A precise support method for deep circular tunnels based on surrounding rock zoning
Through the precise support method of surrounding rock partition, targeted reinforcement and support are carried out according to different damage areas of the tunnel, which solves the problem of insufficient support or excessive strength in the deep tunnel, improves the stability and safety of the tunnel, and reduces the support cost.
Patent Information
- Application Number
- CN202210463915.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-04-29
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2042-04-29
AI Technical Summary
In the existing deep circular tunnel support methods, uniformly applying the same specifications of support force leads to insufficient support or excessive support strength, lack of operable precise support methods, resulting in large deformation, loosening and collapse of surrounding rocks and support. Failure problems occur frequently.
Based on the precision support method of deep circular tunnels based on the surrounding rock partition, the mechanical parameters of surrounding rock are obtained through on-site measurement and laboratory tests, and the minimum and maximum damage area ranges are determined. Grouting reinforcement, prestressed anchors and prestressed anchors are used. Techniques such as cables are reinforced in a targeted manner according to different damage areas, and are supported by steel pipe concrete brackets and fiber concrete spray layers.
Accurate support of surrounding rocks is achieved, and instability caused by excessive local stress in the surrounding rocks and excessive support strength is avoided. The stability and safety of the tunnels are improved, the support costs are reduced, and the construction operation is enhanced. Sex and effect.
Smart Images

Figure CN114687769B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a deep tunnel support method, in particular to a deep circular tunnel support method. Background Art
[0002] For a long time, coal has been the most important primary energy and important industrial raw material in my country, providing a strong guarantee for my country's economic development and the stable and safe supply of national energy. Before other renewable green energy such as non-fossil energy forms a scale, the dominant position of coal resources in my country's primary energy will not change.
[0003] In recent years, in order to meet the needs of economic development, my country's demand for coal resources has continued to increase, and the intensity and speed of coal mining have continued to increase. The mining of coal resources has entered a period of high yield and high efficiency. The strong demand for coal has caused the shallow resources to decrease day by day, resulting in my country's coal mines gradually entering the deep mining state. The mining of coal resources in my country is mainly based on underground mining. A large number of tunnels need to be excavated for underground coal mining. Only by excavating a series of shafts and tunnels into the underground can coal resources be mined. The continuous increase in mining depth, accompanied by the increase in ground stress, makes the geological environment of the tunnel more complex, resulting in the surrounding rock of the deep tunnel showing different physical and mechanical properties from the surrounding rock of the shallow tunnel, making the surrounding rock control of the deep tunnel more difficult than that of the shallow tunnel. Statistics show that the length of newly excavated mine tunnels in my country can reach 13,000 km each year, and the amount of tunnel excavation and maintenance is huge. Due to the influence of deep geostress environment, changes in mechanical behavior of surrounding rock mass and engineering conditions, more than 90% of the surrounding rocks of deep tunnels will experience large deformation, loosening and collapse, and support failure.
[0004] With the rapid development of tunnel support technology and support equipment, especially the rapid development of active support technology based on anchor rods (cables) and passive support technology based on metal supports, the support effect of coal mine tunnels has been significantly improved. However, due to the complex and changeable geological conditions of coal mines, the support and control effect of deep tunnels still needs to be improved. For deep mining in soft rock geological conditions, in order to ensure the stability of deep tunnel structures, circular tunnels are generally used for excavation. At present, the support of circular tunnels in coal mines generally uses active or passive support measures to evenly apply the same specification of support force along the tunnel section. For example:
[0005] Chinese patent application No. 201910483898.5 discloses a method for supporting deep soft rock circular tunnels, which firstly performs interval grouting on the mining surrounding rock, then excavates arc-shaped grooves, and then, while the slurry has not yet solidified, the grouting holes also serve as anchor holes, and the anchors are driven into the surrounding rock. In addition, two movable semicircular buckle devices are designed on the lower surface of the anchor tray, and finally, the steel tube concrete support is supported so that the connection of the casing faces the tray, and then the steel tube concrete support and the anchor are buckled together with the semicircular buckle device, which is fixed with bolts. Although this support method has greatly improved the stress state of the tunnel surrounding rock, restoring it from a two-dimensional stress state to a three-dimensional stress state, it has the following defects. First, due to the obvious difference in the surrounding rock stress at different positions of the tunnel section, targeted support is not carried out according to the stress characteristics of the surrounding rock. Instead, the same specification of support force is applied to the surrounding rock, which will either easily cause local damage to the surrounding rock due to excessive stress, resulting in a larger plastic zone and thus tunnel instability, affecting the normal use of the tunnel, or the support force provided is too large, resulting in excessive support strength and increased support costs.
[0006] In order to effectively solve the problem of structural instability in deep circular tunnels and reduce support costs, Chinese Patent Application No. 20410291192.4 discloses a tiered support method based on a composite bearing body of a deep high-horizontal stress circular tunnel. It mainly divides the tunnel surrounding rock into three areas: a weak bearing area, a critical bearing area, and a strong bearing area. Then, the weak bearing area is reinforced by grouting with full-length grouting anchor rods, the critical bearing area is reinforced by grouting with end grouting anchor rods, and the strong bearing area is reinforced by short anchor cables, thereby forming a tiered support from shallow to deep based on the circular tunnel section. It is undeniable that this zoning support method can effectively limit the instability of the surrounding rock structure around the tunnel, and improve the stability of the tunnel surrounding rock structure and the safety factor of the tunnel. However, from its Figure 1It can be seen that the three areas of weak bearing area, key bearing area and strong bearing area are gradually expanded outward with the circular roadway as the concentric circle. It can also be seen from the test data in Table 1 and Table 2 that the three areas of weak bearing area, key bearing area and strong bearing area all involve the roof, side and bottom arch of the roadway, covering the entire section of the roadway. This shows that the technology actually applies the same specification of support force along the roadway section. As a circular roadway, due to the different effects of the surrounding rock, some parts of the section are under great pressure, and some parts are almost not under the surrounding rock pressure. If the entire roadway section is under the same specification of support force, it is bound to increase the support cost. In particular, it only gives a vague concept of zoning. When used in specific projects, operators cannot figure out how to define the weak bearing area, key bearing area and strong bearing area, which makes the technology lack of operability. If it is defined based on experience, it is bound to be insufficient support or excessive support strength. This is why, despite the fact that there are many support methods available, problems such as large deformation of surrounding rock in deep tunnels, loosening and collapse, and support failure frequently occur, and this is due to the lack of operational and precise support methods. Summary of the invention
[0007] In order to solve the technical problem of insufficient support or excessive support strength caused by uniformly applying the same specification of support force along the tunnel section in circular tunnel support in mines, the present invention proposes a precise support method for deep circular tunnels based on surrounding rock zoning.
