An assembled frame installation structure
Through the design of hinge plates and clamping structures, the complex structure and poor detachability caused by threaded connections in existing prefabricated buildings are solved, and a simple, long-life and repeatable prefabricated skeleton installation structure is realized.
Patent Information
- Application Number
- CN202111596192.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-24
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2041-12-24
AI Technical Summary
Threaded connections in existing prefabricated buildings lead to complex structures, large damage to the beam body, short service life and poor removability.
The hinge plate and clamping structure are adopted to achieve clamping and fixing of the beam body through the hinge shaft and clamping structure, avoiding threaded holes, and the design is simple and repetitively disassembled.
It realizes a prefabricated skeleton installation structure with a simple structure, a long service life and can be removable, improving assembly efficiency and service life.
Smart Images

Figure CN114737679B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of decoration design.
[0002] In particular, the present invention relates to an assembled frame mounting structure. Background Art
[0003] The current decoration industry is developing towards the direction of industrialized modular installation. Generally speaking, beam decoration is a commonly used decoration method in interior design, which can increase the sense of layering of the interior space and play a role in beautifying the decoration.
[0004] When assembling a prefabricated building, the building frame is first spliced and constructed. The existing crossbeam is generally installed by rotating the thread, and the threaded connection is easily affected by moisture and causes internal rust, which causes inconvenience during disassembly. For example, Chinese patent utility model patent CN210887916U relates to a prefabricated building beam and floor frame connection device, which is used for connecting the main beam and the crossbeam. The connection device includes a first connection member detachably connected to the main beam, a second connection member detachably connected to the crossbeam, and a third connection member detachably connected to the floor frame. The first connection member includes a first fixing plate and a second fixing plate arranged oppositely, and a first connecting plate arranged between the first fixing plate and the second fixing plate. A first card slot is formed around the first fixing plate, the second fixing plate and the first connecting plate, and the first card slot is clamped on the main beam. The first fixing plate and the second fixing plate are respectively provided with a second connection member, and the second connection member is provided with a second card slot clamped on the crossbeam. The first connecting plate is provided with a third connection member, and the third connection member is provided with a third card slot clamped on the floor frame, and the installation axes of the third card slot and the first card slot are arranged vertically. The above structure has fast installation speed, flexible adjustment and reduces production cost.
[0005] However, the above connection device still has the following problems: the structure is complex, threaded holes need to be drilled on the beam body, which causes great damage to the beam body, has a short service life, and has poor disassembly capability.
[0006] Therefore, in order to solve the above problems, it is necessary for us to design a reasonable and efficient assembled frame installation structure. Summary of the invention
[0007] The object of the present invention is to provide an assembled frame installation structure which has a simple structure, does not use threaded holes for clamping and fixing the beam body, has a long service life, and has good repeatability and disassembly.
[0008] In order to achieve the above object, the present invention adopts the following technical solutions:
[0009] A prefabricated skeleton installation structure includes a base plate, a hinge plate is provided at the end of the base plate, a shell is provided on the side of the base plate, a clamping structure for clamping the side of a beam body is provided at one end of the shell away from the base plate, and a hinge shaft is provided on the base plate to facilitate the installation and rotation of the hinge plate. The clamping structure includes a fixed plate arranged at the end of the shell away from the base plate, an inner cavity opened toward the beam body in the fixed plate, a stepped groove plate arranged at the opening of the inner cavity, and a first connecting plate arranged in the inner cavity, a second connecting plate connected to the first connecting plate through a hinge rod is provided on the side of the fixed plate close to the beam body, a through hole is provided on the side of the fixed plate away from the beam body, and a resistance rod for passing through the through hole is provided on the side of the first connecting plate away from the beam body, so that when the hinge plate rotates to resist the resistance rod, the first connecting plate and the second connecting plate are squeezed by the hinge plate to move toward the beam body until the second connecting plate is clamped on the side of the beam body.
[0010] As a preferred embodiment of the present invention, hinge plates are provided at both ends of the base plate, and two sets of clamping structures for clamping two sides of the beam body are provided at the end of the shell body.
