A coke oven gas final cooler resistance cleaning system and use method

By setting up a lean oil pipeline, a remaining ammonia water pipeline and a circulation pump in the coke oven gas final cooler, the final cooler can be cleaned, the problem of condensate tank clogging during the cleaning process has been solved, the investment cost has been reduced and the gas final efficiency has been improved. Cold efficiency.

CN114891541BActive Publication Date: 2024-10-01SHANDONG PROVINCE METALLURGICAL ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210594585.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-05-27
Publication Date
2024-10-01
Estimated Expiration
2042-05-27

AI Technical Summary

Technical Problem

During the cleaning process of the coke oven gas final cooler, the condensate tank and pipes were blocked due to the excessive temperature of the remaining ammonia water, which affected the final cooling effect of the gas. In addition, the existing solutions increased investment and floor space.

Method used

Design a coke oven gas final cooler resistance cleaning system. By setting up lean oil pipes, remaining ammonia water pipes, spray liquid circulation pipes, vent liquid pipes and drain pipes, the circulating pump is used for cleaning to prevent the vent liquid from entering the condensate tank. Achieve two cleanings to reduce final cooler resistance and reduce investment and floor space.

Benefits of technology

It effectively reduces the resistance of the final cooler, avoids clogging of the condensate tank and pipes, reduces the investment cost, and takes into account the circulation of the condensate and the discharge of the vent liquid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114891541B_ABST
    Figure CN114891541B_ABST
Patent Text Reader

Abstract

The invention discloses a coke oven gas final cooler resistance cleaning system and a use method, belonging to the technical field of final cooler cleaning. The coke oven gas final cooler resistance cleaning system comprises a lean oil pipeline, a residual ammonia water pipeline, a spray liquid circulation pipeline, a venting liquid pipeline, a drainage pipeline, a final cooler and a circulation pump unit. The final cooler comprises a final cooler A and a final cooler B. The spray liquid circulation pipeline comprises a spray liquid inlet pipeline, a spray liquid outlet pipeline and a spray liquid pump inlet pipeline. The lean oil pipeline and the residual ammonia water pipeline are respectively connected to the top of the final cooler A and the final cooler B. The bottom of the final cooler A and the final cooler B is connected to the venting liquid pipeline. The venting liquid pipeline and the drainage pipeline are connected through the circulation pump unit. The system can clean the final cooler twice to reduce the resistance of the final cooler, reduce the investment cost and avoid the problem of naphthalene blocking the condensate tank and the pipeline.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of final coolers, in particular to a resistance cleaning system for a coke oven gas final cooler and a use method thereof. Background Art

[0002] In the process of washing benzene in the final cooling of coke oven gas, the final cooler, as an important equipment for final cooling of gas, is prone to enriching naphthalene and other substances during the production process, which causes increased equipment resistance. The final cooler is often equipped with a spare. During the normal switching process of the final cooler, the cleaning of the final cooler and the final cooling of gas are generally carried out at the same time. During the cleaning process of the final cooler, residual ammonia water is generally required to clean it to reduce the resistance of the final cooler.

[0003] CN108441268A discloses a method for a coke oven gas treatment system. The treatment system comprises a front process, a benzene washing tower, an oil-rich pump, a final cooler, a spray liquid circulation pump, and a subsequent process. The front process comprises a blast cooling unit, a desulfurization unit, and a deammoniation unit. The subsequent process is a crude benzene distillation unit. The raw gas produced by the coke oven is connected to the blast cooling unit, the desulfurization unit, and the deammoniation unit in sequence through pipelines, and then enters the final cooler for final cooling and cooling of the coke oven gas. The gas then enters the benzene washing tower. The clean gas produced by the benzene washing tower is sent to gas users through a clean gas pipeline. During the final cooling of the gas, the gas is cooled by circulating water and low-temperature water. The condensate in the gas flows into a condensate tank and is circulated and sprayed by a spray liquid circulation pump. After the final cooling, the gas enters the benzene washing tower and is countercurrently contacted with the lean oil entering the benzene washing tower. The rich oil produced is sent to the crude benzene distillation unit through a pipeline by a rich oil pump. The system illustrates the main process of the coke oven gas final cooling and benzene washing process and the principle of using residual ammonia water to reduce the resistance of the final cooler.

