Smart grid dispatching method based on economic dispatching objectives and power parameters
By introducing environmental benefit factors and distributed economic dispatch algorithms into smart grids, combined with the Lagrange multiplier method and consistency algorithm, the problems of complexity and solution speed of economic dispatch models in the existing technology are solved, and power supply and demand are realized. Balanced and optimal economic dispatch improve the robustness and operating efficiency of the system.
Patent Information
- Application Number
- CN202111489793.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-08
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2041-12-08
AI Technical Summary
Existing smart grid economic dispatch methods fail to fully consider environmental factors and loss issues, resulting in reduced complexity of the economic dispatch model and reduced solution speed and quality, and it is difficult for fully distributed algorithms to achieve optimal economic dispatch.
A smart grid dispatching method based on economic dispatch objectives and power parameters is adopted. By obtaining the effective output power and pollutant gas emissions of distributed power generation units, combined with the Lagrange multiplier method and distributed economic dispatch algorithm, the leader-follower consistency is designed. and average consistency algorithm to achieve the global optimal solution.
Environmental benefit factors are introduced to form a precise economic dispatch model, which improves the feasibility and operation rate of dispatch, achieves power supply and demand balance and optimal economic dispatch, and the energy channel and communication channel are independent of each other, improving the robustness of the system.
Smart Images

Figure CN114282779B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of smart grid dispatching methods, and in particular to a smart grid dispatching method based on economic dispatching objectives and power parameters. Background Art
[0002] Smart grid is an improvement on the traditional power grid, which uses the two-way flow of information and electricity to build an automated, distributed and advanced power grid system. Unlike the thermal power generators in the traditional power system that use fossil fuel resources, most distributed energy resources in the smart grid system are powered by renewable energy such as photovoltaics, wind power and hydropower.
[0003] The economic dispatch problem (EDP) is one of the most basic problems in smart grids. The solution to economic dispatch ensures that the power system operates under the most economical conditions. The goal of the economic dispatch problem is to determine the power generation of each power generation unit to minimize the total power generation cost while satisfying the total demand constraints of the power generation unit and the local power generation constraints. The economic dispatch problem is an active direction of power system research. There are centralized methods and techniques for solving economic dispatch problems, such as lambda iteration method, gradient search method, dynamic programming method, Lagrangian relaxation method, etc. In the above centralized control framework, there needs to be a control center that collects all power grid information. The existence of the control center puts forward requirements on the communication and computing capabilities of the power network, reducing the robustness and privacy level of the power system.
[0004] Unlike traditional power grids, smart grids, which are composed of smart devices and have advanced communication and computing capabilities, are considered to be the infrastructure of future power systems. In smart grids, distributed algorithms are more suitable than centralized algorithms for calculating the optimal solution to economic dispatch problems. On the one hand, each power generation unit or load using a distributed approach only requires information about its neighboring power generation units or loads, which is very beneficial to local privacy. On the other hand, the distributed approach is suitable for solving problems caused by various communication networks due to equipment, distribution, and other issues when the power grid is expanded.
[0005] In recent years, a large number of consensus-based distributed algorithms have been applied to the economic dispatch problem of power systems. By exchanging information with neighboring intelligent agents, a small number of variables can be updated. In the literature Ziang Zhang, Xichun Ying and Mo-Yuen Chow, "Decentralizing the economic dispatch problem using a two-level incremental cost consensus algorithm in a smart grid environment," 2011 North American Power Symposium, 2011, pp. 1-7., Zhang et al. proposed an incremental cost consensus algorithm (ICC) that uses the supply-demand mismatch for feedback to converge the total power generation cost of the entire system to the optimal value.
[0006] In the document N.Rahbari-Asr,U.Ojha,Z.Zhang and M.-Y.Chow,"Incremental WelfareConsensus Algorithm for Cooperative Distributed Generation / Demand Response inSmart Grid,"in IEEE Transactions on Smart Grid,vol.5,no.6,pp.2836-2845,Nov.2014, N.Rahbari-Asr designed an incremental welfare consensus algorithm that can ensure that the system reaches the global optimality without the need for a leader and has scalability in terms of node computing and communication burden.
[0007] In the document Z. Zhang and M. Chow, "Convergence Analysis of the IncrementalCost Consensus Algorithm Under Different Communication Network Topologies ina Smart Grid," in IEEE Transactions on Power Systems, vol. 27, no. 4, pp. 1761-1768, Nov. 2012, Zhang et al. proposed an algorithm using a leader-follower consensus protocol to solve the traditional centralized economic scheduling problem with a distributed approach.
[0008] In the document Ma Kai, Yu Yangqing, Zhu Shanying, Yang Jie, Guan Xinping. Distributed economic dispatch algorithm for power grid based on gradient descent and consistency [J]. Chinese Science: Information Science, 2018, 48(10): 1364-1380, Ma Kai et al. designed a distributed algorithm based on gradient descent and consistency protocol to exchange local information between interconnected buses to balance the supply and demand of electricity.
