A bidirectional mixing drill for large diameter mixing pile construction
The two-way stirring drill tool driven by the double-powered head uses a dual-frame structure to achieve bidirectional rotation in the construction of large-diameter and large-depth mixing piles, solving the soil unevenness and safety problems caused by the one-way rotating drill tool, and achieving high Strengthening of solidified soil and engineering quality improvement.
Patent Information
- Application Number
- CN202210127225.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-02-11
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2042-02-11
AI Technical Summary
During the construction of large diameter and large depth mixing piles, one-way rotating mixing drill tool causes uneven mixing of soil, discharge of solidified soil upward along the gap between the drill tool and the drill rod, and clay soil is grouped into drilling and other engineering quality and safety issues. , especially in complex formations, there are serious technical difficulties.
The two-way stirring drill tool driven by a double-powered head is used to achieve two-way rotation at the same speed or variable speed through a dual-frame structure. The adjacent stirring wing plates rotate in opposite directions, ensuring mutual shearing, rubbing, crushing and strong stirring of the soil to achieve the mixing piles. Uniformity and high strength.
Achieve uniform construction of large diameter and large depth mixing piles in complex formations, solve the problems of soil unevenness and group drilling in traditional drilling rig construction, improve the overall strength of the cured soil, save the curing agent material, and ensure that Project quality and safety, shorten construction period and reduce costs.
Smart Images

Figure CN114526007B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of underground construction machinery, and in particular relates to a bidirectional mixing drill tool used for the construction of large-diameter mixing piles. Background Art
[0002] As a major construction method in the field of foundation treatment engineering technology, the deep mixing pile technology of unidirectional rotation mixing has been applied in the field of engineering construction since the 1960s, including civil engineering, construction engineering, railway engineering, highway engineering, water conservancy engineering, municipal engineering and port engineering. The deep mixing pile engineering technology uses a single-axis or multi-axis mixing drill to input cement and other curing agents into the ground, and mixes them with soft and hard soil bodies to produce a series of physical and chemical reactions between the curing agent and the soil body, generating piles, walls and blocks with high strength, good water stability and strong anti-seepage performance. This effectively solves practical engineering problems such as the bearing capacity of composite foundations, the bearing capacity of mixing piles, the bearing capacity of strong core composite piles, the bearing capacity of SMW construction piles, the anti-seepage capacity of water-blocking walls, and the isolation walls and isolation layers of contaminated soil and toxic material landfills.
[0003] Due to the advantages of simple drilling equipment, efficient construction and low cost, deep mixing pile engineering technology has been widely used in the field of civil engineering. However, when using the drilling tools and processes of mixing pile construction with unidirectional rotation mixing, serious engineering quality problems such as uneven soil mixing, upward discharge of solidified soil along the gap around the drilling tool and the drill rod, balling and drilling in the construction of clay soil, and the overall strength of solidified soil lower than the design value often occur, and serious engineering safety problems are often caused. Especially when the project needs to use large-diameter and deep mixing pile construction, the use of single power head, unidirectional rotation mixing drilling tools and technology construction will make the engineering quality and engineering safety risks particularly prominent, and even appear to be banned by industry administrative departments and local governments. The current civil engineering market urgently needs to solve the above engineering and technical problems, including the need to thoroughly solve the above technical defects in terms of mixing pile engineering machinery and equipment, drilling tools and mixing pile construction technology, so that the deep mixing pile engineering technology can be reliably applied in a wider range of engineering fields and more important civil engineering projects. Summary of the invention
[0004] The purpose of the present invention is to overcome the shortcomings of the prior art and to provide a bidirectional mixing drill for the construction of large-diameter mixing piles. By introducing a bidirectional mixing drill driven by a dual power head, the drilling rig can construct mixing piles with a diameter of 1000mm to 3000mm, and can be used in complex strata. Under the action of the torque and drilling pressure of the dual power head of the drilling rig, the bidirectional mixing drill can achieve bidirectional rotation at the same speed or at a variable speed. Since the adjacent frames and transverse mixing wing plates of the drilling tool rotate in opposite directions, the mutual shearing, kneading, crushing and strong mixing of the mixed soil are guaranteed, and the uniformity and high strength of the mixing piles can be achieved.
[0005] The objective of the present invention is achieved through the following technical scheme. The bidirectional mixing drill for large-diameter mixing pile construction comprises a double-frame bidirectional mixing drill, which is composed of an internal double-frame bidirectional mixing drill or an external double-frame bidirectional mixing drill. The internal double-frame bidirectional mixing drill comprises a first central axis and an outwardly convex U-shaped inner frame and an outer frame installed on the outer peripheral side of the first central axis and radially evenly separated. The first central axis is provided with at least two material conveying channels, and the first central axis includes a first outer tube, a first inner tube, and a first central tube from the outside to the inside in sequence; the outer frame is fixedly connected to the first outer tube, the inner frame is fixedly connected to the first inner tube, and the outer frame is located on the outer side of the inner frame and is radially distributed along the first central axis; the inner frame is provided with a first mixing wing plate, the outer frame is provided with a second mixing wing plate, and the outer peripheral side of the first outer tube in the inner frame is provided with a third transverse mixing wing plate, the first mixing wing plate and the second mixing wing plate are arranged at intervals, and the first mixing wing plate and the third transverse mixing wing plate are arranged at intervals; the external double-frame double The directional stirring drill comprises a second central axis and an outwardly convex U-shaped upper frame and a lower frame which are installed on the outer peripheral side of the second central axis and are evenly separated in radial direction. The second central axis is provided with at least two material conveying channels, and the second central axis comprises a second outer tube, a second inner tube, and a second central tube in sequence from the outside to the inside; the upper frame is fixedly connected to the second outer tube, the lower frame is fixedly connected to the second inner tube, a shaft sleeve assembly is installed on the second inner tube, and the shaft sleeve assembly is respectively connected to the upper frame and the lower frame; the upper frame is located above the lower frame , and are all distributed axially along the second central axis; a third stirring wing plate is provided on the upper frame, a fourth stirring wing plate is provided on the lower frame, a fifth transverse stirring wing plate is installed on the outer peripheral side of the second inner tube and the sleeve assembly, and the third stirring wing plate and the fourth stirring wing plate are respectively arranged at intervals from the fifth transverse stirring wing plate; a pilot drill bit is installed at the lower end of the central axis of the built-in double-frame bidirectional stirring drill tool and the external double-frame bidirectional stirring drill tool, and a connecting assembly for fixedly connecting the stirring drill tool with the inner and outer active drill rods is installed at the upper end of the central axis.
