An intelligent flushing and emptying system and working method thereof
By designing an intelligent flushing and evacuation system, using multiple pipelines and solenoid valves and other components, the automatic flushing and evacuation operation of the water purifier is realized, solving the problems of manual operation time and labor consumption and TDS display abnormalities in the prior art, and improving operating efficiency and water quality stability.
Patent Information
- Application Number
- CN202111277306.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-10-29
- Publication Date
- 2025-03-14
- Estimated Expiration
- 2041-10-29
AI Technical Summary
The existing water purifier needs to be manually flushed during the first installation and filter element replacement, which is time-consuming and labor-intensive and prone to irregular operation; customers need to manually emptiate the water when they are not in a fresh state when they are on business or traveling; the water machine uses an abnormal TDS and needs to emptiate the down pressure barrel, which usually requires after-sales office operation.
An intelligent flushing and evacuation system is designed, including components such as multiple pipelines and solenoid valves. Through preset working methods, intelligent operations are realized.
Automatic flushing and emptiation operations are realized, which saves labor costs, avoids invalid expenses, and solves the problem of abnormal TDS display when the water machine is used for a water machine in the water volume.
Smart Images

Figure CN114314872B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of water purifiers, and in particular to an intelligent flushing and emptying system and a working method thereof. Background Art
[0002] Existing waterways usually have three major drawbacks:
[0003] First, when installing the filter for the first time and replacing the filter element later, you need to manually flush the filter element to ensure water safety and filter element life. Manual flushing is time-consuming and labor-intensive, and sometimes there will be problems with improper operation;
[0004] Second, when customers are on a long business trip or traveling, the water stored in the water machine is no longer fresh. Customers need to manually empty the machine after returning home to drink fresh water.
[0005] Third, when the water machine uses little water, the TDS display may occasionally be abnormal. At this time, if you empty the lower pressure tank, the TDS display will be normal. However, this operation requires on-site after-sales service, which will result in after-sales expenses. Summary of the invention
[0006] In view of this, an object of the present invention is to provide an intelligent flushing and emptying system and a working method thereof.
[0007] In order to achieve the above object, the technical solution adopted by the present invention is:
[0008] An intelligent flushing and emptying system, comprising:
[0009] A first pipeline, one end of which is a water inlet end, and the first pipeline is provided with: a low-pressure switch, a first adsorptive filter element, a water inlet solenoid valve, a second adsorptive filter element, and a third adsorptive filter element in sequence;
[0010] A second pipeline, one end of which is connected to the other end of the first pipeline, and the second pipeline is provided with: a self-priming booster pump, a membrane mechanism, and a wastewater ratio solenoid valve in sequence, and the other end of the second pipeline is a water discharge end;
[0011] A third pipeline, one end of which is connected to the other end of the first pipeline, and the third pipeline is provided with: an exhaust solenoid valve, a high-pressure switch, and a pressure tank in sequence;
[0012] A fourth pipeline, one end of which is connected to the other end of the first pipeline, and the fourth pipeline is provided with: a one-way electric two-way valve and a cold water tank in sequence;
[0013] a first branch, the first branch connecting the membrane mechanism and the exhaust solenoid valve;
[0014] A second branch, one end of the second branch is connected to the third pipeline, one end of the second branch is arranged between the high-pressure switch and the pressure tank, the other end of the second branch is connected to the cold water tank, and a water replenishment solenoid valve is arranged on the second branch;
[0015] The third branch, one end of the third branch is connected to the third pipeline, one end of the third branch is arranged between the high-pressure switch and the pressure barrel, the other end of the third branch is connected to one or more extensions, and an electric two-way valve is arranged on the third branch.
[0016] The above-mentioned intelligent flushing and emptying system, wherein, further comprises:
[0017] A cold water drain pipeline, one end of which is connected to the fourth pipeline, one end of which is arranged between the one-way electric two-way valve and the cold water tank, and the other end of which is provided with a cold water drain solenoid valve.
[0018] The above-mentioned intelligent flushing and emptying system, wherein, further comprises:
[0019] A hot water drain pipeline, one end of which is connected to the fourth pipeline, one end of which is arranged between the one-way electric two-way valve and the cold water tank, and the hot water drain pipeline is provided with: a one-way valve, a hot water tank, and a hot water drain solenoid valve in sequence.
[0020] In the above-mentioned intelligent flushing and emptying system, the membrane mechanism adopts a reverse osmosis membrane or a nanofiltration membrane.
[0021] A working method of an intelligent flushing and emptying system, wherein the working method is applicable to the above-mentioned intelligent flushing and emptying system, and is applicable to non-heating models, wherein the working method includes: one or more of a flushing process, an emptying process, a first water production process, a second water production process, and a membrane washing process;
[0022] When the flushing process is executed, the low-pressure switch is closed, the water inlet solenoid valve is opened, the self-priming booster pump is opened, the wastewater ratio solenoid valve is opened, the drain solenoid valve is closed, and the electric two-way valve is closed;
[0023] When executing the emptying process, the low-pressure switch is closed, the water inlet solenoid valve is closed, the self-priming booster pump is turned on, the wastewater ratio solenoid valve is turned on, the emptying solenoid valve is turned on, and the electric two-way valve is closed;
[0024] When executing the first water production process, the low-pressure switch is closed, the water inlet solenoid valve is opened, the self-priming booster pump is opened, the wastewater ratio solenoid valve is closed, the drain solenoid valve is closed, and the electric two-way valve is closed;
[0025] When executing the second water production process, the low-pressure switch is closed, the water inlet solenoid valve is opened, the self-priming booster pump is opened, the wastewater ratio solenoid valve is closed, the drain solenoid valve is closed, and the electric two-way valve is opened;
[0026] When executing the membrane washing process, the low-pressure switch is closed, the water inlet solenoid valve is opened, the self-priming booster pump is turned on, the wastewater ratio solenoid valve is closed, the drain solenoid valve is opened, and the electric two-way valve is closed.
