Output power control method, device and power generation system

Through the collaborative work of the central controller and energy storage equipment, the output power fluctuation data of the power generation equipment is obtained and adjusted, thereby reducing the output power fluctuation of wind energy and solar power generation equipment, and solving the safety problems caused by power fluctuation in the power system. Reliability issues to ensure stable operation of the power grid.

CN114336786BActive Publication Date: 2024-10-01TOWNGAS CHINA ENERGY INVESTMENT LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202111427235.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-11-24
Publication Date
2024-10-01
Estimated Expiration
2041-11-24

AI Technical Summary

Technical Problem

The randomness, intermittence, and volatility of the output power of wind and solar power generation equipment cause challenges to the safe and reliable operation of the power system. How to reduce the fluctuation of the output power of power generation equipment has become a technical problem that needs to be solved.

Method used

The central controller obtains the output power fluctuation data of the power generation equipment and the limited fluctuation data allowed by the power grid system, determines the compensation power value, and outputs the compensation power to the power generation equipment through the energy storage device to synthesize the target output power value so that the absolute value of the fluctuation is less than Or equal to limited fluctuation data.

Benefits of technology

It effectively reduces the fluctuation of the output power of the power generation system, meets the constraints of the grid system on grid-connected power, and promotes the safe and reliable operation of the grid system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114336786B_ABST
    Figure CN114336786B_ABST
Patent Text Reader

Abstract

The present application provides an output power regulation method, device and power generation system, the method comprising: obtaining a first output power value of a power generation device in a preset time period, and obtaining first fluctuation data of the first output power value in the preset time period according to the first output power value; obtaining limited fluctuation data of power fluctuations allowed by the power grid system in the preset time period; determining second fluctuation data in the preset time period according to the first fluctuation data and the limited fluctuation data; sending the second fluctuation data to the energy storage device, wherein the second fluctuation data is used to generate a compensation power value, and the compensation power value is used to superimpose with the first output power value and generate a target output power value, wherein the absolute value of the fluctuation data of the target output power value is less than or equal to the limited fluctuation data. The present application provides an output power regulation method, device and power generation system for reducing the fluctuation of the output power of a power generation device.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of power systems, and specifically to an output power control method, device and power generation system. Background Art

[0002] Wind energy, solar energy, etc. are renewable clean energy sources that play an important role in energy conservation, emission reduction, and sustainable economic and social development. Wind power generation technology and photovoltaic power generation technology have received widespread attention and are gradually developing towards scale and industrialization. However, wind energy and solar energy are intermittent energy sources, which directly leads to the active power output of wind power generation and / or photovoltaic power generation equipment being highly random, intermittent, and volatile, which hinders the safe and reliable operation of the power system. Therefore, how to reduce the fluctuation of the output power of the above-mentioned power generation equipment has become a technical problem that needs to be solved. Summary of the invention

[0003] The present application provides an output power control method, equipment and power generation system for reducing fluctuations in the output power of power generation equipment.

[0004] In a first aspect, the present application provides an output power control method, which is applied to a central controller, comprising:

[0005] Acquire a first output power value of a power generation device in a preset time period, and acquire first fluctuation data of the first output power value in the preset time period according to the first output power value;

[0006] Acquiring limited fluctuation data of power fluctuation allowed by the power grid system within the preset time period;

[0007] Determine second fluctuation data within the preset time period according to the first fluctuation data and the limited fluctuation data;

[0008] The second fluctuation data is sent to the energy storage device, wherein the second fluctuation data is used to generate a compensation power value, and the compensation power value is used to be superimposed with the first output power value and generate a target output power value, wherein the absolute value of the fluctuation data of the target output power value is less than or equal to the limited fluctuation data.

[0009] In a second aspect, the present application provides an output power control method, which is applied to an energy storage device and is used to control the power output by a power generation device, including:

[0010] receiving second fluctuation data from a central controller, and determining a compensation power value output by the energy storage device according to the second fluctuation data;

[0011] Compensation power is sent to the output line of the power generation equipment according to the compensation power value, and the compensation power is used to regulate the power output by the power generation equipment.

[0012] In a third aspect, the present application provides an output power control device, including an energy storage device and a central controller;

[0013] The central controller is used to execute the method described in the first aspect;

[0014] The energy storage device is used to execute the method described in the second aspect.

[0015] In a fourth aspect, the present application provides a power generation system, including a power generation device, a grid-connected line, and an output power control device as described in the third aspect;

[0016] The power generation equipment is used to output a first output power to the grid-connected line within a preset time period;

[0017] The output power control device is used to send compensation power to the grid-connected line;

[0018] The grid-connected line is used to output the target output power to the power grid system according to the first output power and the compensation power.

[0019] In a fifth aspect, the present application also provides an output power control device, which is applied to a central controller. The output power control device includes an acquisition module, a determination module, and a first sending module.

[0020] The acquisition module is used to acquire a first output power value of the power generation equipment in a preset time period, and to acquire first fluctuation data of the first output power value in the preset time period according to the first output power value.

[0021] The acquisition module is further used to acquire limited fluctuation data of power fluctuation allowed by the power grid system within the preset time period.

[0022] The determining module is used to determine the second fluctuation data within the preset time period according to the first fluctuation data and the limited fluctuation data.

[0023] The first sending module is used to send the second fluctuation data to the energy storage device, wherein the second fluctuation data is used to generate a compensation power value, and the compensation power value is used to be superimposed with the first output power value to generate a target output power value, wherein the absolute value of the fluctuation data of the target output power value is less than or equal to the limited fluctuation data.

[0024] In a sixth aspect, the present application further provides an output power control device, which is applied to an energy storage device, and the output power control device includes a receiving module and a second sending module;

[0025] A receiving module, used to receive second fluctuation data from a central controller, and determine a compensation power value output by the energy storage device according to the second fluctuation data; wherein the compensation power value is used to generate a target output power value after being superimposed with a first output power value output by a power generation device;

[0026] The second sending module is used to send the compensation power to the grid-connected line according to the compensation power value.

[0027] The output power control method provided in the embodiment of the present application determines second fluctuation data according to first fluctuation data and limited fluctuation data of the output power emitted by the power generation equipment through a central controller, determines a compensation power value according to the second fluctuation data through the energy storage system and outputs the compensation power value to be superimposed with the first output power value to generate a target output power value, thereby regulating the output power of the power generation system, wherein the absolute values ​​of the fluctuation data of the target output power value are all less than or equal to the limited fluctuation data, so as to reduce (smooth out) the fluctuation amount of the target output power value finally output by the power generation system, so as to meet the restriction constraints of the power grid system on the grid-connected power, and promote the safe and reliable operation of the power grid system. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0029] Figure 1 It is a structural schematic diagram of a power generation system provided in an embodiment of the present application;

[0030] Figure 2 It is a signal interaction block diagram of a power generation system provided by an embodiment of the present application;

[0031] Figure 3 This is a partial flow chart of the first output power control method provided in the embodiment of the present application;

[0032] Figure 4 yes Figure 3 Flow chart of step S110;

[0033] Figure 5 yes Figure 4 Flow chart of step S210;

[0034] Figure 6 yes Figure 4 Flow chart of step S220;

[0035] Figure 7 yes Figure 3 Flow chart of step S120;

[0036] Figure 8 This is another partial flow chart of the first output power control method provided in an embodiment of the present application;

[0037] Fig. 9 This is another partial flow chart of the first output power control method provided in the embodiment of the present application;

[0038] Fig.10 It is a partial flow chart of the second output power control method provided in the embodiment of the present application;

[0039] Fig.11 is another partial flow chart of the second output power control method provided in an embodiment of the present application;

[0040] Fig.12 It is a system block diagram of the first output power control device provided in the embodiment of the present application;

[0041] Fig.13 This is a system block diagram of a second output power control device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0042] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0043] The terms "first", "second", etc. in the specification and claims of this application and the above-mentioned drawings are used to distinguish different objects, rather than to describe a specific order. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device that includes a series of steps or units is not limited to the listed steps or units, but optionally includes steps or units that are not listed, or optionally includes other steps or units inherent to these processes, methods, products or devices.