[0011] As a preferred embodiment of the present invention, the end of the base plate is provided with a groove for facilitating the rotation of the hinge plate and a spring groove with an opening toward the groove, the hinge shaft is arranged between the spring groove and the groove, a clamping rod and an extending spring for connecting the clamping rod and the bottom of the spring groove are arranged in the spring groove, and a clamping groove for facilitating the clamping of the clamping rod is arranged at one end of the hinge plate close to the hinge shaft.
[0012] As a preferred embodiment of the present invention, the end of the hinged plate is provided with a guide groove for facilitating the sliding of the clamping rod.
[0013] As a preferred embodiment of the present invention, the thickness of the first connecting plate is smaller than the depth of the inner cavity, and a limiting spring is provided between the first connecting plate and the stepped groove plate.
[0014] As a preferred embodiment of the present invention, a first slide groove and a first slider and a second slider for sliding in the first slide groove are provided on one side of the first connecting plate close to the second connecting plate, and a first spring is provided between the first slider and the second slider; a second slide groove and a third slider and a fourth slider for sliding in the second slide groove are provided on one side of the second connecting plate close to the first connecting plate, and a second spring is provided between the third slider and the fourth slider.
[0015] As a preferred embodiment of the present invention, the first slider is arranged on a side of the second slider away from the housing; and the third slider is arranged on a side of the fourth slider away from the housing.
[0016] As a preferred embodiment of the present invention, the articulated rod includes a first articulated rod for connecting the first slider and the fourth slider and a second articulated rod for connecting the second slider and the third slider; the middle part of the first articulated rod is hingedly connected to the middle part of the second articulated rod.
[0017] As a preferred embodiment of the present invention, a protrusion is provided on a side of the second connecting plate away from the first connecting plate.
[0018] As a preferred embodiment of the present invention, one end of the interference rod away from the first connecting plate is arranged in an arc shape.
[0019] The beneficial effects of the assembled frame installation structure of the present invention are: simple structure, no thread punching is used to clamp and fix the beam body, long service life, and good repeatability and disassembly. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a schematic diagram of the overall structure of an embodiment of an assembled frame installation structure of the present invention when the beam body is not clamped;
[0021] Figure 2 This is a schematic diagram of the overall structure of an embodiment of an assembled frame installation structure of the present invention when the beam body is clamped;
[0022] Figure 3 for Figure 1 An enlarged schematic diagram of A in FIG.
[0023] Figure 4 for Figure 1 An enlarged schematic diagram of point B in FIG.
[0024] Figure 5 It is a structural schematic diagram of a base plate end portion in an embodiment of an assembled frame installation structure of the present invention;
[0025] In the figure: 1, base plate, 11, hinge plate, 111, slot, 112, guide slot, 12, hinge shaft, 13, groove, 14, spring slot, 141, clamping rod, 142, spring, 2, beam body, 3, clamping structure, 31, fixing plate, 32, inner cavity, 33, stepped groove plate, 331, limit spring, 34, first connecting plate, 341, first slot, 342, first slider, 343, second slider, 344, first spring, 35, second connecting plate, 351, second slot, 352, third slider, 353, fourth slider, 354, second spring, 355, protrusion, 36, hinged rod, 37, resistance rod, 4, shell. DETAILED DESCRIPTION
[0026] The following are specific embodiments of the present invention, which further describe the technical solutions of the present invention, but the present invention is not limited to these embodiments.
[0027] Various exemplary embodiments of the present invention will now be described in detail with reference to the accompanying drawings. It should be noted that unless otherwise specifically stated, the relative arrangement and steps of modules and steps set forth in these embodiments do not limit the scope of the present invention.
[0028] At the same time, it should be understood that for the convenience of description, the processes in the drawings are not just performed separately, but multiple steps are performed in an interlaced manner.
[0029] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, or the positions or positional relationships in which the product of the present invention is usually placed when in use. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.
[0030] The following description of at least one exemplary embodiment is merely illustrative in nature and is in no way intended to limit the invention, its application, or uses.
[0031] Technologies, methods, and systems known to ordinary technicians in the relevant art may not be discussed in detail, but where appropriate, the technologies, methods, and systems should be considered part of the authorization specification.
