A fully sealed direct buried steam insulation pipe and its manufacturing process

By setting up a sealing cavity and slip layer in the steam insulation pipe, the problem of degradation of insulation performance and corrosion caused by water accumulation during the construction of the thermal network is solved, and higher sealing and thermal efficiency are achieved, and the use is extended. life.

CN114352847BActive Publication Date: 2024-11-26SHANGHAI KEHUA THERMAL PIPE SYST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210047439.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-01-17
Publication Date
2024-11-26
Estimated Expiration
2042-01-17

AI Technical Summary

Technical Problem

The existing steam insulation pipes are easily affected by water accumulation during the construction of the thermal grid, and the insulation cotton absorbs water and deforms, resulting in a decrease or loss of insulation performance, and the shell is easily corroded, shortening its service life.

Method used

Design a fully sealed direct buried steam insulation pipe. By setting a sealing cavity between the inner steam pipe and the outer shell, an internal insulation layer is built-in, and a sealed insulation support and slip layer are used to reduce thermal bridges and heat losses, ensuring sealing and Thermal efficiency.

Benefits of technology

It effectively avoids water seepage during on-site construction, improves the quality and life of the thermal network, and reduces the risks of heat loss and corrosion.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114352847B_ABST
    Figure CN114352847B_ABST
Patent Text Reader

Abstract

The present application relates to the field of heat pipe network, and discloses a fully sealed direct buried steam insulation pipe and its manufacturing process, the structure of which includes an inner steam pipe, an inner steel cylinder is sleeved on the inner steam pipe, an outer shell is sleeved on the inner steel cylinder, and both ends between the inner steel cylinder and the outer shell are fixed with sealed insulation supports, and a sealed cavity is formed between the inner steel cylinder, the outer shell and the sealed insulation support, and an inner insulation layer is arranged in the sealed cavity. The present application can effectively prevent rainwater from penetrating into the inner insulation layer during construction, and ensure the quality of use after the heat network is laid.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of thermal power pipe networks, and in particular to a fully sealed direct-buried steam insulation pipe and a manufacturing process thereof. Background Art

[0002] Factory-prefabricated direct-buried steam insulated pipes are mostly made of insulation cotton. They are widely used in municipal heating pipeline construction because of their simple processing and manufacturing methods, low cost, easy availability of materials, and theoretically good insulation performance.

[0003] The structure of the existing steam insulation pipe is as follows Figure 1 As shown, it includes an inner steam pipe 1 and an outer shell 2. An inner insulation layer 3 is filled between the inner steam pipe 1 and the outer shell 2. The inner insulation layer 3 is a fluffy insulation cotton. In order to relatively fix the outer shell 2 and the inner steam pipe 1, brackets 4 are fixed at both ends of a single section of prefabricated steam insulation pipe. During the construction of the heat network, multiple sections of prefabricated steam insulation pipes are firstly laid in the pipe trench, and then the inner steam pipe 1 and the outer shell 2 of adjacent sections are coaxially welded.

[0004] However, in engineering applications, the situation is far from as good as expected. During the construction of the heating network, rain causes water to accumulate in the pipe trench. The water in the trench enters between the outer shell 2 and the inner steam pipe 1. Glass wool, aluminum silicate wool or rock wool can easily absorb water. The thermal insulation felt deforms and deteriorates after absorbing water, and the thermal insulation performance is significantly reduced. In more serious cases, the thermal insulation material may fall off and the thermal insulation function is completely lost. At the same time, once water enters between the outer shell 2 and the inner steam pipe 1, the inner wall of the outer shell 2 is prone to corrosion. In as many as seven or eight years, or as few as two or three years, the outer shell 2 will produce a diffuse and large-scale corrosion process from the inner surface to the outer surface until the heating network is scrapped, thereby greatly shortening the service life of the steam network. Summary of the invention

[0005] In order to improve the waterproof performance of prefabricated direct-buried steam insulation pipes, the present application provides a fully sealed direct-buried steam insulation pipe and a manufacturing process thereof.

[0006] The fully sealed direct buried steam insulation pipe and its manufacturing process provided in this application adopt the following technical solutions:

[0007] A fully sealed direct-buried steam insulation pipe comprises an inner steam pipe, an inner steel cylinder is sleeved on the inner steam pipe, an outer shell is sleeved on the inner steel cylinder, sealing insulation supports are fixed at both ends between the inner steel cylinder and the outer shell, a sealed cavity is formed between the inner steel cylinder, the outer shell and the sealed insulation support, and an inner insulation layer is arranged in the sealed cavity.

