A method and system for starting a same-phase power supply device for an electrified railway

Through the combination of hardware and software, the startup process of the same-phase power supply device is controlled, and the sequencing voltage equalization method is used to select the appropriate module input and removal, which solves the problem of unbalanced inrush current and DC bus voltage, and achieves low cost and high reliability. voltage equalization effect.

CN114447915BActive Publication Date: 2024-10-15XIAN XJ POWER ELECTRONICS TECH +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202011204287.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-11-02
Publication Date
2024-10-15
Estimated Expiration
2040-11-02

AI Technical Summary

Technical Problem

When the same-phase power supply device is started, the inrush current is too large, causing the DC bus capacitor voltage to be unbalanced, affecting system safety and performance. The existing technology is complex and costly.

Method used

Using a method that combines hardware and software, the DC bus capacitor is charged through the soft-start contactor and main contactor control, combined with the H-bridge anti-parallel diode, and the appropriate modules are selected to be put in and removed through the sequencing voltage equalization method to realize the DC bus capacitance. Voltage equalization.

Benefits of technology

It effectively suppresses the inrush current during startup, ensures DC bus capacitor voltage balance, reduces costs, and improves reliability and scope of application.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114447915B_ABST
    Figure CN114447915B_ABST
Patent Text Reader

Abstract

A method and system for starting a co-phase power supply device for an electrified railway, the method comprising a preparation stage, a soft start stage, a voltage stabilization stage and an operation stage, and adopting a combination of hardware and software; the hardware method comprises: (1) closing the soft start contactor, charging the DC bus capacitor through the soft start resistor and the soft start contactor, and the anti-parallel diode of the H-bridge on the series side; (2) closing the main contactor, charging the DC bus capacitor through the main contactor and the anti-parallel diode of the H-bridge on the series side; the software method sorts the capacitor voltage by adopting a sorting voltage balancing method, and selects the most appropriate module to be put into operation and removed. The method and system of the present invention solve the problem of large inrush current and uneven voltage of the DC bus capacitor during the startup process, and the present invention is easy to implement and has the advantages of low cost, high reliability, and a wide range of applications.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of electrified railway traction power supply, and in particular to a method and system for starting an electrified railway co-phase power supply device. Background Art

[0002] When the same-phase power supply device is started, excessive inrush current will seriously affect the service life of the components and even bring harmonic pollution to the power grid. The magnitude of the inrush current is directly determined by whether the DC side voltage is stable and the DC bus voltage difference when the same-phase power supply device is started. The difference in DC side capacitor loss, switching loss, and drive pulses will cause the DC bus capacitor voltage to be unbalanced, which will not only cause the system components to withstand different voltages, but also affect the safety and performance of the system. Therefore, how to reduce the inrush current and achieve balanced control of the DC bus capacitor during the startup process has become a research focus and difficulty.

[0003] The commonly used startup scheme is to connect the AC current limiting resistor in series in the charging circuit to prevent the current in the grid from rushing into the CPD and causing overcurrent damage to the power electronic devices and submodule capacitors. Close the pre-charge soft start contactor and connect to the AC grid. When the submodule pre-charging process is completed, close the main contactor to bypass the current limiting resistor to improve the steady-state operation efficiency.

[0004] There are currently two commonly used methods for controlling DC voltage balance: one is achieved through an external balance control circuit, which requires additional hardware circuits and control systems, increasing the complexity and cost of the device; the other is achieved through active power exchange. Summary of the invention

[0005] The purpose of the present invention is to address the deficiencies of the prior art and provide a method and system for starting a co-phase power supply device for an electrified railway, using a suitable control method to quickly increase the voltage of the sub-modules of the co-phase power supply device to the rated voltage while preventing overcurrent and overvoltage shocks as much as possible.

