A river bank infiltration line field measurement device and method
Through the portable riparian infiltration line field measurement device, the seepage pipe is inserted laterally and the seepage rate is measured, which solves the problems of complex construction and interference in the existing technology, and realizes efficient measurement of the seepage rate and the height of the riparian soil internally. Suitable for soft water bank areas.
Patent Information
- Application Number
- CN202111417936.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-11-26
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2041-11-26
Smart Images

Figure CN114396988B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of infiltration line measurement, and in particular to a river bank infiltration line field measurement device and method. Background Art
[0002] Bank collapse is an important part of the evolution of alluvial river beds, but the occurrence of large-scale bank collapse may cause drastic adjustments in the river flow in local river sections, affecting the safety of water-related engineering facilities such as embankments, water intakes and bridge piers on both sides of the river, and threatening the flood control safety of the river.
[0003] One of the main reasons for the collapse of alluvial rivers is the seepage process inside the riverbank. During the flood season, the seepage process inside the riverbank is strengthened, the infiltration line rises, the pore water pressure is significantly enhanced, and the anti-erosion ability of the riverbank soil is reduced, resulting in a decrease in the stability of the riverbank. During the receding period, the water level of the river channel drops rapidly, the lateral water pressure of the river channel decreases rapidly, and the pore water pressure inside the riverbank soil dissipates slowly, resulting in a pressure difference, which promotes the occurrence of bank collapse. In addition, the seepage direction during the receding period is from the inside of the riverbank to the river channel, and the seepage force causes a certain degree of erosion on the weak layer of the riverbank soil. Therefore, seepage measurement is of great significance for the study of bank collapse in alluvial rivers, the design of bank protection projects, and the monitoring of bank collapse hazards. However, the existing means of field seepage observation are mainly to drill wells / holes on the top of the riverbank by drilling rigs, and bury water level gauges or osmometers and other equipment in the wells / holes to achieve direct measurement of the infiltration line. Its disadvantages are: (1) The construction process is relatively complicated, requiring the use of a drilling rig to dig a well / hole and bury a metal or rubber pressure gauge tube, and a filter layer needs to be laid outside the pressure gauge tube; (2) The disturbance to the river bank is relatively large. Drilling starts from the top of the river bank and usually needs to be drilled below the low water level. For example, in the middle reaches of the Yangtze River, the river bank is 20m high, so the well depth usually needs to be more than 20m, so the drilling process causes relatively large disturbance to the river bank. In areas where the soil on the river bank is soft, it is not suitable to use top drilling to measure the infiltration line inside the river bank. Therefore, it is of great practical value to develop a field measurement method and device for the infiltration line inside the river bank that is simple to operate and has less interference with the river bank. Summary of the invention
[0004] In view of the deficiencies in the prior art, the present invention provides a riverbank infiltration line field measurement device and method.
[0005] The present invention measures the seepage rate of river bank soil and the relationship between the seepage rate and pore water pressure to achieve the measurement of the height of the infiltration line inside the river bank soil and store the data.
[0006] In order to solve the above technical problems, the present invention adopts the following technical solutions:
[0007] A riverbank seepage line field measurement device, comprising a rotating handle, a drill bit, a seepage pipe, a water storage tank, a power supply module, a central processing unit, a data storage device and a water pressure sensor, wherein the seepage pipe comprises an outer pipe, a filter layer and a perforated inner pipe which are arranged concentrically from the outside to the inside, the filter layer is arranged on the outside of the perforated inner pipe to wrap the perforated inner pipe, the outer pipe is sleeved on the outside of the filter layer, one end of the perforated inner pipe is fixedly connected to the drill bit, and the other end of the perforated inner pipe is arranged relative to the drill bit, and the inner and outer pipes are fixedly connected by a second bolt, and the rotating handle is fixedly connected to the end of the outer pipe by a first bolt;
[0008] The seepage pipe is driven horizontally into the riverbank soil and then the outer pipe is taken out. The inner pipe with holes is connected to the water reservoir to introduce pore water into the water reservoir. A plurality of water pressure sensors are provided at the bottom of the water reservoir for measuring the water pressure readings inside the water tank at different times.
