Underground gas storage and its site selection and transformation method

Through a combination of geological analysis and plugging, water level monitoring and water replenishment wells, the sealing and cost problems of converting abandoned mine tunnels into high-pressure underground gas storages were solved, and efficient underground gas storage sealing and low-cost transformation were achieved.

CN114876572BActive Publication Date: 2024-10-01CHANGSHA UNIVERSITY OF SCIENCE AND TECHNOLOGY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111142705.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-09-28
Publication Date
2024-10-01
Estimated Expiration
2041-09-28

AI Technical Summary

Technical Problem

In the existing technology, high-pressure underground gas storage warehouses converted from abandoned mines have problems with sealing and high reconstruction costs.

Method used

By collecting geological data, we draw geological plans and profiles, analyze the lithology of the roof and floor, and determine whether specific conditions are met, such as the existence of a combination structure of aquifers and confined aquifers, set plugs and water level monitoring replenishment wells, and use polymer mortar Or mud can seal the cracks in the aquifer to form a sealed underground gas storage.

Benefits of technology

Making full use of the natural formation sealing performance and groundwater pressure, it reduces the engineering cost of underground gas storage sealing measures, improves the utilization efficiency of waste space, reduces engineering reconstruction costs, and simplifies the construction process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114876572B_ABST
    Figure CN114876572B_ABST
Patent Text Reader

Abstract

The present invention discloses an underground gas storage and a site selection and reconstruction method for reconstructing the underground gas storage by using an abandoned mine cave, which fully utilizes the good sealing performance, low permeability and groundwater pressure of natural strata to seal high-pressure gas, and can greatly reduce the engineering cost of sealing measures for the underground gas storage; at the same time, the underground abandoned spaces such as the goaf of the abandoned mine cave and various abandoned caverns are utilized, and the utilization efficiency of the underground abandoned space is greatly improved; in addition, the abandoned mine cave roof determined according to the site selection step has the characteristics of good deformation resistance and high strength, and therefore, there is no need to carry out large-scale reinforcement treatment on the original abandoned goaf and its tunnels, thereby greatly reducing the cost of engineering reconstruction; the present invention has a simple anti-seepage structure, a simple engineering construction process, and low construction technical difficulty, and can further improve the construction technology level of reconstructing large-scale underground gas storage by using abandoned mine caves.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of underground gas storage, and in particular relates to a site selection and reconstruction method for reconstructing an underground gas storage by utilizing an abandoned mine cave, and an underground gas storage. Background Art

[0002] For the mining of various mineral deposits buried deep underground, a series of tunnels or chambers need to be excavated, and a large number of goafs will be left after the mineral deposits are mined. For goafs with good roof rock quality, backfilling is generally not carried out after mining; at the same time, underground spaces such as preparation tunnels and development tunnels built for underground mining needs will also be retained after the mining work is completed.

[0003] There are two ways to utilize abandoned mine space: single development and utilization and multiple development and utilization. Single development and utilization is to transform the abandoned mine space into a material storage space, such as water storage, gas storage, oil storage, and compressed air energy storage. In order to achieve the goals of carbon peak and carbon neutrality, the use of abandoned mines to build underground gas storage for compressed air energy storage power stations has received high attention in countries around the world. Some scholars have conducted exploratory research on this, but most of these studies are based on conceptual discussions. In practical engineering applications, there are still some key technical problems that have not been solved. In addition, although there are a large number of abandoned mine spaces in countries around the world, not all abandoned mine spaces are suitable for conversion into underground gas storage, especially underground gas storage for compressed air energy storage power stations.

[0004] For underground gas storage, ensuring its sealing is the key. The invention patent with application number CN201610353657.5 discloses a design method using horizontal and vertical water curtains to prevent natural gas leakage in the storage tank. This method is not suitable for gas storage rebuilt in goaf areas. The invention patent with application number 202010352353.3 proposes to use the method of adding water curtains and curtains to achieve the sealing of high-pressure gas. Since the gas pressure sealed in the underground gas storage is as high as 10MPa or more, the required water seal pressure is high and the cost of transformation is high. Summary of the invention

[0005] The purpose of the present invention is to provide a site selection and reconstruction method for reconstructing an underground gas storage using an abandoned mine cave, so as to solve the problems of sealing and excessively high reconstruction cost in the existing reconstruction of high-pressure underground gas storage using abandoned mine caves.