[0008] By adopting the above technical solution, the inner insulation layer is arranged in the sealed cavity, thereby effectively preventing rainwater in the ditch from seeping in during the on-site construction and being absorbed by the inner insulation layer, reducing the adverse effects of the on-site construction environment on the quality of the heating network laying; in addition, the sealed insulation supports are used to seal the two ends between the inner steel cylinder and the outer shell, effectively avoiding the formation of thermal bridges and ensuring the thermal efficiency of the heating network transmission.

[0009] Preferably, the sealing and thermal insulation support includes a thermal insulation ring sleeved on the inner steel cylinder, the inner wall of the thermal insulation ring is provided with a first sealing connection layer for sealingly connecting the inner steel cylinder, and the outer wall of the thermal insulation ring is provided with a second sealing connection layer for sealingly connecting the outer shell.

[0010] By adopting the above technical solution, the thermal insulation ring is sealed and fixed between the inner steel cylinder and the outer shell through the first sealing connection layer and the second sealing connection layer, thereby playing a supporting and thermal insulation role.

[0011] Preferably, the second sealing connection layer includes an adhesive layer coated on the peripheral side of the outer wall of the thermal insulation tile ring, and the adhesive layer is wrapped with an outer steel ring, and the outer steel ring is sealed and fixed to the outer shell.

[0012] By adopting the above technical solution, the outer steel ring is fixed to the thermal insulation tile ring by using the adhesive layer, and the outer steel ring is used as a transition layer, so that the thermal insulation tile ring and the outer shell can be sealed and welded and fixed by the welding process.

[0013] Preferably, a sliding layer is provided between the inner steam pipe and the inner steel cylinder to facilitate the sliding of the inner steam pipe relative to the inner steel cylinder.

[0014] By adopting the above technical solution, a slip layer is provided to reduce direct contact between the inner steam pipe and the inner steel cylinder, thereby reducing the thermal expansion slip resistance of the inner steam pipe and reducing the heat loss of the heat network transmission.

[0015] Preferably, the sliding layer comprises a cushion layer fixed to the inner wall of the inner steel cylinder, and a ball is embedded on a side of the cushion layer close to the inner steam pipe.

[0016] By adopting the above technical solution in combination with the ball bearings, the direct contact between the inner steam pipe and the inner steel cylinder is further reduced, thereby reducing the sliding resistance of the inner steam pipe and reducing the heat loss of the heating network.

[0017] Preferably, the cushion layer has a cross-section shape of a circular arc segment, and the cushion layer is arranged at the bottom between the inner steam pipe and the inner steel cylinder.

[0018] By adopting the above technical solution, the cushion layer plays a role of supporting the inner steam pipe. At the same time, the cushion layer is only arranged at the bottom between the inner steam pipe and the inner steel cylinder, which further reduces the direct contact between the inner steam pipe and the inner steel cylinder and reduces the heat loss during the service of the heating network.

[0019] Preferably, the inner steel cylinder is a plug-in sleeve.

[0020] By adopting the above technical solution, the inner steel cylinder is close to the inner steam pipe, and the elongation due to heat is compensated for by the telescopic movement of the plug-in sleeve.

[0021] Preferably, the inner steel cylinder comprises an inner cylinder and an outer cylinder slidably sleeved on the inner cylinder, and an outer sleeve slidably sleeved on the outer cylinder is fixed to the outer wall of one end of the inner cylinder close to the outer cylinder.

[0022] By adopting the above technical solution, the outer cylinder is inserted between the outer sleeve and the inner cylinder, thereby ensuring the sealing performance in the sealing cavity.

[0023] Preferably, disposable sealing belts are circumferentially arranged at both ends between the inner steel cylinder and the inner steam pipe.

[0024] By adopting the above technical solution, the disposable sealing tape is used to temporarily fix the position of the inner steam pipe relative to the insulation tile ring to prevent the inner steam pipe from slipping in the inner steel cylinder during transportation. On the other hand, it is also used to prevent rainwater from seeping into between the inner steel cylinder and the inner steam pipe during transportation. During laying, the disposable sealing tape needs to be cut off.