[0009] Furthermore, the water storage device includes a seepage external pipe, a water storage tank and a water outlet pipe. The seepage external pipe is fixedly arranged on the top of the water storage tank, and the other end thereof is externally connected to the perforated inner pipe of the seepage pipe. The water outlet pipe is arranged at the bottom of the water storage tank and an electronic valve is arranged inside the water outlet pipe.
[0010] Furthermore, a lifting plate is provided at the bottom of the water tank, and a plurality of fixing wedges are provided on the side thereof. The lifting plate and the plurality of fixing wedges are inserted into the river bank to stabilize the water tank.
[0011] Furthermore, a wet / dry sensor is provided on the side wall of the water tank, which is located 1 / 3 of the height of the tank body below the tank cover. When the water level in the water tank overflows the upper wet / dry sensor, the electronic valve in the tank will automatically open to drain water.
[0012] Furthermore, the central processing unit includes a single-chip microcomputer or a microcomputer, the single-chip microcomputer is a control type, the microcomputer adopts RaspberryPi, the power supply module is used to power the measuring device, and the data storage device is used to store the measured values of the pressure sensor.
[0013] The present invention also provides a river bank seepage line field measurement method, which uses the above-mentioned portable river bank seepage line field measurement device to perform measurement, comprising the following steps:
[0014] Step 1: By consulting existing data or taking soil on site to conduct indoor geotechnical tests, obtain the river bank slope and height, soil layer thickness and permeability coefficient k of each layer in the y and z directions at the location to be measured. y (m / s) and k z (m / s), where z is the vertical direction and y is the lateral direction;
[0015] Step 2: Pre-calculate the functional relationship between the permeability and the average pore water head through numerical simulation in is the average total pore water head value within a certain range, Q is the seepage rate;
[0016] Step 3: Set the monitoring frequency and burial point elevation Z on site y (m), and start recording time t(s);
[0017] Step 4: Read the number of water pressure sensors and number them from left to right as 1-N, and start sensors 1-N / 2;
[0018] Step 5: Read the water pressure sensor value P (N / m 2 );
[0019] Step 6: Calculate the average value of each sensor value Where P i is the reading of the ith sensor (N / m 2 );
[0020] Step 7: Calculate the volume of water in the water tank (m 3 )V=AP m / γ, where A is the cross-sectional area of the water storage tank and γ is the specific gravity of water;
[0021] Step 8: Calculate the permeability Q = (V t+1 -V t ) / Δt, where V t+1 Indicates the volume of water at the current moment (m 3 );V t Indicates the volume of water at the previous moment (m 3 ), Δt represents the time interval between the current moment and the previous moment (s);
[0022] Step 9: Calculate the average total pore water head And output the data to the storage module for storage;
[0023] Step 10: Calculate the height of the wetting line (m) And output the data to the storage module for storage;
[0024] Step 11: Enter the next moment calculation.
[0025] Further, the step 2 specifically includes the following steps:
[0026] Step 2.1, given several seepage boundaries, solve the two-dimensional constant seepage control equation in the form of equation (1), and obtain the total pore water head H in the entire river bank: w(m), and determine the location of the infiltration line, that is, the contour line where the pressure head Hp(m) is 0, where Hp = H w -z;
[0027]
[0028] Step 2.2, calculate the average total pore water head within the range of L (m) from the seepage pipe The value of L can be set as needed, usually 2-3 times the length of the seepage pipe;
[0029] Step 2.3, calculate the seepage velocity distribution within the river bank And calculate the seepage rate Q(m 3 / s):
[0030]
[0031] Where: M is the number of holes on the surface of the seepage tube; is the area of the ith hole (m 2 ), θ represents the flow velocity direction of pore water when it flows into the inner tube surface hole The direction of the surface normal at the location of the hole The angle of
[0032] Step 2.4, fitting The functional relationship with Q is Where Func represents the polynomial fitting function, which has the form of formula (3);
[0033]
[0034] Where: α 0 , α 1 , α 2 , α 3 , α 4 , α 5 represents the fitting coefficient.