[0006] Preferably, the upper end of the outer frame is fixedly connected to the outer side wall of the first outer tube by a first fixed ring sleeve, and the lower end of the outer frame is rotatably connected to the outer side wall of the first inner tube by a first annular limit support bearing sleeve, and the outer frame can rotate with the first outer tube; the upper end of the inner frame is rotatably connected to the outer side wall of the first outer tube by a second annular limit support bearing sleeve, and the lower end of the inner frame is fixedly connected to the outer side wall of the first inner tube by a second fixed ring sleeve, and the inner frame can rotate with the first inner tube.
[0007] Preferably, the first center tube is provided with a first material conveying channel, the annular gap between the first center tube and the first inner tube forms a second material conveying channel, and the annular gap between the first inner tube and the first outer tube forms a third material conveying channel; a first injection port is provided on the transverse grouting pipe connected to the bottom of the first center tube and is located at the rear of the rotation direction of the lead drill bit, and the first injection port is communicated with the first material conveying channel; a second injection port is provided at the lower end of the first inner tube, and the second injection port is communicated with the second material conveying channel; the second stirring wing is a built-in hollow tubular shape and is provided with a third injection port and is located on the inner or outer side of the second stirring wing, and the third injection port is communicated with the third material conveying channel.
[0008] Preferably, a drainage anti-blocking port assembly is provided in the third material conveying channel, and the drainage anti-blocking port assembly is located at the inlet of the transverse channel provided with the second stirring wing plate, and the drainage anti-blocking port assembly includes a sealing bearing and a lifting base, and the lifting base is fixed in the third material conveying channel, the sealing bearing is installed on the lifting base and sealed with the inner wall of the third material conveying channel, and the upper end surface of the sealing bearing is flush with the lower end wall at the inlet of the transverse channel.
[0009] Preferably, a plurality of first injection ports on the transverse grouting pipe connected to the bottom of the first central pipe are sequentially provided along the axial direction of the transverse grouting pipe, and the plurality of first injection ports are distributed from sparse to dense along the width direction of the frame; a first pressure one-way valve pipe is connected to the transverse grouting pipe connected to the bottom of the first central pipe through a first return spring, one side of the first pressure one-way valve pipe is fixedly connected to one side of the transverse grouting pipe through a first return spring, and a first orifice with the same distribution pattern as the first injection ports is opened on the first pressure one-way valve pipe.
[0010] Preferably, the first stirring wing plate includes a first transverse stirring wing plate and a first vertical stirring wing plate, and the second stirring wing plate includes a second transverse stirring wing plate and a second vertical stirring wing plate; the first transverse stirring wing plate located on the outside of the inner frame and the second transverse stirring wing plate located on the inside of the outer frame are spaced apart along the height direction of the frame, and the first vertical stirring wing plate located on the upper and lower outer sides of the inner frame and the second vertical stirring wing plate located on the upper and lower inner sides of the outer frame are spaced apart along the width direction of the frame; the first transverse stirring wing plate located on the inside of the inner frame and the third transverse stirring wing plate are spaced apart along the axial direction of the first center axis.
[0011] Preferably, the sleeve assembly includes an annular limit support bearing long sleeve and an annular limit support bearing short sleeve, and the annular limit support bearing short sleeve is rotatably connected to the outer wall of the annular limit support bearing long sleeve; the upper end of the upper frame is fixedly connected to the outer wall of the second outer tube by a third fixed ring sleeve, and the lower end of the upper frame is rotatably connected to the outer wall of the second inner tube by the annular limit support bearing long sleeve, so that the upper frame can rotate with the second outer tube and drive the annular limit support bearing long sleeve to rotate together; the upper end of the lower frame is rotatably connected to the outer wall of the second inner tube by the annular limit support bearing short sleeve, and the lower end of the lower frame is fixedly connected to the outer wall of the second inner tube by a fourth fixed ring sleeve, so that the lower frame can rotate with the second inner tube.
[0012] Preferably, the second center tube is provided with a fourth material conveying channel, and the annular gap between the second center tube and the second inner tube forms a fifth material conveying channel; a fourth injection port is provided on the tube wall at the lower end of the second center tube, and the fourth injection port is connected with the fourth material conveying channel; the third transverse stirring wing is a built-in hollow tube and is provided with a fifth injection port, and is connected with the fifth material conveying channel, and the fifth transverse stirring wing with the fifth injection port is located in the upper frame, and the fifth injection port is located at the rear of the fifth transverse stirring wing in the rotation direction.
[0013] Preferably, a plurality of the fifth injection ports are sequentially arranged along the length direction of the fifth transverse stirring wing plate, and the plurality of the fifth injection ports are distributed from sparse to dense along the width direction of the frame; a second pressure check valve tube is connected to the fifth transverse stirring wing plate through a second return spring, one side of the second pressure check valve tube is fixedly connected to one side of the fifth transverse stirring wing plate through a second return spring, and a second orifice with the same distribution pattern as the fifth injection ports is opened on the second pressure check valve tube.
[0014] Preferably, the third stirring wing plate includes a third transverse stirring wing plate and a third vertical stirring wing plate, and the fourth stirring wing plate includes a fourth transverse stirring wing plate and a fourth vertical stirring wing plate; the third transverse stirring wing plate and the fifth transverse stirring wing plate located on the second inner tube are axially spaced apart along the second center axis, and the fourth transverse stirring wing plate and the fifth transverse stirring wing plate located on the sleeve assembly are axially spaced apart along the second center axis; the third vertical stirring wing plate is vertically downwardly installed at the bottom of the lower end surface of the upper frame, and the fourth vertical stirring wing plate is vertically upwardly installed at the top of the upper end surface of the lower frame, and the vertical stirring wing plates on the upper and lower end surfaces are spaced apart along the width direction of the frame.
[0015] The beneficial effects of the present invention are as follows: 1. It is suitable for various soft and hard soil layers, and can be used for the construction of mixing piles in large diameter, large depth and complex strata; 2. It solves the technical problem of solidified soil being discharged upward along the gap around the drill tool and the drill rod during the construction of traditional mixing pile drilling rigs; 3. It eliminates the unsolvable problem of one-way rotary mixing pile drilling rigs forming a ball and holding the drill in the construction of clay soil layers; 4. Various soil bodies and solidifying agents are mixed evenly and fully as a whole to form a high-strength solidified soil body; 5. Under the condition that the solidified soil reaches the same overall strength, a large amount of solidifying agent materials can be saved; 6. It ensures the high quality of deep mixing piles, engineering safety, shortened construction period and reduced costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a structural schematic diagram of the bidirectional stirring drill tool of the present invention installed on the drilling rig equipment.
[0017] Figure 2 It is a schematic diagram of the structure of an external double-frame bidirectional stirring drill tool according to the third embodiment of the present invention.
