Method for tying steel cage in hollow hole in the middle of defective cast-in-place pile

By using steel bars to tie the workbench and lifting platform mechanism in the pile holes, combined with bamboo pole transmission reinforcement rings, the problems of high-level steel bars are solved, and construction efficiency and safety are improved.

CN114482024BActive Publication Date: 2024-11-15JIANTAI CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210273998.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-20
Publication Date
2024-11-15
Estimated Expiration
2042-03-20

AI Technical Summary

Technical Problem

During construction, when workers perform steel bar binding operations in pile holes, due to the high strength of the steel bars, it is difficult to tie, especially when operating at high positions, resulting in reduced work efficiency and unsafety.

Method used

The workbench and lifting platform mechanism are adopted to tie the steel bars, and the workbench can be lifted and lowered through electric lifting columns and support rods. Combined with bamboo poles, the reinforcement rings are transmitted, which simplifies the binding operation at high places and reduces the burden on workers' hands.

Benefits of technology

It improves the working efficiency and safety of steel bar binding, reduces the labor intensity of workers, is suitable for defective piles with different hole depths, and avoids the safety hazards of traditional stepping installation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114482024B_ABST
    Figure CN114482024B_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of building construction, and discloses a method for tying a steel cage in a hollow hole in the middle of a defective cast-in-place pile. The method comprises the following construction steps: S1: purchasing and delivering steel bars in advance, and using them after being inspected and approved; S2: cutting and bending reinforcing bars on site to make them into rings for standby; S3: making a simple positioning device for fixing the main bars according to the main bar positioning of a "pile in pile"; S4: putting bundled stirrups into the pile hole, aligning them by using the step-type retaining wall of the defective pile, and putting the main bars in; S5: first placing a steel bar tying workbench at the bottom of the pile hole by using a crane, and then manually entering the hole to perform the "pile in pile" steel cage tying operation; S6: when the construction reaches a position where additional reinforcement bars are required, an operator on the ground transfers a reinforcement ring into the hole, and uses the steel bar tying workbench and a lifting platform mechanism to continue to connect the stirrups circle by circle upwards; S7: during the steel cage tying process, an acoustic detection pipe is simultaneously pre-buried according to design requirements.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction, in particular to a method for binding a steel cage in a hollow hole in the middle of a defective cast-in-place pile. Background Art

[0002] In construction, when dealing with defective bored piles, a hole is directly drilled on the pile position, and workers enter the hole to tie the "pile in pile" steel cage. When the steel cage is tied to form a skeleton, concrete is poured into the hole to form a new pile column. Bored piles have been widely used in the foundation of structural engineering such as roads, railways and bridges due to their mature construction technology, high bearing capacity and wide application range.

[0003] When workers tie steel bars in pile holes, the strength of the steel bars is high and the tying is difficult. It is even more difficult to tie steel bars at higher positions, which reduces work efficiency. In addition, when working on some deep and defective pile holes, it is necessary to set up a support on the hole wall, and the workers stand on the support to tie the steel bars, which is difficult and unsafe.

[0004] Therefore, we introduced a method for tying steel cages inside hollow holes in the middle of defective cast-in-place piles. Summary of the invention

[0005] The purpose of the present invention is to provide a method for tying a steel cage in a hollow hole in the middle of a defective cast-in-place pile, aiming to solve the problem in the above-mentioned background technology that when workers perform steel bar tying operations in the pile hole, the strength of the steel bars is large and the tying is difficult, and it is more difficult to operate when tying steel bars at a higher position, which will reduce work efficiency. The method sets a steel bar tying workbench, which is convenient for workers to operate when the steel bar tying position is high and difficult for workers' hands to reach, improves efficiency, and ensures the safety of workers during construction.

[0006] To achieve the above object, the present invention provides the following technical solution: a method for binding a steel cage in a hollow hole in the middle of a defective cast-in-place pile, comprising the following construction steps:

[0007] S1: Purchase and deliver steel bars in advance and use them after they have passed the inspection and approval;

[0008] S2: Cut and bend the reinforcing bars on site and make them into rings for standby use. According to the height of the 60mm layer of the water-drilling drill and the spacing of the stirrups, calculate the number of circles around the stirrups in each layer, and cut and tie the stirrups in bundles;

[0009] S3: According to the main reinforcement positioning of the "pile in pile", a simple positioning device for fixing the main reinforcement is made, so that the main reinforcement positioning ring of the "pile in pile" can be connected with 5 steel bars and centrally erected on the defective pile retaining wall concrete;

[0010] S4: Put the bundled stirrups into the pile hole, use the step-type retaining wall of the defective pile to align them so that all the stirrups will not accumulate at the bottom of the pile hole under the action of gravity, and put in the main reinforcement;

[0011] S5: First, use a crane to place the steel bar binding workbench at the bottom of the pile hole, and then manually enter the hole to perform the "pile in pile" steel bar cage binding operation. First, evenly position the main bars around the simple positioning device on the top and weld them firmly. Then, spread the bundled stirrups from the bottom of the hole upwards and connect them with the main bars.