[0027] The working method of the above-mentioned intelligent flushing and emptying system includes:
[0028] Step A1: performing the flushing process within a first predetermined time period;
[0029] Step A2: executing the first water production process until the high-pressure switch trips;
[0030] Step A3: performing the emptying process within a second predetermined time period;
[0031] Step A4: Execute the second water production process until the high-pressure switch trips.
[0032] The working method of the above-mentioned intelligent flushing and emptying system includes:
[0033] Step B1: performing the flushing process within a third predetermined time period;
[0034] Step B2: Execute the second water production process until the high-pressure switch trips.
[0035] The working method of the above-mentioned intelligent flushing and emptying system includes:
[0036] Step C1: performing the flushing process within a fourth predetermined time period;
[0037] Step C2: performing the emptying process within a fifth predetermined time period;
[0038] Step C3: executing the first water production process until the high-pressure switch trips;
[0039] Step C4: performing the emptying process within a sixth predetermined time period;
[0040] Step C5: Execute the second water production process until the high-pressure switch trips.
[0041] The working method of the above-mentioned intelligent flushing and emptying system includes:
[0042] Step D1: performing the membrane washing process within the seventh predetermined time period;
[0043] Step D2: Execute the first water production process until the high-pressure switch trips.
[0044] The working method of the above-mentioned intelligent flushing and emptying system includes:
[0045] Step E1: performing the emptying process within the eighth predetermined time period;
[0046] Step E2: Execute the second water production process until the high-pressure switch trips.
[0047] A working method of an intelligent flushing and emptying system, characterized in that it is applicable to the above-mentioned intelligent flushing and emptying system and is applicable to a heating model, wherein the working method includes: one or more of a flushing process, an emptying process, a first water production process, a second water production process, a membrane washing process, a pressure barrel emptying process, and a cold water tank emptying process;
[0048] When executing the flushing process, the low-pressure switch is closed, the water inlet solenoid valve is opened, the self-priming booster pump is opened, the wastewater ratio solenoid valve is opened, the drain solenoid valve is closed, the electric two-way valve is closed, the one-way electric two-way valve is closed, and the water supply solenoid valve is closed;
[0049] When executing the emptying process, the low-pressure switch is closed, the water inlet solenoid valve is closed, the self-priming booster pump is turned on, the wastewater ratio solenoid valve is turned on, the emptying solenoid valve is turned on, the electric two-way valve is closed, the one-way electric two-way valve is closed, and the water supply solenoid valve is closed;
[0050] When executing the first water production process, the low-pressure switch is closed, the water inlet solenoid valve is opened, the self-priming booster pump is opened, the wastewater ratio solenoid valve is closed, the drain solenoid valve is closed, the electric two-way valve is closed, the one-way electric two-way valve is closed, and the water supply solenoid valve is closed;
[0051] When executing the second water production process, the low-pressure switch is closed, the water inlet solenoid valve is opened, the self-priming booster pump is opened, the wastewater ratio solenoid valve is closed, the drain solenoid valve is closed, the electric two-way valve is opened, the one-way electric two-way valve is closed, the water replenishment solenoid valve is opened, and the water replenishment solenoid valve is closed after the cold water tank is full of water;
[0052] When the membrane washing process is executed, the low-pressure switch is closed, the water inlet solenoid valve is closed, the self-priming booster pump is turned on, the wastewater ratio solenoid valve is turned on, the drain solenoid valve is turned on, the electric two-way valve is closed, the one-way electric two-way valve is closed, and the water supply solenoid valve is closed;
[0053] When executing the pressure barrel emptying process, the low-pressure switch is closed, the water inlet solenoid valve is closed, the self-priming booster pump is turned on, the wastewater ratio solenoid valve is turned on, the emptying solenoid valve is turned on, the electric two-way valve is closed, the one-way electric two-way valve is closed, and the water supply solenoid valve is closed;
[0054] When executing the cold water tank emptying process, the low-pressure switch is closed, the water inlet solenoid valve is closed, the self-priming booster pump is turned on, the wastewater ratio solenoid valve is turned on, the emptying solenoid valve is closed, the electric two-way valve is closed, the one-way electric two-way valve is opened, and the water replenishment solenoid valve is closed.
[0055] The working method of the above-mentioned intelligent flushing and emptying system includes:
[0056] Step F1: performing the flushing process within a ninth predetermined time period;
[0057] Step F2: executing the first water production process until the high-pressure switch trips;
[0058] Step F3: performing the emptying process within the tenth predetermined time period;
[0059] Step F4: Execute the second water production process until the high-pressure switch trips.
[0060] The working method of the above-mentioned intelligent flushing and emptying system includes:
[0061] Step G1: performing the flushing process within the eleventh predetermined time period;
[0062] Step G2: Execute the second water production process until the high-pressure switch trips.
[0063] The working method of the above-mentioned intelligent flushing and emptying system includes:
[0064] Step H1: performing the flushing process within a twelfth predetermined time period;
[0065] Step H2: performing the emptying process within the thirteenth predetermined time period;
[0066] Step H3: executing the first water production process until the high-pressure switch trips;
[0067] Step H4: performing the emptying process within the fourteenth predetermined time period;
[0068] Step H5: Execute the second water production process until the high-pressure switch trips.