[0018] Figure 3 It is a schematic diagram of the curing agent flow structure of the external double-frame bidirectional stirring drill tool of the third embodiment of the present invention.
[0019] Figure 4 It is a schematic diagram of the structure of a two-component bidirectional stirring drill tool according to the third embodiment of the present invention.
[0020] Figure 5 It is a schematic diagram of the structure of a three-component bidirectional stirring drill tool according to the third embodiment of the present invention.
[0021] Figure 6 It is a schematic diagram of the structure of a four-component bidirectional stirring drill tool according to the third embodiment of the present invention.
[0022] Figure 7 It is a schematic diagram of the pilot drill structure of embodiment 3 of the present invention.
[0023] Figure 8 It is a schematic diagram of the injection coverage area structure of the injection port in embodiment 3 of the present invention.
[0024] Fig. 9 It is a schematic diagram of the second injection port distribution structure of embodiment 3 of the present invention.
[0025] Fig.10 It is a schematic diagram of the initial position structure of the pressure one-way valve tube of Example 3 of the present invention.
[0026] Fig.11 It is a schematic diagram of the working state structure of the pressure one-way valve tube of embodiment 3 of the present invention.
[0027] Fig.12 It is a schematic diagram of the structure of the built-in double-frame bidirectional stirring drill tool according to the first embodiment of the present invention.
[0028] Fig.13 It is a schematic diagram of the curing agent flow structure of the built-in double-frame bidirectional stirring drill tool according to the first embodiment of the present invention.
[0029] Fig.14 It is a schematic diagram of the curing agent flow direction of the built-in asymmetric double-frame bidirectional stirring drill tool of the second embodiment of the present invention.
[0030] Fig.15 This is a schematic diagram of the structure of the built-in asymmetric double-frame bidirectional stirring drill tool according to the second embodiment of the present invention. Figure 1 .
[0031] Fig.16 This is a schematic diagram of the structure of the built-in asymmetric double-frame bidirectional stirring drill tool according to the second embodiment of the present invention. Figure 2 .
[0032] Fig.17 It is a schematic diagram of the structure of the drainage anti-blocking port assembly of the second embodiment of the present invention.
[0033] Fig.18 It is a schematic diagram of the structure of a two-component bidirectional stirring drill tool according to the first embodiment of the present invention.
[0034] Fig.19 It is a schematic diagram of the structure of a three-component bidirectional stirring drill tool according to the first embodiment of the present invention.
[0035] Fig. 20 It is a schematic diagram of the structure of a four-component bidirectional stirring drill tool according to the first embodiment of the present invention.
[0036] Fig.21 It is a schematic diagram of the injection coverage area structure of the injection port in embodiments 1 and 2 of the present invention.
[0037] Fig. 22 It is a schematic diagram of the first injection port distribution structure of embodiments one and two of the present invention.
[0038] Fig.23 It is a schematic diagram of the initial position structure of the pressure one-way valve tube of embodiments one and two of the present invention.
[0039] Fig.24 It is a schematic diagram of the working state structure of the pressure one-way valve tube of embodiments one and two of the present invention.
[0040] The numbers in the accompanying drawings are: 1, second central axis; 2, upper frame; 3, lower frame; 4, second pilot drill bit; 5, second connecting assembly; 6, long shaft sleeve of annular limit support bearing; 7, short shaft sleeve of annular limit support bearing; 8, third fixed ring sleeve; 9, fourth fixed ring sleeve; 10, second wear-resistant material plate; 11, second outer tube; 12, second inner tube; 13, second central tube; 13-1, fourth material conveying channel; 13-2, fourth injection port; 14, fifth transverse stirring wing plate; 14-1, fifth injection port; 15, fifth material conveying channel ; 16, second return spring; 17, second pressure check valve tube; 17-1, second orifice; 21, third stirring wing plate; 21-1, third horizontal stirring wing plate; 21-2, third vertical stirring wing plate; 22, second upper tooth plate; 31, fourth stirring wing plate; 31-1, fourth horizontal stirring wing plate; 31-2, fourth vertical stirring wing plate; 32, second pick; 100, first central axis; 101, inner frame; 102, outer frame; 103, first outer tube; 104, first inner tube; 105, first central tube; 105-1, first material material conveying channel; 105-2, second material conveying channel; 105-3, third material conveying channel; 105-4, first injection port; 105-5, second injection port; 105-6, third injection port; 106, first fixed ring sleeve; 107, first annular limit support bearing sleeve; 108, second annular limit support bearing sleeve; 109, second fixed ring sleeve; 110, horizontal grouting pipe; 111, first upper tooth plate; 112, first pick; 113, first wear-resistant material plate; 200, first stirring wing plate; 201, first horizontal stirring wing plate; Mixing wing plate; 202, first vertical mixing wing plate; 300, second mixing wing plate; 301, second horizontal mixing wing plate; 302, second vertical mixing wing plate; 303, horizontal channel; 400, third horizontal mixing wing plate; 500, first leading drill bit; 600, first connecting assembly; 700, drainage anti-blocking port assembly; 701, sealing bearing; 702, lifting base; 801, first return spring; 802, first pressure one-way valve pipe; 802-1, first orifice; 900, drilling rig; 901, dual power head; 902, internal and external active drill rod. DETAILED DESCRIPTION
[0041] The present invention will be described in detail below with reference to the accompanying drawings:
[0042] Embodiment 1:
[0043] The engineering background of this embodiment is to construct a steel-cement soil mixing pile wall (SMW method pile) for deep foundation pit support. The designed mixing pile length is 33m, the pile diameter is 1100mm, the H-shaped steel pile length is 33m, the H-shaped steel cross-section is 850x300, the 28-day unconfined compressive strength of the mixing pile is not less than 0.8MPa, and the permeability coefficient k=10-7 cm / s.
[0044] Basic information of this embodiment: the two layers of foundation soil of the site are ① clay, layer thickness 16m, water content w=41%, e=1.32, SPT=5~9, ② silty sand, layer thickness 28m, water content w=32%, SPT=15~26; 42.5 cement, plus 3% bentonite, the addition amount is 16%, the water-cement ratio is 1.2~1.5, and a double-channel cement slurry injection method is used for curing agent slurry spreading; the construction drilling rig 900 adopts a 2x16tm electrically driven dual power head 901 and a built-in double-frame bidirectional mixing drill, and the construction applies the one-spraying and two-mixing construction process of the mixing pile and the H-beam vibration insertion construction process.
