Method, device, electronic device and storage medium for generating fan layout scheme

By calculating the wake effect of the fan in different wind direction sectors in the wind farm, and optimizing the fan layout plan, the problem of great impact on the wake in the wind farm is solved and the total power generation of the wind farm is increased.

CN114297787BActive Publication Date: 2024-11-15STATE NUCLEAR ELECTRIC POWER PLANNING DESIGN & RES INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111400007.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-11-19
Publication Date
2024-11-15
Estimated Expiration
2041-11-19

AI Technical Summary

Technical Problem

The wake effect between wind turbines in a wind farm has a great impact, resulting in a decrease in the total power generation of the wind farm. It is difficult for the prior art to effectively reduce the impact of wake and increase the power generation.

Method used

By obtaining wind resource data and planning data of the wind farm, dividing wind direction sectors, calculating the wake effect of each fan in each sector, determining an optimized fan layout plan to reduce wake effect and improve the total power generation of the wind farm quantity.

Benefits of technology

The calculation accuracy of wake effect was improved, and the layout scheme with a small impact on wake effect was selected, which significantly increased the total power generation of the wind farm.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114297787B_ABST
    Figure CN114297787B_ABST
Patent Text Reader

Abstract

The present application proposes a method and device for generating a wind turbine layout scheme, wherein the method for generating a wind turbine layout scheme includes: obtaining wind resource data of a wind farm and dividing it into N wind direction sectors; obtaining planning data of the wind farm and determining M preliminary layout schemes; inputting the average wind speed of each wind direction sector, the angle of each sector, each preliminary layout scheme and wind turbine characteristic data into a first model to determine the first wake effect influence on each wind turbine of each preliminary layout scheme in each wind direction sector, and the total power generation of the wind farm of each preliminary layout scheme; determining the first target layout scheme according to the total power generation of the wind farm of each preliminary layout scheme. The present application improves the calculation accuracy of the wake effect by calculating the wake effect influence on each wind turbine in each wind direction sector, and then improves the total power generation of the wind farm by selecting a layout scheme with a small wake effect influence.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of wind power engineering, and in particular to a method, device, electronic equipment and storage medium for generating a wind turbine layout scheme. Background Art

[0002] At present, wind power generation has become an important direction for the development of renewable energy. With the development of wind farms, the power and size of wind turbines are getting larger and larger, and the scope and intensity of the wake effect between wind turbines are also getting larger and larger, which has a great impact on the total power generation of wind farms and even on the operating status of wind turbines. The main factors that determine the degree of wake influence are wind speed, wind direction, and the relative position of wind turbines. Therefore, when the geometric shape of the wind farm area, the surrounding environment, and the planned capacity have been determined, it is of great significance to study how to reduce the wake effect and increase the total power generation of the wind farm. Summary of the invention

[0003] The present application aims to solve one of the technical problems in the related art at least to some extent.

[0004] The first embodiment of the present application proposes a method for generating a wind turbine layout scheme, including:

[0005] Acquire wind resource data of the wind farm, wherein the wind resource data includes multiple groups of data pairs, wherein each group of data pairs includes corresponding wind direction and wind speed;

[0006] Divide N wind direction sectors according to the wind resource data to determine the average wind speed and sector angle of each wind direction sector, wherein N is a positive integer greater than 1;

[0007] Acquiring planning data of the wind farm, wherein the planning data includes wind farm site boundary coordinates, wind farm planning capacity and wind turbine characteristic data;

[0008] Determine M preliminary layout plans according to the planning data, where M is a positive integer greater than 1, and the preliminary layout plans include the number of wind turbines and the position coordinates of each wind turbine;

[0009] Inputting the average wind speed of each wind direction sector, each sector angle, each preliminary arrangement scheme and the wind turbine characteristic data into a first model to determine the first wake effect influence on each wind turbine of each preliminary arrangement scheme in each wind direction sector, and determining the total power generation of the wind farm of each preliminary arrangement scheme according to the first wake effect influence on each wind turbine of each preliminary arrangement scheme in each wind direction sector and the wind turbine characteristic data;

[0010] A first target layout scheme is determined according to the total power generation of the wind farm in each of the preliminary layout schemes.

[0011] The second embodiment of the present application proposes a device for generating a fan arrangement scheme, including:

[0012] A first acquisition module is used to acquire wind resource data of a wind farm, wherein the wind resource data includes a plurality of data pairs, wherein each data pair includes a corresponding wind direction and wind speed;

[0013] A first determination module, used for dividing N wind direction sectors according to the wind resource data to determine the average wind speed and sector angle of each wind direction sector, wherein N is a positive integer greater than 1;

[0014] A second acquisition module is used to acquire planning data of the wind farm, wherein the planning data includes wind farm site boundary coordinates, wind farm planning capacity and wind turbine characteristic data;

[0015] A second determination module is used to determine M preliminary layout plans according to the planning data, wherein M is a positive integer greater than 1, and wherein the preliminary layout plan includes the number of wind turbines and the position coordinates of each wind turbine;

[0016] a third determination module, for inputting the average wind speed of each wind direction sector, each sector angle, each preliminary arrangement scheme and the wind turbine characteristic data into the first model to determine the first wake effect influence on each wind turbine of each preliminary arrangement scheme in each wind direction sector, and determining the total power generation of the wind farm of each preliminary arrangement scheme according to the first wake effect influence on each wind turbine of each preliminary arrangement scheme in each wind direction sector and the wind turbine characteristic data;

[0017] The fourth determination module is used to determine the first target layout scheme according to the total power generation of the wind farm in each of the preliminary layout schemes.

[0018] The third aspect of the present application provides an electronic device, including:

[0019] at least one processor; and a memory communicatively coupled to the at least one processor;

[0020] The memory stores instructions that can be executed by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the method for generating a wind turbine layout scheme proposed in the embodiment of the first aspect of the present application.

[0021] The fourth aspect embodiment of the present application proposes a non-temporary computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, it implements the method for generating a wind turbine layout scheme proposed in the first aspect embodiment of the present application.

[0022] The fifth aspect of the present application provides a computer program product, including a computer program, which, when executed by a processor, implements the method for generating a wind turbine arrangement scheme provided in the first aspect of the present application.

[0023] The method, device, computer equipment and storage medium for generating a fan layout scheme provided by the present application have the following beneficial effects:

[0024] First, multiple wind direction sectors are determined based on the wind resource data of the wind farm, and multiple preliminary layout plans are determined based on the planning data of the wind farm; then the first wake effect of each wind turbine in each preliminary layout plan in each wind direction sector is determined, and then the total power generation of the wind farm in each preliminary layout plan is determined; finally, the first target layout plan is determined based on the total power generation of the wind farm in each preliminary layout plan. This application improves the calculation accuracy of the wake effect by calculating the wake effect of each wind turbine in each wind direction sector, and then increases the total power generation of the wind farm by selecting a layout plan with a small wake effect.

[0025] Additional aspects and advantages of the present application will be given in part in the description below, and in part will become apparent from the description below, or will be learned through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:

[0027] Figure 1 is a flow chart of a method for generating a fan arrangement scheme according to an embodiment of the present application;

[0028] Figure 2 is a flow chart of a method for generating a fan arrangement scheme according to another embodiment of the present application;

[0029] Figure 3 is a flow chart of a method for generating a fan arrangement scheme according to another embodiment of the present application;

[0030] Figure 4 is a flow chart of a method for generating a fan arrangement scheme according to another embodiment of the present application;

[0031] Figure 5 is a structural schematic diagram of a device for generating a fan arrangement scheme provided in accordance with an embodiment of the present application;

[0032] Figure 6 It is a block diagram of an electronic device used to implement the method for generating a wind turbine arrangement scheme according to an embodiment of the present application. DETAILED DESCRIPTION

[0033] Embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present application, and should not be construed as limiting the present application.

[0034] The following describes a method and device for generating a wind turbine arrangement scheme according to an embodiment of the present application with reference to the accompanying drawings.

[0035] Figure 1 A schematic flow chart of a method for generating a fan layout scheme provided in one embodiment of the present application.

[0036] The embodiment of the present application takes the method for generating a wind turbine layout plan as an example in which the method is configured in a device for generating a wind turbine layout plan. The device for generating a wind turbine layout plan may be a personal computer (PC), a cloud device, a mobile device, etc. The mobile device may be, for example, a mobile phone, a tablet computer, a personal digital assistant, a wearable device, or other hardware device with various operating systems, touch screens, and / or display screens to execute the function of generating a wind turbine layout plan.