[0044] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.

[0045] In power generation equipment that uses clean energy such as wind power and solar energy to generate electricity, since wind energy and solar energy are intermittent energy sources, sometimes the wind is strong and sometimes the wind is weak; or sometimes the sun is strong and sometimes the sun is weak, the active power output by the power generation equipment through wind power generation and / or photovoltaic power generation is highly random, intermittent, and volatile, which poses a threat to the safe and reliable operation of the power system.

[0046] See also Figure 1 , an embodiment of the present application provides a power generation system 1000. The power generation system 1000 includes a power generation device 100, a grid-connected line 200, and an output power control device 300. The power generation system 1000 is used to output a target output power to the power grid system 2000. The output end of the power generation device 100 is electrically connected to the grid-connected line 200, the output end and the input end of the output power control device 300 are both electrically connected to the grid-connected line 200, and the output end of the grid-connected line 200 is also used to connect to the power grid system 2000.

[0047] See also Figure 1 The output power control device 300 at least includes an energy storage device 320 and a central controller 310 .

[0048] The output power control device 300 adjusts the output power of the power generation device 100 through the energy storage device 320 to reduce (smooth) the fluctuation of the output power of the power generation device 100 to within the range allowed by the power grid system 2000, so that the power finally output by the power generation system 1000 meets the power constraints of the power grid system 2000, and the power output by the power generation system 1000 can be smoothly applied to the power grid system 2000, thereby promoting the safe and reliable operation of the power grid system 2000.

[0049] Specifically, the power generation equipment 100 includes but is not limited to a wind power generation device (also called a wind turbine), or a photovoltaic power generation device (also called a photovoltaic power generation array), or a hybrid power generation device formed by wind power generation and photovoltaic power generation, etc. It can be understood that the power generation equipment 100 is used to convert energy such as wind energy and solar energy into electrical energy and output it to the power grid system 2000. In this embodiment, the power generation equipment 100 includes a hybrid power generation device formed by wind power generation and photovoltaic power generation as an example. Of course, the technical solution provided in this application can also be used in a wind power generation device or a photovoltaic power generation device. In this embodiment, the output power of the wind power generation device and the output power of the photovoltaic power generation are combined to form a combined power.

[0050] See also Figure 2 The power generation device 100 is used to output a first output power to the grid-connected line 200 within a preset time period, and send the first output power value output within the preset time period to the central controller 310.

[0051] Optionally, the power generation equipment 100 is used to output the first output power to the grid-connected line 200 in real time, and send the first output power value to the central controller 310 in real time, or send the first output power value within a period of time at a certain frequency, wherein the period of time can completely cover the preset time period or be a preset time period.

[0052] This application does not make specific restrictions on the preset time period. In this embodiment, the preset time period is 1 to 10 minutes; if the value of the preset time period is selected too large, the grid-connected power (grid-connected power is the power on the grid-connected system and the power at the input end of the grid system 2000) will be too smooth, so it will be necessary to configure an energy storage system with a larger energy storage capacity, resulting in an increase in system cost; if the value of the preset time period is selected too small, the grid-connected power will be less smooth, that is, the grid-connected power will fluctuate more, which is not conducive to the normal operation of the grid system 2000. Therefore, this embodiment uses the grid-connected power fluctuation limit at a time interval of 1 to 10 minutes as a constraint, for example, 1 minute, 5 minutes, 10 minutes, etc. Among them, the preset time period can be selected according to the frequency, for example, once every N minutes; or, the preset time period can be selected continuously, or, the preset time period can be selected according to certain rules, for example, the frequency selected in the time period when the first output power value of the power generation device 100 is relatively stable is low, and the frequency selected in the time period when the first output power value of the power generation device 100 is unstable is high.

[0053] When the power generation equipment 100 includes a hybrid power generation device formed by wind power generation and photovoltaic power generation, the first output power is a combined power formed by superimposing the output power of the wind power generation and the output power of the photovoltaic power generation.

[0054] See also Figure 2The central controller 310 is used to receive a first output power value (first output power value) from the power generation device 100 in a preset time period, and obtain first fluctuation data of the first output power value in the preset time period based on the first output power value.

[0055] The central controller 310 is also called a central processing unit (CPU), and devices having the central controller 310 include but are not limited to computers, hosts, servers, and the like.

[0056] Specifically, the central controller 310 can receive the first output power value from the power generation equipment 100 in real time, and select the first output power value within a preset time period from the received real-time first output power value, or receive the first output power value within a time period at a certain frequency, wherein the time period can completely cover the preset time period or be a preset time period.

[0057] Among them, due to the instability of wind power and solar energy, the output power of the power generation equipment 100 in the preset time period is often a non-fixed value (i.e., a fluctuating value). By selecting a power reference value and calculating the difference between the first output power value and the power reference value, the first fluctuation data of the first output power value relative to the power reference value in the preset time period can be obtained. The first fluctuation data is a set of differences between the first output power value and the power reference value in the preset time period. In other words, the first fluctuation data includes a plurality of first data, wherein the plurality of first data is the difference between the first output power value and the power reference value in the preset time period.

[0058] Among them, the power reference value is greater than the minimum value of the first output power value in the preset time period, and the power reference value is less than the maximum value of the first output power value in the preset time period, so the first data in the first fluctuation data can be a positive number, a negative number, or 0. The specific implementation method of obtaining the first fluctuation data is specifically described in the subsequent output power control method.

[0059] The central controller 310 is further configured to obtain limited fluctuation data of power fluctuation allowed by the power grid system 2000 within the preset time period.

[0060] It is understandable that, in order to meet the safe and reliable operation requirements of the power grid system 2000, the power grid system 2000 has certain requirements for the fluctuation data of the grid-connected power received, namely, the limited fluctuation data described in this embodiment. The limited fluctuation data is used to limit the fluctuation data of the power fluctuation received by the power grid system 2000 to not exceed the limited fluctuation data. The specific method for obtaining the limited fluctuation data is specifically described in the subsequent output power control method.

[0061] See also Figure 2The central controller 310 is further configured to determine second fluctuation data within the preset time period according to the first fluctuation data and the limited fluctuation data.

[0062] Specifically, the second fluctuation data within the preset time period can be superimposed with the first fluctuation data within the preset time period to smooth the fluctuation of the first output power value, so that the fluctuation data of the power received by the power grid system 2000 does not exceed the limited fluctuation data.

[0063] See also Figure 2 , the central controller 310 is also used to send the second fluctuation data to the energy storage device 320. The second fluctuation data is used to generate a compensation power value within a preset time period. The compensation power value is used to superimpose with the first output power value and generate a target output power value of the power generation system 1000 within a preset time period. The absolute value of the fluctuation data of the target output power value is less than or equal to the limited fluctuation data.

