Method for replacing main reel hook crossbeam of large metallurgical bridge crane
By using program control and the method of automatically wrapping new steel ropes in metallurgical bridge cranes, the problem of time-consuming replacement of main hook cross beams is solved, and the replacement efficiency and safety are improved.
Patent Information
- Application Number
- CN202210229533.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-03-09
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2042-03-09
AI Technical Summary
The main lifting mechanism of the existing metallurgical bridge crane adopts non-detachable fixed main hooks, which causes the main hook cross beam to be removed and manually wound when replacing the main hook beam. It takes a long time and is unstable, which affects production efficiency, especially those with large tonnage. Machine, causing long downtime.
Provide a method for replacing the main coil hook beam of a large metallurgical bridge crane. The crane operation is controlled through the program console, and the steel rope cutting and welding is performed using hydraulic wire rope cutting machine and gas welding, combined with the rise of the main hoist. Move, automatically wrap new steel ropes to reduce manual operation and time.
The rapid replacement of the main lifting gantry hook beam is achieved, which reduces downtime, reduces manual labor intensity, improves replacement efficiency and accuracy, and ensures construction safety.
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of metallurgical bridge cranes, in particular to a method for replacing a main reel hook crossbeam of a large metallurgical bridge crane. Background Art
[0002] Bridge cranes are lifting equipment that are horizontally mounted above workshops, warehouses and material yards to lift materials. They are the most widely used and most numerous lifting machinery. Its two ends are located on tall concrete columns or metal brackets, and its shape is like a bridge. The bridge of the bridge crane runs longitudinally along the tracks laid on the elevated platforms on both sides, and can make full use of the space under the bridge to lift materials without being hindered by ground equipment. Large metallurgical bridge cranes are mainly used for lifting molten metal in the steel and metallurgical industry. National standards require that bridge cranes that lift molten metal must use metallurgical casting cranes.
[0003] However, the current metallurgical bridge cranes still have shortcomings. Metallurgical bridge cranes have the following problems when in use:
[0004] The main lifting mechanism of the existing bridge crane adopts a non-detachable fixed main hook. When the main lifting hook crossbeam needs to be replaced, the steel rope must be removed from the fixed and movable pulleys and then installed in the new movable pulley block. All the steel ropes must be released and then wound around the new movable pulley piece by piece. Especially for metallurgical cranes with large tonnage and multiple pulleys, winding the steel rope piece by piece takes a lot of time and manpower, and it is impossible to guarantee that each winding of the steel rope will be successful. In addition, a large amount of maintenance time requires production suspension to cooperate, resulting in long downtime, seriously affecting work production efficiency, and failing to meet production needs.
[0005] In view of the above problems, it is urgently necessary to carry out innovative design based on the original metallurgical bridge crane structure. Summary of the invention
[0006] The purpose of the present invention is to provide a replacement method for the main reel hook beam of a large metallurgical bridge crane, so as to solve the problem that the main lifting mechanism of the existing bridge crane proposed in the above background technology adopts a non-detachable fixed main hook. When the main lifting hook beam needs to be replaced, the steel rope must be removed from the fixed and movable pulleys and then installed in the new movable pulley block. All the steel ropes must be released and then wound around the new movable pulley piece by piece. Especially for metallurgical cranes with larger tonnage and multiple pulleys, winding piece by piece takes a lot of time and manpower, and it is impossible to guarantee that each winding of the steel rope will be successful. In addition, a large amount of maintenance time requires production suspension to cooperate, resulting in long downtime, seriously affecting work production efficiency, and failing to meet production needs.
[0007] To achieve the above object, the present invention provides the following technical solution: a method for replacing a main reel hook crossbeam of a large metallurgical bridge crane, comprising the following steps:
[0008] S1: Trial stage
[0009] S11: Start the switch of the metallurgical bridge crane, control the operation of the metallurgical bridge crane through the program console, move the main reel hook downward until it contacts the ground, and place the main reel hook stably on the ground;
[0010] S12: Turn off the switch of the metallurgical bridge crane, take one end of the steel rope and wrap it around the old movable pulley and the old fixed pulley in turn, so that the steel rope is separated from the old fixed pulley and the old movable pulley, and then the two ends of the old main lifting gantry hook beam are separated from the two metal support frames at the bottom in turn, and the old main lifting gantry hook beam is placed steadily on the ground by a crane, and the new main lifting gantry hook beam is placed on the side of the ground for standby;
[0011] S13: The steel rope is gently wound around the multiple new movable pulleys and the new fixed pulley on the new main lifting gantry hook in sequence according to the disassembly direction of the old fixed pulley and the movable pulley, so that the main winding hook is connected to the new main lifting gantry hook beam, and the crane is driven to move the new main lifting gantry hook beam to the top of the two metal support frames, and the metal support frames and the new main lifting gantry hook beam are installed to complete the installation of the new main lifting gantry hook beam.