[0037] It should be noted that the wake effect between wind turbines in a wind farm will lead to a reduction in the total power generation of the wind farm. The main factors that determine the degree of wake effect are wind speed, wind direction, and the relative position of wind turbines. When the geometric shape, surrounding environment, and planned capacity of the wind farm area have been determined, reducing the wake effect by adjusting the relative position of wind turbines to increase the total power generation of the wind farm is one of the important tasks in the design process of wind power projects.

[0038] like Figure 1 As shown, the method for generating the fan layout scheme may include the following steps:

[0039] Step 101 : acquiring wind resource data of a wind farm, wherein the wind resource data includes a plurality of data pairs, wherein each data pair includes a corresponding wind direction and wind speed.

[0040] Among them, the wind resource data can be the measured data of the wind speed and wind direction of the wind farm within a certain period of time, such as the wind speed and wind direction data of the wind farm within 1 year, or the wind speed and wind direction data of the wind farm within 2 years, etc. This application does not limit this.

[0041] Specifically, each data pair may consist of three items: recording time, wind speed, and wind direction. The recording time interval is hours, the wind speed unit is meters per second, the wind direction unit is degrees, and the range is 0 to 360 degrees. The total time length of the data file is not less than one year, that is, 8760 data records.

[0042] It is understandable that the more wind resource data there is, the closer the power generation of the wind turbine layout scheme is to reality. Wind resource data can be obtained by verifying the measured data of the wind tower in accordance with the requirements of relevant regulations such as "Wind Energy Resource Assessment Method for Wind Farms" and "Technical Regulations for Wind Energy Resource Measurement and Assessment for Wind Farms", and processing the unreasonable and missing data accordingly.

[0043] Step 102: Divide the wind direction into N sectors according to the wind resource data to determine the average wind speed and sector angle of each wind direction sector, where N is a positive integer greater than 1.

[0044] Among them, the wind direction of the wind resource data can be any direction, so the wind direction sectors can be equally divided in the range of 0 degrees to 360 degrees, and the number of sectors can be 8, 16, 32, etc., which is not limited in this application.

[0045] It is understandable that the corresponding sector angles are different when the number of sectors is different. For example, when the number of sectors is 16, the angle of each sector is 22.5 degrees.

[0046] Step 103, obtaining planning data of the wind farm, wherein the planning data includes the wind farm site boundary coordinates, the wind farm planning capacity and wind turbine characteristic data.

[0047] The wind farm site may be of any shape and size, such as a rectangle, a trapezoid, etc., which is not limited in the present application. Accordingly, the boundary coordinates of the wind farm site may be the vertex coordinates of the wind farm site.

[0048] The planned capacity of a wind farm can be the expected power generation of the wind farm. The wind turbine characteristic data may include the impeller diameter, hub height, rated power, thrust coefficient and power characteristic curve or table, the minimum spacing of the wind turbine layout, etc.

[0049] Step 104, determining M preliminary layout plans based on the planning data, where M is a positive integer greater than 1, and the preliminary layout plan includes the number of wind turbines and the position coordinates of each wind turbine.

[0050] The number of wind turbines can be determined based on the planned capacity of the wind farm and the rated power of the wind turbines. For example, if the planned capacity of the wind farm is 361.2MW and the rated power of the wind turbines is 6450W, then the wind farm can be equipped with 56 wind turbines.

[0051] In addition, the row spacing range and column spacing range of the fan can be determined according to the fan impeller diameter, hub height, minimum fan arrangement spacing, etc. For example, the fan row spacing range can be 6 to 20 times the impeller diameter, and the fan column spacing range can be 3 to 6 times the impeller diameter, etc., which is not limited in this application.

[0052] Furthermore, according to the number of fans and the row and column spacing between adjacent fans, multiple preliminary layout schemes can be determined. For example, the row spacing of the fans is specified to be 3 times the impeller diameter, and the column spacing of the fans is specified to be 6 times the impeller diameter, which is not limited in this application.

[0053] Step 105, inputting the average wind speed of each wind direction sector, each sector angle, each preliminary layout plan and wind turbine characteristic data into the first model to determine the first wake effect on each wind turbine of each preliminary layout plan in each wind direction sector, and determining the total power generation of the wind farm of each preliminary layout plan based on the first wake effect on each wind turbine of each preliminary layout plan in each wind direction sector and the wind turbine characteristic data.

[0054] Among them, the incoming wind speed of each wind turbine in each wind direction sector can be determined according to the first wake effect on each wind turbine in each wind direction sector, and then the power generation of each wind turbine in each wind direction sector can be determined according to the incoming wind flow and wind turbine characteristic data, and finally the total power generation of the wind farm can be determined according to the total power generation of each wind turbine in all wind direction sectors.

[0055] Step 106: Determine a first target layout scheme according to the total power generation of the wind farm in each preliminary layout scheme.

[0056] Among them, all preliminary layout plans can be sorted according to the total power generation of the wind farm, and one or more preliminary layout plans with the highest total power generation of the wind farm are selected as the first target layout plan.

[0057] It should be noted that, in an actual wind farm area, due to geographical restrictions, there may be areas where wind turbines are not allowed to be deployed, or areas where construction or operation costs need to be increased.

[0058] Therefore, in the embodiment of the present application, the planning data of the wind farm may also include the boundary coordinates of the area where the installation of wind turbines is prohibited, and the boundary coordinates of the area where the site cost is increased.

[0059] Furthermore, determining the first target layout scheme according to the total power generation of the wind farm in each preliminary layout scheme may include:

[0060] According to the boundary coordinates of the area where installation of wind turbines is prohibited, the position coordinates of the wind turbines that do not meet the installation conditions in each preliminary arrangement plan are deleted to obtain a first preliminary arrangement plan.

[0061] According to the boundary coordinates of the area where the site cost increases, the conversion coefficient of the increased site cost and the power generation is determined.

[0062] In the case that in any first preliminary arrangement scheme, there is more than one wind turbine located in an area where the site cost increases, the reduced power generation of the first preliminary arrangement scheme is determined according to the conversion coefficient.

[0063] A first target layout plan is determined according to the total power generation and the lost power generation of the wind farm in each first preliminary layout plan.

[0064] The total power generation of the wind farm in each first preliminary arrangement scheme may be subtracted from the damaged power generation, and then one or more first preliminary arrangement schemes with the highest total power generation of the remaining wind farm may be selected as the first target arrangement scheme.

[0065] The method for generating a wind turbine layout scheme in an embodiment of the present application first determines multiple wind direction sectors based on the wind resource data of the wind farm, and determines multiple preliminary layout schemes based on the planning data of the wind farm; then determines the first wake effect influence on each wind turbine of each preliminary layout scheme in each wind direction sector, and then determines the total power generation of the wind farm of each preliminary layout scheme; finally, determines the first target layout scheme based on the total power generation of the wind farm of each preliminary layout scheme. The present application improves the calculation accuracy of the wake effect by calculating the wake effect influence on each wind turbine in each wind direction sector, and then increases the total power generation of the wind farm by selecting a layout scheme with a small wake effect influence.

[0066] Figure 2 FIG. 1 is a flow chart of a method for generating a fan layout scheme provided in another embodiment of the present application. Figure 2 As shown, in Figure 1 Based on the illustrated embodiment, step 105 determines the first wake effect on each wind turbine in each wind direction sector, which may include the following steps:

[0067] Step 201, obtaining a wake adjustment coefficient.

[0068] It should be noted that the amount of data required to calculate the total power generation of a wind farm is large and the process is complex. Using the average wind speed in the wind direction sector to calculate the power generation of each wind turbine and the total power generation of the layout scheme can simplify the calculation process and achieve faster calculation speed, but it may also lead to low calculation accuracy. Therefore, the average wind speed in the wind direction sector can be used to calculate the power generation of each wind turbine based on the wake adjustment coefficient.

[0069] In the embodiment of the present application, the wake adjustment coefficient Kw can be obtained by the formula FA(Kw)=FW using the binary division iteration method, wherein FA(Kw) is the total power generation of the wind farm calculated using the first model, and FW is the total power generation of the wind farm calculated using the second model.

[0070] Specifically, the first model is used to calculate the total power generation of the wind farm, and the process is as follows:

[0071] Get the coordinates and model data set of the wind turbine WGP(X i , Y i , Ho i ,Ro i , Dt i , P i ) i=1~N , where N is the number of wind turbines in the wind farm, the machine coordinates X East are positive values, Y North are positive values, Ro is the impeller radius, Ho is the hub height, Dt is the thrust coefficient and power characteristic table, and P is the power generation of a single wind turbine.

