vertical support plate on the ground.

[0015] The present invention also discloses a test method for simulating the pull-out failure of a submarine anchor plate in a plane. Based on the test device for simulating the pull-out failure of a submarine anchor plate in a plane described in the present application, the specific operation steps are as follows:

[0016] S1. The vertical support plate is placed vertically on the test site and fixed to the ground by the expansion first nut;

[0017] S2. The horizontal top plate is erected along the side with the longitudinal slit open end facing upward, and the second pulley assembly and the first pulley assembly are sequentially slid into the longitudinal sliding track from the longitudinal slit open end, and then the horizontal top plate is placed into the mortise of the vertical support plate by the dovetail tenon;

[0018] S3. After the vertical support plate and the horizontal top plate are spliced, the winch is fixed to one side of the upper surface of the horizontal top plate near the open end of the longitudinal slit, and the winch strand is passed through the slit;

[0019] S4. The model box is placed under the support frame;

[0020] S5. The second pulley connected as a whole by the second pulley frame is placed in the vertical sliding track, and the second screw is screwed into the screw hole of the second pulley frame, and the installation of the third pulley assembly is completed;

[0021] S6. Install the first pulley assembly directly below the rope output of the winch, so that the rope output direction of the winch is vertical, and define the pulley on the first pulley assembly as the fourth pulley, and the pulley on the second pulley assembly as the fifth pulley:

[0022] After the steel strand is unwound from the winch, it passes through the fourth pulley and the fifth pulley in sequence and is connected to the anchor plate. A force displacement sensor is connected between the anchor plate pull rod and the steel strand;

[0023] or

[0024] After the steel strand is unwound from the winch, it passes through the fourth pulley, the fifth pulley and the third pulley in sequence and is connected to the anchor plate. A force displacement sensor is connected between the anchor plate pull rod and the steel strand;

[0025] S7. Use the rain method to fill the soil sample into the model box. When the filling height is flush with the buried depth of the anchor plate, place the anchor plate with a tie rod on the surface of the soil sample and fix it, and then continue to fill the soil sample. During the filling process, use geotextile to seal the vertical seams to prevent soil leakage;

[0026] S8. In order to facilitate the observation of the side deformation of the soil sample, a layer of colored sand is applied to the inner side of the front wall of the model box every time a certain height is filled. When the soil sample is filled to the specified height, the filling is stopped;

[0027] S9. A first camera and a laser displacement sensor are arranged on the side wall of the model box, and a second camera is arranged in front of the front wall of the model box, wherein:

[0028] The first camera is used to capture the deformation of the upper surface of the soil sample during the process of the winch retracting the rope;

[0029] The laser displacement sensor is used to capture the displacement of the upper surface of the soil sample during the process of the winch retracting the rope;

[0030] The front wall of the model box is made of transparent material;

[0031] The second camera is used to capture the deformation of the colored sand part on the front side of the soil sample during the winch rope retraction process.

[0032] Preferably, in step S6, the relative positions of the fifth pulley and the third pulley satisfy the following relationship:

[0033] (a) When the anchor plate is buried horizontally, after the horizontal position of the anchor plate is determined, adjust the position of the fifth pulley so that the left side of the fifth pulley wheel rail is tangent to the steel strand, and then fix the fifth pulley to the horizontal top plate;

[0034] (b) When the anchor plate is buried vertically, after the vertical position of the anchor plate is determined, the position of the third pulley is adjusted so that the lower side of the wheel rail of the third pulley is tangent to the steel strand, and then the third pulley is fixed to the left side wall of the model box, and the vertical position of the fifth pulley is consistent with that of the third pulley;

[0035] (c) When the anchor plate is buried at a certain inclination angle, the inclination angle θ is defined as the angle between the steel strand connected to the anchor plate and the vertical direction. The inclination angle θ' is the angle between the steel strand connected to the anchor plate and the vertical direction when the third pulley moves to the top of the vertical sliding track. The relative positions of the fifth pulley and the third pulley are:

[0036] c1: When 0°<θ≤θ′, the fifth pulley is fixed to the left side of the fourth pulley L by the first pad and the first nut. cc Where

[0037] L cc =Htanθ-R / sinθ+R,

[0038] The third pulley is not in use and its position is not required;

[0039] c2: When θ′<θ≤90°, take the upper edge of the left wall of the model box as the initial position and fix the third pulley H below the initial position. c Where

[0040] H c =(H-h1)-(L cm +t m +L ma )tanθ,

[0041] The vertical position of the fifth pulley is consistent with that of the third pulley;

