A double-walled steel cofferdam with integrated weir formwork and vertical hidden cofferdam purlin

Through the integrated double-wall steel cofferdam design of vertical hidden purlins, the problems of inconvenient construction and many consumables are solved, and the construction convenience, consumable savings and construction quality are achieved.

CN114232658BActive Publication Date: 2024-11-05GUANGXI ROAD CONSTR ENG GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111656308.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-31
Publication Date
2024-11-05
Estimated Expiration
2041-12-31

AI Technical Summary

Technical Problem

The existing double-wall steel cofferdam is inconvenient to construct the deep water foundation of the bridge and has many consumables, which is complicated and time-consuming to install and remove the purlins.

Method used

The weir mold integrated double-wall steel cofferdam design adopts vertical hidden purlins, which is formed by stacking welding of multi-layer steel cofferdams. Each layer of cofferdam is welded by right-angle plates and flat plates, and horizontal ring plates are installed in the inner and outer wall panels. and vertical purlins form a hidden purlin structure, reducing the installation and removal steps of purlins, and sinking into place by pouring wall concrete and water injection during the deposition process.

Benefits of technology

It has achieved convenient construction and consumed less steel, shortened construction time and construction period, reduced project costs, and improved the convenience and construction quality of the tyrench steel bar binding.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114232658B_ABST
    Figure CN114232658B_ABST
Patent Text Reader

Abstract

A double-walled steel cofferdam with vertical hidden purlins and integrated weir molds is formed by stacking and welding multiple layers of steel cofferdams. Each layer of steel cofferdams is formed by surrounding and welding four right-angle plates and multiple plane plates. The inner cavity of each layer of steel cofferdams is provided with internal supports. Each of the right-angle plates and plane plates includes an inner wall plate and an outer wall plate. The inner wall plate and the outer wall plate are respectively provided with multiple layers of horizontal ring plates connected by horizontal supports. A partition plate is welded to one side of the inner wall plate and the outer wall plate. A vertical purlin welded and fixed to the wall plate is welded at both ends of the inner side of the partition plate. A vertical purlin is also fixed to the inner side of the two plate walls on the other side between the inner wall plate and the outer wall plate. Purlin supports are fixedly connected between the corresponding two vertical purlins. The welding of two adjacent plates is the welding of one side of a plate with a partition plate and the other side without a partition plate. The cofferdam is convenient to construct, uses less steel, and has good economic benefits.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of bridge foundation construction devices, in particular to a double-wall steel cofferdam with integrated weir moulds of vertical hidden cofferdam purlins. Background Art

[0002] With the vigorous development of China's bridge construction industry, the development of science and technology, and the continuous accumulation of construction experience, the construction technology of underwater foundations is also constantly developing, from caisson and caisson technology to pile foundation, pipe column foundation, steel sheet pile cofferdam technology, and later the double-cap steel pipe pile foundation. These technologies have correspondingly solved some problems in underwater foundation construction.

[0003] Double-walled steel cofferdam, as a new technology in the construction of deep-water bridge foundations, serves as a water retaining structure for the abutment construction, providing a dry working environment for the bridge foundation construction; secondly, as a supporting structure for the drilling platform, the loads it bears include the impact force of the water flow, the head pressure, and the vertical force exerted by the drilling platform. Due to its high strength, high rigidity, and good waterproof performance, and the fact that it can be dismantled after the foundation and piers are built out of the water to avoid blocking the water flow and waterway, it has been widely used in the construction of deep-water foundations of many extra-large bridges. Public literature also reports some double-walled steel cofferdams, such as:

[0004] 1. Chinese patent: A double-walled steel cofferdam, application number: 201610375079.5, application date: 2016.05.31, applicant: China Railway No. 5 Engineering Group Co., Ltd., address: No. 23, Zaoshan Road, Guiyang City, Guizhou Province, 550003, applicant: China Railway No. 5 Engineering Group Mechanization Engineering Co., Ltd., inventors: Li Rong, Zheng Yu, Liu Youwei, He Chi, Shen Jie, abstract: A double-walled steel cofferdam, at the intersection of the transverse cofferdam and the inner support rod of the double-walled steel cofferdam, a concrete reinforcement block is arranged. The concrete reinforcement block is made of filled C25 concrete. The concrete reinforcement block is arranged at the intersection of the double-walled steel cofferdam and the support rod, which can reduce the stress in the area, thereby reducing the strain of the rod, and preventing the regional stress caused by the diffusion of strain from being too large, thereby reducing the cross-sectional size of the main force-bearing rods of the vertical ribs and flat ribs in other areas of the double-walled steel cofferdam, and reducing the amount of steel used in the double-walled steel cofferdam. By filling C25 concrete in the intersection area to form concrete reinforcement blocks, the local compressive strength can be increased, the force requirements can be met, and the overall stability can be ensured.

[0005] 2. Chinese Patent: A double-walled steel cofferdam, application number: 201721278892.7, application date: 2017.09.29, patentee: China Railway Sixth Bureau Group Guangzhou Engineering Co., Ltd., address: Unit 101, Building 18, Tianan Headquarters Center, No. 555, Panyu Avenue North, Donghuan Street, Panyu District, Guangzhou City, Guangdong Province, 510000, inventors: Geng Jinjun, Ma Wenjie, Zhu Yuanhao, Wang Xiejun, Zhang Lei, Dong Liangliang, Zhu Dongyong, Tang Pinghai, Lu Guanjun, Chen Hongkun, abstract: A double-walled steel cofferdam, including a cofferdam body, the inner wall of the cofferdam body is provided with a plurality of guide devices for cooperating with the side wall of the steel casing, the guide device includes a panel, a connecting rod and a guide plate, the panel is fixed to the inner wall of the cofferdam body, and the two ends of the connecting rod are respectively connected to the panel and the guide plate. The double-walled steel cofferdam adopting the technical solution, when the double-walled steel cofferdam is positioned and installed, it is only necessary to coordinate and position any two guide devices on the inner wall of the cofferdam body with the outer wall of the steel casing, and then slowly lower the double-walled steel cofferdam to achieve its positioning and installation. The operation is simple and convenient, and because the guide device is arranged on the inner wall of the cofferdam body, the volume of the double-walled steel cofferdam is reduced, and the lifting and control of the double-walled steel cofferdam is facilitated, thereby avoiding the double-walled steel cofferdam from being stuck during the lifting process; the guide device includes a panel, a connecting rod and a guide plate, so that the guide device is easy to disassemble and assemble.

[0006] 3. Chinese Patent: Double-walled steel cofferdam with low pile foundation in water, Application No.: 201020600814.6, Application Date: 2010.11.11, Patentee: China Railway 13th Bureau Group Co., Ltd. Address: Science and Technology Department of China Railway 13th Bureau, No. 2138 Lingdong Road, Changchun City, Jilin Province 130033, Inventor: Yuan Changchun, Abstract: A double-walled steel cofferdam with low pile foundation in water belongs to the field of bridge construction technology, which is characterized in that: the inner wall plate and the outer wall plate are fixed as a whole by a box beam to form the inner wall and the outer wall of the cofferdam, the inner wall plate and the outer wall plate are reinforced by horizontal trusses, the box-shaped wall body is strengthened and supported by horizontal inner braces and vertical braces, the blade foot is wedge-shaped, and a corbel, a bottom section assembly platform, a lowering guide frame, and a lowering reaction frame are installed on the steel casing. The beneficial effects are: the underwater low pile foundation double-wall steel cofferdam system has clear force and simple structure, and its use can better ensure the safety of the external construction environment and reduce costs.