[0072] Get the wind resource data set WDF (Ws k , Wd k , K k , A k , F k ) k=1~Q , where Q is the number of wind direction sectors of wind resource data, Ws is the average wind speed, Wd is the angle of the sector center dividing line, K is the shape parameter of the Weibull curve, A is the scale parameter of the Weibull curve, and F is the amount of wind speed data in the sector.

[0073] Calculate fan WGP i In the wind direction sector WDF k The average wind speed is Ws k The wake effect affects Cw ki And the incoming wind speed V ki , specifically:

[0074] For the position coordinates X in the data set WGP i , Y i Convert and obtain the wind direction Wd k The machine position coordinates in the positive Y-coordinate direction (Xr i , Yr i ):

[0075] XR i =X i *cosWd k -Y i *sinWd k ;

[0076] Y i =Y i *cosWd k +X i *sinWd k ;

[0077] Sort the converted machine position coordinates in descending order according to the Yr value and calculate the WGP of the fan i With fan WGPj Position difference dy ij , dx ij :

[0078] dy ij = Yr j - Yr i , j < i;

[0079] dx ij = |Xr j - Xr i |;

[0080] Among them, the wind turbine WGP j is the wind turbine located upwind of the wind turbine WGP i . The value range of j is from 1 to i - 1.

[0081] It should be noted that through coordinate transformation (rotation), the sector wind direction is from large to small along the Y-axis, sorted in descending order by Yr. The positions with j < i are all upwind of the i-th position. Therefore, dy ij is a positive value.

[0082] Calculate the sector coverage range γ based on the sector angle α ij , and calculate the wake radius Rh of the wind turbine WGP j based on the wake diffusion coefficient δ ij :

[0083] γ ij = dy ij * tanα;

[0084] Rh ij = Ro j + δ * dy ij ;

[0085] Calculate the wake effect influence Cw k and the oncoming flow velocity V ki when the average wind speed is Ws ki :

[0086]

[0087] V ki = Ws k * (1 - Cw ki ) * Kw;

[0088] Among them, Cw kij is the wake effect influence of the wind turbine WGP j on the wind turbine WGP i ; B kij is the disk of the wind turbine WGP i and the wind turbine WGP jThe overlap area of ​​the wake cross section is j The wake section completely covers the wind turbine WGP i When the disk is kij =1; A kij is the sector wind direction distribution adjustment coefficient.

[0089]

[0090]

[0091] In the formula, β is the adjustment coefficient,

[0092]

[0093] Where θ1 and θ2 are intermediate variables, Si is the WGP of the fan i The disk area;

[0094]

[0095] In the formula, Ct = f(V kj ), by fan WGP j The thrust coefficient table in the fan characteristic data is interpolated and obtained, and Kw is the wake adjustment coefficient.

[0096] Calculate fan WGP i The total power generation P in all wind direction sectors i , the calculation formula is as follows:

[0097] Where P ki =F(V ki ), by fan WGP i The power characteristic table in the fan characteristic data is obtained by interpolation.

[0098] Then, the total power generation P of the wind farm can be calculated as follows:

[0099]

[0100] Specifically, the second model is used to calculate the total power generation of the wind farm, and the process is as follows:

[0101] Get the coordinates and model data set of the wind turbine WGP(X i , Y i , Ho i ,Ro i , Dt i , P i ) i=1~N, where N is the number of wind turbines in the wind farm, the machine coordinates X East are positive values, Y North are positive values, Ro is the impeller radius, Ho is the hub height, Dt is the thrust coefficient and power characteristic table, and P is the power generation of a single wind turbine.

[0102] Get the wind resource data set WDF (Ws k , Wd k , K k , A k , F k ) k=1~Q , where Q is the number of wind direction sectors of wind resource data, Ws is the average wind speed, Wd is the angle of the sector center dividing line, K is the shape parameter of the Weibull curve, A is the scale parameter of the Weibull curve, and F is the amount of wind speed data in the sector.

[0103] Get wind speed V a=1~NA The probability F in each sector ka :

[0104]

[0105] In the formula,

[0106] Among them, V a=1~NA is a wind speed data set, V1 is equal to the wind turbine WGP i Cut-in wind speed, V NA Equal to fan WGP i The cut-out wind speed, set V a=1~NA It is an arithmetic progression, and the level difference d=1 or is the same as the wind speed level difference in the fan characteristic data.

[0107] Calculate fan WGP i In the wind direction sector WDF k Inside, the wind speed is V a The wake effect affects Cw kai and incoming flow velocity V kai , specifically:

[0108] For the aircraft position coordinate X in the data set WGP i , Y i Convert and obtain the wind direction Wd k The machine position coordinates in the positive Y-coordinate direction (Xr i , Yr i ):

[0109] XR i =X i *cosWd k -Y i *sinWd k ;

[0110] Y i =Y i *cosWd k +X i *sinWd k ;

[0111] Sort the converted machine position coordinates in descending order according to the Yr value and calculate the WGP of the fan i With fan WGP j The position difference ij , dx ij :

[0112] dy ij =Yr j -Yr i ,j <i;

[0113] dx ij =|Xr j -Xr i |;

[0114] Calculate the sector coverage γ based on the sector angle α ij , calculate the fan WGP based on the wake diffusion coefficient δ j Wake radius Rh ij :

[0115] γ ij =dy ij *tanα;

[0116] R ij =Ro j +δ*dy ij ;

[0117] Calculate the wind speed as V a The wake effect affects Cw kai and incoming flow velocity V kai :

[0118]

[0119] V kai =V a *(1-Cw kai );

[0120] Among them, Cw kaij For wind turbine WGP j For fan WGP i The wake effect of B kij For wind turbine WGP i Panel and fan WGP j The overlap area of ​​the wake cross section is jThe wake section completely covers the wind turbine WGP i When the disk is kij =1; A kij is the sector wind direction distribution adjustment coefficient.

[0121]

[0122]

[0123] In the formula,

[0124]

[0125] Where:

[0126]

[0127] In the formula, Ct = f(V kaj ), by fan WGP j The thrust coefficient table in the fan characteristic data is interpolated and obtained.

[0128] Calculate fan WGP i In the wind direction sector WDF k Power generation P ki :

[0129]

[0130] Where P kai =F(V kai ), by fan WGP i The power characteristic table in the fan characteristic data is obtained by interpolation.

[0131] Calculate fan WGP i The total power generation P in all wind direction sectors i , the calculation formula is as follows:

[0132]

[0133] Then, the total power generation P of the wind farm can be calculated as follows:

[0134]

[0135] Therefore, by making the total power generation of the wind farm calculated by using the first model equal to the total power generation of the wind farm calculated by using the second model, the wake adjustment coefficient Kw is obtained by adopting the binary method iteration.

[0136] Step 202, input the average wind speed of each wind direction sector, each sector angle, each preliminary layout plan, wind turbine characteristic data and wake adjustment coefficient into the first model to determine the first wake effect of each wind turbine of each preliminary layout plan in each wind direction sector.

[0137] Among them, according to the average wind speed of each wind direction sector, each sector angle, each preliminary layout plan, wind turbine characteristic data and wake adjustment coefficient, the first model is used to determine the specific implementation process of the first wake effect affecting each wind turbine of each preliminary layout plan in each wind direction sector. The specific implementation process can refer to the detailed description of step 201 and will not be repeated here.

[0138] It should be noted that in the embodiment of the present application, any layout scheme can be selected, and the wake adjustment coefficient can be calculated based on the first model and the second model. Then, the wake adjustment coefficient can be applied to the calculation of the power generation of a single wind turbine and the total power generation of the wind farm in all layout schemes, thereby effectively improving the calculation speed of the power generation.

[0139] Figure 3 FIG. 1 is a flow chart of a method for generating a fan layout scheme provided in another embodiment of the present application. Figure 3 As shown, in Figure 1 Based on the illustrated embodiment, there may be one or more first target arrangement schemes. In order to optimize the first target arrangement scheme to obtain a wind turbine arrangement scheme with higher power generation, after step 106, the following may also be included:

[0140] Step 301 : obtaining the candidate position coordinates of each wind turbine in each first target layout solution, wherein each wind turbine has multiple candidate position coordinates.

[0141] It should be noted that, due to the limitation of the initial layout plan, the first target layout plan obtained by screening the initial layout plan has the wind turbines usually arranged regularly, that is, the wind turbines are distributed in rows and columns. Therefore, alternative positions can be set around the original positions to seek a layout plan with higher power generation.