[0064] The second fluctuation data of the compensation power value is superimposed on the first fluctuation data of the first output power value within the preset time period to generate the fluctuation data of the target output power value within the preset time period. According to the implementation method of the compensation power value obtained above, the absolute value of the fluctuation data of the target output power value is less than or equal to the limited fluctuation data, so as to reduce (smooth) the fluctuation amount of the target output power value finally output by the power generation system 1000, so as to meet the restriction constraint conditions of the grid system 2000 on the grid-connected power, and promote the safe and reliable operation of the grid system 2000.

[0065] See also Figure 2 The energy storage device 320 is used to receive the second fluctuation data from the central controller 310, and determine the compensation power value output by the energy storage device 320 according to the second fluctuation data; wherein the compensation power value is used to generate a target output power value after being superimposed with the first output power value output by the power generation device 100.

[0066] Among them, see Figure 2 The energy storage device 320 outputs the compensation power to the grid-connected line 200 according to the compensation power value, and performs power compensation on the first output power value output by the power generation device 100. The grid-connected line 200 receives the first output power and the compensation power to generate the target output power, and sends the target output power to the power grid system 2000.

[0067] It should be noted that the compensation power value described in the present application may be a positive value or a negative value. When the compensation power value is a positive value, it indicates that the energy storage device 320 is in a discharging state, the output power of the energy storage device 320 is added to the first output power value, and the target output power value (target output power value) is greater than the first output power value (first output power value); when the compensation power value is a negative value, it indicates that the energy storage device 320 is in a charging state (specifically, a portion of the first output power value is absorbed by the energy storage device 320), the output power of the energy storage device 320 is destructively added to the first output power value, and the target output power value is less than the first output power value.

[0068] The output power control device 300 provided in the embodiment of the present application determines the second fluctuation data according to the first fluctuation data and the limited fluctuation data of the output power emitted by the power generation equipment 100 through the central controller 310, determines the compensation power value according to the second fluctuation data through the energy storage system and outputs the compensation power value to be superimposed with the first output power value to generate a target output power value, thereby regulating the output power of the power generation system 1000, wherein the absolute value of the fluctuation data of the target output power value is less than or equal to the limited fluctuation data, so as to reduce (smooth) the fluctuation amount of the target output power value finally output by the power generation system 1000, so as to meet the restriction constraints of the power grid system 2000 on the grid-connected power, and promote the safe and reliable operation of the power grid system 2000.

[0069] See also Figure 3 , the embodiment of the present application also provides an output power control method, which is applied to the above-mentioned central controller 310. In other words, the above-mentioned central controller 310 is used to execute the following content. It should be noted that the present application does not limit the order of each step, and the order in the following method can be adjusted.

[0070] S110: Acquire a first output power value of the power generation device 100 in a preset time period, and acquire first fluctuation data of the first output power value in the preset time period according to the first output power value.

[0071] In this step, the first output power value output by the power generation device 100 within the preset time period is first obtained, and then the power reference value is obtained. Optionally, the first output power value is a value that fluctuates with time within the preset time period, and the power reference value is a fixed value within the preset time period. The maximum value of the first output power value within the preset time period is greater than or equal to the power reference value, and the minimum value of the first output power value within the preset time period is less than or equal to the power reference value. The first fluctuation data of the first output power value within the preset time period can be obtained by the difference between the first output power value and the power reference value.

[0072] S120: Acquire limited fluctuation data of power fluctuation allowed by the power grid system 2000 within the preset time period.

[0073] In this step, the output power control device 300 may further include a memory. The limited fluctuation data of the power fluctuation allowed by the power grid system 2000 within the preset time period may be pre-stored in the memory, and the central controller 310 obtains the limited fluctuation data of the power fluctuation allowed by the power grid system 2000 within the preset time period from the memory.

[0074] Optionally, the limited fluctuation data may be a variable that changes with time within a preset time period, or may be a fixed amount that does not change with time within a preset time period. This embodiment is described by taking limiting the fluctuation data to a fixed amount within a preset time period as an example.

[0075] S130: Determine second fluctuation data within the preset time period according to the first fluctuation data and the limited fluctuation data.

[0076] In this step, the second fluctuation data within the preset time period is determined according to the first fluctuation data within the preset time period and the limited fluctuation data within the preset time period, wherein the second fluctuation data is also the second fluctuation data. The second fluctuation data is superimposed on the first fluctuation data so that the absolute value of the superimposed fluctuation data is less than the limited fluctuation data. In this way, the second fluctuation data can correct the first fluctuation data so that the fluctuation data of the output power of the system within the preset time period is below the limited fluctuation data of the power fluctuation within the preset time period allowed by the power grid system 2000.

[0077] S140: Sending the second fluctuation data to the energy storage device 320, wherein the second fluctuation data is used to generate a compensation power value, and the compensation power value is used to be superimposed with the first output power value to generate a target output power value, wherein the absolute value of the fluctuation data of the target output power value is less than or equal to the limited fluctuation data.

[0078] Specifically, after obtaining the second fluctuation data within the preset time period, the central processor transmits the second fluctuation data within the preset time period to the energy storage device 320, and the energy storage device 320 generates a compensation power value according to the second fluctuation data, and the compensation power value includes a positive value, a negative value, or 0.

[0079] When the compensation power value is a positive value, it means that the second fluctuation data is a positive value. At this time, the energy storage device 320 discharges the grid-connected line 200, and its power value is the compensation power value. At the same time, the power generation device 100 also discharges the grid-connected line 200, and the discharged power value is the first output power value. The sum of the compensation power value and the first output power value obtains the target output power value (which is also the power output from the grid-connected line 200 to the power grid system 2000). When the compensation power value is a negative value, it means that the second fluctuation data is a negative value. At this time, the energy storage device 320 is charged from the grid-connected line 200, and the charging power value is the compensation power value. At the same time, the power generation device 100 also discharges the grid-connected line 200, and its power value is the first output power value. The difference between the compensation power value and the first output power value obtains the target output power value.

[0080] The relationship between the target output power value, the first output power value and the compensation power is as follows:

[0081] P grid (t) = P w (t)+P c (t)

[0082] Among them, P grid(t) is the target output power value of the grid-connected line 200 at time t; P w (t) is the first output power value output by the power generation device 100 at time t; P c (t) is the compensation power value output by the energy storage device 320 at time t. c A positive value of (t) indicates that the energy storage device 320 is in a discharging state. c A negative value of (t) indicates that the energy storage device 320 is in a charging state.

[0083] The output power control method provided in the embodiment of the present application determines the second fluctuation data according to the first fluctuation data and the limited fluctuation data of the output power emitted by the power generation equipment 100 through the central controller 310, determines the compensation power value according to the second fluctuation data through the energy storage system and outputs the compensation power value to be superimposed with the first output power value to generate a target output power value, thereby regulating the output power of the power generation system 1000, wherein the absolute values ​​of the fluctuation data of the target output power value are all less than or equal to the limited fluctuation data, so as to reduce (smooth out) the fluctuation amount of the target output power value finally output by the power generation system 1000, so as to meet the restriction constraints of the power grid system 2000 on the grid-connected power, and promote the safe and reliable operation of the power grid system 2000.

[0084] In this embodiment, the power generation device 100 includes a photovoltaic power generation device and a wind power generation device. The output end of the photovoltaic power generation device is electrically connected to the grid-connected line 200. The output end of the wind power generation device is electrically connected to the grid-connected line 200. The photovoltaic power generation device is used to output the second output power to the grid-connected line 200. The wind power generation device is used to output the third output power to the grid-connected line 200.

[0085] See also Figure 4 Step S110 specifically includes the following steps:

[0086] Step S210, obtaining a second output power value (ie, a second output power value) output by the photovoltaic power generation device of the power generation equipment 100 within a preset time period, and obtaining third fluctuation data of the second output power value within the preset time period based on the second output power value.