[0069] The working method of the above-mentioned intelligent flushing and emptying system includes:
[0070] Step I1: performing the membrane washing process within the fifteenth predetermined time period;
[0071] Step I2: Execute the first water production process until the high-pressure switch trips.
[0072] The working method of the above-mentioned intelligent flushing and emptying system includes:
[0073] Step J1: within the sixteenth predetermined time period, executing the pressure tank emptying process;
[0074] Step J2: within the seventeenth predetermined time period, executing the cold water tank emptying process;
[0075] Step J3: Execute the second water production process until the high-pressure switch trips.
[0076] Due to the adoption of the above technology, the present invention has the following positive effects compared with the prior art:
[0077] (1) The present invention can realize intelligent flushing and emptying, effectively save labor costs, and avoid ineffective expenditures. BRIEF DESCRIPTION OF THE DRAWINGS
[0078] Figure 1 It is a schematic diagram of the intelligent flushing and emptying system of the present invention.
[0079] Figure 2 It is a schematic diagram of the route of the flushing process of the intelligent flushing and emptying system of the present invention.
[0080] Figure 3 It is a schematic diagram of the route of the pressure barrel emptying process of the intelligent flushing and emptying system of the present invention.
[0081] Figure 4 It is a schematic diagram of the route of the cold water tank emptying process of the intelligent flushing and emptying system of the present invention.
[0082] Figure 5 It is a schematic diagram of the route of the first water production process of the intelligent flushing and emptying system of the present invention.
[0083] Figure 6 It is a schematic diagram of the route of the second water production process of the intelligent flushing and emptying system of the present invention.
[0084] In the attached figure: 1. low-pressure switch; 2. first adsorptive filter element; 3. water inlet solenoid valve; 4. second adsorptive filter element; 5. third adsorptive filter element; 6. self-priming booster pump; 7. membrane mechanism; 8. wastewater ratio solenoid valve; 9. drain solenoid valve; 10. high-pressure switch; 11. pressure barrel; 12. one-way electric two-way valve; 13. cold water tank; 14. floor drain; 15. extension; 16. water replenishment solenoid valve; 17. electric two-way valve; 18. cold water drain solenoid valve; 19. one-way valve; 20. hot water tank; 21. hot water drain solenoid valve. DETAILED DESCRIPTION
[0085] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0086] Figure 1 is a schematic diagram of the intelligent flushing and emptying system of the present invention, see Figure 1 As shown, a preferred embodiment of an intelligent flushing and emptying system is shown, including: a first pipeline, one end of the first pipeline is a water inlet end, and the first pipeline is provided with: a low-pressure switch 1, a first adsorptive filter element 2, a water inlet solenoid valve 3, a second adsorptive filter element 4, and a third adsorptive filter element 5 in sequence.
[0087] Furthermore, as a preferred embodiment, the intelligent flushing and emptying system includes: a second pipeline, one end of the second pipeline is connected to the other end of the first pipeline, and the second pipeline is provided with: a self-priming booster pump 6, a membrane mechanism 7, and a wastewater ratio solenoid valve 8 in sequence, and the other end of the second pipeline is a drain end.
[0088] Further, as a preferred embodiment, the intelligent flushing and emptying system includes: a third pipeline, one end of the third pipeline is connected to the other end of the first pipeline, and the third pipeline is sequentially provided with: an emptying solenoid valve 9, a high-pressure switch 10, and a pressure barrel 11.
[0089] Further, as a preferred embodiment, the intelligent flushing and emptying system includes: a fourth pipeline, one end of the fourth pipeline is connected to the other end of the first pipeline,
[0090] Further, as a preferred embodiment, the intelligent flushing and emptying system includes: a first branch, the first branch connecting the membrane mechanism 7 and the emptying solenoid valve 9.
[0091] Furthermore, as a preferred embodiment, the intelligent flushing and emptying system includes: a second branch, one end of the second branch is connected to the third pipeline, one end of the second branch is arranged between the high-pressure switch 10 and the pressure barrel 11, the other end of the second branch is connected to the cold water tank 13, and a water replenishment solenoid valve 16 is provided on the second branch.
[0092] Furthermore, as a preferred embodiment, the intelligent flushing and emptying system includes: a third branch, one end of the third branch is connected to the third pipeline, one end of the third branch is arranged between the high-pressure switch 10 and the pressure barrel 11, the other end of the third branch is connected to one or more extensions 15, and an electric two-way valve 17 is provided on the third branch.
[0093] Furthermore, as a preferred embodiment, the intelligent flushing and emptying system also includes: a cold water drain pipeline, one end of the cold water drain pipeline is connected to the fourth pipeline, one end of the cold water drain pipeline is arranged between the one-way electric two-way valve 12 and the cold water tank 13, and the other end of the cold water drain pipeline is provided with a cold water drain solenoid valve 18.
[0094] Furthermore, as a preferred embodiment, the intelligent flushing and emptying system also includes: a hot water drain pipeline, one end of the hot water drain pipeline is connected to the fourth pipeline, one end of the hot water drain pipeline is arranged between the one-way electric two-way valve 12 and the cold water tank 13, and the hot water drain pipeline is provided with: a one-way valve 19, a hot water tank 20, and a hot water drain solenoid valve 21 in sequence.
[0095] Furthermore, as a preferred embodiment, the membrane mechanism 7 adopts a reverse osmosis membrane or a nanofiltration membrane.