[0012] S6: When the construction reaches the part where reinforcement is needed, the workers on the ground will pass the reinforcement ring into the hole for binding and fixing. Then, using the reinforcement binding workbench and lifting platform mechanism, they will continue to connect the stirrups circle by circle until the overall production of the "pile in pile" reinforcement cage is completed;

[0013] S7: During the reinforcement cage binding process, acoustic detection tubes are pre-buried according to design requirements, and quality inspection of the pile concrete is carried out after the curing age.

[0014] Further, in the above step S5, the placement of the steel bar binding workbench includes the following implementation steps:

[0015] S501: When tying the steel bar cage upward from the bottom of the pile hole of the defective pile, first use a crane to place the steel bar tying workbench at the bottom of the pile hole, and then workers enter the hole and work on the steel bar tying workbench;

[0016] S502: After the steel bar binding of the bottom layer of the pile hole is completed, a fixing hole is drilled on the inner wall of the defective pile hole, the steel bar binding workbench is lifted by a crane, and the bottom of the steel bar binding workbench is fixed to the inner wall of the defective pile hole, and then the binding operation is continued upwards.

[0017] Furthermore, in the above step S6, the operator on the ground transfers the reinforcing rib into the hole, including the following implementation steps:

[0018] S601: Insert the bottoms of the four bamboo poles into the four brackets of the lifting platform mechanism respectively;

[0019] S602: Put the reinforcing ribs on the rectangle formed by the four bamboo poles, loosen the reinforcing ribs and let them slide freely into the bracket of the lifting platform mechanism.

[0020] Furthermore, the ground workers should pay attention to the following when transferring reinforcement ribs into the hole:

[0021] The reinforcement bars should not be put on a single bamboo pole and passed downward, as this may easily injure the workers working in the pile hole. The number of reinforcement bars passed at one time should not be too many.

[0022] Furthermore, the steel bar binding workbench includes a base, an electric lifting column, a platform, and support rods. A plurality of electric lifting columns are fixedly connected to the bottom end of the base near the outer edge, and the electric lifting columns are evenly distributed along the circumferential direction of the base. The top end of the electric lifting column is fixedly connected to the platform, and the bottom of the base is slidably connected to four support rods.

[0023] Furthermore, an electric push column is fixedly connected to the inner center of the base, and one end of the electric push column close to the outer edge of the base is fixedly connected to a motor, and the output end of the motor is fixedly connected to the support rod.

[0024] Furthermore, the lifting platform mechanism includes pillars, sliding columns, annular platforms, brackets, foot pedals, inflatable airbags, return springs, catheters, and telescopic airbags. The top of the platform is fixedly connected to a number of pillars, and the pillars are evenly distributed along the circumferential direction of the platform. The middle of the pillars is slidably connected to the sliding columns, the top of the sliding columns is fixedly connected to the annular platform, and four brackets are fixedly connected to the outer edge wall of the annular platform, and the brackets are evenly distributed along the circumferential direction of the annular platform.

[0025] Furthermore, foot pedals are slidably connected to both ends of the top of the platform, an inflatable airbag is fixedly connected to the interior of the platform near the bottom of the foot pedal, return springs are provided on both sides of the inflatable airbag inside the platform, and the top of the return spring is fixedly connected to the top of the inflatable airbag, a telescopic airbag is provided inside the pillar near the bottom of the sliding column, and the top of the telescopic airbag is fixedly connected to the bottom of the sliding column, and a conduit is provided between the telescopic airbag and the inflatable airbag.

[0026] Furthermore, a plurality of storage slots are arranged on the top of the annular table, a card slot is arranged in the middle of the bracket, and a socket is arranged on the top of the bracket near the card slot.