[0008] To achieve the above purpose, the specific steps of the method are as follows:
[0009] A method for accurate support of deep circular tunnels based on surrounding rock zoning, characterized in that it comprises the following steps:
[0010] Step 1: During the excavation of the circular tunnel, the ground stress of the tunnel stratum is measured based on field measurements and laboratory tests to obtain the mechanical parameters of the surrounding rock and tunnel dimensions of the circular tunnel, including: the cohesion c of the surrounding rock of the circular tunnel, the internal friction angle of the surrounding rock of the circular tunnel Vertical ground stress p of circular tunnel V , Horizontal ground stress p of circular tunnel H , radius of circular tunnel R0; vertical ground stress p through circular tunnel V and the horizontal ground stress p of the circular tunnel H Get the lateral pressure coefficient λ, That is, p H =λp V ;
[0011] Step 2: Based on the mechanical parameters of the surrounding rock of the circular tunnel, the ground stress parameters and the tunnel size, determine the minimum destruction zone width value a of the surrounding rock of the circular tunnel; when the surrounding rock mechanical parameter test is inconvenient or the test conditions are not available, the drilling peek method and ultrasonic method commonly used in coal mines can be used to measure the minimum destruction zone width value a;
[0012] Step 3: According to the data obtained in the first and second steps, the stress axis ratio parameters of the circular roadway are obtained based on the axis variation theory. The maximum damage zone width value b of the circular roadway surrounding rock is calculated according to the stress axis ratio parameters. According to the minimum damage zone width value a of the circular roadway surrounding rock, the maximum damage zone width value b and the lateral pressure coefficient λ, the required reinforcement range of the circular roadway surrounding rock is determined. The specific determination method is:
[0013] When the side pressure coefficient λ=1, the minimum damage zone width value a is equal to the maximum damage zone width value b, and the surrounding rock range that needs to be reinforced in the circular tunnel is a circular ring area surrounded by concentric circles with the circular tunnel as the inner ring, the circular tunnel center as the center, and the minimum damage zone width value a or the maximum damage zone width value b as the radius as the outer ring;
[0014] When the lateral pressure coefficient λ is less than 1, the surrounding rock range that needs to be reinforced in the circular tunnel is an elliptical ring area formed by taking the circular tunnel as the inner ring and an ellipse with the minimum damage zone width value a as the short axis radius and the maximum damage zone width value b as the long axis radius as the outer ring, and the short axis of the ellipse is in the horizontal direction and the long axis is in the vertical direction;
[0015] When the lateral pressure coefficient λ>1, the surrounding rock range that needs to be reinforced in the circular tunnel is an elliptical ring area surrounded by an ellipse with the circular tunnel as the inner ring, the center of the circular tunnel as the center, the minimum damage zone width value a as the short axis radius, and the maximum damage zone width value b as the long axis radius, and the short axis of the ellipse is in the vertical direction and the long axis is in the horizontal direction;
[0016] Step 4: After the circular tunnel is excavated, the fiber concrete spray layer is quickly sprayed on the surrounding rock surface of the entire tunnel section to seal the surrounding rock to form a smooth and flat tunnel surface, prevent the tunnel surrounding rock from softening, and facilitate the installation of support equipment;
[0017] Step 5: When the surrounding rock range to be reinforced in the circular tunnel is an elliptical ring, the center line position of the ellipse minor axis is taken as the starting point, the width value a of the minimum damage zone of the surrounding rock is taken as the radius, and the surrounding rock within the fan-shaped range of 45° on both sides of the center line is taken as the minimum damage zone surrounding rock, and the grouting material is used to perform grouting reinforcement on the surrounding rock in the minimum damage zone to improve the integrity of the surrounding rock in the minimum damage zone; then proceed to step 6;
[0018] When the surrounding rock range to be reinforced in the circular tunnel is a ring, the surrounding rock range of the minimum damage zone is the same as the surrounding rock range of the maximum damage zone. Grouting materials are used to reinforce the surrounding rock to be reinforced. After the grouting materials solidify, prestressed anchor holes are drilled in the surrounding rock of the entire section of the tunnel. The anchor length L 锚杆Determine according to the minimum damage zone width a of the circular tunnel surrounding rock; hang a metal mesh on the tunnel surface and install prestressed anchor rods and W-shaped steel belts at the same time, use the metal mesh, prestressed anchor rods and W-shaped steel belts to anchor the tunnel surrounding rock, support the tunnel surrounding rock with prestressed anchor rods + metal mesh, and then spray the fiber concrete spray layer on the entire section of the tunnel surrounding rock for the second time; then directly turn to the eighth step;
[0019] Step 6: After the grouting material solidifies, drill holes for prestressed anchor bolts in the surrounding rock of the entire tunnel section. The anchor bolt length is L 锚杆 Determined according to the minimum damage zone width a of the circular tunnel surrounding rock; hang a metal mesh on the tunnel surface and install prestressed anchor rods and W-shaped steel belts at the same time, use the metal mesh, prestressed anchor rods and W-shaped steel belts to anchor the tunnel surrounding rock, and support the tunnel surrounding rock with prestressed anchor rods + metal mesh;
[0020] Step 7: When the surrounding rock range to be reinforced in the circular tunnel is an elliptical ring, take the midline position of the ellipse major axis as the starting point, take the width value b of the maximum damage zone of the surrounding rock as the radius, and take the surrounding rock within the fan-shaped range of 45° on both sides of the midline as the surrounding rock of the maximum damage zone. Install prestressed anchor cables in the surrounding rock of the maximum damage zone, and the anchor cable length L 锚索 According to the maximum damage zone width b of the circular tunnel surrounding rock, the fiber concrete spraying layer is then sprayed twice on the surrounding rock of the entire tunnel section;
[0021] Step 8: After the secondary fiber concrete spraying layer solidifies, a steel tube concrete support that matches the circular tunnel section is installed on the entire tunnel section. A flexible cushion layer is used to fill the space between the steel tube concrete support and the spraying layer to reserve space for surrounding rock deformation and complete the support.