[0045] As attached Figure 1 , 12 As shown in , 13, 18 to 24, the built-in double-frame bidirectional stirring drill comprises a first central axis 100, and also comprises an outwardly convex U-shaped inner frame 101 and an outer frame 102 which are installed on the outer peripheral side of the first central axis 100 and are evenly separated in radial direction, the first central axis 100 is provided with at least two material conveying channels, and the first central axis 100 comprises a first outer tube 103, a first inner tube 104, and a first central tube 105 in sequence from the outside to the inside; the outer frame 102 is fixedly connected to the first outer tube 103, the inner frame 101 is fixedly connected to the first inner tube 104, and the outer frame 102 is located on the outside of the inner frame 101, and both are along the first A central axis 100 is radially distributed; a first stirring wing plate 200 is provided on the inner frame 101, a second stirring wing plate 300 is provided on the outer frame 102, a third transverse stirring wing plate 400 is installed on the outer peripheral side of the first outer tube 103 in the inner frame 101, the first stirring wing plate 200 and the second stirring wing plate 300 are arranged at intervals, and the first stirring wing plate 200 and the third transverse stirring wing plate 400 are arranged at intervals; a first pilot drill bit 500 is installed at the lower end of the first central axis 100, and a first connecting assembly 600 for fixing the stirring drill tool with the inner and outer active drill rods 902 is installed at the upper end of the first central axis 100. For example: the first outer tube 103 rotates clockwise during the mixing construction process, then the outer frame 102 and the second mixing wing plate 300 connected thereto also rotate clockwise, and at the same time the third transverse mixing wing plate 400 on the first outer tube 103 also rotates clockwise; the first inner tube 104 rotates counterclockwise during the mixing construction process, then the inner frame 101 and the first mixing wing plate 200 connected thereto also rotate counterclockwise; thereby achieving mutual shearing, rubbing, crushing and strong mixing of the reinforced soil between the mixing wings.
[0046] The upper end of the outer frame 102 is fixedly connected to the outer side wall of the first outer tube 103 by a first fixed ring sleeve 106, and the lower end of the outer frame 102 is rotatably connected to the outer side wall of the first inner tube 104 by a first annular limit support bearing sleeve 107, so that the outer frame 102 can rotate with the first outer tube 103; the upper end of the inner frame 101 is rotatably connected to the outer side wall of the first outer tube 103 by a second annular limit support bearing sleeve 108, and the lower end of the inner frame 101 is fixedly connected to the outer side wall of the first inner tube 104 by a second fixed ring sleeve 109, so that the inner frame 101 can rotate with the first inner tube 104; in this way, the inner and outer frames do not affect each other when rotating, and can rotate independently in the same direction or opposite directions.
[0047] The first central tube 105 is provided with a first material conveying channel 105-1, the annular gap between the first central tube 105 and the first inner tube 104 forms a second material conveying channel 105-2, and the annular gap between the first inner tube 104 and the first outer tube 103 forms a third material conveying channel 105-3; the above-mentioned material conveying channels can be used for conveying gas, water, slurry or powdered curing agent.
[0048] The first injection port 105-4 is provided on the transverse grouting pipe 110 connected to the bottom of the first central pipe 105 and is located at the rear of the first pilot drill bit 500 in the direction of rotation. The first injection port 105-4 is connected to the first material conveying channel 105-1. The lower end of the first inner pipe 104 is provided with a second injection port 105-5, which is connected to the second material conveying channel 105-2. The second stirring wing 300 is a built-in hollow tube and is provided with a third injection port 105-6 and is located on the inner or outer side of the second stirring wing 300. The second stirring wing 300 refers to the second vertical stirring wing 302. The third injection port 105-6 is connected to the third material conveying channel 105-3. It is convenient to inject the material in the material conveying channel into the deep soil through the injection port. As shown in the attached figure Fig.21 , 22 As shown, a plurality of first injection ports 105-4 on the transverse grouting pipe 110 connected to the bottom of the first central pipe 105 are sequentially arranged along the axial direction of the transverse grouting pipe 110, and the plurality of first injection ports 105-4 are distributed from sparse to dense along the width direction of the frame; so that after the mixing drill rotates one circle, the coverage area swept by each injection port is equal. Fig.23 , 24As shown, the first pressure one-way valve tube 802 is connected to the transverse grouting pipe 110 connected to the bottom of the first central pipe 105 through the first return spring 801, one side of the first pressure one-way valve tube 802 is fixedly connected to one side of the transverse grouting pipe 110 through the first return spring 801, and the first pressure one-way valve tube 802 is provided with a first orifice 802-1 having the same distribution form as the first injection port 105-4; and it can solve the problem of being unable to inject the curing agent due to the blockage of the first injection port, reduce the waste of curing materials and avoid the work of frequently cleaning the slurry delivery pipe. Its working principle is as follows: when the grouting of the mixing pile starts, under the action of the shotcrete pressure, the first return spring 801 is compressed, driving the first pressure one-way valve tube 802 to move to the right, and the first orifice 802-1 moves to the position of the first injection port 105-4 and aligns one by one. At this time, the first injection port 105-4 is opened to start grouting; when the grouting stops, the first return spring 801 returns to the initial position, and the first pressure one-way valve tube 802 moves to the left and covers the first injection port 105-4 to protect the first injection port 105-4 from being blocked by the soil.
[0049] The first stirring wing 200 includes a first transverse stirring wing 201 and a first vertical stirring wing 202, and the second stirring wing 300 includes a second transverse stirring wing 301 and a second vertical stirring wing 302; the first transverse stirring wing 201 located on the outside of the inner frame 101 and the second transverse stirring wing 301 located on the inside of the outer frame 102 are spaced apart along the height direction of the frame, and the first vertical stirring wing 202 located on the upper and lower outer sides of the inner frame 101 and the second vertical stirring wing 302 located on the upper and lower inner sides of the outer frame 102 are spaced apart along the width direction of the frame; the first transverse stirring wing 201 located on the inside of the inner frame 101 and the third transverse stirring wing 400 are spaced apart along the axial direction of the first central axis 100; such a structural arrangement enables the soil to achieve overall uniformity and high strength of the solidified soil through mutual shearing, rubbing, crushing and strong mixing.
[0050] A first upper tooth plate 111 pointing vertically upward is installed at the upper outer end of the outer frame 102, which plays a role of secondary mixing during the construction process of the drilling rig in the upward stage; a first pick 112 is provided at the lower outer end of the outer frame 102, which plays a role of drilling and mixing during the construction process of the drilling rig in the downward stage; it can also facilitate the downward or upward construction of the mixing drill, greatly improving the efficiency and effect of the construction.
[0051] The vertical outer side walls of the outer frame 102 and the inner frame 101 are both provided with a first wear-resistant material plate 113, which can greatly extend the service life of the frame structure.
