A method for filling coal mine long wall goaf with paste strips without template
Through the template-free paste strip filling method, the problems of high cost and low efficiency in traditional filling methods are solved, efficient coal mining and surface stability control are achieved, and the environment is protected.
Patent Information
- Application Number
- CN202210409430.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-04-19
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2042-04-19
AI Technical Summary
The traditional long-wall paste filling mining method requires hanging filling templates, which results in high initial investment in filling, high later operating costs, low coal mining efficiency in the working face, and low filling efficiency, which affects surface stability and environmental protection.
Using the template-free paste strip filling method, coal-based solid waste and water are stirred on the surface to form a non-gelling slurry, and mixed with cementitious materials underground to form an inorganic paste with short initial setting time and high initial strength. , using the gaps in the goaf to mine and fill simultaneously to construct a strip filling body, avoiding the need to erect filling templates and special hydraulic supports.
It greatly reduces the initial investment and operating costs of filling, improves coal mining efficiency, reduces surface deformation and environmental impact, and achieves active control of overlying rock movement and protection of surface stability.
Smart Images

Figure CN114837736B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of coal mine filling and mining, and in particular relates to a template-free paste strip filling method for a coal mine long wall goaf area. Background Art
[0002] Most of the coal mines in my country are equipped with longwall mining technology. After coal mining, the overburden in the mining area will produce collapse, fracture, delamination and sinking. Filling mining is the main technical way to alleviate the overburden movement and surface subsidence in longwall mining. Filling mining uses solid waste such as coal gangue as the main filling material to fill the mine underground, which can not only reduce the discharge of waste such as gangue, but also slow down mining subsidence, and meet the requirements of coal circular economy and green mining. The traditional longwall paste filling mining adopts the method of filling the whole goaf, which requires hanging filling templates and using special filling hydraulic supports. The filling operation and coal mining operation cannot be carried out at the same time, resulting in high initial filling investment and later operation costs, low coal mining efficiency at the working face, etc. Therefore, it is necessary to provide a new paste filling method for the goaf of longwall coal mines to solve the above technical problems. This filling method will be of great significance for actively controlling the movement of overburden, protecting water resources, controlling surface deformation and protecting the mining environment. Summary of the invention
[0003] The inventors found that the traditional longwall paste filling mining adopts the method of filling the goaf in full, resulting in large filling volume and low filling efficiency; coal mining and filling work affect each other and cannot be carried out in parallel; filling templates need to be hung, and the installation of filling templates takes a long time; the paste solidifies slowly, affecting the filling efficiency. As shown in Table 1, taking a coal mine in Shanxi Province as an example, the time and proportion of each process in the current filling method coal mining (each shift working time underground is 8 hours). Each "coal mining-filling" cycle takes a total of 48 hours (6 shifts). It is worth mentioning that the entire filling process takes only 8 hours on the working face with a total length of about 260 meters, and it takes an additional 8 hours to wait for the initial setting of the filling body. However, it took up to 24 hours to complete the closing process of the filling space before the filling process. In addition, due to the lack of in-depth understanding of the theory of overburden control of the filling body, the working face of each coal mining process in the full filling method of the mine is currently only advanced by 2.4 meters.
[0004] Process coal mining Closed filling space filling Waiting for the filling to solidify Time per cycle (hours) 8 24 8 8 The time proportion of each cycle (%) 16.7 50 16.7 16.7
[0005] Table 1 The time and proportion of each process in the full backfill method of coal mining in a coal mine in Shanxi Province
[0006] If a qualified filling body can be formed without setting up a filling template, a large amount of time in the sealing process will be saved. However, no solution for filling the goaf without setting up a filling template has been found in the current literature.
[0007] After research and development, the inventors have provided a method for filling the goaf of a longwall surface in a coal mine; the specific technical solution is:
[0008] A method for filling a coal mine longwall goaf comprises the following steps:
[0009] 1) Mixing coal-based solid waste and water on the surface to form a non-gelled slurry; the mass percentage of the coal-based solid waste in the slurry is 80.0% to 83.6%; the balance is water; pumping the non-gelled slurry to a batching and mixing device in an underground drift;
[0010] 2) The cementitious material is fed from the feeding well to the underground buffer bin, and then transported to the batching and mixing device in the underground chute by a belt conveyor;
[0011] 3) The non-gelling slurry and the gelling material are mixed evenly by a batching and stirring device to form a paste;
[0012] 4) Without setting up a filling formwork, the paste is piled up along the extension direction of the roadway as the coal mining progresses to form a strip-shaped filling body with a cross section in the shape of a normal distribution diagram.