[0022] Further: In the second step, the calculation formulas for the minimum damage zone width value a and the maximum damage zone width value b are:
[0023]
[0024] When the lateral pressure coefficient λ≥1, the maximum damage zone width value b=λa;
[0025] When the side pressure coefficient λ is less than 1, the maximum damage zone width
[0026] Furthermore, in the fourth step, the thickness of the fiber concrete spray layer is 40mm-50mm.
[0027] Furthermore, the grouting material in the fifth step is a micro-nano inorganic grouting material.
[0028] Furthermore, the length L of the prestressed anchor rod is 锚杆 Determined by the minimum destruction zone width a of the surrounding rock of the circular tunnel, L 锚杆 = l锚杆1 +(a-R0)+l 锚杆2 , where: l 锚杆1 is the exposed length of the prestressed anchor rod, which is 0.1m-0.2m; l 锚杆2 The anchoring length of the prestressed anchor is 0.4m-0.6m; the prestress of the prestressed anchor is 80kN-120kN, the spacing between the prestressed anchors is 600mm×600mm-1200mm×1200mm, and the diameter of the prestressed anchor is preferably 20mm, 22mm, and 24mm; the anchor tray uses an arched high-strength tray with a size of 150mm×150mm×12mm; the metal mesh is a diamond metal mesh woven with 4mm diameter iron wire, with a mesh size of 40mm×40mm, and adjacent metal meshes are overlapped with W-shaped steel belts, and the overlap distance is not less than 120mm; the width of the W-shaped steel belt is 200mm and the thickness is 5mm.
[0029] Furthermore, in the seventh step, the length L of the prestressed anchor cable 锚索 Determined by the maximum damage zone width b of the surrounding rock of the circular tunnel, L 锚索 = l 锚索1 +(b-R0)+l 锚索2 , where: l 锚索1 is the exposed length of the prestressed anchor cable, which is 0.3m; l 锚索2 The anchoring length of the prestressed anchor cable is 1.5m-2.0m; the diameter of the prestressed anchor cable is 3.80mm and 21.6mm, the spacing between the prestressed anchor cables is 600mm×2000mm-1000mm×2000mm, and the prestress of the prestressed anchor cable is 40kN-220kN; the anchor cable support plate uses a high-strength adjustable center support plate with a size of 250mm×250mm×14mm.
[0030] Furthermore, the thickness of the secondary fiber concrete spray layer is 80mm-90mm.
[0031] Furthermore, the steel tube concrete support in the eighth step is selected from seamless steel pipes for structure, which are made of four sections of 90° arc arch steel pipes and filled with concrete; the arc arches of the steel tube concrete support are connected by sleeves, and the spacing between the steel tube concrete supports is 500mm-2000mm; the steel tube concrete supports are connected by connecting rods.
[0032] Compared with the existing support technology, the invention has the advantages that after obtaining various parameters of the circular tunnel, the easily damaged area of the tunnel surrounding rock and the corresponding support range are clarified. After the circular tunnel is excavated, the fiber concrete spraying layer is quickly sprayed on the surface of the surrounding rock of the entire section of the tunnel for the first time to seal the surrounding rock; grouting reinforcement is performed in the minimum damage area of the surrounding rock to make the tunnel surrounding rock with developed cracks and broken consolidate into a whole again, so as to give full play to the self-bearing capacity of the surrounding rock; the length of the prestressed anchor rod is determined according to the radius of the minimum damage area of the surrounding rock, and the prestressed anchor rod support is performed on the surrounding rock of the entire section of the tunnel; the maximum damage area of the surrounding rock is obtained according to the axial deformation theory, the length of the prestressed anchor cable is determined, and the prestressed anchor cable support is performed on the maximum damage area; after the prestressed anchor rod and the prestressed anchor cable are installed, the fiber concrete spraying layer is sprayed for the second time, and then the steel tube concrete bracket is installed to complete the support work.
[0033] The present invention is based on the principle that the surrounding rock stress at different positions of the circular tunnel section is different, and the surrounding rock mechanical parameters are used to obtain the minimum damage zone range and the maximum damage zone range of the circular tunnel, and then targeted reinforcement is carried out in the minimum damage zone range and the maximum damage zone range respectively. In this way, the surrounding rock in the maximum damage zone will not be locally damaged due to excessive stress, resulting in a larger plastic zone and thus causing tunnel instability, and excessive support force will be avoided, resulting in excessive support strength and increased support cost.
[0034] The present invention determines the maximum and minimum damage areas of the tunnel simply, effectively and accurately through the given calculation formula according to the surrounding rock mechanical parameters of the specific tunnel, and then determines the support means in a targeted manner according to the different damage areas. It has strong operability, and the maximum and minimum damage areas are areas divided by the calculation results, with high accuracy. It not only realizes precise support, but also speeds up the construction speed, improves the support effect and saves support costs.
[0035] The present invention mainly forms an active support system through surrounding rock grouting, prestressed anchor rods and prestressed anchor cables, and mainly forms a passive support system with steel tube concrete brackets, which can well improve the stress state of the surrounding rock of the circular tunnel, belongs to a rigid-flexible support method, can effectively improve the support strength, and reduce the number of tunnel repairs. The present invention has the advantages of reasonable support parameters and good support effect, and has wide promotion and application value. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] In order to more clearly illustrate the technical solution of the embodiment of the present invention, the drawings used in the description of the embodiment will be briefly introduced below. The drawings in the following description are only principle diagrams of an embodiment of the present invention. For ordinary technicians in this field, other similar drawings can also be obtained based on these drawings.
