AGV automatic material sending and receiving scheduling method, system and storage medium
Through the AGV automatic material transmission and reception scheduling method, the server or operation terminal can obtain the storage status in real time, generate scheduling instructions, and automate material distribution, solving the problems of manual supervision and security risks in the existing technology, and achieving efficient and accurate unmanned Material distribution and data traceability.
Patent Information
- Application Number
- CN202111319186.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-11-09
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2041-11-09
AI Technical Summary
The existing AGV technology still requires a lot of manual supervision during material handling, resulting in an increase in the burden on the operator, low efficiency, and safety risks.
The AGV automatic material delivery and receiving scheduling method executed by the server or operating terminal defines the storage type and status, obtains the storage status in real time, and generates scheduling instructions to automate the delivery, weighing, abnormal material return and distribution tasks of the material.
Unmanned material delivery has been realized, the timeliness and accuracy of delivery has been improved, and the full data traceability has been carried out, which has reduced manual intervention and reduced safety risks.
Smart Images

Figure CN114115244B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of AGV scheduling, and in particular to an AGV automatic material sending and receiving scheduling method, system and storage medium. Background Art
[0002] The AGV cart is equipped with an electromagnetic and automatic navigation device and can travel along the specified navigation path. It is a transport vehicle with safety protection and various transfer functions. Its travel path can be controlled by a computer or established using an electromagnetic track.
[0003] In the wire production line, the loading and unloading of busbar cages is usually done manually by crane or forklift, which is time-consuming and labor-intensive. Material handling personnel and production operators interfere with each other in the workshop, posing a great safety risk.
[0004] With the development of AGV technology, related companies use AGV to replace traditional overhead cranes and manual forklifts in material handling. However, in the existing technology, companies often use point-to-point directional handling in the use of AGV. During the material delivery process, a large number of personnel are required to monitor the use of materials in real time and respond in a timely manner. Although the risks of manual handling and the manpower of some handling are solved, the workload of operators is increased, and the operating efficiency of personnel is not high. Summary of the invention
[0005] In view of the deficiencies in the prior art, the object of the present invention is to provide an AGV automatic material receiving and sending scheduling method, system and storage medium.
[0006] The technical solution of the present invention is summarized as follows:
[0007] On the one hand, the present invention provides an AGV automatic material sending and receiving scheduling method, which is executed by a server or an operation terminal; comprising:
[0008] Define storage location types and storage location status; where storage location types include at least receiving dock location, return dock location, weighing location, buffer location, and machine location; storage location status includes at least empty storage location, empty carrier, waiting to be weighed, accepted, rejected, empty cage, half cage, full cage, and overdue;
[0009] Obtain the storage status of each storage type in real time;
[0010] According to the current storage location status of the storage location type, the material information is updated and a dispatch instruction for the AGV is generated.
[0011] Furthermore, updating material information according to the current storage location status of the storage location type and generating AGV scheduling task information includes:
[0012] Get the current storage status of the receiving dock;
[0013] When the current storage position status of the receiving dock is empty, a reminder to discharge the material is generated; after the incoming material is placed, the storage position status of the receiving dock is updated to pending weighing, and the material is updated to pending weighing material;
[0014] When the current storage location state of the receiving dock is an empty carrier, obtaining the current storage location type of the carrier;
[0015] A first dispatch instruction for the AGV is generated according to the current storage location type where the carrier is located; wherein the first dispatch instruction is used to dispatch the carrier from the current storage location type where the carrier is located to the receiving dock location.
[0016] Further, according to the current storage location status of the storage location type, the material information is updated and the scheduling task information of the AGV is generated, which also includes:
[0017] Determine whether the weighing position is occupied. When the weighing position is empty, generate a second dispatch instruction for the AGV to transport the material to be weighed to the weighing position; wherein the second dispatch instruction is used to dispatch the material to be weighed from the receiving dock or buffer area to the weighing position.
[0018] Further, according to the current storage location status of the storage location type, the material information is updated and the scheduling task information of the AGV is generated, which also includes:
[0019] The weighing module on the weighing station uploads the actual weight and compares it with the stored weight;
[0020] When the comparison result between the actual weight and the stored weight meets the predetermined condition, the storage position state of the weighing position is updated to receiving, the material to be weighed is updated to the material to be received, and a third dispatch instruction of the AGV is generated; wherein the third dispatch instruction is used to dispatch the material to be received from the weighing position to the cache position;
[0021] When the comparison result between the actual weight and the stored weight does not meet the predetermined conditions, the storage status of the weighing position is updated to reject, the material to be weighed is updated to the material to be rejected, and the fourth scheduling instruction of the AGV is generated; wherein the fourth scheduling instruction is used to schedule the material to be rejected from the weighing position to the return dock or buffer area.