[0025] A manufacturing process of a fully sealed direct buried steam insulation pipe comprises the following steps:

[0026] S1, prepare the inner steam pipe; prepare the outer cylinder, inner cylinder and outer sleeve, and assemble them into the inner steel cylinder;

[0027] S2, fixed slip layer on the inner wall of the inner steel cylinder;

[0028] S3, coaxially sleeve the inner steel cylinder with the sliding layer on the inner steam pipe;

[0029] S4, tying the inner insulation layer outside the inner tube and the outer sleeve;

[0030] S5, coating the outer tube with high temperature resistant glue, and laying thermal insulation tiles on the high temperature resistant glue to form a thermal insulation tile ring;

[0031] S6, coating an adhesive layer on the outer wall of the insulation tile ring, and wrapping an outer steel ring on the insulation tile ring;

[0032] S7, winding the ribbon around the inner insulation layer to tighten the inner insulation layer;

[0033] S8, sleeve an outer shell onto the outer steel ring and the inner insulation layer, and seal-weld the outer steel ring and the outer shell;

[0034] S9, slide the outer shell and the outer cylinder to expose the end of the inner cylinder away from the outer cylinder, and repeat steps S5 and S6 on the inner cylinder;

[0035] S10, sliding the outer shell and the outer cylinder back to their original positions, and sealingly welding the outer steel ring at the other end of the outer cylinder to the outer shell;

[0036] S11, apply sealant around both ends between the inner steel cylinder and the inner steam pipe to form a disposable sealing belt.

[0037] By adopting the above technical solution and utilizing the structure of the inner steel tube plug-in and sliding, the insulation tile rings and the outer steel ring at both ends are manufactured in sequence, and the structure of the sealed inner insulation layer is manufactured from a technological perspective.

[0038] In summary, the present application includes at least one of the following beneficial technical effects:

[0039] By setting a sealed cavity between the inner steam pipe and the outer shell, and setting an inner insulation layer in the sealed cavity, water in the ditch can be prevented from seeping into the inner insulation layer during on-site construction, thus ensuring the quality of use of the heating network after construction;

[0040] By setting a slip layer between the inner steam pipe and the inner steel cylinder, the contact area between the inner steam pipe and the inner steel cylinder is reduced, and the heat loss caused by heat conduction of the inner steam pipe is reduced while reducing the slip resistance of the thermal expansion of the inner steam pipe;

[0041] The inner steel tube is set as a plug-in sleeve, and the insulation tile rings and outer steel rings at both ends are manufactured in turn, so as to realize the manufacturing of the fully sealed direct-buried steam insulation pipe with a sealed inner insulation layer from a technical point of view. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] Figure 1 It is a structural schematic diagram of an existing steam insulation pipeline.

[0043] Figure 2 It is a structural schematic diagram of a fully sealed direct-buried steam insulation pipe according to an embodiment of the present application.

[0044] Explanation of the reference numerals: 1. inner steam pipe; 2. outer shell; 3. inner insulation layer; 4. bracket; 5. inner steel cylinder; 6. insulation tile ring; 7. first sealing connection layer; 8. outer steel ring; 9. adhesive layer; 10. cushion layer; 11. ball bearing; 12. inner cylinder; 13. outer cylinder; 14. outer sleeve; 15. disposable sealing tape. DETAILED DESCRIPTION

[0045] The following is combined with Figure 2 This application is described in further detail.

[0046] The embodiment of the present application discloses a fully sealed direct-buried steam insulation pipe and a manufacturing process thereof.

[0047] Reference Figure 2A fully sealed direct-buried steam insulation pipe comprises an inner steam pipe 1, an inner steel cylinder 5 is coaxially sleeved on the inner steam pipe 1, an outer shell 2 is sleeved on the inner steel cylinder 5, and sealed insulation supports are fixed at both ends between the inner steel cylinder 5 and the outer shell 2, a sealed cavity is formed between the inner steel cylinder 5, the outer shell 2 and the sealed insulation support, an inner insulation layer 3 is installed in the sealed cavity, the inner insulation layer 3 adopts insulation cotton felt, and insulation cotton felt has a very high cost performance as an insulation material. In the present application, a sealed cavity is set on the inner wall of the outer shell 2, and the sealed cavity is used to accommodate the inner insulation layer 3. During the laying of the buried steam insulation pipe on site, it is ensured that rainwater in the construction environment cannot penetrate into the inner insulation layer 3, thereby effectively avoiding corrosion in the heat network and moisture in the insulation cotton felt, and ensuring the quality of the steam pipe network after construction and laying.