[0006] The present invention solves the above technical problems through the following technical solutions: a site selection and reconstruction method for reconstructing an underground gas storage using an abandoned mine cave, comprising:

[0007] Collect hydrogeology, engineering geology and various geological data revealed during the mining period of abandoned mines, and organize and draw geological plan maps and geological profiles of abandoned mines;

[0008] Analyze the lithology of the roof and floor of the underground space according to the geological profile, and qualitatively determine the strength characteristics, permeability characteristics and groundwater pressure distribution characteristics of the roof and the rock layers above the roof; the underground space includes the goaf and its tunnels;

[0009] Determine whether the abandoned mine cave meets the following conditions at the same time. If so, determine that the abandoned mine cave is the official site of the underground gas storage:

[0010] Condition 1: The top plate and the rock formations above the top plate contain a stratigraphic structure consisting of at least one aquiclude and one confined aquifer;

[0011] Condition 2: The plane coverage of the aquiclude and the confined aquifer is verified according to the geological plane map, and the plane coverage exceeds the horizontal boundary of the goaf and its tunnels by at least 500m;

[0012] Condition 3: Obtain the permeability of the waterproof layer, calculate the minimum thickness of the waterproof layer according to the permeability, and the actual thickness of the waterproof layer is 1.5 to 2 times the minimum thickness;

[0013] Condition 4: Analyze the buried depth of the goaf and its tunnels, and the buried depth of the goaf and its tunnels is greater than 200m;

[0014] Condition 5: Analyze the groundwater level above the goaf and its tunnels, and the distance between the upper boundary of the goaf and its tunnels and the groundwater level surface is at least greater than 150m.

[0015] Furthermore, there are two ways to obtain the permeability. The first is to collect the permeability of the aquiclude obtained during mineral exploitation, and the second is to conduct a drilling water pressure test in an abandoned mine to obtain the permeability of the aquiclude.

[0016] Furthermore, the calculation expression of the minimum thickness is:

[0017]

[0018] Where H is the minimum thickness, in m; k is the permeability of the aquiclude, in m 2 ; t is the operating time of the gas storage, in seconds; p1 is the maximum gas storage pressure of the underground gas storage, in Pa; p2 is the water pressure of the aquiclude, in Pa; μ is the viscosity coefficient, in Pa.s.

[0019] Furthermore, in the condition 4, the buried depth of the goaf and its tunnels is 200 to 500 meters.

[0020] Furthermore, the site selection and transformation method also includes:

[0021] A plug is arranged in the vertical shaft corresponding to the waterproof layer, wherein the plug and the waterproof layer together form a sealing layer;

[0022] A water level monitoring and water replenishment well is set above the goaf and its tunnel, one end of the water level monitoring and water replenishment well is located in the confined aquifer, and the other end extends upward out of the ground;

[0023] A water pit is excavated at the bottom of the vertical shaft, and a submersible pump is arranged in the water pit, wherein the submersible pump is connected to the vertical shaft corresponding to the submerged aquifer through a drainage pipe;

[0024] Set up gas inlet and outlet pipes in the injection and production well, and cast and seal the gap between the injection and production well and the waterproof layer;

[0025] The local cracks in the aquiclude and the unfavorable geological bodies are sealed by grouting, thus forming a complete and sealed underground gas storage.

[0026] Furthermore, the plug is a reinforced concrete plug containing an entry manhole.

[0027] The present invention also provides an underground gas storage facility transformed by the site selection and transformation method as described above, comprising a bottom plate, a goaf area and its tunnels, a roof plate located above the goaf area and its tunnels, a vertical shaft, a submerged aquifer, and an injection and production well; the roof plate comprises at least one aquiclude and a confined aquifer; and further comprises a water level monitoring and water replenishment well, one end of the water level monitoring and water replenishment well being located in the confined aquifer, and the other end sequentially passes through the aquiclude and submerged aquifer on the confined aquifer and extends out of the ground;

[0028] A plug is provided in the vertical shaft corresponding to the aquiclude, and the plug and the aquiclude form a sealing layer together; a water accumulation pit is provided at the bottom of the vertical shaft, a submersible pump is arranged in the water accumulation pit, and the submersible pump is connected to the vertical shaft corresponding to the submerged aquifer through a drainage pipe; inlet and outlet gas pipes are provided in the injection and production well, and the gap between the injection and production well and the aquiclude is cast and sealed; local cracks in the aquiclude and poor geological bodies are grouting-sealed.

