A subway operation failure emergency linkage interactive method, device, equipment and medium

Through service architecture and fault impact analysis, combined with operation and maintenance and social collaboration modules, the problem of insufficient collaboration capabilities in subway fault emergency linkage is solved, rapid response and resource optimization are achieved, and the reliability and safety of subway operations are ensured.

CN114519491BActive Publication Date: 2024-12-13CASCO SIGNAL LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111595391.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-24
Publication Date
2024-12-13
Estimated Expiration
2041-12-24

AI Technical Summary

Technical Problem

The existing subway fault emergency linkage mechanism has problems such as single emergency linkage subject, insufficient collaboration capabilities, insufficient professional and technical communication and lack of resource sharing, which leads to the inability to achieve effective and rapid emergency linkage and cooperation.

Method used

Adopt the service architecture, by obtaining subway operation failure information, performing fault impact analysis, functional decomposition and service matching, combining operation and maintenance, operation and social collaboration modules, realize cross-professional and cross-departmental collaborative information integration and resource optimization, and quickly respond and recover. .

Benefits of technology

It realizes collaborative communication across majors and departments, improves emergency linkage efficiency, ensures the reliability of subway operations and passenger and property safety, and optimizes emergency resource allocation and fault recovery.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114519491B_ABST
    Figure CN114519491B_ABST
Patent Text Reader

Abstract

The present invention relates to a subway operation fault emergency linkage interaction method, device, equipment and medium, the method comprising: S1, obtaining a subway operation emergency linkage subject; S2, obtaining subway operation fault operation and maintenance information; S3, obtaining two directly affected objects in the subway operation fault, namely, passengers P in the car and subway equipment D, and mapping the passengers P in the car and subway equipment D to an emergency service demand area Sq, decomposing the required service functions according to each independent demand and collecting them into an emergency service demand pool Sp; S4, functionally decomposing the emergency linkage subject, obtaining each service set so that can provide services, obtaining the weight Won of each service demanded by passengers in the car, subway equipment and linkage objects, and the weight Wo of the service provider. Compared with the prior art, the present invention has the advantages of being able to effectively realize cross-professional and cross-departmental collaborative communication, while ensuring the independence within the profession and within the department.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a subway signal control system, and in particular to a subway operation failure emergency linkage interaction method, device, equipment and medium. Background Art

[0002] With the acceleration of my country's urbanization process and the increase of urban population, urban subways have become one of the main modes of transportation for people's urban travel due to their safety, efficiency, large passenger capacity and punctuality. The development of subway lines has gradually changed from the station-line mode to the station-line-line network mode. This indicates that a failure at a certain point in the operation of the subway will not only affect the operation of the line, but will also further affect the operation of other normal lines, affect the reliability of subway operations, cause chaos in the operation of the line network and even threaten social security. Therefore, when an emergency occurs in the subway, it is necessary not only to "horizontally" coordinate the coordination and linkage between internal departments and professions of the line, but also to "vertically" coordinate with external linkage entities, such as public security, fire protection, medical care, government, etc., so as to quickly eliminate the hazards that may be caused by subway operation failures and ensure the safety of passengers and property.

[0003] The current emergency linkage handling mechanism for subway faults still has problems such as "single" emergency linkage subject, "different" emergency linkage mechanism, "limited" emergency linkage collaboration, and "unsmooth" emergency linkage intercommunication. In terms of linkage subjects, the subjects involved in the linkage are too simple, with single rights and responsibilities and rigid skills. In terms of linkage mechanism, linkage personnel are not standardized, linkage technical support is not unified, linkage operation mechanism is imperfect, and linkage execution guarantee mechanism is not comprehensive. In terms of linkage collaboration, linkage collaboration capacity is insufficient, there are gaps in handling and coordination, and management authority is unclear and authority is delayed. In terms of linkage intercommunication, the main problems are insufficient professional and technical communication, lack of emergency resource sharing, and emergency command errors. Therefore, how to automatically link various emergency subjects efficiently and accurately and reasonably plan and allocate emergency resources has become a technical problem that needs to be solved at present. Summary of the invention

[0004] The purpose of the present invention is to overcome the defects of the above-mentioned prior art and to provide a subway operation failure emergency linkage interaction method, device, equipment and medium, thereby solving the problem that the emergency linkage handling in the prior art is affected by cross-professional, cross-departmental and internal and external collaboration, and cannot achieve effective and rapid emergency linkage collaboration.