[0013] Furthermore, the slump of the paste is 15 to 18 cm, and the initial setting time is 45 to 70 min; the strength of the filling body at 2 hours is in the range of 0.4 to 0.6 MPa, and the strength at 28 days is in the range of 4 to 8 MPa.
[0014] Furthermore, the mass ratio of the cementitious material to the coal-based solid waste is 3:97 to 6:94.
[0015] Furthermore, the cementitious material is prepared by mixing 100 parts by mass of P.O42.5R ordinary Portland cement and adding 3 to 6 parts by mass of J85 type accelerating agent.
[0016] Furthermore, the batching and stirring device is composed of a plurality of mixing units connected in series; the mixing unit is provided with a fixed spiral blade twisted by 180 degrees, and the fixed spiral blades in two adjacent sections rotate in opposite directions and are staggered by 90 degrees.
[0017] Furthermore, the coal-based solid waste is composed of coal gangue and fly ash. In order to facilitate pumping of the non-gelled slurry and reduce the wear of the slurry on the pipeline, the particle size grading of the coal-based solid waste needs to contain a certain proportion of powder. The mass ratio of the coal gangue to the fly ash is 3:1 to 5:1, and the particle size between 0.2mm and 3mm in the particle size grading of the coal-based solid waste accounts for 40% to 50%, the particle size between 0.08mm and 0.2mm accounts for 20-30%, the particle size less than 0.08mm accounts for 15-20%, and the rest is coal gangue with a particle size of 3mm to 15mm.
[0018] The technical solution of the present invention is to prepare an inorganic paste with a short initial setting time and high initial strength, and utilize the characteristics of the paste such as high concentration, high stability, small slump, low water seepage rate and easy accumulation, arrange filling branch pipes at regular intervals behind the hydraulic support of the longwall working face, utilize the gaps in the goaf to pump the paste into the goaf in the form of mining and filling, thereby constructing a strip filling body.
[0019] The filling method does not require setting up a filling template or a special filling hydraulic support during filling. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a top view of the paste strip filling in the long wall goaf without formwork frame;
[0021] Figure 2 It is a cross-sectional view of the arrangement of the main pipe and branch pipes in the hydraulic support;
[0022] Figure 3 This is a schematic diagram of the long wall goaf area without formwork and the paste strip filling before direct collapse;
[0023] Figure 4 This is a schematic diagram of the long wall goaf area after direct collapse due to paste strip filling without formwork.
[0024] In the figure: 1. Transport chute; 2. Return air chute; 3. Gob-side tunnel; 4. Abandoned tunnel; 5. Filling wall; 6. Filling body; 7. Comprehensive mining working face; 8. Filling main pipe; 9. Filling branch pipe; 10. Hydraulic support; 11. Basic top; 12. Direct top; 13. Filling gap; 14. Direct top fragments. DETAILED DESCRIPTION
[0025] The present invention is described more fully below using embodiments. The present invention can be embodied in many different forms and should not be construed as being limited to the exemplary embodiments described herein.
[0026] In the method for filling coal mine longwall goaf with template-free paste strips in this embodiment, non-cementitious slurry is prepared on the surface, and cementitious material (P.O42.5R ordinary Portland cement + J85 type quick-setting agent) is prepared in the underground drift.
[0027] The paste strips are arranged as Figure 1 shown.
[0028] An inorganic paste with a short initial setting time and high initial strength is prepared by separately mixing non-gelled slurry and cementitious materials at the underground working face chute filling site. In addition, filling branches are arranged at regular intervals behind the hydraulic support of the longwall working face by utilizing the gaps in the goaf and pumping the paste into the goaf in the form of mining and filling, thereby constructing a strip filling body.
[0029] Since the paste has a short initial setting time and high initial strength, there is no need to set up a filling formwork or a special filling hydraulic support during filling.
