By analyzing the grid channel saturation and permeability thermal scenarios, determining the target replenishment area and number, the problems of insufficient channel service capacity coverage and resource waste in the existing technology are solved, and business efficiency and rationality of replenishment are improved.

CN114358451BActive Publication Date: 2024-11-08CHINA MOBILE GRP GUANGDONG CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202011061864.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-09-30
Publication Date
2024-11-08
Estimated Expiration
2040-09-30

AI Technical Summary

Technical Problem

When the existing technology lacks the coverage of channel service capabilities, the location and area of ​​the replenishment needs to be identified manually, which consumes high time and costs, is low in business efficiency, and ignores the replenishment needs of areas with channel coverage but strong demand, which can easily lead to resource waste.

Method used

By obtaining data information in the grid, determining the channel saturation, dividing the grid type, and based on the flow thermal scene saturation of the unsaturated grid, determining the target replenishment area, number of replenishment points and type of channel replenishment points, comprehensively considering the channels Complement the needs of areas covered but strong demand to avoid waste of resources.

Benefits of technology

Improve business efficiency, avoid resource waste caused by replenishing points in areas where unmanned traffic gatherings are located, and ensure the rationality and efficiency of replenishing points.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114358451B_ABST
    Figure CN114358451B_ABST
Patent Text Reader

Abstract

The present invention discloses a grid channel layout planning method and system, the method comprising obtaining data information within a grid; determining the channel saturation of the grid according to the data information; determining the grid type according to the channel saturation, wherein the grid type comprises an unsaturated grid, a saturated grid and an oversaturated grid; determining the saturation of the thermal scene of human flow of the unsaturated grid based on the unsaturated grid; determining the target supplementary point area, the number of supplementary points and the channel supplementary point type according to the saturation of the thermal scene of human flow. The embodiment of the present invention evaluates supplementary points based on the densely populated areas of the unsaturated grid, comprehensively considers the supplementary point needs of areas with channel coverage but strong demand, avoids the waste of resources caused by supplementary points in areas without human flow, and improves business efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the business support IT field, and in particular to a grid channel layout planning method and system. Background Art

[0002] In order to achieve scientific evaluation of grid channel capabilities, improve evaluation efficiency, and thereby enhance market operation capabilities and channel market share, in some instances, channel managers judge the coverage of channel service capabilities based on channel performance data and personal business experience, identify areas where channel service capabilities and channel coverage are insufficient based on experience, and then go to the destination to conduct on-site inspections or sampling surveys, compile statistics on the sampling survey data to form a site selection report, and arrange channel supplementary points in the corresponding areas.

[0003] However, the above example only considers adding points in areas without channel coverage, and ignores the need for adding points in areas with channel coverage, strong demand but insufficient number of channels. The flow of people in areas without channel coverage may be small, and the value of adding points is low. Adding points in such areas is likely to cause a waste of resources, and manually identifying the best areas for adding points is time-consuming and has low business efficiency. Summary of the invention

[0004] The embodiment of the present invention provides a grid channel layout planning method and system to solve the problems in the prior art that when the channel service capacity coverage is insufficient, the channel layout planning is unreasonable, the location and area of ​​the supplementary points need to be manually identified, the time-consuming cost is high, and the business efficiency is low.

[0005] In order to solve the above-mentioned technical problems, the present invention is achieved as follows:

[0006] In a first aspect, a grid channel layout planning method is provided, the method comprising:

[0007] Get the data information in the grid;

[0008] Determining the channel saturation of the grid according to the data information;

[0009] Determining a grid type according to the channel saturation, wherein the grid type includes an unsaturated grid, a saturated grid, and an oversaturated grid;

[0010] Based on the unsaturated grid, determining the saturation of the thermal scene of the passenger flow of the unsaturated grid;

[0011] According to the saturation of the thermal scene of human flow, the target filling point area, the number of filling points and the channel filling point type are determined.

[0012] In a second aspect, a grid channel layout planning system is provided, the system comprising:

[0013] The acquisition module is used to obtain data information in the grid;

[0014] A first determination module, used to determine the channel saturation of the grid according to the data information;

[0015] A second determination module is used to determine a grid type according to the channel saturation, wherein the grid type includes an unsaturated grid, a saturated grid and an oversaturated grid;

[0016] A third determination module is used to determine the saturation of the thermal scene of the passenger flow of the unsaturated grid based on the unsaturated grid;

[0017] The fourth determination module is used to determine the target replenishment point area, the number of replenishment points and the channel replenishment point type according to the saturation of the thermal scene of the pedestrian flow.

