Distribution network expansion planning methods, devices, computer equipment and storage media

By establishing an economic and reliability target model and improving the load node parameters, the problem that the existing distribution network expansion planning method cannot optimize economic and reliability at the same time is solved, and the accuracy of distribution network expansion planning is improved.

CN114492896BActive Publication Date: 2024-12-03GUANGZHOU POWER SUPPLY BUREAU GUANGDONG POWER GRID CO LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202011164200.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-10-27
Publication Date
2024-12-03
Estimated Expiration
2040-10-27

AI Technical Summary

Technical Problem

The existing distribution network expansion planning method cannot ensure the global optimal solution of the final solution from both economic and reliability at the same time, resulting in a decrease in the accuracy of the expansion planning.

Method used

By establishing an economic target model and a reliability target model, improving the parameters of the load node based on the prediction function, a new reliability target model is obtained, and then the distribution network expansion planning is carried out to ensure the simultaneous optimization of economic and reliability indicators.

Benefits of technology

It has achieved the global optimal solution to the distribution network expansion planning scheme from both economic and reliability aspects, and improved the accuracy of the expansion planning.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114492896B_ABST
    Figure CN114492896B_ABST
Patent Text Reader

Abstract

The present application relates to a distribution network expansion planning method, device, computer equipment and storage medium. The method includes: obtaining parameters and variables in the distribution system, and obtaining determined economic indicators and reliability indicators; establishing economic target models for each economic indicator and reliability target models for each reliability indicator according to the parameters and variables; based on the economic target model, improving the load node state variables in the reliability target model in the form of a prediction function to obtain a new reliability target model; and performing distribution network expansion planning according to the economic target model and the new reliability target model. The use of this method can improve the accuracy of expansion planning.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of distribution network expansion planning, and in particular to a distribution network expansion planning method, device, computer equipment and storage medium. Background Art

[0002] The expansion planning of the distribution network refers to the determination of the distribution network construction plan in multiple planning stages according to the results of load forecasting and existing network facilities within a certain planning period, so as to meet the electricity demand in the planned year on the basis of safe and stable operation of the distribution system. In essence, it is to determine the location, time stage and equipment type of safe new distribution equipment or replacement of existing distribution equipment on the basis of the existing distribution network within a specified time range. Therefore, it is obvious that the model used for distribution network expansion planning belongs to the mixed integer programming model. In the process of distribution network expansion planning, in addition to minimizing the total expansion planning cost, the reliability level of the distribution system is also an important factor. However, since the reliability index of the distribution network depends on the known network topology, and the distribution network topology is the output result of the expansion planning, the reliability index cannot be involved in the expansion planning process.

[0003] In order to obtain the expansion planning scheme of the distribution network from the perspectives of economy and reliability, most of the existing methods first optimize the objective function of the economic index to obtain the expansion planning method of the distribution network system. Then the value of the reliability index is calculated by the known decision variable value and the network topology. In order to select an expansion planning scheme with good economy and high reliability, different planning schemes are obtained by changing the upper limit parameter of the investment cost, and then the corresponding reliability index value is calculated. Finally, the decision-making method is adopted to compare and analyze multiple planning schemes from the two aspects of economic cost and system reliability to determine the final implementation plan. However, these methods do not consider the expansion planning of the distribution network from the two aspects of economy and reliability at the same time, so it is impossible to ensure that the final implementation plan is the global optimal solution from the two aspects of economy and reliability, which reduces the accuracy of the expansion planning. Summary of the invention

[0004] Based on this, it is necessary to provide a distribution network expansion planning method, device, computer equipment and storage medium that can improve the accuracy of expansion planning in response to the above technical problems.

[0005] A distribution network expansion planning method, the method comprising:

[0006] Obtaining parameters and variables in the power distribution system, and obtaining certain economic indicators and reliability indicators;

[0007] According to the parameters and the variables, respectively establishing an economic target model for each of the economic indicators and a reliability target model for each of the reliability indicators;

[0008] Based on the economic target model, the parameters of the load nodes in the reliability target model are improved in the form of a prediction function to obtain a new reliability target model;

[0009] Distribution network expansion planning is performed according to the economic target model and the new reliability target model.

[0010] In one of the embodiments, the parameters of the load node in the reliability target model include the load demand of the load node;

[0011] Based on the economic target model, the parameters of the load nodes in the reliability target model are improved in the form of a prediction function to obtain a new reliability target model, including:

[0012] Based on the economic target model, the load demand of the load node in the reliability target model is split into the sum of the current amplitudes of the branches corresponding to the load node to obtain a new reliability target model.

[0013] In one of the embodiments, the parameters of the load node in the reliability target model include the number of users of the load node;

[0014] Based on the economic target model, the parameters of the load nodes in the reliability target model are improved in the form of a prediction function to obtain a new reliability target model, including:

[0015] Based on the economic target model, the number of users of the load node in the reliability target model is split into the sum of the number of users of the branches corresponding to the load node, so as to obtain a new reliability target model.

[0016] In one embodiment, the distribution network expansion planning is performed according to the economic target model and the new reliability target model, including:

[0017] Obtaining preset convergence conditions corresponding to the economic indicators and the reliability indicators;

[0018] Establishing constraints for each of the variables respectively;

[0019] Under the constraints of each of the constraints, taking the preset convergence condition as the target, using the economic target model and the reliability target model to respectively solve the optimal variable value of each of the variables;

[0020] Distribution network expansion planning is performed based on the optimal values ​​of each of the variables.

[0021] In one embodiment, under the constraints of the constraints, taking the preset convergence condition as the target, using the economic target model and the reliability target model to respectively solve the optimal variable value of each variable, includes:

[0022] Under the constraints of the constraints, the initial values ​​of the variables are input into the economic target model and the reliability target model, and the values ​​of the economic indicators and the reliability indicators are output;

[0023] When the values ​​of the economic indicators and the reliability indicators do not satisfy the preset convergence condition, adjusting the initial value according to the values ​​to obtain an adjusted value;

[0024] The adjustment value is used as the initial value, and is returned to the step of inputting into the economic target model and the reliability target model until the output values ​​of the economic indicators and the reliability indicators meet the preset convergence condition;

[0025] The initial value corresponding to the numerical value that meets the preset convergence condition is used as the optimal variable value.

