Control method of pile driver and pile driver
By decomposing the stroke displacement section and micro-movement adjustment using the hydraulic control system, the problem of high precision control of pile heads of pile drivers is solved, and the pile driving efficiency is improved.
Patent Information
- Application Number
- CN202210360512.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-04-07
- Publication Date
- 2024-11-26
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In pile driving operations, precise control of pile heads is difficult, and the operator needs to cooperate with the on-site instructor. The delay in hand movements leads to overshooting of the movements and low efficiency.
A pile driver control method is adopted. By obtaining the current position and target position of the pile head, the actual stroke displacement is decomposed into multiple stroke displacement sections, the hydraulic control system and solenoid valve group are used for micro-movement adjustment, and the pile head movement is automatically controlled to reduce the Manual adjustment.
The movement efficiency of the pile head is improved, the repeated adjustment of manual control is reduced, precise control of piles is achieved, and the efficiency of pile driving is improved.
Smart Images

Figure CN114645541B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to a control method for a pile driver and the pile driver. Background Art
[0002] A pile driver is one of the many variants of excavators and is widely used in scenarios such as cofferdam piling. In the actual piling operation, the position and direction control of the pile head are very demanding. Therefore, in the prior art, piling operations are generally completed by an operator and a field instructor. The field instructor conveys the deviation of the distance between the pile head and the piling point to the operator to guide the operator to operate. However, when approaching the piling point, the operator needs to perform very fine control actions to achieve relatively fast piling, which is difficult for the operator to achieve. Moreover, due to the delay in the hand-feel action, it is easy to cause overshoot of the action, and repeated adjustments are required to achieve accurate piling, which is inefficient.
[0003] It should be noted that the statements in this background technology section only provide background technology related to the present application and do not necessarily constitute prior art. Summary of the invention
[0004] The present application provides a control method for a pile driver and a pile driver to improve the efficiency of piling.
[0005] In a first aspect, the present application provides a control method for a pile driver, the pile driver comprising a lower vehicle traveling device, an upper vehicle operating device rotatably arranged on the lower vehicle traveling device, and a hydraulic control system, the upper vehicle operating device comprising a boom, a bucket rod, and a pile head, the first end of the boom being rotatably connected to the lower vehicle traveling device, the first end of the bucket rod being rotatably connected to the second end of the boom, the pile head being arranged at the second end of the bucket rod, the hydraulic control system comprising a hydraulic motor for controlling the rotation of the upper vehicle operating device, at least one hydraulic cylinder for controlling the movement of the boom and the bucket rod, and a solenoid valve group for controlling the movement of the hydraulic motor and the at least one hydraulic cylinder, the control method comprising the following steps:
[0006] Get the current position of the pile head;
[0007] Get the target position of the piling point;
[0008] Determine the actual travel displacement required for the pile head to move from the current position to the target position based on the current position of the pile head and the target position of the piling point; and
[0009] When the actual stroke displacement is less than the set value, the actual stroke displacement is divided into a plurality of stroke displacement segments, and the pile head is fine-tuned for each stroke displacement segment respectively. In each stroke displacement segment, the target current value and target working time of the solenoid valve group are obtained according to the stroke displacement segment, and the action of the solenoid valve group is automatically controlled according to the target current value and the target working time.
[0010] In some embodiments, obtaining the target current value and target working time of the solenoid valve group according to the stroke displacement segment includes: determining the action level according to the stroke displacement segment, and obtaining the target current value and target working time of the solenoid valve group according to the action level.
[0011] In some embodiments, the action level is displayed on the human-computer interaction interface.
[0012] In some embodiments, determining the action level according to the stroke displacement segment includes: determining a first reference table between multiple action levels and stroke displacements, each action level in the multiple action levels represents a different stroke displacement range, and determining the action level corresponding to the stroke displacement segment according to the actual stroke displacement and the first reference table.
[0013] In some embodiments, controlling the action of the solenoid valve group according to the target current value and the target working time includes: obtaining the operator's control command time, when the control command time is greater than the target working time, controlling the action of the solenoid valve group according to the target working time, and when the control command time is less than the target working time, controlling the action of the solenoid valve group according to the control command time.