[0018] In a third aspect, an electronic device is provided, comprising: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the computer program is executed by the processor, the steps of the method described in the first aspect are implemented.

[0019] In a fourth aspect, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the steps of the method described in the first aspect are implemented.

[0020] In an embodiment of the present invention, data information in the grid is first obtained, and the channel saturation of the grid is determined based on the data information. The grid type is determined based on the channel saturation. Based on the unsaturated grid in the grid type, the saturation of the thermal scene of the unsaturated grid is determined. Finally, according to the saturation of the thermal scene of the unsaturated grid, the target supplementary point area, the number of supplementary points and the channel supplementary point type are determined. The embodiment of the present invention evaluates supplementary points in densely populated areas of unsaturated grids, comprehensively considers the supplementary point needs of areas with channel coverage but strong demand, avoids the waste of resources caused by supplementary points in areas without human traffic, and improves business efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:

[0022] Figure 1 is a flow chart of a grid channel layout planning method provided by an embodiment of the present invention;

[0023] Figure 2 is a schematic diagram of another grid channel layout planning system provided by an embodiment of the present invention;

[0024] Figure 3 It is a schematic diagram of the hardware structure of a terminal device provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0025] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0026] The embodiment of the present invention provides a grid channel layout planning method and system, which takes the channel supply and demand relationship of the comprehensive grid as the starting point, analyzes based on POI (Point of Information) data and mobile business big data, constructs a comprehensive grid channel saturation scoring model to quantitatively evaluate the distribution of physical channels in the comprehensive grid, extracts crowd gathering areas based on unsaturated grids, outputs layout planning suggestions through the comprehensive grid channel supplement recommendation model, and guides channel operations.

[0027] like Figure 1 As shown in FIG. 1 , it is a flow chart of a grid channel layout planning method provided by an embodiment of the present invention. Figure 1 As shown, the grid channel layout planning method may include: the contents shown in step S101 to step S105.

[0028] In step S101, data information in the grid is obtained.

[0029] In an embodiment of the present invention, the data information may include business handling volume information, passenger flow information, infrastructure information, business district feature information, and store location information.

[0030] In step S102, the channel saturation of the grid is determined according to the data information.

[0031] In step S103, the grid type is determined according to the channel saturation.

[0032] The grid types include unsaturated grids, saturated grids and oversaturated grids. The specific grid classification is described in detail in the following embodiments and is not described in detail in this embodiment.

[0033] In step S104, based on the unsaturated grid, the saturation of the thermal scene of the pedestrian flow of the unsaturated grid is determined.

[0034] In step S105, the target supplementary point area, the number of supplementary points and the channel supplementary point type are determined according to the saturation of the thermal scene of the flow of people.

[0035] In the embodiment of the present invention, data information in the grid is first obtained, and the channel saturation of the grid is determined according to the data information. The grid type is determined according to the channel saturation. Based on the unsaturated grid in the grid type, the saturation of the thermal scene of the unsaturated grid is determined. Finally, according to the saturation of the thermal scene of the unsaturated grid, the target supplementary point area, the number of supplementary points and the channel supplementary point type are determined. The supplementary point evaluation is performed in the densely populated area of ​​the unsaturated grid, and the supplementary point demand in the area with channel coverage but strong demand is comprehensively considered, avoiding the waste of resources caused by supplementary points in the area without human traffic, and improving business efficiency.

[0036] In a possible implementation manner of the present invention, obtaining data information in a grid may include the following steps.

[0037] Obtain sample data, including business volume information, passenger flow information, infrastructure information, business district feature information, and store location information;

[0038] Perform indicator screening on sample data to obtain data information within the grid.

[0039] Specifically, an embodiment of the present invention provides a comprehensive grid saturation scoring model, which mainly quantitatively analyzes the grid channel supply and demand relationship based on the typical attributes of the grid and outputs the channel saturation of the grid.

[0040] Furthermore, the present invention integrates POI data and mobile business big data to obtain the business processing volume information, passenger flow information, infrastructure information, business district feature information, and store location information of the grid, constructs a scientific factor library, and constructs two evaluation systems of grid development potential and grid service capability according to business needs. The service capability includes three dimensions: expected business scale, competitive business distribution, and business capability; the development potential includes four dimensions: convenient transportation, grid ecology, user value, and user scale.