[0142] Specifically, you can set the coordinate offset set (Xs, Ys) of the alternative camera search area. s=1~Sp , and then calculate the coordinate offset (Xs, Ys) of each alternative camera position.

[0143] For example, the candidate area can be a circular area, and the coordinate offset (Xs, Ys) of the candidate position can be:

[0144] X Sij =D*Step*i*sin(180*j / i);

[0145] Ysij =D*Step*i*cos(180*j / i);

[0146]

[0147] In the formula, j=1~2*i, i=1~Ns, Ns is the number of layers of alternative machine positions, Step is the step size of the alternative machine positions, D is the diameter of the fan impeller, and Sp is the number of alternative machine positions for each fan.

[0148] Alternatively, the candidate area may be a rectangular area, and the coordinate offset (Xs, Ys) of the candidate position may be:

[0149] Xs ij =D*Step*i;

[0150] Ys ij =D*Step*j;

[0151]

[0152] Wherein, i=-Ns~Ns, j=-Ns~Ns, Ns is the number of layers of alternative machine positions, Step is the step length of alternative machine positions, D is the diameter of the fan impeller, and Sp is the number of alternative machine positions for each fan.

[0153] Then, by adding the coordinate offset to the original position coordinates of the wind turbine, the coordinates of the alternative position can be obtained. k The position coordinates (X ks , Y ks ) can be: X ks =X ko +X s , Y ks =Y ko +Y s , where (X ko , Y ko ) are the original camera coordinates.

[0154] Step 302, traverse each wind turbine of each first target layout scheme, update the position coordinates of the i-th wind turbine in sequence according to multiple candidate position coordinates of the i-th wind turbine, and obtain multiple corresponding first candidate layout schemes, where i is a positive integer.

[0155] Among them, for any first target layout plan, the number of first alternative layout plans corresponding to the i-th wind turbine is the same as the number of alternative machine positions for the i-th wind turbine, that is, in each first alternative layout plan corresponding to the i-th wind turbine, only one machine position coordinate is different from the machine position coordinate of the corresponding target layout plan.

[0156] Step 303, calculating the power generation of the i-th wind turbine and the total power generation of the wind farm in multiple first alternative arrangement schemes corresponding to the i-th wind turbine, so as to determine the first alternative machine position coordinates that make the power generation of the i-th wind turbine the highest, and the second alternative machine position coordinates that make the total power generation of the wind farm the highest.

[0157] Among them, the first model can be used to calculate the power generation of each wind turbine and the total power generation of the wind farm in each first alternative arrangement scheme. The specific implementation process can refer to the detailed description of the above embodiments of the present application, which will not be repeated here.

[0158] Step 304: Determine the optimized position coordinates of the i-th wind turbine according to the first candidate position coordinates and the second candidate position coordinates.

[0159] For example, the coordinates of the first candidate camera position and the second candidate camera position are (X p , Y p ) and (X g , Y g ), then optimize the camera position coordinates (X k , Y k ) can be:

[0160] X k =X ko +C1*Random*(X p -X ko )+C2*Random*(X g -X ko );

[0161] Y k =Y ko +C1*Random*(Y p -Y ko )+C2*Random*(Y g -Y ko ).

[0162] In the formula, C1=2 is the individual sensitivity coefficient, C2=2 is the overall sensitivity coefficient, and Random is a random number between 0 and 1.

[0163] Step 305: Update the position coordinates of the i-th wind turbine in the corresponding first target layout solution according to the optimized position coordinates.

[0164] Step 306: When the total power generation of the wind farm in the updated first target layout scheme is greater than the total power generation of the wind farm before the update, the optimized machine position coordinates of the i+1th wind turbine are determined based on the updated first target layout scheme; when the total power generation of the wind farm in the updated first target layout scheme is less than or equal to the total power generation of the wind farm before the update, the optimized machine position coordinates of the i+1th wind turbine are determined based on the first target layout scheme before the update, until the coordinates of each wind turbine in the first target layout scheme are updated.

[0165] That is to say, for each first target layout scheme, the position coordinates of the first wind turbine may be updated first according to the optimized position coordinates of the first wind turbine, and then the total power generation of the wind farm of the updated first target layout scheme may be calculated.

[0166] When the total power generation of the wind farm of the updated first target layout scheme is greater than the total power generation of the wind farm before the update, the updated first target layout scheme is used as the current first target layout scheme, and then the optimized machine position coordinates of the second wind turbine are calculated and updated.

[0167] When the total power generation of the wind farm of the updated first target layout scheme is less than or equal to the total power generation of the wind farm before the update, the first target layout scheme before the update is maintained as the current first target layout scheme, and then the optimized machine position coordinates of the second wind turbine are calculated and updated.

[0168] This process is repeated in this way until the position coordinates of the last wind turbine are updated according to the optimized position coordinates of the last wind turbine, thereby obtaining an updated first target layout plan.

[0169] Among them, the first model can be used to calculate the power generation of a single wind turbine and the total power generation of the wind farm in the updated first target layout scheme. The specific implementation process can refer to the detailed description of the above embodiments of the present application, which will not be repeated here.

[0170] It should be noted that after completing an optimization update of the first target layout scheme through the above process, the iterative update can be continued according to the above process based on the updated first target layout scheme until the number of updates reaches the set threshold, or the difference between the total power generation of the wind farm of the first target layout scheme obtained by the last update and the total power generation of the wind farm of the first target layout scheme obtained by the previous update is less than the set threshold.

[0171] Therefore, by iteratively updating each first target layout scheme multiple times, a first target layout scheme with higher power generation can be obtained, thereby providing support for obtaining a final wind turbine layout scheme with higher power generation.

[0172] Step 307 : when the update iteration number of each first target arrangement scheme reaches a set threshold, the total wind farm power generation of each updated first target arrangement scheme is calculated to determine an optimized arrangement scheme.

[0173] Among them, after each first target layout scheme is updated, the first model can be used to calculate the total power generation of the wind farm of each updated first target layout scheme. The specific implementation process can refer to the detailed description of the above embodiments of the present application and will not be repeated here.

[0174] Furthermore, all first target layout schemes may be ranked according to the total power generation of the wind farm, and one or more first target layout schemes with the highest total power generation of the wind farm may be selected as the optimized layout scheme.

[0175] It should be noted that there can be multiple first target layout schemes. After using the first model to calculate the total power generation of the wind farm of the first target layout scheme and obtaining the optimized layout scheme, the second model can also be used to calculate the total power generation of the wind farm of the optimized layout scheme to improve the calculation accuracy of the total power generation of the wind farm of the optimized layout scheme, thereby accurately selecting the layout scheme with the highest power generation.

[0176] Step 308, obtaining the cut-in wind speed and cut-out wind speed of the wind turbine.

[0177] The cut-in wind speed refers to the wind speed that meets the grid-connected conditions, that is, the minimum wind speed that can generate electricity. If the wind speed is lower than this, it will automatically shut down. The cut-out wind speed refers to the maximum wind speed of the wind turbine generator set for grid-connected power generation. If the wind speed exceeds this, the unit will be cut out of the grid, that is, the wind turbine will shut down and stop generating electricity. For example, the cut-in wind speed can be 3m / s, and the cut-out wind speed can be 31m / s.

[0178] Step 309, determining multiple incoming wind speeds and the distribution probability of each incoming wind speed in each wind direction sector according to the cut-in wind speed and the cut-out wind speed, wherein the numerical range of the incoming wind speed is greater than or equal to the cut-in wind speed and less than or equal to the cut-out wind speed.

[0179] For example, the incoming wind speed V a=1~NA Can be a wind speed data set, V1 is equal to the wind turbine WGP i Cut-in wind speed, V NA Equal to fan WGP i The cut-out wind speed, set V a=1~NA It can be an arithmetic progression, with a level difference d=1 or the same as the wind speed level difference in the fan characteristic data.

[0180] Get wind speed V a=1~NA The probability F in each sector ka :

[0181]

[0182] In the formula,

[0183] Step 310, each incoming wind speed, each sector angle, each first target layout scheme and wind turbine characteristic data are input into a second model to determine the influence of the second wake effect on each wind turbine of each first target layout scheme in each wind direction sector under each incoming wind speed, and determine the total power generation of the wind farm of each first target layout scheme based on the influence of the second wake effect on each wind turbine of each first target layout scheme in each wind direction sector, the distribution probability of each incoming wind speed in each wind direction sector and the wind turbine characteristic data.