[0004] The temperature of the remaining ammonia water is too high, and it cannot be directly mixed into the condensate tank during the cleaning process. If it is mixed into the condensate tank, it will affect normal production. If it is cooled and then enters the final cooler, there will be no good effect. When the remaining ammonia water discharged during the cleaning of the final cooler is mixed with the condensate sprayed during normal production, the temperature will rise, thus affecting the final cooling effect of the coal gas. After mixing, the temperature of the remaining ammonia water decreases, and because the ammonia water contains naphthalene, the temperature decrease will cause naphthalene to be re-enriched in the condensate tank or pipeline, causing the condensate tank or pipeline to form a blockage, affecting the final cooling of the coal gas. It is also possible to set up an additional condensate tank, and the remaining ammonia water after normal cleaning is stored in a separate condensate tank and then pumped out of the boundary area by a separate pump. This method does not affect the normal final cooling of the coal gas, but setting up a separate condensate tank and pump will increase investment and occupy a larger area. And there is also the problem of enriching naphthalene, causing the condensate tank and pipeline to be blocked. Summary of the invention

[0005] The purpose of the present invention is to solve the problems raised in the background technology, and to provide a coke oven gas final cooler resistance cleaning system and a method for using the system. The system can clean the final cooler after switching under normal final cooling of the gas to reduce the final cooler resistance, without the need to set up a separate condensate tank and a separate pump, and can achieve the same effect, thereby reducing investment costs and avoiding the problem of clogging the condensate tank and pipelines.

[0006] To achieve the above-mentioned purpose, the technical solution of the present invention is a coke oven gas final cooler resistance cleaning system, comprising a lean oil pipeline, a residual ammonia water pipeline, a spray liquid circulation pipeline, a venting liquid pipeline, a drainage pipeline, a final cooler and a circulation pump unit, wherein the final cooler comprises a final cooler A and a final cooler B, and the spray liquid circulation pipeline comprises a spray liquid inlet pipeline, a spray liquid outlet pipeline and a spray liquid pump inlet pipeline, wherein the spray liquid inlet pipeline is respectively connected to the top of the final cooler A and the final cooler B, and one end of the spray liquid outlet pipeline is connected to the top of the final cooler A and the final cooler B. They are respectively connected to the bottom of the final cooler A and the final cooler B, the other end of the spray liquid outlet pipe is connected to the condensate tank, one end of the spray liquid inlet pump pipe is connected to the condensate tank, the other end of the spray liquid inlet pump pipe is connected to the spray liquid inlet pipe through the circulating pump unit, the lean oil pipe and the residual ammonia water pipe are respectively connected to the top of the final cooler A and the final cooler B, the bottom of the final cooler A and the final cooler B is connected to the venting liquid pipe, and the venting liquid pipe and the drain pipe are connected through the circulating pump unit.

[0007] Furthermore, a lean oil inlet valve A is provided between the lean oil pipeline and the top of the final cooler A, and a lean oil inlet valve B is provided between the lean oil pipeline and the top of the final cooler B.

[0008] Furthermore, a residual ammonia water inlet valve A is provided between the residual ammonia water pipeline and the top of the final cooler A, and a residual ammonia water inlet valve B is provided between the residual ammonia water pipeline and the top of the final cooler B.

[0009] Furthermore, a spray liquid inlet valve A is arranged between the spray liquid inlet pipe and the top of the final cooler A, and a spray liquid inlet valve B is arranged between the spray liquid inlet pipe and the top of the final cooler B; a spray liquid outlet valve A is arranged between the spray liquid outlet pipe and the bottom of the final cooler A, and a spray liquid outlet valve B is arranged between the spray liquid outlet pipe and the bottom of the final cooler B.

[0010] Furthermore, the circulation pump unit includes a spray liquid circulation pump A and a spray liquid circulation pump B.

[0011] Furthermore, the spray liquid pump inlet pipeline is respectively connected to the spray liquid circulation pump A and the spray liquid circulation pump B, a pump A inlet valve 2 is arranged between the spray liquid pump inlet pipeline and the spray liquid circulation pump A, and a pump B inlet valve 2 is arranged between the spray liquid pump inlet pipeline and the spray liquid circulation pump B.