[0037] Figure 1 The method flow chart of the present invention is
[0038] Figure 2 It is a schematic diagram of the range of surrounding rock reinforcement required for a circular tunnel determined by the present invention when the lateral pressure coefficient λ is less than 1;
[0039] Figure 3 It is a schematic diagram of the range of surrounding rock reinforcement required for a circular tunnel determined by the present invention when the lateral pressure coefficient λ>1;
[0040] Figure 4 It is a schematic diagram of circular tunnel support determined by the present invention when the side pressure coefficient λ is less than 1;
[0041] Figure 5 It is a schematic diagram of circular tunnel support determined by the present invention when the lateral pressure coefficient λ>1;
[0042] Figure 6 This is a schematic diagram of prestressed anchor rod + metal mesh support within the range of anchor cable support;
[0043] Figure 7 This is a schematic diagram of prestressed anchor rod + metal mesh support within the range of no anchor cable support;
[0044] Figure 8 It is a schematic diagram of the connection between steel tube concrete supports;
[0045] Figure 9a-9c This is a simplified diagram of the circular tunnel mechanical model involved in the present invention, where Figure 9a It shows the actual stress condition of the circular tunnel. Figure 9b The figure shows the mechanical state of the circular tunnel under bidirectional isobaric pressure. Fig.9c It shows the mechanical state of the circular tunnel under horizontal tension and vertical compression. Figure 9b and Fig.9c yes Figure 9a Exploded diagram of .
[0046] Fig.10 This is a schematic diagram of the stress calculation around the elliptical roadway;
[0047] Fig.11 This is a schematic diagram of the surrounding rock range that needs to be reinforced when the lateral pressure coefficient λ=1;
[0048] Fig.12 It is a schematic diagram of the surrounding rock range that needs to be reinforced in the tunnel when the lateral pressure coefficient λ is less than 1;
[0049] Fig.13 Schematic diagram of the surrounding rock range that needs to be reinforced in the tunnel when the lateral pressure coefficient λ>1.
[0050] In the figure: 1. surrounding rock; 2. circular tunnel; 3. arched high-strength tray; 4. high-strength adjustable centering tray; 5. surrounding rock range to be reinforced for circular tunnel; 6. primary sprayed fiber concrete layer; 7. grouting reinforcement range; 8. prestressed anchor rod; 9. prestressed anchor cable; 10. secondary sprayed fiber concrete layer; 11. steel tube concrete support; 12. flexible cushion layer; 13. casing; 14. connecting rod; 15. metal mesh; 16. W-shaped steel belt. DETAILED DESCRIPTION
[0051] The present invention provides a deep circular tunnel support method. In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer and more specific, the technical solution in the embodiments of the present invention will be clearly and completely described in combination with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention. Figure 1 As shown below:
[0052] The first step: excavate the circular tunnel 2 of the current construction section according to the actual geological conditions. During the excavation of the circular tunnel 2, the ground stress of the stratum where the circular tunnel 2 is located is measured based on the field measurement and laboratory test to obtain the mechanical parameters of the surrounding rock of the circular tunnel 2 and the size of the circular tunnel 2; wherein, the field measurement and laboratory test in this step include the circular tunnel 2 surrounding rock sample collection step and the test step, the ground stress measurement step, the circular tunnel 2 size measurement step, to obtain the mechanical parameters of the surrounding rock of the circular tunnel 2 and the size of the circular tunnel 2; the said circular tunnel 2 surrounding rock mechanical parameters and the circular tunnel 2 size include: the surrounding rock cohesion c of the circular tunnel 2, the surrounding rock internal friction angle of the circular tunnel 2 Vertical ground stress p of circular tunnel 2 V , Horizontal ground stress p of circular tunnel 2 H and the radius R0 of circular tunnel 2; according to the vertical stress p of circular tunnel 2 V and horizontal ground stress p of circular tunnel 2 H Get the side pressure coefficient
[0053] Step 2: Based on the mechanical parameters of the surrounding rock of circular tunnel 2, the ground stress parameters and the size of circular tunnel 2, determine the minimum width a of the surrounding rock of the circular tunnel through theoretical calculation or on-site measurement; the theoretical calculation of the minimum width a of the surrounding rock of the circular tunnel is carried out using the following formula: When the minimum destruction zone width a of the surrounding rock of circular tunnel 2 is measured on site, the borehole peep method or ultrasonic method is used for measurement;
[0054] Step 3: Based on the data obtained in Steps 1 and 2, the stress axis ratio of circular tunnel 2 is obtained based on the axis variation theory, and the maximum damage zone width value b of the surrounding rock of circular tunnel 2 is calculated according to the stress axis ratio, and the surrounding rock range 5 required to be reinforced of circular tunnel 2 is determined. The specific method for determining the maximum damage zone width value b is described later;
[0055] The surrounding rock range 5 of the circular tunnel 2 to be reinforced is an elliptical ring area formed by taking the circular tunnel 2 as the inner ring and an ellipse with the center of the circular tunnel 2 as the center and the short axis length 2a and the long axis 2b as the outer ring; or a circular ring area formed by taking the circular tunnel 2 as the inner ring and concentric circles with the center of the circular tunnel 2 as the center and the radius a or b as the outer ring;
[0056] Further: According to the size of the lateral pressure coefficient λ, it can be divided into the following three cases:
[0057] When the lateral pressure coefficient λ is less than 1, the surrounding rock range 5 required for the circular tunnel 2 is an elliptical ring surrounding rock area with a short axis in the horizontal direction and a long axis in the vertical direction (e.g. Figure 2 and Fig.12 shown);
[0058] When the lateral pressure coefficient λ>1, the surrounding rock range 5 required for the circular tunnel 2 is an elliptical ring surrounding rock area with a short axis in the vertical direction and a long axis in the horizontal direction (e.g. Figure 3 and Fig.13 shown);