[0184] The second model is used to determine the total power generation of the wind farm for each first target layout scheme. The specific implementation process can refer to the detailed description of the aforementioned embodiment of the present application, which will not be repeated here.

[0185] Step 311: determine a second target arrangement scheme according to the total power generation of the wind farm of each first target arrangement scheme.

[0186] Among them, all the first target layout schemes can be sorted according to the total power generation of the wind farm, and one or more first target layout schemes with the highest total power generation of the wind farm can be selected as the second target layout scheme.

[0187] In the embodiment of the present application, the position coordinates of the first target layout plan are updated by using the alternative positions to obtain the optimized layout plan, thereby effectively improving the accuracy of selecting the layout plan with the highest power generation.

[0188] Figure 4 A schematic diagram of a flow chart of a method for generating a fan layout scheme provided in another embodiment of the present application. Figure 4 As shown, in Figure 1 Based on the illustrated embodiment, step 104 determines M preliminary arrangement schemes, which may include the following steps:

[0189] Step 401, determining a row spacing data set and a column spacing data set of wind turbines according to planning data.

[0190] Among them, the fan arrangement row spacing range RowS~RowE, the row spacing step Rowstep, and the column spacing range ColS~ColE, the column spacing step Colstep can be set.

[0191] Furthermore, the row spacing data set can be determined according to the row spacing range and the row spacing step length. Similarly, the column spacing data set can be determined according to the column spacing range and the column spacing step length.

[0192] For example, within the range of the minimum row spacing RowS to the maximum row spacing RowE, the fan row spacing Row may be: Row=RowS+n*Rowstep, where n is a natural number.

[0193] Similarly, within the range of the minimum column spacing ColS to the maximum column spacing ColE, the fan column spacing Col can be: Col=ColS+m*Colstep, where m is a natural number.

[0194] Step 402: determining a wind turbine rotation angle data set according to the dominant wind direction angle of the wind resource.

[0195] The rotation angle is the angle between the vertical line and the dominant wind direction. The rotation angle range of the wind turbine can be set to AngleS~AngleE, and the rotation angle step length is AngleStep. The rotation angle range should be able to cover the angle between the dominant wind direction and the vertical line on one side of the wind farm.

[0196] Furthermore, the rotation angle data set can be determined according to the rotation angle range and the rotation angle step. For example, within the range of the minimum rotation angle AngleS to the maximum rotation angle AngleE, the fan rotation angle Angle can be: Angle = AngleS + k*Anglestep, where k is a natural number.

[0197] Step 403, traverse the row spacing data set, column spacing data set and rotation angle data set respectively to obtain multiple original layout plans, wherein the original layout plan includes the number of wind turbines and the position coordinates of each wind turbine, and the number of wind turbines includes the planned number of wind turbines and the number of redundant positions.

[0198] The original layout plan should cover the area of ​​the wind farm. Therefore, the boundary coordinates Y of the wind farm can be obtained first. top , Y bottom , X left , X right Among them, Y top is the maximum value of the boundary coordinate in the Y direction, Y bottom is the minimum value of the boundary coordinate in the Y direction, X left is the minimum value of the boundary coordinate in the X direction, X right is the maximum value of the boundary coordinate in the X direction.

[0199] Furthermore, we can set the coordinate point (X left , Y top ) is the starting point of the layout, and all row spacings, all column spacings and all rotation angles are traversed in turn to obtain the position coordinates (X ij , Y ij ). Among them, X ij Should be greater than or equal to Xleft , less than or equal to X right .Y ij Should be greater than or equal to Y bottom , less than or equal to Y top .

[0200] It is understandable that in an actual wind farm area, due to geographical restrictions, it may not be appropriate to set up wind turbines at the boundary of the wind farm. Therefore, a row creeping range and a column creeping range can be set for the layout starting point, and a layout starting point data set can be determined according to the row creeping range and the column creeping range, so as to traverse all layout starting points according to the layout starting point data set.

[0201] It should be noted that the number of wind turbines can be determined according to the planned capacity of the wind farm, which will not be described in detail here. In addition, since the number of wind turbines in each row and column is usually set the same when planning the preliminary layout plan, the preliminary layout plan may miss a plan with higher power generation due to the limitation of the number of wind turbines.

[0202] For example, suppose the wind farm is a square site composed of nine small squares. The best layout is to place a wind turbine in the center of each small square. According to the planned capacity of the wind farm, eight wind turbines are to be placed. Then, no matter how the row spacing, column spacing, and other values ​​are changed, the above-mentioned optimal layout cannot be obtained. If a redundant position is added to increase the number of wind turbines to 9, the above-mentioned optimal solution can be obtained in the process of traversing the row spacing, column spacing, etc.

[0203] Therefore, in the embodiment of the present application, when determining the number of wind turbines, in addition to the planned number of wind turbines N, the number of redundant positions Nr can also be set to reduce the possibility that the obtained preliminary arrangement plan does not include the optimal plan. The value range of Nr can be set as needed, for example, it can be 1 to 3, etc., and this application does not limit this.

[0204] It is understandable that the arrangement scheme obtained by traversing the row spacing, column spacing, rotation angle, etc. may include a number of fans Npre that is greater than the sum of the number of fans planned and the number of redundant positions Nr+N set initially. Therefore, the arrangement scheme in which the number of fans Npre satisfies Nr+N≥Npre≥N can be selected as the original arrangement scheme.

[0205] Step 404, inputting the average wind speed of each wind direction sector, each sector angle, each original layout scheme and wind turbine characteristic data into the first model to determine the influence of the third wake effect on each wind turbine of each original layout scheme in each wind direction sector, and determining the total power generation of the wind farm of each original layout scheme based on the influence of the third wake effect on each wind turbine of each original layout scheme in each wind direction sector and the wind turbine characteristic data.

[0206] Among them, according to the average wind speed of each wind direction sector, the angle of each sector, each original layout plan, and the wind turbine characteristic data, the first model is used to determine the specific implementation process of the influence of the third wake effect on each wind turbine of each original layout plan in each wind direction sector. The specific implementation process can refer to the detailed description of other embodiments of the present application and will not be repeated here.

[0207] In addition, since the number of wind turbines Npre in the original layout plan may be greater than the planned number of wind turbines N, for the original layout plan with Npre greater than N, the Npre-N wind turbines with the smallest power generation can be removed as the final original layout plan, and the total power generation of the wind farm can be calculated.

[0208] Step 405: Determine M preliminary layout plans according to the total power generation of the wind farm in each original layout plan.

[0209] Among them, all original layout plans can be sorted according to the total power generation of the wind farm, and multiple original layout plans with the highest total power generation of the wind farm are selected as preliminary layout plans.

[0210] In the embodiment of the present application, by screening the original layout scheme according to the total power generation of the wind farm, the amount of calculation for the subsequent selection of the target layout scheme can be reduced, thereby improving the generation efficiency of the wind turbine layout scheme.

[0211] To implement the above-mentioned embodiments, the present application also provides a device for generating a wind turbine arrangement scheme.

[0212] Figure 5 A schematic diagram of the structure of a device for generating a fan arrangement scheme provided in one embodiment of the present application.

[0213] like Figure 5 As shown, the generating device of the fan arrangement scheme may include:

[0214] The first acquisition module 110 , the first determination module 120 , the second acquisition module 130 , the second determination module 140 , the third determination module 150 and the fourth determination module 160 .

[0215] The first acquisition module 110 is used to acquire wind resource data of the wind farm, wherein the wind resource data includes multiple groups of data pairs, wherein each group of data pairs includes corresponding wind direction and wind speed.

[0216] The first determination module 120 is used to divide the wind direction sectors into N sectors according to the wind resource data to determine the average wind speed and sector angle of each wind direction sector, wherein N is a positive integer greater than 1.

[0217] The second acquisition module 130 is used to acquire planning data of the wind farm, wherein the planning data includes the wind farm site boundary coordinates, the wind farm planning capacity and wind turbine characteristic data.

[0218] The second determination module 140 is used to determine M preliminary layout plans according to the planning data, where M is a positive integer greater than 1, and the preliminary layout plan includes the number of wind turbines and the position coordinates of each wind turbine.

[0219] The third determination module 150 is used to input the average wind speed of each wind direction sector, each sector angle, each preliminary layout plan and wind turbine characteristic data into the first model to determine the first wake effect on each wind turbine of each preliminary layout plan in each wind direction sector, and determine the total power generation of the wind farm of each preliminary layout plan based on the first wake effect on each wind turbine of each preliminary layout plan in each wind direction sector and the wind turbine characteristic data.