[0052] As attached Figures 18 to 20As shown, the outer convex U-shaped inner frame 101 and the outer frame 102 are evenly separated by 180 degrees, 120 degrees or 90 degrees and radially installed with two, three or four frames; the frame formed thereby can be symmetrical or asymmetrical, especially in the construction of large diameter mixing piles, it is generally preferred to adopt an asymmetrical form, such as the attached Figures 14 to 16 As shown, the size and shape of each inner frame 101 and each outer frame 102 can be set to different sizes and forms.
[0053] The working principle of this embodiment is:
[0054] Construction during the drilling rig's downward phase: determine the position of the mixing pile, start the drilling rig and the backstage slurry supply system after the drilling rig is in place, apply clockwise and counterclockwise torques and vertical drilling pressures to the inner and outer drill rods according to the set construction parameters, and carry out drilling and mixing operations during the drilling rig's downward phase. At the same time, use a high-pressure grouting pump to quantitatively spread the curing agent through the above-mentioned injection port. Since the rotation directions of the adjacent horizontal mixing wings of the drilling tool are opposite, the reinforced soil can be fully and uniformly mixed as a whole through mutual shearing, kneading, crushing and strong mixing. Until the downward operation of the mixing drill tool reaches the designed pile bottom elevation, the construction of the downward drilling and mixing operation phase is completed.
[0055] Construction in the upward stage of the drilling rig: the drilling rig continues to apply torque and lifting force to the inner and outer drill rods in the opposite direction to those in the downward stage according to the set construction parameters, and performs secondary mixing operations on the mixing piles in the upward stage of the drilling rig; the above-mentioned injection port can also be used to quantitatively spread the secondary curing agent according to construction needs; in the secondary mixing operation stage, the drilling rig can increase the rotation speed and lifting speed of the built-in double-frame two-way mixing drill bit, and utilize the reverse rotation of the vertical mixing wings and the horizontal mixing wings of each adjacent inner and outer frame to fully shear and repeatedly mix the soil and the curing agent slurry for a second time, until the upward operation of the two-way mixing mechanism reaches the designed pile top elevation, completing the construction of the upward mixing operation stage; the mixing piles using the one-spray-two-mixing or two-spray-two-mixing construction process have completed the construction in this stage.
[0056] Embodiment 2:
[0057] The engineering background of this embodiment is the construction of large-diameter mixing piles in the composite foundation floor of a coastal ore stockpile yard. The pile length is 16m, the pile diameter is 3000mm, the design ultimate bearing capacity of the mixing pile composite foundation is 280kPa, and the 28-day unconfined compressive strength of the mixing pile is not less than 1.2MPa.
[0058] Basic conditions of the embodiment: The site foundation soil is a deep marine saturated soft clay foundation with a water content of w = 65%, e = 1.3, q c =0.2MPa, f s=6kPa, SPT=3~8, the surface soil of the site is a 3m thick hard crust layer, and its foundation bearing capacity is 100kPa; the curing agent is KD1, the mixing amount is 15%, and the powder + slurry injection method is used for curing agent dry powder and curing agent slurry injection; the construction drilling rig 900 adopts 2x18tm electrically driven dual power head 901 and built-in dual-frame mixing drill, and the construction applies one spray and two mix construction technology.
[0059] The difference between the built-in double-frame directional stirring drill and the first embodiment is that: Figures 14 to 16 As shown, an asymmetric inner and outer frame is adopted, and a first injection port 105-4 is provided on the transverse grouting pipe 110 connected to the bottom of the first central pipe 105 and is located at the rear of the first pilot drill bit 500 in the rotation direction, and the first injection port 105-4 is connected to the first material conveying channel 105-1; a second injection port 105-5 is provided at the lower end of the first inner pipe 104, and the second injection port 105-5 is connected to the second material conveying channel 105-2; the second stirring wing plate 300 is a built-in hollow tube and is provided with a third injection port 105-6 and is located on the inner or outer side of the second stirring wing plate 300, and the second stirring wing plate 300 refers to the second vertical stirring wing plate 302, and the third injection port 105-6 is connected to the third material conveying channel 105-3. As shown in the attached Fig.21 , 22 As shown, a plurality of first injection ports 105-4 on the transverse injection pipe 110 connected to the bottom of the central pipe 105 are sequentially arranged along the axial direction of the transverse injection pipe 110, and the plurality of first injection ports 105-4 are distributed from sparse to dense along the width direction of the frame. Fig.23 , 24 As shown, the first pressure check valve tube 802 is connected to the transverse grouting pipe 110 connected to the bottom of the first central pipe 105 through the first return spring 801, one side of the first pressure check valve tube 802 is fixedly connected to one side of the transverse grouting pipe 110 through the first return spring 801, and the first pressure check valve tube 802 is provided with a first orifice 802-1 having the same distribution form as the first injection port 105-4. Its working principle is: when the mixing pile grouting starts, under the action of the spraying pressure, the first return spring 801 is compressed, the first pressure check valve tube 802 moves to the right, the first orifice 802-1 moves to the position of the first injection port 105-4 and aligns one by one, and the first injection port 105-4 opens the spraying; when the grouting stops, the first return spring 801 returns to the initial position, the first pressure check valve tube 802 covers the first injection port 105-4, and protects the first injection port 105-4 from being blocked by the soil.
[0060] As attached Fig.17As shown, a drainage anti-blocking port assembly 700 is provided in the third material conveying channel 105-3, and the drainage anti-blocking port assembly 700 is located at the inlet of the transverse channel 303 provided on the second stirring wing plate 300. The drainage anti-blocking port assembly 700 includes a sealing bearing 701 and a lifting base 702. The lifting base 702 is fixed in the third material conveying channel 105-3, and the sealing bearing 701 is installed on the lifting base 702 and sealed with the inner wall of the third material conveying channel 105-3, and the upper end surface of the sealing bearing 701 is flush with the lower end wall at the inlet of the transverse channel 303.
[0061] Embodiment three:
[0062] The engineering background of this embodiment is the construction of foundation piles and reinforced core composite piles for small high-rise residential buildings. The mixing piles are 30m long and 1200mm in diameter. The PHC pipe piles are 30m long and 800mm in diameter. The single pile design ultimate bearing capacity is 4800kN.
[0063] Basic information of this embodiment: the three layers of foundation soil of the site are respectively ① clay, layer thickness 14m, water content w=38%, e=1.3, SPT=3~8, ② silt, layer thickness 13m, water content w=29%, e=1.0, SPT=7~20, ③ fine sand, layer thickness 9m, water content w=35%, SPT=14~27; KD curing agent product is used, the addition amount is 14%, the water-cement ratio is 0.6, and the double-channel slurry injection method is used to spread the curing agent slurry; the construction drilling rig 900 adopts a 2x20tm hydraulically driven dual power head 901 and an external double-frame bidirectional mixing drill, and the construction applies the one-spraying and two-mixing construction process of the mixing pile and the PHC pipe pile holding and pressing construction process.