[0042]

[0043]

[0044] In the above formula, h1 is the distance from the geometric center of the fifth pulley to the upper edge of the model box, h2 is the distance from the center of gravity of the anchor plate to the upper surface of the soil sample, h3 is the height of the soil sample, h4 is the height of the inner side of the model box, and t a is the thickness of the anchor plate, R is the radius of the fourth pulley, the fourth pulley, the fifth pulley and the third pulley have the same diameter, L′ is the horizontal distance of the fifth pulley when θ=θ′ relative to the fifth pulley when θ=0°, L cm is the horizontal distance from the geometric center of the third pulley to the outer side of the left wall of the model box, t m is the thickness of the left wall of the model box, L ma It is the horizontal distance from the inner side of the left side wall of the model box to the center of gravity of the anchor plate.

[0045] The present application describes a test method for simulating the pull-out failure of a submarine anchor plate in a plane. By designing a support frame and a model box, sliding tracks and pulleys are provided on the top of the support frame and the side walls of the model box, and vertical slits are provided on the side walls of the model box, so that the anchor plate can be pulled out along any preset angle (0°-90°); the front wall of the model box adopts transparent tempered glass with preset positioning marking points, and cameras and laser displacement sensors are installed on the right side wall and the front wall to accurately capture the movement trajectory of the anchor plate and the deformation and failure form of the soil sample in real time; the pulling angle setting method is flexible and the test equipment is unified, which not only saves the test expenses, but also can more accurately obtain the ultimate pull-out bearing capacity of the anchor plate, the pull-out failure mechanism and its changing law.

[0046] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are:

[0047] 1. A test device for simulating pull-out failure of a submarine anchor plate in a plane described in the present application, wherein a longitudinal slit penetrating the horizontal top plate is horizontally arranged on the upper edge of the horizontal top plate, one end of the longitudinal slit passes through one side of the horizontal top plate, and the longitudinal sliding track is arranged in the longitudinal slit, so that the pulley assembly can be installed into the longitudinal slit and slide with the longitudinal sliding track, and at least two pulley assemblies are slidably matched with the longitudinal sliding track. During the test, the first pulley assembly and the second pulley assembly are first arranged at the target position, and then the first pulley assembly and the second pulley assembly are moved to the target position. The components are relatively fixed to the horizontal top plate. When other angle tests are performed, the second pulley assembly is relatively loosened from the horizontal top plate, and the second pulley assembly is slidably matched with the longitudinal sliding track to change position. Then, the second pulley assembly is relatively fixed to the horizontal top plate to realize the vertical pull-out test and the inclined pull-out test of the anchor plate, thereby revealing the anchor plate failure mode and pull-out bearing capacity exertion mechanism under different burial angles, and the influence law and exertion process of the anchor plate burial parameters and soil parameters on the ultimate pull-out bearing capacity of the anchor plate can be obtained, so as to achieve the purpose of guiding the engineering design of the anchor plate.

[0048] 2. The test device described in the present application simulates the pull-out failure of the submarine anchor plate in a plane. A third pulley assembly is arranged on the side wall of the model box. During the test, the steel strand led out from the winch passes through the longitudinal slit and then bypasses the first pulley assembly and the second pulley assembly in sequence to be connected to the anchor plate, or the steel strand led out from the winch passes through the longitudinal slit and then bypasses the first pulley assembly, the second pulley assembly and the third pulley assembly in sequence to be connected to the anchor plate, so as to realize the horizontal pull-out test and the inclined pull-out test of the anchor plate, thereby revealing the failure mode and pull-out bearing capacity mechanism of the anchor plate under different burial angles, and obtaining the influence law and process of the anchor plate burial parameters and soil parameters on the ultimate pull-out bearing capacity of the anchor plate, so as to achieve the purpose of guiding the engineering design of the anchor plate.

[0049] 3. The present application describes a test method for simulating the pull-out failure of a submarine anchor plate in a plane. By designing a support frame and a model box, sliding tracks and pulleys are opened on the top of the support frame and the side walls of the model box, and vertical slits are opened on the side walls of the model box, the pulling of the anchor plate along any preset angle (0°-90°) is realized; the front wall of the model box adopts transparent tempered glass with preset positioning marking points, and cameras and laser displacement sensors are installed on the right side wall and the front wall to accurately capture the movement trajectory of the anchor plate and the deformation and failure form of the soil sample in real time; the pulling angle setting method is flexible and the test equipment is unified, which not only saves the test expenses, but also can more accurately obtain the ultimate pull-out bearing capacity of the anchor plate, the pull-out failure mechanism and its changing law. BRIEF DESCRIPTION OF THE DRAWINGS

[0050] Figure 1 It is a structural front view of a test device for simulating pull-out failure of a submarine anchor plate in a plane according to the present invention (the steel strands are passed around the fourth pulley and the fifth pulley, and the fifth pulley is located directly above the anchor plate).