[0048] The sealing and thermal insulation support includes an insulating tile ring 6 which is sleeved on the inner steel cylinder 5. The insulating tile ring 6 is used to avoid the formation of a thermal bridge between the inner steam pipe 1 and the outer shell 2, which causes heat loss. The inner wall of the insulating tile ring 6 is coated with a first sealing connection layer 7 for sealingly connecting the inner steel cylinder 5. The first sealing connection layer 7 is a high-temperature resistant sealant. The outer wall of the insulating tile ring 6 is provided with a second sealing connection layer for sealingly connecting the outer shell 2. The first sealing connection layer 7 and the second sealing connection layer are used to fix the insulating tile ring 6 to the end between the outer shell 2 and the inner steam pipe 1 to ensure that rainwater from the outside cannot penetrate into the sealed cavity.

[0049] Due to process limitations, the outer wall of the insulation tile ring 6 is not convenient to be sealed and connected to the outer shell 2 by coating with sealant, so the second sealing connection layer includes an adhesive layer 9 coated on the outer side of the outer wall of the insulation tile ring 6. The adhesive layer 9 is formed by the solidification of the sealant. An outer steel ring 8 is wrapped around the adhesive layer 9. The end of the outer steel ring 8 away from the inner insulation layer 3 is circumferentially sealed and welded to the outer shell 2, that is, the outer steel ring 8 is used as a transition layer to achieve a sealed connection between the insulation tile ring 6 and the outer shell 2.

[0050] A slip layer is provided between the inner steam pipe 1 and the inner steel cylinder 5 to facilitate the sliding of the inner steam pipe 1 relative to the inner steel cylinder 5. The slip layer includes a cushion layer 10 fixed to the inner wall of the inner steel cylinder 5, and a ball 11 is embedded on the side of the cushion layer 10 close to the inner steam pipe 1. By providing the slip layer, firstly, the contact area between the inner steam pipe 1 and the inner steel cylinder 5 is reduced, and the resistance to relative sliding between the two is reduced, which facilitates the thermal expansion and contraction movement of the inner steam pipe 1 in the inner steel cylinder 5; secondly, since the slip layer is provided between the inner steam pipe 1 and the inner steel cylinder 5, the direct contact between the inner steam pipe 1 and the inner steel cylinder 5 is reduced, forming an air layer with a smaller width, thereby greatly reducing the heat loss of the inner steam pipe 1. By embedding the ball 11, the resistance to the thermal expansion and contraction movement of the inner steam pipe 1 and the contact area between the inner steam pipe 1 and the inner steel cylinder 5 are further reduced, thereby reducing the heat loss.

[0051] The cross section of the cushion layer 10 is in the shape of a circular arc segment. The cushion layer 10 is also located at the bottom between the inner steam pipe 1 and the inner steel cylinder 5. Since the application scenario of this application is a buried pipe, the inner steam pipe 1 is supported by the bottom of the inner wall of the inner steel cylinder 5 during use. Therefore, in order to further reduce the contact between the inner steam pipe 1 and the inner steel cylinder 5, the cushion layer 10 is only set at the bottom. The central angle of the cushion layer 10 is between 150 degrees and 20 degrees. Under the premise that the support strength is met, it is better for the cushion layer 10 to have a smaller central angle, which reduces the direct contact area between the cushion layer 10 and the inner steam pipe 1, and can also facilitate the fixing of the cushion layer 10 in the inner steel cylinder 5 during the production process.