[0006] The present invention is implemented by the following technical solutions:

[0007] The first aspect of the present invention provides a method for starting a same-phase power supply device for an electrified railway, wherein the power supply device comprises a power cabinet, a starting cabinet, a control cabinet, an incoming switch cabinet and an outgoing switch cabinet; the power cabinet comprises a power unit; the starting cabinet comprises a soft-start contactor, a soft-start resistor and a main contactor; the incoming switch cabinet comprises a series-side circuit breaker, a series-side isolating knife switch and a series-side grounding knife switch; the outgoing switch cabinet comprises a parallel-side circuit breaker, a parallel-side isolating knife switch and a parallel-side grounding knife switch; the power unit comprises a parallel-side H-bridge, a DC bus capacitor and a series-side H-bridge, the parallel side is equipped with a module grid-connected contactor, and the series side is equipped with a bypass switch; the starting method comprises the following steps:

[0008] Preparation stage: confirm that the series side circuit breaker, parallel side circuit breaker, main contactor, and soft start contactor are open, the series side isolation knife switch and parallel side isolation knife switch are closed, and the series side grounding knife switch and parallel side grounding knife switch are open;

[0009] The soft start phase includes:

[0010] 1) The circuit breaker on the series side is closed, the soft-start contactor is closed, and the DC bus capacitor is charged by controlling the soft-start resistor, the soft-start contactor, and the anti-parallel diode of the H-bridge on the series side;

[0011] 2) When the soft start charging time is greater than the first predetermined time and the minimum DC bus voltage average value is greater than a predetermined voltage value, the main contactor is closed;

[0012] 3) Charge the DC bus capacitor by controlling the main contactor and the anti-parallel diode of the H-bridge on the series side;

[0013] 4) The soft-start contactor opens and charges the DC bus capacitor by controlling the main contactor and the anti-parallel diode of the H-bridge on the series side.

[0014] Voltage stabilization stage: After the soft start is completed, the parallel side circuit breaker is closed, the module grid contactor is closed, and the parallel side module controller starts voltage stabilization;

[0015] Operation phase: The parallel side module controller completes voltage regulation, and the series side controller unlocks the pulse.

[0016] Furthermore, in the soft start stage step 1), the series side circuit breaker is closed, the soft start contactor is closed, and the DC bus capacitor is charged by controlling the soft start resistor, the soft start contactor, and the series side H-bridge anti-parallel diode, including:

[0017] Detecting a predetermined number of submodules corresponding to the maximum value of the DC bus voltage of all submodules every second predetermined time, bypassing the corresponding submodules, and charging the remaining submodules through the H-bridge anti-parallel diodes;

[0018] At the next second predetermined time, the bypass submodule is put into operation, and a predetermined number of submodules corresponding to the maximum value of the DC bus voltage of all submodules are re-detected, and the corresponding submodules are bypassed, and the remaining submodules are charged through the H-bridge anti-parallel diodes;

[0019] Preferably, the second predetermined time is 10 ms, and the predetermined number of sub-modules is 2.

[0020] Furthermore, the first predetermined time in step 2) of the soft start phase is 20s, and the predetermined voltage value is 600V.

[0021] Furthermore, in the soft start stage step 3), charging the DC bus capacitor by controlling the main contactor and the series-side H-bridge anti-parallel diode includes:

[0022] The main contactor is closed, and a predetermined number of submodules corresponding to the maximum value of the DC bus voltage of all submodules are detected every second predetermined time, and the corresponding submodules are bypassed, and the remaining submodules are charged through the anti-parallel diodes of the H bridge on the series side;

[0023] At the next second predetermined time, the bypass submodule is put into operation, the submodule corresponding to the maximum DC bus voltage of all submodules is re-detected, the corresponding submodule is bypassed, and the remaining submodules are charged through the anti-parallel diode of the H bridge on the series side;

[0024] Preferably, the second predetermined time is 10 ms, and the predetermined number of sub-modules is 1.