[0014] In some embodiments, obtaining the operator's control instruction time includes obtaining the operation instruction time through a control device, and the control device includes at least one of a handle, a foot pedal, a button switch, or a rocker switch.
[0015] In some embodiments, obtaining the target current value and target working time of the solenoid valve group according to the stroke displacement segment includes: obtaining a second reference table between multiple stroke displacements and the target current value and target working time of the solenoid valve group through experiments, and obtaining the target current value and target working time of the solenoid valve group corresponding to the stroke displacement segment according to the stroke displacement segment and the second reference table.
[0016] In some embodiments, acquiring the current position of the pile head includes acquiring a current posture of the pile driver and acquiring the current position of the pile head according to the posture of the pile driver.
[0017] In some embodiments, the control method of the pile driver further includes: when the actual stroke displacement is greater than the set value, obtaining the operator's control instruction, and controlling the action of the solenoid valve group according to the control instruction.
[0018] A second aspect of the present application provides a pile driver, comprising:
[0019] Get-off walking device;
[0020] The upper vehicle operation device is rotatably arranged on the lower vehicle traveling device, and the upper vehicle operation device includes a movable arm, a bucket rod and a pile head, the first end of the movable arm is rotatably connected to the lower vehicle traveling device, the first end of the bucket rod is rotatably connected to the second end of the movable arm, and the pile head is arranged at the second end of the bucket rod;
[0021] A hydraulic control system, comprising a hydraulic motor for controlling the rotation of the vehicle working device, at least one hydraulic cylinder for controlling the movement of the boom and the arm, and a solenoid valve group for controlling the movement of the hydraulic motor and the at least one hydraulic cylinder; and
[0022] The controller is configured to obtain the current position of the pile head; obtain the target position of the piling point; determine the actual stroke displacement required for the pile head to move from the current position to the target position according to the current position of the pile head and the target position of the piling point; and when the actual stroke displacement is less than the set value, divide the actual stroke displacement into a plurality of stroke displacement segments, and perform micro-adjustment on the pile head for each stroke displacement segment respectively, in each stroke displacement segment, obtain the target current value and target working time of the solenoid valve group according to the size of its stroke displacement segment, and automatically control the action of the solenoid valve group according to the target current value and the target working time.
[0023] Based on the various aspects provided in the present application, the control method of the pile driver obtains the actual stroke displacement, and when the actual stroke displacement is less than the set value, that is, when the pile head is close to the piling point, the movement of the pile head enters the micro-motion mode, and the actual stroke displacement is divided into multiple stroke displacement segments in the micro-motion mode, and the pile head is micro-adjusted for each stroke displacement segment respectively. In each stroke displacement segment, the target current value and target working time of the solenoid valve group corresponding to the stroke displacement segment are obtained according to the size of the stroke displacement segment, and the target current value is output to the solenoid valve group and the time for outputting the target current value is the target working time, so as to realize automatic control of the pile head movement, so that the pile head can be quickly moved to the piling point without repeated adjustments like manual control in the prior art, thereby improving the efficiency of piling.
[0024] Other features and advantages of the present application will become apparent from the following detailed description of exemplary embodiments of the present application with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:
[0026] Figure 1 This is a schematic diagram of the steps of a method for controlling a pile driver according to an embodiment of the present application.
[0027] Figure 2 This is a block diagram of a control system for a pile driver according to an embodiment of the present application.
[0028] Figure 3 A reference diagram of the human-computer interaction interface of an embodiment of the present application. DETAILED DESCRIPTION
[0029] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments. The following description of at least one exemplary embodiment is actually only illustrative and is by no means intended to limit the present application and its application or use. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0030] Unless otherwise specifically stated, the relative arrangement, numerical expressions and numerical values of the parts and steps set forth in these embodiments do not limit the scope of the application. Meanwhile, it should be understood that, for ease of description, the sizes of the various parts shown in the accompanying drawings are not drawn according to actual proportional relationships. The technology, methods and equipment known to those of ordinary skill in the relevant art may not be discussed in detail, but in appropriate cases, the technology, methods and equipment should be considered as a part of the specification. In all examples shown and discussed here, any specific value should be interpreted as being merely exemplary, rather than as a limitation. Therefore, other examples of exemplary embodiments may have different values. It should be noted that similar reference numerals and letters represent similar items in the following drawings, and therefore, once a certain item is defined in an accompanying drawing, it does not need to be further discussed in subsequent drawings.