[0059] When the side pressure coefficient λ=1, the minimum damage zone width a is equal to the maximum damage zone width b. The surrounding rock range 5 required to be reinforced in the circular tunnel 2 is a concentric ring area with the center of the circular tunnel 2 as the center and the minimum damage zone width a or the maximum damage zone width b as the radius (e.g. Fig.11 shown);
[0060] Step 4: After the circular tunnel 2 is excavated, a primary fiber concrete spray layer 6 with a thickness of 40mm-50mm is quickly sprayed on the surrounding rock surface of the entire tunnel section to seal the surrounding rock to form a smooth and flat tunnel surface, prevent the tunnel surrounding rock from softening, and facilitate the installation of support equipment;
[0061] Step 5: Reference Figure 4-5 When the surrounding rock range 5 to be reinforced in the circular tunnel 2 is an elliptical ring, the centerline position of the ellipse minor axis is taken as the starting point, the width value a of the minimum damage zone of the surrounding rock is taken as the radius, and the surrounding rock within the fan ring range within 45° on both sides of the centerline is taken as the minimum damage zone surrounding rock. Grouting materials are used to reinforce the surrounding rock in the minimum damage zone, forming a grouting reinforcement zone 7 as shown in the figure, thereby improving the integrity of the surrounding rock in the minimum damage zone. Figure 4 The fan ring is the surrounding rock with the minimum damage zone when the lateral pressure coefficient λ is less than 1. Figure 5The fan ring part is the surrounding rock of the minimum damage zone when the lateral pressure coefficient λ>1; then proceed to step 6;
[0062] When the surrounding rock range 5 of the circular tunnel 2 to be reinforced is a ring, the surrounding rock range of the minimum damage zone is the same as the surrounding rock range of the maximum damage zone. Grouting materials are used to reinforce the surrounding rock to be reinforced. After the grouting materials solidify, prestressed anchor holes are drilled in the surrounding rock of the entire section of the tunnel. The anchor length L 锚杆 Determine according to the minimum destruction zone width a of the surrounding rock of the circular tunnel 2; hang a metal mesh 15 on the tunnel surface and install prestressed anchor rods 8 and W-shaped steel belts 16 at the same time, use the metal mesh 15, prestressed anchor rods 8 and W-shaped steel belts 16 to anchor the tunnel surrounding rock 1, support the tunnel surrounding rock 1 with prestressed anchor rods 8 + metal mesh 15, and then spray the fiber concrete spray layer 10 on the surrounding rock of the entire tunnel section; then directly enter the eighth step;
[0063] Step 6: After the grouting material solidifies, anchor holes are drilled in the surrounding rock 1, a metal mesh 15 is hung on the surface of the circular tunnel 2, and prestressed anchor rods 8 and W-shaped steel belts 16 are installed at the same time. The tunnel surrounding rock 1 is anchored by the metal mesh 15, prestressed anchor rods 8 and W-shaped steel belts 16, and the tunnel surrounding rock 1 is supported by prestressed anchor rods 8 + metal mesh 15; the length of the prestressed anchor rod 8 in this step is L 锚杆 According to the minimum destruction zone width a of the surrounding rock of circular tunnel 2, L 锚杆 = l 锚杆1 +(a-R0)+l 锚杆2 , where: l 锚杆1 is the exposed length of the prestressed anchor rod 8, which is 0.1m-0.2m; l 锚杆2 is the anchoring length of the prestressed anchor rod 8, which is 0.4m-0.6m; the prestress of the prestressed anchor rod 8 is 80kN-120kN, the spacing between the prestressed anchor rods 8 is 600mm×600mm-1200mm×1200mm, and the diameter of the prestressed anchor rod 8 is preferably 20mm, 22mm, and 24mm; the anchor rod tray uses an arched high-strength tray 3 with a size of 150mm×150mm×12mm; the metal mesh 15 is a diamond-shaped metal mesh woven by 4mm diameter iron wire, with a mesh size of 40mm×40mm, and adjacent metal meshes 15 are overlapped with W-shaped steel strips 16, and the overlap distance is not less than 120mm; the width of the W-shaped steel strip 16 is 200mm and the thickness is 5mm; the support results are shown in Figure 6 ;
[0064] Step 7: When the surrounding rock range 5 to be reinforced in the circular tunnel 2 is an elliptical ring, the center line position where the major axis of the ellipse is located is taken as the starting point, and the width value b of the maximum damage zone of the tunnel surrounding rock is taken as the radius. The surrounding rock within the fan-shaped range within 45° on both sides of the center line is taken as the surrounding rock of the maximum damage zone, and the prestressed anchor cable 9 is installed in the surrounding rock of the maximum damage zone, and then the fiber concrete spray layer 10 with a thickness of 80mm-90mm is sprayed for the second time; the length L of the prestressed anchor cable 9 in this step is 锚索 According to the maximum destruction zone width b of the surrounding rock of circular tunnel 2, L 锚索 = l 锚索1 +(b-R0)+l 锚索2 , where: l 锚索1 is the exposed length of the prestressed anchor cable 9, which is 0.3m; l 锚索2 The anchor length of the prestressed anchor cable 9 is 1.5m-2.0m; the diameter of the prestressed anchor cable 9 is 3.80mm and 21.6mm, the spacing between the prestressed anchor cables 9 is 600mm×2000mm-1000mm×2000mm, and the prestress of the prestressed anchor cable 9 is 40kN-220kN; the anchor cable support plate uses a high-strength adjustable center support plate 4 with a size of 250mm×250mm×14mm; the support results are shown in Figure 7 ;
[0065] Step 8: After the secondary fiber concrete spray layer 10 solidifies, install the Figure 8 The steel tube concrete support 11 shown, wherein a flexible cushion layer 12 is used to fill between the steel tube concrete support 11 and the secondary fiber concrete spray layer 10 to reserve space for surrounding rock deformation and complete support; the steel tube concrete support 11 in this step selects a structural seamless steel pipe, which is made of four sections of 90° arc arch steel pipes and filled with concrete; the arc arches of the steel tube concrete support 11 are connected by a sleeve 13, and the spacing between the steel tube concrete support 11 is 500mm-2000mm; the steel tube concrete support 11 is connected by a connecting rod 14.