[0007] 4. Chinese Patent: A Double-walled Steel Cofferdam, Application Number: 201721880579.0, Application Date: 2017.12.28, Patentee: China Construction Fourth Engineering Bureau Co., Ltd., Address: 5th Floor, Building B, No. 16, Keyun Road, Tianhe District, Guangzhou City, Guangdong Province, 510665, Inventor: Jiang Zhenfu, Abstract: A double-walled steel cofferdam comprises a first cofferdam, a second cofferdam, a third cofferdam and a fourth cofferdam, wherein the bottom of the first cofferdam is a blade foot, the top is connected to the bottom of the second cofferdam, the top of the second cofferdam is connected to the bottom of the third cofferdam, the top of the third cofferdam is connected to the bottom of the fourth cofferdam The second, third and fourth sections of the cofferdam have the same structure. The advantages are: the entire cofferdam is manufactured in blocks on site, and is transported to the assembly platform at the pier for assembly and connection with high-strength bolts, which can greatly improve work efficiency, shorten construction period, and can be recycled to avoid waste of materials due to wall deformation and damage caused by cutting and demolition. The vertical connection of the steel cofferdam adopts a prestressed structure, and the separation of the cofferdam above the riverbed and the part below the riverbed can be operated above the water surface. The buoyancy of the water is used to automatically float the part above the riverbed to the surface for demolition. There is no need for diving operations, and the demolition turnover speed is fast.

[0008] Practical application research has found that the double-wall steel cofferdam currently used in the construction of deep-water bridge foundations has disadvantages such as inconvenient construction and high consumables. Summary of the invention

[0009] The purpose of the present invention is to provide a double-walled steel cofferdam with an integrated weir mold of a vertical hidden purlin. The double-walled steel cofferdam is easy to construct and consumes less steel. It can be suitable for the construction of deep-water bridge foundation pedestals. It can be arranged in different cross-sectional forms and different heights according to the different cross-sectional forms of the pedestals, providing a dry working environment for the construction of underwater pedestals and ensuring the construction quality of the pedestals under the bridge structure.

[0010] In order to achieve the purpose of the present invention, the technical solution adopted is:

[0011] A double-walled steel cofferdam with a vertical hidden purlin weir mold integrated, which is formed by stacking and welding multiple layers of steel cofferdams, each layer of steel cofferdam is formed by surrounding and welding four right-angle plates and multiple flat plates, and the inner cavity of each layer of steel cofferdam is provided with an inner support, and each of the right-angle plates and flat plates includes an inner wall plate and an outer wall plate, and multiple layers of horizontal ring plates are respectively provided on the inner wall plate and the outer wall plate, and the height of the horizontal ring plate on the inner wall plate corresponds to that of the horizontal ring plate on the outer wall plate, and the horizontal ring plates at two locations of corresponding heights are connected by multiple evenly distributed horizontal supports, and one side between the inner wall plate and the outer wall plate is sealed A partition plate is welded to the blockage, and a vertical purlin is welded to the two ends of the inner side of the partition plate. The vertical purlin is set to be full-length in the same plate, and serves as a supporting purlin for the inner support of the steel cofferdam. The two vertical purlins are also welded and fixed to the corresponding inner wall plate and outer wall plate, and a purlin support is fixedly connected between the two vertical purlins. A vertical purlin is also fixed to the inner side of the two plate walls on the other side between the inner wall plate and the outer wall plate, and a purlin support is also fixedly connected between the two vertical purlins. The welding of two adjacent plates is the welding of one side of a plate with a partition plate and the other side without a partition plate. The connection of the two adjacent steel cofferdams is that the top of the lower steel cofferdam and the bottom of the upper steel cofferdam are welded into a whole through a horizontal ring plate. The steel cofferdam can be floated or hoisted to the lowering position after the overall welding is completed on land before lowering, or it can be assembled in stages and lowered section by section at the lowering position; during the sinking and landing process of the steel cofferdam, the purpose of sinking into place is achieved by evenly and symmetrically pouring sandwich concrete, sandbags and water in the cofferdam chamber, as well as sucking mud and clearing silt at the landing point.

[0012] Further preferred: a blade angle structure is provided between the inner wall plate and the outer wall plate at the bottom of the lowest layer of the steel cofferdam, the bottom of the inner wall plate is higher than the bottom of the outer wall plate, and a sealing blade angle plate is connected between the bottom of the inner wall plate and the bottom of the outer wall plate.

[0013] Further preferred: a blade angle stiffening plate is provided on the bottom surface of the sealing blade angle plate to increase the rigidity of the bottom of the steel cofferdam and ensure that the bottom of the steel cofferdam does not deform too much during the process of cutting soil and sinking.