[0031] For ease of description, spatially relative terms such as "above", "above", "on the upper surface of", "above", etc. may be used here to describe the spatial positional relationship between a device or feature and other devices or features as shown in the figure. It should be understood that spatially relative terms are intended to include different orientations of the device in use or operation in addition to the orientation described in the figure. For example, if the device in the accompanying drawings is inverted, the device described as "above other devices or structures" or "above other devices or structures" will be positioned as "below other devices or structures" or "below other devices or structures". Thus, the exemplary term "above" may include both "above" and "below". The device may also be positioned in other different ways, and the spatially relative descriptions used here are interpreted accordingly.
[0032] A pile driver is a type of pile-driving machinery, a variation of an excavator, and is mainly used for piling. The types of pile heads include pipe piles, steel sheet piles, steel pipe piles, precast concrete piles, wooden piles, and the like.
[0033] The pile driver includes a lower vehicle traveling device, an upper vehicle working device rotatably arranged on the lower vehicle traveling device, and a hydraulic control system. The upper vehicle working device includes a boom, a bucket rod, and a pile head. The first end of the boom is rotatably connected to the lower vehicle traveling device, the first end of the bucket rod is rotatably connected to the second end of the boom, and the pile head is arranged at the second end of the bucket rod. The hydraulic control system includes a hydraulic motor for controlling the rotation of the upper vehicle working device, at least one hydraulic cylinder for controlling the movement of the boom and the bucket rod, and a solenoid valve group 40 for controlling the movement of the hydraulic motor and the at least one hydraulic cylinder.
[0034] like Figure 1 As shown, the control method of the pile driver provided in the embodiment of the present application includes the following steps:
[0035] S501, obtaining the current position of the pile head;
[0036] S502, obtaining the target position of the piling point;
[0037] S503, determining the actual travel displacement required for the pile head to move from the current position to the target position according to the current position of the pile head and the target position of the piling point; and
[0038] S504, when the actual stroke displacement is less than the set value, the actual stroke displacement is divided into multiple stroke displacement segments, and the pile head is fine-tuned for each stroke displacement segment respectively. In each stroke displacement segment, the target current value and target working time of the solenoid valve group are obtained according to the size of the stroke displacement segment, and the action of the solenoid valve group is automatically controlled according to the target current value and target working time.
[0039] The control method of the pile driver in the embodiment of the present application obtains the actual stroke displacement, and when the actual stroke displacement is less than the set value, that is, when the pile head is close to the piling point, the movement of the pile head enters the micro-motion mode, and in the micro-motion mode, the actual stroke displacement is divided into a plurality of stroke displacement segments, and the pile head is micro-adjusted for each stroke displacement segment respectively, in each stroke displacement segment, the target current value and target working time of the solenoid valve group corresponding to the actual stroke displacement are obtained according to the size of the stroke displacement segment, and the target current value is output to the solenoid valve group and the time for outputting the target current value is the target working time, so as to realize automatic control of the pile head movement, so that the pile head can be quickly moved to the piling point without repeated adjustments like the manual control in the prior art, thereby improving the efficiency of piling.
[0040] It should be noted here that the solenoid valve group mentioned above is used to control at least one hydraulic cylinder and to control the action of the hydraulic motor. In some embodiments, the solenoid valve group includes multiple solenoid valves. For example, the hydraulic control system includes a first hydraulic cylinder for controlling the action of the boom, a second hydraulic cylinder for controlling the action of the stick, and a hydraulic motor for controlling the action of the hydraulic motor. The solenoid valve group includes multiple solenoid valves for controlling the actions of the first hydraulic cylinder, the second hydraulic cylinder, and the hydraulic motor, respectively. Then, the target current value and target working time of the solenoid valve group are obtained according to the actual stroke displacement. In some embodiments, the target current value may be a target current value group composed of multiple target current values. Similarly, the target working time may also be a target working time group composed of multiple target working times. The target current value refers to the control current of the solenoid valve, and the target working time refers to the output time of the control current.