[0012] Furthermore, a pump A outlet valve 1 is provided between the spray liquid circulation pump A and the spray liquid inlet pipeline, and a pump B outlet valve 1 is provided between the spray liquid circulation pump B and the spray liquid inlet pipeline.

[0013] Furthermore, a vent valve A is provided between the final cooler A and the vent liquid pipeline, and a vent valve B is provided between the final cooler B and the vent liquid pipeline.

[0014] Furthermore, a pump A inlet valve 1 is provided between the venting liquid pipeline and the spraying liquid circulation pump A, and a pump B inlet valve 1 is provided between the venting liquid pipeline and the spraying liquid circulation pump B.

[0015] Furthermore, a second pump A outlet valve is provided between the spray liquid circulation pump A and the discharge pipe, and a second pump B outlet valve is provided between the spray liquid circulation pump B and the discharge pipe.

[0016] A method for using a coke oven gas final cooler resistance cleaning system comprises the following steps:

[0017] (1) When the final cooler A and the final cooler B are in normal production, the condensate is sprayed on the final cooler A and the final cooler B respectively through the spray liquid circulation pump A and the spray liquid circulation pump B; when spraying the final cooler A, open the outlet valve 1 of pump A and close the outlet valve 2 of pump A, and the condensate is pumped from the spray liquid circulation pump A to the spray liquid inlet pipeline; open the spray liquid inlet valve A, close the lean oil inlet valve A and the residual ammonia inlet valve A, and the condensate sent from the spray liquid inlet pipeline enters the final cooler A through the spray liquid inlet valve A for spraying, open the spray liquid outlet valve A, close the vent valve A, and the condensate after spraying passes through the spray liquid outlet valve A and enters the condensate tank; open the inlet valve 2 of pump A, close the inlet valve 1 of pump A, and the condensate entering the condensate tank passes through the spray liquid outlet valve A. The spraying liquid enters the spraying liquid circulation pump A through the pump inlet pipeline and the pump A inlet valve 2 for circulating spraying; when spraying the final cooler B, open the pump B outlet valve 1, close the pump B outlet valve 2, and the condensate is pumped from the spraying liquid circulation pump B to the spraying liquid inlet pipeline; open the spraying liquid inlet valve B, close the lean oil inlet valve B and the residual ammonia inlet valve B, and the condensate sent from the spraying liquid inlet pipeline enters the final cooler B through the spraying liquid inlet valve B for spraying, open the spraying liquid outlet valve B, close the vent valve B, and the condensate after spraying passes through the spraying liquid outlet valve B and enters the condensate tank; open the pump B inlet valve 2, close the pump B inlet valve 1, and the condensate entering the condensate tank passes through the spraying liquid pump inlet pipeline and the pump B inlet valve 2 to enter the spraying liquid circulation pump B for circulating spraying;

[0018] (2) When the final cooler A is in normal production and the final cooler B is to be cleaned, the residual ammonia water is first cleaned and the residual ammonia water is sent from the boundary area to the residual ammonia water pipeline; the residual ammonia water inlet valve B is opened, the lean oil inlet valve B and the spraying liquid inlet valve B are closed, and the spraying liquid sent from the residual ammonia water pipeline enters the final cooler B through the residual ammonia water inlet valve B for spray cleaning; the vent valve B is opened, and the spraying liquid outlet valve B is closed. The vent liquid after cleaning passes through the vent valve B and enters the vent liquid pipeline; the pump B inlet valve 1 is opened, and the pump B inlet valve 2 is closed. The vent liquid entering the vent liquid pipeline passes through the pump B inlet valve 1 and enters the spraying liquid circulation pump B. The pump B outlet valve 2 is opened, and the pump B outlet valve 1 is closed. The vent liquid is pumped out by the spraying liquid circulation pump B through the vent valve B. The oil is sent out of the boundary area through the second outlet valve of pump B and the discharge pipeline; then the lean oil is cleaned and sent from the boundary area to the lean oil pipeline; the lean oil inlet valve B is opened, the residual ammonia inlet valve B and the spraying liquid inlet valve B are closed, and the spraying liquid sent from the lean oil pipeline passes through the lean oil inlet valve B into the final cooler B for spray cleaning, the vent valve B is opened, the spraying liquid outlet valve B is closed, and the venting liquid after cleaning passes through the vent valve B and enters the venting liquid pipeline; the inlet valve 1 of pump B is opened, the inlet valve 2 of pump B is closed, and the venting liquid entering the venting liquid pipeline passes through the inlet valve 2 of pump B and enters the spraying liquid circulation pump B, the outlet valve 2 of pump B is opened, the outlet valve 1 of pump B is closed, and the venting liquid is pumped out by the spraying liquid circulation pump B through the outlet valve 2 of pump B and the discharge pipeline to be sent out of the boundary area;