[0035] Compared with the prior art, the present invention has the following advantages and beneficial effects:
[0036] 1. Field observation of the seepage rate and the height of the infiltration line of the river bank soil. The existing technical means need to carry out drilling operations on the top of the river bank and measure the water level in the well to measure the infiltration line. The present invention measures the seepage rate by drilling from the side to achieve the observation of the height of the infiltration line, which greatly simplifies the construction procedure.
[0037] 2. Portable and easy to use. Compared with the prior art, the present invention is assembled, and the size of each component can be adjusted according to the needs, so the use of the present invention is more convenient, greatly saving manpower and material resources.
[0038] 3. Small disturbance to the river bank. Compared with the previous technical means of conducting measurements by drilling wells / holes on the top of the river bank, the present invention has less disturbance to the river bank soil and can be used in areas with relatively soft river bank soil. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] Figure 1 It is a schematic diagram of the working of an embodiment of the present invention;
[0040] Figure 2 It is a schematic diagram of the installation of the drill pipe and the seepage pipe of the present invention;
[0041] Figure 3 It is a schematic diagram of the installation of the seepage pipe and the rotating handle of the present invention;
[0042] Figure 4 is a schematic cross-sectional view of a seepage pipe of the present invention;
[0043] Figure 5 It is a schematic diagram of the internal structure of the water storage device of the present invention;
[0044] Figure 6 It is a schematic flow chart of the measuring method of the present invention;
[0045] Figure 7 It is a schematic diagram of the result of the numerical simulation calculation of seepage in the present invention;
[0046] Figure 8 Schematic diagram of the flow field near the seepage pipe in the present invention;
[0047] Fig. 9 It is an example diagram of the relationship curve between the seepage rate and the total head of pore water in the present invention.
[0048] In the figure: 1-rotating handle, 2-drill bit, 3-outer tube, 4-filter layer, 5-inner tube with holes, 6-first bolt, 7-second bolt; 8-seepage external tube, 9-dry and wet sensor, 10-water storage tank, 11-outlet pipe, 12-electronic valve, 13-fixed baffle, 14-lifting plate, 15-fixed wedge, 16-electronic component area, 17-power supply module, 18-central processing unit, 19-data storage device, 20-water pressure sensor, 21-river bank, 22-infiltration line. DETAILED DESCRIPTION
[0049] The present invention is further described in detail below with reference to the accompanying drawings and specific embodiments:
[0050] like Figure 1-5As shown, the present invention provides a portable river bank infiltration line field measurement device, including a rotating handle 1, a drill bit 2, a seepage pipe, a water storage tank, a power supply module 17, a central processing unit 18, a data storage device 19, and a water pressure sensor 20.
[0051] like Figure 1 and 2 As shown, the drill rod includes a rotating handle 1, a drill bit 2 and a seepage pipe, all of which are made of hard metal materials. The rotating handle 1 and the seepage pipe are assembled together using a detachable first bolt 6 to drive the seepage pipe into the soil of the river bank 21.
[0052] like Figure 3 and 4 As shown, the seepage pipe is composed of an outer tube 3, a filter layer 4, and a perforated inner tube 5. The outer tube is made of smooth hard metal material to withstand the resistance when drilling into the soil, and the smooth surface is to reduce the friction with the soil. The second bolt 7 includes a screw and two nuts. Holes are pre-drilled on the inner and outer tube walls near the handle side. A screw is passed through the small holes on the two tubes, and then the nuts are tightened on both sides to fix the inner and outer tubes. When removing the outer tube 3, the second bolt 7 must be removed first, and then the rotating handle 1 is turned to pull out the outer tube 5. Rubber balls are laid in the filter layer 4 to prevent the river bank 21 sediment from entering the inner tube 5 with the pore water. The perforated inner tube 5 is made of corrosion-resistant metal or rubber material, and circular holes are opened on the surface. The pore water enters the perforated inner tube 5 through the circular holes. The outer layer of the perforated inner tube 5 is wrapped with a permeable gauze, which has the effect of sediment anti-filtration. The material selection of the perforated inner tube 5 should be determined according to the burial depth. When the burial depth is large, the pressure exerted by the river bank soil on the inner tube is large, and materials with high compressive strength such as metal should be selected. When the burial depth is small, the soil pressure is small, and rubber tubes can be selected to reduce costs.