[0026] A distribution network expansion planning device based on reliability index, the device comprising:

[0027] An acquisition module, used to acquire parameters and variables in the power distribution system, and to acquire determined economic indicators and reliability indicators;

[0028] An establishing module, used for establishing an economic target model of each of the economic indicators and a reliability target model of each of the reliability indicators respectively according to the parameters and the variables;

[0029] An improvement module, used for improving the load node state variables in the reliability target model in the form of a prediction function based on the economic target model to obtain a new reliability target model;

[0030] A planning module is used to carry out distribution network expansion planning according to the economic target model and the new reliability target model.

[0031] In one of the embodiments, the load node state variables in the reliability target model include load demand of the load node;

[0032] The improved module is also used to split the load demand of the load node in the reliability target model into the sum of the current amplitudes of the branches corresponding to the load node based on the economic target model, so as to obtain a new reliability target model.

[0033] In one of the embodiments, the load node state variable in the reliability target model includes the number of users of the load node;

[0034] The improved module is also used to split the number of users of the load node in the reliability target model into the sum of the number of users of the branches corresponding to the load node based on the economic target model, so as to obtain a new reliability target model.

[0035] A computer device comprises a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps of any one of the above-mentioned distribution network expansion planning methods when executing the computer program.

[0036] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the steps of any one of the above-mentioned distribution network expansion planning methods.

[0037] The above-mentioned distribution network expansion planning method, device, computer equipment and storage medium, because the load node state variables in the reliability target model corresponding to the reliability index usually need to rely on the known network topology, while the economic index does not. Therefore, after establishing the economic target model of the economic index and the reliability target model of the reliability index according to the acquired parameters and variables of the distribution network system, the method improves the load node state variables in the reliability target function in the form of a prediction function based on the economic target model, so that the calculation of the reliability index no longer depends on the network topology, and then the distribution network expansion planning can be carried out according to the improved new reliability target model and economic target model at the same time, so as to ensure that the final implementation plan is the global optimal solution from both the economic and reliability aspects, and improve the accuracy of the expansion planning. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] Figure 1 An application environment diagram of a distribution network expansion planning method in one embodiment;

[0039] Figure 2 A schematic diagram of a flow chart of a distribution network expansion planning method in one embodiment;

[0040] Figure 3 It is a flowchart of the steps of performing distribution network expansion planning according to the economic target model and the new reliability target model in one embodiment;

[0041] Figure 4 is a schematic diagram of a power distribution system of a three-phase network consisting of 18 nodes in one embodiment;

[0042] Figure 5 A schematic diagram of a power distribution system of a three-phase network consisting of 18 nodes according to another embodiment;

[0043] Figure 6 It is a structural block diagram of a distribution network expansion planning device in one embodiment;

[0044] Figure 7 FIG. 4 is a diagram showing the internal structure of a computer device in one embodiment. DETAILED DESCRIPTION

[0045] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0046] The distribution network expansion planning method provided in this application can be applied to Figure 1 In the application environment shown. Among them, the terminal 102 communicates with the server 104 through the network. When the terminal 102 receives the planning instruction, the terminal 102 can implement the distribution network expansion planning method alone. The terminal 102 can also send the received planning instruction to the server 104, and the distribution network expansion planning method is implemented by the server. Taking the terminal 102 as an example, the terminal 102 obtains the parameters and variables in the distribution system, and obtains the determined economic indicators and reliability indicators; the terminal 102 establishes the economic target model of each economic indicator and the reliability target model of each reliability indicator according to the parameters and variables; the terminal 102 improves the load node state variables in the reliability target model in the form of a prediction function based on the economic target model to obtain a new reliability target model; the terminal 102 performs distribution network expansion planning according to the economic target model and the new reliability target model. Among them, the terminal 102 can be but not limited to various personal computers, laptops, smart phones, tablet computers and portable wearable devices, and the server 104 can be implemented with an independent server or a server cluster composed of multiple servers.

[0047] In one embodiment, Figure 2 As shown in FIG. 1 , a distribution network expansion planning method is provided, which is applied to Figure 1 The terminal in is used as an example to illustrate, including the following steps:

[0048] Step S202, obtaining parameters and variables in the power distribution system, and obtaining determined economic indicators and reliability indicators.

[0049] The distribution system is a power network system that transforms voltage and distributes electric energy directly to end users, consisting of a variety of distribution equipment and facilities, from the step-down distribution substation to the user end of the power system. Parameters and variables can be understood as parameters and variables related to each distribution equipment and distribution facility in the distribution system, where variables include binary variables and continuous variables (decision variables). Economic indicators and reliability indicators are indicators related to the expansion plan of the distribution network. Economic indicators include investment costs. Maintenance costs Network loss costs and load shedding charges Reliability indicators include expected energy shortage (EENS), system average interruption frequency (SAIFI) and system average interruption time (SAIDI).

[0050] Specifically, when the terminal receives the planning instruction, it obtains the parameters and variables in the power distribution system. And obtains the configured economic indicators and reliability indicators. The parameters and variables, as well as the economic indicators and reliability indicators can be pre-existing local, or can be carried in the planning instruction in real time. The terminal can directly obtain the parameters and variables, as well as the economic indicators and reliability indicators from the pre-stored path. Alternatively, the terminal obtains the parameters and variables, as well as the economic indicators and reliability indicators from the received planning instruction.

[0051] Step S204: establishing an economic target model for each economic indicator and a reliability target model for each reliability indicator according to the parameters and variables.