[0005] The purpose of the present invention can be achieved by the following technical solutions:

[0006] According to a first aspect of the present invention, a subway operation failure emergency linkage interaction method is provided, the method comprising the following steps:

[0007] Step S1, obtaining the subway operation emergency linkage subject;

[0008] Step S2, obtaining subway operation failure operation and maintenance information;

[0009] Step S3, obtaining two directly affected objects in the subway operation failure, namely, passengers P in the train and subway equipment D, and mapping the passengers P in the train and subway equipment D to the emergency service demand area Sq, decomposing the required service functions according to each independent demand and collecting them into the emergency service demand pool Sp;

[0010] Step S4, decompose the functions of the emergency linkage subject to obtain a service set so that can provide services, obtain the weight Won of each service required by passengers in the car, subway equipment and linkage objects, and the weight Wo of the service provider, recursively match the services according to the services in the emergency service demand pool, and display the importance of the required emergency subject according to the weight of the object demand.

[0011] As a preferred technical solution, the emergency linkage subjects include subway internal personnel, social collaboration personnel and every member of the public who participates in it.

[0012] As a preferred technical solution, the fault operation and maintenance information includes equipment status information, train scheduling information, passenger flow information, and station operation information.

[0013] As a preferred technical solution, when the value of the weight Wo of the service provider is larger, it means that the service provider so needs to be urgently notified and quickly put into the emergency process.

[0014] As a preferred technical solution, the weight Won of the linkage object demand is obtained based on the impact analysis of the emergency coordination subject.

[0015] As a preferred technical solution, the weight Won of the linkage object requirement is specifically as follows:

[0016] Subway operation and maintenance personnel are the most directly affected and have the highest weight, with an initial value of 10; while the weights of other collaborative departments are relatively weak, with an initial value of 1.

[0017] According to a second aspect of the present invention, a device for the subway operation failure emergency linkage interaction method is provided, the device comprising:

[0018] Fault impact analysis module, used to evaluate the level of subway operation faults and determine different emergency linkage entities according to different levels;

[0019] The operation and maintenance emergency module is used for the operation and maintenance of subway equipment, planning of emergency routes and emergency processes, and realizing emergency repairs of equipment to quickly restore the normal operation of the line;

[0020] Operational emergency module, which is used to control risks for passengers’ personal and property safety through train scheduling and station operation management;

[0021] The social collaborative emergency response module is used to provide interactive docking with external linkage entities.

[0022] As a preferred technical solution, the workflow of the fault impact analysis module is as follows:

[0023] First, we analyze the fault event type, scope, and consequences in terms of time and space to determine the professional scope of the fault and whether it affects normal traffic dispatch and passenger services.

[0024] Secondly, the impact on the operation of the entire urban rail system is analyzed from three levels: stations, lines, and lines network;

[0025] Thirdly, combine historical passenger flow data and passenger flow forecast data to determine the impact on the entire city's traffic;

[0026] Finally, the impact time on the entire urban rail system is predicted and analyzed based on the emergency response process and fault expert database.

[0027] As a preferred technical solution, the fault impact analysis module divides the impact levels of emergencies into Level I, Level II, Level III, and Level IV through impact analysis, and finally runs different strategies according to the determined impact levels, where Level I, Level II, Level III, and Level IV are represented by red, orange, yellow, and blue, respectively.

[0028] As a preferred technical solution, the workflow of the operation and maintenance emergency module is as follows:

[0029] 1) Fault data analysis;

[0030] 2) Expert reasoning and fault location;

[0031] 3) On-site fault confirmation;

[0032] 4) Automatic generation of emergency plans;

[0033] 5) Recommendations for emergency supplies and personnel;

[0034] 6) Emergency route planning;

[0035] 7) Emergency remote assistance.

[0036] As a preferred technical solution, the operational emergency module completes the operational tasks through four processes: emergency organization linkage, driving organization adjustment, driving emergency organization and fault emergency handling, and conducts post-event summary and analysis.