[0022] Further, according to the current storage location status of the storage location type, the material information is updated and the scheduling task information of the AGV is generated, which also includes:
[0023] Update and obtain material information on the cache position in real time, prioritize materials according to batch and weight, and generate the fifth scheduling instruction for materials that match the demand information of the production line and are ranked high; the fifth scheduling instruction is used to schedule materials with high rankings from the cache position to the machine position for use by the production line.
[0024] Further, according to the current storage location status of the storage location type, the material information is updated and the scheduling task information of the AGV is generated, which also includes:
[0025] At regular intervals, the storage location status on the machine position is obtained; including: obtaining material information on the machine position, determining whether the storage location status on the machine position is overdue according to the batch of the material; then determining whether the storage location status on the machine position is empty, half-cage, or full according to the quality of the material; generating different AGV scheduling instructions according to the storage location status on the machine position.
[0026] Further, when the storage status of the machine position is overdue, the material on the machine position is updated to be an overdue material, and a sixth dispatching instruction of the AGV is generated; wherein the sixth dispatching instruction is used to dispatch the overdue material from the machine position to the return material dock position;
[0027] When the storage status on the machine position is not overdue, the storage status on the machine position is determined as empty cage, half cage, or full cage according to the quality of the material;
[0028] When the storage position on the machine position is empty, a seventh dispatch instruction is generated, and the seventh dispatch instruction is used to dispatch the empty cage to the cache position or the unloading position;
[0029] When the storage position status on the machine position is half cage, the eighth dispatching instruction is generated, and the eighth dispatching instruction is used to dispatch the half cage to the weighing position. After weighing, the weighing position updates the quality information of the material, and generates the ninth dispatching instruction, and the ninth dispatching instruction is used to dispatch the half cage material to the cache position;
[0030] When the storage position on the machine position is full, the tenth dispatch instruction is generated, and the tenth dispatch instruction is used to dispatch the full cage material to the cache position;
[0031] Loop execution steps: update and obtain material information on the cache position in real time, prioritize materials according to batch and weight, and generate the fifth scheduling instruction based on the materials that match the demand information of the production line and are ranked high; the fifth scheduling instruction is used to schedule the materials ranked high from the cache position to the machine position for use by the production line.
[0032] Correspondingly, the present invention also provides an AGV automatic material receiving and sending scheduling system, including a server or an operation terminal, and the server or the operation terminal is used to execute the AGV automatic material receiving and sending scheduling method as described above.
[0033] Furthermore, it also includes PDA operation terminal, weighing module, MES system, and AGV execution control system;
[0034] The PDA handheld operation terminal is used to scan materials, confirm materials and obtain batches of materials. A material weighing module is set on the weighing position; the MES system stores the storage weight; and the AGV execution control system is used to receive the dispatching instructions of the AGV to execute AGV control.
[0035] Correspondingly, the present invention also provides a computer-readable storage medium, on which a program is stored, and when the program is executed by a processor, the above-mentioned AGV automatic material receiving and sending scheduling method is implemented.
[0036] Compared with the prior art, the present invention has the following beneficial effects:
[0037] The present invention provides an AGV automatic material receiving and dispatching scheduling method, which obtains different storage location types and storage location status in real time, and realizes automatic scheduling of AGV tasks such as dock material receiving, weighing, abnormal material return, and material distribution according to the corresponding different storage location status. The method realizes unmanned operation for production line material distribution, improves the timeliness and accuracy of distribution, and also realizes the full data traceability of the material distribution process.
[0038] The above description is only an overview of the technical solution of the present invention. In order to more clearly understand the technical means of the present invention and implement it according to the contents of the specification, the following is a detailed description of the preferred embodiments of the present invention in conjunction with the accompanying drawings. The specific implementation of the present invention is given in detail by the following embodiments and their accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0040] Figure 1 It is a flow chart of an AGV automatic material sending and receiving scheduling method of the present invention;
[0041] Figure 2 Another schematic diagram of the process of the AGV automatic material receiving and sending scheduling method of the present invention;
[0042] Figure 3 It is a schematic diagram of the state transition of the storage state in the present invention;
[0043] Figure 4 It is a schematic diagram of an AGV automatic material receiving and sending scheduling system of the present invention.