[0052] Among them, the economic target model is a model corresponding to the economic index, which can be understood as an objective function for estimating the cost corresponding to the economic index. The reliability target model is a model corresponding to the reliability index, which is an objective function for estimating the reliability value corresponding to the reliability index.

[0053] Specifically, the economic target model corresponding to each economic indicator is as follows:

[0054]

[0055] in, is the investment cost. In the first item: NAB is the newly added branch; NRB is the newly replaced branch; l is the branch; parameter RR l is the branch capital recovery rate; K l is a set of candidate branch types; γ l is a branch set; parameter is the investment cost of branch l of type k; binary variable is the investment variable of the k-type branch ij at time t. In the second term: NT is the new transformer; parameter RR NT is the capital recovery rate of the new transformer; KNT A set of candidate types for new transformers; SS is a substation node set; parameter is the investment cost of a new transformer of type k; binary variable is the investment variable of substation node i with type k transformer selected at time t.

[0056]

[0057] in, is the maintenance cost. In the first term: L is the branch set; l is the branch; K l is the set of branch candidate types, k∈K l ; γ l is a branch set; parameter is the maintenance cost of the k-type branch, a binary variable The variable used by the k-class branch ij at t, a binary variable is the usage variable of the k-type branch ji at time t; among them, since the current has a direction, the branch ij and the branch ji can be understood as different current directions of the same branch. That is, the usage variables of different current directions of the same branch, when one direction has a usage variable, the usage variable of the other direction is 0. In the second term: TR is the transformer set; K TR is a set of transformer candidate types; SS is a substation node set; parameter is the maintenance cost of class k transformer; binary variable The usage variable of substation node i that selects type k transformer at time t.

[0058]

[0059] in, is the network loss cost. In the first term: LL is the load level set, ll∈LL; parameter RATE ll The electricity fee for load level II; parameter DURL ll is the duration of load level ll. In the second term: L is the branch set; l is the branch; K l is the set of branch candidate types, k∈K l ; γ l is a branch set; parameter is the k-type branch resistor; TR is the transformer set; K TR is a set of transformer candidate types; SS is a substation node set; parameter is the resistance of the K-type transformer tr; continuous variable The power transmission of substation node i at load level ll when selecting type k transformer at time t; continuous variable is the current amplitude of the k-type branch ij at load level ll at time t; continuous variable is the current amplitude of the k-type branch ji at load level ll at time t. Similarly, since there are two substation nodes in a branch and the current has a direction, branch ij and branch ji can be understood as different current directions of the same branch, that is, the current amplitude of different current directions of the same branch. When there is a current amplitude in one direction, the current amplitude in the other direction is 0.

[0060]

[0061] in, is the load shedding cost. In the first term: LL is the load level set, ll∈LL; LN is the set of load nodes; parameter VOLL is the load shedding penalty fee; continuous variable is the load shedding amount of load node i at load level ll at time t.

[0062] The costs corresponding to each type of economic indicator are superimposed in the form of net present value to generate the net present value of the total distribution network expansion planning cost:

[0063]

[0064] Among them, EPV is the net present value, parameter I f is the annual inflation-adjusted interest rate, T is the time index set, t∈T, For investment costs, For maintenance costs, Network loss costs and For load shedding charges.

[0065] The reliability target model corresponding to each reliability index is as follows:

[0066]

[0067] Among them, EENS t is the expected value of insufficient power at time t; in the first term: LL is the load level set, ll∈LL; Ψ LN is the set of load nodes; parameter λ i is the average failure rate of load node i; parameter r i is the maintenance time of load node i; parameter DURL ll is the duration of load level II; parameter D it,ll is the demand of load node i at load level ll.

[0068]

[0069] Among them, SAIFIt is the average interruption frequency of the system at time t; LN is the set of load nodes; parameter λ i is the average failure rate of load node i; parameter is the number of users of load node i.

[0070]

[0071] Among them, SAIDI t is the average system interruption time at time t; LN is the set of load nodes; parameter λ i is the average failure rate of load node i; parameter r i is the maintenance time of load node i; continuous variable is the number of users of load node i.

[0072] Step S206: Based on the economic target model, the parameters of the load nodes in the reliability target model are improved in the form of a prediction function to obtain a new reliability target model.

[0073] Specifically, the parameters of the load nodes in the reliability target model usually need to rely on the known network topology to be known. That is, in the reliability target model, the load node in the expected value of power shortage has a demand value D at load level i in ll. it,ll , and the number of users at load node i in the system average interruption frequency and system average interruption time It depends on the known network topology.

[0074] However, the economic target model does not need to rely on the known network topology. Therefore, in order for the reliability target model to be able to carry out the expansion planning of the distribution network synchronously with the economic target model, the economic target model established with variables can be referred to, and the two parameters of the demand and number of users of the load node can be represented by variables, so that the calculation of the reliability index no longer depends on the network topology. At the same time, since the demand and number of users of the load node are usually related to the demand and number of users of each branch corresponding to the load node. Therefore, the two parameters of the demand and number of users of the load node in the reliability target model can be further improved in the form of variable prediction of the demand and number of users corresponding to each branch, thereby obtaining a new reliability target model.

[0075] Step S208: Perform distribution network expansion planning based on the economic target model and the new reliability target model.

[0076] Specifically, after obtaining the improved new reliability index, the economic target model and the new reliability target model can be used simultaneously to carry out expansion planning for the distribution network.

[0077] In the above distribution network expansion planning method, since the load node state variables in the reliability target model corresponding to the reliability index usually need to rely on the known network topology, while the economic index does not. Therefore, after establishing the economic target model of the economic index and the reliability target model of the reliability index according to the acquired parameters and variables of the distribution network system, the method improves the load node state variables in the reliability target function in the form of a prediction function based on the economic target model, so that the calculation of the reliability index no longer depends on the network topology, and then the distribution network expansion planning can be carried out according to the improved new reliability target model and economic target model at the same time, so as to ensure that the final implementation plan is the global optimal solution from both the economic and reliability aspects, and improve the accuracy of the expansion planning.