[0096] Figure 2 is a schematic diagram of the flushing process of the intelligent flushing and emptying system of the present invention, Figure 3 is a schematic diagram of the emptying process of the intelligent flushing and emptying system of the present invention, Figure 4 It is a schematic diagram of the route of the cold water tank emptying process of the intelligent flushing and emptying system of the present invention, Figure 5 It is a schematic diagram of the route of the first water production process of the intelligent flushing and emptying system of the present invention. Figure 6 This is a schematic diagram of the second water production process of the intelligent flushing and emptying system of the present invention, see Figures 2 to 6 As shown, a schematic diagram of the flushing process, the emptying process, the first water production process, and the second water production process of the non-heating model and / or the heating model is shown. Figures 2 to 6 The positions and connections of the various components are consistent with Figure 1 In order to make the route clear, it is not repeated.
[0097] The present invention also provides a working method of an intelligent flushing and emptying system, which is applicable to non-heating models, wherein the working method includes: one or more of a flushing process, an emptying process, a first water production process, a second water production process, and a membrane washing process;
[0098] When the flushing process is executed, the low-pressure switch 1 is closed, the water inlet solenoid valve 3 is opened, the self-priming booster pump 6 is opened, the wastewater ratio solenoid valve 8 is opened, the drain solenoid valve 9 is closed, and the electric two-way valve 17 is closed;
[0099] When executing the emptying process, the low-pressure switch 1 is closed, the water inlet solenoid valve 3 is closed, the self-priming booster pump 6 is turned on, the wastewater ratio solenoid valve 8 is turned on, the emptying solenoid valve 9 is turned on, and the electric two-way valve 17 is closed;
[0100] When executing the first water production process, the low-pressure switch 1 is closed, the water inlet solenoid valve 3 is opened, the self-priming booster pump 6 is opened, the wastewater ratio solenoid valve 8 is closed, the drain solenoid valve 9 is closed, and the electric two-way valve 17 is closed;
[0101] When executing the second water production process, the low-pressure switch 1 is closed, the water inlet solenoid valve 3 is opened, the self-priming booster pump 6 is opened, the wastewater ratio solenoid valve 8 is closed, the drain solenoid valve 9 is closed, and the electric two-way valve 17 is opened;
[0102] When executing the membrane washing process, the low-pressure switch 1 is closed, the water inlet solenoid valve 3 is opened, the self-priming booster pump 6 is turned on, the wastewater ratio solenoid valve 8 is closed, the drain solenoid valve 9 is opened, and the electric two-way valve 17 is closed.
[0103] Further, as a preferred embodiment, a first installation flushing method for a non-heating type is provided, which comprises:
[0104] Step A1: performing a flushing process within a first predetermined time period;
[0105] Step A2: Execute the first water production process until the high-pressure switch trips;
[0106] Step A3: performing an emptying process within a second predetermined time period;
[0107] Step A4: Execute the second water production process until the high pressure switch trips.
[0108] Furthermore, as a preferred embodiment, after the water machine is installed, it is activated through the mobile phone cloud. After the water machine is activated, it directly enters the flushing countdown interface, the low-pressure switch of the water machine is in a closed state, and it enters the flushing process. After the flushing process, it enters the water making process. After the pressure tank is full, it enters the emptying process. After the pressure tank is emptied, it enters the No. 2 water making process and makes water normally.
[0109] Further, as a preferred embodiment, after the water machine is installed, when the low-pressure switch is tripped, it enters a waiting state.
[0110]
[0111] Further, as a preferred embodiment, a first type of filter element flushing method including a non-heating type includes:
[0112] Step B1: performing a flushing process within a third predetermined time period;
[0113] Step B2: Execute the second water production process until the high pressure switch trips.
[0114] Furthermore, as a preferred embodiment, after replacing the first type of filter element and brushing the "NFC" anti-counterfeit filter element label, the water machine verifies the anti-counterfeit label with the IoT cloud based on its own signal strength. When the verification is successful and the water machine detects that the low-pressure switch is in a closed state, it enters the flushing process. At this time, the mobile phone scans the QR code on the screen to pop up a prompt box of "Anti-counterfeit filter element identification successful", and enters the flushing countdown interface until the flushing is completed.
[0115] Furthermore, as a preferred embodiment, when the water machine has no signal or the signal strength is weak and cannot connect to the cloud, it will first skip the cloud verification and enter the flushing process, and then perform anti-counterfeiting verification after the signal is connected to the network.
[0116]
[0117] Further, as a preferred embodiment, a second type of filter element flushing method including a non-heating type includes:
[0118] Step C1: performing a flushing process within a fourth predetermined time period;
[0119] Step C2: performing an emptying process within a fifth predetermined time period;
[0120] Step C3: Execute the first water production process until the high-pressure switch trips;
[0121] Step C4: performing an emptying process within a sixth predetermined time period;
[0122] Step C5: Execute the second water production process until the high-pressure switch trips.
[0123] Furthermore, as a preferred embodiment, after replacing the second type of filter element and brushing the "NFC" anti-counterfeit filter element label, the water machine verifies the anti-counterfeit label with the IoT cloud based on its own signal strength. When the anti-counterfeit label verification is successful and the water machine detects that the low-pressure switch is in a closed state, it enters the flushing process. After the flushing process is completed, the emptying process is entered. After the pressure barrel is emptied, the first water production process is entered. After the pressure barrel is full of water, the emptying process is entered again. After the pressure barrel is emptied, the second water production process is entered.