[0029] Furthermore, polymer mortar or polymer mud is used to perform grouting and plugging of local cracks and poor geological bodies in the waterproof layer.

[0030] Beneficial Effects

[0031] Compared with the prior art, the advantages of the present invention are:

[0032] The site selection and reconstruction method for reconstructing an underground gas storage using an abandoned mine cave provided by the present invention fully utilizes the good sealing performance, low permeability and groundwater pressure of natural strata to seal high-pressure gas, which can greatly reduce the engineering cost of sealing measures for the underground gas storage cave; at the same time, it utilizes underground abandoned spaces such as goafs of abandoned mine caves and various abandoned caverns, greatly improving the utilization efficiency of underground abandoned spaces; in addition, the abandoned mine cave roof determined according to the site selection steps has the characteristics of good deformation resistance and high strength, so there is no need to carry out large-scale reinforcement treatment on the original abandoned goafs and their tunnels, thereby greatly reducing the cost of engineering reconstruction.

[0033] The anti-seepage structure of the present invention is simple, the engineering construction process is simple, and the construction technology is of low difficulty, which can further improve the construction technology level of reconstructing large-scale underground gas storage by utilizing abandoned mines. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] In order to more clearly illustrate the technical solution of the present invention, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only one embodiment of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0035] Figure 1 It is a schematic diagram of the plan layout of an underground gas storage converted from an abandoned mine cave in an embodiment of the present invention;

[0036] Figure 2 It is a schematic cross-sectional structure diagram of an underground gas storage converted from an abandoned mine in an embodiment of the present invention;

[0037] Figure 3 It is a schematic diagram of the boundary of the goaf and its tunnel in the embodiment of the present invention.

[0038] Among them, 1-bottom plate, 2-tunnel, 3-goaf, 4-vertical shaft, 5-aquiclude, 6-confined aquifer, 7-unconfined aquifer, 8-injection and production well, 9-water level monitoring and water replenishment well, 10-plug, 11-submersible pump, 12-drainage pipe, 13-groundwater level, 14-water pit, 15-gap between injection and production well and aquiclude, 17-horizontal boundary of aquiclude, 18-horizontal boundary of tunnel, 19-horizontal boundary of goaf. DETAILED DESCRIPTION

[0039] The following is a clear and complete description of the technical solutions in the present invention in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0040] The technical solution of the present application is described in detail with specific embodiments below. The following specific embodiments can be combined with each other, and the same or similar concepts or processes may not be described in detail in some embodiments.

[0041] The present embodiment provides a site selection and reconstruction method for reconstructing an underground gas storage using an abandoned mine cave, which includes two parts, namely, a site selection part and a reconstruction part. The specific implementation steps of the site selection include:

[0042] Step 1: Collect the hydrogeological, engineering geological and various geological data revealed during the mining period of the abandoned mine, and organize and draw the geological plan and geological profile of the abandoned mine.

[0043] The geological data related to abandoned mines are existing data and can be obtained and collected through the National Geological Data Center, geological data information service platform and other channels.

[0044] Step 2: Analyze the rock properties of the roof and floor of the underground space based on the geological profile, and qualitatively determine the strength characteristics, permeability characteristics and groundwater pressure distribution characteristics of the roof and the rock strata above the roof; the underground space includes the goaf and its tunnels.

[0045] Abandoned mines have goafs and tunnels. Making full use of underground space mainly involves making full use of goafs and tunnels. Figure 1 As shown in the figure, there are goafs and tunnels in the abandoned mine. Above the goafs and tunnels are the roof and the rock layers above the roof. The roof is mainly subjected to the pressure of high-pressure compressed air, and needs to have higher strength requirements. At the same time, the rock strength of the roof or the rock layers above the roof is very high, which not only has good sealing performance, but also has good water-proof effect.

[0046] Step 3: If the roof and the rock layers above the roof contain a stratigraphic combination structure consisting of at least one aquiclude and one confined aquifer, the abandoned mine cave is preliminarily determined as an alternative site for the underground gas storage.