[0041] Then, based on the seven dimensions of the two evaluation systems, secondary indicators are constructed. The business expectation scale dimension includes secondary indicators such as package upgrade income expectations, number release expectations, and home network application expectations. The competitive distribution dimension includes the number of self-operated channels, social channels, and other network channels. The business capability dimension includes our company's channel density, average star rating, etc. The transportation convenience dimension includes the number of subway stations, bus stops, and intersections. The grid ecology dimension includes the number of catering services, higher vocational and undergraduate programs, general hospitals, residential areas, etc. The user value dimension includes the average 5G traffic per customer, the average 4G traffic per customer, the average main package price per customer, etc. The user scale dimension includes the total grid population, the number of users aged 25-30, the number of white-collar workers, etc.

[0042] Furthermore, the indicator of the business expectation scale dimension means taking the average business level of cities and prefectures as the business standard that the grid expects to achieve, taking the calculation of number allocation expectations as an example.

[0043] First, calculate the average number of number releases of each star-level channel in each city as the number release expectation E of the star-level channel in the city. i .

[0044] For example, the number of numbers released by each 3-star channel in the grid is 70, 40, 60, and 80 respectively. The expected number of numbers released by the 3-star channels in this grid = (70+40+60+80) / 4 = 62.5 = E i .

[0045] Secondly, the total number release expectation A of the grid is calculated based on the number of star-level channels in the comprehensive grid. The calculation formula is:

[0046] Where N i is the number of i-star channels in the grid, E i is the number release expectation of the i-star channel, and n is the number of star levels.

[0047] For example, 1 star N i is 5, E i N is 2; 2 stars i =2, E i 5; 3 stars N i =1, E i 10; 4 stars N i =1, E i is 20, then A=5×2+2×5+1×10+1×20=50

[0048] Furthermore, with the rapid growth of the indicator database data scale, the indicator data corresponding to each grid also increases, including irrelevant and interfering indicators. In order to avoid affecting the progress and efficiency of the model, indicator screening is very necessary.

[0049] First, the correlation analysis method is used to calculate the correlation between indicators, and then combined with the IV value (Information Value) method, the indicators with high IV values ​​are retained. While avoiding multicollinearity, irrelevant indicators are also screened.

[0050] In a possible implementation manner of the present invention, determining the channel saturation of a grid according to data information may include the following steps.

[0051] Determine the grid service capability and development potential score of each data based on the indicator weight and indicator value of the data information;

[0052] The channel saturation of the grid is determined based on the ratio of the grid’s service capability and development potential scores.

[0053] Specifically, the embodiment of the present invention provides a comprehensive grid saturation scoring model, which calculates the weights of the secondary indicators under the seven dimensions through the entropy method, and then calculates the scores of the seven dimensions based on the indicator weights and indicator values, and then calculates the dimension weights based on the seven dimension scores through the entropy method, and finally calculates the grid service capability and development potential scores based on the dimension weights. Service capability is used to evaluate the resource input of the grid, and development potential is used to evaluate the market demand of the grid. The grid saturation is constructed by the ratio of grid service capability to development potential, and the balance between the market demand and resource input of the channels within the grid is evaluated, thereby evaluating the rationality of the channel distribution of the grid.

[0054] The grid saturation scores are sorted in ascending order, and the first 10% grids of the third-tier cities with a saturation <0.85 are output as unsaturated grids, the last 10% grids of the third-tier cities with a saturation >1.15 are output as oversaturated grids, and the rest are saturated grids.

[0055] Among them, the grid service capacity and grid development potential of the saturated grid are relatively balanced, indicating that the grid's resource input matches the market demand and the channel distribution is relatively reasonable. The grid current service capacity of the oversaturated grid is greater than the grid's development potential, indicating that the grid's resource input is higher than the market demand and is in a state of oversupply. The grid current service capacity of the unsaturated grid is less than the grid's development potential, indicating that the grid has missed potential markets and is in a state of insufficient supply.

[0056] The process of calculating indicator weights based on the entropy method:

[0057] The entropy value can be calculated to determine the degree of dispersion of the secondary indicators under the seven dimensions of the two evaluation systems. The greater the degree of dispersion, the greater the impact of the indicator on the score of the dimension.

[0058] First, the entropy value of the indicator is calculated to measure the discrete degree of the indicator. The calculation formula is as follows:

[0059]

[0060]

[0061] Among them, r ij It indicates the weight of the jth indicator under the i-th record.