[0027] Furthermore, a round rod is fixedly connected to one end of the top of the annular platform, a shielding plate is hinged on the top of the round rod, and the shielding plate is made of a transparent material.

[0028] The method for tying a steel cage in a hollow hole in the middle of a defective cast-in-place pile proposed by the present invention is to set up a steel tying workbench. When the position of the steel tying is high and difficult for workers to reach with their hands, the electric lifting column is started, and the output end of the electric lifting column is extended to drive the platform to rise, so that workers can tie the steel bars at high places, which is convenient for workers to work and improves efficiency. By setting support rods, the steel tying workbench can be applied to defective piles with different hole depths. When the hole of the defective pile is deep, it is only necessary to fix the steel tying workbench layer by layer and perform tying operations layer by layer. Compared with the traditional method of setting steps on the hole wall, the steel tying workbench is convenient for workers to stand and work, improves work efficiency, and ensures the safety of workers during construction.

[0029] The method for tying a steel cage in a hollow hole in the middle of a defective cast-in-place pile proposed by the present invention provides a lifting platform mechanism and a socket. When the workers on the ground pass the reinforcing bars into the hole, the reinforcing bars can quickly fall into the hole along the bamboo poles and fall on the periphery of the workers, thereby improving work efficiency and ensuring the safety of underground workers. When the workers tie the reinforcing bars at a higher position, the bracket can rise to the chest position of the workers with the reinforcing bars placed thereon, which is conducive to reducing the burden on the workers' hands, so that the workers can tie the reinforcing bars without holding them, which can greatly improve the workers' tying speed and reduce the workers' labor intensity. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 It is an overall flow chart of the method for tying a steel cage in a hollow hole in the middle of a defective cast-in-place pile of the present invention;

[0031] Figure 2 A flow chart of placing a steel bar binding workbench of a method for binding a steel bar cage in a hollow hole in the middle of a defective cast-in-place pile according to the present invention;

[0032] Figure 3 It is a flow chart of transferring reinforcing bars into the hole of the method for tying a steel cage in a hollow hole in the middle of a defective cast-in-place pile of the present invention;

[0033] Figure 4 A schematic diagram of the structure of a steel bar binding workbench of a method for binding a steel bar cage in a hollow hole in the middle of a defective cast-in-place pile according to the present invention;

[0034] Figure 5 A front view of a steel bar tying workbench of a method for tying a steel bar cage in a hollow hole in the middle of a defective cast-in-place pile according to the present invention;

[0035] Figure 6 A schematic diagram of the bottom structure of a steel bar binding workbench of a method for binding a steel bar cage in a hollow hole in the middle of a defective cast-in-place pile according to the present invention;

[0036] Figure 7 for Figure 4 An enlarged schematic diagram of part A is shown;

[0037] Figure 8 for Figure 5 An enlarged schematic diagram of part B is shown.

[0038] In the figure: 1. Steel bar binding workbench; 11. Base; 12. Electric lifting column; 13. Platform; 14. Support rod; 2. Motor; 3. Electric push column; 4. Lifting platform mechanism; 41. Support column; 42. Sliding column; 43. Ring platform; 44. Bracket; 45. Foot pedal; 46. Inflatable airbag; 47. Return spring; 48. Catheter; 49. Telescopic airbag; 5. Storage slot; 6. Socket; 7. Round rod; 8. Shielding plate. DETAILED DESCRIPTION

[0039] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0040] The same or similar numbers in the drawings of this embodiment correspond to the same or similar parts; in the description of the present invention, it should be understood that if the terms "upper", "lower", "left", "right" and the like indicate directions or positional relationships based on the directions or positional relationships shown in the drawings, it is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction. Therefore, the terms describing the positional relationship in the drawings are only used for illustrative purposes and cannot be understood as limitations on this patent. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.

[0041] Reference Figure 1-8 The figure shows a preferred embodiment of the present invention.