[0019] (3) When the final cooler B is in normal production and the final cooler A is to be cleaned, the residual ammonia water is first cleaned and the residual ammonia water is sent from the boundary area to the residual ammonia water pipeline; the residual ammonia water inlet valve A is opened, the lean oil inlet valve A and the spraying liquid inlet valve A are closed, and the spraying liquid sent from the residual ammonia water pipeline enters the final cooler A through the residual ammonia water inlet valve A for spray cleaning; the vent valve A is opened, and the spraying liquid outlet valve A is closed, and the vent liquid after cleaning passes through the vent valve A and enters the vent liquid pipeline; the inlet valve 1 of pump A is opened, and the inlet valve 2 of pump A is closed, and the vent liquid entering the vent liquid pipeline passes through the inlet valve 1 of pump A and enters the spraying liquid circulation pump A; the outlet valve 2 of pump A is opened, and the outlet valve 1 of pump A is closed, and the vent liquid is pumped out by the spraying liquid circulation pump A through the vent valve 2 of pump A. The oil is sent out of the boundary area through the second outlet valve of pump A and the discharge pipe; then the lean oil is cleaned and the lean oil is sent from the boundary area to the lean oil pipe; the lean oil inlet valve A is opened, the residual ammonia inlet valve A and the spraying liquid inlet valve A are closed, and the spraying liquid sent from the lean oil pipe enters the final cooler A through the lean oil inlet valve A for spray cleaning, the vent valve A is opened, the spraying liquid outlet valve A is closed, and the vent liquid after cleaning passes through the vent valve A and enters the vent liquid pipe; the inlet valve one of pump A is opened, the inlet valve two of pump A is closed, the vent liquid entering the vent liquid pipe enters the spraying liquid circulation pump A through the inlet valve two of pump A, the outlet valve two of pump A is opened, the outlet valve one of pump A is closed, and the vent liquid is pumped out by the spraying liquid circulation pump A through the outlet valve two of pump A and the discharge pipe to be sent out of the boundary area.

[0020] Compared with the prior art, the present invention has the following beneficial effects:

[0021] 1. By setting up venting liquid pipelines and drainage pipelines, the venting liquid after cleaning the final cooler is discharged to the boundary area through a circulating pump, which prevents the venting liquid from entering the condensate tank, and further prevents the condensate temperature after mixing from being too high to affect the final cooling effect. In addition, since ammonia water contains naphthalene, the temperature drop will cause naphthalene to be re-enriched in the condensate tank or pipeline, resulting in blockage of the condensate tank or pipeline, affecting the final cooling effect of coal gas. The venting liquid after cleaning is directly sent away, and there is no temperature drop that causes naphthalene to block the condensate tank and pipeline.

[0022] 2. By setting up a lean oil pipeline and a residual ammonia water pipeline, and using residual ammonia water and lean oil for two cleanings, it is easier to clean out substances such as naphthalene enriched on the final cooler that affect the resistance of the final cooler.

[0023] 3. Through the spraying liquid circulation pump, the circulation of condensate and the discharge of venting liquid are taken into account, reducing investment and floor space. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0025] Figure 1 It is a schematic diagram of the overall structure of the present invention.