[0009] In the document S.Kar and G.Hug, "Distributed robust economic dispatch in power systems: A consensus+innovations approach," in 2012 IEEE Power and Energy Society General Meeting, 2012, pp.1-8, S.Kar et al. proposed a distributed economic dispatch method based on the consensus+innovations framework to make the power system converge to the optimal dispatch state.
[0010] In the literature B. Huang, Y. Li, H. Zhang and Q. Sun, "Distributed optimal co-multi-microgrids energy management for energy internet," in IEEE / CAA Journal of Automatica Sinica, vol. 3, no. 4, pp. 357-364, Oct. 2016, Huang et al. proposed two consensus algorithms to solve the economic dispatch problem, one to drive the incremental cost of each distributed generator to converge to the main grid electricity price, and the other to estimate the global power mismatch of the grid.
[0011] It should be pointed out that in dealing with the economic dispatch problem of smart grids, the algorithms disclosed in the above literature still have some shortcomings. First, the actual practical problems in the process of power dispatch of smart grid systems, such as environmental factors and loss problems, are not fully considered. The above methods are highly restricted by specific types of functions or specified principles, which destroy the integrity of the problem while reducing the complexity of the economic dispatch problem model. Secondly, when performing economic dispatch, the communication network and energy network of the power system are integrated into the same network, so that the communication flow and energy flow are transmitted together, which reduces the transmission speed of power and information of economic dispatch, resulting in a decrease in the speed and quality of solution. Finally, the use of a fully distributed algorithm to decompose or decouple the constraints in the centralized proposition will not lead to the system achieving optimal economic dispatch, and the economic dispatch problem is converted into a problem where the consistency algorithm converges to the optimal value, and the solution process is relatively difficult. Summary of the invention
[0012] The purpose of the present invention is to provide a smart grid dispatching method based on economic dispatching objectives and power parameters to solve the deficiencies of the existing economic dispatching methods in the prior art.
[0013] In order to achieve the above object, the technical solution adopted by the present invention is:
[0014] The smart grid dispatching method based on economic dispatching objectives and power parameters includes the following steps:
[0015] Step 1: Obtain the effective output power and cost parameters of each distributed generation unit in the smart grid, and construct the power generation cost function of each distributed generation unit based on this, as shown in formula (1):
[0016]
[0017] In formula (1), α i ,β i ,γ i are the cost parameters of the i-th distributed generation unit; P i is the effective output power of the i-th distributed generation unit; F i (P i ) is the generation cost function of the ith distributed generation unit;
[0018] Step 2: Obtain the pollutant gas emissions H of each distributed generation unit i (P i ), and convert it into cost as shown in formula (2):
[0019]
[0020] In formula (2), a i ,b i ,c i are the emission parameters of the i-th distributed generation unit; P i is the effective output power of the i-th distributed generation unit;
[0021] Step 3: Obtain the electricity price of the smart grid, the power consumed by the load, the power exchange data, and the transmission loss data, and combine formulas (1) and (2) to establish the smart grid economic dispatch formula as shown in formula (3):
[0022]
[0023] In formula (3), ω is a given dispatch parameter, and ω>0, ω≠1; λ0 is the initial electricity price; P iis the effective output power of the i-th distributed generation unit; P Zi is the power consumed by the load in the power system; P EG It is the exchange of power between the local microgrid and the external distribution system; are the upper and lower limits of the effective output power of the i-th distributed generation unit; is the transmission loss during power transmission, where P Li =S i P i , S i >0 is the loss coefficient;
[0024] Step 4: Use the Lagrange multiplier method to solve formula (3) for the global optimal solution As shown in formulas (6) and (7):
[0025]
[0026]
[0027] Step 5: Design a distributed economic dispatch algorithm to achieve the global optimal solution of formula (3), that is, each distributed generation unit is based on its own parameters The state at that time {λ i (k),P i (k)} and the information obtained from the adjacent distributed generation units to solve the optimal economic dispatch problem. The process is as follows:
[0028] Step 5.1: First, use the leader-follower consensus algorithm to calculate λ for each distributed generation unit. i (k), the incremental cost of each distributed generation unit λ i (k) is driven to the distribution system electricity price λ0 obtained by the energy converter, as shown in formula (8):
[0029]
[0030] In formula (8), δ i >0 is the step size of the leader-follower consensus algorithm; λ0 is the given initial electricity price; a ij Represents the communication relationship between distributed generation units i and j. When distributed generation unit j can directly send information to distributed generation unit i, a ij > 0, otherwise a ij =0;λ j (k) represents the incremental cost of DG unit j sending information directly to DG unit i at time k;
[0031] Step 5.2: Then, each distributed generation unit calculates the effective output power P at time ki (k), as shown in formula (9):
[0032]
[0033] Step 5.3: Finally, each distributed generation unit estimates the average power mismatch m of each node in the power grid system through the average consistency algorithm. i (k), as shown in formula (10):
[0034]
[0035] In formula (10), is the average consistency algorithm step length; ΔP i (k) = P Zi (k)+P Li (k)-P i (k) is the power mismatch of the i-th distributed generation unit at time k; P Li (k) Line transmission loss of the ith distributed generation unit at time k; is the local estimate of the average power mismatch of all nodes by the i-th distributed generation unit; represents all distributed generation units adjacent to the energy converter; represents the local estimate of the average power mismatch of all nodes by DG unit j sending information directly to DG unit i at time k; a 0i Represents the communication relationship between the energy converter (node 0) and the distributed generation unit i. When the distributed generation unit i can directly send information to the energy converter (node 0), a 0i > 0, otherwise a 0i =0;
[0036] Based on formulas (8), (9), and (10) in steps 5.1-5.3, the dispatching control of the smart grid is realized under the global optimal solution.