[0030] The filling material adopts a material system of coal-based solid waste (coal gangue, fly ash, etc.) + P.O42.5R ordinary Portland cement + J85 type accelerator. The ratio of coal-based solid waste to filling materials is 94% to 97%, the ratio of P.O42.5R ordinary Portland cement to filling materials is 3% to 6%, the addition amount of J85 type accelerator is 3% to 6% of the cement amount, the mass concentration of paste is 81% to 84%, the mass ratio of water is 16% to 19%, and the slump is 15 to 18 cm.
[0031] The initial setting time of the above filling body can be shortened to 45-70 minutes, and the strength of the filling body at 28 days old is in the range of 4-8 MPa.
[0032] The main route of the filling pipeline is laid out from the surface filling station and extends to the longwall mining face. The pipeline at the working face is laid at the bottom of the non-cutting wall of the return air chute. When it is laid to about one working day's coal cutting progress from the mining site (a modern high-yield and high-efficiency mine has a daily coal cutting progress of about 15m), the segmented metal pipes are replaced with segmented hoses and extended to the entire mining site.
[0033] One working day is set as a filling cycle. After each cycle, the length of the corresponding metal pipe is reduced according to the coal cutting footage of the day.
[0034] The filling main pipe of the stope is arranged between two rows of columns of the hydraulic support. At the same time, the filling main pipe is branched, and the branch pipe is erected between two hydraulic supports or in a specially reserved filling window. Each branch pipe corresponds to a designed filling body. Figure 2 As shown, the paste outlet height is the designed filling body height.
[0035] After the filling main pipe leads to each branch pipe, valves are installed at the branch pipes close to the main pipe; when necessary, any branch line can be closed.
[0036] The center distance of the filling body is determined according to the requirements of top control, which can directly reflect the effect of the periodic pressure step distance on the basic top of the mining field after the implementation of filling. That is, if the periodic pressure step distance increases, it means that the overburden movement has eased and the purpose of top control has been achieved. According to the above analysis, taking the basic top periodic pressure step distance of 20m under similar mining geological conditions or adjacent working faces as an example, at the same time, it is calculated based on the standard that no less than 2 strips and no more than 3 strips are constructed under this periodic pressure step distance, and the strip spacing is a multiple of the center distance of the hydraulic support. The center distance of the hydraulic support is 1.5m, and the center distance of the filling body is 6m, 7.5m or 9m. After the strip filling is implemented on site, the changes in the periodic pressure step distance are measured to verify the top control effect of this filling method.
[0037] The filling height of the filling body is determined according to the mining thickness of the coal seam, the stability of the immediate roof, and the thickness of the immediate roof. The design is based on the fact that the combined effect of the filling body and the collapsed and broken gangue can support the basic roof, thereby achieving the purpose of actively controlling the movement of the overburden and the surface subsidence from the source. Taking the coal seam thickness of 4m, the immediate roof of 5m, the basic roof of 6m, and the direct roof expansion coefficient of 1.4 as an example, the height of the collapsed immediate roof is 7m, and the sum of the thickness of the coal seam and the immediate roof is 9m. Taking a coefficient of 1.5, the stacking height of the filling body is 3m. That is, a filling body with a maximum stacking height of 3m and a cross-sectional shape similar to the normal distribution with an aspect ratio of 1.70-1.80 is constructed. The collapsed and broken gangue is accumulated after the filling body and can immediately support the basic roof. Figure 3 , Figure 4 shown.
[0038] Furthermore, the filling method constructs a filling body wall at the end of the transport chute of the coal mining face, retains the transport chute as the return air chute of the next working face, achieves the purpose of leaving a tunnel along the empty space, and thus improves the resource recovery rate.
[0039] The length of the filling bag forming the filling wall is about 3m, the width is about 1.5~2m determined according to the mining pressure of the working face and the strength of the filling body, and the height is consistent with the height of the drift.
[0040] Preferably, the gangue is crushed gangue. To facilitate pumping, the maximum particle size of the gangue is 15 mm. Depending on the particle size grading of the gangue, the mass ratio of gangue to fly ash is 3:1 to 5:1, and the particle size between 0.2 mm and 3 mm in the particle size grading of coal-based solid waste accounts for 40% to 50%, the particle size between 0.08 mm and 0.2 mm accounts for 20-30%, the particle size less than 0.08 mm accounts for 15-20%, and the rest is gangue with a particle size of 3 mm to 15 mm.