[0053] like Figure 1 and 5As shown, the water storage device is composed of a seepage external pipe 8, a dry and wet sensor 9, a water storage tank 10, a water outlet pipe 11, an electronic valve 12, a fixed baffle 13, a lifting plate 14 and a fixed wedge 15. The seepage external pipe 8 can be made of a lightweight rubber tube or a lightweight metal tube. Spiral patterns are set between the seepage external pipe 8 and the inlet of the water storage tank 10, and between the seepage external pipe 8 and the perforated inner pipe 5, and they are connected by screwing, serving as an external channel for pore water to enter the water storage tank 10. In addition, the outlet of the seepage external pipe 8 must be at least 10 cm higher than the dry and wet sensor, so as to ensure that the outlet is connected to the atmosphere and realize the free outflow of water. The water storage tank is sealed and made of lightweight and corrosion-resistant rubber or metal material. The top cover has 2-3 pores with a diameter of about 1-2 mm. The existence of the pores will maintain the balance of pressure inside and outside the water storage tank, and its small diameter can prevent rainfall from entering the water storage tank. A wet / dry sensor 9 is provided on the side wall of the water tank 10, which is located at 1 / 3 of the height of the tank body below the tank cover. When the water level in the water tank 10 overflows the wet / dry sensor 9 on the top, the electronic valve 12 in the tank will automatically open to drain water, thereby ensuring that the water tank 10 can be used continuously and reducing its manufacturing volume. When the water pressure value read by the bottom water pressure sensor 20 is less than a certain value, the drainage ends and the sensing information is transmitted to the central processor 18, which controls the electronic valve 12 to close. The fixed baffle 13 is provided at the bottom of the water pressure sensor 20 to prevent water from entering the bottom central processor 18 and the power supply module 17. The fixed wedge 15 on the back of the water storage tank 10 and the bottom lifting plate 14 are both made of hard metal materials, and the head is made into a pointed shape to smoothly insert into the river bank and stabilize the water storage tank.
[0054] The water pressure sensor 20 uses an existing micro water pressure gauge, which is arranged at the bottom of the box. The arrangement density can be adjusted according to the capacity of the power supply module 17. The arranged water pressure gauges can be used separately, that is, when a part of the water pressure gauges is damaged, the water pressure gauges of the other part will start to work. The function of the water pressure gauge is to record the water pressure readings P (N / m 2 ). The water pressure reading P is divided by the bulk density γ (kN / m 3 ), then convert it into water depth (m) h = P / γ, and then multiply it by the cross-sectional area of the box A (m 2 ), converted into water volume (m 3 )V=Ah.
[0055] like Figure 5 As shown, the power supply module 17 is composed of 3 batteries, 2 of which are placed at the bottom of the water tank, one is the main battery, and the other is the backup battery, which supplies power to the central processor and the water pressure gauge. The other one is placed at the back of the water tank to supply power to the electronic valve and the dry and wet sensor.
[0056] The central processing module 18 mainly includes a single chip microcomputer or a microcomputer. The single chip microcomputer is a control type, and the microcomputer adopts RaspberryPi. The central processing unit reads the data of the water pressure gauge and calculates the water pressure according to the following example: Figure 6 The process shown calculates the seepage volume and the height of the infiltration line 22 inside the river bank, and stores the data in the data storage 19. The CPU calculation includes two parts: preparatory operation and on-site calculation. The specific steps include:
[0057] Step 1: By consulting existing data or taking soil on site to conduct indoor geotechnical tests, obtain the river bank slope and height, soil layer thickness and permeability coefficient k of each layer in the y and z directions at the location to be measured. y (m / s) and k z (m / s) (z is the vertical direction, y is the horizontal direction);
[0058] Step 2: Pre-calculate the functional relationship between the permeability and the average pore water head through numerical simulation
[0059] First, given several seepage boundaries, the two-dimensional constant seepage control equation in the form of equation (1) is solved to obtain the total pore water head H in the entire riverbank: w (m), and determine the location of the infiltration line 22, that is, the contour line where the pressure head Hp(m) is 0, where Hp = H w -z (such as Figure 7 shown).