[0041] For example, after obtaining the actual stroke displacement of the pile head from the current position to the target position of the piling point, according to the current position of the pile head, it is necessary to make the upper working device of the pile driver first realize a small angle rotation relative to the lower traveling device, and then control the movement of the boom and the arm. At this time, the control of multiple solenoid valves is involved. The control method of the present application will determine the rotation angle of the upper working device, the rotation angle of the boom and the rotation angle of the arm according to the actual stroke displacement of the pile head, and then determine the target current value and target working time of the corresponding solenoid valve based on the above angles.
[0042] Specifically, the above-mentioned division of the actual stroke displacement into multiple stroke displacement segments refers to decomposing the distance from the current position of the pile head to the target position so as to gradually reach the target position, thereby avoiding the inefficiency caused by repeated over-motion adjustments in the prior art. Then for each stroke displacement segment, it is necessary to obtain the target current value and target working time of the solenoid valve group corresponding to the size of each stroke displacement segment according to the size of the stroke displacement segment, and then the control current can be output to the solenoid valve group according to the obtained target current value and target working time.
[0043] In some embodiments, after the first stroke displacement segment is completed, the control method of the pile driver further includes obtaining the current position of the pile head again to obtain the real-time position of the pile head in real time to further guide the motion control of the pile head. For example, after the first stroke displacement segment is completed, it is found that the current position of the pile head does not match the calculated end point of the first stroke displacement segment, then at this time, it is necessary to recalculate according to the current position of the pile head to make the control of the pile head more accurate.
[0044] like Figure 2As shown, the embodiment of the present application also provides a pile driver. The control system of the pile driver includes a dismounting traveling device, an onboard operating device, a hydraulic control system and a controller. The onboard operating device is rotatably arranged on the dismounting traveling device. The onboard operating device includes a boom, a bucket rod and a pile head, the first end of the boom is rotatably connected to the dismounting traveling device, the first end of the bucket rod is rotatably connected to the second end of the boom, and the pile head is arranged at the second end of the bucket rod. The hydraulic control system includes a hydraulic motor for controlling the rotation of the onboard operating device, at least one hydraulic cylinder for controlling the movement of the boom and the bucket rod, and a solenoid valve group 40 for controlling the movement of the hydraulic motor and at least one hydraulic cylinder. The controller 10 is configured to obtain the current position of the pile head; obtain the target position of the piling point; determine the actual stroke displacement required for the pile head to move from the current position to the target position according to the current position of the pile head and the target position of the piling point; and when the actual stroke displacement is less than the set value, divide the actual stroke displacement into a plurality of stroke displacement segments, and perform micro-adjustments on the pile head for each stroke displacement segment respectively, in each stroke displacement segment, obtain the target current value and target working time of the solenoid valve group according to the size of the stroke displacement segment, and automatically control the action of the solenoid valve group according to the target current value and the target working time.
[0045] The control system of the pile driver in the embodiment of the present application obtains the actual stroke displacement, and when the actual stroke displacement is less than the set value, that is, when the pile head is close to the piling point, even if the movement of the pile head enters the micro-motion mode, the actual stroke displacement is divided into multiple stroke displacement segments, and the pile head is micro-adjusted for each stroke displacement segment respectively. In each stroke displacement segment, the target current value and target working time of the solenoid valve group corresponding to the actual stroke displacement are obtained according to the size of the stroke displacement segment, and the target current value is output to the solenoid valve group and the time for outputting the target current value is the target working time, so as to realize automatic control of the pile head movement, so that the pile head can be quickly moved to the piling point without repeated adjustments like manual control in the prior art, thereby improving the efficiency of piling.
[0046] In some embodiments, the control method of the pile driver further includes: when the actual stroke displacement is greater than the set value, obtaining the operator's control instruction, and controlling the solenoid valve group to move according to the control instruction. That is to say, when the distance between the pile head and the pile driving point is very far, the operator's control instruction is obtained at this time, and the solenoid valve group is controlled to move according to the control instruction. In this way, manual control is directly performed based on the operator's experience to achieve a large-scale movement of the pile head. In this process, since the moving stroke is large and repeated movement is not required, the purpose can be achieved faster through manual control, thereby improving efficiency.