[0220] The fourth determination module 160 is used to determine a first target layout scheme according to the total power generation of the wind farm of each preliminary layout scheme.

[0221] Furthermore, in a possible implementation of the embodiment of the present application, there are multiple first target arrangement schemes, and the device further includes:

[0222] a third acquisition module, configured to acquire the candidate position coordinates of each wind turbine in each first target layout scheme, wherein each wind turbine has multiple candidate position coordinates; and

[0223] Traversing each wind turbine of each first target layout scheme, updating the position coordinates of the i-th wind turbine in sequence according to multiple candidate position coordinates of the i-th wind turbine, and obtaining multiple corresponding first candidate layout schemes, where i is a positive integer;

[0224] a fifth determination module, configured to calculate the power generation of the i-th wind turbine and the total power generation of the wind farm in a plurality of first alternative arrangement schemes corresponding to the i-th wind turbine, so as to determine the first alternative position coordinates that make the power generation of the i-th wind turbine the highest, and the second alternative position coordinates that make the total power generation of the wind farm the highest; and

[0225] Determine the optimized position coordinates of the i-th wind turbine according to the first candidate position coordinates and the second candidate position coordinates;

[0226] A first updating module, configured to update the position coordinates of the i-th wind turbine in the corresponding first target layout scheme according to the optimized position coordinates; and

[0227] When the total power generation of the wind farm in the updated first target layout scheme is greater than the total power generation of the wind farm before the update, the optimized machine position coordinates of the i+1th wind turbine are determined based on the updated first target layout scheme; when the total power generation of the wind farm in the updated first target layout scheme is less than or equal to the total power generation of the wind farm before the update, the optimized machine position coordinates of the i+1th wind turbine are determined based on the first target layout scheme before the update, until the coordinates of each wind turbine in the first target layout scheme are updated;

[0228] The sixth determination module is used to calculate the total wind farm power generation of each updated first target layout scheme when the update iteration number of each first target layout scheme reaches a set threshold, so as to determine the optimal layout scheme.

[0229] Furthermore, in a possible implementation of the embodiment of the present application, there are multiple first target arrangement schemes, and the device further includes:

[0230] A fourth acquisition module is used to acquire a cut-in wind speed and a cut-out wind speed of the wind turbine;

[0231] A seventh determination module is used to determine a plurality of incoming flow wind speeds and a distribution probability of each incoming flow wind speed in each wind direction sector according to the cut-in wind speed and the cut-out wind speed, wherein the numerical range of the incoming flow wind speed is greater than or equal to the cut-in wind speed and less than or equal to the cut-out wind speed;

[0232] an eighth determination module, for inputting each incoming wind speed, each sector angle, each first target layout scheme and wind turbine characteristic data into a second model to determine the influence of the second wake effect on each wind turbine of each first target layout scheme in each wind direction sector at each incoming wind speed, and determining the total power generation of the wind farm of each first target layout scheme according to the influence of the second wake effect on each wind turbine of each first target layout scheme in each wind direction sector, the distribution probability of each incoming wind speed in each wind direction sector and the wind turbine characteristic data;

[0233] The ninth determination module is used to determine the second target arrangement scheme according to the total power generation of the wind farm of each first target arrangement scheme.

[0234] Further, in a possible implementation manner of the embodiment of the present application, the second determining module is specifically configured to:

[0235] According to the planning data, determine the row spacing data set and column spacing data set of the wind turbine;

[0236] Determine the rotation angle data set of the wind turbine according to the dominant wind direction angle of the wind resource;

[0237] Traversing the row spacing data set, the column spacing data set, and the rotation angle data set respectively to obtain a plurality of original layout schemes, wherein the original layout scheme includes the number of wind turbines and the position coordinates of each wind turbine, and the number of wind turbines includes the planned number of wind turbines and the number of redundant positions;

[0238] The average wind speed of each wind direction sector, the angle of each sector, each original layout scheme and the wind turbine characteristic data are input into the first model to determine the influence of the third wake effect on each wind turbine of each original layout scheme in each wind direction sector, and the total power generation of the wind farm of each original layout scheme is determined according to the influence of the third wake effect on each wind turbine of each original layout scheme in each wind direction sector and the wind turbine characteristic data;

[0239] According to the total power generation of the wind farm in each original layout scheme, M preliminary layout schemes are determined.

[0240] Further, in a possible implementation manner of the embodiment of the present application, the third determining module is specifically configured to:

[0241] Get wake adjustment factor;

[0242] The average wind speed of each wind direction sector, each sector angle, each preliminary layout plan, wind turbine characteristic data and wake adjustment coefficient are input into the first model to determine the first wake effect on each wind turbine of each preliminary layout plan in each wind direction sector.

[0243] Furthermore, in a possible implementation of the embodiment of the present application, the planning data of the wind farm also includes the coordinates of the boundary of the area where the installation of wind turbines is prohibited, and the fourth determination module is specifically used to:

[0244] According to the coordinates of the boundary of the area where the installation of wind turbines is prohibited, the coordinates of the positions of wind turbines that do not meet the installation conditions in each preliminary arrangement plan are deleted to obtain a first preliminary arrangement plan;

[0245] A first target layout scheme is determined according to the total power generation of the wind farm in each first preliminary layout scheme.

[0246] Furthermore, in a possible implementation of the embodiment of the present application, the planning data of the wind farm also includes the coordinates of the boundary of the area where the site cost increases, and the fourth determination module is specifically used to:

[0247] Determine the conversion factor of the increased site cost and power generation based on the coordinates of the area boundary where the site cost increases;

[0248] In the event that more than one wind turbine is located in an area where the site cost increases in any preliminary arrangement, the reduced power generation of the preliminary arrangement is determined based on the conversion factor;

[0249] The first target layout plan is determined according to the total power generation and the reduced power generation of the wind farm in each preliminary layout plan.

[0250] It should be noted that the above explanation of the embodiment of the method for generating a wind turbine arrangement plan is also applicable to the device for generating a wind turbine arrangement plan of this embodiment, and will not be repeated here.

[0251] The wind turbine layout scheme generation device of the embodiment of the present application first determines multiple wind direction sectors according to the wind resource data of the wind farm, and determines multiple preliminary layout schemes according to the planning data of the wind farm; then determines the first wake effect influence on each wind turbine of each preliminary layout scheme in each wind direction sector, and then determines the total power generation of the wind farm of each preliminary layout scheme; finally, according to the total power generation of the wind farm of each preliminary layout scheme, determines the first target layout scheme. The present application improves the calculation accuracy of the wake effect by calculating the wake effect influence on each wind turbine in each wind direction sector, and then improves the total power generation of the wind farm by selecting a layout scheme with a small wake effect influence.

[0252] According to an embodiment of the present application, the present application also provides an electronic device and a readable storage medium.

[0253] like Figure 6 , is a block diagram of an electronic device for implementing a method for generating a fan arrangement scheme of an embodiment of the present application. The electronic device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workbenches, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device may also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices, and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present application described and / or required herein.

[0254] like Figure 6As shown, the electronic device includes: one or more processors 601, a memory 602, and interfaces for connecting various components, including high-speed interfaces and low-speed interfaces. The various components are interconnected using different buses and can be installed on a common mainboard or installed in other ways as needed. The processor can process instructions executed in the electronic device, including instructions stored in or on the memory to display the graphical information of the GUI on an external input / output device (such as a display device coupled to the interface). In other embodiments, if necessary, multiple processors and / or multiple buses can be used together with multiple memories and multiple memories. Similarly, multiple electronic devices can be connected, and each device provides some necessary operations (for example, as a server array, a group of blade servers, or a multi-processor system). Figure 6 A processor 601 is taken as an example.

[0255] The memory 602 is a non-transitory computer-readable storage medium provided in the present application. The memory stores instructions executable by at least one processor, so that at least one processor executes the method for generating a wind turbine layout scheme provided in the present application. The non-transitory computer-readable storage medium of the present application stores computer instructions, which are used to cause a computer to execute the method for generating a wind turbine layout scheme provided in the present application.

[0256] The memory 602 is a non-transient computer-readable storage medium that can be used to store non-transient software programs, non-transient computer executable programs and modules, such as program instructions / modules corresponding to the method for generating a wind turbine layout scheme in the embodiment of the present application. The processor 601 executes various functional applications and data processing of the server by running the non-transient software programs, instructions and modules stored in the memory 602, that is, implements the method for generating a wind turbine layout scheme in the above method embodiment.