[0037] As a preferred technical solution, the social collaborative emergency module integrates subway operation information and pushes it to external systems, while feeding back linkage measures to the subway emergency center.

[0038] According to a third aspect of the present invention, there is provided an electronic device, comprising a memory and a processor, wherein a computer program is stored in the memory, and the method described above is implemented when the processor executes the program.

[0039] According to a fourth aspect of the present invention, there is provided a computer-readable storage medium having a computer program stored thereon, wherein the program implements the method described when executed by a processor.

[0040] Compared with the prior art, the present invention has the following advantages:

[0041] 1) The present invention is based on the service architecture, combines application service decomposition with service discovery and search for emergency linkage, and covers the entire process of emergency linkage involving different subjects, including prior information collection, in-process information processing and disposal linkage, and post-event information feedback and summary analysis.

[0042] 2) The present invention realizes passenger flow prediction and passenger flow pattern matching, passenger flow impact analysis at three levels of stations, lines and lines by applying passenger flow prediction, similarity matching and link prediction algorithms, so as to recommend corresponding passenger flow plans and quickly respond to passenger flow changes caused by faults;

[0043] 3) The present invention realizes emergency GIS tracking and path optimization, transport capacity linkage and station information release association through path planning, fuzzy logic, etc., completes the integration of collaborative information and public information, and thus realizes the linkage of social resources;

[0044] 3) The present invention uses algorithms such as time series, neural networks, and expert rules to achieve rapid positioning of fault locations, monitoring and remote assistance of the troubleshooting process, and prediction of the troubleshooting time, thereby optimizing the allocation of emergency personnel and emergency materials and completing rapid repair of faults;

[0045] 4) The present invention achieves the elimination of subway operation failures and reliable and safe line network operation through emergency linkage and coordinated disposal. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] Figure 1 It is the emergency coordination subject analysis diagram of the present invention;

[0047] Figure 2 A flowchart of the steps of the present invention

[0048] Figure 3 It is a structural schematic diagram of the present invention. DETAILED DESCRIPTION

[0049] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0050] The subway operation emergency linkage interaction method based on the service architecture of the present invention can effectively realize cross-professional and cross-departmental collaborative communication, while ensuring the independence within the profession and department, without affecting the original system operation.

[0051] A subway operation emergency linkage interaction method based on a service architecture, the method comprising:

[0052] Obtain the subway operation emergency linkage subject; the emergency linkage subject includes emergency personnel, train dispatching personnel, station staff, public security personnel, firefighters, medical staff, public transportation personnel and other subway internal personnel and social collaboration personnel and every member of the public involved; obtain subway operation fault operation and maintenance information; the fault operation / maintenance information includes equipment status information, train dispatching information, passenger flow information, station operation information, etc.;

[0053] Obtain two directly affected objects in subway operation failure: passengers in the car (P) and subway equipment (D), and map the passengers in the car P and subway equipment D to the emergency service demand area Sq. According to each independent demand, the required service functions are decomposed and collected into the emergency service demand pool Sp.

[0054] Decompose the emergency linkage subject by function, and obtain the service set so of each service that can be provided, so = {s1, s2, s3, ..., sn}; obtain the weight Won of each service demanded by passengers in the train, subway equipment and linkage objects, and the weight Wo of the service provider, and recursively match the services according to the services in the emergency service demand pool, and display the importance of the required emergency subject according to the weight of the object demand. The larger the value of Wo, the more it means that the service provider so needs to be urgently notified and quickly put into the emergency process;

[0055] Furthermore, the weight of the linkage object demand is obtained based on the impact analysis of the emergency coordination subject, as shown in the following example: Figure 1 As shown, subway operation and maintenance personnel are the most directly affected, with the highest weight, and an initial value of 10; the weights of other collaborative departments are relatively weak, with an initial value of 1; through service decomposition, the responsibilities of each emergency subject are determined, the efficiency of emergency collaboration is improved, and the "single" of emergency subjects is avoided through service search and discovery. The urgency of the emergency is guaranteed through the service weight coefficient.