[0064] As attached Figures 1 to 11As shown, the external double-frame bidirectional stirring drill comprises a second central axis 1, and also comprises an outwardly convex U-shaped upper frame 2 and a lower frame 3 which are installed on the outer peripheral side of the second central axis 1 and are evenly separated in radial direction, the central axis 1 is provided with at least two material conveying channels, and the second central axis 1 comprises a second outer tube 11, a second inner tube 12, and a second central tube 13 from the outside to the inside; the upper frame 2 is fixedly connected to the second outer tube 11, the lower frame 3 is fixedly connected to the second inner tube 12, a shaft sleeve assembly is installed on the second inner tube 12, and the shaft sleeve assembly is respectively connected to the upper frame 2 and the lower frame 3; The upper frame 2 is located above the lower frame 3 and is axially distributed along the second central axis 1; a third stirring wing plate 21 is provided on the upper frame 2, a fourth stirring wing plate 31 is provided on the lower frame 3, a fifth transverse stirring wing plate 14 is installed on the outer peripheral side of the inner tube 12 and the sleeve assembly, and the third stirring wing plate 21 and the fourth stirring wing plate 31 are respectively arranged at intervals from the fifth transverse stirring wing plate 14; a second leading drill bit 4 is installed at the lower end of the second central axis 1, and a second connecting assembly 5 for fixedly connecting the stirring drill tool with the inner and outer active drill rods 902 is installed at the upper end of the second central axis 1. For example: if the second outer tube 11 rotates clockwise during the mixing construction process, the upper frame 2 and the third mixing wing plate 21 connected thereto also rotate clockwise, and the fifth transverse mixing wing plate 14 on the annular limit support bearing long shaft sleeve 6 also rotates clockwise; if the second inner tube 12 rotates counterclockwise during the mixing construction process, the lower frame 3 and the fourth mixing wing plate 31 connected thereto also rotate counterclockwise, and the fifth transverse mixing wing plate 14 on the second inner tube 12 rotates counterclockwise; thereby achieving mutual shearing, rubbing, crushing and strong mixing of the reinforced soil between the mixing wings.
[0065] The above-mentioned convex U-shaped upper frame 2 and lower frame 3 are evenly separated by 180 degrees, 120 degrees or 90 degrees and radially installed with two, three or four-level structure frames; Figures 4 to 6 shown.
[0066] The shaft sleeve assembly includes an annular limit support bearing long shaft sleeve 6 and an annular limit support bearing short shaft sleeve 7, and the annular limit support bearing short shaft sleeve 7 is rotatably connected to the outer side wall of the annular limit support bearing long shaft sleeve 6; the upper end of the upper frame 2 is fixedly connected to the outer side wall of the outer tube 11 by a third fixed ring sleeve 8, and the lower end of the upper frame 2 is rotatably connected to the outer side wall of the second inner tube 12 by the annular limit support bearing long shaft sleeve 6, so that the upper frame can rotate with the second outer tube 11 and drive the annular limit support bearing long shaft sleeve 6 to rotate together; the upper end of the lower frame 3 is rotatably connected to the outer side wall of the second inner tube 12 by the annular limit support bearing short shaft sleeve 7, and the lower end of the lower frame 3 is fixedly connected to the outer side wall of the second inner tube 12 by a fourth fixed ring sleeve 9, and the lower frame 3 can rotate with the second inner tube 12; in this way, the upper and lower frames do not affect each other when rotating, and can rotate independently in the same direction or opposite directions.
[0067] As attached Figure 3 As shown, the second central tube 13 is provided with a fourth material conveying channel 13-1, and the annular gap between the second central tube 13 and the second inner tube 12 forms a fifth material conveying channel 15; the material conveying channels mentioned above are used for conveying curing agent.
[0068] A fourth injection port 13-2 is provided on the wall of the lower end of the second central tube 13, and the fourth injection port 13-2 is connected to the fourth material conveying channel 13-1; the fifth transverse stirring wing plate 14 is a built-in hollow tube and is provided with a fifth injection port 14-1, and is connected to the fifth material conveying channel 15, and the fifth transverse stirring wing plate 14 with the fifth injection port 14-1 is located in the upper frame 2, and the fifth injection port 14-1 is located at the rear of the fifth transverse stirring wing plate 14 in the direction of rotation; it is convenient to inject the solidified material in the material conveying channel into the deep soil through the injection port. As shown in the attached figure Fig. 9 As shown, a plurality of fifth injection ports 14-1 are sequentially arranged along the length direction of the fifth transverse stirring wing plate 14, and the plurality of fifth injection ports 14-1 are distributed from sparse to dense along the width direction of the frame; so that after the stirring drill rotates one circle, the coverage area swept by each injection port is equal. Fig.10 , 11 As shown, a second pressure one-way valve tube 17 is connected to the fifth transverse stirring wing plate 14 through a second return spring 16, one side of the second pressure one-way valve tube 17 is fixedly connected to one side of the fifth transverse stirring wing plate 14 through the second return spring 16, and a second orifice 17-1 having the same distribution form as the fifth injection port 14-1 is provided on the second pressure one-way valve tube 17; and the problem of the inability to inject the solidifying material due to the blockage of the fifth injection port can be solved, and the waste of the solidifying material can be reduced and the frequent cleaning of the slurry delivery pipe can be avoided. Its working principle is as follows: when the grouting of the mixing pile starts, under the action of the shotcrete pressure, the second return spring 16 is compressed, driving the second pressure one-way valve tube 17 to move to the right, and the second orifice 17-1 moves to the position of the fifth injection port 14-1 and aligns one by one, and the fifth injection port 14-1 opens for spraying; when the grouting stops, the second return spring 16 returns to the initial position, and the second pressure one-way valve tube 17 covers the fifth injection port 14-1 to protect the fifth injection port 14-1 from being blocked by the soil.
[0069] The third stirring wing 21 includes a third transverse stirring wing 21-1 and a third vertical stirring wing 21-2, and the fourth stirring wing 31 includes a fourth transverse stirring wing 31-1 and a fourth vertical stirring wing 31-2; the third transverse stirring wing 21-1 and the fifth transverse stirring wing 14 located on the second inner tube 12 are spaced apart along the axial direction of the second central axis 1, and the fourth transverse stirring wing 31-1 and the fifth transverse stirring wing 14 located on the sleeve assembly are spaced apart along the axial direction of the second central axis 1; the third vertical stirring wing 21-2 is vertically downwardly installed at the bottom of the lower end surface of the upper frame 2, and the fourth vertical stirring wing 31-2 is vertically upwardly installed at the top of the upper end surface of the lower frame 3, and the vertical stirring wings on the upper and lower end surfaces are spaced apart along the width direction of the frame; such a structural setting can enable the soil to achieve overall uniformity and high strength of the solidified soil through mutual shearing, kneading, crushing and strong mixing.