[0042] See also Figure 1 The method for tying the steel cage in the hollow hole in the middle of the defective cast-in-place pile includes the following construction steps:

[0043] Step 1: Purchase and deliver the steel bars to the site in advance and use them after they have passed the inspection and approval;

[0044] Step 2: Cut and bend the reinforcement bars on site and make them into rings for standby use. According to the height of the 60mm layer of the water-grinding drill and the spacing of the stirrups, calculate the number of circles around the stirrups in each layer, and cut and tie the stirrups in bundles;

[0045] Step 3: According to the main reinforcement positioning of the "pile in pile", a simple positioning device for fixing the main reinforcement is made, so that the main reinforcement positioning ring of the "pile in pile" can be centrally erected on the defective pile retaining wall concrete by connecting with 5 steel bars;

[0046] Step 4: Put the bundled stirrups into the pile hole, use the step-type retaining wall of the defective pile to align them so that all the stirrups will not accumulate at the bottom of the pile hole under the action of gravity, and put in the main reinforcement;

[0047] Step 5: First, use a crane to place the steel bar binding workbench 1 at the bottom of the pile hole, and then manually enter the hole to perform the "pile in pile" steel cage binding operation. First, evenly position the main reinforcement around the simple positioning device on the top and firmly weld it, and then spread the bundled stirrups from the bottom of the hole upward in turn and connect them with the main reinforcement;

[0048] Step 6: When the reinforcement bar needs to be added to the part, the workers on the ground will pass the reinforcement bar ring into the hole for binding and fixing, and use the reinforcement binding workbench 1 and the lifting platform mechanism 4 to continue to connect the stirrups circle by circle upwards until the overall production of the "pile in pile" reinforcement cage is completed;

[0049] Step 7: During the steel cage binding process, the sonic detection tube is pre-buried according to the design requirements, and the quality of the pile concrete is tested after the curing age.

[0050] See also Figure 2 In the above step S5, the placement of the steel bar binding workbench 1 includes the following implementation steps:

[0051] S501: When tying the steel cage upward from the bottom of the pile hole of the defective pile, first use a crane to place the steel bar tying workbench 1 at the bottom of the pile hole, and then workers enter the hole and work on the steel bar tying workbench 1;

[0052] S502: After the steel bar binding of the bottom layer of the pile hole is completed, a fixing hole is drilled on the inner wall of the defective pile hole, the steel bar binding workbench 1 is lifted by a crane, and the bottom of the steel bar binding workbench 1 is fixed to the inner wall of the defective pile hole, and then the binding operation is continued upwards.

[0053] See also Figure 3 In the above step S6, the operator on the ground transfers the reinforcement ribs into the hole, including the following implementation steps:

[0054] S601: Insert the bottoms of the four bamboo poles into the four brackets 44 of the lifting platform mechanism 4 respectively;

[0055] S602: Put the reinforcing ribs on the rectangle formed by the four bamboo poles, loosen the reinforcing ribs and let them slide freely into the bracket 44 of the lifting platform mechanism 4.

[0056] When workers on the ground pass reinforcement bars into the hole, they should pay attention to the following:

[0057] The reinforcement bars should not be put on a single bamboo pole and passed downward, as this may easily injure the workers working in the pile hole. The number of reinforcement bars passed at one time should not be too many.

[0058] See also Figure 4-6The steel bar binding workbench 1 includes a base 11, an electric lifting column 12, a platform 13, and a support rod 14. A plurality of electric lifting columns 12 are fixedly connected to the bottom of the base 11 near the outer edge, and the electric lifting columns 12 are evenly distributed along the circumferential direction of the base 11. The top of the electric lifting column 12 is fixedly connected to the platform 13, and four support rods 14 are slidably connected to the bottom of the base 11. When binding the steel cage from the bottom of the pile hole of the defective pile, first use a crane to place the steel bar binding workbench 1 at the bottom of the pile hole, and then the workers enter the hole and work on the platform 13. When the position of the steel bar binding is high and the workers' hands are difficult to reach, by starting the electric lifting column 12, the output end of the electric lifting column 12 extends to drive the platform 13 to rise, so that the workers can bind the steel bars at high places, which is convenient for the workers to work and improves efficiency.

[0059] See also Figure 4 and Figure 6 , the inner center of the base 11 is fixedly connected with an electric push column 3, and one end of the electric push column 3 close to the outer edge of the base 11 is fixedly connected with a motor 2, and the output end of the motor 2 is fixedly connected with the support rod 14. After the binding of the steel bars of the bottom layer of the pile hole is completed, a fixing hole is drilled on the inner wall of the defective pile hole, and the steel bar binding workbench 1 is lifted by a crane, and the motor 2 and the electric push column 3 are started. The motor 2 drives the support rod 14 to rotate, and the electric push column 3 pushes the support rod 14 to be inserted into the fixing hole, so that the base 11 is fixed to the inner wall of the defective pile hole. At this time, the staff can stand on the platform 13 and continue to perform the binding operation upwards, and repeat the above operation until all the steel cages of the center hole of the defective pile are bound. The support rod 14 is set, so that the steel bar binding workbench 1 can be applied to defective piles with different hole depths. When the pile hole of the defective pile is deep, it is only necessary to fix the steel bar binding workbench 1 layer by layer, and perform the binding operation layer by layer. Compared with the traditional method of setting steps on the hole wall, the steel bar binding workbench 1 is convenient for workers to stand and work, improves work efficiency, and ensures the safety of workers during construction.