[0087] Specifically, the method of obtaining the third fluctuation data includes but is not limited to determining the first power reference value of the second output power value, and determining the third fluctuation data of the second output power value within the preset time period based on the difference between the second output power value and the first power reference value.

[0088] See also Figure 5 , step S210 specifically includes:

[0089] Step S211: obtaining a second output power value output by the photovoltaic power generation device of the power generation equipment 100 within a preset time period, and determining a first average value according to the second output power value.

[0090] Specifically, the second output power value output by the photovoltaic power generation device is smoothed by a sliding average method. After smoothing control by this method, a first average value of the smoothed output of the photovoltaic power generation device can be obtained.

[0091]

[0092] Wherein, t=T / 2, (T / 2)-1, ... (NT) / 2, where N is a number greater than T. Optionally, N can be a cycle of the power output of the power generation device 100. In formula (1), P g (t) is the second output power value output by the photovoltaic power generation device at time t; P out_1 (t) is the first average value output by the photovoltaic power generation device at time t after smoothing, and T refers to a preset time period, also known as a window length.

[0093] For multiple non-stationary output powers within a period N, it is assumed that the output power in a small area within each T time period is nearly stationary, and its mean is close to a constant. Therefore, the average value within each T time period can be taken to represent any value within the T time period, and it is regarded as a measurement result that suppresses random errors or a signal that eliminates noise.

[0094] The window length T is an important parameter of the sliding average method. If its value is too large, the grid-connected power will be too smooth, the energy storage system capacity will be too large, and the investment cost will increase; if its value is too small, the grid-connected power will be low in smoothness, which will endanger the normal operation of the power system. In this application, the grid-connected power fluctuation limit is set as a constraint at a time interval of 1 to 10 minutes.

[0095] From formula (1), it can be seen that the value of k is not in the range of 0 to T, but in the range of (T / 2)-1 to (T-1), starting from the middle value close to the preset time period. The fluctuation in the latter part is relatively large, and a more accurate first average value can be obtained.

[0096] Step S212: determining third fluctuation data of the second output power value within the preset time period according to the difference between the first average value and the second output power value.

[0097] Specifically, third fluctuation data of the second output power value within the preset time period is determined according to the difference between the first average value and the second output power value.

[0098] P b_1 (t) = P out_1 (t)-P g (t) (2)

[0099] Among them, P g (t) is the second output power value output by the photovoltaic power generation device at time t; P out_1 (t) is the first average value outputted by the photovoltaic power generation device at time t after smoothing; P b_1 (t) is the third fluctuation data of the second output power value at time t.

[0100] Step S220, obtaining a third output power value (i.e., a third output power value) of the wind power generation device of the power generation equipment 100 within the preset time period, and obtaining fourth fluctuation data of the third output power value within the preset time period based on the third output power value.

[0101] Specifically, the method of obtaining the fourth fluctuation data includes but is not limited to determining the second power reference value of the third output power value, and determining the fourth fluctuation data of the third output power value within the preset time period based on the difference between the third output power value and the second power reference value.

[0102] See also Figure 6 , step S220 specifically includes:

[0103] Step S221: Acquire a third output power value output by the wind power generation device of the power generation equipment 100 within a preset time period, and determine a second average value according to the third output power value.

[0104] Specifically, the third output power value output by the wind power generation device is smoothed by a sliding average method. After smoothing control by this method, a second average value of the wind power generation device output after smoothing can be obtained.

[0105]

[0106] Where, t = T / 2, (T / 2)-1, ... (NT) / 2. In formula (3), P f (k) is the third output power value output by the wind power generation device at time t; P out_2 (t) is the second average value output by the wind power generation device at time t after smoothing, and T refers to a preset time period.

[0107] For multiple non-stationary output powers within a period N, it is assumed that the output power in a small area within each T time period is nearly stationary, and its mean is close to a constant. Therefore, the average value within each T time period can be taken to represent any value within the T time period, and it is regarded as a measurement result that suppresses random errors or a signal that eliminates noise.

[0108] The window length T is an important parameter of the sliding average method. If its value is too large, the grid-connected power will be too smooth, the energy storage system capacity will be too large, and the investment cost will increase; if its value is too small, the grid-connected power will be low in smoothness, which will endanger the normal operation of the power system. In this application, the grid-connected power fluctuation limit is set as a constraint at a time interval of 1 to 10 minutes.

[0109] From formula (3), it can be seen that the value of k is not in the range of 0 to T, but in the range of (T / 2)-1 to (T-1), starting from the middle value close to the preset time period. The fluctuation in the latter part is relatively large, and a more accurate second average value can be obtained.

[0110] Step S222: Determine fourth fluctuation data of the third output power value within the preset time period according to the difference between the third output power value and the second average value.

[0111] Specifically, fourth fluctuation data of the third output power value within the preset time period is determined according to the difference between the second average value and the third output power value.

[0112] Pb_2 (t) = P out_2 (t)-P f (t) (4)

[0113] Among them, P f (t) is the third output power value output by the wind power generation device at time t; P out_2 (t) is the second average value of the wind power generation device output at time t after smoothing; P b_2 (t) is the fourth fluctuation data of the third output power value at time t.

[0114] Step S230: Determine a first output power value from the power generation device 100 within the preset time period according to the second output power value and the third output power value.

[0115] Specifically, the first output power value from the power generation device 100 within the preset time period is determined according to the sum of the second output power value and the third output power value.

[0116] P w (t) = P f (t)+P g (t) (5)

[0117] Among them, P g (t) is the second output power value output by the photovoltaic power generation device at time t; P f (t) is the third output power value output by the wind power generation device at time t; P w (t) is the first output power value output by the power generation device 100 at time t.

[0118] Step S240: Determine first fluctuation data of the first output power value within the preset time period according to the third fluctuation data and the fourth fluctuation data.

[0119] Specifically, the first fluctuation data of the first output power value at time t is determined according to the sum of the third fluctuation data at time t and the fourth fluctuation data at time t. The first fluctuation data within the preset time period can be determined according to the sum of the third fluctuation data at all times in the preset time period and the fourth fluctuation data at all times.

[0120] See also Figure 7 , step S120 specifically includes:

[0121] Step S310: Obtain a mapping relationship table between power fluctuation constraint conditions and time periods allowed by the power grid system 2000, wherein the constraint conditions include multiple constraint factors and a power variation limit value corresponding to each constraint factor.

[0122] Specifically, the mapping relationship table includes constraints for multiple discrete time periods, and the constraints for different time periods in a day are different. For example, the constraints for some time periods are related to the installed capacity of the power generation equipment 100 and the length of the preset time period T. Of course, the constraints for other time periods are not related to the installed capacity of the power generation equipment 100, but are related to the length of the preset time period T. Of course, the above are all examples of different constraints for different time periods in a day, and cannot be used as a limitation on the constraints.

[0123] The power fluctuation constraint conditions allowed by the power grid system 2000 shown in the present application are a set of multiple constraint factors and power variation limit values ​​corresponding to each constraint factor. For example, the constraint condition set is as follows:

[0124]

[0125] in, It represents the limit growth rate of the output power of the wind power generation and photovoltaic power generation system 1000 allowed by the power grid system 2000 under the nth constraint factor. It represents the input power allowed by the power grid under the nth constraint factor.

[0126] It is understandable that the above examples of constraint condition sets include the input power allowed by the power grid system 2000 under the nth constraint factor. Of course, in other implementations, for studying the fluctuation of the input power of the power grid system 2000, the constraint condition set may only include the maximum growth rate of the output power of the wind power generation and photovoltaic power generation system 1000 allowed by the power grid system 2000 under n constraint factors.