[0070] A second upper tooth plate 22 pointing vertically upward is installed on the top of the upper end surface of the upper frame 2, which plays a role of secondary mixing during the construction process of the drilling rig in the upward stage; a second pick 32 is installed on the bottom of the lower end surface of the lower frame 3, which plays a role of mixing during the construction process of the drilling rig in the downward stage; it can facilitate the downward or upward construction of the stirring drill bit, greatly improving the efficiency and effect of the construction.
[0071] The vertical outer side walls of the upper frame 2 and the lower frame 3 are both provided with a second wear-resistant material plate 10, which can extend the service life of the frame structure.
[0072] The working principle of this embodiment is:
[0073] Construction during the drilling rig's downward phase: determine the position of the mixing pile, start the drilling rig and the backstage slurry supply system after the drilling rig is in place, apply clockwise and counterclockwise torques and vertical drilling pressures to the inner and outer drill rods according to the set construction parameters, and carry out drilling and mixing operations during the drilling rig's downward phase. At the same time, use a high-pressure grouting pump to quantitatively spread the curing agent through the above-mentioned injection port. Since the rotation directions of the adjacent horizontal mixing wings of the drilling tool are opposite, the reinforced soil can be fully and uniformly mixed as a whole through mutual shearing, kneading, crushing and strong mixing. Until the downward operation of the mixing drill tool reaches the designed pile bottom elevation, the construction of the downward drilling and mixing operation phase is completed.
[0074] Construction in the upward stage of the drilling rig: The drilling rig continues to apply torque and lifting force to the inner and outer drill rods in the opposite direction to those in the downward stage according to the set construction parameters, and performs secondary mixing operations on the mixing piles in the upward stage of the drilling rig; the above-mentioned injection port can also be used to quantitatively spread the secondary curing agent according to construction needs; in the secondary mixing operation stage, the drilling rig can increase the rotation speed and lifting speed of the external double-frame two-way mixing drill bit, and utilize the mutual reverse rotation of the vertical mixing wings and the horizontal mixing wings of each adjacent frame to perform secondary sufficient mutual shearing and repeated mixing of the soil and the curing agent slurry, until the upward operation of the two-way mixing mechanism reaches the designed pile top elevation, completing the construction of the upward mixing operation stage; for the mixing piles using the one-spray-two-mixing or two-spray-two-mixing construction process, the construction operations have been completed in this stage.
[0075] The present invention is not limited to the above-mentioned embodiments. No matter any changes are made in the shape or material composition, any structural design provided by the present invention is a variation of the present invention and should be considered to be within the protection scope of the present invention.
Claims
1. A bidirectional mixing drill for large diameter mixing pile construction, characterized in that: The invention comprises a double-frame bidirectional stirring drill, wherein the double-frame bidirectional stirring drill is composed of an internal double-frame bidirectional stirring drill, wherein the internal double-frame bidirectional stirring drill comprises a first central axis (100) and an outwardly convex U-shaped inner frame (101) and an outer frame (102) which are installed on the outer peripheral side of the first central axis (100) and are evenly separated in radial direction, wherein the first central axis (100) is provided with at least two material conveying channels, and the first central axis (100) comprises, from the outside to the inside, a first outer tube (103), a first inner tube (104), and a first central tube (105); the outer frame (102) is fixedly connected to the first outer tube (103), the inner frame (101) is fixedly connected to the first inner tube (104), and the outer frame (102) is located outside the inner frame (101). , and are all radially distributed along the first central axis (100); a first stirring wing plate (200) is provided on the inner frame (101), a second stirring wing plate (300) is provided on the outer frame (102), a third transverse stirring wing plate (400) is installed on the outer peripheral side of the first outer tube (103) inside the inner frame (101), the first stirring wing plate (200) and the second stirring wing plate (300) are arranged at an interval, and the first stirring wing plate (200) and the third transverse stirring wing plate (400) are arranged at an interval; a pilot drill bit is installed at the lower end of the first central axis (100) of the built-in double-frame bidirectional stirring drill, and a connecting assembly for fixedly connecting the double-frame bidirectional stirring drill with the inner and outer active drill rods (902) is installed at the upper end of the first central axis (100); The upper end of the outer frame (102) is fixedly connected to the outer side wall of the first outer tube (103) via a first fixed ring sleeve (106), and the lower end of the outer frame (102) is rotatably connected to the outer side wall of the first inner tube (104) via a first annular limit support bearing sleeve (107), so that the outer frame (102) can rotate with the first outer tube (103); the upper end of the inner frame (101) is rotatably connected to the outer side wall of the first outer tube (103) via a second annular limit support bearing sleeve (108), and the lower end of the inner frame (101) is fixedly connected to the outer side wall of the first inner tube (104) via a second fixed ring sleeve (109), so that the inner frame (101) can rotate with the first inner tube (104); The first central tube (105) is provided with a first material conveying channel (105-1); the annular gap between the first central tube (105) and the first inner tube (104) forms a second material conveying channel (105-2); and the annular gap between the first inner tube (104) and the first outer tube (103) forms a third material conveying channel (105-3); a first injection port (105-4) is provided on a transverse grouting pipe (110) connected to the bottom of the first central tube (105) and is located at the rear of the leading drill bit in the direction of rotation; the first The injection port (105-4) is in communication with the first material conveying channel (105-1); the lower end of the first inner tube (104) is provided with a second injection port (105-5), and the second injection port (105-5) is in communication with the second material conveying channel (105-2); the second stirring wing plate (300) is in the shape of an internal hollow tube and is provided with a third injection port (105-6) and is located on the inner side or the outer side of the second stirring wing plate (300), and the third injection port (105-6) is in communication with the third material conveying channel (105-3); The first stirring wing (200) comprises a first transverse stirring wing (201) and a first vertical stirring wing (202), and the second stirring wing (300) comprises a second transverse stirring wing (301) and a second vertical stirring wing (302); the first transverse stirring wing (201) located outside the inner frame (101) and the second transverse stirring wing (301) located inside the outer frame (102) are arranged at intervals in the height direction, and the first vertical stirring wing (202) located outside the upper and lower sides of the inner frame (101) and the second vertical stirring wing (302) located inside the upper and lower sides of the outer frame (102) are arranged at intervals in the width direction; the first transverse stirring wing (201) located inside the inner frame (101) and the third transverse stirring wing (400) are arranged at intervals in the axial direction of the first central axis (100).