[0056] like Figure 1 As shown in the figure, the emergency coordination subject analysis diagram analyzes the impact of sudden incidents on the subway and finds that equipment failure directly affects driving operations and maintenance operations, and has the most direct impact on passengers in the car, passengers in the station, as well as drivers, station staff, emergency repair personnel and other subway operation and maintenance personnel; from the perspective of passenger personal safety and reliable and safe travel, the media system needs to release various messages to notify every citizen, the transportation system needs to arrange buses, online car-hailing services, etc. to assist passengers in traveling, and the public security / fire / medical / government systems need to provide assistance for possible social security and public health issues, which requires the linkage of multiple departments; from the perspective of emergency personnel operations, it is necessary to consider the cooperation of experts in different professional fields, as well as the configuration of emergency personnel and materials, which requires the coordination of multiple professions such as vehicles, electricity, communications, signals, and dispatching.

[0057] like Figure 2 As shown, a subway operation emergency linkage interaction method based on a service architecture includes the following steps:

[0058] In step 401, the system obtains data on subway operation and equipment operation, analyzes the information, obtains analysis results, and then executes step 402;

[0059] In step 402, the system judges the analysis result, and if it exceeds the range, it will generate information and issue an alarm, and then execute step 403;

[0060] In step 403, the system analyzes the impact scope of the issued alarm through the impact analysis module, determines which operation strategies to adopt, and determines whether to execute steps 404, 405, and 406 based on equipment safety, passenger safety, and social safety;

[0061] In step 404, the system publishes equipment operation and maintenance information and organizes equipment repair, automatically recommends emergency personnel, matches emergency supplies, and plans emergency routes, etc.;

[0062] In step 405, the system releases station and vehicle operation information and organizes the adjustment of driving plans, driving emergency organization and station operation organization, etc.;

[0063] In step 406, the system releases social collaboration information, releases relevant operation information and passenger flow information to external departments, provides emergency information to public security, public transportation, medical and other departments, and releases emergency information through the public platform;

[0064] In step 407, after all emergency tasks are completed and normal operations are restored, the system records the entire emergency process in real time, and automatically generates a fault analysis report, an operation report, and a collaborative process report, and enters them into the expert database system.

[0065] The above is an introduction to a method embodiment. The following is a further explanation of the solution of the present invention through an apparatus embodiment.

[0066] The subway operation emergency linkage interactive device based on service architecture includes a fault impact analysis module, an operation and maintenance emergency module, an operation emergency module and a social collaborative emergency module.

[0067] The fault impact analysis module mainly evaluates the level of subway operation failures, determines different emergency linkage subjects according to different levels, and can reasonably link various internal professions, departments and external related departments to avoid the waste of emergency resources. Based on the time and space analysis of the type, scope, consequences and other dimensions of the fault event, the professional scope of the fault impact is analyzed from the professional field and type, whether it affects the normal driving dispatch, passenger service, etc.; secondly, the degree of impact on the operation of the entire urban rail system is analyzed from the three levels of station, line and line network; then the degree of impact on the entire urban traffic is determined by combining the historical passenger flow data and the passenger flow forecast data; and then the impact time on the entire urban rail system is predicted and analyzed based on the emergency handling process and the fault expert database. According to the above impact analysis, the impact level of the emergency event is divided into level I (red), level II (orange), level III (yellow), and level IV (blue), and finally different strategies are run according to the determined impact level.

[0068] The operation and maintenance emergency module realizes emergency repair of equipment and quickly restores the normal operation of the line through the operation and maintenance of subway equipment, emergency path and emergency process planning. It mainly involves operation and maintenance personnel and emergency personnel related to the equipment to complete the coordination and linkage between internal departments and professions. There are mainly the following processes: 1. Fault data analysis 2. Expert reasoning and fault location 3. Fault site confirmation 4. Automatic generation of emergency plans 5. Emergency spare parts and personnel recommendation 6. Emergency path planning 7. Emergency remote assistance, etc. When the operation and maintenance emergency module is completed and the equipment failure is resolved, the service demand of the equipment will be eliminated, thereby supervising the progress of the entire emergency linkage.

[0069] The operational emergency module is aimed at the personal and property safety of passengers, and controls risks through train dispatching, station operation management, etc. It mainly involves operators related to train and station operations, such as drivers, dispatchers, station staff, etc. The operational tasks are completed through four processes: emergency organization linkage, train organization adjustment, train emergency organization, and fault emergency disposal, and a post-event summary and analysis is conducted.