[0124] Furthermore, as a preferred embodiment, after replacing the second type of filter element and brushing the "NFC" anti-counterfeit filter element label, use the mobile phone to scan the screen QR code, and a prompt box "Anti-counterfeit filter element identification successful" will pop up, and enter the flushing countdown interface. If the power is turned off and restarted at this time, the prompt on the mobile phone will disappear, and the water machine will directly enter the flushing state.
[0125] Furthermore, as a preferred embodiment, when the water machine has no signal or the signal strength is weak and cannot connect to the cloud, it will first skip the cloud verification and enter the flushing process, and then perform anti-counterfeiting verification after the signal is connected to the network.
[0126]
[0127]
[0128] Further, as a preferred embodiment, a non-heating type film washing method is provided, which comprises:
[0129] Step D1: performing a membrane washing process within a seventh predetermined time period;
[0130] Step D2: Execute the first water production process until the high pressure switch trips.
[0131] Further, as a preferred embodiment, after each cumulative water production of N hours, the water machine is in a full water state and enters the membrane washing process. After the membrane washing process is completed, it enters the first water production process and stops working when the pressure tank is full of water.
[0132]
[0133] Further, as a preferred embodiment, an automatic / manual drainage and water storage method for a non-heating type is provided, which comprises:
[0134] Step E1: performing an emptying process within an eighth predetermined time period;
[0135] Step E2: Execute the second water production process until the high pressure switch trips.
[0136] Furthermore, as a preferred embodiment, when the water machine has not been used for more than N days (i.e., the interval between two executions of the first water production process and / or the second water production process is greater than N days, and the specific value of N is set according to actual needs), the emptying process is automatically triggered, and the water machine enters the pressure barrel emptying process, and then enters the second water production process to produce water normally.
[0137] Furthermore, as a preferred embodiment, in an offline state, the water machine can also automatically trigger the emptying process according to its own state, and the water machine enters the pressure barrel emptying process, and then enters the second water production process to produce water normally.
[0138] Furthermore, as a preferred embodiment, when the water machine is full of water, the water machine detects and monitors the water quality in real time. When the water quality is poor, the water machine initiates an early warning prompt in the cloud background.
[0139] Furthermore, as a preferred embodiment, the technician sends an instruction to execute the emptying process to the water machine through the emptying button of the IoT cloud background to perform manual emptying. The water machine enters the pressure tank emptying process, and then enters the second water production process to produce water normally.
[0140]
[0141] The present invention also provides a working method of an intelligent flushing and emptying system, which is applicable to a heating model, wherein the working method includes: one or more of a flushing process, an emptying process, a first water production process, a second water production process, a membrane washing process, a pressure barrel emptying process, and a cold water tank emptying process;
[0142] When the flushing process is executed, the low-pressure switch 1 is closed, the water inlet solenoid valve 3 is opened, the self-priming booster pump 6 is opened, the wastewater ratio solenoid valve 8 is opened, the drain solenoid valve 9 is closed, the electric two-way valve 17 is closed, the one-way electric two-way valve 12 is closed, and the water supply solenoid valve 16 is closed;
[0143] When executing the emptying process, the low-pressure switch 1 is closed, the water inlet solenoid valve 3 is closed, the self-priming booster pump 6 is turned on, the wastewater ratio solenoid valve 8 is turned on, the emptying solenoid valve 9 is turned on, the electric two-way valve 17 is closed, the one-way electric two-way valve 12 is closed, and the water supply solenoid valve 16 is closed;
[0144] When executing the first water production process, the low-pressure switch 1 is closed, the water inlet solenoid valve 3 is opened, the self-priming booster pump 6 is opened, the wastewater ratio solenoid valve 8 is closed, the drain solenoid valve 9 is closed, the electric two-way valve 17 is closed, the one-way electric two-way valve 12 is closed, and the water supply solenoid valve 16 is closed;
[0145] When executing the second water production process, the low-pressure switch 1 is closed, the water inlet solenoid valve 3 is opened, the self-priming booster pump 6 is opened, the wastewater ratio solenoid valve 8 is closed, the drain solenoid valve 9 is closed, the electric two-way valve 17 is opened, the one-way electric two-way valve 12 is closed, the water supply solenoid valve 16 is opened, and the water supply solenoid valve 16 is closed after the cold water tank 13 is full of water;
[0146] When performing the membrane washing process, the low-pressure switch 1 is closed, the water inlet solenoid valve 3 is closed, the self-priming booster pump 6 is turned on, the wastewater ratio solenoid valve 8 is turned on, the drain solenoid valve 9 is turned on, the electric two-way valve 17 is closed, the one-way electric two-way valve 12 is closed, and the water supply solenoid valve 16 is closed;
[0147] When executing the pressure barrel emptying process, the low-pressure switch 1 is closed, the water inlet solenoid valve 3 is closed, the self-priming booster pump 6 is turned on, the wastewater ratio solenoid valve 8 is turned on, the emptying solenoid valve 9 is turned on, the electric two-way valve 17 is closed, the one-way electric two-way valve 12 is closed, and the water supply solenoid valve 16 is closed;
[0148] When executing the cold water tank emptying process, the low-pressure switch 1 is closed, the water inlet solenoid valve 3 is closed, the self-priming booster pump 6 is turned on, the wastewater ratio solenoid valve 8 is turned on, the emptying solenoid valve 9 is closed, the electric two-way valve 17 is closed, the one-way electric two-way valve 12 is opened, and the water supply solenoid valve 16 is closed.