[0078] In one embodiment, the parameters of the load node in the reliability target model include the load demand of the load node; step S206 includes: based on the economic target model, splitting the load demand of the load node in the reliability target model into the sum of the current amplitudes of the branches corresponding to the load node to obtain a new reliability target model.

[0079] Specifically, in a radial distribution network, when a fault occurs, it is assumed that the load side of each branch has a circuit breaker for isolating the downstream network, and the commonly used backup switches are ignored. At this time, the expected value of power shortage is the downstream demand borne by the branch when each branch fails with a certain probability. And, inspired by "a branch uses two binary variables and two non-negative continuous variables to simulate the current direction and amplitude respectively". Therefore, the load demand of the load node in the reliability target model corresponding to the expected value of power shortage is split into the sum of the current amplitudes of the branches corresponding to the load nodes. The improved new reliability target model of the reliability target model corresponding to the expected value of power shortage is:

[0080]

[0081]

[0082]

[0083] Among them, L is the branch set; l is the branch; K l is a set of candidate branch types; γ l is the branch set; LL is the load level set, ll∈LL; parameter λ ijk is the average failure rate of the k-type branch ij; parameter r ijk is the maintenance time of branch ij of type k; parameter DURL ll is the duration of load level II; continuous variable is the current amplitude of the k-type branch ij at load level ll at time t; continuous variable is the current amplitude of the k-type branch ji at load level ll at time t; m,ij is the incidence matrix χ m When the node m is connected to the branch ij, and the preset direction of the branch ij is towards the node m, it takes -1, and away from the node m, it takes +1; otherwise, it takes 0; D mt,ll is the load demand of level ll at node m at time t; is the load shedding amount of level ll at node m at time t; is the load node set at time t; is the power transmission of the m substation node level ll at time t; is the substation node set at time t.

[0084] In one embodiment, the parameters of the load node in the reliability target model include the number of users of the load node; step S206 includes: based on the economic target model, splitting the number of users of the load node in the reliability target model into the sum of the number of users responsible for the branches corresponding to the load node to obtain a new reliability target model.

[0085] Specifically, the number of users at the load node Split into two non-negative continuous variables (decision variables) and The new reliability target model corresponding to SAIFI and SAIDI is as follows:

[0086]

[0087]

[0088]

[0089]

[0090] Among them, L is the branch set; l is the branch; K l is a set of candidate branch types; γ l is the branch set; parameter λ ijk is the average failure rate of the k-type branch ij; parameter r ijk is the maintenance time of the k-type branch ij; continuous variable is the number of users that the k-type branch ij undertakes at time t; continuous variable is the number of users undertaken by the k-type branch ij at time t. Similarly, when there is a number of users undertaken in one direction, the number of users undertaken in the other direction is 0; ng mt is the total number of users at substation node m; m,ij is the incidence matrix χm When the node m is connected to the branch ij, and the preset direction of the branch ij is towards the node m, it takes -1, and when it leaves the node m, it takes +1; otherwise, it takes 0; N mt is the number of users of node m at time t; is the load node set at time t; is the power transmission of the m substation node level ll at time t; is the substation node set at time t.

[0091] In one embodiment, Figure 3 As shown, step S208 includes:

[0092] Step S302, obtaining preset convergence conditions corresponding to each economic indicator and reliability indicator.

[0093] The preset convergence condition refers to the pre-configured condition for ending the iteration when iterating to find the optimal solution. It can be the threshold corresponding to each configured economic indicator and reliability indicator. When the value corresponding to each solved economic indicator and reliability indicator reaches the threshold, the iteration can be stopped. It can also be the preset number of iterations. When the number of iterations reaches the preset number of iterations, the iteration is stopped.

[0094] Step S304, respectively establish constraint conditions for each variable.

[0095] Among them, the constraints are the constraints established for variables to ensure the safe and stable operation of the distribution system, that is, constraints are established for continuous variables and binary variables respectively.

[0096] Specifically, the configured constraint rules are obtained, which include various constraints on variables. Constraint conditions are established according to the constraints in the constraint rules. The constraint condition function of each continuous variable is as follows:

[0097]

[0098]

[0099]

[0100]

[0101]

[0102]

[0103] Among them, L is the branch set; l is the branch; K l is the set of branch candidate types, k∈K l ; is the current amplitude of type k branch ij at load level ll at time t; is the current amplitude of the k-type branch ji at load level ll at time t; TR is the transformer set; K TR A set of alternative types for transformers; The power transmission capacity of substation node i with type k transformer at load level ll at time t; D it,ll is the load demand of level ll at node i; is the voltage amplitude of load node i at load level ll at time t; is the k-type branch resistance; V it,ll is the voltage amplitude of substation node i at time t; V jt,ll is the voltage amplitude of substation node j at time t; is the used variable of the k-type branch ij at time t; is the usage variable of substation i with type k transformer selected at time t; V is the lower limit of voltage amplitude; is the upper limit of voltage amplitude; is the upper limit of the current amplitude; The upper limit of power transmission capacity of the substation is selected for the K-type transformer.

[0104] The constraint function of each binary variable is as follows:

[0105]

[0106]

[0107]

[0108]

[0109]

[0110]

[0111]

[0112]

[0113]

[0114] Where T is the time index set t∈T, t'∈t; K l is the set of branch candidate types, k∈K l ; is the investment variable of the k-type branch ij at time t; l is the branch; NAB is the newly added branch; NRB is the newly replaced branch; L is the branch set; l is the branch; is the investment variable of substation node i at time t; K NTA collection of candidate types for new transformers; is the investment variable of substation node i for selecting type k transformer at time t; is the used variable of the k-type branch ij at time t; is the variable used by branch ji of type k at time t; is the investment variable of the k-type branch ij at time t; EFB is the existing fixed branch; ERB is the existing replaceable branch; is the used variable of the inherent branch ij of type k at time t; The variables used by the k-type replaceable branch ij when t; is the investment variable of substation node i at time t'; The investment variable of the replaceable branch ij of type k' at time t'; is the node j belonging to the set of branches l; is the load node set at time t.