[0041] The filling method is to mix the crushed coal gangue, fly ash and water according to the proportion on the surface, stir them to form a non-gelled slurry and pump it into the mine; the cementitious material is fed from the feeding well to the underground buffer bin, and the cementitious material is transported to the batching and mixing device in the underground chute by a belt conveyor, and the non-gelled slurry and cementitious material are fully mixed and stirred and then pumped to the filling area.
[0042] The filling method is to mix the non-cementitious slurry with the cementitious material underground to form a paste; the stirring device is composed of several mixing units in series, and each mixing unit is provided with a fixed spiral blade twisted by 180°. The fixed spiral blades are divided into left-handed and right-handed; the spiral blades in two adjacent sections rotate in opposite directions, and the fixed positions are staggered by 90°. Among them, the spiral blades of the batching and stirring device are inactive, and only the high-pressure slurry and cementitious powder are moved. Without the need for external power, the non-cementitious slurry will produce three effects of diversion, cross-mixing and reverse vortex through the batching and stirring device, so that the cementitious powder of the two media added is quickly and evenly diffused into the entire non-cementitious slurry, achieving the purpose of instant mixing, and the mixing efficiency is as high as 90-95%.
[0043] At the beginning of the filling cycle, the mixing, slurrying and pumping of the non-gelled slurry and the mixing of the gelled material are started first; after the slurry is transported to the downhole batching and stirring device, the mixed gelled material is added; the non-gelled slurry and the gelled material are mixed evenly by the stirring device to form a paste.
[0044] 1) When starting to fill, reduce the angle between the filling branch pipe 9 and the ground; the paste forms a conical filling initial body on the ground.
[0045] 2) As the height of the initial filling body increases, the angle between the filling branch pipe 9 and the ground gradually increases until the height of the conical initial filling body is consistent with the designed filling height.
[0046] 3) The filling branch pipe 9 moves gradually along the mining direction, that is, moves synchronously with the hydraulic support, and the moving speed is about 1m / h; through continuous accumulation, a filling body 6 is formed; due to the fast initial setting speed of the paste, there is no need to set up a filling template, or only temporarily use a filling template at the bottom for shaping, so as to form a filling body 6 with a cross-sectional shape of a normal distribution shape with an aspect ratio of 1.70-1.80.
[0047] Before the filling cycle is over, stop adding the gelling material and continue pumping the non-gelling slurry to flush the pipeline. Since the non-gelling slurry has poor gelling ability and does not solidify in the pipeline, it has the advantage of not needing to flush the entire pipeline with clean water.
[0048] The above examples are only used to illustrate the present invention. In addition, there are many different implementations. These implementations are all conceivable by those skilled in the art after understanding the concept of the present invention. Therefore, they are not listed here one by one.
Claims
1. A method for filling a coal mine longwall goaf, characterized in that: The following steps are involved: 1) Mixing coal-based solid waste and water on the surface to form a non-gelled slurry; the mass percentage of the coal-based solid waste in the slurry is 80.0% to 83.6%; the balance is water; pumping the non-gelled slurry to a batching and mixing device in an underground drift; 2) The cementitious material is fed from the feeding well to the underground buffer bin, and then transported to the batching and mixing device in the underground chute by a belt conveyor; 3) The non-gelling slurry and the gelling material are mixed evenly by a batching and stirring device to form a paste; 4) Without setting up a filling formwork, the paste is piled up along the extension direction of the roadway as the coal mining progresses to form a strip-shaped filling body with a cross section in the shape of a normal distribution diagram; The mass ratio of the cementitious material to the coal-based solid waste is 3:97 to 6:94; The cementitious material is prepared by mixing 100 parts by mass of P.O42.5R ordinary Portland cement and adding 3 to 6 parts by mass of J85 type accelerating agent.
2. The method for filling the goaf of a coal mine longwall as claimed in claim 1, characterized in that: The paste has a slump of 15 to 18 cm and an initial setting time of 45 to 70 min; the strength of the filling body at 2 hours is in the range of 0.4 to 0.6 MPa, and the strength at 28 days is in the range of 4 to 8 MPa.
3. The method for filling the goaf of a coal mine longwall as claimed in claim 1, characterized in that: The batching and stirring device is composed of a plurality of mixing units connected in series; the mixing unit is provided with a fixed spiral blade twisted by 180 degrees, and the fixed spiral blades in two adjacent sections rotate in opposite directions and are staggered by 90 degrees.