[0066] Combine the following Figure 9a-9c as well as Fig.10 The method for determining the minimum width a of the surrounding rock of a circular tunnel and the maximum width b of the surrounding rock of a circular tunnel is described in detail.
[0067] 1. Calculate the minimum damage zone width a
[0068] like Figure 9a The figure shows the mechanical model of a circular tunnel after excavation. Due to the symmetric structure and asymmetric load, the stress solution of the circular tunnel under the bidirectional unequal pressure stress field can be regarded as the following through the Keels solution: Figure 9b The uniform compressive stress field and Fig.9cThe superposition of the left and right compressive and top and bottom tensile stress fields is shown.
[0069] 1.Reference Figure 9b Explain the surrounding rock stress of the tunnel under uniform compressive stress field
[0070] It is known from elastic mechanics that the surrounding rock of the tunnel is subjected to external pressure in the elastic stage in a uniform stress field. The stress formula of tunnel surrounding rock is obtained by Lamé:
[0071]
[0072]
[0073] In the formula, σ ar , σ aθ are respectively the radial pressure and annular pressure at any point in the uniform stress field, MPa; λ is the lateral pressure coefficient; p V is the vertical stress at the location of the tunnel, MPa; R0 is the radius of the circular tunnel, m; r is the distance between any point of the surrounding rock and the center of the tunnel, m.
[0074] (2)Reference Fig.9c Explain the tunnel surrounding rock stress field with left and right compression and top and bottom tension
[0075] The stress solution of the left and right compression and top and bottom tension stress field is obviously related to r and θ. Therefore, the stress function is: Substitute the stress function into the biharmonic equation:
[0076]
[0077] Simplified:
[0078]
[0079] Then the general solution of formula (4) is:
[0080] f(r)=Ar 4 +Br 2 +C+Dr -2 (5)
[0081] Substituting formula (5) into the stress function, we get:
[0082]
[0083] Substituting formula (6) into the stress component calculation formula, we get:
[0084]
[0085] Arranged:
[0086]
[0087] Based on the boundary conditions, the stress solution formula of the tunnel surrounding rock under the polar coordinates with tension on the left and compression on the top and bottom is:
[0088]
[0089]
[0090]
[0091] In the formula, σ br , σ bθ , τ brθ are the radial pressure, annular pressure and shear stress at any point in the left and right tensile and upper and lower compressive stress fields, respectively, in MPa; θ is the angle between the line from any point of the surrounding rock to the center of the tunnel and the horizontal direction, in rad; the meanings of other symbols are the same as above.
[0092] From the above solution, we can see that the total plastic zone radius can be regarded as the sum of (1) the plastic zone radius of the uniform compressive stress field and (2) the plastic zone radius of the left and right compressive and top and bottom tensile stress fields.
[0093] 2. Calculate the total plastic zone radius R p
[0094] (1) Calculation of the radius R of the plastic zone in the uniform compressive stress field ap
[0095] After the plastic zone appears in the surrounding rock, the stress in the plastic zone satisfies both the equilibrium differential equation and the plastic condition. The Mohr-Coulomb strength criterion is used as the starting condition for the tunnel surrounding rock to enter the plastic state from the elastic state.
[0096] Under plane strain conditions, the equilibrium differential equation in polar coordinates is:
[0097]
[0098] Under plane strain conditions, the relationship between the stress components expressed in polar coordinates and the principal stress is:
[0099]
[0100]
[0101] Wherein, σ1 and σ3 are the maximum principal stress and the minimum principal stress, respectively, in MPa; the other symbols have the same meanings as above.
[0102] When the tunnel surrounding rock reaches the elastic limit and enters the plastic state, the Mohr-Coulomb strength criterion is usually used as the judgment criterion. The Mohr-Coulomb strength criterion expressed by σ1 and σ3 is as follows:
[0103]
[0104] In the formula, is the internal friction angle of the surrounding rock, °; c is the cohesion of the surrounding rock, MPa.
[0105] From the boundary conditions we know:
[0106] In the elastic region: outer boundary: r→∞, Inner boundary (elastic-plastic interface): r = R ap (R ap is the plastic zone radius of condition (1), The superscript "e" represents the physical quantity in the elastic region.
[0107] In the plastic zone: outer boundary (elastic-plastic interface): r = R ap , Inner boundary: r = R0, The superscript “p” represents the physical quantity in the plastic zone.
[0108] Solve equations (12) and (15) together. And use the inner boundary conditions of the plastic zone to get:
[0109]
[0110] Substituting equation (16) into equations (13)-(15), the simplified equation is:
[0111]
[0112] According to the inner boundary of the elastic zone, the outer edge of the plastic zone and the stress conditions, the stress in the elastic zone is obtained:
[0113]
[0114] According to equations (17), (18) and the equality of the elastic-plastic boundary with respect to radial stress, the radius of the plastic zone is obtained as:
[0115]
[0116] Formula (19) is the calculation formula for the radius of the plastic zone in the uniform compressive stress field (1).
[0117] (2) Calculate the radius R of the plastic zone under left and right compression and top and bottom tension stress fields bp
[0118] According to the derivation process of (1) the calculation formula of the radius of the plastic zone in the uniform compressive stress field, (2) the calculation formula of the radius of the plastic zone in the left and right compressive and upper and lower tensile stress fields is obtained in the same way, and we get:
[0119]
[0120] Formula (20) is the calculation formula for the radius of the plastic zone in the stress field (2) with compression on the left and tension on the top and bottom.
[0121] (3) Calculate the total plastic zone radius R p
[0122] The total plastic zone radius can be obtained by adding equation (19) and equation (20):
[0123] R p =R ap +R bp (twenty one)
[0124] Simplified:
[0125]
[0126] 3. Calculate the minimum damage zone width a
[0127] Since the plastic zone is the area where damage has occurred, according to the axis deformation theory and the radius of the plastic zone R p The calculation formula obtains the minimum damage zone width value a. Based on this principle, the minimum damage zone width value a under different lateral pressure coefficients is calculated.