[0012] S2: Specify the improvement plan stage;
[0013] S21: Prepare professional maintenance equipment such as hydraulic wire rope cutter and gas welding according to actual repair needs, and inspect and debug the equipment in advance;
[0014] S3: installation phase;
[0015] S31: Start the switch of the metallurgical bridge crane, control the operation of the metallurgical bridge crane through the program console, lower the old steel rope on the lifting drum, and make the old steel rope at the movable pulley in a relaxed state.
[0016] S32: Use tools to disassemble the end of the old steel rope connected to the bracket on the main hoisting gantry hook beam, and disassemble the wedge iron;
[0017] S33: Start the hydraulic wire rope cutter to cut the old wire rope at the movable pulley in sequence, so as to separate the old movable pulley from the old main hoisting gantry hook beam, and then pass the old wire rope through the movable pulley on the new main hoisting gantry hook beam;
[0018] S34: The operator preheats and welds the cross section of the old steel rope and the cross section of the steel rope on the new movable pulley by gas welding, and performs a test to ensure the firmness of the welding between the new steel rope and the old steel rope;
[0019] S35: After the new movable pulley and the old steel rope are connected and transitioned, the replacement of the main hoisting gantry hook beam is completed;
[0020] S36: Take out the new steel rope, and quickly weld the new steel rope to the old steel rope and the unsplit end of the main hoisting gantry hook beam by gas welding;
[0021] S37: Use equipment to remove the pressure plate on the drum, and then take out the rope head on the drum through the steel rope hole of the trolley frame;
[0022] S38: starting the main winch drum to make it move upward, so that the connection point between the new steel rope and the old steel rope rotates until the connection point between the new steel rope and the old steel rope moves to the position of two turns on the top of the drum;
[0023] S39: The operator uses the hydraulic wire rope cutter again to cut the connection between the new steel rope and the old steel rope, thereby completing the transition of the old steel rope from the old beam to the new beam, and then fixes the new steel rope on the drum with a pressure plate, and continues to move the drum upward until all the new steel ropes are wound on the drum, and connects the other end of the new steel rope to the corbel on the new main hoisting gantry hook beam to complete the replacement of the old steel rope with the new steel rope.
[0024] S4: debugging stage;
[0025] S41: The operator measures the height of the new main hoisting gantry hook beam, starts the new main hoisting gantry hook beam, and tries to use the new main hoisting gantry hook beam, so as to timely understand the safety performance of the new main hoisting gantry hook beam and collect feedback after the test;
[0026] S42: New installation data is obtained according to the debugging, and the time used in the traditional installation and the new installation operation process is recorded respectively, and the two installation data are compared to obtain that the new installation data is improved in terms of time, efficiency and accuracy.
[0027] Preferably, in S31, after the old steel rope on the lifting drum is lowered, two turns of the old steel rope need to be reserved on the pressure plate.
[0028] Preferably, in S38, under the action of the main hoisting drum, the connection point between the new steel rope and the old steel rope passes around each active pulley and fixed pulley in sequence.
[0029] Preferably, the S33 introduces one end of the old steel rope into the new movable pulley, and the insertion direction of the old steel rope and the new movable pulley is consistent with the insertion direction of the old steel rope and the old movable pulley.