[0062] Then, the weight of the indicator is calculated to measure the coefficient that the secondary indicator under the seven dimensions should be multiplied by when calculating the total score. The calculation formula is as follows:

[0063]

[0064] where h j is the difference coefficient h of the jth index j =1-e j ,j=1,2,3.

[0065] Finally, the entropy score of each secondary indicator is calculated based on the indicator weight and indicator value.

[0066]

[0067] Similarly, according to the secondary indicator weights and indicator values, the scores of the seven dimensions are calculated, and then the dimension weights are calculated based on the seven dimension scores through the entropy method. Finally, the grid service capability and development potential scores are obtained based on the dimension weights.

[0068] In a possible implementation of the present invention, based on the unsaturated grid, determining the saturation of the thermal scene of the passenger flow of the unsaturated grid may include the following steps.

[0069] According to the population distribution in the unsaturated grid, kernel density analysis is performed on the base stations in the unsaturated grid;

[0070] Based on the analysis results, the saturation of the thermal scenario of pedestrian flow in the unsaturated grid is determined.

[0071] Specifically, an embodiment of the present invention provides an unsaturated grid scene extraction model, which mainly extracts the crowd gathering area of ​​the unsaturated grid according to the population distribution of the base station.

[0072] Furthermore, the kernel density analysis algorithm can be used to measure population density and generate crowd flow heat maps. Based on the mobile phone signaling data, this scheme regards the CGI (Common Gateway Interface) of the cell where the user stays the longest in the month as its home base station for base station population statistics, and performs kernel density analysis on the base stations in the unsaturated grid output by the comprehensive grid saturation scoring model. Based on the unsaturated grid, a crowd flow heat map is generated, and scenes of densely populated areas are extracted according to certain thresholds.

[0073] The process of calculating population density based on kernel density is as follows.

[0074] Assume that the density of the spatial pattern at the base station S is measurable, and let the event density at S be λ(S), whose estimated value is but:

[0075]

[0076] In the formula, C(s,r) is the circular domain with point s as the center and r as the radius, and # represents the number of events S falling in the circular domain C.

[0077] According to probability theory, the general definition of kernel density estimation is: Let X1,...,Xn be independent and identically distributed samples drawn from a population with a distribution density function of f, and estimate the value f(x) of f at a certain point x. Usually, there is the Rosenblatt-Parzen kernel estimate:

[0078]

[0079] In the formula, n represents the number of spatial entities contained in the distance threshold range; represents the kernel function; h represents the distance threshold; (xX i ) represents the estimated value x to event X i The distance between the

[0080] According to the Rosenblatt-Parzen kernel estimation formula, the estimated value of the point density λ(s) of geographical event s in the study area R is have

[0081]

[0082] In the formula, represents the kernel function. For the convenience of processing, this function is normalized (i.e., the volume under the function surface with s as the origin is 1); h>0 is the bandwidth. The choice of h value will affect the smoothness of the distribution density estimate; (ss i ) are the points s and s that need to be estimated i The distance between.

[0083] Commonly used kernel functions include Gaussian kernel function and quartic polynomial kernel function, where Gaussian kernel function is expressed as:

[0084]

[0085] The fourth-order polynomial kernel function is expressed as:

[0086]

[0087] Where h represents the distance threshold of the kernel function, i.e., the bandwidth; (xX i ) represents the estimated value x to event X i The distance between the

[0088] In a possible implementation manner of the present invention, determining the target supplementary point area, the number of supplementary points and the channel supplementary point type according to the saturation of the thermal scene of the flow of people may include the following steps.

[0089] Determine the unsaturated thermal scene based on the saturation of the thermal scene of the flow of people;

[0090] The unsaturated thermal scenario is used as the target filling point area in the grid channel;

[0091] The grid service capacity of the unsaturated grid is matched with the preset service capacity table to determine the channel supplement point type and number of supplement points.

[0092] Specifically, an embodiment of the present invention provides a comprehensive grid channel filling point recommendation model, which is mainly based on the thermal scene output by the unsaturated grid scene extraction model, evaluates the channel saturation of the area, and outputs the target filling point area, the number of filling points and the filling point channel type in combination with the unsaturated grid score.

[0093] Furthermore, firstly, the saturation evaluation is performed based on the thermal scenario output by the unsaturated grid scenario extraction model, and the unsaturated thermal scenario is output, which is the target filling point area with blank or low occupancy of the channel.