[0128] (1) When the lateral pressure coefficient λ is less than 1, the minimum damage zone width a is in the horizontal direction. At this time, θ = 0°. The calculation method of the minimum damage zone width a is:
[0129]
[0130] (2) When the lateral pressure coefficient λ is greater than 1, the minimum damage zone width a is in the vertical direction. At this time, θ = 90°. The calculation method of the minimum damage zone width a is:
[0131]
[0132] (3) When the lateral pressure coefficient λ = 1, the calculation method of the minimum damage zone width a is:
[0133]
[0134] 2. Calculate the maximum damage zone width b
[0135] The calculation process is: based on the axis variation theory, the stress axis ratio of the circular tunnel is obtained, and the maximum destruction zone width b of the surrounding rock of the circular tunnel is calculated through the stress axis ratio.
[0136] The elliptical shape is the final state of various shapes of tunnels after destruction. It can be concluded that the tunnel section using the stress axis ratio in tunnel engineering design is the most stable section. At this time, the stress distribution around the tunnel is uniform. Fig.10 .
[0137] Both equation (23) and equation (24) determine a, and a has two cases. In the first case, a is in the horizontal direction, and in the second case, a is in the vertical direction.
[0138] (1) When the lateral pressure coefficient λ is less than 1, the minimum damage zone width a is in the horizontal direction. Under the original rock stress state, the stress at any point around the elliptical roadway is solved using a complex function:
[0139]
[0140] Where b is the semi-axis length of the ellipse on the y-axis (that is, the maximum width of the damage zone), a is the semi-axis length of the ellipse on the x-axis (that is, the minimum width of the damage zone), and θ is the angle between the line connecting the calculation point C and the center of the ellipse and the vertical axis.
[0141] When the stress around the tunnel is evenly distributed, the tunnel is most stable, so:
[0142]
[0143] The stress axis ratio at this time
[0144] (2) When the lateral pressure coefficient λ is greater than 1, the minimum damage zone width a is in the vertical direction. Under the original rock stress state, the stress at any point around the elliptical roadway is solved using a complex function:
[0145]
[0146] Where a is the semi-axis length of the ellipse on the y-axis (that is, the minimum width of the damage zone), b is the semi-axis length of the ellipse on the x-axis (that is, the maximum width of the damage zone), and θ is the angle between the line connecting the calculation point C and the center of the ellipse and the vertical axis.
[0147] When the stress around the tunnel is evenly distributed, the tunnel is most stable. By the same logic as formula (27), the stress axis ratio at this time is obtained:
[0148] (3) When the lateral pressure coefficient λ = 1, it means that the vertical pressure and horizontal pressure of the tunnel surrounding rock are equal, and b = a.
[0149] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any changes or substitutions that are not conceived through creative work should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope defined in the claims.
Claims
1. A precise support method for deep circular tunnels based on surrounding rock zoning. It is characterized in that It includes the following steps: Step 1: During the excavation of the circular tunnel, the ground stress of the tunnel stratum is measured based on field measurements and laboratory tests to obtain the mechanical parameters of the surrounding rock and tunnel dimensions of the circular tunnel, including: the cohesion c of the surrounding rock of the circular tunnel, the internal friction angle of the surrounding rock of the circular tunnel Vertical ground stress p of circular tunnel V , horizontal ground stress p of circular tunnel H , Circular tunnel radius R 0 ; Vertical ground stress p through circular tunnel V and the horizontal ground stress p of the circular tunnel H Get the lateral pressure coefficient λ, Step 2: Based on the mechanical parameters of the surrounding rock, the ground stress parameters and the size of the circular tunnel, determine the minimum width a of the surrounding rock of the circular tunnel; when the mechanical parameter test of the surrounding rock is inconvenient or the test conditions are not available, it is necessary to use the drilling peek method and the ultrasonic method on site to measure the minimum width a of the surrounding rock; Step 3: According to the data obtained in the first and second steps, the stress axis ratio parameters of the circular roadway are obtained based on the axis variation theory. The maximum damage zone width value b of the circular roadway surrounding rock is calculated according to the stress axis ratio parameters. According to the minimum damage zone width value a of the circular roadway surrounding rock, the maximum damage zone width value b and the lateral pressure coefficient λ, the required reinforcement range of the circular roadway surrounding rock is determined. The specific determination method is: When the side pressure coefficient λ=1, the minimum damage zone width value a is equal to the maximum damage zone width value b, and the surrounding rock range that needs to be reinforced in the circular tunnel is a circular ring area surrounded by concentric circles with the circular tunnel as the inner ring, the circular tunnel center as the center, and the minimum damage zone width value a or the maximum damage zone width value b as the radius as the outer ring; When the lateral pressure coefficient λ is less than 1, the surrounding rock range that needs to be reinforced in the circular tunnel is an elliptical ring area formed by taking the circular tunnel as the inner ring and an ellipse with the minimum damage zone width value a as the short axis radius and the maximum damage zone width value b as the long axis radius as the outer ring, and the short axis of the ellipse is in the horizontal direction and the long axis is in the vertical direction; When the lateral pressure coefficient λ>1, the surrounding rock range that needs to be reinforced in the circular tunnel is an elliptical ring area surrounded by an ellipse with the circular tunnel as the inner ring, the center of the circular tunnel as the center, the minimum damage zone width value a as the short axis radius, and the maximum damage zone width value b as the long axis radius, and the short axis of the ellipse is in the vertical direction and the long axis is in the horizontal direction; Step 4: After the circular tunnel is excavated, the fiber concrete spray layer is quickly sprayed on the surrounding rock surface of the entire tunnel section to seal the surrounding rock to form a smooth and flat tunnel surface, prevent the tunnel surrounding