[0115] Step S306, under the constraints of various constraints and with the preset convergence condition as the target, the economic target model and the reliability target model are used to respectively solve the optimal variable value of each variable.

[0116] Step S308: Perform distribution network expansion planning based on the optimal values ​​of each variable.

[0117] Specifically, after obtaining the convergence conditions and establishing the constraints, the optimal variable values ​​of each variable are solved using the economic target model and the reliability target model under the constraints of the constraints and with the preset convergence conditions as the goal. Then, the optimal variable values ​​are output, and subsequent planners can refer to the optimal variable values ​​for distribution network expansion planning.

[0118] In one embodiment, step S306 includes: under the constraints of various constraints, inputting the initial value of each variable into the economic target model and the reliability target model, and outputting the numerical value of each economic indicator and the reliability indicator; when the numerical value of each economic indicator and the reliability indicator does not meet the preset convergence condition, adjusting the initial value according to the numerical value to obtain an adjusted value; using the adjusted value as the initial value, returning to the step of inputting into the economic target model and the reliability target model, until the output numerical value of each economic indicator and the reliability indicator meets the preset condition; using the initial value corresponding to the numerical value that meets the preset convergence condition as the optimal variable value.

[0119] Specifically, the initial values ​​of the parameters in the economic target model and the reliability target model are first randomly given, and the variable values ​​of the variables are calculated according to the initial values ​​of the parameters. Then, the specific values ​​of the economic indicators and reliability indicators are calculated using the randomly given initial values ​​and the variable values ​​corresponding to the initial values. That is, the specific investment costs can be calculated respectively. Maintenance costs Network loss costs and load shedding charges As well as the expected value of insufficient power (EENS), the system average interruption frequency (SAIFI) and the system average interruption time (SAIDI). Then, when the preset convergence condition is the threshold of each value, the specific value of each indicator is compared with the threshold. If it is determined that the value of each indicator has converged, it means that the variable value corresponding to the randomly given initial value is the optimal variable value, that is, the iteration is ended. If it is determined that the value of each indicator has not converged, the initial value is adjusted according to the specific value of each indicator calculated to obtain the adjustment value. Then, the adjustment value is used as the initial value to recalculate the new variable value and input it into the economic target model and the reliability target model for calculation to obtain a new specific value. If the new specific value obtained at this time is compared with the threshold to determine that it has converged, the variable value corresponding to the adjustment value as the initial value is the optimal variable value. If it still has not converged, the initial value is adjusted again according to the new specific value. At this time, the adjusted initial value is actually the adjustment value used as the initial value, thereby obtaining a new adjustment value. The new adjustment value is still used as the initial value to solve until the specific output value converges, and the variable value corresponding to the initial value corresponding to the converged specific value is used as the optimal variable value.

[0120] In this embodiment, the optimal variable value is solved iteratively to ensure accurate variable values, thereby improving the accuracy of planning.

[0121] In one embodiment, this embodiment describes in detail the above distribution network expansion planning method using a virtual three-phase distribution system consisting of 18 nodes.

[0122] refer to Figure 4 , the three-phase network includes 2 substation nodes, 16 load nodes and 24 branches. Among them, the rectangle represents the substation node, and the circle represents the load node. The thick lines (including thick solid lines and thick dashed lines) represent the connection of the initial network, the thick dashed lines represent the fixed and irreplaceable branches, the thick solid lines represent the branches that can be replaced during the expansion planning process, and the thin dashed lines represent the branches that are considered to be added during the expansion planning process of the distribution network.

[0123] Assume that the distribution network expansion planning cycle is three years, with each year being a planning stage. f is 10%, and the capital recovery rate of the new branch l is RR l The capital recovery rate RR of the new transformer NT is 11%. NT The specific data of the existing branches and new branches are shown in Table 1, and the specific data of the transformers are listed in Table 2. In addition, the maintenance costs of the branches and transformers are 450$ / year and 3k$ / year respectively, and the load shedding penalty fee is 2k$ / MWh.

[0124] Table 1 Network branch data

[0125]

[0126]

[0127] Table 2 Transformer data

[0128]

[0129] In addition, the number of users undertaken by each load node at different planning stages and its load demand at different load levels are shown in Table 3, where the duration of each load level is listed in the last row of Table 3. The electricity charges of load levels LL1, LL2, and LL3 are $50 / MWh, $40 / MWh, and $27.4 / MWh, respectively, and their daily durations are 3h, 13h, and 8h, respectively. The pricing of DG (Distributed Generation) in LL1, LL2, and LL3 is $21 / MVA, $4.2 / MVA, and $4.2 / MVA, respectively. The failure rate and maintenance time data of existing branches and newly added branches are shown in Table 4.

[0130] Table 3 Network load node data

[0131]

[0132] Table 4 Branch reliability parameter data

[0133]

[0134]

[0135] Then, the distribution network expansion plan of this embodiment is carried out based on the parameters provided above, and the implementation plan of the distribution network expansion plan finally obtained is as follows: Figure 5 Reference Figure 5 , the topology shows that the system has replaced 3 original branches and added 8 new branches in total. The "RiTj" mark on the replaceable branch indicates that in the jth stage of the distribution network system planning, the original branch at that location was replaced by the conductor option i. The "AiTj" mark on the newly added branch indicates that in the jth stage, the conductor option i was selected to create the new branch. It can be seen from this implementation plan that nodes with large load demands are built with conductors with lower failure rates, shorter repair times but higher costs. On the other hand, in the three stages of planning, different original branches were replaced with conductors with higher reliability coefficients. This is because the system reliability must be guaranteed while the load demand continues to increase.