[0094] Secondly, a channel indicator system is constructed based on the business capabilities of each star-level and type of channels, and the entropy method is used to calculate the weights to output the channel service capability table, as shown in Table 1.

[0095] Table 1

[0096] Channel Star Channel service capability score average 1 star social channels X1 2 stars social channels X2 3 Star Social Channels X3 4 Star Social Channels X4 … … Store Franchise X6 Self-operated hall X7

[0097] Finally, based on the service capacity gap of the unsaturated grid, a mathematical match is made with the service capacity table of the channel to obtain the channel filling point combination, and finally the optimal channel filling point type and number of filling point recommendations are output.

[0098] The embodiment of the present invention also provides a grid channel layout planning system. Figure 2 FIG. 1 is a schematic diagram of a grid channel layout planning system provided by an embodiment of the present invention. Figure 2 As shown, the grid channel layout planning system may include: an acquisition module 201 , a first determination module 202 , a second determination module 203 , a third determination module 204 and a fourth determination module 205 .

[0099] Specifically, the acquisition module 201 is configured to acquire data information within the grid; the first determination module 202 is configured to determine the channel saturation of the grid based on the data information; the second determination module 203 is configured to determine the grid type based on the channel saturation, wherein the grid types include unsaturated grids, saturated grids and oversaturated grids; the third determination module 204 is configured to determine the saturation of the thermal scene of the flow of people in the unsaturated grid based on the unsaturated grid; the fourth determination module 205 is configured to determine the target supplementary point area, the number of supplementary points and the channel supplementary point type based on the saturation of the thermal scene of the flow of people.

[0100] In the embodiment of the present invention, first, the acquisition module 201 acquires the data information in the grid, the first determination module 202 determines the channel saturation of the grid according to the data information, the second determination module 203 determines the grid type according to the channel saturation, the third determination module 204 determines the saturation of the thermal scene of the unsaturated grid based on the unsaturated grid in the grid type, and finally the fourth determination module 205 determines the target supplementary point area, the number of supplementary points and the channel supplementary point type according to the saturation of the thermal scene of the unsaturated grid. The supplementary point evaluation is performed in the densely populated area of ​​the unsaturated grid, and the supplementary point demand in the area with channel coverage but strong demand is comprehensively considered, so as to avoid the waste of resources caused by supplementary points in the area without human flow, and improve business efficiency.

[0101] In a possible implementation of the present invention, the acquisition module 201 may include: an acquisition unit and a screening unit.

[0102] Specifically, the acquisition unit is used to acquire sample data, which includes business volume information, passenger flow information, infrastructure information, business district feature information and store location information; the screening unit is used to perform index screening on the sample data to obtain data information within the grid.

[0103] In a possible implementation manner of the present invention, the first determining module 202 may include: a first determining unit and a second determining unit.

[0104] Specifically, the first determination unit is used to determine the grid service capability and development potential score of each data according to the indicator weight and indicator value of the data information; the second determination unit is used to determine the channel saturation of the grid according to the ratio of the grid service capability and development potential scores.

[0105] In a possible implementation manner of the present invention, the third determination module 204 may include: an analysis unit and a third determination unit.

[0106] Specifically, the analyzing unit is used to perform a kernel density analysis on the base stations in the unsaturated grid according to the population distribution in the unsaturated grid; and the third determining unit is used to determine the saturation of the thermal scene of the flow of people in the unsaturated grid according to the analysis result.

[0107] In a possible implementation manner of the present invention, the fourth determining module 205 may include: a fourth determining unit, a fifth determining unit, and a sixth determining unit.

[0108] Specifically, the fourth determination unit is used to determine the unsaturated thermal scene according to the saturation of the thermal scene of the passenger flow; the fifth determination unit is used to use the unsaturated thermal scene as the target filling point area in the grid channel; the sixth determination unit is used to match the grid service capacity of the unsaturated grid with the preset service capacity table to determine the channel filling point type and the number of filling points.

[0109] The function of the grid channel layout planning system described in the present invention is already Figure 1 The method embodiment shown is described in detail, so for matters that are not detailed in the description of this embodiment, please refer to the relevant description in the aforementioned embodiment, and will not be repeated here.

[0110] Figure 3 A schematic diagram of the hardware structure of a terminal device for implementing various embodiments of the present invention.