[0032] Embodiment 1: Figures 1 to 5The figure is only one of the embodiments of the present invention, an assembled skeleton installation structure, including a base plate 1, a hinge plate 11 is arranged at the end of the base plate 1, a shell 4 is arranged on the side of the base plate 1, and a clamping structure 3 for clamping the side of the beam body 2 is arranged at the end of the shell 4 away from the base plate 1, and a hinge shaft 12 for facilitating the installation and rotation of the hinge plate 11 is arranged on the base plate 1, and the clamping structure 3 includes a fixing plate 31 arranged at the end of the shell 4 away from the base plate 1, an inner cavity 32 opened toward the direction of the beam body 2 arranged in the fixing plate 31, and a stepped groove plate 33 arranged at the opening of the inner cavity 32. And a first connecting plate 34 is arranged in the inner cavity 32, a second connecting plate 35 connected to the first connecting plate 34 through a hinge rod 36 is arranged on the side of the fixing plate 31 close to the beam body 2, a through hole is arranged on the side of the fixing plate 31 away from the beam body 2, and a resistance rod 37 for passing through the through hole is arranged on the side of the first connecting plate 34 away from the beam body 2, so that when the hinge plate 11 rotates to resist the resistance rod 37, the first connecting plate 34 and the second connecting plate 35 are squeezed by the hinge plate 11 to move toward the beam body 2 until the second connecting plate 35 is clamped on the side of the beam body 2.
[0033] In the present invention, the substrate 1 is the skeleton body. The substrate 1 is lifted to the height of the beam body 2. The clamping structure 3 on the side of the substrate 1 is triggered by the hinge plate 11 to clamp the side of the beam body. The connection between the substrate 1 and the beam body 2 is not completed. After that, other decorative structures can be installed on the substrate 1.
[0034] First, the structure of the end of the base plate 1 , the end of the base plate 1 is provided with a hinge plate 11 , the base plate 1 is provided with a hinge shaft 12 for facilitating the installation and rotation of the hinge plate 11 , and the hinge plate 11 rotates around the axis of the hinge shaft 12 .
[0035] Here, the end of the base plate 1 is provided with a groove 13 for facilitating the rotation of the hinge plate 11 and a spring groove 14 with an opening toward the groove 13, the hinge shaft 12 is arranged between the spring groove 14 and the groove 13, the spring groove 14 is provided with a clamping rod 141 and an extension spring 142 for connecting the clamping rod 141 and the bottom of the spring groove 14, and the end of the hinge plate 11 close to the hinge shaft 12 is provided with a clamping groove 111 for facilitating the clamping rod 141 to be inserted; the hinge plate 11 rotates around the hinge shaft 12, and when the hinge plate 11 rotates to be parallel to the end plane of the base plate 1, a part of the hinge plate 11 just lies in the groove 13, and at this time, the movable end of the hinge plate 11 is just far away from the clamping rod 141, and at this time, the clamping groove 111 is aligned with the clamping rod 141, and the clamping rod 141 is extended and inserted into the clamping groove 111 under the elastic force of the extension spring 142, and the hinge plate 11 will not be able to rotate again.
[0036] Next is the setting of the clamping structure 3. A shell 4 is provided on the side of the substrate 1, and a clamping structure 3 for clamping the side of the beam body 2 is provided at one end of the shell 4 away from the substrate 1. The clamping structure 3 includes a fixing plate 31 provided at the end of the shell 4 away from the substrate 1, an inner cavity 32 opened toward the beam body 2 in the fixing plate 31, a stepped groove plate 33 provided at the opening of the inner cavity 32, and a first connecting plate 34 provided in the inner cavity 32. A second connecting plate 35 connected to the first connecting plate 34 through a hinge rod 36 is provided on the side of the fixing plate 31 close to the beam body 2, a through hole is provided on the side of the fixing plate 31 away from the beam body 2, and a resistance rod 37 for passing through the through hole is provided on the side of the first connecting plate 34 away from the beam body 2.