[0136] In this implementation, the EPV, EENS, SAIFI, and SAIDI values ​​of each stage in the implementation plan obtained by the distribution network expansion planning model that simultaneously considers the reliability index are shown in Table 5.

[0137] Table 5 Objective function values ​​in the implementation scheme

[0138]

[0139] It can be seen that using the target model containing many targets established in this embodiment to plan the distribution network can not only promote the expansion planning of the distribution network to take into account both economy and reliability, but also ensure that the implementation plan is the global optimal solution.

[0140] It should be understood that although Figure 2-3 The steps in the flowchart are shown in sequence as indicated by the arrows, but these steps are not necessarily executed in the order indicated by the arrows. Unless otherwise specified in this document, there is no strict order restriction for the execution of these steps, and these steps can be executed in other orders. Moreover, Figure 2-3 At least part of the steps may include multiple steps or multiple stages. These steps or stages are not necessarily performed at the same time, but can be performed at different times. The execution order of these steps or stages is not necessarily sequential, but can be performed in turn or alternately with other steps or at least part of the steps or stages in other steps.

[0141] In one embodiment, Figure 6 As shown, a distribution network expansion planning device is provided, including: an acquisition module 602, an establishment module 604, an improvement module 606 and a planning module 608, wherein:

[0142] An acquisition module 602 is used to acquire parameters and variables in the power distribution system, and to acquire determined economic indicators and reliability indicators;

[0143] Establishing module 604, for establishing economic target models of various economic indicators and reliability target models of various reliability indicators respectively according to parameters and variables;

[0144] An improvement module 606 is used to improve the load node state variables in the reliability target model in the form of a prediction function based on the economic target model to obtain a new reliability target model;

[0145] The planning module 608 is used to carry out distribution network expansion planning according to the economic target model and the new reliability target model.

[0146] In one embodiment, the load node state variables in the reliability target model include the load demand of the load node; the improvement module 606 is also used to split the load demand of the load node in the reliability target model into the sum of the current amplitudes of the branches corresponding to the load node based on the economic target model to obtain a new reliability target model.

[0147] In one embodiment, the load node state variables in the reliability target model include the number of users of the load node; the improvement module 606 is also used to split the number of users of the load node in the reliability target model into the sum of the number of users responsible for the branches corresponding to the load node based on the economic target model, so as to obtain a new reliability target model.

[0148] In one embodiment, the planning module 608 is also used to obtain preset convergence conditions corresponding to each economic indicator and reliability indicator; establish constraints for each variable respectively; under the constraints of each constraint, with the preset convergence conditions as the goal, use the economic target model and the reliability target model to solve the optimal variable value of each variable respectively; and perform distribution network expansion planning based on the optimal values ​​of each variable.

[0149] In one embodiment, the planning module 608 is also used to input the initial value of each variable into the economic target model and the reliability target model under the constraints of various constraints, and output the numerical values ​​of each economic indicator and reliability indicator; when the numerical values ​​of each economic indicator and reliability indicator do not meet the preset convergence conditions, adjust the initial value according to the numerical value to obtain an adjusted value; use the adjusted value as the initial value, return to the step of inputting into the economic target model and the reliability target model, until the output numerical values ​​of each economic indicator and reliability indicator meet the preset convergence conditions; use the initial value corresponding to the numerical value that meets the preset convergence conditions as the optimal variable value.

[0150] For the specific definition of the distribution network expansion planning device, please refer to the definition of the distribution network expansion planning method above, which will not be repeated here. Each module in the above-mentioned distribution network expansion planning device can be implemented in whole or in part by software, hardware and a combination thereof. The above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the operations corresponding to the above modules.

[0151] In one embodiment, a computer device is provided. The computer device may be a terminal, and its internal structure diagram may be as follows: Figure 7As shown. The computer device includes a processor, a memory, a communication interface, a display screen and an input device connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The communication interface of the computer device is used to communicate with an external terminal in a wired or wireless manner, and the wireless manner can be achieved through WIFI, an operator network, NFC (near field communication) or other technologies. When the computer program is executed by the processor, a distribution network expansion planning method is implemented. The display screen of the computer device can be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer device can be a touch layer covered on the display screen, or a button, trackball or touchpad set on the computer device housing, or an external keyboard, touchpad or mouse, etc.

[0152] Those skilled in the art will understand that Figure 7 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.

[0153] In one embodiment, a computer device is provided, including a memory and a processor, wherein a computer program is stored in the memory, and when the processor executes the computer program, the following steps are implemented:

[0154] Obtaining parameters and variables in the power distribution system, and obtaining certain economic indicators and reliability indicators;

[0155] According to the parameters and variables, the economic target model of each economic index and the reliability target model of each reliability index are established respectively;

[0156] Based on the economic target model, the load node state variables in the reliability target model are improved in the form of prediction functions to obtain a new reliability target model.

[0157] Distribution network expansion planning is carried out based on the economic target model and the new reliability target model.

[0158] In one embodiment, the load node state variables in the reliability target model include the load demand of the load node; when the processor executes the computer program, the following steps are also implemented: based on the economic target model, the load demand of the load node in the reliability target model is split into the sum of the current amplitudes of the branches corresponding to the load node, and a new reliability target model is obtained.

[0159] In one embodiment, the load node state variables in the reliability target model include the number of users of the load node; when the processor executes the computer program, the following steps are also implemented: based on the economic target model, the number of users of the load node in the reliability target model is split into the sum of the number of users responsible for the branches corresponding to the load node, and a new reliability target model is obtained.

[0160] In one embodiment, when the processor executes the computer program, the following steps are also implemented: obtaining preset convergence conditions corresponding to each economic indicator and reliability indicator; establishing constraints for each variable respectively; under the constraints of each constraint condition, taking the preset convergence condition as the target, using the economic target model and the reliability target model to solve the optimal variable value of each variable respectively; and performing distribution network expansion planning according to the optimal values ​​of each variable.