[0014] Further preferred: vertical stiffening ribs are provided on both plate walls in the chamber between the inner wall plate and the outer wall plate. The vertical stiffening ribs are L-shaped angle steels, which are arranged along the height direction of the cofferdam and are arranged in a notch-like manner with the wall plates.

[0015] Further preferably, a partition plate stiffening rod is provided on the inner side of the partition plate.

[0016] Further preferably, the two ends of the inner support are fixedly connected to the inner wall plate at the connection point of the two plates through the inner wall stiffening plate.

[0017] Further preferably, the horizontal supports are all connected and fixed to the upper part of the horizontal ring plate.

[0018] Further preferred: the vertical purlins are made of channel steel, the channel steel is invertedly arranged inside the steel cofferdam chamber, one side of the channel steel is welded to the wall plate, and the opening surface of the channel steel is welded to the partition plate.

[0019] Further preferred: the horizontal supports all use L-shaped angle steels, and at the support points of the inner supports, the extension lines of two of the horizontal supports are required to pass through the center points of the inner wall stiffening plates; the purlin supports all use L-shaped angle steels, and at the support points of the inner supports, the extension lines of two of the purlin supports are required to pass through the center points of the inner wall stiffening plates.

[0020] Further preferably, the axis of the inner support and the cross-sectional centroid of the inner wall stiffening plate are on the same straight line, and each inner wall stiffening plate is divided into four small blocks, which are welded in small sections to ensure that the inner wall stiffening plate and the wall panel are firmly welded.

[0021] The advantages of the vertical hidden purlin cofferdam with integrated weir formwork and double-wall steel cofferdam are:

[0022] 1. The hidden vertical purlins can be accurately positioned and installed during the processing and assembly of the double-walled steel cofferdam. The partition plates, partition plate stiffeners, vertical purlins and purlin supports are arranged between the inner wall plates and the outer wall plates of the double-walled steel cofferdam to form hidden purlins. When the cofferdam is lowered and the pedestal is constructed under different pumping conditions, the steps of installing and removing the purlins and installing the pedestal templates are eliminated, so as to achieve the purpose of speeding up the construction progress.

[0023] 2. The force form of the double-walled steel cofferdam has been optimized, which can resist the water pressure and soil pressure on the outside of the cofferdam after pumping, while reducing the use of steel, reducing project costs, and having certain economic benefits.

[0024] 3. When the inner wall of the cofferdam is used as the foundation template, the spatial collision between the traditional built-in purlin and the foundation reinforcement binding can be effectively avoided during the foundation construction process, which is beneficial to the foundation reinforcement binding during the construction process and makes on-site construction more convenient. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 This is a schematic diagram of the installation structure of the vertical hidden cofferdam formwork integrated double-wall steel cofferdam;

[0026] Figure 2 for Figure 1 A left side cross-sectional schematic diagram of ;

[0027] Figure 3 It is a schematic diagram of the connection relationship between the inner support and the inner wall plate;

[0028] Figure 4 for Figure 3 A top view schematic diagram of

[0029] Figure 5 It is a schematic diagram of the connection relationship between the inner support and the inner wall stiffening plate;

[0030] Figure 6 It is a schematic diagram of the structure of the right-angle plate;

[0031] Figure 7 It is a schematic diagram of the structure of the plane plate;

[0032] Figure 8 It is a three-dimensional structural diagram of the installation relationship between the partition board and the vertical purlin;

[0033] The names corresponding to the numbers in the figure are:

[0034] 1-1, inner wall plate; 1-2, outer wall plate; 11, vertical stiffening ribs; 2, horizontal ring plate; 21, horizontal support; 3, sealing blade angle plate; 31, blade angle stiffening plate; 4, partition plate; 41, partition plate stiffening rod; 5, vertical purlin; 51, purlin support; 6, inner wall stiffening plate; 7, inner support; 8, pedestal; 9, pile column; 10, bottom sealing concrete. DETAILED DESCRIPTION

[0035] In order to make the technical solution and advantages of the present application more clear, the technical solution is clearly and completely described below in conjunction with embodiments. Example 1