[0037] In the further step 3, the constraint set Q of formula (3) is established as follows:
[0038]
[0039] Among them, the constraint set Q is a bounded closed subset.
[0040] In the formula (10) of the further step 5.3, the energy converter will directly supplement the power of its adjacent distributed generation units after each iteration, and the power mismatch estimate of all distributed generation units adjacent to the energy converter is zero.
[0041] In a further step 5, the incremental power exchanged with the external power distribution system is adjusted by the energy converter, thereby establishing an adjustment control formula as shown in formula (11):
[0042]
[0043] In formula (11), P EG (k) is the power exchanged between the microgrid and the external distribution system; is the incremental power exchanged with the external power distribution system; at time k, the actual total power mismatch of the smart grid system is The corresponding adjustment control is implemented based on formula (11).
[0044] In view of the shortcomings of existing economic dispatch methods, the present invention is aimed at the economic dispatch problem of smart grid. On the basis of the existing distributed economic dispatch consistency solution method, the incremental cost consistency algorithm of the smart grid system considering environmental benefit factors and other conditions is studied to improve the feasibility and operation rate of smart grid economic dispatch and to find the optimal convergence value of the general smart grid economic dispatch solution.
[0045] Compared with the prior art, the advantages of the present invention are:
[0046] 1) To systematically describe the economic dispatch problem of smart grid, environmental benefit factors are introduced into the existing economic dispatch model to form an accurate modeling of the economic dispatch problem;
[0047] 2) In order to make the economic dispatch process more accurate and the power system operation more rapid, an operation mode in which the energy channel and the communication channel are independent of each other is adopted;
[0048] 3) In order to optimize and solve the economic dispatch problem after precise modeling, a distributed economic dispatch method combining a distributed incremental cost consistency algorithm with an energy converter is proposed. This method reduces the fluctuation of exchange power while ensuring convergence, so that the entire system asymptotically achieves power supply and demand balance and optimal economic dispatch. BRIEF DESCRIPTION OF THE DRAWINGS
[0049] Figure 1 It is a diagram of the smart grid system architecture of the present invention.
[0050] Figure 2 It is a framework diagram of the economic dispatch of the smart grid of the present invention.
[0051] Figure 3 It is a directed graph that meets the conditions in the convergence analysis of the present invention.
[0052] Figure 4 It is the electrical network structure of the numerical simulation of the present invention.
[0053] Figure 5It is a communication topology diagram in the simulation experiment of the present invention.
[0054] Figure 6 is the incremental cost λ in the simulation results of the present invention i (k) Curve graph.
[0055] Figure 7 is the effective output power P in the simulation experiment results of the present invention i Graph.
[0056] Figure 8 is the local estimate of the average power mismatch in the simulation results of the present invention. Graph.
[0057] Fig. 9 It is a curve diagram of the estimated value and actual value of global power mismatch in the simulation experiment results of the present invention.
[0058] Fig.10 is the incremental cost λ of each distributed generation unit of the present invention i (k) and effective output power P i The simulation results of (a) and (b) show that δ i =0.25, (c) and (d) i =0.01,
[0059] Fig.11 is the incremental cost λ of each distributed generation unit of the present invention i (k) and effective output power P i The simulation results of (a) and (b) are δ i = 0.1, (c) and (d) δ i =0.1.
[0060] Fig.12 This is a simulation result diagram comparing the economic dispatch efficiency of the present invention. DETAILED DESCRIPTION
[0061] The present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0062] In the smart grid system architecture described in the present invention, the main grid is the core backbone grid, and the microgrid is the local grid. In the microgrid, the distributed generation units and loads are directly controlled by the control unit deployed on the bus node, and the control units of adjacent bus nodes can exchange information with each other. The energy converter is an intermediate transmission network between the microgrid and the external power distribution main grid. As an intermediate unit connecting the microgrid with the external power distribution main grid, the power supply and demand balance of the microgrid is met through power exchange.
[0063] In the smart grid system architecture of the present invention, the microgrid, main grid, control unit and energy converter are regarded as intelligent entities at different levels, realizing distributed autonomous collaborative management of the power system. Figure 1 shown.