[0060] See also Figure 4 , Figure 5 and Figure 7The lifting platform mechanism 4 includes pillars 41, sliding columns 42, annular platforms 43, brackets 44, foot pedals 45, inflatable airbags 46, return springs 47, guide tubes 48, and telescopic airbags 49. The top of the platform 13 is fixedly connected with a plurality of pillars 41, and the pillars 41 are evenly distributed along the circumferential direction of the platform 13. The middle of the pillars 41 is slidably connected with sliding columns 42, and the top of the sliding columns 42 is fixedly connected with the annular platform 43. Four brackets 44 are fixedly connected to the outer edge wall of the annular platform 43, and the brackets 44 are evenly distributed along the circumferential direction of the annular platform 43. The top of the annular platform 43 is provided with a plurality of storage slots 5, the middle of the bracket 44 is provided with a card slot, and the top of the bracket 44 is provided with a socket 6 near the card slot. When the operator on the ground passes the reinforcing bar into the hole, first insert the bottom of the four bamboo poles into the sockets 6 of the four brackets 44 respectively, then put the reinforcing bar on the rectangle formed by the four bamboo poles, loosen the reinforcing bar so that it can slide freely into the slot of the bracket 44, so that the worker can take the reinforcing bar conveniently when tying, and when the operator on the ground passes the reinforcing bar into the hole, the reinforcing bar can quickly fall into the hole along the bamboo pole and fall on the periphery of the worker, which improves the work efficiency and ensures the safety of the underground workers. When tying, the worker can place the tools in the storage slot 5 on the annular table 43, which is convenient for taking and storing the tools and preventing the tools from being lost.

[0061] See also Figure 5 and Figure 8 Foot pedals 45 are slidably connected to both ends of the top of the platform 13, and an inflatable airbag 46 is fixedly connected to the inside of the platform 13 near the bottom of the foot pedal 45. Return springs 47 are provided on both sides of the inflatable airbag 46 inside the platform 13, and the top of the return spring 47 is fixedly connected to the top of the inflatable airbag 46. A telescopic airbag 49 is provided inside the pillar 41 near the bottom of the sliding column 42, and the top of the telescopic airbag 49 is fixedly connected to the bottom end of the sliding column 42, and a conduit 48 is provided between the telescopic airbag 49 and the inflatable airbag 46. When a worker is tying a higher position steel bar on the platform 13, he presses down the foot pedal 45 with his foot, so that the foot pedal 45 squeezes the inflatable airbag 46, and the air inside the inflatable airbag 46 enters the telescopic airbag 49 through the conduit 48. The telescopic airbag 49 stretches and pushes the sliding column 42 to rise, and the sliding column 42 drives the annular platform 43 and the bracket 44 to rise. The bracket 44 rises to the chest position of the worker with the reinforcement placed on it, and the worker can directly tie the reinforcement on the bracket 44. After the tying is completed, the foot pedal 45 is released, the annular platform 43 descends, and the bracket 44 is separated from the tied reinforcement. The lifting platform mechanism 4 is set up, when the worker ties the reinforcement at a higher position, it is helpful to reduce the burden on the worker's hands, so that the worker can tie it without holding the reinforcement, which can greatly improve the worker's tying speed and reduce the worker's labor intensity.

[0062] See also Figure 4 A round rod 7 is fixedly connected to one end of the top of the annular platform 43, and a shielding plate 8 is hinged on the top of the round rod 7, and the shielding plate 8 is made of transparent material. When the wind and sand in the external environment are strong, the worker can rotate the shielding plate 8 to shield the worker's head to prevent flying sand and gravel from falling into the pile hole and causing harm to the worker, and the shielding plate 8 is made of transparent material and will not block light.