[0037] Then, when the hinge plate 11 rotates to abut against the abutting rod 37 , the first connecting plate 34 and the second connecting plate 35 are squeezed by the hinge plate 11 to move toward the beam body 2 until the second connecting plate 35 is clamped on the side of the beam body 2 .
[0038] Of course, hinge plates 11 are provided at both ends of the base plate 1 , and two sets of clamping structures 3 for clamping the two sides of the beam body 2 are provided at the end of the shell 4 .
[0039] When there is no need to connect the base plate 1 with the beam body 2 , the hinge plate 11 is arranged perpendicular to the end surface of the base plate 1 .
[0040] When the base plate 1 needs to be connected to the beam body 2, it is only necessary to bend the hinge plate 11 and rotate it around the hinge axis 12 until the hinge plate 11 is parallel to the end surface of the base plate 1 and the clamping rod 141 is inserted into the clamping groove 111. At this time, the hinge plate 11 squeezes the contact rod 37, the first connecting plate 34 and the second connecting plate 35 to move toward the beam body 2, so that the second connecting plate 35 clamps the beam body 2 away from the side of the first connecting plate 34.
[0041] When the connection between the base plate 1 and the beam body 2 needs to be disassembled, it is only necessary to use a tool to push the clamping rod 141 into the spring slot 14 until the clamping rod 141 is disengaged from the clamping slot 111. At this time, the hinge plate 11 can be rotated to disengage the resistance rod 37, and the second connecting plate 35 releases the beam body 2.
[0042] In order to allow the second connecting plate 35 to release the beam body 2, the thickness of the first connecting plate 34 is smaller than the depth of the inner cavity 32, and a limit spring 331 is provided between the first connecting plate 34 and the stepped groove plate 33. When the hinged plate 11 is separated from the resistance rod 37, the elastic force of the limit spring 331 (actually a return spring) causes the resistance rod 37, the first connecting plate 34 and the second connecting plate 35 to move away from the beam body 2, and the second connecting plate 35 releases the beam body 2.
[0043] The assembled frame installation structure of the present invention has a simple structure, does not use threaded holes to clamp and fix the beam body, has a long service life, and has good repeatability and disassembly.
[0044] Embodiment 2, still as Figures 1 to 5 The figure shown is only one of the embodiments of the present invention. On the basis of the first embodiment, in an assembled skeleton installation structure of the present invention, the end of the hinged plate 11 is provided with a guide groove 112 for facilitating the sliding of the card rod 141, so as to facilitate the sliding of the card rod 141 in the guide groove 112 and limit the sliding of the card rod 141. Of course, the guide groove 112 is an arc-shaped groove.
[0045] In addition, a first slide groove 341 and a first slider 342 and a second slider 343 for sliding in the first slide groove 341 are provided on one side of the first connecting plate 34 close to the second connecting plate 35, and a first spring 344 is provided between the first slider 342 and the second slider 343; a second slide groove 351 and a third slider 352 and a fourth slider 353 for sliding in the second slide groove 351 are provided on one side of the second connecting plate 35 close to the first connecting plate 34, and a second spring 354 is provided between the third slider 352 and the fourth slider 353.
[0046] Here, the first slider 342 is disposed on a side of the second slider 343 away from the housing 4 ; the third slider 352 is disposed on a side of the fourth slider 353 away from the housing 4 .
[0047] Of course, the articulated rod 36 includes a first articulated rod for connecting the first slider 342 and the fourth slider 353 and a second articulated rod for connecting the second slider 343 and the third slider 352; the middle part of the first articulated rod and the middle part of the second articulated rod are articulated.
[0048] Finally, a protrusion 355 is provided on one side of the second connecting plate 35 away from the first connecting plate 34. The friction between the second connecting plate 35 and the beam body 2 can be increased, so that the clamping effect is better.
[0049] Finally, the end of the abutment rod 37 away from the first connecting plate 34 is in an arc shape, so as to prevent the abutment rod 37 from being damaged by scratches with the hinge plate 11, and prolong the service life.
[0050] The assembled frame installation structure of the present invention has a simple structure, does not use threaded holes to clamp and fix the beam body, has a long service life, and has good repeatability and disassembly.