[0064] The present invention analyzes the smart grid based on graph theory. In graph theory, G = {v, ε, A} is a weighted directed graph, and each smart device in the smart grid is assigned as a node in the topological network. Where v = {1, 2, ...., N} represents the node set of N distributed power generation units in the power system, is an edge set, and an ordered pair (j,i) represents an edge. (j,i)∈ε means that node j can directly send information to node i, and nodes j and i are called neighbors. Node j is called the input neighbor of node i, and node i is called the output neighbor of node j. The set of all input neighbors of node i is denoted by Represents. Matrix is the weighted adjacency matrix of the directed graph G, describing the adjacency relationship of the nodes in the directed graph G. When (j,i)∈ε, a ij > 0, otherwise a ij = 0. The matrix L = DA is the Laplacian matrix of the directed graph G, where D = diag (deg in (1),....,deg in (N)) is an N×N diagonal matrix, with the diagonal elements being the degree of each vertex.
[0065] In this invention, the goal of the economic dispatch problem (EDP) is to determine the power generation of each generation unit to minimize the total power generation cost while satisfying the total demand constraint and the local power generation constraints of the generation unit. Figure 2 As shown in the figure, it can be seen that the energy flow and information flow are transmitted independently through the designed energy channel and communication channel respectively, the power mismatch information and incremental cost information are exchanged between the power generation units through the communication network, and each economic dispatch (ED) unit computing device calculates the planned power generation according to the mismatch information and the current power generation. Each ED unit is regarded as an intelligent agent, and each intelligent agent realizes the energy exchange between the microgrid and the main grid through the energy converter according to the power mismatch information.
[0066] The economic dispatch model proposed in the present invention considers both the economic issues of smart grids and their impact on the environment, and takes environmental benefit factors such as pollutant gas emissions into account in the economic dispatch goals, which meets the actual needs of maximizing the economic benefits of smart grids.
[0067] Assume that there is a microgrid system with N buses connected to an external power distribution system. Each bus contains a distributed generation unit and a load. The power generation cost function of the i-th distributed generation unit is defined as:
[0068]
[0069] In the formula, α i ,β i ,γ i are the cost parameters of the i-th distributed generation unit; P i is the effective output power of the i-th distributed generation unit; F i (P i ) is the generation cost function of the ith distributed generation unit.
[0070] In the actual power grid system, the power generation unit will produce a large amount of pollutant gas during the power generation process, which has a huge impact on environmental benefits. If the pollutant gas is discharged into the air, it needs to be treated, which will incur additional costs. The pollutant gas emission H of the i-th distributed power generation unit is given as i (P i ), H i (P i ) is converted into cost according to specific rules, which can be expressed as:
[0071]
[0072] In the formula, a i ,b i ,c i are the emission parameters of the i-th distributed generation unit; P i is the effective output power of the i-th distributed generation unit.
[0073] The economic dispatch problem of smart grid can be formulated as:
[0074]
[0075] Where ω is a given dispatch parameter, and ω>0, ω≠1; λ0 is the initial electricity price; P i is the effective output power of the i-th distributed generation unit; P Zi is the power consumed by the load in the power system; P EG It is the exchange of power between the local microgrid and the external distribution system; are the upper and lower limits of the effective output power of the i-th distributed generation unit; is the transmission loss during power transmission, where P Li =S i P i , Si >0 is the loss coefficient.
[0076] The constraint set is:
[0077]
[0078] The constraint set Q is a bounded closed subset, and the cost function of the optimization problem (3) is continuous on the constraint set Q. The optimization problem (3) must have a global minimum, that is, the smart grid economic dispatch problem has an optimal solution. Therefore, the present invention can use the Lagrange multiplier method to solve the economic dispatch problem shown in the above formula (3).
[0079] The process of finding the optimal solution of Lagrangian is as follows:
[0080] The Lagrangian function is defined as:
[0081]
[0082] In the formula, λ,θ i =[θ1,....,θ N ] T ,τ i =[τ1,....,τ N ] T is the Lagrange multiplier of each distributed generation unit. According to the Karush-Kuhn-Tucker (KKT) condition:
[0083]
[0084] Solved:
[0085]
[0086] in is the penalty factor for the i-th distributed generation unit. Find the global optimal solution They are
[0087]
[0088]
[0089] Calculate the optimal solution The process is a centralized algorithm. This requires a very powerful communication infrastructure. In addition, if the central controller is attacked, the entire smart grid system will collapse.
[0090] The goal of this invention is to design a distributed economic dispatch algorithm to achieve the global optimal solution of formula (3), that is, each distributed generation unit is based on its own parameters The state at that time {λi (k),P i (k)} and the information obtained from adjacent distributed generation units to solve the optimal economic dispatch problem. The specific process is as follows:
[0091] First, each distributed generation unit uses the leader-follower consensus algorithm to calculate λ i (k). The incremental cost of each distributed generation unit is i (k) Driven to the distribution system electricity price λ0 obtained by the energy converter.
[0092]
[0093] In the formula, δ i >0 is the step size of the algorithm; λ0 is the given initial electricity price; a ij Represents the communication relationship between distributed generation units i and j. When distributed generation unit j can directly send information to distributed generation unit i, a ij > 0, otherwise a ij =0;λ j (k) represents the incremental cost of DG unit j sending information directly to DG unit i at time k.