[0025] Furthermore, in the soft start stage step 4), the soft start contactor is opened, and the DC bus capacitor is charged by controlling the main contactor and the series side H-bridge anti-parallel diode, including:

[0026] Detecting a predetermined number of submodules corresponding to the maximum value of the DC bus voltage of all submodules every second predetermined time, bypassing the corresponding submodules, and charging the remaining submodules through the anti-parallel diodes of the H bridge on the series side;

[0027] At the next second predetermined time, the bypass submodule is put into operation, and a predetermined number of submodules corresponding to the maximum value of the DC bus voltage of all submodules are re-detected, and the corresponding submodules are bypassed, and the remaining submodules are charged through the anti-parallel diodes of the H bridge on the series side;

[0028] Preferably, the second predetermined time is 10 ms, and the predetermined number of sub-modules is 2.

[0029] Furthermore, a bubble sort method is used to sort the submodules, and a predetermined number of submodules corresponding to the maximum value of the DC bus voltage of all submodules is calculated.

[0030] Furthermore, the corresponding submodule is bypassed by turning on two lower switch tubes of the H bridge on the series side.

[0031] Furthermore, the bypass submodule is put into operation by turning off two lower switch tubes of the H bridge on the series side.

[0032] The second aspect of the present invention provides a starting system for an electrified railway co-phase power supply device, wherein the power supply device includes a power cabinet, a starting cabinet, a control cabinet, an incoming switch cabinet and an outgoing switch cabinet; the power cabinet includes a power unit; the starting cabinet includes a soft-start contactor, a soft-start resistor and a main contactor; the incoming switch cabinet includes a series side circuit breaker, a series side isolating knife switch and a series side grounding knife switch; the outgoing switch cabinet includes a parallel side circuit breaker, a parallel side isolating knife switch and a parallel side grounding knife switch; the power unit includes a parallel side H-bridge, a DC bus capacitor and a series side H-bridge, the parallel side is equipped with a modular grid-connected contactor, and the series side is equipped with a bypass switch; the starting system is started according to the starting method of the electrified railway co-phase power supply device as described above.

[0033] In summary, the present invention provides a method and system for starting a co-phase power supply device for an electrified railway, which adopts a combination of hardware and software; the hardware method includes: (1) closing the soft-start contactor, charging the DC bus capacitor through the soft-start resistor and the soft-start contactor, and the anti-parallel diode of the H-bridge on the series side; (2) closing the main contactor, charging the DC bus capacitor through the main contactor and the anti-parallel diode of the H-bridge on the series side; the software method sorts the capacitor voltage by using the sorting and voltage balancing method, and selects the most appropriate module to be put into operation and removed. The method and system of the present invention solve the problem of large impact current and uneven voltage of the DC bus capacitor during the startup process, and the present invention is simple to implement and has the advantages of low cost, high reliability, and a wide range of applications.

[0034] The beneficial technical effects of the present invention are:

[0035] 1. The present invention adopts a sorting and voltage balancing method to select appropriate bus capacitors to be put in and removed, thereby ensuring voltage balancing of DC bus capacitors, and has low cost, high reliability and wide application range.

[0036] 2. The present invention effectively suppresses the impact current caused by unstable DC side voltage and large DC voltage difference during the startup process. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1 1 is a schematic diagram of a single-phase combined structure of an electrified railway same-phase power supply device according to an embodiment of the present invention;

[0038] Figure 2 This is a topological structure diagram of an electrified railway co-phase power supply device according to an embodiment of the present invention;

[0039] Figure 3 is a schematic diagram of a power module circuit of an electrified railway co-phase power supply device according to an embodiment of the present invention;

[0040] Figure 4 It is a flow chart of a method for starting a same-phase power supply device for an electrified railway according to an embodiment of the present invention;

[0041] Figure 5 It is a flow chart of the soft start phase of the electrified railway co-phase power supply device according to an embodiment of the present invention. DETAILED DESCRIPTION

[0042] In order to make the purpose, technical scheme and advantages of the present invention clearer, the present invention is further described in detail below in conjunction with specific embodiments and with reference to the accompanying drawings. It should be understood that these descriptions are only exemplary and are not intended to limit the scope of the present invention. In addition, in the following description, the description of well-known structures and technologies is omitted to avoid unnecessary confusion of the concept of the present invention.