[0030] Compared with the prior art, the present invention provides a method for replacing the main reel hook crossbeam of a large metallurgical bridge crane, which has the following advantages:
[0031] 1. After cutting off the old steel rope on the old main hoisting gantry hook beam, use gas welding to connect the new steel rope on the movable pulley on the new main hoisting gantry hook beam with the old steel rope, and then make the connection between the new steel rope and the old steel rope pass through the outer wall of the new movable pulley and the fixed pulley in turn, so as to quickly complete the replacement from the old main hoisting gantry hook beam to the new main hoisting gantry hook beam, thereby reducing the downtime of production equipment;
[0032] 2. By starting the main winch drum, the main winch drum moves upward, and then the connection between the new steel rope and the old steel rope is entangled with the new movable pulley and the new fixed pulley, avoiding the need to manually wrap the steel rope around each fixed pulley and movable pulley in traditional installation, reducing the labor intensity of maintenance personnel, and at the same time, the operators basically operate on the ground, reducing the time of high-altitude operations, thereby maintaining the construction safety of employees. DETAILED DESCRIPTION
[0033] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0034] The present invention provides a technical solution: a method for replacing a main reel hook crossbeam of a large metallurgical bridge crane, comprising the following steps:
[0035] S1: Trial stage
[0036] S11: Start the switch of the metallurgical bridge crane, control the operation of the metallurgical bridge crane through the program console, move the main reel hook downward until it contacts the ground, and place the main reel hook stably on the ground;
[0037] S12: Turn off the switch of the metallurgical bridge crane, take one end of the steel rope and wrap it around the old movable pulley and the old fixed pulley in turn, so that the steel rope is separated from the old fixed pulley and the old movable pulley, and then the two ends of the old main lifting gantry hook beam are separated from the two metal support frames at the bottom in turn, and the old main lifting gantry hook beam is placed steadily on the ground by a crane, and the new main lifting gantry hook beam is placed on the side of the ground for standby;
[0038] S13: The steel rope is gently wound around the multiple new movable pulleys and the new fixed pulley on the new main lifting gantry hook in sequence according to the disassembly direction of the old fixed pulley and the movable pulley, so that the main winding hook is connected to the new main lifting gantry hook beam, and the crane is driven to move the new main lifting gantry hook beam to the top of the two metal support frames, and the metal support frames and the new main lifting gantry hook beam are installed to complete the installation of the new main lifting gantry hook beam.
[0039] S2: Specify the improvement plan stage;
[0040] S21: Prepare professional maintenance equipment such as hydraulic wire rope cutter and gas welding according to actual repair needs, and inspect and debug the equipment in advance;
[0041] S3: installation phase;
[0042] S31: Start the switch of the metallurgical bridge crane, control the operation of the metallurgical bridge crane through the program console, lower the old steel rope on the lifting drum, and make the old steel rope at the movable pulley in a relaxed state.
[0043] S32: Use tools to disassemble the end of the old steel rope connected to the bracket on the main hoisting gantry hook beam, and disassemble the wedge iron;
[0044] S33: Start the hydraulic wire rope cutter to cut the old wire rope at the movable pulley in sequence, so as to separate the old movable pulley from the old main hoisting gantry hook beam, and then pass the old wire rope through the movable pulley on the new main hoisting gantry hook beam;
[0045] S34: The operator preheats and welds the cross section of the old steel rope and the cross section of the steel rope on the new movable pulley by gas welding, and performs a test to ensure the firmness of the welding between the new steel rope and the old steel rope;
[0046] S35: After the new movable pulley and the old steel rope are connected and transitioned, the replacement of the main hoisting gantry hook beam is completed;
[0047] S36: Take out the new steel rope, and quickly weld the new steel rope to the old steel rope and the unsplit end of the main hoisting gantry hook beam by gas welding;
[0048] S37: Use equipment to remove the pressure plate on the drum, and then take out the rope head on the drum through the steel rope hole of the trolley frame;
[0049] S38: starting the main winch drum to make it move upward, so that the connection point between the new steel rope and the old steel rope rotates until the connection point between the new steel rope and the old steel rope moves to the position of two turns on the top of the drum;
[0050] S39: The operator uses the hydraulic wire rope cutter again to cut the connection between the new steel rope and the old steel rope, thereby completing the transition of the old steel rope from the old beam to the new beam, and then fixes the new steel rope on the drum with a pressure plate, and continues to move the drum upward until all the new steel ropes are wound on the drum, and connects the other end of the new steel rope to the corbel on the new main hoisting gantry hook beam to complete the replacement of the old steel rope with the new steel rope.
[0051] S4: debugging stage;
[0052] S41: The operator measures the height of the new main hoisting gantry hook beam, starts the new main hoisting gantry hook beam, and tries to use the new main hoisting gantry hook beam, so as to timely understand the safety performance of the new main hoisting gantry hook beam and collect feedback after the test;
[0053] S42: New installation data is obtained according to the debugging, and the time used in the traditional installation and the new installation operation process is recorded respectively, and the two installation data are compared to obtain that the new installation data is improved in terms of time, efficiency and accuracy.
[0054] S31 After the old steel rope on the lifting drum is lowered, two loops of the old steel rope must be reserved on the pressure plate;
[0055] In S38, under the action of the main winch drum, the connection point between the new steel rope and the old steel rope passes around each active pulley and fixed pulley in turn.
[0056] The S33 introduces one end of the old steel rope into the new movable pulley, and the insertion direction of the old steel rope and the new movable pulley is consistent with the insertion direction of the old steel rope and the old movable pulley.
[0057] The contents not described in detail in this specification belong to the prior art known to professional and technical personnel in this field.