[0094] Then, each distributed generation unit calculates the effective output power P at time k i (k):
[0095]
[0096] Finally, each distributed generation unit estimates the average power mismatch m of each node in the power grid system through the average consistency algorithm. i (k):
[0097]
[0098] In the formula, is the algorithm step length; ΔP i (k) = P Zi (k)+P Li (k)-P i (k) is the power mismatch of the i-th distributed generation unit at time k; P Li (k) Line transmission loss of the ith distributed generation unit at time k; is the local estimate of the average power mismatch of all nodes by the i-th distributed generation unit; represents all distributed generation units adjacent to the energy converter; represents the local estimate of the average power mismatch of all nodes by DG unit j sending information directly to DG unit i at time k; a 0iRepresents the communication relationship between the energy converter (node 0) and the distributed generation unit i. When the distributed generation unit i can directly send information to the energy converter (node 0), a 0i > 0, otherwise a 0i = 0. The energy converter will directly replenish its power after each iteration, so the power mismatch estimate of all distributed generation units adjacent to the energy converter is zero.
[0099] Based on the above formulas (8), (9) and (10), the dispatch control of the smart grid can be realized under the local optimal solution of the economic dispatch target.
[0100] In each iteration of the smart grid of the present invention, the incremental power exchanged with the external power distribution system is adjusted by the energy converter, and the adjustment is shown in formula (11):
[0101]
[0102] Where P EG (k) is the power exchanged between the microgrid and the external distribution system; is the incremental power exchanged with the external power distribution system. At time k, the actual total power mismatch of the smart grid system is Therefore, based on formula (11), the adjustment and control of the incremental power in the smart grid can be realized.
[0103] As the intermediate unit connecting the microgrid with the external main grid, the energy converter plays an important role in microgrid access to the distribution system, energy quality monitoring and control, and information communication security.
[0104] The convergence analysis of the present invention is as follows:
[0105] For equations (8)-(11), Figure 3 As shown, there are the following assumptions and conditions.
[0106] Assumption 1: The directed graph G contains a spanning tree with node 0 as the root node.
[0107] Assumption 2: For any given node i∈{1,....,N}, there is at least one path from node i to node 0.
[0108] Condition 1: Algorithm step size
[0109] Condition 2: Algorithm step size
[0110] Assumption 1 ensures that the electricity price information of the external distribution system can be transmitted from the energy converter to each distributed generation unit. Assumption 2 ensures that each distributed generation unit can transmit the estimate of the average power mismatch of all nodes to the energy converter, and then the energy converter can calculate the incremental power exchanged between the external distribution system and the microgrid.
[0111] Regarding the convergence of the distributed economic dispatch algorithm (10)-(13), there is the following theorem.
[0112] Theorem 1 is based on assumptions 1-2. If conditions 1-2 are further established, for algorithms (8)-(11), we have:
[0113]
[0114] This shows that the incremental cost of each DG unit is i (k) It converges asymptotically to the electricity price of the external distribution system, that is, the effective power generation of each distributed generation unit asymptotically reaches the optimum, and the smart grid system achieves a balance between electricity supply and demand, thereby asymptotically achieving the optimal economic dispatch.
[0115] Proof: Based on the directed graph G, the energy exchanger is denoted as node 0, and the system including nodes 0, 1, ..., N is denoted as A related Lemma 1 is given.
[0116] Lemma 1
[25] : is a directed graph, G = {{1,2,···,N},ε,A} is a subgraph of the directed graph G0, and:
[0117]
[0118] B1=diag(a 10 ,a 20 ,···,a N0 ),when When i0 =1; otherwise a i0 = 0. B2 = diag(a 01 ,a 02 ,···,a 0N ),when When 0i =1; otherwise a 0i =0.
[0119] To facilitate the following analysis, another form of the update formula (8) is written as:
[0120] λ(k+1)-λ0=[λ(k)-λ0E N ][E N -δ(L+B1)], (12),
[0121] In the formula, λ(k)=[λ1(k),λ2(k),···,λ N (k)] T ; E N is the N-dimensional identity matrix; L is the Laplace matrix of the directed graph G; δ=diag(δ1,δ2,···,δ N ); A is the weighted adjacency matrix of the directed graph G.
[0122] Equation (8) is the standard leader-follower consensus algorithm, which is a special case of the distributed consensus algorithm in a directed graph. If Assumption 1 and Condition 1 hold, it can be seen from the literature R.Olfati-Saber, JAFax and RMM Murray, "Consensus and Cooperation in Networked Multi-Agent Systems," in Proceedings of the IEEE, vol. 95, no. 1, pp. 215-233, Jan. 2007 that [E N All eigenvalues of -δ(L+B1)] are within the unit circle of the complex plane. Then from equation (13), we can get:
[0123]
[0124] Then, through the above and formula (9), we can get:
[0125]
[0126] Next, we will prove Define a vector:
[0127] M(k)=[m1(k),m2(k),···,m N (k)] T ,
[0128] P(k)=[P1(k),P2(k),···,P N (k)] T ,
[0129] ΔP(k)=[ΔP1(k),ΔP2(k),···,ΔP N (k)] T ,
[0130]
[0131] Another form of formula (10) is:
[0132]
[0133] Where η(k)=ΔP(k+1)-ΔP(k).