[0127] Of course, in actual application, the input power of the power grid system 2000 and the fluctuation of the input power need to meet the conditions at the same time.

[0128] This application focuses on the fluctuation of the output power of the grid-connected line 200. For example, for the constraint conditions, the change rate of the output power of the wind power generation device 110 may include the power change rate of 1min (T is 1min) and the power change rate of 10min (T is 10min). For a wind power generation device 110 with an installed capacity of less than 30MW, the maximum power change of 1min is 6MW, and the maximum power change of 10min is 20MW; for a wind power generation device 110 with an installed capacity of 30-150MW, the maximum power change of 1min is the installed capacity / 5, and the maximum power change of 10min is the installed capacity / 1.5; for a wind power generation device 110 with an installed capacity of 150-250MW, the maximum power change of 1min is 30MW, and the maximum power change of 10min is 100MW; for a wind power generation device 110 with an installed capacity of more than 250MW, the maximum power change of 1min and the maximum power change of 10min need to be determined according to the access system.

[0129] It should be noted that the above is merely an example of a constraint condition and does not limit the constraint conditions provided in this application.

[0130] Step S320: Determine, according to the mapping relationship table and the preset time period, a minimum value among the plurality of power change limit values ​​as limiting fluctuation data of power fluctuation within the preset time period.

[0131] Among them, the limited volatility data is β lim , where β lim The minimum value of the limit growth rate corresponding to the constraint factor in the constraint condition within the preset time period is taken.

[0132]

[0133] Since the power received by the power grid system 2000 needs to satisfy all constraint factors among the multiple constraint factors, the fluctuation data is limited to the minimum value of the limit growth rate corresponding to all constraint factors.

[0134] Step S130 specifically includes:

[0135] The second fluctuation data is determined according to the absolute value of the sum of the first fluctuation data and the second fluctuation data being less than or equal to the limited fluctuation data. The specific formula is as follows:

[0136]

[0137] β t ≤β lim (8)

[0138] Among them, β tis the power fluctuation of the wind-solar energy storage system (i.e., the power generation system 1000) per unit time, is the first fluctuation data of the first output power value output by the power generation device 100 within a unit time, It is the second fluctuation data of the compensation power value in unit time. lim The maximum fluctuation per unit time of the wind-solar-energy storage system allowed by the power grid system 2000 is calculated by taking the output of the wind-solar-energy storage system as a controllable and adjustable power source with the same properties and calculating the maximum power change per unit time to ensure the safe and stable operation of the power grid system 2000 without adding other measures.

[0139] It can be understood that the first fluctuation data is the rate of change of the first output power value over time, and the second fluctuation data is the rate of change of the compensation power value over time.

[0140] According to formula (7) and formula (8), after the second fluctuation data smoothes the first fluctuation data, the absolute value of the obtained fluctuation data does not exceed the limited fluctuation data, thereby achieving that the fluctuation of the power output of the grid-connected line 200 is less than the minimum value of the fluctuation data constraint allowed by the grid system 2000, that is, the fluctuation of the power output of the grid-connected line 200 satisfies all the constraints allowed by the grid system 2000.

[0141] The output power control method provided in this embodiment is that the first output power value output by the power generation equipment 100 is adjusted by the above-mentioned compensation power value so that the absolute value of the fluctuation data of the target output power value obtained is less than or equal to the limited fluctuation data, so as to meet the power fluctuation requirements allowed by the power grid system 2000, so as to reduce (smooth) the fluctuation amount of the target output power value finally output by the power generation system 1000, so as to meet the restriction constraints of the power grid system 2000 on the grid-connected power, and promote the safe and reliable operation of the power grid system 2000.

[0142] Optional, see Figure 8 Before step S130, the method further includes:

[0143] S410: Determine whether the maximum absolute value of the first fluctuation data within the preset time period is greater than the limited fluctuation data.

[0144] S420. If the maximum absolute value of the first fluctuation data within the preset time period is greater than the limited fluctuation data, the second fluctuation data within the preset time period is determined based on the first fluctuation data and the limited fluctuation data; if the maximum absolute value of the first fluctuation data within the preset time period is less than or equal to the limited fluctuation data, the first output power value is determined to be the target output power value.

[0145] For the power generation device 100, the first output power value output by the power generation device 100 fluctuates greatly in some time periods and fluctuates slightly in some time periods. Before determining the second fluctuation data in the preset time period based on the first fluctuation data and the limited fluctuation data, it is judged whether the maximum value of the absolute value of the first fluctuation data in the preset time period is greater than the limited fluctuation data. If the maximum value of the absolute value of the first fluctuation data is less than or equal to the limited fluctuation data, it means that the fluctuation of the first output power value is small and meets the requirements of the power grid system 2000. Then, there is no need to compensate the power and the first output power value can be directly output to the power grid system 2000, thereby improving the response rate of the output power of the power generation system 1000 and realizing intelligent control of the output power.

[0146] After step S210, please refer to Fig. 9 , the method further comprises:

[0147] Step S510: determining first smoothed data within the preset time period according to the third fluctuation data within the preset time period, wherein the first smoothed data is formed by smoothing the third fluctuation data; and obtaining a first energy storage capacity value according to the first smoothed data.

[0148] Specifically, the third fluctuation data within the preset time is filtered by a low-pass filter, and the third fluctuation data is smoothed based on the low-pass filter. The basic principle is to input the photovoltaic power generation data into the low-pass filter, and smooth the output of the low-pass filter to obtain the following formula:

[0149]

[0150] Among them, P b_1 (s) is the third fluctuation data of the second power value input to the low-pass filter, P out_1 (s) is the third fluctuation data after being smoothed by a low-pass filter. s is the parameter of the filtering process.

[0151] P out_1 (s) performs an inverse Laplace transform and integrates it to obtain the following formula:

[0152]

[0153] Wherein, C1(t) is the first energy storage capacity value required to be configured for smoothing the photovoltaic power generation fluctuation (i.e., the third fluctuation data) during the time period t-t0. The first energy storage capacity value is the battery module 321 of the energy storage device 320 (see Figure 1) The energy storage capacity value that needs to be configured to smooth the fluctuation of photovoltaic power generation (i.e. the third fluctuation data) during the time period t-t0.

[0154] After step S220, the method further includes:

[0155] Step S520: determining second smoothed data within the preset time period according to the fourth fluctuation data within the preset time period, wherein the second smoothed data is formed by smoothing the fourth fluctuation data; and obtaining a second energy storage capacity value according to the second smoothed data.

[0156] Specifically, the fourth fluctuation data within the preset time is filtered by a low-pass filter, and the fourth fluctuation data is smoothed based on the low-pass filter. The basic principle is to input the wind power generation data into the low-pass filter, and smooth the output of the low-pass filter to obtain the following formula:

[0157]

[0158] Among them, P b_2 (s) is the fourth fluctuation data of the third power value input to the low-pass filter, P out_2 (s) is the fourth fluctuation data after being smoothed by a low-pass filter. s is the parameter of the filtering process.

[0159] P out_2 (s) performs an inverse Laplace transform and integrates it to obtain the following formula:

[0160]

[0161] Wherein, C2(t) is the second energy storage capacity value required to be configured for smoothing wind power generation fluctuations (i.e., the fourth fluctuation data) during the time period t-t0. The second energy storage capacity value is the energy storage capacity value required to be configured for the battery module 321 of the energy storage device 320 for smoothing wind power generation fluctuations (i.e., the fourth fluctuation data) during the time period t-t0.