[0026] In the accompanying drawings, the components represented by the reference numerals are listed as follows:

[0027] 1. Final cooler A; 2. Final cooler B; 3. Condensate tank; 4. Spraying liquid circulation pump A; 5. Spraying liquid circulation pump B; 6. Lean oil inlet valve A; 7. Residual ammonia inlet valve A; 8. Spraying liquid inlet valve A; 9. Lean oil inlet valve B; 10. Residual ammonia inlet valve B; 11. Spraying liquid inlet valve B; 12. Spraying liquid outlet valve A; 13. Vent valve A; 14. Spraying liquid outlet valve B; 15. Vent valve B; 16 1. Pump A inlet valve one; 17. Pump A inlet valve two; 18. Pump B inlet valve one; 19. Pump B inlet valve two; 20. Pump A outlet valve one, 21. Pump A outlet valve two; 22. Pump B outlet valve one; 23. Pump B outlet valve two; 24. Lean oil pipeline; 25. Residual ammonia pipeline; 26. Spray liquid inlet pipeline; 27. Drain pipeline; 28. Spray liquid inlet pump pipeline; 29. ​​Spray liquid outlet pipeline; 30. Vent liquid pipeline. DETAILED DESCRIPTION

[0028] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0029] In the description of the present invention, it should be noted that the terms "upper / lower end", "inner", "outer", "front end", "rear end", "two ends", "one end", "the other end" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.

[0030] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "setting / sleeving", "sleeve connection", "connection", etc. should be understood in a broad sense. For example, "connection" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0031] See also Figure 1The present invention provides a technical solution: a coke oven gas final cooler resistance cleaning system, comprising a lean oil pipeline 24, a residual ammonia water pipeline 25, a spray liquid circulation pipeline, a venting liquid pipeline 30, a drainage pipeline 27, a final cooler and a circulation pump unit, wherein the final cooler comprises a final cooler A1 and a final cooler B2, the spray liquid circulation pipeline comprises a spray liquid inlet pipeline 26, a spray liquid outlet pipeline 29 and a spray liquid pump inlet pipeline 28, the spray liquid inlet pipeline 26 is respectively connected to the top of the final cooler A1 and the final cooler B2, one end of the spray liquid outlet pipeline 29 is respectively connected to the bottom of the final cooler A1 and the final cooler B2, the other end of the spray liquid outlet pipeline 29 is connected to the condensate tank 3, one end of the spray liquid pump inlet pipeline 28 is connected to the condensate tank 3, the other end of the spray liquid pump inlet pipeline 28 is connected to the spray liquid inlet pipeline 26 through the circulation pump unit, and the circulation pump unit comprises a spray liquid circulation pump A4 and a spray liquid circulation pump B5. A spray liquid inlet valve A8 is provided between the spray liquid inlet pipe 26 and the top of the final cooler A, and a spray liquid inlet valve B11 is provided between the spray liquid inlet pipe 26 and the top of the final cooler B2; a spray liquid outlet valve A12 is provided between the spray liquid outlet pipe 29 and the bottom of the final cooler A, and a spray liquid outlet valve B14 is provided between the spray liquid outlet pipe 29 and the bottom of the final cooler B2. The spray liquid pump inlet pipe 28 is connected to the spray liquid circulation pump A4 and the spray liquid circulation pump B5 respectively, and a pump A inlet valve 17 is provided between the spray liquid pump inlet pipe 28 and the spray liquid circulation pump A4, and a pump B inlet valve 19 is provided between the spray liquid pump inlet pipe 28 and the spray liquid circulation pump B5. A pump A outlet valve 20 is arranged between the spray liquid circulation pump A4 and the spray liquid inlet pipe 26, and a pump B outlet valve 22 is arranged between the spray liquid circulation pump B5 and the spray liquid inlet pipe 26.

[0032] The lean oil pipeline 24 and the residual ammonia water pipeline 25 are connected to the top of the final cooler A1 and the final cooler B2 respectively. The bottoms of the final coolers A1 and B2 are connected to the venting liquid pipeline 30. A lean oil inlet valve A6 is provided between the lean oil pipeline 24 and the top of the final cooler A1, and a lean oil inlet valve B9 is provided between the lean oil pipeline 24 and the top of the final cooler B2. A residual ammonia water inlet valve A7 is provided between the residual ammonia water pipeline 25 and the top of the final cooler A1, and a residual ammonia water inlet valve B10 is provided between the residual ammonia water pipeline 25 and the top of the final cooler B2.