[0043] The single-phase combined same-phase power supply system provided in this embodiment is as follows: Figure 1 As shown, the traction substation consists of a single-phase traction transformer TT, a standby traction transformer TB and a co-phase power supply device CPD. The co-phase power supply device CPD consists of a high-voltage matching transformer HMT, a co-phase power supply converter ADA and a traction matching transformer TMT.

[0044] The traction transformer TT and the standby traction transformer TB form an unequal-sided SCOTT connection group with the high-voltage matching transformer TMT, that is, a special three-phase-two-phase two-phase balancing transformer with unequal power supply capacity, unequal voltage amplitude and vertical voltage phase. In normal operation, the traction transformer TT and the co-phase power supply device CPD supply power to the traction load of the traction network. The traction transformer TT is responsible for the main power supply task, and the co-phase power supply device CPD is responsible for the secondary power supply task, so that the power quality of the entire power supply system meets the national standard requirements.

[0045] The topology of the same-phase power supply device provided in this embodiment is as follows: Figure 2 As shown, a back-to-back H-bridge hybrid structure is adopted, which consists of a traction matching transformer, 18 power modules (including 2 redundant modules), and a cascade side reactor; the power module consists of a parallel side converter, a DC side converter, and a series side converter. The DC side can be connected to an energy storage device, the parallel side converter is connected in parallel, and is connected to the power grid M through a multi-winding transformer, and the series side converter is connected in series, and is directly connected to the power grid T through a reactor. In this embodiment, the number of power unit modules is 18 (including 2 redundant modules). In actual applications, it can be designed according to specific engineering requirements.

[0046] The power module of the same-phase power supply device provided in this embodiment is as follows: Figure 3 As shown, the power unit consists of a parallel side H-bridge, a DC bus capacitor and a series side H-bridge. The parallel side is equipped with a module grid-connected contactor, and the series side is equipped with a bypass switch.

[0047] A first aspect of the present invention provides a method for starting a common-phase power supply device for an electrified railway. Figure 4 As shown, the following steps are included:

[0048] Step S100, preparation stage: confirm that the series side circuit breaker, the parallel side circuit breaker, the main contactor, and the soft start contactor are open, the series side isolation switch and the parallel side isolation switch are closed, and the series side grounding switch and the parallel side grounding switch are open;

[0049] Step S200, the soft start phase, includes:

[0050] 1) The circuit breaker on the series side is closed, the soft-start contactor is closed, and the DC bus capacitor is charged by controlling the soft-start resistor, the soft-start contactor, and the series-side H-bridge anti-parallel diode;

[0051] 2) When the soft start charging time is greater than the first predetermined time and the minimum DC bus voltage average value is greater than a predetermined voltage value, the main contactor is closed;

[0052] 3) Charge the DC bus capacitor by controlling the main contactor and the anti-parallel diode of the H-bridge on the series side;

[0053] 4) The soft-start contactor opens and charges the DC bus capacitor by controlling the main contactor and the anti-parallel diode of the H-bridge on the series side.

[0054] Step S300, voltage stabilization stage: after the soft start is completed, the parallel side circuit breaker is closed, the module grid contactor is closed, and the parallel side module controller starts voltage stabilization;

[0055] Step S400, operation phase: the voltage regulation of the parallel side module controller is completed, and the series side controller unlocks the pulse.

[0056] Furthermore, in the soft start stage step 1), charging the DC bus capacitor by controlling the soft start resistor, the soft start contactor, and the anti-parallel diode of the H-bridge on the series side includes: detecting the predetermined number of sub-modules corresponding to the maximum value of the DC bus voltage of all sub-modules every second predetermined time, bypassing the corresponding sub-modules, and charging the remaining sub-modules through the anti-parallel diode of the H-bridge on the series side; putting the bypass sub-module into operation at the next second predetermined time, re-detecting the predetermined number of sub-modules corresponding to the maximum value of the DC bus voltage of all sub-modules, bypassing the corresponding sub-modules, and charging the remaining sub-modules through the anti-parallel diode of the H-bridge on the series side. Preferably, the second predetermined time is 10ms, and the predetermined number of sub-modules is 2.