[0111] The terminal device 400 includes but is not limited to: a radio frequency unit 401, a network module 402, an audio output unit 403, an input unit 404, a sensor 405, a display unit 406, a user input unit 407, an interface unit 408, a memory 409, a processor 410, and a power supply 411. Those skilled in the art will appreciate that Figure 3 The terminal device structure shown in the figure does not constitute a limitation on the terminal device, and the terminal device may include more or fewer components than shown in the figure, or combine certain components, or arrange the components differently. In the embodiment of the present invention, the terminal device includes but is not limited to a mobile phone, a tablet computer, a laptop computer, a PDA, a vehicle-mounted terminal, a wearable device, and a pedometer.

[0112] The processor 410 may be used for:

[0113] Get the data information in the grid;

[0114] Based on the data information, determine the channel saturation of the grid;

[0115] According to the channel saturation, the grid type is determined, wherein the grid type includes an unsaturated grid, a saturated grid and an oversaturated grid;

[0116] Based on the unsaturated grid, determine the saturation of the thermal scene of the unsaturated grid;

[0117] According to the saturation of the thermal scene of pedestrian flow, determine the target area for replenishment, the number of replenishment points and the type of channel replenishment points.

[0118] In the embodiment of the present invention, data information in the grid is first obtained, and the channel saturation of the grid is determined according to the data information. The grid type is determined according to the channel saturation. Based on the unsaturated grid in the grid type, the saturation of the thermal scene of the unsaturated grid is determined. Finally, according to the saturation of the thermal scene of the unsaturated grid, the target supplementary point area, the number of supplementary points and the channel supplementary point type are determined. The supplementary point evaluation is performed in the densely populated area of ​​the unsaturated grid, and the supplementary point demand in the area with channel coverage but strong demand is comprehensively considered, avoiding the waste of resources caused by supplementary points in the area without human traffic, and improving business efficiency.

[0119] It should be understood that in the embodiment of the present invention, the radio frequency unit 401 can be used for receiving and sending signals during information transmission or communication. Specifically, after receiving downlink data from the base station, it is sent to the processor 410 for processing; in addition, uplink data is sent to the base station. Generally, the radio frequency unit 401 includes but is not limited to an antenna, at least one amplifier, a transceiver, a coupler, a low noise amplifier, a duplexer, etc. In addition, the radio frequency unit 401 can also communicate with the network and other devices through a wireless communication system.

[0120] The terminal device provides users with wireless broadband Internet access through the network module 402, such as helping users to send and receive emails, browse web pages, and access streaming media.

[0121] The audio output unit 403 can convert the audio data received by the RF unit 401 or the network module 402 or stored in the memory 409 into an audio signal and output it as sound. Moreover, the audio output unit 403 can also provide audio output related to a specific function performed by the terminal device 400 (for example, a call signal reception sound, a message reception sound, etc.). The audio output unit 403 includes a speaker, a buzzer, a receiver, etc.

[0122] The input unit 404 is used to receive audio or video signals. The input unit 404 may include a graphics processor (GPU) 4041 and a microphone 4042, and the graphics processor 4041 processes the image data of a static picture or video obtained by an image capture device (such as a camera) in a video capture mode or an image capture mode. The processed image frame can be displayed on the display unit 406. The image frame processed by the graphics processor 4041 can be stored in the memory 409 (or other storage medium) or sent via the radio frequency unit 401 or the network module 402. The microphone 4042 can receive sound and can process such sound into audio data. The processed audio data can be converted into a format output that can be sent to a mobile communication base station via the radio frequency unit 401 in the case of a telephone call mode.

[0123] The terminal device 400 also includes at least one sensor 405, such as a light sensor, a motion sensor, and other sensors. Specifically, the light sensor includes an ambient light sensor and a proximity sensor, wherein the ambient light sensor can adjust the brightness of the display panel 4061 according to the brightness of the ambient light, and the proximity sensor can turn off the display panel 4061 and / or the backlight when the terminal device 400 is moved to the ear. As a type of motion sensor, the accelerometer sensor can detect the magnitude of acceleration in each direction (generally three axes), and can detect the magnitude and direction of gravity when stationary, which can be used to identify the terminal device posture (such as horizontal and vertical screen switching, related games, magnetometer posture calibration), vibration recognition related functions (such as pedometer, tapping), etc.; the sensor 405 can also include a fingerprint sensor, a pressure sensor, an iris sensor, a molecular sensor, a gyroscope, a barometer, a hygrometer, a thermometer, an infrared sensor, etc., which will not be repeated here.