[0036] A double-walled steel cofferdam with a vertical hidden purlin weir mold integrated, which is formed by stacking and welding multiple layers of steel cofferdams, each layer of steel cofferdam is formed by surrounding and welding four right-angle plates and multiple flat plates, and the inner cavity of each layer of steel cofferdam is provided with an inner support 7, each of the right-angle plates and flat plates includes an inner wall plate 1-1 and an outer wall plate 1-2, and multiple layers of horizontal ring plates 2 are respectively provided on the inner wall plate 1-1 and the outer wall plate 1-2, and the heights of the horizontal ring plates 2 on the inner wall plate 1-1 and the horizontal ring plates 2 on the outer wall plate 1-2 correspond to each other, and the horizontal ring plates 2 at two corresponding heights are connected by multiple evenly distributed horizontal supports 21, and the inner wall plate 1-1 and the outer wall plate 1-2 are connected by multiple horizontal supports 21. A partition plate 4 is welded to the sealing side, and a vertical purlin 5 is welded to the two ends of the inner side of the partition plate 4. The vertical purlin 5 is set to be full-length in the same plate, and serves as a supporting purlin for the inner support of the steel cofferdam. The two vertical purlins 5 are also welded and fixed to the corresponding inner wall plate 1-1 and outer wall plate 1-2, and a purlin support 51 is fixedly connected between the two vertical purlins 5. A vertical purlin 5 is also fixed to the inner side of the two plate walls on the other side between the inner wall plate 1-1 and the outer wall plate 1-2, and a purlin support 51 is also fixedly connected between the two vertical purlins 5; the welding of two adjacent plates is the welding of one side of a plate with the partition plate 4 to the side of the other plate without the partition plate 4. A blade angle structure is arranged between the inner wall plate 1-1 and the outer wall plate 1-2 at the bottom of the lowest layer of the steel cofferdam. The bottom of the inner wall plate 1-1 is higher than the bottom of the outer wall plate 1-2. A sealing blade angle plate 3 is connected between the bottom of the inner wall plate 1-1 and the bottom of the outer wall plate 1-2.

[0037] The bottom surface of the sealing blade angle plate 3 is provided with a blade angle stiffening plate 31 to increase the rigidity of the bottom of the steel cofferdam and ensure that the bottom of the steel cofferdam does not deform too much during the process of cutting soil and sinking. Example 2

[0038] A double-walled steel cofferdam with an integrated weir mold of a vertical hidden purlin is formed by stacking and welding multiple layers of steel cofferdams, each layer of which is formed by surrounding and welding four right-angle plates and multiple flat plates, and the inner cavity of each layer of the steel cofferdam is provided with an inner support 7, each of the right-angle plates and flat plates includes an inner wall plate 1-1 and an outer wall plate 1-2, and multiple layers of horizontal ring plates 2 are respectively provided on the inner wall plate 1-1 and the outer wall plate 1-2, and the heights of the horizontal ring plates 2 on the inner wall plate 1-1 and the horizontal ring plates 2 on the outer wall plate 1-2 correspond to each other, and the horizontal ring plates 2 at two corresponding heights are connected by a plurality of evenly distributed horizontal supports 21, and the horizontal supports 21 are all connected and fixed to the upper part of the horizontal ring plates 2. A partition board 4 is welded to the sealing of one side between the inner wall board 1-1 and the outer wall board 1-2, and a vertical purlin 5 is welded to the two ends of the inner side of the partition board 4. The vertical purlin 5 is set to be full-length in the same plate, and serves as a supporting purlin for the inner support of the steel cofferdam. The two vertical purlins 5 are also welded and fixed to the corresponding inner wall board 1-1 and outer wall board 1-2, and a purlin support 51 is fixedly connected between the two vertical purlins 5. The inner side of the partition board 4 is provided with a partition board stiffening rod 41. A vertical purlin 5 is also fixed to the inner side of the two plate walls on the other side between the inner wall board 1-1 and the outer wall board 1-2, and a purlin support 51 is also fixedly connected between the two vertical purlins 5; the welding of two adjacent plates is the welding of one side of a plate with a partition board 4 to the side of the other plate without a partition board 4. The connection between two adjacent steel cofferdams is that the top of the lower steel cofferdam and the bottom of the upper steel cofferdam are welded into a whole through a horizontal ring plate.