[0149] Further, as a preferred embodiment, a first installation flushing method for a heating type is provided, which comprises:
[0150] Step F1: performing a flushing process within a ninth predetermined time period;
[0151] Step F2: Execute the first water production process until the high-pressure switch trips;
[0152] Step F3: performing an emptying process within the tenth predetermined time period;
[0153] Step F4: Execute the second water production process until the high pressure switch trips.
[0154] Furthermore, as a preferred embodiment, after the water machine is installed, it is activated through the mobile phone cloud. After the water machine is activated, it directly enters the flushing countdown interface, the low-pressure switch of the water machine is in a closed state, and it enters the flushing process. After the flushing process, it enters the water making process. After the pressure tank is full, it enters the emptying process. After the pressure tank is emptied, it enters the No. 2 water making process and makes water normally.
[0155] Further, as a preferred embodiment, after the water machine is installed, when the low-pressure switch is tripped, it enters a waiting state.
[0156]
[0157] Further, as a preferred embodiment, a first type of filter element flushing method including a heating type includes:
[0158] Step G1: performing a flushing process within the eleventh predetermined time period;
[0159] Step G2: Execute the second water production process until the high pressure switch trips.
[0160] Furthermore, as a preferred embodiment, after replacing the first type of filter element and brushing the "NFC" anti-counterfeit filter element label, the water machine verifies the anti-counterfeit label with the IoT cloud based on its own signal strength. When the verification is successful and the water machine detects that the low-pressure switch is in a closed state, it enters the flushing process. At this time, the mobile phone scans the QR code on the screen to pop up a prompt box of "Anti-counterfeit filter element identification successful", and enters the flushing countdown interface until the flushing is completed.
[0161] Furthermore, as a preferred embodiment, when the water machine has no signal or the signal strength is weak and cannot connect to the cloud, it will first skip the cloud verification and enter the flushing process, and then perform anti-counterfeiting verification after the signal is connected to the network.
[0162]
[0163] Further, as a preferred embodiment, a second filter element flushing method including a heating type includes:
[0164] Step H1: performing a flushing process within a twelfth predetermined time period;
[0165] Step H2: performing an emptying process within a thirteenth predetermined time period;
[0166] Step H3: Execute the first water production process until the high-pressure switch trips;
[0167] Step H4: performing an emptying process within a fourteenth predetermined time period;
[0168] Step H5: Execute the second water production process until the high pressure switch trips.
[0169] Furthermore, as a preferred embodiment, after replacing the second type of filter element and brushing the "NFC" anti-counterfeit filter element label, the water machine verifies the anti-counterfeit label with the IoT cloud based on its own signal strength. When the anti-counterfeit label verification is successful and the water machine detects that the low-pressure switch is in a closed state, it enters the flushing process. After the flushing process is completed, the emptying process is entered. After the pressure barrel is emptied, the first water production process is entered. After the pressure barrel is full of water, the emptying process is entered again. After the pressure barrel is emptied, the second water production process is entered.
[0170] Furthermore, as a preferred embodiment, after replacing the second type of filter element and brushing the "NFC" anti-counterfeit filter element label, use the mobile phone to scan the screen QR code, and a prompt box "Anti-counterfeit filter element identification successful" will pop up, and enter the flushing countdown interface. If the power is cut off and restarted at this time, the prompt on the mobile phone will disappear, and the water machine will directly enter the flushing state.
[0171] Furthermore, as a preferred embodiment, when the water machine has no signal or the signal strength is weak and cannot connect to the cloud, it will first skip the cloud verification and enter the flushing process, and then perform anti-counterfeiting verification after the signal is connected to the network.
[0172]
[0173] Further, as a preferred embodiment, a film washing method including a heating type includes:
[0174] Step I1: performing a membrane washing process within the fifteenth predetermined time period;
[0175] Step I2: Execute the first water production process until the high-pressure switch trips.
[0176] Further, as a preferred embodiment, after each cumulative water production of N hours, the water machine is in a full water state and enters the membrane washing process. After the membrane washing process is completed, it enters the first water production process and stops working when the pressure tank is full of water.
[0177]
[0178]
[0179] Further, as a preferred embodiment, an automatic / manual drainage and water storage method for a heating type is provided, which comprises:
[0180] Step J1: within the sixteenth predetermined time period, executing the pressure tank emptying process;
[0181] Step J2: During the seventeenth predetermined time period, executing the cold water tank emptying process;
[0182] Step J3: Execute the second water production process until the high pressure switch trips.
[0183] Furthermore, as a preferred embodiment, when the water machine has not been used for more than N days (that is, the interval between two executions of the first water production process and / or the second water production process is greater than N days, and the specific value of N is set according to actual needs), the emptying process is automatically triggered, and the water machine enters the pressure barrel emptying process and the cold water tank emptying process in sequence, and then enters the second water production process to produce water normally.
[0184] Furthermore, as a preferred embodiment, in an offline state, the water machine can also automatically trigger the emptying process according to its own state. The water machine sequentially enters the pressure barrel emptying process and the cold water tank emptying process, and then enters the second water production process to produce water normally.
[0185] Furthermore, as a preferred embodiment, when the water machine is full of water, the water machine detects and monitors the water quality in real time. When the water quality is poor, the water machine initiates an early warning prompt in the cloud background.
[0186] Furthermore, as a preferred embodiment, the technician sends an instruction to execute the emptying process to the water machine through the emptying button of the IoT cloud background to perform manual emptying. The water machine enters the pressure tank emptying process and the cold water tank emptying process in sequence, and then enters the second water production process to produce water normally.