rock from softening, and facilitate the installation of support equipment; Step 5: When the surrounding rock range to be reinforced in the circular tunnel is an elliptical ring, the center line position of the ellipse minor axis is taken as the starting point, the width value a of the minimum damage zone of the surrounding rock is taken as the radius, and the surrounding rock within the fan-shaped range of 45° on both sides of the center line is taken as the minimum damage zone surrounding rock, and the grouting material is used to perform grouting reinforcement on the surrounding rock in the minimum damage zone to improve the integrity of the surrounding rock in the minimum damage zone; then proceed to step 6; When the surrounding rock range to be reinforced in the circular tunnel is a ring, the surrounding rock range of the minimum damage zone is the same as the surrounding rock range of the maximum damage zone. Grouting materials are used to reinforce the surrounding rock to be reinforced. After the grouting materials solidify, prestressed anchor holes are drilled in the surrounding rock of the entire section of the tunnel. The anchor length L 锚杆 Determine according to the minimum damage zone width a of the circular tunnel surrounding rock; hang a metal mesh on the tunnel surface and install prestressed anchor rods and W-shaped steel belts at the same time, use the metal mesh, prestressed anchor rods and W-shaped steel belts to anchor the tunnel surrounding rock, support the tunnel surrounding rock with prestressed anchor rods + metal mesh, and then spray the fiber concrete spray layer on the entire section of the tunnel surrounding rock for the second time; then directly turn to the eighth step; Step 6: After the grouting material solidifies, drill holes for prestressed anchor bolts in the surrounding rock of the entire tunnel section. The anchor bolt length is L 锚杆 Determined according to the minimum damage zone width a of the circular tunnel surrounding rock; hang a metal mesh on the tunnel surface and install prestressed anchor rods and W-shaped steel belts at the same time, use the metal mesh, prestressed anchor rods and W-shaped steel belts to anchor the tunnel surrounding rock, and perform prestressed anchor rod + metal mesh support on the tunnel surrounding rock; Step 7: When the surrounding rock range to be reinforced in the circular tunnel is an elliptical ring, take the midline position of the ellipse major axis as the starting point, take the width value b of the maximum damage zone of the surrounding rock as the radius, and take the surrounding rock within the fan-shaped range of 45° on both sides of the midline as the surrounding rock of the maximum damage zone. Install prestressed anchor cables in the surrounding rock of the maximum damage zone, and the anchor cable length L 锚索 According to the maximum damage zone width b of the circular tunnel surrounding rock, the fiber concrete spraying layer is then sprayed twice on the surrounding rock of the entire tunnel section; Step 8: After the secondary fiber concrete spraying layer solidifies, a steel tube concrete support that matches the circular tunnel section is installed on the entire tunnel section. A flexible cushion layer is used to fill the space between the steel tube concrete support and the spraying layer to reserve space for surrounding rock deformation and complete the support.
2. The method for accurate support of deep circular tunnels based on surrounding rock zoning according to claim 1, It is characterized in that In the second step, the calculation formulas for the minimum damage zone width a and the maximum damage zone width b are: When the lateral pressure coefficient λ≥1, the maximum damage zone width value b=λa; When the side pressure coefficient λ is less than 1, the maximum damage zone width 3. The method for accurate support of deep circular tunnels based on surrounding rock zoning according to claim 1, It is characterized in that In the fourth step, the thickness of the fiber concrete spray layer is 40mm-50mm.
4. The method for accurate support of deep circular tunnels based on surrounding rock zoning according to claim 1, It is characterized in that The grouting material in the fifth step is a micro-nano inorganic grouting material.
5. The method for accurate support of deep circular tunnels based on surrounding rock zoning according to claim 1, It is characterized in that The length L of the prestressed anchor rod in the sixth step 锚杆 Determined by the minimum destruction zone width a of the surrounding rock of the circular tunnel, L 锚杆 = l 锚杆1 +(aR 0 )+l 锚杆2 , where: l 锚杆1 is the exposed length of the prestressed anchor rod, which is 0.1m-0.2m; l 锚杆2 The anchoring length of the prestressed anchor is 0.4m-0.6m; the prestress of the prestressed anchor is 80kN-120kN, the spacing between the prestressed anchors is 600mm×600mm-1200mm×1200mm, and the diameter of the prestressed anchor is 20mm, 22mm or 24mm; the anchor tray is an arched high-strength tray with a size of 150mm×150mm×12mm; The metal mesh in the sixth step is a diamond-shaped metal mesh woven by 4mm diameter iron wire, with a mesh size of 40mm×40mm. Adjacent metal meshes are overlapped with W-shaped steel strips, and the overlap distance is not less than 120mm; the W-shaped steel strip is 200mm wide and 5mm thick.
6. The method for accurate support of deep circular tunnels based on surrounding rock zoning according to claim 1, It is characterized in that The length L of the prestressed anchor cable in the seventh step 锚索 Determined by the maximum destruction zone width b of the surrounding rock of the circular tunnel, L 锚索 = l 锚索1 +(bR 0 )+l 锚索2 , where: l 锚索1 is the exposed length of the prestressed anchor cable, which is 0.3m; l 锚索2 The anchoring length of the prestressed anchor cable is 1.5m-2.0m; the diameter of the prestressed anchor cable is 3.80mm or 21.6mm, the spacing between the prestressed anchor cables is 600mm×2000mm-1000mm×2000mm, and the prestress of the prestressed anchor cable is 40kN-220kN; the anchor cable support plate is a high-strength adjustable support plate with a size of 250mm×250mm×14mm.
7. The method for accurate support of deep circular tunnels based on surrounding rock zoning according to claim 1, It is characterized in that The thickness of the secondary sprayed fiber concrete spray layer in the seventh step is 80mm-90mm.
8. The method for accurate support of deep circular tunnels based on surrounding rock zoning according to claim 1, It is characterized in that In the eighth step, the steel tube concrete support is made of seamless steel pipe for structure, which is made of four sections of 90° arc arch steel pipes and filled with concrete; the arc arch of the steel tube concrete support is connected by a sleeve, and the spacing between the steel tube concrete supports is 500mm-2000mm; the steel tube concrete supports are connected by connecting rods.