[0124] The display unit 406 is used to display information input by the user or information provided to the user. The display unit 406 may include a display panel 4061, which may be configured in the form of a liquid crystal display (LCD), an organic light-emitting diode (OLED), or the like.

[0125] The user input unit 407 can be used to receive input digital or character information, and to generate key signal input related to the user settings and function control of the terminal device. Specifically, the user input unit 407 includes a touch panel 4071 and other input devices 4072. The touch panel 4071, also known as a touch screen, can collect the user's touch operation on or near it (such as the user's operation on the touch panel 4071 or near the touch panel 4071 using any suitable object or accessory such as a finger, stylus, etc.). The touch panel 4071 may include two parts: a touch detection device and a touch controller. Among them, the touch detection device detects the user's touch orientation, detects the signal brought by the touch operation, and transmits the signal to the touch controller; the touch controller receives the touch information from the touch detection device, converts it into the contact point coordinates, and then sends it to the processor 410, receives the command sent by the processor 410 and executes it. In addition, the touch panel 4071 can be implemented using various types such as resistive, capacitive, infrared and surface acoustic waves. In addition to the touch panel 4071, the user input unit 407 may also include other input devices 4072. Specifically, other input devices 4072 may include but are not limited to a physical keyboard, function keys (such as volume control keys, switch keys, etc.), a trackball, a mouse, and a joystick, which are not described in detail here.

[0126] Furthermore, the touch panel 4071 may be overlaid on the display panel 4061. When the touch panel 4071 detects a touch operation on or near it, it is transmitted to the processor 410 to determine the type of the touch event. Then, the processor 410 provides a corresponding visual output on the display panel 4061 according to the type of the touch event. Figure 3 In the figure, the touch panel 4071 and the display panel 4061 are used as two independent components to realize the input and output functions of the terminal device. However, in some embodiments, the touch panel 4071 and the display panel 4061 can be integrated to realize the input and output functions of the terminal device, which is not limited here.

[0127] The interface unit 408 is an interface for connecting an external device to the terminal device 400. For example, the external device may include a wired or wireless headset port, an external power supply (or battery charger) port, a wired or wireless data port, a memory card port, a port for connecting a device with an identification module, an audio input / output (I / O) port, a video I / O port, a headphone port, etc. The interface unit 408 may be used to receive input (e.g., data information, power, etc.) from an external device and transmit the received input to one or more elements in the terminal device 400 or may be used to transmit data between the terminal device 400 and an external device.

[0128] The memory 409 can be used to store software programs and various data. The memory 409 can mainly include a program storage area and a data storage area, wherein the program storage area can store an operating system, at least one application required for a function (such as a sound playback function, an image playback function, etc.), etc.; the data storage area can store data created according to the use of the mobile phone (such as audio data, a phone book, etc.), etc. In addition, the memory 409 can include a high-speed random access memory, and can also include a non-volatile memory, such as at least one disk storage device, a flash memory device, or other volatile solid-state storage devices.

[0129] The processor 410 is the control center of the terminal device. It uses various interfaces and lines to connect various parts of the entire terminal device. By running or executing software programs and / or modules stored in the memory 409 and calling data stored in the memory 409, it executes various functions of the terminal device and processes data, thereby monitoring the terminal device as a whole. The processor 410 may include one or more processing units; preferably, the processor 410 may integrate an application processor and a modem processor, wherein the application processor mainly processes the operating system, user interface, and application programs, and the modem processor mainly processes wireless communications. It is understandable that the above-mentioned modem processor may not be integrated into the processor 410.

[0130] The terminal device 400 may also include a power supply 411 (such as a battery) for supplying power to each component. Preferably, the power supply 411 may be logically connected to the processor 410 through a power management system, thereby implementing functions such as charging, discharging, and power consumption management through the power management system.

[0131] In addition, the terminal device 400 includes some functional modules not shown, which will not be described in detail here.

[0132] Preferably, an embodiment of the present invention further provides a terminal device, including a processor 410, a memory 409, and a computer program stored in the memory 409 and executable on the processor 410. When the computer program is executed by the processor 410, each process of the above-mentioned grid channel layout planning method embodiment is implemented, and the same technical effect can be achieved. To avoid repetition, it will not be described here.

[0133] The embodiment of the present invention further provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, each process of the above-mentioned grid channel layout planning method embodiment is implemented, and the same technical effect can be achieved. To avoid repetition, it is not repeated here. The computer-readable storage medium is, for example, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk.