[0039] A blade angle structure is provided between the inner wall plate 1-1 and the outer wall plate 1-2 at the bottom of the bottom steel cofferdam, the bottom of the inner wall plate 1-1 is higher than the bottom of the outer wall plate 1-2, and a sealing blade angle plate 3 is connected between the bottom of the inner wall plate 1-1 and the bottom of the outer wall plate 1-2. A blade angle stiffening plate 31 is provided on the bottom surface of the sealing blade angle plate 3 to increase the rigidity of the bottom of the steel cofferdam and ensure that the bottom of the steel cofferdam does not deform too much during the process of cutting soil and sinking.

[0040] Vertical stiffening ribs 11 are provided on both plate walls in the chamber between the inner wall plate 1-1 and the outer wall plate 1-2. The vertical stiffening ribs 11 are made of L-shaped angle steels and are arranged along the height direction of the cofferdam, and the arrangement form forms a notch shape with the wall plate.

[0041] The two ends of the inner support 7 are fixedly connected to the inner wall plate 1-1 at the connection point of the two plates through the inner wall stiffening plate 6 respectively.

[0042] The vertical purlin 5 is made of channel steel, which is inverted and arranged inside the steel cofferdam chamber. One side of the channel steel is welded to the wall plate, and the opening surface of the channel steel is welded to the partition plate 4.

[0043] The horizontal supports 21 are all made of L-shaped angle steel, and at the support of the inner support 7, the extension lines of two of the horizontal supports 21 are required to pass through the center point of the inner wall stiffening plate 6; the purlin supports 51 are all made of L-shaped angle steel, and at the support of the inner support 7, the extension lines of two of the purlin supports 51 are required to pass through the center point of the inner wall stiffening plate 6.

[0044] The axis of the inner support 7 is on the same straight line as the cross-sectional centroid of the inner wall stiffening plate 6. Each inner wall stiffening plate 6 is divided into four small blocks, which are welded in small sections to ensure that the inner wall stiffening plate 6 is firmly welded to the wall panel.

[0045] The double-walled steel cofferdam can be floated or hoisted to the lowering position after the overall welding is completed on the shore before lowering, or it can be assembled in stages and lowered section by section at the lowering position; during the sinking and landing process of the steel cofferdam, the purpose of sinking into place is achieved by evenly and symmetrically pouring sandwich concrete, sandbags and water injection in the cofferdam chamber, as well as sucking mud and clearing silt at the landing point. The bottom of the double-walled steel cofferdam is fixed to the pile column 9 by the bottom concrete 10, and the pedestal 8 is arranged in the double-walled steel cofferdam on the top of the bottom concrete 10. The double-walled steel cofferdam improves the overall rigidity of the cofferdam by setting up double-walled compartments, and resists the water pressure and soil pressure on the outside of the cofferdam after pumping through the internal support 7, stiffening plates and purlin supports 51.

[0046] Compared with the traditional steel cofferdam (horizontal purlins are arranged on the inside of the cofferdam), the Bengang cofferdam can save the installation steps of the inner purlins of the cofferdam during the lowering process, which can save 13% of the construction period (the traditional steel cofferdam takes 60 days to lower, while the Bengang cofferdam takes 50 days to lower); the Bengang cofferdam design can reduce the use of steel, saving 8% of steel (the dimensions of the constructed pedestal are 16.8m long, 10.8m wide and 4.5m high. To meet the construction requirements, the total height of the steel cofferdam is 17m, the traditional steel cofferdam design requires 415t, and the Bengang cofferdam requires 380t); compared with the traditional steel cofferdam, since the purlins are hidden on the inside of the steel cofferdam, the integrity of the pedestal reinforcement binding can be effectively guaranteed during the pedestal construction process, and the quality of the pedestal reinforcement construction can be better guaranteed.

[0047] The above description is not a limitation of the present application, and the present application is not limited to the above examples. Any changes, modifications, additions or substitutions made by ordinary technicians in this technical field within the essential scope of the present application should fall within the scope of protection of the present application.