[0047] like Figure 2 As shown, there is a bottom plate below the goaf and its tunnels, and a top plate and rock layers above the top plate. If the top plate and the rock layers above the top plate contain at least one impermeable layer and one confined aquifer, it means that the goaf and the tunnels above have good anti-seepage performance and good water sealing performance, and the abandoned mine can be preliminarily determined as an alternative site for underground gas storage.

[0048] Step 4: Check the plane coverage of the aquiclude and confined aquifer above the goaf and its tunnels based on the geological plane map, and determine whether the plane coverage exceeds the horizontal boundary of the goaf and its tunnels by at least 500m (e.g. Figure 3If yes, the abandoned mine is further determined as an alternative site for underground gas storage.

[0049] In most cases, the gas seepage impact range of the goaf and its tunnels is less than 500m. Therefore, the plane coverage of the aquifer and the confined aquifer exceeds the horizontal boundary of the goaf and its tunnels by at least 500m, which can ensure that high-pressure gas will not leak from the side of the gas storage reservoir.

[0050] Step 5: Obtain the permeability of the aquiclude and calculate the minimum thickness of the aquiclude based on the permeability.

[0051] In this embodiment, there are two ways to obtain the permeability of the aquiclude. The first is to collect the permeability of the aquiclude during mining, and the second is to conduct a drilling water pressure test at an abandoned mine site to obtain the permeability of the aquiclude.

[0052] The minimum thickness of the waterproof layer is calculated as:

[0053]

[0054] Where H is the minimum thickness, in m; k is the permeability of the aquiclude, in m 2 ; t is the operating time of the gas storage, in seconds; p1 is the maximum gas storage pressure of the underground gas storage, in Pa; p2 is the water pressure of the aquiclude, in Pa; μ is the viscosity coefficient, in Pa.s.

[0055] Step 6: If the actual thickness of the impermeable layer is 1.5 to 2 times its minimum thickness, the abandoned mine is further determined as an alternative site for the underground gas storage.

[0056] The actual thickness of the waterproof layer is 1.5 to 2 times its minimum thickness, indicating good anti-seepage ability.

[0057] Step 7: Analyze the buried depth of the goaf and its tunnels. If the buried depth of the goaf and its tunnels is greater than 200m, further determine the abandoned mine as an alternative site for underground gas storage.

[0058] The buried depth of the goaf and its tunnels is greater than 200m. The greater the buried depth, the better the stability of the goaf and its tunnels, the smaller the ground deformation under the action of high-pressure gas, and the safer the gas storage. If the buried depth is too small, the safety risk of the gas storage is high. In this embodiment, the preferred value of the buried depth is 200-500m.

[0059] Step 8: Analyze the height of the natural groundwater level above the goaf and its tunnels. If the distance between the upper boundary of the goaf and its tunnels and the natural groundwater level is at least greater than 150m, the abandoned mine is determined as the official site of the underground gas storage.

[0060] The distance between the upper boundary of the goaf and its tunnels and the natural groundwater level is at least greater than 150m, indicating that it has good water sealing performance for the high-pressure gas in the gas storage reservoir.

[0061] If the abandoned mine cave meets the conditions recorded in steps 3, 4, 6, 7, and 8 at the same time (there is no order requirement for steps 3, 4, 6, 7, and 8, they only need to be met at the same time), it can be determined that the abandoned mine cave can be used as the official site or site selection for the underground gas storage reservoir of the compressed air energy storage power station.

[0062] The specific implementation steps of the transformation part include:

[0063] Step 9: A plug is installed in the vertical shaft corresponding to the waterproof layer, and the plug and the waterproof layer together form a sealing layer.

[0064] like Figure 2 As shown, plugs are provided in the vertical shafts corresponding to each waterproof layer, and the plugs and the corresponding waterproof layer together form a sealing layer to cut off the leakage channel of the high-pressure gas enclosed in the goaf, thereby improving the sealing of the underground gas storage.