[0047] As can be seen from the above, the control method of the pile driver of the embodiment of the present application divides the movement of the pile head into two major stages. In the first stage, the pile head is moved significantly to reach a position close to the piling point through direct manual control by the operator; in the second stage, it is determined whether to enter the micro-motion mode according to the actual stroke displacement, and then the target current value and target working time of the solenoid valve group are obtained according to the size of the stroke displacement segment, and the solenoid valve group is automatically controlled according to the target current value and target working time to achieve automatic control of the pile head. In this stage, micro-motion control is performed on the pile head. The control method of the pile driver of the embodiment of the present application controls the movement of the pile head by adopting different control methods at different stages, which is conducive to improving the overall efficiency of piling.
[0048] Continue below according to Figure 1 and Figure 2 Each step of the control method of the embodiment of the present application is described in detail.
[0049] like Figure 1 As shown, step S501 obtains the current position of the pile head. In some embodiments, obtaining the current position of the pile head includes obtaining the current posture of the pile driver and obtaining the current position of the pile head according to the posture of the pile driver.
[0050] Specifically, obtaining the current posture of the pile driver includes obtaining the current rotation angle of the pile driver, the current operating inclination angle of the pile driver, the current angle of the boom, and the current angle of the stick, and obtaining the current position of the pile head according to the size parameters of the pile driver itself. For example, the current operating inclination angle of the pile driver is obtained through an inclination sensor; the current angle of the boom and the current angle of the stick are obtained through an angle sensor; and the current rotation angle of the on-board working device is obtained through a rotary encoder. Of course, the control method of the embodiment of the present application does not limit the method for obtaining the current posture of the pile driver, as long as the current posture of the pile driver can be obtained, and the current position of the pile head can be obtained according to the posture of the pile driver.
[0051] Step S502, obtaining the target position of the piling point includes obtaining the target position of the piling point by target vision or laser ranging, etc. Of course, in other embodiments, the target position of the piling point can also be obtained by an on-site instructor.
[0052] It should also be noted that by obtaining the current position of the pile head and the target position of the pile driving point, and obtaining the actual stroke displacement through the above two positions, it is necessary to convert the current position and the target position into the same coordinate system for calculation.
[0053] Step S504, the actual stroke displacement is divided into a plurality of stroke displacement segments, and the pile head is fine-tuned for each stroke displacement segment, and in each stroke displacement segment, a target current value and a target working time of the solenoid valve group are obtained according to the size of the stroke displacement segment. In some embodiments, obtaining the target current value and the target working time of the solenoid valve group according to the stroke displacement segment includes: determining an action level according to the size of the stroke displacement segment, and obtaining the target current value and the target working time of the solenoid valve group according to the action level.
[0054] Specifically, determining the action level according to the size of the stroke displacement segment includes: determining a first reference table between multiple action levels and stroke displacements, each of the multiple action levels representing a different stroke displacement range, and determining the action level corresponding to the size of the stroke displacement segment according to the size of the stroke displacement segment and the first reference table.
[0055] In a specific embodiment, the control system of the pile driver includes six action levels, each action level corresponds to a different stroke displacement, for example, the first action level represents the smallest stroke displacement, the second action level represents a stroke displacement that is larger than the stroke displacement represented by the first action level, and so on, it can be seen that the sixth action level represents the largest stroke displacement. Then on this basis, after obtaining the actual stroke displacement of the pile head, the controller can obtain the corresponding action level according to the stroke displacement segment, and then obtain the target current value and target working time of the corresponding solenoid valve group according to the action level.
[0056] The first reference table between a plurality of action levels and stroke displacements may be determined, for example, by obtaining the table through multiple tests or simulations.
[0057] Of course, the stroke displacement in the first reference table between multiple action levels and stroke displacement may be a stroke displacement range, and then it is determined that the acquired stroke displacement segment is within the stroke displacement range corresponding to which action level.
[0058] Of course, in some embodiments, obtaining the target current value and target working time of the solenoid valve group according to the actual stroke displacement includes: obtaining a second reference table between multiple stroke displacements and the target current value and target working time of the solenoid valve group through experiments, and obtaining the target current value and target working time of the solenoid valve group corresponding to the actual stroke displacement according to the actual stroke displacement and the second reference table. In this way, the target current value and target working time of the solenoid valve group can be obtained more directly according to the actual stroke displacement.