[0051] Figure 2 It is a structural front view of a test device for simulating pull-out failure of a submarine anchor plate in a plane according to the present invention (the steel strands are passed around the fourth pulley and the fifth pulley, and the fifth pulley is located obliquely above the anchor plate).

[0052] Figure 3 It is a schematic diagram of the main structure of a test device for simulating pull-out failure of a submarine anchor plate in a plane according to the present invention (the steel strands are wound around the fourth pulley, the fifth pulley and the third pulley, and the third pulley is located obliquely above the anchor plate).

[0053] Figure 4 It is a structural front view schematic diagram of a test device for simulating pull-out failure of a submarine anchor plate in a plane according to the present invention (the steel strands are passed around the fourth pulley, the fifth pulley and the third pulley, and the fifth pulley, the third pulley and the anchor plate are arranged in a colinear manner).

[0054] Figure 5It is a schematic structural front view of a test device for simulating pull-out failure of a submarine anchor plate in a plane according to the present invention (the steel strands are wound around the fourth pulley, the fifth pulley and the third pulley, and the pulley assembly is located on the horizontal left side of the anchor plate).

[0055] Figure 6 It is a schematic top view of the structure of a test device for simulating the pull-out failure of a seabed anchor plate in a plane according to the present invention.

[0056] Figure 7 It is a vertically cut left view schematic diagram of a test device for simulating pull-out failure of a seabed anchor plate in a plane according to the present invention.

[0057] Figure 8 This invention is attached Figure 7 Enlarged schematic diagram of part A in the middle.

[0058] Fig. 9 It is a structural schematic diagram of the pulley assembly of the present invention.

[0059] In the figure: 1-support frame; 2-model box; 3-vertical support plate; 4-horizontal top plate; 5-winch; 6-longitudinal sliding track; 7-first pulley; 8-second nut; 9-first screw; 10-first pad; 11-first nut; 12-vertical sliding track; 13-anchor plate; 14-soil sample; 15-longitudinal slit; 16-first pulley frame; 17-steel strand; 18-third pulley assembly; 19-side wall; 20-vertical slit; 21-first pulley assembly; 22-second pulley assembly; 23-second pulley frame; 24-second pulley; 25-second pad; 26-fourth pulley; 27-fifth pulley; 28-third pulley, 29-second screw. DETAILED DESCRIPTION

[0060] The present invention will be described in detail below in conjunction with the accompanying drawings.

[0061] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0062] Example 1

[0063] like Figure 1-9As shown, a test device for simulating the pull-out failure of a submarine anchor plate in a plane described in this embodiment includes a support frame 1, a model box 2, a winch 5 and a third pulley assembly 18, a soil sample 14 is placed in the model box 2, an anchor plate 13 is buried in the soil sample 14, the support frame 1 includes a horizontal top plate 4 and a vertical support plate 3 for supporting the horizontal top plate 4, the model box 2 is located below the horizontal top plate 4, and a longitudinal slit 15 penetrating the horizontal top plate 4 is horizontally arranged on the upper edge of the horizontal top plate 4, one end of the longitudinal slit 15 passes through one side of the horizontal top plate 4, and the longitudinal slit 15 passes through one side of the horizontal top plate 4. A longitudinal sliding track 6 is horizontally arranged along the inner side of the slit 15, and at least two pulley assemblies are slidably fitted on the longitudinal sliding track 6, wherein the two pulley assemblies are respectively defined as a first pulley assembly 21 and a second pulley assembly 22. The winch 5 is connected to the top of the horizontal top plate 4, and the steel strand 17 led out of the winch 5 passes through the longitudinal slit 15 and then bypasses the first pulley assembly 21 and the second pulley assembly 22 in turn and is connected to the anchor plate 13. The first pulley assembly 21 and the second pulley assembly 22 can both be relatively fixed to the horizontal top plate 4, and the upper part of the model box 2 is open.