[0044] Figure numerals: 101, database server; 102, management system server; 103, PDA operation terminal; 104, weighing module; 105, operation terminal; 106, PLC control module. DETAILED DESCRIPTION
[0045] The present invention is further described in detail below in conjunction with the accompanying drawings, and the aforementioned and other purposes, features, aspects and advantages of the present invention will become more obvious, so that those skilled in the art can implement it with reference to the text of the specification. In the accompanying drawings, for the sake of clarity, the shapes and sizes can be enlarged, and the same reference numerals will be used in all figures to indicate the same or similar parts. In the following description, words such as center, thickness, height, length, front, back, rear, left, right, top, bottom, upper, lower, etc. are based on the orientation or position relationship shown in the accompanying drawings. In particular, "height" is equivalent to the size from top to bottom, "width" is equivalent to the size from left to right, and "depth" is equivalent to the size from front to back. These relative terms are for the convenience of explanation and are generally not intended to require specific orientation. Terms related to attachment, connection, etc. (for example, "connection" and "attachment") refer to the relationship between these structures directly or indirectly fixed or attached to each other through intermediate structures, and movable or rigid attachment or relationship, unless otherwise explicitly stated.
[0046] Next, the present invention is further described in conjunction with the accompanying drawings and specific embodiments. It should be noted that, under the premise of no conflict, the various embodiments or technical features described below can be arbitrarily combined to form a new embodiment. It should be understood that the terms such as "having", "including" and "comprising" used herein do not specify the existence or addition of one or more other elements or their combinations.
[0047] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.
[0048] In the subsequent description, the suffixes such as "module", "component" or "unit" used to represent elements are only used to facilitate the description of the present invention, and have no specific meanings. Therefore, "module", "component" or "unit" can be used in a mixed manner.
[0049] Embodiment 1:
[0050] like Figure 1-3 As shown, an AGV automatic material sending and receiving scheduling method of the present invention is executed by a server or an operation terminal; comprising:
[0051] S1. Define storage location types and storage location status; where storage location types include at least receiving dock location, return dock location, weighing location, buffer location, and machine location; storage location status includes at least empty storage location, empty carrier, to be weighed, accepted, rejected, empty cage, half cage, full cage, and overdue; material status includes at least material to be weighed, material to be accepted, material to be rejected, half cage material, empty cage material, and overdue material.
[0052] S2. Obtain the storage status of each storage type in real time.
[0053] S3. Update material information according to the current storage status of the storage type, and generate a dispatch instruction for the AGV.
[0054] S3 includes:
[0055] S10, obtaining the current storage status of the receiving dock;
[0056] S20, when the current storage position status of the receiving dock is empty, generate a reminder to discharge the material; after the incoming material is placed, update the storage position status of the receiving dock to pending weighing, and update the material to pending weighing;
[0057] S70, when the current storage location state of the receiving dock is an empty carrier, obtaining the current storage location type of the carrier;
[0058] A first dispatch instruction for the AGV is generated according to the current storage location type where the carrier is located; wherein the first dispatch instruction is used to dispatch the carrier from the current storage location type where the carrier is located to the receiving dock location.
[0059] Preferably, after S20, the method further includes:
[0060] S30, determining whether the weighing position is occupied;
[0061] S31, when the weighing position is empty, generate a second dispatching instruction of the AGV to transport the material to be weighed to the weighing position; wherein the second dispatching instruction is used to dispatch the material to be weighed from the receiving dock position or the buffer area to the weighing position. Specifically, a weighing module 104 is provided on the weighing position.
[0062] S32. When the weighing position is occupied, a dispatch instruction is generated for dispatching the heavy material to the buffer area.
[0063] Alternatively, when there are too many materials to be weighed at the receiving dock, the materials to be weighed can be dispatched to the buffer area first, and when the weighing position is empty, a second dispatch instruction is generated to dispatch the materials to be weighed from the buffer area to the weighing position. Whether the weighing position is empty can be determined by using a photoelectric sensor or an image collector.