[0065] Abandoned mines are generally distributed with vertical shafts or inclined shafts, or both. As passages, vertical shafts and inclined shafts are generally connected to goafs. To prevent high-pressure gas from leaking from vertical shafts or inclined shafts, plugs are needed to seal them. In some cases, there may be no vertical shafts used for mining above the available abandoned mines. In this case, new vertical shafts should be excavated in goafs or abandoned tunnels at the locations converted into gas storages as passages for high-pressure gas to enter and exit the gas storages. Vertical shafts are best arranged in the center of the converted gas storages.

[0066] In this embodiment, the plug is a reinforced concrete plug with an entry manhole.

[0067] Step 10: Set up a water level monitoring and water replenishment well above the goaf and its tunnels. One end of the water level monitoring and water replenishment well is located in the pressurized aquifer, and the other end extends upward out of the ground.

[0068] There are two functions of water level monitoring and water replenishment wells: one is to monitor the dynamic changes of the groundwater level above the gas storage reservoir converted from an abandoned mine, and provide a basis for judging the leakage of high-pressure gas in the gas storage reservoir; the other is that when the groundwater level drops and the water seal performance is insufficient, water level monitoring and water replenishment wells can be used to artificially replenish water to the pressurized aquifer and the submerged aquifer that provide the water seal pressure for the gas storage reservoir to restore the water seal pressure.

[0069] Step 11: dig a water pit at the bottom of the vertical shaft, and arrange a submersible pump in the water pit. The submersible pump is connected to the vertical shaft corresponding to the submerged aquifer through a drainage pipe.

[0070] During the construction period, the water pit can be used to drain the water accumulated in the gas storage reservoir during the construction process. During the operation period, the water that penetrates into the gas storage reservoir from the surrounding rock can be drained to the submerged aquifer through a submersible pump. The water seepage pumping and drainage facilities composed of the water pit, submersible pump and drainage pipe ensure the gas storage capacity of the gas storage reservoir.

[0071] A phreatic aquifer is an aquifer not far from the surface of the earth. All projects will have phreatic aquifers. Both phreatic aquifers and confined aquifers are two forms of groundwater distribution.

[0072] Step 12: Set up inlet and outlet gas pipelines in the injection and production well, and cast and seal the gap between the injection and production well and the waterproof layer.

[0073] Highly elastic, anti-permeability and anti-cracking materials are used to cast and seal the gap between the inlet and outlet gas pipelines and the waterproof layer to prevent high-pressure gas from leaking along the injection and production wells.

[0074] Step 13: Grouting is performed to seal local cracks in the aquiclude and poor geological bodies, thereby forming a complete and sealed underground gas storage reservoir.

[0075] For cracks in the roof caused by mining and local poor geological bodies, polymer mortar or polymer mud is used for grouting and sealing to prevent local leakage.

[0076] like Figure 1 and 2 As shown, this embodiment also provides an underground gas storage facility transformed by the site selection and transformation method as described above, including a bottom plate, a goaf and its tunnels, a top plate located above the goaf and its tunnels, a vertical shaft, a submerged aquifer, and an injection and production well; the top plate includes at least one aquiclude and one confined aquifer; and also includes a water level monitoring and water replenishment well, one end of which is located in the confined aquifer, and the other end passes through the aquiclude and submerged aquifer on the confined aquifer in sequence and extends out of the ground.

[0077] Plugs are installed in the vertical shafts corresponding to each aquiclude, and the plugs and the corresponding aquiclude form a sealing layer together; a water accumulation pit is provided at the bottom of the vertical shaft, and a submersible pump is arranged in the water accumulation pit, and the submersible pump is connected to the vertical shaft corresponding to the submerged aquifer through a drainage pipe; inlet and outlet pipes are provided in the injection and production wells, and the gap between the injection and production wells and the aquiclude is cast and sealed; local cracks in the aquiclude and poor geological bodies are sealed by grouting.

[0078] What is disclosed above is only a specific implementation mode of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can easily think of changes or modifications within the technical scope disclosed in the present invention, which should be covered within the protection scope of the present invention.