2. The bidirectional mixing drill for large diameter mixing pile construction according to claim 1, characterized in that: A drainage anti-blocking port assembly (700) is provided in the third material conveying channel (105-3), and the drainage anti-blocking port assembly (700) is located at the inlet of the transverse channel (303) provided on the second stirring wing plate (300). The drainage anti-blocking port assembly (700) comprises a sealing bearing (701) and a lifting base (702), and the lifting base (702) is fixed in the third material conveying channel (105-3). The sealing bearing (701) is mounted on the lifting base (702) and is sealed with the inner wall of the third material conveying channel (105-3), and the upper end surface of the sealing bearing (701) is flush with the lower end wall at the inlet of the transverse channel (303).
3. The bidirectional mixing drill for large diameter mixing pile construction according to claim 1, characterized in that: A plurality of first injection ports (105-4) on the transverse grouting pipe (110) connected to the bottom of the first central pipe (105) are sequentially arranged along the axial direction of the transverse grouting pipe (110), and the plurality of first injection ports (105-4) are distributed from sparse to dense along the axial direction; a first pressure check valve pipe (802) is connected to the inside of the transverse grouting pipe (110) connected to the bottom of the first central pipe (105) via a first return spring (801), one side of the first pressure check valve pipe (802) is fixedly connected to one side of the transverse grouting pipe (110) via the first return spring (801), and a first orifice (802-1) having the same distribution pattern as the first injection ports (105-4) is provided on the first pressure check valve pipe (802).
4. A bidirectional mixing drill for large diameter mixing pile construction, characterized in that: The invention comprises a double-frame bidirectional stirring drill, wherein the double-frame bidirectional stirring drill is composed of an external double-frame bidirectional stirring drill, wherein the external double-frame bidirectional stirring drill comprises a second central axis (1) and an outwardly convex U-shaped upper frame (2) and a lower frame (3) which are installed on the outer peripheral side of the second central axis (1) and are evenly separated in radial direction, wherein the second central axis (1) is provided with at least two material conveying channels, and the second central axis (1) comprises, from the outside to the inside, a second outer tube (11), a second inner tube (12), and a second central tube (13); the upper frame (2) is fixedly connected to the second outer tube (11), the lower frame (3) is fixedly connected to the second inner tube (12), a shaft sleeve assembly is installed on the second inner tube (12), and the shaft sleeve assembly is respectively connected to the upper frame (2) and the second inner tube (12). The upper frame (2) is located above the lower frame (3) and is axially distributed along the second central axis (1); the upper frame (2) is provided with a third stirring wing plate (21), the lower frame (3) is provided with a fourth stirring wing plate (31), the outer peripheral side of the second inner tube (12) and the sleeve assembly is provided with a fifth transverse stirring wing plate (14), and the third stirring wing plate (21) and the fourth stirring wing plate (31) are respectively arranged at intervals from the fifth transverse stirring wing plate (14); the lower end of the second central axis (1) of the external double-frame bidirectional stirring drill is provided with a pilot drill bit, and the upper end of the second central axis (1) is provided with a connecting assembly for fixedly connecting the double-frame bidirectional stirring drill with the inner and outer active drill rods (902); The shaft sleeve assembly comprises an annular limit support bearing long shaft sleeve (6) and an annular limit support bearing short shaft sleeve (7), and the annular limit support bearing short shaft sleeve (7) is rotatably connected to the outer wall of the annular limit support bearing long shaft sleeve (6); the upper end of the upper frame (2) is fixedly connected to the outer wall of the second outer tube (11) through a third fixed ring sleeve (8), and the lower end of the upper frame (2) is rotatably connected to the outer wall of the second inner tube (12) through the annular limit support bearing long shaft sleeve (6), so that the upper frame can rotate with the second outer tube (11) and drive the annular limit support bearing long shaft sleeve (6) to rotate together; the upper end of the lower frame (3) is rotatably connected to the outer wall of the second inner tube (12) through the annular limit support bearing short shaft sleeve (7), and the lower end of the lower frame (3) is fixedly connected to the outer wall of the second inner tube (12) through a fourth fixed ring sleeve (9), so that the lower frame can rotate with the second inner tube (12); The second central tube (13) is provided with a fourth material conveying channel (13-1), and the annular gap between the second central tube (13) and the second inner tube (12) forms a fifth material conveying channel (15); a fourth injection port (13-2) is provided on the tube wall at the lower end of the second central tube (13), and the fourth injection port (13-2) is communicated with the fourth material conveying channel (13-1); the fifth transverse stirring wing plate (14) is in the shape of a built-in hollow tube and is provided with a fifth injection port (14-1), which is communicated with the fifth material conveying channel (15), and the fifth transverse stirring wing plate (14) with the fifth injection port (14-1) is located in the upper frame (2), and the fifth injection port (14-1) is located at the rear of the fifth transverse stirring wing plate (14) in the rotation direction; The third stirring wing (21) comprises a third transverse stirring wing (21-1) and a third vertical stirring wing (21-2), and the fourth stirring wing (31) comprises a fourth transverse stirring wing (31-1) and a fourth vertical stirring wing (31-2); the third transverse stirring wing (21-1) and a fifth transverse stirring wing (14) located on the second inner tube (12) are arranged at intervals along the axial direction of the second central axis (1), and the fourth transverse stirring wing (31-1) and the fifth transverse stirring wing (14) located on the shaft sleeve assembly are arranged at intervals along the axial direction of the second central axis (1); the third vertical stirring wing (21-2) is mounted vertically downward at the bottom of the lower end surface of the upper frame (2), and the fourth vertical stirring wing (31-2) is mounted vertically upward at the top of the upper end surface of the lower frame (3), and the third vertical stirring wing (21-2) and the fourth vertical stirring wing (31-2) on the upper and lower end surfaces are arranged at intervals along the width direction.
5. The bidirectional mixing drill for large diameter mixing pile construction according to claim 4, characterized in that: A plurality of the fifth injection ports (14-1) are sequentially arranged along the length direction of the fifth transverse stirring wing plate (14), and the plurality of the fifth injection ports (14-1) are distributed from sparse to dense along the length direction; a second pressure check valve tube (17) is connected to the inside of the fifth transverse stirring wing plate (14) via a second return spring (16), one side of the second pressure check valve tube (17) is fixedly connected to one side of the fifth transverse stirring wing plate (14) via a second return spring (16), and a second orifice (17-1) having the same distribution pattern as the fifth injection ports (14-1) is opened on the second pressure check valve tube (17).