[0059] In some embodiments, the action level is displayed on the human-computer interaction interface 20. Figure 2 and 3As shown, the human-machine interface 20 is electrically connected to the controller 10, and the human-machine interface can be used to display the action level. Of course, in other embodiments, the action level can also be directly input to the controller 10 through the human-machine interface 20. For example, when obtaining the target position of the pile driving point through the on-site instructor, the operator can judge which action level the moving distance belongs to based on experience, and directly input it into the controller 10 through the human-machine interface. Then the controller 10 directly obtains the target current and target control time of the solenoid valve group according to the action level input through the human-machine interface.
[0060] In order to enable the control method of the embodiment of the present application to take into account the advantages of both automatic control and manual control, for example, when the operator is a very experienced operator, the accuracy of his manual control may be higher than the automatic control of the controller. In some embodiments, controlling the action of the solenoid valve group according to the target current value and the target working time includes: obtaining the operator's control command time, when the control command time is greater than the target working time, controlling the action of the solenoid valve group according to the target working time, and when the control command time is less than the target working time, controlling the action of the solenoid valve group according to the control command time.
[0061] That is to say, after the target working time is obtained through the automatic calculation of the controller 10, the control method of the embodiment of the present application also needs to obtain the operator's control command time. If the control command time is greater than the target working time, it means that the operator's operation amplitude is too large, and the control current is output to the solenoid valve group 40 according to the target working time. If the control command time is less than the target working time, it means that the operator's operation amplitude is small according to his experience, and the output control current of the solenoid valve group can be controlled according to the operator's control command time.
[0062] like Figure 2 As shown, the controller 10 is electrically connected to the control device 30 to receive the control instruction issued by the control device 30. In some embodiments, obtaining the control instruction time of the operator includes obtaining the operation instruction time through the control device 30. The control device 30 includes at least one of a handle, a foot pedal, a key switch or a rocker switch.
[0063] The operation instruction time here refers to the duration of pressing the operating device 30 .
[0064] Next, according to Figures 1 to 3 A control method for a pile driver and a structure of the pile driver according to a specific embodiment of the present application are further described.
[0065] like Figure 2As shown, the controller 10 is the core control unit of the system, which communicates with the human-machine interface 20 via the CAN bus to read the set parameters. The controller 10 is also used to execute control strategies and operation algorithms to achieve precise control.
[0066] The human-machine interface 20 is used to display the current working state. It can also realize user parameter selection and setting, for example, the human-machine interface 20 is used to receive the operator's selection of turning on or off the micro-motion mode.
[0067] In some embodiments, the on-site instructor can pass the moving travel distance to the operator, and the operator determines whether to turn on the inching mode according to the travel distance, and turns it on and inputs the corresponding action level through the human-computer interaction interface 20. Further, the operator sends a mode instruction through the control device 30 to determine whether to enter the inching mode. If the inching mode is entered, the controller queries the corresponding target current and target working time parameter group according to the action level input by the operator, for example:
[0068] Action level: [1; 2; 3; 4; 5; 6];
[0069] Output current: [Cur1; Cur2; Cur3; Cur4; Cur5; Cur6];
[0070] Time parameters: [Time1; Time2; Time3; Time4; Time5; Time6; Time7; Time8; Time9; Time10];
[0071] At the same time, the controller 10 also obtains the command time of the control device, and compares the control command time with the time parameter obtained by the above query. If the control command time is greater than the target working time, it means that the action amplitude operated by the operator is too large, and the control current is output to the solenoid valve group 40 according to the target working time. If the control command time is less than the target working time, it means that the action amplitude operated by the operator based on his experience is small, and the output control current of the solenoid valve group can be controlled according to the operator's control command time. Then the solenoid valve group 40 acts under the control of the corresponding control current.
[0072] The control method of the embodiment of the present application provides the operator with an optional multi-level fine motion control method, which helps the operator to quickly and accurately perform pile operations, while solving the motion overshoot caused by the time delay between local operation and remote control operation, thereby improving the pile accuracy and efficiency.