Claims

1. A site selection and reconstruction method for reconstructing an underground gas storage using an abandoned mine cave, characterized in that: include: Collect hydrogeology, engineering geology and various geological data revealed during the mining period of abandoned mines, and organize and draw geological plan maps and geological profiles of abandoned mines; Analyze the lithology of the roof and floor of the underground space according to the geological profile, and qualitatively determine the strength characteristics, permeability characteristics and groundwater pressure distribution characteristics of the roof and the rock layers above the roof; the underground space includes the goaf and its tunnels; Determine whether the abandoned mine cave meets the following conditions at the same time. If so, determine that the abandoned mine cave is the official site of the underground gas storage: Condition 1: The top plate and the rock formations above the top plate contain a stratigraphic structure consisting of at least one aquiclude and one confined aquifer; Condition 2: The plane coverage of the aquiclude and the confined aquifer is verified according to the geological plane map, and the plane coverage exceeds the horizontal boundary of the goaf and its tunnels by at least 500m; Condition 3: Obtain the permeability of the waterproof layer, calculate the minimum thickness of the waterproof layer according to the permeability, and the actual thickness of the waterproof layer is 1.5 to 2 times the minimum thickness; Condition 4: Analyze the buried depth of the goaf and its tunnels, and the buried depth of the goaf and its tunnels is greater than 200m; Condition 5: Analyze the groundwater level above the goaf and its tunnels, and the distance between the upper boundary of the goaf and its tunnels and the groundwater level is at least greater than 150m; A plug is arranged in the vertical shaft corresponding to the waterproof layer, wherein the plug and the waterproof layer together form a sealing layer; A water level monitoring and water replenishment well is set above the goaf and its tunnel, one end of the water level monitoring and water replenishment well is located in the confined aquifer, and the other end extends upward out of the ground; A water pit is excavated at the bottom of the vertical shaft, and a submersible pump is arranged in the water pit, wherein the submersible pump is connected to the vertical shaft corresponding to the submerged aquifer through a drainage pipe; Set up gas inlet and outlet pipes in the injection and production well, and cast and seal the gap between the injection and production well and the waterproof layer; The local cracks in the aquiclude and the unfavorable geological bodies are sealed by grouting, thus forming a complete and sealed underground gas storage.

2. The site selection and reconstruction method for reconstructing an underground gas storage using an abandoned mine cave as claimed in claim 1 is characterized in that: There are two ways to obtain the permeability. The first is to collect the permeability of the aquiclude obtained during mining, and the second is to conduct a drilling water pressure test in an abandoned mine to obtain the permeability of the aquiclude.

3. The site selection and reconstruction method for reconstructing an underground gas storage using an abandoned mine cave as claimed in claim 1 is characterized in that: The calculation expression of the minimum thickness is: Where H is the minimum thickness, in m; k is the permeability of the aquiclude, in m 2 ; t is the operating time of the gas storage, in seconds; p1 is the maximum gas storage pressure of the underground gas storage, in Pa; p2 is the water pressure of the aquiclude, in Pa; μ is the viscosity coefficient, in Pa.s.

4. The site selection and reconstruction method for reconstructing an underground gas storage using an abandoned mine cave as claimed in claim 1, characterized in that: In condition 4, the buried depth of the goaf and its tunnels is 200 to 500 meters.

5. The site selection and reconstruction method for reconstructing an underground gas storage using an abandoned mine cave as claimed in claim 1, characterized in that: The plug is a reinforced concrete plug containing an entry manhole.

6. An underground gas storage facility transformed by the site selection and transformation method according to claim 1 or 5, comprising a bottom plate, a goaf and its tunnels, a roof plate located above the goaf and its tunnels, a vertical shaft, a submerged aquifer, and an injection and production well; the roof plate comprises at least one aquiclude and one confined aquifer; characterized in that: It also includes a water level monitoring and water replenishment well, one end of which is located in the confined aquifer, and the other end of which passes through the aquifer and the phreatic aquifer on the confined aquifer in sequence and extends out of the ground; A plug is provided in the vertical shaft corresponding to the aquiclude, and the plug and the aquiclude form a sealing layer together; a water accumulation pit is provided at the bottom of the vertical shaft, a submersible pump is arranged in the water accumulation pit, and the submersible pump is connected to the vertical shaft corresponding to the submerged aquifer through a drainage pipe; inlet and outlet gas pipes are provided in the injection and production well, and the gap between the injection and production well and the aquiclude is cast and sealed; local cracks in the aquiclude and poor geological bodies are grouting-sealed.

7. The underground gas storage according to claim 6, characterized in that: Polymer mortar or polymer mud is used to perform grouting and plugging of local cracks and poor geological bodies in the waterproof layer.