[0057] Furthermore, the first predetermined time in step 2) of the soft start phase is 20s, and the predetermined voltage value is 600V.

[0058] Furthermore, in the soft start stage step 3), charging the DC bus capacitor by controlling the main contactor and the anti-parallel diode of the H-bridge on the series side includes: closing the main contactor, detecting the predetermined number of submodules corresponding to the maximum value of the DC bus voltage of all submodules every second predetermined time, bypassing the corresponding submodules, and charging the remaining submodules through the anti-parallel diode of the H-bridge on the series side; putting the bypass submodule into operation at the next second predetermined time, re-detecting the submodule corresponding to the maximum value of the DC bus voltage of all submodules, bypassing the corresponding submodule, and charging the remaining submodules through the anti-parallel diode of the H-bridge on the series side. Preferably, the second predetermined time is 10ms, and the predetermined number of submodules is 1.

[0059] Furthermore, in the soft start stage step 4), the soft start contactor is opened, and the DC bus capacitor is charged by controlling the main contactor and the series side H-bridge anti-parallel diode, including: detecting a predetermined number of sub-modules corresponding to the maximum value of the DC bus voltage of all sub-modules every second predetermined time, bypassing the corresponding sub-modules, and charging the remaining sub-modules through the series side H-bridge anti-parallel diode; at the next second predetermined time, the bypass sub-module is put into use, and the predetermined number of sub-modules corresponding to the maximum value of the DC bus voltage of all sub-modules is re-detected, and the corresponding sub-modules are bypassed, and the remaining sub-modules are charged through the series side H-bridge anti-parallel diode. Preferably, the second predetermined time is 10ms, and the predetermined number of sub-modules is 2.

[0060] Furthermore, a bubble sort method is used to sort the submodules, and a predetermined number of submodules corresponding to the maximum value of the DC bus voltage of all submodules is calculated.

[0061] Furthermore, the corresponding submodule is bypassed by turning on two lower switch tubes of the H bridge on the series side.

[0062] Furthermore, the bypass submodule is put into operation by turning off two lower switch tubes of the H bridge on the series side.

[0063] Specifically, the soft start phase in the startup method of the same-phase power supply device provided in this embodiment is as follows: Figure 5As shown, the following steps are included: after the 12kV GIS switch cabinet circuit breaker is closed, (1) after the soft start contactor is closed, 1) a sorting voltage equalization method is used to detect the two sub-modules corresponding to the maximum DC bus voltage of all sub-modules every 10ms, bypass the sub-modules, and charge the other sub-modules through the soft start resistor, soft start contactor and series side H-bridge anti-parallel diode; 2) in the next 10ms, the bypass sub-module is put into use, and the two sub-modules corresponding to the maximum DC bus voltage of all sub-modules are re-detected, the sub-modules are bypassed, and the other sub-modules are charged through the soft start resistor, soft start contactor and series side H-bridge anti-parallel diode; (2) after the soft start is completed, 1) the main contactor is closed, and one sub-module corresponding to the maximum DC bus voltage of all sub-modules is detected every 10ms, and the sub-module is bypassed, and the main contactor and The series side H-bridge anti-parallel diode charges the other sub-modules; 2) In the next 10ms, the bypass sub-module is put into operation, and the sub-module corresponding to the maximum DC bus voltage of all sub-modules is re-detected, and the sub-module is bypassed, and the other sub-modules are charged through the main contactor and the series side H-bridge anti-parallel diode; (3) After the soft-start contactor is opened, 1) the 2 sub-modules corresponding to the maximum DC bus voltage of all sub-modules are detected every 10ms, and the sub-modules are bypassed, and the other sub-modules are charged through the main contactor and the series side H-bridge anti-parallel diode; 2) In the next 10ms, the bypass sub-module is put into operation, and the 2 sub-modules corresponding to the maximum DC bus voltage of all sub-modules are re-detected, and the sub-module is bypassed, and the other sub-modules are charged through the main contactor and the series side H-bridge anti-parallel diode.