[0187]
[0188] It should be noted that the specific duration of the above-mentioned first predetermined time period to the above-mentioned seventeenth predetermined time period is set according to actual needs. Since the sizes of pressure barrels or cold water tanks of different models are different, the specific flushing and / or emptying time needs to be set according to actual needs.
[0189] The above description is only a preferred embodiment of the present invention, and does not limit the implementation mode and protection scope of the present invention. For those skilled in the art, it should be aware that all solutions obtained by equivalent substitutions and obvious changes made using the description and illustrations of the present invention should be included in the protection scope of the present invention.
Claims
1. A working method of an intelligent flushing and emptying system, characterized in that: Applicable to non-heating models, wherein the working method includes: one or more of a flushing process, an emptying process, a first water production process, a second water production process, and a membrane washing process; A first pipeline, one end of which is a water inlet end, and the first pipeline is provided with: a low-pressure switch, a first adsorptive filter element, a water inlet solenoid valve, a second adsorptive filter element, and a third adsorptive filter element in sequence; A second pipeline, one end of which is connected to the other end of the first pipeline, the second pipeline is provided with: a booster pump, a membrane mechanism, and a wastewater ratio solenoid valve in sequence, and the other end of the second pipeline is a water discharge end; A third pipeline, one end of which is connected to the other end of the first pipeline, and the third pipeline is provided with: an exhaust solenoid valve, a high-pressure switch, and a pressure barrel in sequence; A fourth pipeline, one end of which is connected to the other end of the first pipeline, and the fourth pipeline is provided with: a one-way electric two-way valve and a cold water tank in sequence; a first branch, the first branch connecting the membrane mechanism and the exhaust solenoid valve; A second branch, one end of the second branch is connected to the third pipeline, one end of the second branch is arranged between the high-pressure switch and the pressure tank, the other end of the second branch is connected to the cold water tank, and a water replenishment solenoid valve is arranged on the second branch; A third branch, one end of the third branch is connected to the third pipeline, one end of the third branch is arranged between the high-pressure switch and the pressure barrel, the other end of the third branch is connected to one or more extensions, and an electric two-way valve is arranged on the third branch; A cold water drain pipeline, one end of which is connected to the fourth pipeline, one end of which is arranged between the one-way electric two-way valve and the cold water tank, and the other end of which is provided with a cold water drain solenoid valve; A hot water discharge pipeline, one end of which is connected to the fourth pipeline, one end of which is arranged between the one-way electric two-way valve and the cold water tank, and the hot water discharge pipeline is provided with: a one-way valve, a hot water tank, and a hot water discharge solenoid valve in sequence; The membrane mechanism adopts a reverse osmosis membrane or a nanofiltration membrane; When the flushing process is executed, the low-pressure switch is closed, the water inlet solenoid valve is opened, the booster pump is opened, the wastewater ratio solenoid valve is opened, the drain solenoid valve is closed, and the electric two-way valve is closed; When executing the emptying process, the low-pressure switch is closed, the water inlet solenoid valve is closed, the booster pump is turned on, the wastewater ratio solenoid valve is turned on, the emptying solenoid valve is turned on, and the electric two-way valve is closed; When executing the first water production process, the low-pressure switch is closed, the water inlet solenoid valve is opened, the booster pump is opened, the wastewater ratio solenoid valve is closed, the drain solenoid valve is closed, and the electric two-way valve is closed; When executing the second water production process, the low-pressure switch is closed, the water inlet solenoid valve is opened, the booster pump is opened, the wastewater ratio solenoid valve is closed, the drain solenoid valve is closed, and the electric two-way valve is opened; When executing the membrane washing process, the low-pressure switch is closed, the water inlet solenoid valve is opened, the booster pump is turned on, the wastewater ratio solenoid valve is closed, the drain solenoid valve is opened, and the electric two-way valve is closed.
2. The working method of the intelligent flushing and emptying system according to claim 1, characterized in that: include: Step A1: performing the flushing process within a first predetermined time period; Step A2: executing the first water production process until the high-pressure switch trips; Step A3: performing the emptying process within a second predetermined time period; Step A2: Execute the second water production process until the high-pressure switch trips.
3. The working method of the intelligent flushing and emptying system according to claim 1, characterized in that: include: Step B1: performing the flushing process within a third predetermined time period; Step B2: Execute the second water production process until the high-pressure switch trips.
4. The working method of the intelligent flushing and emptying system according to claim 1, characterized in that: include: Step C1: performing the flushing process within a fourth predetermined time period; Step C2: performing the emptying process within a fifth predetermined time period; Step C3: executing the first water production process until the high-pressure switch trips; Step C4: performing the emptying process within a sixth predetermined time period; Step C5: Execute the second water production process until the high-pressure switch trips.
5. The working method of the intelligent flushing and emptying system according to claim 1, characterized in that: include: Step D1: performing the membrane washing process within the seventh predetermined time period; Step D2: Execute the first water production process until the high-pressure switch trips.
6. The working method of the intelligent flushing and emptying system according to claim 1, characterized in that: include: Step E1: performing the emptying process within the eighth predetermined time period; Step E2: Execute the second water production process until the high-pressure switch trips.