[0063] Working principle: When tying the steel cage from the bottom of the pile hole of the defective pile, first use a crane to place the steel bar tying workbench 1 at the bottom of the pile hole, and then the workers enter the hole to work on the platform 13. When the position of the steel bar tying is high and the workers' hands are difficult to reach, by starting the electric lifting column 12, the output end of the electric lifting column 12 extends and drives the platform 13 to rise, so that the workers can tie the steel bars at high places, which is convenient for the workers to work and improves efficiency.

[0064] After the steel bar binding of the bottom layer of the pile hole is completed, a fixing hole is drilled on the inner wall of the defective pile hole, and the steel bar binding workbench 1 is lifted by a crane, and the motor 2 and the electric push column 3 are started. The motor 2 drives the support rod 14 to rotate, and the electric push column 3 pushes the support rod 14 to be inserted into the fixing hole, so that the base 11 is fixed to the inner wall of the defective pile hole. At this time, the staff can stand on the platform 13 and continue to perform the binding operation upwards, and repeat the above operation until all the steel cages of the center hole of the defective pile are bound. The support rod 14 is set, so that the steel bar binding workbench 1 can be applied to defective piles with different hole depths. When the pile hole of the defective pile is deeper, it is only necessary to fix the steel bar binding workbench 1 layer by layer, and perform the binding operation layer by layer. Compared with the traditional method of setting steps on the hole wall, the steel bar binding workbench 1 is convenient for workers to stand and work, improves work efficiency, and ensures the safety of workers during construction.

[0065] When the operator on the ground passes the reinforcing bar into the hole, first insert the bottom of the four bamboo poles into the sockets 6 of the four brackets 44 respectively, then put the reinforcing bar on the rectangle formed by the four bamboo poles, loosen the reinforcing bar so that it can slide freely into the slot of the bracket 44, so that the worker can take the reinforcing bar conveniently when tying, and when the operator on the ground passes the reinforcing bar into the hole, the reinforcing bar can quickly fall into the hole along the bamboo pole and fall on the periphery of the worker, which improves the work efficiency and ensures the safety of the underground workers. When tying, the worker can place the tools in the storage slot 5 on the annular table 43, which is convenient for taking and storing the tools and preventing the tools from being lost.

[0066] When a worker is tying a higher position steel bar on the platform 13, he presses down the foot pedal 45 with his foot, so that the foot pedal 45 squeezes the inflatable airbag 46, and the air inside the inflatable airbag 46 enters the telescopic airbag 49 through the conduit 48. The telescopic airbag 49 stretches and pushes the sliding column 42 to rise, and the sliding column 42 drives the annular platform 43 and the bracket 44 to rise. The bracket 44 rises to the chest position of the worker with the reinforcement placed on it, and the worker can directly tie the reinforcement on the bracket 44. After the tying is completed, the foot pedal 45 is released, the annular platform 43 descends, and the bracket 44 is separated from the tied reinforcement. The lifting platform mechanism 4 is set up, when the worker ties the reinforcement at a higher position, it is helpful to reduce the burden on the worker's hands, so that the worker can tie it without holding the reinforcement, which can greatly improve the worker's tying speed and reduce the worker's labor intensity.