[0064] The second aspect of the present invention provides a starting system for an electrified railway co-phase power supply device, wherein the power supply device includes a power cabinet, a starting cabinet, a control cabinet, an incoming switch cabinet and an outgoing switch cabinet; the power cabinet includes a power unit; the starting cabinet includes a soft-start contactor, a soft-start resistor and a main contactor; the incoming switch cabinet includes a series side circuit breaker, a series side isolating knife switch and a series side grounding knife switch; the outgoing switch cabinet includes a parallel side circuit breaker, a parallel side isolating knife switch and a parallel side grounding knife switch; the power unit includes a parallel side H-bridge, a DC bus capacitor and a series side H-bridge, the parallel side is equipped with a modular grid-connected contactor, and the series side is equipped with a bypass switch; the starting system is started according to the starting method of the electrified railway co-phase power supply device as described above.

[0065] In summary, the present invention provides a method and system for starting a co-phase power supply device for an electrified railway, which adopts a combination of hardware and software; the hardware method includes: (1) closing the soft-start contactor, charging the DC bus capacitor through the soft-start resistor and the soft-start contactor, and the anti-parallel diode of the H-bridge on the series side; (2) closing the main contactor, charging the DC bus capacitor through the main contactor and the anti-parallel diode of the H-bridge on the series side; the software method sorts the capacitor voltage by using the sorting and voltage balancing method, and selects the most appropriate module to be put into operation and removed. The method and system of the present invention solve the problem of large impact current and uneven voltage of the DC bus capacitor during the startup process, and the present invention is simple to implement and has the advantages of low cost, high reliability, and a wide range of applications.

[0066] The above gives the specific implementation methods of the present invention, but the present invention is not limited to the described implementation methods. Under the idea given by the present invention, the technical means in the above-mentioned embodiments are transformed, replaced, and modified in a way that is easy for a person skilled in the art to think of, and the effect is basically the same as the corresponding technical means in the present invention, and the purpose of the invention is basically the same. The technical solution formed in this way is formed by fine-tuning the above-mentioned embodiments, and this technical solution still falls within the protection scope of the present invention.