[0162] Step S530, determine a target energy storage capacity value according to the sum of the first energy storage capacity value and the second energy storage capacity value, and send the target energy storage capacity value to the energy storage device 320, wherein the target energy storage capacity value is used to generate the energy storage capacity value of the energy storage device 320, wherein the energy storage capacity value of the energy storage device 320 is greater than or equal to the target energy storage capacity value and can generate the compensation power value.

[0163] C(t)=C1(t)+C2(t) (13)

[0164] C(t) is the target energy storage capacity value that needs to be configured for smoothing the fluctuation of photovoltaic power generation (i.e., the third fluctuation data) and smoothing the fluctuation of wind power generation (i.e., the fourth fluctuation data) in the time period t-t0. C(t) represents the different requirements for the capacity of the energy storage device 320 in different time periods, and the maximum value of the target energy storage capacity value is used as the rated capacity of the energy storage system, so that the energy storage device 320 has sufficient capacity to provide a compensation power value to smooth the fluctuation of photovoltaic power generation (i.e., the third fluctuation data) and smooth the fluctuation of wind power generation (i.e., the fourth fluctuation data), so that the fluctuation of the target output power value output by the grid-connected line 200 is within the power fluctuation range allowed by the power grid system 2000.

[0165] This embodiment configures an energy storage system based on understanding the fluctuations in wind power and photovoltaic output power to smooth the fluctuations in wind power and photovoltaic output power.

[0166] The method provided in the embodiment of the present application studies the capacity configuration of the energy storage device 320 for smoothing the combined output fluctuations of the wind power generation device 110 and the photovoltaic power generation device 120. The capacity of the configured energy storage device 320 can effectively smooth the fluctuations of wind power and photovoltaic output power, and the capacity configuration of the energy storage device 320 affects the investment and economic benefits of the power generation system 1000. Under the premise of ensuring that the grid-connected power meets the fluctuation limit requirements, the method uses the sliding average method to smooth the wind power and photovoltaic output power, determines the window length value based on the grid-connected power fluctuation limit requirements as a constraint, and uses a low-pass filter method to smooth the fluctuating power, and obtains the optimal storage capacity required for smoothing wind power and photovoltaic fluctuations, thereby effectively improving the stability and economy of the power generation system 1000.

[0167] The embodiment of the present application further provides an output power control method, which is applied to the energy storage device 320. It can be understood that the energy storage device 320 in the output power control device 300 is used to execute the output power control method provided in this embodiment.

[0168] See also Figure 1 The energy storage device 320 includes a battery module 321, a DC / DC converter 322, a DC bus (not shown), a DC / AC converter 323 and an AC bus (not shown) which are electrically connected in sequence; the AC bus is electrically connected to the grid-connected line 200, and the battery module 321 is used to charge or discharge through the DC / DC converter 322, the DC bus, the DC / AC converter 323 and the AC bus to provide compensation power.

[0169] See also Fig.10 , methods include:

[0170] Step S610, receiving second fluctuation data from the central controller 310, and determining the compensation power value output by the energy storage device 320 according to the second fluctuation data; wherein the compensation power value is used to generate a target output power value after being superimposed with the first output power value output by the power generation device 100.

[0171] The method for acquiring the second fluctuation data may refer to step S130 provided in the above embodiment.

[0172]

[0173] β t ≤β lim (8)

[0174] According to formulas (7) and (8), we can get According to the preset time period The compensation power value P within the preset time period can be obtained c .

[0175] Step S620: Send compensation power to the grid-connected line 200 according to the compensation power value.

[0176] The output power regulation method provided in the embodiment of the present application comprises the following steps: the energy storage device 320 receives second fluctuation data from the central controller 310, determines the compensation power value output by the energy storage device 320 according to the second fluctuation data, and sends the compensation power to the grid-connected line 200 according to the compensation power value. After the compensation power is output to the grid-connected line 200, the first output power output by the power generation device 100 to the grid-connected line 200 can be regulated so that the fluctuation of the target output power value output by the grid-connected line 200 to the power grid system 2000 satisfies the minimum fluctuation allowed by the power grid system 2000, so as to reduce (smooth out) the fluctuation of the target output power value finally output by the power generation system 1000, so as to meet the restriction constraints of the power grid system 2000 on the grid-connected power, and promote the safe and reliable operation of the power grid system 2000.

[0177] See also Fig.11 , the method further comprises:

[0178] Step S710 , receiving a target energy storage capacity value from the central controller 310 .

[0179] Specifically, the step of obtaining the target energy storage capacity value may refer to step S510 to step S530.

[0180] Step S720: configuring the energy storage capacity value of the energy storage device 320 according to the target energy storage capacity value, wherein the energy storage capacity value of the energy storage device 320 is greater than or equal to the target energy storage capacity value, and the energy storage capacity value of the energy storage device 320 can generate the compensation power value.

[0181] Specifically, the step of obtaining the energy storage capacity value of the energy storage device 320 can refer to step S510 to step S530. The energy storage capacity value is the capacity value of the battery module 321, so that the battery module 321 can provide sufficient compensation power.

[0182] By taking the maximum value of the target energy storage capacity value as the rated capacity of the energy storage system, the energy storage device 320 has sufficient capacity to provide a compensation power value to smooth out the fluctuations in photovoltaic power generation (i.e., the third fluctuation data) and the fluctuations in wind power generation (i.e., the fourth fluctuation data), so that the fluctuations in the target output power value output by the grid-connected line 200 are within the power fluctuation range allowed by the power grid system 2000.

[0183] The energy storage device 320 is set to receive a target energy storage capacity value from the central controller 310, and the energy storage capacity value of the energy storage device 320 is configured according to the target energy storage capacity value, wherein the energy storage capacity value of the energy storage device 320 is greater than or equal to the target energy storage capacity value, and the energy storage capacity value of the energy storage device 320 can generate the compensation power value; the compensation power value required for smoothing the combined output fluctuation of the wind power generation device 110 and the photovoltaic power generation device 120 is studied, and the capacity of the energy storage device 320 is configured according to the compensation power value, and the capacity of the configured energy storage device 320 can effectively smooth out the fluctuation of wind power and photovoltaic output power, and the capacity configuration of the energy storage device 320 affects the investment and economic benefits of the power generation system 1000. Under the premise of ensuring that the grid-connected power meets the fluctuation limit requirements, the method uses a low-pass filter method to smooth the fluctuating power, and obtains the optimal energy storage capacity required for smoothing wind power and photovoltaic fluctuations, thereby effectively improving the stability and economy of the power generation system 1000.

[0184] The embodiment of the present application also provides an output power control method, which is applied to a power generation device 100, and the power generation device 100 is used to perform the following steps, wherein the power generation device 100 outputs a first output power to the grid-connected line 200, and outputs a first output power value to the central controller 310. The first output power value is the value of the first output power. The first output power value is used to generate first fluctuation data, and the first fluctuation data is used to indicate whether it needs to be superimposed with the second fluctuation data. When the first fluctuation data is superimposed with the second fluctuation data, the first output power is superimposed with the compensation power so that the fluctuation of the target output power output by the grid-connected line 200 meets the minimum constraint condition allowed by the power grid system 2000.

[0185] See also Fig.12 The embodiment of the present application further provides an output power control device 400, which is applied to the central controller 310. The output power control device 400 includes an acquisition module 410, a determination module 420, and a first sending module 430.

[0186] The acquisition module 410 is used to acquire a first output power value of the power generation device 100 in a preset time period, and acquire first fluctuation data of the first output power value in the preset time period according to the first output power value.