[0064] The pulley assembly includes a first pulley 7 that slides with the longitudinal sliding track 6, the lower end of the first pulley 7 is connected to the first pulley frame 16, the first pulley frame 16 is provided with a pulley, the upper end of the first pulley 7 is connected to the first screw 9, the first screw 9 passes through the longitudinal slit 15, and is fixed to the upper surface of the horizontal top plate 4 by a first pad 10 and a first nut 11. When the pulley assembly is relatively fixed to the horizontal top plate 4, the first pad 10 and the first pulley frame 16 clamp the horizontal top plate 4 from both sides of the horizontal top plate 4, and the third pulley assembly 18 is connected to the side wall 19 of the model box 2, and can slide with the side wall 19 vertically along the side wall 19.

[0065] The third pulley assembly 18 can be fixed relative to the side wall 19 , and the steel strand 17 led out of the winch 5 passes through the longitudinal slit 15 and then passes around the first pulley assembly 21 , the second pulley assembly 22 and the third pulley assembly 18 in sequence and is connected to the anchor plate 13 . A vertical slit 20 penetrating the side wall 19 is vertically arranged on the side wall 19 of the model box 2, and the lower end of the vertical slit 20 corresponds to the maximum burial depth of the anchor plate 13, and vertical sliding tracks 12 are arranged on both sides of the vertical slit 20. The third pulley assembly 18 includes a second pulley frame 23, and a second pulley 24 is connected to the second pulley frame 23, and the second pulley 24 slides with the vertical sliding track 12. The second pulley frame 23 is connected with a second screw rod 29 and a third pulley 28, and one end of the second screw rod 29 passes through the vertical slit 20 and is fixed to the side wall 19 by a second pad 25 and a second nut 8. When the third pulley assembly 18 is relatively fixed to the side wall 19, the second pad 25 and the second pulley frame 23 clamp the side wall 19 from both sides of the thickness of the side wall 19.

[0066] By setting a third pulley assembly 18 on the side wall 19 of the model box 2, during the test, the steel strand 17 led out from the winch 5 passes through the longitudinal slit 15 and then bypasses the first pulley assembly 21 and the second pulley assembly 22 in sequence to be connected to the anchor plate 13, or the steel strand 17 led out from the winch 5 passes through the longitudinal slit 15 and then bypasses the first pulley assembly 21, the second pulley assembly 22 and the third pulley assembly 18 in sequence to be connected to the anchor plate 13, so as to realize the horizontal pull-out test, vertical pull-out test and inclined pull-out test of the anchor plate 13, thereby revealing the failure mode and pull-out bearing capacity mechanism of the anchor plate 13 at different burial angles, and obtaining the influence law and process of the burial parameters and soil parameters of the anchor plate 13 on the ultimate pull-out bearing capacity of the anchor plate 13, so as to achieve the purpose of guiding the engineering design of the anchor plate 13.

[0067] A vertical hole is provided at the bottom of the vertical support plate 3 , and a first expansion nut 11 is provided on the vertical hole for fixing the vertical support plate 3 on the ground.

[0068] Beneficial effects of this embodiment: The test device described in this application simulates the pull-out failure of the submarine anchor plate in a plane, wherein the horizontal top plate 4 is horizontally provided with a longitudinal slit 15 penetrating the horizontal top plate 4, one end of the longitudinal slit 15 passes through one side of the horizontal top plate 4, and the longitudinal sliding track 6 is arranged in the longitudinal slit 15, so that the first pulley assembly 21 and the second pulley assembly 22 can be installed into the longitudinal slit 15 and slide with the longitudinal sliding track 6, with the assistance of at least two first pulley assemblies sliding on the longitudinal sliding track 6. During the test, the first pulley assembly 21 and the second pulley assembly 22 are first set at the target position, and then Then the first pulley assembly is relatively fixed to the horizontal top plate 4, and when other angle tests are performed, the second pulley assembly 22 is relatively loosened from the horizontal top plate 4, and the second pulley assembly 22 is slidably matched with the longitudinal sliding track 6 to change position, and then the second pulley assembly 22 is relatively fixed to the horizontal top plate 4 to realize the vertical pull-out test and inclined pull-out test of the anchor plate 13, thereby revealing the failure mode and pull-out bearing capacity mechanism of the anchor plate 13 under different burial angles, and obtaining the influence law and process of the burial parameters and soil parameters of the anchor plate 13 on the ultimate pull-out bearing capacity of the anchor plate 13, so as to achieve the purpose of guiding the engineering design of the anchor plate 13.

[0069] Example 2

[0070] like Figure 1-9 As shown, a test device for simulating pull-out failure of a submarine anchor plate in a plane according to this embodiment includes a support frame 1 and a model box 2;

[0071] The support frame 1 includes a vertical support plate 3 and a horizontal top plate 4. The vertical support plate 3 is an inverted "T"-shaped hollow steel plate used to support the horizontal top plate 4. The horizontal top plate 4 is an "I"-shaped hollow steel plate used to adjust the pulling direction of the anchor plate 13 and fix the winch 5.