Claims

1. A method for starting a same-phase power supply device for an electrified railway, characterized in that: The power supply device includes a power cabinet, a starter cabinet, a control cabinet, an incoming switch cabinet and an outgoing switch cabinet; the power cabinet includes a power unit; the starter cabinet includes a soft start contactor, a soft start resistor and a main contactor; the incoming switch cabinet includes a series side circuit breaker, a series side isolation switch and a series side grounding switch; the outgoing switch cabinet includes a parallel side circuit breaker, a parallel side isolation switch and a parallel side grounding switch; the power unit includes a parallel side H-bridge, a DC bus capacitor and a series side H-bridge, the parallel side is equipped with a module grid-connected contactor, and the series side is equipped with a bypass switch; The startup method comprises the following steps: Preparation stage: confirm that the series side circuit breaker, parallel side circuit breaker, main contactor, and soft start contactor are open, the series side isolation knife switch and parallel side isolation knife switch are closed, and the series side grounding knife switch and parallel side grounding knife switch are open; The soft start phase includes: 1) The circuit breaker on the series side is closed, the soft start contactor is closed, and the DC bus capacitor is charged by controlling the soft start resistor, the soft start contactor, and the series side H-bridge anti-parallel diode; including: Detecting a predetermined number of submodules corresponding to the maximum value of the DC bus voltage of all submodules every second predetermined time, bypassing the corresponding submodules, and charging the remaining submodules through the anti-parallel diodes of the H bridge on the series side; At the next second predetermined time, the bypass submodule is put into operation, and a predetermined number of submodules corresponding to the maximum value of the DC bus voltage of all submodules are re-detected, and the corresponding submodules are bypassed, and the remaining submodules are charged through the anti-parallel diodes of the H bridge on the series side; Wherein, the second predetermined time is 10ms, and the predetermined number of submodules is 2; 2) When the soft start charging time is greater than the first predetermined time and the minimum DC bus voltage average value is greater than the voltage predetermined value, the main contactor is closed; 3) Charging the DC bus capacitor by controlling the main contactor and the series-side H-bridge anti-parallel diode; including: The main contactor is closed, and a predetermined number of submodules corresponding to the maximum value of the DC bus voltage of all submodules are detected every second predetermined time, and the corresponding submodules are bypassed, and the remaining submodules are charged through the anti-parallel diodes of the H bridge on the series side; At the next second predetermined time, the bypass submodule is put into operation, the submodule corresponding to the maximum DC bus voltage of all submodules is re-detected, the corresponding submodule is bypassed, and the remaining submodules are charged through the anti-parallel diode of the H bridge on the series side; Wherein, the second predetermined time is 10ms, and the predetermined number of submodules is 1; 4) The soft start contactor opens, and the DC bus capacitor is charged by controlling the main contactor and the anti-parallel diode of the H bridge on the series side; including: Detecting a predetermined number of submodules corresponding to the maximum value of the DC bus voltage of all submodules every second predetermined time, bypassing the corresponding submodules, and charging the remaining submodules through the anti-parallel diodes of the H bridge on the series side; At the next second predetermined time, the bypass submodule is put into operation, and a predetermined number of submodules corresponding to the maximum value of the DC bus voltage of all submodules are re-detected, and the corresponding submodules are bypassed, and the remaining submodules are charged through the anti-parallel diodes of the H bridge on the series side; Wherein, the second predetermined time is 10ms, and the predetermined number of submodules is 2; Voltage stabilization stage: After the soft start is completed, the parallel side circuit breaker is closed, the module grid contactor is closed, and the parallel side module controller starts voltage stabilization; Operation phase: The parallel side module controller completes voltage regulation, and the series side controller unlocks the pulse.

2. The method for starting the electric railway co-phase power supply device according to claim 1, characterized in that: The first predetermined time in step 2) of the soft start phase is 20s, and the predetermined voltage value is 600V.

3. The method for starting the electric railway co-phase power supply device according to claim 1, characterized in that: The bubble sorting method is used to sort the sub-modules, and a predetermined number of sub-modules corresponding to the maximum value of the DC bus voltage of all sub-modules are calculated.

4. The method for starting the electric railway co-phase power supply device according to claim 1, characterized in that: The corresponding submodule is bypassed by turning on the two lower switch tubes of the H bridge on the series side.

5. The method for starting the electric railway co-phase power supply device according to claim 1, characterized in that: The bypass submodule is put into operation by turning off the two lower switch tubes of the H bridge on the series side.

6. A starting system for a same-phase power supply device for an electrified railway, characterized in that: The power supply device includes a power cabinet, a starting cabinet, a control cabinet, an incoming switch cabinet and an outgoing switch cabinet; the power cabinet includes a power unit; the starting cabinet includes a soft-start contactor, a soft-start resistor and a main contactor; the incoming switch cabinet includes a series side circuit breaker, a series side isolating knife switch and a series side grounding knife switch; the outgoing switch cabinet includes a parallel side circuit breaker, a parallel side isolating knife switch and a parallel side grounding knife switch; the power unit includes a parallel side H-bridge, a DC bus capacitor and a series side H-bridge, the parallel side is equipped with a modular grid-connected contactor, and the series side is equipped with a bypass switch; the starting system is started according to the starting method of the electrified railway same-phase power supply device as described in any one of claims 1-5.