[0060]
[0061] Secondly, calculate the average total pore water head within the range of L (m) from the seepage pipe (like Figure 7 The value of L can be set as needed, usually 2-3 times the length of the seepage pipe.
[0062] Next, calculate the seepage velocity distribution within the river bank (like Figure 8 As shown), and calculate the seepage rate Q (m 3 / s):
[0063]
[0064] Where: M is the number of holes on the surface of the seepage tube; is the area of the ith hole (m 2 ), θ represents the flow velocity direction of pore water when it flows into the inner tube surface hole The direction of the surface normal at the location of the hole The angle of
[0065] Finally, the fitting The functional relationship with Q (such as Fig. 9 shown), i.e. R 2 =0.9644, where Func represents a polynomial fitting function, which has the form of formula (3).
[0066]
[0067] Where: α 0 , α 1 , α 2 , α 3 , α 4 , α 5 represents the fitting coefficient.
[0068] Step 3: Set the monitoring frequency and burial point elevation Z on site y (m), and start recording time t(s);
[0069] Step 4: Read the number of water pressure sensors and number them from left to right as 1-N, and start sensors 1-N / 2;
[0070] Step 5: Read the water pressure sensor value P (N / m 2 );
[0071] Step 6: Calculate the average value of each sensor value Where P i is the reading of the ith sensor (N / m 2 );
[0072] Step 7: Calculate the volume of water in the water tank (m 3 )V=AP m / γ;
[0073] Step 8: Calculate the permeability Q = (V t+1 -V t ) / Δt, where V t+1 Indicates the volume of water at the current moment (m 3 ), V t Indicates the volume of water at the previous moment (m 3 ), Δt represents the time interval between the current moment and the previous moment (s);
[0074] Step 9: Calculate the total head of the average pore water And output the data to the storage module for storage;
[0075] Step 10: Calculate the height of the wetting line (m) And output the data to the storage module for storage;
[0076] Step 11: Enter the next moment calculation.
[0077] The present invention utilizes water pressure sensing technology and soil seepage theory to measure the seepage rate, and then uses a microcomputer RaspberryPi to calculate the seepage rate as the height of the river bank internal seepage line 22 using a specific algorithm, and stores it, thereby achieving the measurement of the river bank seepage line 22 height and seepage rate in the field.
[0078] The above description is the best embodiment of the invention and does not limit the invention in any form. Any simple modification, equivalent changes and modifications made to the above examples based on the essence of the invention still fall within the protection scope of the invention.
[0079] The above embodiments are only used to illustrate and explain the present invention, and are not intended to limit the present invention to the scope of the described embodiments. In addition, it can be understood by those skilled in the art that the present invention is not limited to the above embodiments, and more variations and modifications can be made according to the teachings of the present invention, and these variations and modifications all fall within the scope of the protection claimed by the present invention.
Claims
1. A field measurement method for river bank infiltration line, characterized by: The measurement is performed using a riverbank seepage line field measurement device, which includes: a rotating handle, a drill bit, a seepage pipe, a water storage tank, a power supply module, a central processing unit, a data storage device and a water pressure sensor, wherein the seepage pipe includes an outer pipe, a filter layer and a perforated inner pipe which are arranged concentrically from the outside to the inside, the filter layer is arranged on the outside of the perforated inner pipe and wraps the perforated inner pipe, the outer pipe is sleeved on the outside of the filter layer, one end of the perforated inner pipe is fixedly connected to the drill bit, and the other end of the perforated inner pipe is fixedly connected with the inner and outer pipes by a second bolt, and the rotating handle is fixedly connected to the end of the outer pipe by a first bolt; The water storage device comprises a seepage external pipe, a water storage tank and a water outlet pipe, wherein the seepage external pipe is fixedly arranged on the top of the water storage tank, and the other end of the seepage external pipe is externally connected to the perforated inner pipe of the seepage pipe, and the water outlet pipe is arranged at the bottom of the water storage tank and an electronic valve is arranged inside the water outlet pipe; The seepage pipe is driven horizontally into the riverbank soil and then the outer pipe is taken out. The inner pipe with holes is connected to the water reservoir to introduce pore water into the water reservoir. A plurality of water pressure