[0072] A vertical hole is provided at the bottom of the vertical support plate 3 so as to fix the vertical support plate 3 to the ground by expanding the first nut 11;

[0073] A winch 5 for applying driving force is installed on the right side of the upper surface of the horizontal top plate 4, and a longitudinal sliding track 6 is arranged on the lower surface starting from the right end, and a longitudinal slit 15 penetrating the upper surface of the horizontal top plate 4 is preset just above the track;

[0074] Four first pulleys 7 that can freely move in translation are arranged in the longitudinal sliding track 6, the lower end of the first pulley 7 is connected to the pulley, and the upper end is connected to the first screw 9, the first screw 9 passes through the longitudinal slit, and is fixed to the upper surface of the horizontal top plate 4 by a first pad 10 and a first nut 11;

[0075] The steel strand of the hoist 5 passes through the longitudinal slit 15 and is placed in the concave guide rails of the fourth pulley 26, the fifth pulley 27 and the third pulley 28;

[0076] The vertical support plate 3 and the horizontal top plate 4 are connected by mortise and tenon. A mortise is provided on the upper part of the vertical support plate 3, and a dovetail tenon matched with the mortise is provided at the end of the horizontal top plate 4.

[0077] The model box 2 is located inside the support frame 1, and includes a left side wall, a right side wall, a front wall, a rear wall and a bottom plate. The side walls and the side walls and the bottom plate are sealed by rivets to form a box body with an open top.

[0078] A completely penetrating vertical slit 20 is provided at the longitudinal symmetry axis of the left side wall 19 so that the steel strand of the hoist 5 can pass through the vertical slit 20. The starting point of the vertical slit 20 is consistent with the corresponding position of the maximum embedding depth of the anchor plate 13, and the end point is the upper edge of the left side wall 19;

[0079] With the longitudinal symmetry axis as the dividing line, two vertical sliding rails 12 are arranged on the outer side of the left side wall 19. The specifications of the vertical sliding rails 12 are the same as those of the longitudinal sliding rails 6, and the starting and ending points are consistent with the starting and ending points of the vertical slits 20.

[0080] A second pulley 24 is provided on each of the vertical sliding rails 12, and the pulleys in the vertical sliding rails 12 are connected as a whole by a steel plate, a screw hole is opened at the geometric center of the steel plate and a second screw rod 29 is passed through, the left end of the second screw rod 29 is connected to the third pulley 28, and the right end passes through the vertical slit 20, so as to fix the third pulley 28 at a designated position of the left side wall 19;

[0081] A high-definition camera is arranged at the midpoint of the upper edge of the right side wall, and two laser displacement sensors are arranged on both sides of the high-definition camera, respectively used to capture the surface damage morphology and displacement of the soil sample in the model box 2;

[0082] The front side wall is made of transparent tempered glass, with positioning marking points on the outside, and a high-definition camera is arranged in the front to shoot the side deformation of the soil sample in the model box 2 in real time, and obtain the soil sample displacement vector diagram based on the smooth particle flow technology.

[0083] Example 3

[0084] like Figure 1-9 As shown, the present invention also discloses a test method for simulating the pull-out failure of a submarine anchor plate in a plane, based on the test device for the pull-out failure of a submarine anchor plate described in Example 1 or 2, and the specific operation steps are as follows:

[0085] S1. The vertical support plate 3 is placed in an inverted "T" shape on the test site and fixed to the surface by the expansion first nut 11;

[0086] S2. The horizontal top plate 4 is erected along the side, and the open end of the longitudinal slit 15 is facing upward, and the second pulley assembly 22 and the first pulley assembly 21 are sequentially slid from the open end of the longitudinal slit 15 into the longitudinal sliding track 6, and then the horizontal top plate 4 is placed into the mortise of the vertical support plate 3 by the dovetail tenon;

[0087] S3. After the vertical support plate 3 and the horizontal top plate 4 are spliced, the hoist 5 is fixed to the upper surface of the horizontal top plate 4 near the side of the open end of the longitudinal slit 15, and the steel strand of the hoist 5 passes through the slit 15;

[0088] S4. The model box 2 is placed on the right side below the support frame 1, and the horizontal spacing between the model box 2 and the vertical support plate 3 can be freely adjusted depending on the test conditions;