[0134] From formula (13), we can see that when k→∞, η(k)=0 N×1 Then, through equations (11) and (14), we can get:
[0135]
[0136] in We can get:
[0137]
[0138] From formula (14), we can get:
[0139]
[0140] Assumption 2 shows that there is always a path from node j to node i. Lemma 1 and Condition 2 show that All eigenvalues of are inside the unit circle of the complex plane. And by From formula (16), we can know that:
[0141]
[0142] From equation (7), equation (13), equation (15) and equation (17), we can get:
[0143]
[0144] Therefore, the entire system asymptotically achieves power supply and demand balance and optimal economic dispatch.
[0145] The simulation experiment of the present invention is as follows:
[0146] In order to verify the effectiveness of the smart grid economic dispatching method proposed in the present invention, the present invention designs a smart grid system on a Matlab simulation platform and conducts a numerical simulation experiment on the proposed method through an example.
[0147] 1. Simulation parameter settings
[0148] The electrical network structure of the numerical simulation is as follows Figure 4 As shown in Figure 1, it includes 5 distributed generation units, 1 energy converter and 3 loads. The communication topology between the nodes of the simulation test system is shown in Figure 1. Figure 5 As shown in the figure, "MG" represents the main distribution network, "0" represents the energy converter, and "1, 2, 3, 4, 5, 6" represent the distributed generation units and buses. The microgrid is connected to the distribution system through the energy converter.
[0149] The power system energy channel and communication channel designed by the present invention are independent of each other, so the smart grid electrical network and communication network involved in the simulation test system need to have different structures. The simulation test system is specifically embodied as follows: in the electrical network, bus 1 and bus 2 are adjacent neighbors, such as Figure 4 As shown, in the communication network, the control unit of bus 1 and the control unit of bus 2 are not adjacent neighbors, such as Figure 5 shown.
[0150] In the simulation test, the dispatch parameter ω in the optimization problem (3) of smart grid economic dispatch is set to 2. The environmental benefit parameters are shown in Table 1, and the power generation parameters of each distributed generation unit are shown in Table 2.
[0151] Table 1 Environmental benefit parameters
[0152] DG <![CDATA[a i ]]> <![CDATA[b i ]]> <![CDATA[c i ]]> 1 -616 0.037 -3.41 2 -385 0.016 -2.68 3 -472 0.090 -1.77 4 -224 0.043 -1.56 5 -531 0.012 -2.09
[0153] Table 2 Power generation unit parameters
[0154] DG <![CDATA[α i ]]> <![CDATA[β i ]]> <![CDATA[γ i ]]> <![CDATA[S i ]]> <![CDATA[P i min ]]> <![CDATA[P i max ]]> 1 5680 60.282 30.71 0.021 0 160 2 4726 136.177 29.60 0.025 0 180 3 6989 33.442 68.83 0.026 0 120 4 8452 58.754 41.56 0.027 0 160 5 9327 197.778 17.35 0.023 0 180
[0155] 2. Feasibility of Distributed Economic Dispatch Method
[0156] In the example of the simulation test system, the load of each bus is designed as follows. The load of bus 1 is designed to be 150MW, the load of bus 2 and bus 6 is designed to be 75MW, and the load of bus 3 and bus 4 is designed to be 125MW. The total load of the system is 550MW. The initial electricity price of the distribution system obtained by the energy converter is 88¥ / MW. According to the various parameters of the simulation test system, the optimal solution for economic dispatch is obtained as follows:
[0157] For the optimization problem of smart grid economic dispatch (Formula (3), the distributed economic dispatch algorithm (Formulas (8)-(11)) is applied and simulated in the Matlab simulation environment. i =0.1, i=1,2,···,6; When , the simulation results are as follows Figure 6 , 7 , 8, and 9. Figure 6 Describes the incremental cost of each distributed generation unit λ i The optimization process of (k) Figure 7 Describes the effective output power P of each distributed generation unit i The optimization process Figure 8 Describes the local estimate of the average power mismatch of each control unit optimization process. Fig. 9The estimation of the global power mismatch of the system and the optimization process of the actual global power mismatch are described.
[0158] From the simulation results Figure 6 It can be seen that when k = 100, the incremental cost λ of all distributed generation units is i (k) asymptotically and smoothly converges to the electricity price λ0 of the distribution system, which indicates that the electricity prices of all distributed generation units asymptotically reach the optimal economic dispatch solution. By observing the effective output power P of each distributed generation unit i From the optimization process, it can be seen that each distributed generation unit converges and optimizes quickly and smoothly. When k = 100, the effective output power P of each distributed generation unit i To the optimum output power like Figure 7 shown.