sensors are provided at the bottom of the water reservoir to measure the water pressure readings inside the water tank at different times. The method comprises the following steps: Step 1: By consulting existing data or taking soil on site to conduct indoor geotechnical tests, obtain the river bank slope and height, soil layer thickness and the depth of each layer at the location to be measured. y Direction and z Permeability coefficient in direction k y and k z , unit: m / s, where z is the vertical direction, y is the horizontal direction; Step 2: Pre-calculate the functional relationship between the permeability and the average pore water head through numerical simulation =Func( Q ),in is the average total head value of pore water within a certain range, Q is the permeability; Step 3: Set the monitoring frequency and burial point elevation on site Z y , unit: m, and start recording time t , unit: s; Step 4: Read the number of water pressure sensors and number them from left to right as 1-N, and start water pressure sensors 1-N / 2; Step 5: Read the water pressure sensor value P , unit: N / m 2 ; Step 6: Calculate the average value of each water pressure sensor ,in P i For the i The reading of a water pressure sensor, unit: N / m 2 ; Step 7: Calculate the volume of water in the water storage tank V = AP m / γ , unit: m 3 ,in A is the cross-sectional area of the water tank, γ To express the bulk density of water; Step 8 : Calculate the permeability Q = (V t+1 - V t ) / Δt ,in V t+1 Indicates the volume of water at the current moment in m 3 ; V t Indicates the volume of water at the previous moment: m 3 , Δt Indicates the time interval between the current moment and the previous moment in units of s; Step 9: Calculate the average total pore water head =Func( Q ), and output the data to a data storage device for storage; Step 10: Calculate the Wetting Line Height Z = Z y + , unit: m, and output the data to the data storage device for storage; Step 11: Enter the next moment calculation.
2. A river bank infiltration line field measurement method according to claim 1, characterized in that: The step 2 specifically includes the following steps: Step 2.1, given several seepage boundaries, solve the two-dimensional constant seepage control equation in the form of equation (1) to obtain the total pore water head in the entire river bank: H w The distribution of the unit is m, and the location of the infiltration line is determined, that is, the pressure head Hp The contour line is 0, unit: m, where Hp = H w - z ; (1) Step 2.2, calculate the distance to the seepage pipe L Average total pore water head value within the range , L The value can be set as needed, usually 2-3 times the length of the seepage pipe, unit: m; Step 2.3, calculate the seepage velocity distribution within the river bank , unit: m / s, and calculate the seepage rate into the seepage pipe Q , unit: m 3 / s: (2) Where: M is the number of holes on the inner surface of the seepage tube; It is i The area of each hole, unit: m 2 , Indicates the flow velocity direction of pore water when it flows into the inner tube surface hole The direction of the surface normal at the location of the hole The angle of ; Step 2.4, fitting With Q The functional relationship is =Func( Q ), where Func represents the polynomial fitting function, which has the form of formula (3); (3) Where: 、 、 、 、 、 represents the fitting coefficient.
3. A river bank infiltration line field measurement method according to claim 1, characterized in that: A lifting plate is provided at the bottom of the water tank, and a plurality of fixing wedges are provided on the side thereof. The lifting plate and the plurality of fixing wedges are inserted into the river bank to stabilize the water storage container.
4. A river bank infiltration line field measurement method according to claim 1, characterized in that: A dry and wet sensor is provided on the side wall of the water tank, which is located at 1 / 3 of the tank body height below the tank cover. When the water level in the water tank overflows the upper dry and wet sensor, the electronic valve in the tank will automatically open to drain water.
5. A river bank infiltration line field measurement method according to claim 1, characterized in that: The central processing unit includes a single-chip microcomputer or a microcomputer, the single-chip microcomputer is a control type, the microcomputer adopts RaspberryPi, the power supply module is used to power the measuring device, and the data storage device is used to store the measured values of the water pressure sensor.
Citation Information
Patent Citations
Method and device for measuring saturation line of tailings pond
CN102494740A
Model test apparatus and test method for monitoring dam saturation line
CN103245391A
Seepage line distribution sensor
JP2001281082A
Drain structure of banking levee body and its construction method
JP2006274655A