[0089] S5. The second pulley 24 connected as a whole by the second pulley frame 23 is placed in the vertical sliding track 12 on the outer side of the left side wall of the model box 2, and the second screw 9 is screwed into the screw hole of the second pulley frame 23, and the installation of the third pulley assembly 18 is completed;

[0090] S6. Install the first pulley assembly 21 directly below the rope output of the winch 5, so that the rope output direction of the winch 5 is vertical, and define the pulley on the first pulley assembly 21 as the fourth pulley 26, and the pulley on the second pulley assembly 22 as the fifth pulley 27:

[0091] After the steel strand 17 is unwound from the winch 5, it passes through the fourth pulley 26 and the fifth pulley 27 in sequence and is connected to the anchor plate 13. A force displacement sensor is connected between the anchor plate 13 pull rod and the steel strand;

[0092] or

[0093] The steel strand 17 is unwound from the winch 5 and passed through the fourth pulley 26, the fifth pulley 27 and the third pulley 28 in sequence and then connected to the anchor plate 13. A force displacement sensor is connected between the anchor plate 13 pull rod and the steel strand;

[0094] The relative positions of the fifth pulley 27 and the third pulley 28 satisfy the following relationship:

[0095] (a) When the anchor plate 13 is buried horizontally, after the horizontal position of the anchor plate 13 is determined, the position of the fifth pulley 27 is adjusted so that the left side of the wheel rail of the fifth pulley 27 is tangent to the steel strand 17, and then the fifth pulley 27 is fixed to the horizontal top plate 4;

[0096] (b) When the anchor plate 13 is buried vertically, after the vertical position of the anchor plate 13 is determined, the position of the third pulley 28 is adjusted so that the lower side of the wheel rail of the third pulley 28 is tangent to the steel strand 17, and then the third pulley 28 is fixed to the left side wall of the model box 2, and the vertical position of the fifth pulley 27 is consistent with that of the third pulley 28;

[0097] (c) When the anchor plate 13 is buried at a certain inclination angle, the inclination angle θ is defined as the angle between the steel strand 17 connected to the anchor plate 13 and the vertical direction. The inclination angle θ′ is the angle between the steel strand 17 connected to the anchor plate 13 and the vertical direction when the third pulley 28 moves to the top of the vertical sliding track 12. The relative positions of the fifth pulley 27 and the third pulley 28 are:

[0098] c1: When 0°<θ≤θ′, the fifth pulley 27 is fixed to the left side L of the fourth pulley 26 by the first pad 10 and the first nut 11. cc Where

[0099] L cc =Htanθ-R / sinθ+R,

[0100] The third pulley 28 is not in use and its position is not required;

[0101] c2: When θ′<θ≤90°, the upper edge of the left wall of the model box 2 is taken as the initial position, and the third pulley 28 is fixed below the initial position H c Where

[0102] H c =(H-h1)-(L cm +t m +L ma )tanθ,

[0103] The vertical position of the fifth pulley 27 is consistent with that of the third pulley 28;

[0104]

[0105]

[0106] In the above formula, h1 is the distance from the geometric center of the fifth pulley 27 to the upper edge of the model box 2, h2 is the distance from the center of gravity of the anchor plate 13 to the upper surface of the soil sample, h3 is the height of the soil sample, h4 is the height of the inner side of the model box 2, and t a is the thickness of the anchor plate 13, R is the radius of the fourth pulley 26, the fourth pulley 26, the fifth pulley 27 and the third pulley 28 have the same diameter, L′ is the horizontal distance of the fifth pulley 27 when θ=θ′ relative to the fifth pulley 27 when θ=0°, L cm is the horizontal distance from the geometric center of the third pulley 28 to the outer side of the left side wall of the model box 2, t m is the thickness of the left wall of model box 2, Lma is the horizontal distance from the inner side of the left side wall of the model box 2 to the center of gravity of the anchor plate 13;

[0107] S7. The soil sample 14 is filled into the model box 2 by the rain method. When the filling height is flush with the buried depth of the anchor plate 13, the anchor plate 13 with a tie rod is placed on the surface of the soil sample and fixed, and then the soil sample 14 is filled. During the filling process, the vertical slit 20 is blocked with a geotextile to prevent soil leakage;

[0108] S8. In order to facilitate the observation of the side deformation of the soil sample, each filled to a certain height, a layer of colored sand is applied to the inner side of the front wall of the model box 2. When the soil sample is filled to a specified height, stop filling;

[0109] S9. Cameras and laser displacement sensors are arranged on the side walls of the model box 2, and a camera is set up in front of the front wall of the model box 2 to capture the deformation and displacement of the side and upper surfaces of the soil sample during loading. A force displacement sensor is connected between the anchor plate 13 pull rod and the steel strand to measure the pull-out force.