7. A working method of an intelligent flushing and emptying system, characterized in that: Applicable to heating models, wherein the working method includes: one or more of a flushing process, an emptying process, a first water production process, a second water production process, a membrane washing process, a pressure barrel emptying process, and a cold water tank emptying process; A first pipeline, one end of which is a water inlet end, and the first pipeline is provided with: a low-pressure switch, a first adsorptive filter element, a water inlet solenoid valve, a second adsorptive filter element, and a third adsorptive filter element in sequence; A second pipeline, one end of which is connected to the other end of the first pipeline, the second pipeline is provided with: a booster pump, a membrane mechanism, and a wastewater ratio solenoid valve in sequence, and the other end of the second pipeline is a water discharge end; A third pipeline, one end of which is connected to the other end of the first pipeline, and the third pipeline is provided with: an exhaust solenoid valve, a high-pressure switch, and a pressure barrel in sequence; A fourth pipeline, one end of which is connected to the other end of the first pipeline, and the fourth pipeline is provided with: a one-way electric two-way valve and a cold water tank in sequence; a first branch, the first branch connecting the membrane mechanism and the exhaust solenoid valve; A second branch, one end of the second branch is connected to the third pipeline, one end of the second branch is arranged between the high-pressure switch and the pressure tank, the other end of the second branch is connected to the cold water tank, and a water replenishment solenoid valve is arranged on the second branch; A third branch, one end of the third branch is connected to the third pipeline, one end of the third branch is arranged between the high-pressure switch and the pressure barrel, the other end of the third branch is connected to one or more extensions, and an electric two-way valve is arranged on the third branch; A cold water drain pipeline, one end of which is connected to the fourth pipeline, one end of which is arranged between the one-way electric two-way valve and the cold water tank, and the other end of which is provided with a cold water drain solenoid valve; A hot water discharge pipeline, one end of which is connected to the fourth pipeline, one end of which is arranged between the one-way electric two-way valve and the cold water tank, and the hot water discharge pipeline is provided with: a one-way valve, a hot water tank, and a hot water discharge solenoid valve in sequence; When executing the flushing process, the low-pressure switch is closed, the water inlet solenoid valve is opened, the booster pump is opened, the wastewater ratio solenoid valve is opened, the drain solenoid valve is closed, the electric two-way valve is closed, the one-way electric two-way valve is closed, and the water supply solenoid valve is closed; When executing the emptying process, the low-pressure switch is closed, the water inlet solenoid valve is closed, the booster pump is turned on, the wastewater ratio solenoid valve is turned on, the emptying solenoid valve is turned on, the electric two-way valve is closed, the one-way electric two-way valve is closed, and the water supply solenoid valve is closed; When executing the first water production process, the low-pressure switch is closed, the water inlet solenoid valve is opened, the booster pump is opened, the wastewater ratio solenoid valve is closed, the drain solenoid valve is closed, the electric two-way valve is closed, the one-way electric two-way valve is closed, and the water supply solenoid valve is closed; When executing the second water production process, the low-pressure switch is closed, the water inlet solenoid valve is opened, the booster pump is opened, the wastewater ratio solenoid valve is closed, the drain solenoid valve is closed, the electric two-way valve is opened, the one-way electric two-way valve is closed, the water replenishment solenoid valve is opened, and the water replenishment solenoid valve is closed after the cold water tank is full of water; When the membrane washing process is executed, the low-pressure switch is closed, the water inlet solenoid valve is closed, the booster pump is turned on, the wastewater ratio solenoid valve is turned on, the drain solenoid valve is turned on, the electric two-way valve is closed, the one-way electric two-way valve is closed, and the water supply solenoid valve is closed; When executing the pressure barrel emptying process, the low-pressure switch is closed, the water inlet solenoid valve is closed, the booster pump is turned on, the wastewater ratio solenoid valve is turned on, the emptying solenoid valve is turned on, the electric two-way valve is closed, the one-way electric two-way valve is closed, and the water supply solenoid valve is closed; When executing the cold water tank emptying process, the low-pressure switch is closed, the water inlet solenoid valve is closed, the booster pump is turned on, the wastewater ratio solenoid valve is turned on, the emptying solenoid valve is closed, the electric two-way valve is closed, the one-way electric two-way valve is opened, and the water replenishment solenoid valve is closed.
8. The working method of the intelligent flushing and emptying system according to claim 7, characterized in that: include: Step F1: performing the flushing process within a ninth predetermined time period; Step F2: executing the first water production process until the high-pressure switch trips; Step F3: performing the emptying process within the tenth predetermined time period; Step F4: Execute the second water production process until the high-pressure switch trips.
9. The working method of the intelligent flushing and emptying system according to claim 7, characterized in that: include: Step G1: performing the flushing process within the eleventh predetermined time period; Step G2: Execute the second water production process until the high-pressure switch trips.
10. The working method of the intelligent flushing and emptying system according to claim 7, characterized in that: include: Step H1: performing the flushing process within a twelfth predetermined time period; Step H2: performing the emptying process within the thirteenth predetermined time period; Step H3: executing the first water production process until the high-pressure switch trips; Step H4: performing the emptying process within the fourteenth predetermined time period; Step H5: Execute the second water production process until the high-pressure switch trips.
11. The working method of the intelligent flushing and emptying system according to claim 7, characterized in that: include: Step I1: performing the membrane washing process within the fifteenth predetermined time period; Step I2: Execute the first water production process until the high-pressure switch trips.
12. The working method of the intelligent flushing and emptying system according to claim 7, characterized in that: include: Step J1: within the sixteenth predetermined time period, executing the pressure tank emptying process; Step J2: within the seventeenth predetermined time period, executing the cold water tank emptying process; Step J3: Execute the second water production process until the high-pressure switch trips.
Citation Information
Patent Citations
Intelligent flushing and emptying system
CN216639074U