[0051] The present invention is not limited to the above specific implementations, and the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made to the above implementations based on the technical essence of the present invention shall be included in the protection scope of the present invention.
Claims
1. An assembled frame installation structure, characterized in that: The invention comprises a base plate (1), an end of the base plate (1) is provided with a hinge plate (11), a side of the base plate (1) is provided with a shell (4), an end of the shell (4) away from the base plate (1) is provided with a clamping structure (3) for clamping the side of the beam body (2), a hinge shaft (12) is provided on the base plate (1) for facilitating the installation and rotation of the hinge plate (11), the clamping structure (3) comprises a fixing plate (31) provided at an end of the shell (4) away from the base plate (1), an inner cavity (32) provided in the fixing plate (31) and opening toward the beam body (2), a stepped groove plate (33) provided at the opening of the inner cavity (32), and a fixing plate (31) provided at the fixing plate (31). and a first connecting plate (34) arranged in the inner cavity (32); a second connecting plate (35) connected to the first connecting plate (34) via a hinge rod (36) is arranged on a side of the fixing plate (31) close to the beam body (2); a through hole is arranged on a side of the fixing plate (31) away from the beam body (2); and a resisting rod (37) for passing through the through hole is arranged on a side of the first connecting plate (34) away from the beam body (2), so that when the hinge plate (11) rotates to resist the resisting rod (37), the first connecting plate (34) and the second connecting plate (35) are squeezed by the hinge plate (11) to move toward the beam body (2). until the second connecting plate (35) is clamped on the side of the beam body (2); the end of the base plate (1) is provided with a groove (13) for facilitating the rotation of the hinge plate (11) and a spring groove (14) with an opening facing the groove (13); the hinge shaft (12) is arranged between the spring groove (14) and the groove (13); the spring groove (14) is provided with a clamping rod (141) and an extending spring (142) for connecting the clamping rod (141) and the bottom of the spring groove (14); the end of the hinge plate (11) close to the hinge shaft (12) is provided with a clamping groove (111) for facilitating the clamping of the clamping rod (141); A first slide groove (341) and a first slider (342) and a second slider (343) for sliding in the first slide groove (341) are arranged on one side of the first connecting plate (34) close to the second connecting plate (35); a first spring (344) is arranged between the first slider (342) and the second slider (343); a second slide groove (351) and a third slider (352) and a fourth slider (353) for sliding in the second slide groove (351) are arranged on one side of the second connecting plate (35) close to the first connecting plate (34); a second spring (354) is arranged between the third slider (352) and the fourth slider (353).
2. The assembled frame installation structure according to claim 1, characterized in that: Both ends of the base plate (1) are provided with hinged plates (11), and the ends of the shell (4) are provided with two groups of clamping structures (3) for clamping two sides of the beam body (2).
3. The assembled frame installation structure according to claim 1, characterized in that: The end of the hinged plate (11) is provided with a guide groove (112) for facilitating the sliding of the clamping rod (141).
4. The assembled frame installation structure according to claim 1, characterized in that: The thickness of the first connecting plate (34) is smaller than the depth of the inner cavity (32), and a limit spring (331) is provided between the first connecting plate (34) and the stepped groove plate (33).
5. The assembled frame installation structure according to claim 1, characterized in that: The first sliding block (342) is arranged on a side of the second sliding block (343) away from the housing (4); and the third sliding block (352) is arranged on a side of the fourth sliding block (353) away from the housing (4).
6. The assembled frame installation structure according to claim 5, characterized in that: The hinged rod (36) comprises a first hinged rod for connecting the first slider (342) and the fourth slider (353) and a second hinged rod for connecting the second slider (343) and the third slider (352); the middle part of the first hinged rod is hingedly connected to the middle part of the second hinged rod.
7. The assembled frame installation structure according to claim 1, characterized in that: A protrusion (355) is provided on a side of the second connecting plate (35) away from the first connecting plate (34).
8. The assembled frame installation structure according to claim 1, characterized in that: One end of the resisting rod (37) away from the first connecting plate (34) is arranged in an arc shape.