[0067] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for tying a steel cage in a hollow hole in the middle of a defective cast-in-place pile, characterized in that: The construction steps include: S1: Purchase and deliver steel bars in advance and use them after they have passed the inspection and approval; S2: Cut and bend the reinforcing bars on site and make them into rings for standby use. According to the height of the 60mm layer of the water-drilling drill and the spacing of the stirrups, calculate the number of circles around the stirrups in each layer, and cut and tie the stirrups in bundles; S3: According to the main reinforcement positioning of the "pile in pile", a simple positioning device for fixing the main reinforcement is made, so that the main reinforcement positioning ring of the "pile in pile" can be connected with 5 steel bars and centrally erected on the defective pile retaining wall concrete; S4: Put the bundled stirrups into the pile hole, use the step-type retaining wall of the defective pile to align them so that all the stirrups will not accumulate at the bottom of the pile hole under the action of gravity, and put in the main reinforcement; S5: First, a crane is used to place the steel bar binding workbench (1) at the bottom of the pile hole, and then a person manually enters the hole to perform the "pile in pile" steel bar cage binding operation. First, the main bars are evenly positioned around the simple positioning device at the top and firmly welded, and then the bundled stirrups are spread out from the bottom of the hole upwards and connected with the main bars by binding; S6: When the construction reaches the part where reinforcement bars need to be added, the workers on the ground transfer the reinforcement ring into the hole for binding and fixing, and use the reinforcement binding workbench (1) and the lifting platform mechanism (4) to continue to connect the stirrups circle by circle upwards until the overall production of the "pile in pile" reinforcement cage is completed; S7: During the steel cage binding process, the acoustic detection pipe is pre-buried according to the design requirements, and the quality of the pile concrete is tested after the curing age; In the above step S6, the operator on the ground transfers the reinforcement ribs into the hole, including the following implementation steps: S601: inserting the bottoms of the four bamboo poles into the four brackets (44) of the lifting platform mechanism (4) respectively; S602: Put the reinforcing ribs on the rectangle formed by the four bamboo poles, loosen the reinforcing ribs and let them slide freely into the bracket (44) of the lifting platform mechanism (4); When workers on the ground pass reinforcement bars into the hole, they should pay attention to the following: Do not put the reinforcing bar on a single bamboo pole and pass it downward, as it is easy to injure the workers working in the pile hole. The number of reinforcing bars passed at one time should not be too many; The steel bar binding workbench (1) comprises a base (11), an electric lifting column (12), a platform (13), and a support rod (14); a plurality of electric lifting columns (12) are fixedly connected to the bottom end of the base (11) near the outer edge, and the electric lifting columns (12) are evenly distributed along the circumferential direction of the base (11); the top end of the electric lifting column (12) is fixedly connected to the platform (13); and the bottom of the base (11) is slidably connected to four support rods (14); The lifting platform mechanism (4) comprises a pillar (41), a sliding column (42), an annular platform (43), a bracket (44), a foot pedal (45), an inflatable airbag (46), a return spring (47), a guide tube (48), and a telescopic airbag (49). The top of the platform (13) is fixedly connected to a plurality of pillars (41), and the pillars (41) are evenly distributed along the circumferential direction of the platform (13). The middle of the pillar (41) is slidably connected to a sliding column (42), and the top of the sliding column (42) is fixedly connected to the annular platform (43). Four brackets (44) are fixedly connected to the outer edge wall of the annular platform (43), and the brackets (44) are evenly distributed along the circumferential direction of the annular platform (43). Both ends of the top of the platform (13) are slidably connected with foot pedals (45), and an inflatable airbag (46) is fixedly connected inside the platform (13) near the foot pedal (45). Return springs (47) are provided on both sides of the inflatable airbag (46) inside the platform (13), and the top of the return spring (47) is fixedly connected to the top of the inflatable airbag (46). A telescopic airbag (49) is provided inside the pillar (41) near the bottom of the sliding column (42), and the top of the telescopic airbag (49) is fixedly connected to the bottom of the sliding column (42), and a conduit (48) is provided between the telescopic airbag (49) and the inflatable airbag (46).

2. The method for tying a steel cage in a hollow hole in the middle of a defective cast-in-place pile according to claim 1, characterized in that: In the above step S5, the placement of the steel bar binding workbench (1) includes the following implementation steps: S501: When tying the steel bar cage upward from the bottom of the pile hole of the defective pile, first use a crane to place the steel bar tying workbench (1) at the bottom of the pile hole, and then workers enter the hole and work on the steel bar tying workbench (1); S502: After the steel bar binding of the bottom layer of the pile hole is completed, a fixing hole is drilled on the inner wall of the defective pile hole, the steel bar binding workbench (1) is lifted by a crane, and the bottom of the steel bar binding workbench (1) is fixed to the inner wall of the defective pile hole, and then the binding operation is continued upwards.

3. The method for tying a steel cage in a hollow hole in the middle of a defective cast-in-place pile as claimed in claim 2, characterized in that: An electric push column (3) is fixedly connected to the inner center of the base (11), and an end of the electric push column (3) close to the outer edge of the base (11) is fixedly connected to a motor (2), and an output end of the motor (2) is fixedly connected to a support rod (14).

4. The method for tying a steel cage in a hollow hole in the middle of a defective cast-in-place pile as claimed in claim 3, characterized in that: The top of the annular platform (43) is provided with a plurality of receiving grooves (5), the middle of the bracket (44) is provided with a clamping groove, and the top of the bracket (44) is provided with a plug hole (6) near the clamping groove.

5. The method for tying a steel cage in a hollow hole in the middle of a defective cast-in-place pile as claimed in claim 4, characterized in that: A round rod (7) is fixedly connected to one end of the top of the annular platform (43), a shielding plate (8) is hingedly connected to the top of the round rod (7), and the shielding plate (8) is made of a transparent material.