[0161] In one embodiment, when the processor executes the computer program, the following steps are also implemented: under the constraints of various constraints, the initial value of each variable is input into the economic target model and the reliability target model, and the numerical value of each economic indicator and reliability indicator is output; when the numerical value of each economic indicator and reliability indicator does not meet the preset convergence condition, the initial value is adjusted according to the numerical value to obtain an adjusted value; the adjusted value is used as the initial value, and the step of inputting into the economic target model and the reliability target model is returned until the output numerical value of each economic indicator and reliability indicator meets the preset convergence condition; the initial value corresponding to the numerical value that meets the preset convergence condition is used as the optimal variable value.

[0162] In one embodiment, a computer readable storage medium is provided, on which a computer program is stored, and when the computer program is executed by a processor, the following steps are implemented:

[0163] Obtaining parameters and variables in the power distribution system, and obtaining certain economic indicators and reliability indicators;

[0164] According to the parameters and variables, the economic target model of each economic index and the reliability target model of each reliability index are established respectively;

[0165] Based on the economic target model, the load node state variables in the reliability target model are improved in the form of prediction functions to obtain a new reliability target model.

[0166] Distribution network expansion planning is carried out based on the economic target model and the new reliability target model.

[0167] In one embodiment, the load node state variables in the reliability target model include the load demand of the load node; when the computer program is executed by the processor, the following steps are also implemented: based on the economic target model, the load demand of the load node in the reliability target model is split into the sum of the current amplitudes of the branches corresponding to the load nodes, and a new reliability target model is obtained.

[0168] In one embodiment, the load node state variables in the reliability target model include the number of users of the load node; when the computer program is executed by the processor, the following steps are also implemented: based on the economic target model, the number of users of the load node in the reliability target model is split into the sum of the number of users responsible for the branches corresponding to the load node, and a new reliability target model is obtained.

[0169] In one embodiment, when the computer program is executed by the processor, the following steps are also implemented: obtaining preset convergence conditions corresponding to each economic indicator and reliability indicator; establishing constraints for each variable respectively; under the constraints of each constraint condition, taking the preset convergence conditions as the target, using the economic target model and the reliability target model to solve the optimal variable value of each variable respectively; and performing distribution network expansion planning according to the optimal values ​​of each variable.

[0170] In one embodiment, when the computer program is executed by the processor, the following steps are also implemented: under the constraints of various constraints, the initial value of each variable is input into the economic target model and the reliability target model, and the numerical value of each economic indicator and reliability indicator is output; when the numerical value of each economic indicator and reliability indicator does not meet the preset convergence condition, the initial value is adjusted according to the numerical value to obtain an adjusted value; the adjusted value is used as the initial value, and the step of inputting into the economic target model and the reliability target model is returned until the output numerical value of each economic indicator and reliability indicator meets the preset convergence condition; the initial value corresponding to the numerical value that meets the preset convergence condition is used as the optimal variable value.

[0171] Those of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory or optical memory, etc. Volatile memory can include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM).

[0172] The technical features of the above embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0173] The above-mentioned embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent of the present application shall be subject to the attached claims.

Claims

1. A distribution network expansion planning method, characterized in that: The method comprises: Obtaining parameters and variables in the power distribution system, and obtaining determined economic indicators and reliability indicators, wherein the reliability indicators include an expected value of power shortage, an average system interruption frequency, and an average system interruption time; According to the parameters and the variables, respectively establishing an economic target model for each of the economic indicators and a reliability target model for each of the reliability indicators; Based on the economic target model, the parameters of the load nodes in the reliability target model are improved in the form of a prediction function to obtain a new reliability target model; Perform distribution network expansion planning according to the economic target model and the new reliability target model; In the case where the parameters of the load node in the reliability target model include the load demand of the load node, the parameters of the load node in the reliability target model are improved in the form of a prediction function based on the economic target model to obtain a new reliability target model, including: based on the economic target model, splitting the load demand of the load node in the reliability target model into the sum of the current amplitudes of the branches corresponding to the load node to obtain a new reliability target model, and the obtained new reliability target model is: Among them, EENS t for t The expected value of insufficient power at the time, L is the branch set; l is a branch; K l is a set of candidate branch types; γ l is a branch set; LL is the load level set, ll ∈LL; parameters for k Class Branch ij The average failure rate of for k Class Branch ij Maintenance time; parameters for ll Duration of the load level; continuous variable for t hour k Class Branch ij exist ll Current magnitude for load levels; continuous variable for t hour k Class Branch ji exist ll Current amplitude of load level; is the incidence matrix When the node m With branch ij Connected and branched ij The default direction is towards the node m Take -1 and leave the node m Take +1; otherwise, take 0; for t hour m Node Level ll The load demand; for t hour m Node Level ll The amount of load shedding; for t Time load node set; for t hour m Substation node level ll The amount of power delivered; for t A collection of time-varying substation nodes; In the case where the parameters of the load node in the reliability target model include the number of users of the load node, the parameters of the load node in the reliability target model are improved in the form of a prediction function based on the economic target model to obtain a new reliability target model, including: based on the economic target model, the number of users of the load node in the reliability target model is split into the sum of the number of users of the branches corresponding to the load node to obtain a new reliability target model, and the obtained new reliability target model is: in, for t The average interrupt frequency of the system at for t The average system interruption time is, L is the branch set; l is a branch; K l is a set of candidate branch types; γ l is a branch set; parameter for k Class Branch ij The average failure rate of for k Class Branch ij Maintenance time; continuous variable for t hour k Class Branch ij The number of users undertaken; continuous variable for t hour k Class Branch ij The number of users responsible. When there are users responsible in one direction, the number of users responsible in the other direction is 0. is the total number of users at substation node m; is the incidence matrix When the node m With branch ij Connected and branched ij The default direction is towards the node m Take -1 and leave the node m Take +1; otherwise, take 0; is the number of users of node m at time t; is the load node set at time t; for t hour m Substation node level ll The amount of power delivered; for t The set of time-varying substation nodes, is the number of users of the load node.