[0110] S10. After inspecting the test device and the loading and testing equipment and eliminating potential hazards, start the winch 5 for loading and turn on the camera to capture the deformation of the soil sample.

[0111] Beneficial effects of this embodiment: The test method described in this application for simulating the pull-out failure of a submarine anchor plate in a plane, by designing a support frame 1 and a model box 2, and opening sliding tracks and pulleys on the top of the support frame 1 and the side walls of the model box 2, and opening vertical slits on the side walls of the model box 2, realizes the pulling of the anchor plate 13 along any preset angle (0°-90°); the front wall of the model box 2 adopts transparent tempered glass and preset positioning marking points, and the right side wall and the front wall are equipped with cameras and laser displacement sensors to accurately capture the movement trajectory of the anchor plate 13 and the deformation and failure form of the soil sample in real time; the pulling angle setting method is flexible, and the test equipment is unified, which not only saves the test expenses, but also can more accurately obtain the ultimate pull-out bearing capacity of the anchor plate 13, the pull-out failure mechanism and its change law.

[0112] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A test device for simulating pull-out failure of a seabed anchor plate in a plane, characterized in that: It comprises a support frame, a model box and a winch, wherein a soil sample is placed in the model box, an anchor plate is buried in the soil sample, the support frame comprises a horizontal top plate and a vertical support plate for supporting the horizontal top plate, the model box is located below the horizontal top plate, a longitudinal slit penetrating the horizontal top plate is horizontally arranged on the upper edge of the horizontal top plate, one end of the longitudinal slit passes through one side of the horizontal top plate, a longitudinal sliding track is horizontally arranged on the inner edge of the longitudinal slit, at least two pulley assemblies are slidably matched on the longitudinal sliding track, wherein the two pulley assemblies are respectively defined as a first pulley assembly and a second pulley assembly, the winch is connected to the top of the horizontal top plate, and the pulley assembly can be relatively fixed to the horizontal top plate; The pulley assembly includes a first pulley that is slidably matched with the longitudinal sliding track, the lower end of the first pulley is connected to the first pulley frame, the first pulley frame is provided with a pulley, the upper end of the first pulley is connected to the first screw rod, the first screw rod passes through the longitudinal slit, and is fixed to the upper surface of the horizontal top plate by a first pad and a first nut, when the pulley assembly is relatively fixed to the horizontal top plate, the first pad and the first pulley frame clamp the horizontal top plate from both sides of the horizontal top plate; It also includes a third pulley assembly, which is connected to the side wall of the model box and can slide with the side wall vertically along the side wall, and the third pulley assembly can be fixed relative to the side wall; The side wall of the model box is vertically provided with a vertical slit penetrating the side wall, the lower end of the vertical slit corresponds to the maximum burial depth of the anchor plate, vertical sliding tracks are provided on both sides of the vertical slit, the third pulley assembly includes a second pulley frame, the second pulley is connected to the second pulley frame, the second pulley is slidably matched with the vertical sliding track, the second pulley frame is connected with a second screw rod and a third pulley, one end of the second screw rod passes through the vertical slit, and is fixed to the inner side of the side wall by a second pad and a second nut, when the third pulley assembly is relatively fixed to the side wall, the second pad and the second pulley frame clamp the side wall from both sides of the thickness of the side wall; The steel strand led out of the winch passes through the longitudinal slit and then bypasses the first pulley assembly and the second pulley assembly in sequence to be connected to the anchor plate, or the steel strand led out of the winch passes through the longitudinal slit and then bypasses the first pulley assembly, the second pulley assembly and the third pulley assembly in sequence to be connected to the anchor plate, so as to realize pulling of the anchor plate at any preset angle within the range of 0°-90°.

2. A test device for simulating pull-out failure of a seabed anchor plate in a plane according to claim 1, characterized in that: A vertical hole is arranged at the bottom of the vertical support plate, and a first expansion nut is matched on the vertical hole for fixing the vertical support plate on the ground.