[0187] The acquisition module 410 is further used to acquire limited fluctuation data of power fluctuation allowed by the power grid system 2000 within the preset time period.

[0188] The determination module 420 is used to determine the second fluctuation data within the preset time period according to the first fluctuation data and the limited fluctuation data.

[0189] The first sending module 430 is used to send the second fluctuation data to the energy storage device 320, wherein the second fluctuation data is used to generate a compensation power value, and the compensation power value is used to be superimposed with the first output power value to generate a target output power value, wherein the absolute value of the fluctuation data of the target output power value is less than or equal to the limited fluctuation data.

[0190] The acquisition module 410 includes an acquisition unit 411 and a first determination unit 412 .

[0191] The acquisition module 410, in the step of acquiring a first output power value of the power generation device 100 within a preset time period, and acquiring first fluctuation data of the first output power value within the preset time period according to the first output power value, specifically includes:

[0192] The acquisition unit 411 is used to acquire a second output power value of the photovoltaic power generation device of the power generation equipment 100 within a preset time period, and acquire third fluctuation data of the second output power value within the preset time period according to the second output power value.

[0193] The acquisition unit 411 is further configured to acquire a third output power value of the wind power generation device of the power generation equipment 100 within the preset time period, and acquire fourth fluctuation data of the third output power value within the preset time period according to the third output power value.

[0194] The first determination unit 412 is used to determine the first output power value from the power generation equipment 100 within the preset time period based on the second output power value and the third output power value; and to determine the first fluctuation data of the first output power value within the preset time period based on the third fluctuation data and the fourth fluctuation data.

[0195] The acquiring unit 411 includes an acquiring subunit 413 and a determining subunit 414 .

[0196] The acquiring unit 411, in the step of acquiring a second output power value of the photovoltaic power generation device of the power generation equipment 100 within a preset time period, and acquiring third fluctuation data of the second output power value within the preset time period according to the second output power value, further includes:

[0197] The acquisition subunit 413 is used to acquire a second output power value output by the photovoltaic power generation device of the power generation equipment 100 within a preset time period, and determine a first average value according to the second output power value.

[0198] The determination subunit 414 is configured to determine third fluctuation data of the second output power value within the preset time period according to the difference between the first average value and the second output power value.

[0199] In the step of acquiring the third output power value of the wind power generation device of the power generation equipment 100 within the preset time period, and acquiring fourth fluctuation data of the third output power value within the preset time period according to the third output power value, the acquiring unit 411 further includes:

[0200] The acquisition subunit 413 is further configured to acquire a third output power value output by the wind power generation device of the power generation equipment 100 within a preset time period, and determine a second average value according to the third output power value.

[0201] The determination subunit 414 is further configured to determine fourth fluctuation data of the third output power value within the preset time period according to the difference between the third output power value and the second average value.

[0202] The first determining unit 412, in the step of determining the first output power value from the power generation device 100 within the preset time period according to the second output power value and the third output power value; and determining the first fluctuation data of the first output power value within the preset time period according to the third fluctuation data and the fourth fluctuation data, further comprises:

[0203] The first determining unit 412 is configured to determine a first output power value from the power generation device 100 within the preset time period according to the sum of the second output power value and the third output power value.

[0204] The first determining unit 412 is further configured to determine first fluctuation data of the first output power value within the preset time period according to the sum of the third fluctuation data and the fourth fluctuation data.

[0205] After the step of acquiring the second output power value of the photovoltaic power generation device of the power generation equipment 100 within a preset time period, and acquiring third fluctuation data of the second output power value within the preset time period according to the second output power value, the acquisition unit 411 further includes:

[0206] The determination subunit 414 is further configured to determine first smoothed data within the preset time period according to the third fluctuation data within the preset time period, wherein the first smoothed data is formed by smoothing the third fluctuation data.

[0207] The acquisition subunit 413 is further configured to acquire a first energy storage capacity value according to the first smoothed data.

[0208] After the acquiring unit 411 acquires the third output power value of the wind power generation device of the power generation equipment 100 within the preset time period, and acquires fourth fluctuation data of the third output power value within the preset time period according to the third output power value, the method further includes:

[0209] The determination subunit 414 is further configured to determine second smoothed data within the preset time period according to the fourth fluctuation data within the preset time period, wherein the second smoothed data is formed by smoothing the fourth fluctuation data.

[0210] The acquisition subunit 413 is further configured to acquire a second energy storage capacity value according to the second smoothed data.

[0211] The determination subunit 414 is also used to determine a target energy storage capacity value based on the sum of the first energy storage capacity value and the second energy storage capacity value, and send the target energy storage capacity value to the energy storage device 320, wherein the target energy storage capacity value is used to generate the energy storage capacity value of the energy storage device 320, wherein the energy storage capacity value of the energy storage device 320 is greater than or equal to the target energy storage capacity value and can generate the compensation power value.

[0212] The acquisition module 410, in the step of acquiring limited fluctuation data of power fluctuation allowed by the power grid system 2000 within the preset time period, includes:

[0213] The acquisition unit 411 is further used to obtain a mapping relationship table between constraints of power fluctuations allowed by the power grid system 2000 and time periods, wherein the constraints include multiple constraint factors and a power variation limit value corresponding to each constraint factor.

[0214] The first determining unit 412 is further configured to determine, according to the mapping relationship table and the preset time period, a minimum value among a plurality of the power change limit values ​​as limiting fluctuation data of the power fluctuation within the preset time period.

[0215] The determination module 420, in the step of determining the second fluctuation data within the preset time period according to the first fluctuation data and the limited fluctuation data, includes:

[0216] The second fluctuation data is determined according to that an absolute value of a sum of the first fluctuation data and the second fluctuation data is less than or equal to the limited fluctuation data.

[0217] The determination module 420 includes a determination unit 421 and a second determination unit 422 .

[0218] Before the step of determining the second fluctuation data within the preset time period according to the first fluctuation data and the limited fluctuation data by the determination module 420, the method further includes:

[0219] The judging unit 421 is configured to judge whether the maximum absolute value of the first fluctuation data within the preset time period is greater than the limited fluctuation data.

[0220] The second determination unit 422 is used to determine the second fluctuation data within the preset time period according to the first fluctuation data and the limited fluctuation data when the maximum value of the absolute value of the first fluctuation data within the preset time period is greater than the limited fluctuation data, and is also used to determine that the first output power value is a target output power value when the maximum value of the absolute value of the first fluctuation data within the preset time period is less than or equal to the limited fluctuation data.

[0221] See also Fig.13 The embodiment of the present application further provides an output power control device 400 , which is applied to the energy storage device 320 . The output power control device 400 includes a receiving module 440 , a second sending module 450 and a configuration module 460 .

[0222] The receiving module 440 is used to receive the second fluctuation data from the central controller 310, and determine the compensation power value output by the energy storage device 320 according to the second fluctuation data; wherein the compensation power value is used to generate a target output power value after being superimposed with the first output power value output by the power generation device 100;

[0223] The second sending module 450 is used to send the compensation power to the grid-connected line 200 according to the compensation power value.

[0224] The receiving module 440 is further used to receive the target energy storage capacity value from the central controller 310;

[0225] The configuration module 460 is also used to configure the energy storage capacity value of the energy storage device 320 according to the target energy storage capacity value, wherein the energy storage capacity value of the energy storage device 320 is greater than or equal to the target energy storage capacity value, and the energy storage capacity value of the energy storage device 320 can generate the compensation power value.

[0226] The above is part of the implementation methods of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present application. These improvements and modifications are also considered to be within the scope of protection of the present application.