[0052] Also limited by the production process, in order to smoothly put the outer shell 2 on the inner insulation layer 3, it is necessary to use a ribbon to wrap and shrink the inner insulation layer 3, so as to facilitate the outer shell 2 to be put on the inner insulation layer 3, but if the insulation tile rings 6 at both ends are made first, the ribbon cannot be pulled out. Therefore, the inner steel cylinder 5 is a plug-in sleeve, and the telescopic sliding of the plug-in sleeve is used to realize the length compensation of the inner steel cylinder 5 after the heat extension. The inner steel cylinder 5 includes an inner cylinder 12 and an outer cylinder 13 slidingly sleeved on the inner cylinder 12. When in use, the thermal insulation ring 6 at one end is first fixed to the outer shell 2, and then the outer shell 2 is slid to expose the other end of the inner steel cylinder 5. After the thermal insulation ring 6 at the other end is made, the sliding outer shell 2 is reset, and finally the thermal insulation ring 6 at the other end is sealed and fixed to the outer shell 2. The outer wall of one end of the inner cylinder 12 close to the outer cylinder 13 is fixed with an outer sleeve 14 slidingly sleeved on the outer cylinder 13, and then one end of the outer cylinder 13 is inserted between the outer sleeve 14 and the inner cylinder 12 to further ensure the sealing of the sealing cavity. Sealant is applied circumferentially at both ends between the inner steel cylinder 5 and the inner steam pipe 1, and a disposable sealing tape 15 is formed after the sealant solidifies. The disposable sealing tape 15 is provided to temporarily fix the position of the inner steam pipe 1 relative to the thermal insulation ring 6 to prevent the inner steam pipe 1 from slipping in the inner steel cylinder 5 during transportation, and to prevent rainwater from seeping into between the inner steel cylinder 5 and the inner steam pipe 1 during transportation. The disposable sealing tape 15 is cut off during laying.

[0053] A manufacturing process of a fully sealed direct buried steam insulation pipe comprises the following steps:

[0054] S1, prepare an inner steam pipe 1 of a required size; prepare an inner cylinder 12 and an outer sleeve 14, and coaxially seal and weld one end of the outer sleeve 14 to the inner cylinder 12, then prepare an outer cylinder 13, and coaxially insert one end of the outer cylinder 13 between the outer sleeve 14 and the inner cylinder 12 to assemble into an inner steel cylinder 5;

[0055] S2, fixing the slip layer at the bottom of the inner wall of both ends of the inner steel cylinder 5. The slip layer can be fixed to the inner wall of the inner steel cylinder 5 by using high temperature resistant glue or by welding;

[0056] S3, coaxially sleeve the inner steel cylinder 5 with the sliding layer on the inner steam pipe 1. In order to ensure that the inner steel cylinder 5 remains coaxial with the inner steam pipe 1, a pad may be inserted between the inner steam pipe 1 and the inner steel cylinder 5. The pad may be a heat-insulating cotton felt. The pad is arranged at the end of the inner steel cylinder 5 to facilitate the subsequent removal of the pad.

[0057] S4, tying thermal insulation felt outside the inner tube 12 and the outer sliding sleeve 14 to form an inner thermal insulation layer 3;

[0058] S5, coating the outer tube 13 with high temperature resistant glue, laying insulation tiles on the high temperature resistant glue, forming an insulation tile ring 6, and forming a first sealing connection layer 7 after the high temperature resistant glue solidifies;

[0059] S6, coating the outer wall of the heat-insulating tile ring 6 with high temperature resistant glue, wrapping the outer steel ring 8 on the heat-insulating tile ring 6, and forming a bonding layer 9 after the high temperature resistant glue solidifies;

[0060] S7, winding the ribbon around the inner insulation layer 3 to tighten the inner insulation layer 3;

[0061] S8, sleeve the outer shell 2 on the outer steel ring 8 and the inner insulation layer 3, and pull out the ribbon through the end of the inner insulation layer 3 away from the insulation tile ring 6 to release the inner insulation layer 3, so as to facilitate the expansion of the insulation cotton felt and achieve better insulation performance, and seal and weld the end of the outer steel ring 8 away from the inner insulation layer 3 to the outer shell 2;

[0062] S9, slide the outer shell 2 and the outer cylinder 13 to expose the end of the inner cylinder 12 away from the outer cylinder 13, and the end of the outer cylinder 13 does not separate from the outer wall of the inner cylinder 12, and repeat steps S5 and S6 on the inner cylinder 12 to manufacture the insulation tile ring 6 and the outer steel ring 8 on the end of the inner cylinder 12 away from the outer cylinder 13;

[0063] S10, the sliding housing 2 and the outer cylinder 13 are reset, and the outer steel ring 8 at the other end of the outer cylinder 13 is sealed and welded to the housing 2;

[0064] S11, applying sealant around both ends of the inner steel cylinder 5 and the inner steam pipe 1 to form a disposable sealing belt 15.