[0064] Furthermore, S3 also includes:
[0065] S40, after weighing is completed, the weighing module on the weighing position uploads the actual weight and compares it with the stored weight stored in the MES system; and determines whether the comparison result between the actual weight and the stored weight meets the predetermined conditions.
[0066] S41. When the comparison result between the actual weight and the stored weight meets the predetermined condition, the storage status of the weighing position is updated to receiving, the material to be weighed is updated to the material to be received, and a third scheduling instruction of the AGV is generated; wherein the third scheduling instruction is used to schedule the material to be received from the weighing position to the cache position.
[0067] S42. When the comparison result between the actual weight and the stored weight does not satisfy a predetermined condition, the storage status of the weighing position is updated to reject, the material to be weighed is updated to the material to be rejected, and a fourth dispatch instruction of the AGV is generated; wherein the fourth dispatch instruction is used to dispatch the material to be rejected from the weighing position to the return material dock or buffer area.
[0068] Among them, when there is no vacant space at the return dock, the rejected materials will be dispatched to the buffer area.
[0069] Specifically, the weighing module on the weighing position automatically reads the actual weight and compares the actual weight with the stored weight. If the difference between the actual weight and the stored weight does not exceed the allowed preset value, the storage position status is updated to receive and the material is updated to material to be received; if the difference between the actual weight and the stored weight exceeds the allowed preset value, the storage position status is updated to reject and the material is updated to material to be rejected.
[0070] Furthermore, S3 also includes:
[0071] S50. Update and obtain in real time the material information on the cache position, prioritize the materials according to batch and weight, and generate a fifth scheduling instruction based on the materials that match the demand information of the production line and are ranked high; the fifth scheduling instruction is used to schedule the materials ranked high from the cache position to the machine position for use by the production line.
[0072] It can be understood that in the above steps, when there are too many materials to be weighed, they will be dispatched to the cache; materials to be accepted will be dispatched to the mixed storage area; materials to be rejected will be dispatched to the return dock or cache area. As a transfer station for materials, the mixed storage area needs to obtain all material information in the current cache area in real time and sort all current material information.
[0073] The batches of materials can be scanned, confirmed and obtained through the PDA handheld operation terminal 103 when the incoming materials are placed. The batches include the size of the materials, production time, deadline, etc. The weight of the materials is obtained through the weighing module on the weighing position. The obtained quality can match the material states such as half-cage materials and full-cage materials. After matching the corresponding qualified materials according to the size required by the production line, the qualified materials are sorted. For example, they can be sorted in the order of priority of production time, half-cage materials, and full-cage materials, and materials with early production time and half-cage materials are given priority. By automatically matching the demand information of the production line and automatically scheduling the materials with the highest ranking, the scheduling efficiency is improved while reducing the waste of materials.
[0074] It can be understood that when the material is a metal wire or other material, the demand of each or each production line is different, and the size and half cage, full cage, etc. can be matched according to the demand information issued by the production line. It can be understood that the present invention can also not divide the material state by half cage or full cage, and can directly use weight as one of the material information, and directly match the corresponding quality according to the required quality of the production line.
[0075] Preferably, S3 further includes:
[0076] S60. Obtain the storage status of the machine position at regular intervals; including: obtaining material information on the machine position, and determining whether the storage status of the machine position is overdue according to the batch of the material; and then determining whether the storage status of the machine position is empty, half-cage, or full according to the quality of the material; and generating different AGV scheduling instructions according to the storage status of the machine position.
[0077] S61, when the storage status of the machine position is overdue, the material on the machine position is updated to be an overdue material, and a sixth dispatch instruction of the AGV is generated; wherein the sixth dispatch instruction is used to dispatch the overdue material from the machine position to the return material dock position;
[0078] S62. When the storage status of the machine position is not overdue, the storage status of the machine position is determined as empty cage, half cage, or full cage according to the quality of the material; and different AGV scheduling instructions are generated according to the storage status of the machine position.
[0079] S621, when the storage position on the machine position is an empty cage, generate a seventh dispatch instruction, the seventh dispatch instruction is used to dispatch the empty cage to the cache position or the unloading position;
[0080] S622, when the storage position state on the machine position is half cage, generate an eighth dispatch instruction, the eighth dispatch instruction is used to dispatch the half cage material to the weighing position, the weighing position updates the quality information of the material after weighing, and generate a ninth dispatch instruction, the ninth dispatch instruction is used to dispatch the half cage material to the cache position;
[0081] S623, when the storage position on the machine position is full, generate a tenth dispatch instruction, the tenth dispatch instruction is used to dispatch the full cage material to the cache position;
[0082] Step S50 is executed in a loop.