[0159] Since the energy transmission channel and the communication transmission channel are independent of each other in the distributed economic dispatch algorithm proposed by the present invention, the mismatching information between each distributed generation unit and the bus is more rapid and accurate when exchanging information with each other and communicating with the energy converter. Figure 8 It can be seen that all control units iteratively calculate the local estimate of the average power mismatch through the distributed economic dispatch algorithm (10) In this process, each control unit transmits mismatch information through the designed communication channel, so that the power mismatch of each control unit can be quickly and accurately supplemented until the system reaches the optimal economic dispatch state, that is, the local estimate of the average power mismatch of each control unit
[0160] from Fig. 9 It can be seen that from the beginning of the economic dispatch process to the time when the system reaches the optimal economic dispatch state, the estimated value of the global power mismatch of the system is always equal to the actual global power mismatch of the system. The feasibility of the distributed economic dispatch method proposed in the present invention is further illustrated by comparing the actual global power mismatch of the system with the estimated value of the global power mismatch of the system.
[0161] The above simulation results show that the distributed economic dispatch method proposed in the present invention, under the condition of considering the maximization of environmental benefits, through the exchange of incremental cost information and power mismatch information between various intelligent agents, ensures the convergence speed and convergence accuracy of the economic dispatch process, while enabling the power system to gradually achieve optimal economic dispatch, proving the effectiveness and feasibility of the proposed method.
[0162] 3. Factors affecting the convergence speed of the algorithm
[0163] When δ i =0.25, and δi =0.01, When the incremental cost of each distributed generation unit is i (k) and effective output power P i The simulation results are as follows Fig.10 (a), (b) and Fig.10 (c) and (d). From the simulation results, we can see that the smaller δ is, the greater the incremental cost λ of each distributed generation unit is. i (k) and effective output power P i The slower the convergence speed. The main reason is that the incremental cost λ i The convergence of (k) will directly affect the effective output power P of each distributed generation unit. i The convergence of . δ i =0.1 and δ i =0.1, the incremental cost of each distributed generation unit λ i (k) and effective output power P i The simulation results are as follows Fig.11 (a), (b) and Fig.11 (c) and (d). By observing the simulation results, it can be concluded that when As it gets smaller, it will slow down the incremental cost of each distributed generation unit λ i (k) and effective output power P i The effectiveness of the algorithm of the present invention is further verified by analyzing the influence of the algorithm step size on the algorithm convergence speed.
[0164] 4. Comparison of economic dispatch efficiency
[0165] Under the same simulation experimental conditions, the number of distributed generation units in the power system is set to 2, 4, 6, 8, and 10. The economic dispatch efficiency of Algorithm 1, Algorithm 2 (reference
[23] . B. Huang, Y. Li, H. Zhang and Q. Sun, "Distributed optimal co-multi-microgrids energy management for energy internet," in IEEE / CAA Journal of Automatica Sinica, vol. 3, no. 4, pp. 357-364, Oct. 2016.), and Algorithm 3 (reference
[26] . He Yongjing, Wang Wei, Wu Xuezhi. Economic optimization dispatch strategy of distributed power sources considering communication delay [J]. Power System Technology, 2021, 45 (08): 3015-3025) are compared in five experimental scenarios, among which Algorithm 1 is the economic dispatch method proposed in this invention. At the same time, in order to avoid the randomness of the results, each algorithm was repeated 30 times. The simulation results are shown in the figure. Fig.12 As shown. By comparison, it is found that the economic dispatch time of the algorithm 1 proposed in the present invention is better than that of other algorithms, and the economic dispatch speed is the fastest. From the above simulation results, it can be seen that the economic dispatch method proposed in the present invention, while considering environmental benefit factors and other conditions, ensures the operating efficiency and accuracy of the economic dispatch process, which is of great significance to the economic dispatch problem of power system.
[0166] In summary, in view of the problem that the economic dispatch problem of the existing smart grid needs to meet multiple constraints, based on multi-agent collaborative control and topological graph theory, this paper proposes an economic dispatch method that combines a distributed incremental cost consistency algorithm with an energy converter. Different from previous studies, the environmental benefit factors in the actual power generation process are taken into account in the economic dispatch target model. At the same time, when power is transmitted in the local microgrid, the transmission loss is taken into account within the constraints of the economic dispatch problem. In addition, the energy transmission channel and the information transmission channel of this method operate independently of each other, which improves the operating efficiency and robustness of the power system. The simulation results show that the proposed method ensures the convergence speed and quality while enabling the power system to achieve the optimal economic dispatch state under the premise of meeting multiple constraints.
[0167] The research of the present invention is carried out under ideal communication conditions. How to achieve economic dispatch of smart grid systems under non-ideal communication conditions, such as communication delay, information packet loss, random switching of communication topology networks, etc., is a task that needs to be improved in the future.