[0257] The memory 602 may include a program storage area and a data storage area, wherein the program storage area may store an operating system and application programs required for at least one function; the data storage area may store data created according to the use of an electronic device that executes a method for generating a wind turbine layout plan, etc. In addition, the memory 602 may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some embodiments, the memory 602 may optionally include a memory remotely disposed relative to the processor 601, and these remote memories may be connected to the electronic device that executes the method for generating a wind turbine layout plan via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0258] The electronic device for executing the method for generating a wind turbine layout plan may further include: an input device 603 and an output device 604. The processor 601, the memory 602, the input device 603 and the output device 604 may be connected via a bus or other means. Figure 5 The example of connecting through bus is taken in the following.

[0259] The input device 603 can receive input digital or character information, and generate key signal input related to user settings and function control of the electronic device that executes the method for generating the wind turbine layout plan, such as a touch screen, a keypad, a mouse, a track pad, a touch pad, an indicator rod, one or more mouse buttons, a trackball, a joystick and other input devices. The output device 604 may include a display device, an auxiliary lighting device (e.g., an LED) and a tactile feedback device (e.g., a vibration motor), etc. The display device may include, but is not limited to, a liquid crystal display (LCD), a light emitting diode (LED) display and a plasma display. In some embodiments, the display device may be a touch screen.

[0260] Various implementations of the systems and techniques described herein can be realized in digital electronic circuit systems, integrated circuit systems, dedicated ASICs (application specific integrated circuits), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.

[0261] These computer programs (also referred to as programs, software, software applications, or code) include machine instructions for programmable processors and can be implemented using high-level procedural and / or object-oriented programming languages, and / or assembly / machine languages. As used herein, the terms "machine-readable medium" and "computer-readable medium" refer to any computer program product, device, and / or means (e.g., disk, optical disk, memory, programmable logic device (PLD)) for providing machine instructions and / or data to a programmable processor, including a machine-readable medium that receives machine instructions as a machine-readable signal. The term "machine-readable signal" refers to any signal for providing machine instructions and / or data to a programmable processor.

[0262] To provide interaction with a user, the systems and techniques described herein can be implemented on a computer having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and pointing device (e.g., a mouse or trackball) through which the user can provide input to the computer. Other types of devices can also be used to provide interaction with the user; for example, the feedback provided to the user can be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user can be received in any form (including acoustic input, voice input, or tactile input).

[0263] The systems and techniques described herein may be implemented in a computing system that includes back-end components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes front-end components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such back-end components, middleware components, or front-end components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), and the Internet.

[0264] A computer system may include clients and servers. Clients and servers are generally remote from each other and usually interact through a communication network. The relationship of client and server is generated by computer programs running on respective computers and having a client-server relationship to each other.

[0265] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps recorded in this application can be executed in parallel, sequentially or in different orders, as long as the expected results of the technical solution disclosed in this application can be achieved, and this document is not limited here.

[0266] The above specific implementations do not constitute a limitation on the protection scope of this application. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modifications, equivalent substitutions and improvements made within the spirit and principles of this application should be included in the protection scope of this application.

Claims

1. A method for generating a fan layout scheme, characterized in that: include: Acquire wind resource data of the wind farm, wherein the wind resource data includes multiple groups of data pairs, wherein each group of data pairs includes corresponding wind direction and wind speed; Divide N wind direction sectors according to the wind resource data to determine the average wind speed and sector angle of each wind direction sector, wherein N is a positive integer greater than 1; Acquiring planning data of the wind farm, wherein the planning data includes wind farm site boundary coordinates, wind farm planning capacity and wind turbine characteristic data; Determine M preliminary layout plans according to the planning data, where M is a positive integer greater than 1, and the preliminary layout plans include the number of wind turbines and the position coordinates of each wind turbine; Inputting the average wind speed of each wind direction sector, each sector angle, each preliminary arrangement scheme and the wind turbine characteristic data into a first model to determine the first wake effect influence on each wind turbine of each preliminary arrangement scheme in each wind direction sector, and determining the total power generation of the wind farm of each preliminary arrangement scheme according to the first wake effect influence on each wind turbine of each preliminary arrangement scheme in each wind direction sector and the wind turbine characteristic data; Determining a first target layout scheme according to the total power generation of the wind farm of each of the preliminary layout schemes; There are multiple first target arrangement schemes, and after determining the first target arrangement scheme, the method further includes: Obtaining the candidate position coordinates of each wind turbine in each of the first target layout solutions, wherein each wind turbine has multiple candidate position coordinates; Traversing each wind turbine of each of the first target layout schemes, updating the position coordinates of the i-th wind turbine in sequence according to a plurality of candidate position coordinates of the i-th wind turbine, and obtaining a plurality of corresponding first candidate layout schemes, where i is a positive integer; Calculate the power generation of the i-th wind turbine and the total power generation of the wind farm in multiple first alternative layout schemes corresponding to the i-th wind turbine, so as to determine the first alternative machine position coordinates that make the power generation of the i-th wind turbine the highest, and the second alternative machine position coordinates that make the total power generation of the wind farm the highest; Determining the optimized position coordinates of the i-th wind turbine according to the first candidate position coordinates and the second candidate position coordinates; According to the optimized machine position coordinates, the machine position coordinates of the i-th wind turbine in the corresponding first target layout scheme are updated; When the total power generation of the wind farm of the first target layout scheme after the update is greater than the total power generation of the wind farm before the update, the optimized machine position coordinates of the i+1th wind turbine are determined based on the first target layout scheme after the update; when the total power generation of the wind farm of the first target layout scheme after the update is less than or equal to the total power generation of the wind farm before the update, the optimized machine position coordinates of the i+1th wind turbine are determined based on the first target layout scheme before the update, until the coordinates of each wind turbine of the first target layout scheme are updated; When the number of update iterations of each of the first target layout solutions reaches a set threshold, the total power generation of the wind farm of each updated first target layout solution is calculated to determine an optimized layout solution.

2. The method according to claim 1, characterized in that There are multiple first target arrangement schemes, and after determining the first target arrangement scheme, the method further includes: Obtaining a cut-in wind speed and a cut-out wind speed of the wind turbine; According to the cut-in wind speed and the cut-out wind speed, a plurality of incoming wind speeds and a distribution probability of each of the incoming wind speeds in each of the wind direction sectors are determined, wherein the numerical range of the incoming wind speed is greater than or equal to the cut-in wind speed and less than or equal to the cut-out wind speed; Input each of the incoming wind speeds, each of the sector angles, each of the first target layout schemes and the wind turbine characteristic data into a second model to determine the influence of the second wake effect on each wind turbine of each of the first target layout schemes in each of the wind direction sectors at each of the incoming wind speeds, and determine the total power generation of the wind farm of each of the first target layout schemes according to the influence of the second wake effect on each of the wind turbines of each of the first target layout schemes in each of the wind direction sectors, the distribution probability of each of the incoming wind speeds in each of the wind direction sectors and the wind turbine characteristic data; A second target arrangement scheme is determined according to the total power generation of the wind farm of each of the first target arrangement schemes.

3. The method according to claim 1, characterized in that Determining M preliminary layout plans according to the planning data includes: Determining a row spacing data set and a column spacing data set of the wind turbine according to the planning data; Determining a rotation angle data set of the wind turbine according to the dominant wind direction angle of the wind resource; Traversing the row spacing data set, the column spacing data set, and the rotation angle data set respectively to obtain a plurality of original layout schemes, wherein the original layout schemes include the number of wind turbines and the position coordinates of each wind turbine, and the number of wind turbines includes the planned number of wind turbines and the number of redundant positions; Inputting the average wind speed of each wind direction sector, each sector angle, each original layout scheme and the wind turbine characteristic data into the first model to determine the influence of the third wake effect on each wind turbine of each original layout scheme in each wind direction sector, and determining the total power generation of the wind farm of each original layout scheme according to the influence of the third wake effect on each wind turbine of each original layout scheme in each wind direction sector and the wind turbine characteristic data; According to the total power generation of the wind farm of each of the original layout plans, M preliminary layout plans are determined.

4. The method according to claim 1, characterized in that The determining of the first wake effect influence on each wind turbine of each preliminary arrangement scheme in each wind direction sector comprises: Get wake adjustment factor; The average wind speed of each wind direction sector, each sector angle, each preliminary layout plan, the wind turbine characteristic data and the wake adjustment coefficient are input into the first model to determine the influence of the first wake effect on each wind turbine of each preliminary layout plan in each wind direction sector.