[0073] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present application rather than to limit it. Although the present application has been described in detail with reference to the preferred embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present application can still be modified or some technical features can be replaced by equivalents without departing from the spirit of the technical solution of the present application, which should be included in the scope of the technical solution for protection in the present application.
Claims
1. A control method for a pile driver, the pile driver comprising an undercarriage traveling device, an upper car working device rotatably arranged on the undercarriage traveling device and a hydraulic control system, the upper car working device comprising a boom, a bucket rod and a pile head, the first end of the boom is rotatably connected to the undercarriage traveling device, the first end of the bucket rod is rotatably connected to the second end of the boom, the pile head is arranged at the second end of the bucket rod, the hydraulic control system comprises a hydraulic motor for controlling the rotation of the upper car working device, at least one hydraulic cylinder for controlling the movement of the boom and the bucket rod, and an electromagnetic valve group for controlling the movement of the hydraulic motor and the at least one hydraulic cylinder, characterized in that: The control method comprises the following steps: Obtaining the current position of the pile head; Get the target position of the piling point; Determine the actual travel displacement required for the pile head to move from the current position to the target position during the piling process according to the current position of the pile head and the target position of the piling point; When the actual stroke displacement is greater than the set value, the manual mode is entered: the operator's control instruction is obtained, and the solenoid valve group is controlled to act according to the control instruction; and When the actual stroke displacement is less than the set value, the micro-motion mode is entered: the actual stroke displacement is divided into a plurality of stroke displacement segments, and the pile head is micro-adjusted for each stroke displacement segment respectively, in each stroke displacement segment, the target current value and target working time of the solenoid valve group are obtained according to the size of the stroke displacement segment, and the action of the solenoid valve group is automatically controlled according to the target current value and the target working time; Wherein, obtaining the target current value and target working time of the solenoid valve group according to the size of the stroke displacement segment includes: determining the action level according to the size of the stroke displacement segment, and obtaining the target current value and target working time of the solenoid valve group according to the action level; Controlling the action of the solenoid valve group according to the target current value and the target working time includes: obtaining the operator's control command time, when the control command time is greater than the target working time, controlling the action of the solenoid valve group according to the target working time, and when the control command time is less than the target working time, controlling the action of the solenoid valve group according to the control command time.
2. The control method of a pile driver according to claim 1, characterized in that: The action level is displayed on a human-computer interaction interface.
3. The control method of a pile driver according to claim 1, characterized in that: Determining the action level according to the size of the stroke displacement segment includes: determining a first reference table between multiple action levels and stroke displacement, each action level in the multiple action levels represents a different stroke displacement range, and determining the action level corresponding to the size of the stroke displacement segment according to the size of the stroke displacement segment and the first reference table.
4. The control method of a pile driver according to claim 1, characterized in that: Acquiring the operator's control instruction time includes acquiring the operation instruction time through a control device, and the control device includes at least one of a handle, a foot pedal, a key switch or a rocker switch.
5. The control method of a pile driver according to claim 1, characterized in that: Obtaining the target current value and target working time of the solenoid valve group according to the size of the stroke displacement segment includes: obtaining a second reference table between multiple stroke displacements and the target current value and target working time of the solenoid valve group through experiments, and obtaining the target current value and target working time of the solenoid valve group corresponding to the stroke displacement segment according to the size of the stroke displacement segment and the second reference table.
6. The control method of a pile driver according to claim 1, characterized in that: Acquiring the current position of the pile head includes acquiring the current posture of the pile driver and acquiring the current position of the pile head according to the posture of the pile driver.
7. A pile driver, characterized in that: include: Get-off walking device; An upper vehicle operation device is rotatably arranged on the lower vehicle traveling device, and the upper vehicle operation device comprises a movable arm, a bucket arm and a pile head, wherein the first end of the movable arm is rotatably connected to the lower vehicle traveling device, the first end of the bucket arm is rotatably connected to the second end of the movable arm, and the pile head is arranged at the second end of the bucket arm; A hydraulic control system, comprising a hydraulic motor for controlling the rotation of the vehicle working device, at least one hydraulic cylinder for controlling the movement of the boom and the arm, and a solenoid valve group for controlling the movement of the hydraulic motor and the at least one hydraulic cylinder; as well as A controller configured to execute the pile driver control method according to any one of claims 1 to 6.