[0058] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A method for replacing the main reel hook crossbeam of a large metallurgical bridge crane, characterized in that: The steps include: S1: trial stage; S11: Start the switch of the metallurgical bridge crane, control the operation of the metallurgical bridge crane through the program console, move the main reel hook downward until it contacts the ground, and place the main reel hook stably on the ground; S12: Turn off the switch of the metallurgical bridge crane, take one end of the steel rope and wrap it around the old movable pulley and the old fixed pulley in turn, so that the steel rope is separated from the old fixed pulley and the old movable pulley, and then the two ends of the old main lifting gantry hook beam are separated from the two metal support frames at the bottom in turn, and the old main lifting gantry hook beam is placed steadily on the ground by a crane, and the new main lifting gantry hook beam is placed on the side of the ground for standby; S13: winding the steel rope smoothly from multiple new movable pulleys and new fixed pulleys on the new main lifting gantry hook in sequence according to the disassembly direction of the old fixed pulley and movable pulley, so that the main winding hook is connected to the new main lifting gantry hook beam, driving the crane to move the new main lifting gantry hook beam to the top of the two metal support frames, and installing the metal support frames and the new main lifting gantry hook beam, completing the installation of the new main lifting gantry hook beam; S2: Specify the improvement plan stage; S21: Prepare hydraulic wire rope cutter and gas welding professional maintenance equipment according to actual repair needs, and inspect and debug the equipment in advance; S3: installation phase; S31: Start the switch of the metallurgical bridge crane, control the operation of the metallurgical bridge crane through the program console, lower the old steel rope on the lifting drum, and make the old steel rope at the movable pulley in a relaxed state. S32: Use tools to disassemble the end of the old steel rope connected to the bracket on the main hoisting gantry hook beam, and disassemble the wedge iron; S33: Start the hydraulic wire rope cutter to cut the old wire rope at the movable pulley in sequence, so as to separate the old movable pulley from the old main hoisting gantry hook beam, and then pass the old wire rope through the movable pulley on the new main hoisting gantry hook beam; S34: The operator preheats and welds the cross section of the old steel rope and the cross section of the steel rope on the new movable pulley by gas welding, and performs a test to ensure the firmness of the welding between the new steel rope and the old steel rope; S35: After the new movable pulley and the old steel rope are connected and transitioned, the replacement of the main hoisting gantry hook beam is completed; S36: Take out the new steel rope, and quickly weld the new steel rope to the old steel rope and the unsplit end of the main hoisting gantry hook beam by gas welding; S37: Use equipment to remove the pressure plate on the drum, and then take out the rope head on the drum through the steel rope hole of the trolley frame; S38: starting the main hoisting drum to make the main hoisting drum move upward, so that the connection point between the new steel rope and the old steel rope rotates until the connection point between the new steel rope and the old steel rope moves to the position of two turns on the top of the drum; S39: The operator uses the hydraulic wire rope cutter to cut the connection between the new wire rope and the old wire rope again, thereby completing the transition of the old wire rope from the old beam to the new beam, and then fixes the new wire rope on the drum with a pressure plate, and continues to move the drum upward until all the new wire ropes are wound on the drum, and connects the other end of the new wire rope to the bracket on the new main hoisting gantry hook beam, completing the replacement of the old wire rope with the new wire rope; S4: debugging stage; S41: The operator measures the height of the new main hoisting gantry hook beam, starts the new main hoisting gantry hook beam, and tries to use the new main hoisting gantry hook beam, so as to timely understand the safety performance of the new main hoisting gantry hook beam and collect feedback after the test; S42: New installation data is obtained according to the debugging, and the time used in the traditional installation and the new installation operation process is recorded respectively, and the two installation data are compared to obtain that the new installation data is improved in terms of time, efficiency and accuracy.
2. The method for replacing the main reel hook crossbeam of a large metallurgical bridge crane according to claim 1, characterized in that: After the old steel rope on the lifting drum is lowered in S31, two turns of the old steel rope need to be reserved on the pressing plate.
3. The method for replacing the main reel hook crossbeam of a large metallurgical bridge crane according to claim 1, characterized in that: In the S38, under the action of the main hoisting drum, the connection point between the new steel rope and the old steel rope passes around each active pulley and fixed pulley in turn.
4. The method for replacing the main reel hook crossbeam of a large metallurgical bridge crane according to claim 1, characterized in that: The S33 introduces one end of the old steel rope into the new movable pulley, and the insertion direction of the old steel rope and the new movable pulley is consistent with the insertion direction of the old steel rope and the old movable pulley.
Citation Information
Patent Citations
Method for replacing steel wire rope and gantry hook of large-scale bridge crane simultaneously
CN102009917A
Device for detecting the replacement state of wear of a high-strength fibre rope during use in lifting gear
CN105683085A
Rope binding device of crane
KR1020170112293A