5. The method according to any one of claims 1 to 4, characterized in that: The planning data of the wind farm also includes the coordinates of the boundary of the area where the installation of wind turbines is prohibited. The first target layout scheme is determined according to the total power generation of the wind farm of each of the preliminary layout schemes, including: According to the boundary coordinates of the area where wind turbines are prohibited from being installed, the position coordinates of wind turbines that do not meet the installation conditions in each of the preliminary layout plans are deleted to obtain a first preliminary layout plan; A first target arrangement scheme is determined according to the total power generation of the wind farm of each of the first preliminary arrangement schemes.

6. The method according to any one of claims 1 to 4, characterized in that: The planning data of the wind farm also includes the coordinates of the boundary of the area where the site cost increases. The determining of the first target layout scheme according to the total power generation of the wind farm of each of the preliminary layout schemes includes: Determine the conversion coefficient of the increased site cost and the power generation according to the boundary coordinates of the area where the site cost increases; In the case that in any of the preliminary layout schemes there is more than one wind turbine located in the area where the site cost increases, determining the reduced power generation of the preliminary layout scheme according to the conversion coefficient; A first target layout scheme is determined according to the total power generation of the wind farm and the lost power generation of each of the preliminary layout schemes.

7. A device for generating a fan layout scheme, characterized in that: include: A first acquisition module is used to acquire wind resource data of a wind farm, wherein the wind resource data includes a plurality of data pairs, wherein each data pair includes a corresponding wind direction and wind speed; A first determination module, used for dividing N wind direction sectors according to the wind resource data to determine the average wind speed and sector angle of each wind direction sector, wherein N is a positive integer greater than 1; A second acquisition module is used to acquire planning data of the wind farm, wherein the planning data includes wind farm site boundary coordinates, wind farm planning capacity and wind turbine characteristic data; A second determination module is used to determine M preliminary layout plans according to the planning data, wherein M is a positive integer greater than 1, and wherein the preliminary layout plans include the number of wind turbines and the position coordinates of each wind turbine; a third determination module, for inputting the average wind speed of each wind direction sector, each sector angle, each preliminary arrangement scheme and the wind turbine characteristic data into the first model to determine the first wake effect influence on each wind turbine of each preliminary arrangement scheme in each wind direction sector, and determining the total power generation of the wind farm of each preliminary arrangement scheme according to the first wake effect influence on each wind turbine of each preliminary arrangement scheme in each wind direction sector and the wind turbine characteristic data; A fourth determination module, configured to determine a first target layout scheme according to the total power generation of the wind farm of each of the preliminary layout schemes; There are multiple first target arrangement schemes, and the device further includes: a third acquisition module, configured to acquire the candidate position coordinates of each wind turbine in each of the first target layout solutions, wherein each wind turbine has multiple candidate position coordinates; and Traversing each wind turbine of each of the first target layout schemes, updating the position coordinates of the i-th wind turbine in sequence according to a plurality of candidate position coordinates of the i-th wind turbine, and obtaining a plurality of corresponding first candidate layout schemes, where i is a positive integer; a fifth determination module, configured to calculate the power generation of the i-th wind turbine and the total power generation of the wind farm in a plurality of first alternative arrangement schemes corresponding to the i-th wind turbine, so as to determine the first alternative position coordinates that make the power generation of the i-th wind turbine the highest, and the second alternative position coordinates that make the total power generation of the wind farm the highest; and Determining the optimized position coordinates of the i-th wind turbine according to the first candidate position coordinates and the second candidate position coordinates; A first updating module, configured to update the position coordinates of the i-th wind turbine in the corresponding first target layout scheme according to the optimized position coordinates; and When the total power generation of the wind farm of the first target layout scheme after the update is greater than the total power generation of the wind farm before the update, the optimized machine position coordinates of the i+1th wind turbine are determined based on the first target layout scheme after the update; when the total power generation of the wind farm of the first target layout scheme after the update is less than or equal to the total power generation of the wind farm before the update, the optimized machine position coordinates of the i+1th wind turbine are determined based on the first target layout scheme before the update, until the coordinates of each wind turbine of the first target layout scheme are updated; The sixth determination module is used to calculate the total power generation of the wind farm of each updated first target layout scheme when the number of update iterations of each first target layout scheme reaches a set threshold, so as to determine an optimized layout scheme.

8. The device according to claim 7, characterized in that There are multiple first target arrangement schemes, and the device further includes: A fourth acquisition module, used to acquire a cut-in wind speed and a cut-out wind speed of the wind turbine; a seventh determination module, configured to determine a plurality of incoming wind speeds and a distribution probability of each of the incoming wind speeds in each of the wind direction sectors according to the cut-in wind speed and the cut-out wind speed, wherein the numerical range of the incoming wind speed is greater than or equal to the cut-in wind speed and less than or equal to the cut-out wind speed; an eighth determination module, for inputting each of the incoming wind speeds, each of the sector angles, each of the first target layout schemes and the wind turbine characteristic data into a second model to determine the influence of the second wake effect on each wind turbine of each of the first target layout schemes in each of the wind direction sectors under each of the incoming wind speeds, and determining the total power generation of the wind farm of each of the first target layout schemes according to the influence of the second wake effect on each wind turbine of each of the first target layout schemes in each of the wind direction sectors, the distribution probability of each of the incoming wind speeds in each of the wind direction sectors and the wind turbine characteristic data; The ninth determination module is used to determine a second target arrangement scheme according to the total power generation of the wind farm of each of the first target arrangement schemes.

9. The device according to claim 7, characterized in that The second determining module is specifically used to: Determining a row spacing data set and a column spacing data set of the wind turbine according to the planning data; Determining a rotation angle data set of the wind turbine according to the dominant wind direction angle of the wind resource; Traversing the row spacing data set, the column spacing data set, and the rotation angle data set respectively to obtain a plurality of original layout schemes, wherein the original layout schemes include the number of wind turbines and the position coordinates of each wind turbine, and the number of wind turbines includes the planned number of wind turbines and the number of redundant positions; The average wind speed of each wind direction sector, each sector angle, each original layout scheme and the wind turbine characteristic data are input into the first model to determine the influence of the third wake effect on each wind turbine of each original layout scheme in each wind direction sector, and the total power generation of the wind farm of each original layout scheme is determined according to the influence of the third wake effect on each wind turbine of each original layout scheme in each wind direction sector and the wind turbine characteristic data; According to the total power generation of the wind farm of each of the original layout plans, M preliminary layout plans are determined.

10. The device according to claim 7, characterized in that The third determination module is specifically used for: Get wake adjustment coefficient; The average wind speed of each wind direction sector, each sector angle, each preliminary layout plan, the wind turbine characteristic data and the wake adjustment coefficient are input into the first model to determine the influence of the first wake effect on each wind turbine of each preliminary layout plan in each wind direction sector.

11. The device according to any one of claims 7 to 10, characterized in that: The planning data of the wind farm also includes the coordinates of the boundary of the area where the installation of wind turbines is prohibited. The fourth determination module is specifically used for: According to the boundary coordinates of the area where wind turbines are prohibited from being installed, the position coordinates of wind turbines that do not meet the installation conditions in each of the preliminary layout plans are deleted to obtain a first preliminary layout plan; A first target arrangement scheme is determined according to the total power generation of the wind farm of each of the first preliminary arrangement schemes.

12. The device according to any one of claims 7 to 10, characterized in that: The planning data of the wind farm also includes the boundary coordinates of the area where the site cost increases, and the fourth determination module is specifically used for: Determine the conversion coefficient of the increased site cost and the power generation according to the boundary coordinates of the area where the site cost increases; In the case that in any of the preliminary layout schemes there is more than one wind turbine located in the area where the site cost increases, determining the reduced power generation of the preliminary layout scheme according to the conversion coefficient; A first target layout scheme is determined according to the total power generation of the wind farm and the lost power generation of each of the preliminary layout schemes.

13. An electronic device, characterized in that: comprising at least one processor; and a memory in communication with the at least one processor; The memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the method for generating a wind turbine arrangement scheme according to any one of claims 1 to 6.

14. A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the method for generating a wind turbine arrangement scheme according to any one of claims 1 to 6 is implemented.

15. A computer program product, characterized in that The invention comprises a computer program, which, when executed by a processor, implements the method for generating a wind turbine arrangement scheme according to any one of claims 1 to 6.