Claims

1. A method for controlling output power, characterized in that: Applied to a central controller for regulating the power output of power generation equipment, the power generation equipment including photovoltaic power generation equipment and wind power generation equipment, including: Acquire a first output power value of the power generation device in a preset time period, and acquire first fluctuation data of the first output power value in the preset time period according to the first output power value, wherein the first fluctuation data is a rate of change of the first output power value over time; Obtaining a mapping relationship table of power fluctuation constraints allowed by the power grid system and time periods, wherein the constraints include multiple constraint factors and power variation limit values ​​corresponding to each constraint factor; the mapping relationship table includes constraint conditions for multiple discrete time periods, and the constraint conditions for different time periods in a day are different; Determine, according to the mapping relationship table and the preset time period, a minimum value among the plurality of power change limit values ​​as limited fluctuation data of power fluctuation within the preset time period; Determine second fluctuation data within the preset time period according to the first fluctuation data and the limited fluctuation data; The second fluctuation data is sent to the energy storage device, wherein the second fluctuation data is used to generate a compensation power value, and the second fluctuation data is the rate of change of the compensation power value over time; the compensation power value is used to be superimposed with the first output power value and generate a target output power value, wherein the absolute value of the fluctuation data of the target output power value is less than or equal to the limited fluctuation data.

2. The method according to claim 1, characterized in that The obtaining of a first output power value of the power generation device within a preset time period, and obtaining first fluctuation data of the first output power value within the preset time period according to the first output power value, comprises: Acquire a second output power value of the photovoltaic power generation device of the power generation equipment within a preset time period, and acquire third fluctuation data of the second output power value within the preset time period according to the second output power value; Acquire a third output power value of the wind power generation device of the power generation equipment within the preset time period, and acquire fourth fluctuation data of the third output power value within the preset time period according to the third output power value; Determine the first output power value from the power generation equipment within the preset time period based on the second output power value and the third output power value; determine the first fluctuation data of the first output power value within the preset time period based on the third fluctuation data and the fourth fluctuation data.

3. The method according to claim 2, characterized in that The obtaining of a second output power value of the photovoltaic power generation device of the power generation equipment within a preset time period, and obtaining third fluctuation data of the second output power value within the preset time period according to the second output power value, comprises: Acquire a second output power value output by the photovoltaic power generation device of the power generation equipment within a preset time period, and determine a first average value according to the second output power value; Determine third fluctuation data of the second output power value within the preset time period according to the difference between the first average value and the second output power value; The obtaining of the third output power value of the wind power generation device of the power generation equipment within the preset time period, and obtaining fourth fluctuation data of the third output power value within the preset time period according to the third output power value, comprises: Acquire a third output power value output by the wind power generation device of the power generation equipment within a preset time period, and determine a second average value according to the third output power value; Determine fourth fluctuation data of the third output power value within the preset time period according to the difference between the third output power value and the second average value; The determining of the first output power value from the power generation device within the preset time period according to the second output power value and the third output power value; and the determining of the first fluctuation data of the first output power value within the preset time period according to the third fluctuation data and the fourth fluctuation data include: Determine a first output power value from the power generation device within the preset time period according to the sum of the second output power value and the third output power value; The first fluctuation data of the first output power value within the preset time period is determined according to the sum of the third fluctuation data and the fourth fluctuation data.

4. The method according to claim 2, characterized in that After obtaining the second output power value of the photovoltaic power generation device of the power generation equipment within a preset time period, and obtaining third fluctuation data of the second output power value within the preset time period according to the second output power value, the method further includes: Determine first smoothed data within the preset time period according to the third fluctuation data within the preset time period, wherein the first smoothed data is formed by smoothing the third fluctuation data; Acquire a first energy storage capacity value according to the first smoothed data; After obtaining the third output power value of the wind power generation device of the power generation equipment within the preset time period, and obtaining fourth fluctuation data of the third output power value within the preset time period according to the third output power value, the method further includes: Determine second smoothed data within the preset time period according to the fourth fluctuation data within the preset time period, wherein the second smoothed data is formed by smoothing the fourth fluctuation data; Acquire a second energy storage capacity value according to the second smoothed data; A target energy storage capacity value is determined according to the sum of the first energy storage capacity value and the second energy storage capacity value, and the target energy storage capacity value is sent to the energy storage device, wherein the target energy storage capacity value is used to generate the energy storage capacity value of the energy storage device, wherein the energy storage capacity value of the energy storage device is greater than or equal to the target energy storage capacity value and can generate the compensation power value.

5. The method according to any one of claims 1 to 4, characterized in that: The determining, according to the first fluctuation data and the limited fluctuation data, the second fluctuation data within the preset time period comprises: The second fluctuation data is determined according to that an absolute value of a sum of the first fluctuation data and the second fluctuation data is less than or equal to the limited fluctuation data.

6. A method for controlling output power, characterized in that: Applied to energy storage equipment, used to regulate the power output of power generation equipment, the power generation equipment includes photovoltaic power generation equipment and wind power generation equipment, including: receiving second fluctuation data from a central controller, and determining a compensation power value output by the energy storage device according to the second fluctuation data, wherein the second fluctuation data is a rate of change of the compensation power value over time; The second fluctuation data within the preset time period is determined according to the first fluctuation data of the first output power value within the preset time period and the limited fluctuation data of the power fluctuation within the preset time period; The first fluctuation data of the first output power value within the preset time period is determined according to the first output power value of the power generation equipment within the preset time period; The limited fluctuation data of the power fluctuation within the preset time period is determined according to the mapping relationship table and the minimum value of multiple power change limit values ​​in the preset time period; wherein the mapping relationship table is a mapping table of the constraint conditions of the power fluctuation allowed by the power grid system and the time period, wherein the constraint conditions include multiple constraint factors and the power change limit value corresponding to each constraint factor; the mapping relationship table includes constraint conditions of multiple discrete time periods, and the constraint conditions of different time periods in each day are different; Compensation power is sent to the output line of the power generation equipment according to the compensation power value, and the compensation power is used to regulate the power output by the power generation equipment.

7. The method according to claim 6, characterized in that The method further comprises: receiving a target energy storage capacity value from a central controller; The energy storage capacity value of the energy storage device is configured according to the target energy storage capacity value, wherein the energy storage capacity value of the energy storage device is greater than or equal to the target energy storage capacity value, and the energy storage capacity value of the energy storage device can generate the compensation power value.

8. An output power control device, characterized in that: Including energy storage equipment and central controller; The central controller is used to execute the method according to any one of claims 1 to 5; The energy storage device is used to execute the method according to any one of claims 6 to 7.

9. A power generation system, characterized in that: It comprises power generation equipment, a grid-connected line and the output power control device as claimed in claim 8; The power generation equipment is used to output a first output power to the grid-connected line within a preset time period; The output power control device is used to send compensation power to the grid-connected line; The grid-connected line is used to output the target output power to the power grid system according to the first output power and the compensation power.

Citation Information

Patent Citations

  • Method for optimizing capacity of energy storage system in case of fluctuation of smooth and renewable energy sources electricity generation output

    CN102377248A

  • Energy storing device, system and method for stabilizing wind turbine generator output power fluctuations

    CN103490442A

  • Control method for stabilizing wind and light output power fluctuation through hybrid energy storage system

    CN103595068A

  • Hybrid energy storage leveling wind power fluctuation system and coordination control method thereof

    CN104158202A

  • Capacity allocation method for hybrid energy storage system capable of restraining wind power output power fluctuation

    CN104779630A