[0083] It can be understood that in the application scenarios of materials such as metal wire, if the materials are not used for a long time, the materials will expire; after the materials are used up, when only the container is left, it is an empty cage, and both the empty cage and the carrier need to be reused, so they need to be dispatched to the required position; when the material is used and the cage is not full, it can be called a half cage, which can be used again by the production line within the time limit. Therefore, the present invention takes the example of preventing the waste of materials and the reuse of empty cages, and generates different dispatch instructions according to different storage position states on the machine. In particular, for the half-cage state, the present invention dispatches the half-cage material to the weighing position, updates the material information at the weighing position, and then dispatches it to the cache position, and executes step S50 cyclically to realize the recyclable use of the half-cage material. Among them, Figure 3 It is a partial schematic diagram of this embodiment.
[0084] Embodiment 2:
[0085] Accordingly, refer to Figure 4 The present invention also provides an AGV automatic material sending and receiving scheduling system, including a server or an operation terminal 105, and the server or the operation terminal 105 is used to execute an AGV automatic material sending and receiving scheduling method as described in Example 1.
[0086] It also includes a PDA operating terminal 103, a weighing module 104, an MES system, and an AGV execution control system.
[0087] The server includes a database server 101 and a management system server 102, which can be on the same server or on different servers.
[0088] In addition, a PLC control module 106 is included to implement PLC control.
[0089] The PDA handheld operation terminal 103 is used to scan materials, confirm materials and obtain batches of materials. The material weighing module 104 is set on the weighing position; the MES system stores the stored weight; the AGV execution control system is used to receive the AGV scheduling instructions to execute AGV control.
[0090] Correspondingly, the present invention also provides a computer-readable storage medium, on which a program is stored, and when the program is executed by a processor, an AGV automatic material receiving and sending scheduling method as implemented in the first embodiment is implemented.
[0091] The present invention provides an AGV automatic material receiving and dispatching scheduling method, which obtains different storage location types and storage location status in real time, and realizes automatic scheduling of AGV tasks such as dock material receiving, weighing, abnormal material return, and material distribution according to the corresponding different storage location status. The method realizes unmanned operation for production line material distribution, improves the timeliness and accuracy of distribution, and also realizes the full data traceability of the material distribution process.
[0092] It should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, article or device including the element.
[0093] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.
[0094] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present invention, or the part that contributes to the prior art, can be embodied in the form of a software product, which is stored in a storage medium (such as ROM / RAM, a magnetic disk, or an optical disk), and includes a number of instructions for enabling a terminal (which can be a mobile phone, a computer, a server, an air conditioner, or a network device, etc.) to execute the methods described in each embodiment of the present invention.
[0095] The embodiments of the present invention are described above in conjunction with the accompanying drawings, but the present invention is not limited to the above-mentioned specific implementation modes, which are merely illustrative rather than restrictive. Under the guidance of the present invention, ordinary technicians in this field can also make many forms without departing from the scope of protection of the present invention and the claims, all of which are within the protection of the present invention.