[0070] The social collaborative emergency module provides interactive docking for collaboration with external linkage entities, integrates subway operation information and pushes it to external systems, and at the same time feeds back linkage measures to the subway emergency center, mainly involving social organizations and agencies related to emergency linkage, such as transportation systems, public security systems, medical systems, fire protection systems, etc.

[0071] This system displays the emergency strategies of different subjects of emergency linkage in three stages: prior information collection, in-process information processing and disposal linkage, and post-event information feedback and summary analysis, thus realizing closed-loop management of emergency linkage and continuously optimizing the emergency linkage process.

[0072] like Figure 3 As shown, a subway operation emergency linkage interactive implementation plan based on service architecture includes a passenger flow collection interface 11, an equipment collection interface 12, a driving collection interface 13, a core switch 14, a data analysis server 15, a database server 21, an application server 22, a gateway server 23, a PC terminal 31, and a handheld terminal 32.

[0073] The passenger flow collection interface 11, equipment collection interface 12, and driving collection interface 13 are basic data collection interfaces, which upload basic data to the data analysis server 15 through the core switch 14, and perform passenger flow analysis, fault location analysis, emergency plan analysis, etc. on the data analysis server 15.

[0074] The database server 21 stores the analysis results of the data analysis server 15, and also stores other business data, including operation plan information, passenger flow route information, etc.; the application server 22 is connected to the database server 21 and the data analysis 15, through which it obtains passenger flow data in real time and performs business processing, and is also connected to the gateway server 23 to receive request information and send response information.

[0075] The PC terminal 31 and the application server 22 transmit data through the gateway server 23, wherein the PC terminal mainly displays the emergency GIS map, real-time fault information and impact range.

[0076] The handheld terminal 32 and the application server 22 transmit data through the gateway server 23, wherein the PC terminal mainly notifies emergency personnel, sends emergency procedures and emergency process confirmation.

[0077] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working process of the described module can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.

[0078] The electronic device of the present invention includes a central processing unit (CPU), which can perform various appropriate actions and processes according to computer program instructions stored in a read-only memory (ROM) or loaded from a storage unit into a random access memory (RAM). In the RAM, various programs and data required for device operation can also be stored. The CPU, ROM and RAM are connected to each other via a bus. An input / output (I / O) interface is also connected to the bus.

[0079] Multiple components in the device are connected to the I / O interface, including: input units, such as keyboards, mice, etc.; output units, such as various types of displays, speakers, etc.; storage units, such as disks, optical disks, etc.; and communication units, such as network cards, modems, wireless communication transceivers, etc. The communication unit allows the device to exchange information / data with other devices through computer networks such as the Internet and / or various telecommunication networks.

[0080] The processing unit performs the various methods and processes described above, such as the method of the present invention. For example, in some embodiments, the method of the present invention can be implemented as a computer software program, which is tangibly contained in a machine-readable medium, such as a storage unit. In some embodiments, part or all of the computer program can be loaded and / or installed on the device via a ROM and / or a communication unit. When the computer program is loaded into RAM and executed by the CPU, one or more steps of the method of the present invention described above can be performed. Alternatively, in other embodiments, the CPU can be configured to perform the method of the present invention by any other appropriate means (e.g., by means of firmware).

[0081] The functions described above herein may be performed at least in part by one or more hardware logic components. For example, without limitation, exemplary types of hardware logic components that may be used include: field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), complex programmable logic devices (CPLDs), and the like.

[0082] The program code for implementing the method of the present invention can be written in any combination of one or more programming languages. These program codes can be provided to a processor or controller of a general-purpose computer, a special-purpose computer or other programmable data processing device, so that the program code, when executed by the processor or controller, enables the functions / operations specified in the flow chart and / or block diagram to be implemented. The program code can be executed entirely on the machine, partially on the machine, partially on the machine as a stand-alone software package and partially on a remote machine, or entirely on a remote machine or server.

[0083] In the context of the present invention, a machine-readable medium may be a tangible medium that may contain or store a program for use by or in conjunction with an instruction execution system, device, or equipment. A machine-readable medium may be a machine-readable signal medium or a machine-readable storage medium. A machine-readable medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices, or equipment, or any suitable combination of the foregoing. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.