3. A test method for simulating pull-out failure of a seabed anchor plate in a plane, characterized in that: Based on the test device for simulating the pull-out failure of a seabed anchor plate in a plane as described in claim 1, the specific operating steps are as follows: S1. The vertical support plate is placed vertically on the test site and fixed to the ground by the expansion first nut; S2. The horizontal top plate is erected along the side with the longitudinal slit open end facing upward, and the second pulley assembly and the first pulley assembly are sequentially slid into the longitudinal sliding track from the longitudinal slit open end, and then the horizontal top plate is placed into the mortise of the vertical support plate by the dovetail tenon; S3. After the vertical support plate and the horizontal top plate are spliced, the winch is fixed to one side of the upper surface of the horizontal top plate near the open end of the longitudinal slit, and the winch strand is passed through the longitudinal slit; S4. The model box is placed under the support frame; S5. The second pulley connected as a whole by the second pulley frame is placed in the vertical sliding track, and the second screw is screwed into the screw hole of the second pulley frame, and the installation of the third pulley assembly is completed; S6. Install the first pulley assembly directly below the rope output of the winch, so that the rope output direction of the winch is vertical, and define the pulley on the first pulley assembly as the fourth pulley, and the pulley on the second pulley assembly as the fifth pulley: After the steel strand is unwound from the winch, it passes through the fourth pulley and the fifth pulley in sequence and is connected to the anchor plate. A force displacement sensor is connected between the anchor plate pull rod and the steel strand; or After the steel strand is unwound from the winch, it passes through the fourth pulley, the fifth pulley and the third pulley in sequence and is connected to the anchor plate. A force displacement sensor is connected between the anchor plate pull rod and the steel strand; S7. Use the rain method to fill the soil sample into the model box. When the filling height is flush with the buried depth of the anchor plate, place the anchor plate with a tie rod on the surface of the soil sample and fix it, and then continue to fill the soil sample. During the filling process, use geotextile to seal the vertical seams to prevent soil leakage; S8. In order to facilitate the observation of the side deformation of the soil sample, a layer of colored sand is applied to the inner side of the front wall of the model box every time a certain height is filled. When the soil sample is filled to the specified height, the filling is stopped; S9. A first camera and a laser displacement sensor are arranged on the side wall of the model box, and a second camera is set up in front of the front wall of the model box, wherein: The first camera is used to capture the deformation of the upper surface of the soil sample during the process of the winch retracting the rope; The laser displacement sensor is used to capture the displacement of the upper surface of the soil sample during the process of the winch retracting the rope; The front wall of the model box is made of transparent material; The second camera is used to capture the deformation of the colored sand part on the front side of the soil sample during the winch rope retraction process.

4. A test method for simulating pull-out failure of a seabed anchor plate in a plane according to claim 3, characterized in that: In step S6, the relative positions of the fifth pulley and the third pulley satisfy the following relationship: (a) When the anchor plate is buried horizontally, after the horizontal position of the anchor plate is determined, adjust the position of the fifth pulley so that the left side of the fifth pulley wheel rail is tangent to the steel strand, and then fix the fifth pulley to the horizontal top plate; (b) When the anchor plate is buried vertically, after the vertical position of the anchor plate is determined, the position of the third pulley is adjusted so that the lower side of the wheel rail of the third pulley is tangent to the steel strand, and then the third pulley is fixed to the side wall of the model box, and the vertical position of the fifth pulley is consistent with that of the third pulley; (c) When the anchor plate is buried at a certain inclination angle, the inclination angle θ is defined as the angle between the steel strand connected to the anchor plate and the vertical direction. The inclination angle θ' is the angle between the steel strand connected to the anchor plate and the vertical direction when the third pulley moves to the top of the vertical sliding track. The relative positions of the fifth pulley and the third pulley are: c1: When 0°<θ≤θ′, the fifth pulley is fixed to the left side of the fourth pulley L by the first pad and the first nut. cc Where L cc =Htanθ-R / sinθ+R; c2: When θ′<θ≤90°, take the upper edge of the left wall of the model box as the initial position and fix the third pulley H below the initial position. c Where H c =(H-h1)-(L cm +t m +L ma )tanθ, The vertical position of the fifth pulley is consistent with that of the third pulley; In the above formula, h1 is the distance from the geometric center of the fifth pulley to the upper edge of the model box, h2 is the distance from the center of gravity of the anchor plate to the upper surface of the soil sample, h3 is the height of the soil sample, h4 is the height of the inner side of the model box, and t a is the thickness of the anchor plate, R is the radius of the fourth pulley, the fourth pulley, the fifth pulley and the third pulley have the same diameter, L′ is the horizontal distance of the fifth pulley when θ=θ′ relative to the fifth pulley when θ=0°, L cm is the horizontal distance from the geometric center of the third pulley to the outside of the side wall of the model box, t m is the side wall thickness of the model box, L ma It is the horizontal distance from the inner side of the model box side wall to the center of gravity of the anchor plate.