2. The method according to claim 1, characterized in that The economic indicators include investment costs, maintenance costs, network loss costs and load shedding costs.

3. The method according to claim 1, characterized in that The parameters and variables are parameters and variables related to each power distribution device and power distribution facility in the power distribution system, and the variables include binary variables and continuous variables.

4. The method according to any one of claims 1 to 3, characterized in that: The distribution network expansion planning is performed according to the economic target model and the new reliability target model, including: Obtaining preset convergence conditions corresponding to the economic indicators and the reliability indicators; Establishing constraints for each of the variables respectively; Under the constraints of each of the constraints, taking the preset convergence condition as the target, using the economic target model and the reliability target model to respectively solve the optimal variable value of each of the variables; Distribution network expansion planning is performed based on the optimal values ​​of each of the variables.

5. The method according to claim 4, characterized in that Under the constraints of the constraints, taking the preset convergence condition as the target, using the economic target model and the reliability target model to respectively solve the optimal variable value of each variable, including: Under the constraints of the constraints, the initial values ​​of the variables are input into the economic target model and the reliability target model, and the values ​​of the economic indicators and the reliability indicators are output; When the values ​​of the economic indicators and the reliability indicators do not satisfy the preset convergence condition, adjusting the initial value according to the values ​​to obtain an adjusted value; The adjustment value is used as the initial value, and is returned to the step of inputting into the economic target model and the reliability target model until the output values ​​of the economic indicators and the reliability indicators meet the preset convergence condition; The initial value corresponding to the numerical value that meets the preset convergence condition is used as the optimal variable value.

6. A distribution network expansion planning device, characterized in that: The device comprises: An acquisition module, used to acquire parameters and variables in the power distribution system, and to acquire determined economic indicators and reliability indicators, wherein the reliability indicators include an expected value of insufficient power, an average system interruption frequency, and an average system interruption time; An establishing module, used for establishing an economic target model of each of the economic indicators and a reliability target model of each of the reliability indicators respectively according to the parameters and the variables; An improvement module, used for improving the load node state variables in the reliability target model in the form of a prediction function based on the economic target model to obtain a new reliability target model; A planning module, used for carrying out distribution network expansion planning according to the economic target model and the new reliability target model; The improved module is further used for, when the load node state variable in the reliability target model includes the load demand of the load node, splitting the load demand of the load node in the reliability target model into the sum of the current amplitudes of the branches corresponding to the load node based on the economic target model to obtain a new reliability target model, and the obtained new reliability target model is: Among them, EENS t for t The expected value of insufficient power at the time, L is the branch set; l is a branch; K l is a set of candidate branch types; γ l is a branch set; LL is the load level set, ll ∈LL; parameters for k Class Branch ij The average failure rate of for k Class Branch ij Maintenance time; parameters for ll Duration of the load level; continuous variable for t hour k Class Branch ij exist ll Current magnitude for load levels; continuous variable for t hour k Class Branch ji exist ll Current amplitude of load level; is the incidence matrix When the node m With branch ij Connected and branched ij The default direction is towards the node m Take -1 and leave the node m Take +1; otherwise, take 0; for t hour m Node Level ll The load demand; for t hour m Node Level ll The amount of load shedding; for t Time load node set; for t hour m Substation node level ll The amount of power delivered; for t A collection of time-varying substation nodes; The improved module is further used for, when the load node state variable in the reliability target model includes the number of users of the load node, splitting the number of users of the load node in the reliability target model into the sum of the number of users of the branches corresponding to the load node based on the economic target model, to obtain a new reliability target model, and the obtained new reliability target model is: in, for t The average interrupt frequency of the system at for t The average system interruption time is, L is the branch set; l is a branch; K l is a set of candidate branch types; γ l is a branch set; parameter for k Class Branch ij The average failure rate of for k Class Branch ij Maintenance time; continuous variable for t hour k Class Branch ij The number of users undertaken; continuous variable for t hour k Class Branch ij The number of users responsible. When there are users responsible in one direction, the number of users responsible in the other direction is 0. is the total number of users at substation node m; is the incidence matrix When the node m With branch ij Connected and branched ij The default direction is towards the node m Take -1 and leave the node m Take +1; otherwise, take 0; is the number of users of node m at time t; is the load node set at time t; for t hour m Substation node level ll The amount of power delivered; for t The set of time-varying substation nodes, is the number of users of the load node.

7. The device according to claim 6, characterized in that The planning module is also used to obtain preset convergence conditions corresponding to each economic indicator and reliability indicator; establish constraints for each variable respectively; under the constraints of each constraint condition, with the preset convergence conditions as the target, use the economic target model and the reliability target model to solve the optimal variable value of each variable respectively; and carry out distribution network expansion planning according to the optimal values ​​of each variable.

8. The device according to claim 6, characterized in that The planning module is further used to input the initial value of each variable into the economic target model and the reliability target model under the constraints of various constraints, and output the numerical values ​​of each economic indicator and reliability indicator; when the numerical values ​​of each economic indicator and reliability indicator do not meet the preset convergence conditions, adjust the initial value according to the numerical value to obtain the adjusted value; use the adjusted value as the initial value, and return to the step of inputting into the economic target model and the reliability target model until the output numerical values ​​of each economic indicator and reliability indicator meet the preset convergence conditions; The initial value corresponding to the numerical value that meets the preset convergence condition is taken as the optimal variable value.

9. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 5 are implemented.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 5 are implemented.

Citation Information

Patent Citations

  • Reference power grid evaluation method with power flow control equipment

    CN106920012A

  • Power supplying capability improvement oriented power distribution network double-layer expansion planning method

    CN108683186A

  • Expansion planning method considering power grid structure optimization for power transmission network

    CN108847667A

  • Improved time series electricity sales prediction method and system based on economic business method

    CN110009419A

  • Power distribution network planning method considering reliability constraint

    CN110210659A