Claims
1. An AGV automatic material sending and receiving scheduling method, It is characterized in that Executed by the server or running terminal; includes: Define storage location types and storage location status; where storage location types include at least receiving dock location, return dock location, weighing location, buffer location, and machine location; storage location status includes at least empty storage location, empty carrier, waiting to be weighed, accepted, rejected, empty cage, half cage, full cage, and overdue; Obtain the storage status of each storage type in real time; According to the current storage location status of the storage location type, update the material information and generate the AGV scheduling instruction; Determine whether the weighing position is occupied. When the weighing position is empty, generate a second dispatch instruction for the AGV to transport the material to be weighed to the weighing position; wherein the second dispatch instruction is used to dispatch the material to be weighed from the receiving dock or buffer area to the weighing position; The weighing module on the weighing station uploads the actual weight and compares it with the stored weight; When the comparison result between the actual weight and the stored weight meets the predetermined condition, the storage position state of the weighing position is updated to receiving, the material to be weighed is updated to the material to be received, and a third dispatch instruction of the AGV is generated; wherein the third dispatch instruction is used to dispatch the material to be received from the weighing position to the cache position; When the comparison result between the actual weight and the stored weight does not meet the predetermined condition, the storage position status of the weighing position is updated to rejection, the material to be weighed is updated to the material to be rejected, and a fourth dispatch instruction of the AGV is generated; wherein the fourth dispatch instruction is used to dispatch the material to be rejected from the weighing position to the return material position or buffer area; Wherein, according to the current storage location status of the storage location type, updating the material information and generating the scheduling task information of the AGV also includes: At regular intervals, the storage status of the machine position is obtained; including: obtaining the material information on the machine position, determining whether the storage status of the machine position is overdue according to the batch of the material; and then determining whether the storage status of the machine position is empty, half-cage, or full according to the quality of the material; generating different AGV scheduling instructions according to the storage status of the machine position; When the storage status of the machine position is overdue, the material on the machine is updated to be overdue material, and the sixth dispatch instruction of the AGV is generated; wherein the sixth dispatch instruction is used to dispatch the overdue material from the machine position to the return material dock position; When the storage status on the machine position is not overdue, the storage status on the machine position is determined as empty cage, half cage, or full cage according to the quality of the material; When the storage position on the machine position is empty, a seventh dispatch instruction is generated, and the seventh dispatch instruction is used to dispatch the empty cage to the cache position or the unloading position; When the storage position status on the machine position is half cage, the eighth dispatching instruction is generated, and the eighth dispatching instruction is used to dispatch the half cage to the weighing position. After weighing, the weighing position updates the quality information of the material, and generates the ninth dispatching instruction, and the ninth dispatching instruction is used to dispatch the half cage material to the cache position; When the storage position on the machine position is full, the tenth dispatch instruction is generated, and the tenth dispatch instruction is used to dispatch the full cage material to the cache position; Loop execution steps: update and obtain material information on the cache position in real time, prioritize materials according to batch and weight, and generate the fifth scheduling instruction based on the materials that match the demand information of the production line and are ranked high; the fifth scheduling instruction is used to schedule the materials ranked high from the cache position to the machine position for use by the production line.
2. The AGV automatic material sending and receiving scheduling method as claimed in claim 1, It is characterized in that According to the current storage location status of the storage location type, the material information is updated and the AGV scheduling task information is generated, including: Get the current storage status of the receiving dock; When the current storage position status of the receiving dock is empty, a reminder to discharge the material is generated; after the incoming material is placed, the storage position status of the receiving dock is updated to pending weighing, and the material is updated to pending weighing material; When the current storage location state of the receiving dock is an empty carrier, obtaining the current storage location type of the carrier; A first dispatch instruction for the AGV is generated according to the current storage location type where the carrier is located; wherein the first dispatch instruction is used to dispatch the carrier from the current storage location type where the carrier is located to the receiving dock location.
3. The AGV automatic material sending and receiving scheduling method as claimed in claim 1, It is characterized in that According to the current storage location status of the storage location type, the material information is updated, and the scheduling task information of the AGV is generated, which also includes: Update and obtain material information on the cache position in real time, prioritize materials according to batch and weight, and generate the fifth scheduling instruction for materials that match the demand information of the production line and are ranked high; the fifth scheduling instruction is used to schedule materials with high rankings from the cache position to the machine position for use by the production line.
4. An AGV automatic material receiving and dispatching system, Features: It includes a server or an operation terminal, and the server or the operation terminal is used to execute the AGV automatic material receiving and sending scheduling method as described in claim 1.
5. An AGV automatic material receiving and dispatching system as claimed in claim 4, It is characterized in that It also includes PDA operation terminal, weighing module, MES system, and AGV execution control system; The PDA handheld operation terminal is used to scan materials, confirm materials and obtain batches of materials. A material weighing module is set on the weighing position; the MES system stores the storage weight; and the AGV execution control system is used to receive the dispatching instructions of the AGV to execute AGV control.
6. A computer-readable storage medium, Features: The computer-readable storage medium stores a program, and when the program is executed by the processor, the AGV automatic material receiving and sending scheduling method as claimed in claim 1 is implemented.
Citation Information
Patent Citations
AGV device-based logistics multi-task control system and control method
CN108133335A
Cigarette feed deviation alarm and feed batch method
CN109674078A
AGV control method
CN110580028A
Production line capable of automatically discharging metal from electrolytic furnaces and control method
CN111763961A
Feeding system of material grading system based on big data cloud analysis
CN111861324A