[0084] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can easily think of various equivalent modifications or replacements within the technical scope disclosed by the present invention, and these modifications or replacements should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be based on the protection scope of the claims.

Claims

1. A subway operation failure emergency linkage interactive method, It is characterized in that The method comprises the following steps: Step S1, obtaining the subway operation emergency linkage subject; Step S2, obtaining subway operation failure operation and maintenance information; Step S3, obtaining two directly affected objects in the subway operation failure, namely, passengers P in the train and subway equipment D, and mapping the passengers P in the train and subway equipment D to the emergency service demand area Sq, decomposing the required service functions according to each independent demand and collecting them into the emergency service demand pool Sp; Step S4, decompose the emergency linkage subject into functions, obtain each service set so that can provide services, obtain the weight Won of each service demanded by passengers in the train, subway equipment and linkage objects, and the weight Wo of the service provider, recursively match the services according to the services in the emergency service demand pool, and display the importance of the required emergency subject according to the weight of the object demand; The emergency linkage subjects include subway internal personnel, social collaboration personnel and every member of the public involved; the fault operation and maintenance information includes equipment status information, train scheduling information, passenger flow information, and station operation information; When the value of the weight Wo of the service provider is larger, it means that the service provider so needs to be urgently notified and quickly put into the emergency process; The weight Won of the linkage object demand is obtained according to the impact analysis of the emergency coordination subject; the weight Won of the linkage object demand is as follows: Subway operation and maintenance personnel are the most directly affected and have the highest weight, with an initial value of 10; while the weights of other collaborative departments are relatively weak, with an initial value of 1.

2. A device for the subway operation failure emergency linkage interactive method according to claim 1, It is characterized in that The device includes: Fault impact analysis module, used to evaluate the level of subway operation faults and determine different emergency linkage entities according to different levels; The operation and maintenance emergency module is used for the operation and maintenance of subway equipment, planning of emergency routes and emergency processes, and realizing emergency repairs of equipment to quickly restore the normal operation of the line; Operational emergency module, which is used to control risks for passengers’ personal and property safety through train scheduling and station operation management; The social collaborative emergency response module is used to provide interactive docking with external linkage entities.

3. The device according to claim 2, It is characterized in that The workflow of the fault impact analysis module is as follows: First, we analyze the fault event type, scope, and consequences in terms of time and space to determine the professional scope of the fault and whether it affects normal traffic dispatch and passenger services. Secondly, the impact on the operation of the entire urban rail system is analyzed from three levels: stations, lines, and lines network; Thirdly, combine historical passenger flow data and passenger flow forecast data to determine the impact on the entire city's traffic; Finally, the impact time on the entire urban rail system is predicted and analyzed based on the emergency response process and fault expert database.

4. The device according to claim 3, It is characterized in that The fault impact analysis module divides the impact levels of emergencies into Level I, Level II, Level III, and Level IV through impact analysis, and finally runs different strategies according to the determined impact levels, where Level I, Level II, Level III, and Level IV are represented by red, orange, yellow, and blue, respectively.

5. The device according to claim 2, It is characterized in that The workflow of the operation and maintenance emergency module is as follows: 1) Fault data analysis; 2) Expert reasoning and fault location; 3) On-site fault confirmation; 4) Automatic generation of emergency plans; 5) Recommendations for emergency supplies and personnel; 6) Emergency route planning; 7) Emergency remote assistance.

6. The device according to claim 2, It is characterized in that The operational emergency module completes the operational tasks through four processes: emergency organization linkage, driving organization adjustment, driving emergency organization and fault emergency handling, and conducts post-event summary and analysis.

7. The device according to claim 2, It is characterized in that The social collaborative emergency module integrates subway operation information and pushes it to external systems, while feeding back linkage measures to the subway emergency center.

8. An electronic device comprising a memory and a processor, wherein a computer program is stored in the memory. It is characterized in that When the processor executes the program, the method according to claim 1 is implemented.

9. A computer-readable storage medium having a computer program stored thereon, It is characterized in that When the program is executed by a processor, the method according to claim 1 is implemented.