[0134] It should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, article or device including the element.

[0135] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present invention, or the part that contributes to the prior art, can be embodied in the form of a software product, which is stored in a storage medium (such as ROM / RAM, a magnetic disk, or an optical disk), and includes a number of instructions for enabling a terminal (which can be a mobile phone, a computer, a server, an air conditioner, or a network device, etc.) to execute the methods described in each embodiment of the present invention.

[0136] The embodiments of the present invention are described above in conjunction with the accompanying drawings, but the present invention is not limited to the above-mentioned specific implementation modes, which are merely illustrative rather than restrictive. Under the guidance of the present invention, ordinary technicians in this field can also make many forms without departing from the scope of protection of the present invention and the claims, all of which are within the protection of the present invention.

Claims

1. A grid channel layout planning method, It is characterized in that include: Get the data information in the grid; Determining the channel saturation of the grid according to the data information; Determining a grid type according to the channel saturation, wherein the grid type includes an unsaturated grid, a saturated grid, and an oversaturated grid; Based on the unsaturated grid, determining the saturation of the thermal scene of the passenger flow of the unsaturated grid; According to the saturation of the thermal scene of the flow of people, determine the target replenishment point area, the number of replenishment points and the channel replenishment point type; The determining, based on the unsaturated grid, the saturation of the thermal scene of the passenger flow of the unsaturated grid includes: performing a kernel density analysis on the base stations in the unsaturated grid according to the population distribution in the unsaturated grid; According to the analysis result, the saturation of the thermal scene of the passenger flow of the unsaturated grid is determined.

2. The method according to claim 1, It is characterized in that The step of obtaining data information in the grid includes: Acquire sample data, wherein the sample data includes business volume information, passenger flow information, infrastructure information, business district feature information, and store location information; The sample data is screened by indicators to obtain data information within the grid.

3. The method according to claim 1, It is characterized in that Determining the channel saturation of the grid according to the data information includes: Determine the grid service capability and development potential score of each data according to the indicator weight and indicator value of the data information; The channel saturation of the grid is determined based on the ratio of the grid service capability and development potential scores.

4. The method according to claim 1, It is characterized in that According to the saturation of the thermal scene of the flow of people, determine the target area for replenishment, the number of replenishment points and the type of channel replenishment points, including: Determining an unsaturated thermal scene according to the saturation of the thermal scene of the passenger flow; Taking the unsaturated thermal scenario as a target filling point area in the grid channel; The grid service capacity of the unsaturated grid is matched with a preset service capacity table to determine the channel supplement point type and the number of supplement points.

5. A grid channel layout planning system, It is characterized in that include: The acquisition module is used to obtain data information in the grid; A first determination module, used to determine the channel saturation of the grid according to the data information; A second determination module is used to determine a grid type according to the channel saturation, wherein the grid type includes an unsaturated grid, a saturated grid and an oversaturated grid; A third determination module is used to determine the saturation of the thermal scene of the passenger flow of the unsaturated grid based on the unsaturated grid; A fourth determination module is used to determine the target replenishment point area, the number of replenishment points and the channel replenishment point type according to the saturation of the passenger flow thermal scene; The third determination module comprises: An analysis unit, configured to perform a kernel density analysis on the base stations in the unsaturated grid according to the population distribution in the unsaturated grid; The third determining unit is used to determine the saturation of the thermal scene of the passenger flow of the unsaturated grid according to the result of the analysis.

6. The system according to claim 5, It is characterized in that The acquisition module comprises: An acquisition unit, used to acquire sample data, wherein the sample data includes business handling volume information, passenger flow information, infrastructure information, business district feature information, and store location information; The screening unit is used to screen the sample data by indicators to obtain data information in the grid.

7. The system according to claim 5, It is characterized in that The first determining module comprises: A first determination unit, configured to determine the grid service capability and development potential score of each data according to the indicator weight and indicator value of the data information; The second determination unit is used to determine the channel saturation of the grid according to the ratio of the grid service capability and the development potential score.

8. The system according to claim 5, It is characterized in that The fourth determination module comprises: A fourth determining unit, configured to determine an unsaturated thermal scene according to the saturation of the thermal scene of the passenger flow; a fifth determining unit, configured to use the unsaturated thermal scenario as a target filling point area in a grid channel; The sixth determining unit is used to match the grid service capacity of the unsaturated grid with a preset service capacity table to determine the channel supplement point type and the number of supplement points.