[0065] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A fully sealed direct buried steam insulation pipe, characterized in that: The invention comprises an inner steam pipe (1), an inner steel cylinder (5) is sleeved on the inner steam pipe (1), an outer shell (2) is sleeved on the inner steel cylinder (5), sealing and heat-insulating supports are fixed at both ends between the inner steel cylinder (5) and the outer shell (2), a sealed cavity is formed between the inner steel cylinder (5), the outer shell (2) and the sealed and heat-insulating supports, and an inner heat-insulating layer (3) is arranged in the sealed cavity; The sealing and heat-insulating support comprises a heat-insulating tile ring (6) sleeved on the inner steel cylinder (5); the inner wall of the heat-insulating tile ring (6) is provided with a first sealing connection layer (7) for sealingly connecting the inner steel cylinder (5); the outer wall of the heat-insulating tile ring (6) is provided with a second sealing connection layer for sealingly connecting the outer shell (2); the second sealing connection layer comprises a glue layer (9) coated on the peripheral side of the outer wall of the heat-insulating tile ring (6); the glue layer (9) is covered with an outer steel ring (8); the outer steel ring (8) is sealed and fixed to the outer shell (2); A sliding layer is provided between the inner steam pipe (1) and the inner steel cylinder (5) to facilitate the sliding of the inner steam pipe (1) relative to the inner steel cylinder (5); the sliding layer comprises a cushion layer (10) fixed to the inner wall of the inner steel cylinder (5), and a ball (11) is embedded on a side of the cushion layer (10) close to the inner steam pipe (1); The inner steel cylinder (5) is a plug-in sleeve; the inner steel cylinder (5) comprises an inner cylinder (12) and an outer cylinder (13) which is slidably sleeved on the inner cylinder (12); an outer sleeve (14) which is slidably sleeved on the outer cylinder (13) is fixed to the outer wall of one end of the inner cylinder (12) close to the outer cylinder (13).

2. A fully sealed direct buried steam insulation pipe according to claim 1, characterized in that: The cushion layer (10) has a cross section in the shape of a circular arc segment, and the cushion layer (10) is arranged at the bottom between the inner steam pipe (1) and the inner steel cylinder (5).

3. A fully sealed direct buried steam insulation pipe according to claim 1, characterized in that: Disposable sealing belts (15) are circumferentially arranged at both ends between the inner steel cylinder (5) and the inner steam pipe (1).

4. A manufacturing process for a fully sealed direct buried steam insulation pipe as claimed in claim 3, characterized in that: The following steps are included: S1, preparing an inner steam pipe (1); preparing an outer cylinder (13), an inner cylinder (12) and an outer sliding sleeve (14), and assembling them into an inner steel cylinder (5); S2, a fixed slip layer on the inner wall of the inner steel cylinder (5); S3, coaxially sleeve the inner steel cylinder (5) with the sliding layer on the inner steam pipe (1); S4, tying thermal insulation felt outside the inner tube (12) and the outer sliding sleeve (14) to form an inner thermal insulation layer (3); S5, coating the outer tube (13) with a high temperature resistant sealant, laying insulation tiles on the high temperature resistant sealant to form an insulation tile ring (6), and forming a first sealing connection layer (7) after the high temperature resistant sealant solidifies; S6, coating an adhesive layer (9) on the outer wall of the thermal insulation tile ring (6), and wrapping an outer steel ring (8) on the thermal insulation tile ring (6); S7, winding the ribbon around the inner thermal insulation layer (3) to tighten the inner thermal insulation layer (3); S8, sleeve the outer shell (2) onto the outer steel ring (8) and the inner insulation layer (3), and seal-weld the outer steel ring (8) and the outer shell (2); S9, sliding the outer shell (2) and the outer cylinder (13) to expose the end of the inner cylinder (12) away from the outer cylinder (13), and repeating steps S5 and S6 on the inner cylinder (12); manufacturing a heat-insulating tile ring (6) and an outer steel ring (8) on the end of the inner cylinder (12) away from the outer cylinder (13); S10, the sliding housing (2) and the outer cylinder (13) are reset, and the outer steel ring (8) at one end away from the outer cylinder (13) is sealed and welded to the housing (2); S11, applying sealant around the two ends between the inner steel cylinder (5) and the inner steam pipe (1) to form a disposable sealing belt (15).