Claims

1. A vertical hidden cofferdam with integrated weir formwork and double-walled steel cofferdam, which is formed by stacking and welding multiple layers of steel cofferdams, and is characterized by: Each layer of the steel cofferdam is formed by welding four right-angle plates and a plurality of plane plates. The inner cavity of each layer of the steel cofferdam is provided with an inner support (7). Each of the right-angle plates and the plane plates comprises an inner wall plate (1-1) and an outer wall plate (1-2). The inner wall plate (1-1) and the outer wall plate (1-2) are respectively provided with a plurality of horizontal ring plates (2). The horizontal ring plates (2) on the inner wall plate (1-1) and the horizontal ring plates (2) on the outer wall plate (1-2) are respectively provided with a plurality of horizontal ring plates (2). The two horizontal ring plates (2) at the corresponding heights are connected by a plurality of evenly distributed horizontal supports (21), a partition plate (4) is welded to one side of the inner wall plate (1-1) and the outer wall plate (1-2), and a vertical purlin (5) is welded to both ends of the inner side of the partition plate (4), and the two vertical purlins (5) are also welded and fixed to the corresponding inner wall plate (1-1) and the outer wall plate (1-2), and the two vertical purlins (5) are welded to the corresponding inner wall plate (1-1) and the outer wall plate (1-2). ) are fixedly connected with a purlin support (51), and a vertical purlin (5) is also fixedly provided on the inner side of the two plate walls on the other side between the inner wall plate (1-1) and the outer wall plate (1-2), and a purlin support (51) is also fixedly connected between the two vertical purlins (5); the welding of two adjacent plates is welding the side of one plate with the partition plate (4) to the side of the other plate without the partition plate (4); the two ends of the inner support (7) are respectively fixedly connected to the inner wall plate (1-1) at the connection between the two plates through the inner wall stiffening plate (6); the horizontal supports (21) are all made of L-shaped angle steel, and at the support of the inner support (7), the extension lines of two of the horizontal supports (21) are required to pass through the center point of the inner wall stiffening plate (6); the purlin supports (51) are all made of L-shaped angle steel, and at the support of the inner support (7), the extension lines of two of the purlin supports (51) are required to pass through the center point of the inner wall stiffening plate (6).

2. The vertical hidden purlin weir mold integrated double-wall steel cofferdam according to claim 1, characterized in that: A blade angle structure is provided between the inner wall plate (1-1) and the outer wall plate (1-2) at the bottom of the lowest layer of the steel cofferdam; the bottom of the inner wall plate (1-1) is higher than the bottom of the outer wall plate (1-2); and a sealing blade angle plate (3) is connected between the bottom of the inner wall plate (1-1) and the bottom of the outer wall plate (1-2).

3. The vertical hidden purlin weir mold integrated double-wall steel cofferdam according to claim 2, characterized in that: A corner stiffening plate (31) is provided on the bottom surface of the sealing corner plate (3).

4. The vertical hidden purlin weir mold integrated double-wall steel cofferdam according to claim 1, characterized in that: Vertical stiffening ribs (11) are provided on both plate walls in the chamber between the inner wall plate (1-1) and the outer wall plate (1-2).

5. The vertical hidden cofferdam with integrated weir formwork and double-walled steel cofferdam according to claim 1, characterized in that: A partition plate stiffening rod (41) is provided on the inner side of the partition plate (4).

6. The vertical hidden purlin weir mold integrated double-wall steel cofferdam according to claim 1, characterized in that: The horizontal supports (21) are all connected and fixed to the upper part of the horizontal ring plate (2).

7. The vertical hidden cofferdam with integrated weir formwork and double-wall steel cofferdam according to claim 1, characterized in that: The vertical purlin (5) is made of channel steel, which is arranged in an inverted manner inside the steel cofferdam chamber, one side of the channel steel is welded to the wall plate, and the opening surface of the channel steel is welded to the partition plate (4).

8. The vertical hidden purlin weir mold integrated double-wall steel cofferdam according to claim 1, characterized in that: The axis of the inner support (7) and the centroid of the cross section of the inner wall stiffening plate (6) are on the same straight line, and each inner wall stiffening plate (6) is divided into four small blocks, which are welded in sections.