[0168] The embodiments described in the present invention are merely descriptions of the preferred implementation modes of the present invention, and are not intended to limit the concept and scope of the present invention. Without departing from the design concept of the present invention, various modifications and improvements made to the technical solutions of the present invention by engineers and technicians in this field should fall within the protection scope of the present invention. The technical contents for which protection is sought in the present invention have all been recorded in the claims.
Claims
1. A smart grid dispatching method based on economic dispatching objectives and power parameters, characterized in that: The following steps are involved: Step 1: Obtain the effective output power and cost parameters of each distributed generation unit in the smart grid, and construct the power generation cost function of each distributed generation unit based on this, as shown in formula (1): F i (P i )=a i +b i P i +g i P i 2 ,i=1,......,N (1), In formula (1), α i ,β i ,γ i are the cost parameters of the i-th distributed generation unit; P i is the effective output power of the i-th distributed generation unit; F i (P i ) is the generation cost function of the ith distributed generation unit; Step 2: Obtain the pollutant gas emissions H of each distributed generation unit i (P i ), and convert it into cost as shown in formula (2): H i (P i )=a i +b i P i +c i P i 2 ,i=1,......N (2), In formula (2), a i ,b i ,c i are the emission parameters of the i-th distributed generation unit; P i is the effective output power of the i-th distributed generation unit; Step 3: Obtain the electricity price of the smart grid, the power consumed by the load, the power exchange data, and the transmission loss data, and combine formulas (1) and (2) to establish the smart grid economic dispatch formula as shown in formula (3): In formula (3), ω is a given dispatch parameter, and ω>0, ω≠1; λ0 is the initial electricity price; P i is the effective output power of the i-th distributed generation unit; P Zi is the power consumed by the load in the power system; P EG It is the power exchange between the local microgrid and the external distribution system; P i min , P i max are the upper and lower limits of the effective output power of the i-th distributed generation unit; is the transmission loss during power transmission, where P Li =S i P i , S i >0 is the loss coefficient; Step 4: Use the Lagrange multiplier method to solve formula (3) for the global optimal solution As shown in formulas (6) and (7): Step 5: Design a distributed economic dispatch algorithm to achieve the global optimal solution of formula (3), that is, each distributed generation unit is based on its own parameters {α i ,β i ,γ i ,a i ,b i ,c i ,S i ,P i min ,P i max }, the state at that time {λ i (k),P i (k)} and the information obtained from the adjacent distributed generation units to solve the optimal economic dispatch problem. The process is as follows: Step 5.1: First, use the leader-follower consensus algorithm to calculate λ for each distributed generation unit. i (k), the incremental cost of each distributed generation unit λ i (k) is driven to the distribution system electricity price λ0 obtained by the energy converter, as shown in formula (8): In formula (8), δ i >0 is the step size of the leader-follower consensus algorithm; λ0 is the given initial electricity price; a ij Represents the communication relationship between distributed generation units i and j. When distributed generation unit j can directly send information to distributed generation unit i, a ij > 0, otherwise a ij =0;λ j (k) represents the incremental cost of DG unit j sending information directly to DG unit i at time k; Step 5.2: Then, each distributed generation unit calculates the effective output power P at time k i (k), as shown in formula (9): Step 5.3: Finally, each distributed generation unit estimates the average power mismatch m of each node in the power grid system through the average consistency algorithm. i (k), as shown in formula (10): In formula (10), is the average consistency algorithm step length; ΔP i (k) = P Zi (k)+P Li (k)-P i (k) is the power mismatch of the i-th distributed generation unit at time k; P Li (k) Line transmission loss of the ith distributed generation unit at time k; is the local estimate of the average power mismatch of all nodes by the i-th distributed generation unit; represents all distributed generation units adjacent to the energy converter; represents the local estimate of the average power mismatch of all nodes by DG unit j sending information directly to DG unit i at time k; a 0i Represents the communication relationship between the energy converter and the distributed generation unit i. When the distributed generation unit i can send information directly to the energy converter, a 0i > 0, otherwise a 0i =0; Based on formulas (8), (9), and (10) in steps 5.1-5.3, the dispatching control of the smart grid is realized under the global optimal solution.
2. The smart grid dispatching method based on economic dispatching objectives and power parameters according to claim 1 is characterized in that: In step 3, the constraint set Q of formula (3) is established as follows: Among them, the constraint set Q is a bounded closed subset.
3. The smart grid dispatching method based on economic dispatching objectives and power parameters according to claim 1 is characterized in that: In formula (10) of step 5.3, the energy converter will directly supplement the power of its adjacent distributed generation units after each iteration, and the power mismatch estimate of all distributed generation units adjacent to the energy converter is zero.
4. The smart grid dispatching method based on economic dispatching objectives and power parameters according to claim 1 is characterized in that: In step 5, the incremental power exchanged with the external power distribution system is adjusted by the energy converter, thereby establishing the adjustment control formula as shown in formula (11): In formula (11), P EG (k) is the power exchanged between the microgrid and the external distribution system; is the incremental power exchanged with the external power distribution system; at time k, the actual total power mismatch of the smart grid system is The corresponding adjustment control is implemented based on formula (11).