[0033] The venting liquid pipeline 30 is connected to the draining liquid pipeline 27 through a circulating pump unit, a venting port valve A13 is provided between the final cooler A1 and the venting liquid pipeline 30, and a venting port valve B15 is provided between the final cooler B2 and the venting liquid pipeline 30. A pump A inlet valve 16 is provided between the venting liquid pipeline 30 and the spraying liquid circulation pump A4, and a pump B inlet valve 18 is provided between the venting liquid pipeline 30 and the spraying liquid circulation pump B5. A pump A outlet valve 21 is provided between the spraying liquid circulation pump A4 and the draining liquid pipeline 27, and a pump B outlet valve 23 is provided between the spraying liquid circulation pump B5 and the draining liquid pipeline 27.

[0034] A method for using a coke oven gas final cooler resistance cleaning system comprises the following steps:

[0035] (1) When the final cooler A1 and the final cooler B2 are in normal production, the condensate is sprayed on the final cooler A1 and the final cooler B2 through the spray liquid circulation pump A4 and the spray liquid circulation pump B5 respectively; the spray circulation is required during normal production to flush out impurities in the coal gas. When spraying the final cooler A1, open the outlet valve 1 20 of pump A, close the outlet valve 2 21 of pump A, and the condensate is pumped from the spray liquid circulation pump A4 to the spray liquid inlet pipe 26; open the spray liquid inlet valve A8, close the lean oil inlet valve A6 and the residual ammonia inlet valve A7, and the condensate sent from the spray liquid inlet pipe 26 enters the final cooler A1 through the spray liquid inlet valve A8 for spraying, open the spray liquid outlet valve A12, close the vent valve A13, and the condensate after spraying passes through the spray liquid outlet valve A12 and enters the condensate tank 3; open the inlet valve 2 17 of pump A, close the inlet valve 1 16 of pump A, and the condensate entering the condensate tank 3 passes through the spray liquid inlet pump pipe 28 and the inlet valve 2 17 of pump A to enter the spray liquid circulation pump A4 for circulating spraying; When the final cooler B2 is spraying, the outlet valve 1 22 of pump B is opened, the outlet valve 2 23 of pump B is closed, and the condensate is pumped from the spray liquid circulation pump B5 to the spray liquid inlet pipe 26; the spray liquid inlet valve B11 is opened, the lean oil inlet valve B9 and the residual ammonia inlet valve B10 are closed, and the condensate sent from the spray liquid inlet pipe 26 enters the final cooler B2 through the spray liquid inlet valve B11 for spraying, the spray liquid outlet valve B14 is opened, and the vent valve B15 is closed, and the condensate after spraying passes through the spray liquid outlet valve B14 and enters the condensate tank 3; the inlet valve 2 19 of pump B is opened, and the inlet valve 18 of pump B is closed, and the condensate entering the condensate tank 3 passes through the spray liquid inlet pump pipe 28 and the inlet valve 2 19 of pump B to enter the spray liquid circulation pump B5 for circulating spraying;

[0036] (2) When the final cooler A1 is in normal production and the final cooler B2 is to be cleaned, the residual ammonia water is first cleaned and the residual ammonia water is sent from the boundary area to the residual ammonia water pipeline 25; the residual ammonia water inlet valve B10 is opened, the lean oil inlet valve B9 and the spraying liquid inlet valve B11 are closed, and the spraying liquid sent from the residual ammonia water pipeline 25 enters the final cooler B2 through the residual ammonia water inlet valve B10 for spray cleaning, the vent valve B15 is opened, and the spraying liquid outlet valve B14 is closed. The vent liquid after cleaning passes through the vent valve B15 and enters the vent liquid pipeline 30; the pump B inlet valve 18 is opened, and the pump B inlet valve 219 is closed. The vent liquid entering the vent liquid pipeline 30 passes through the pump B inlet valve 18 and enters the spraying liquid circulation pump B5. The pump B outlet valve 23 is opened, and the pump B outlet valve 22 is closed. The vent liquid is pumped out by the spraying liquid circulation pump B5 and passes through the pump B outlet valve 23 and drain pipe 27 send out the boundary area; then the lean oil is cleaned, and the lean oil is sent from the boundary area to the lean oil pipe 24; the lean oil inlet valve B9 is opened, the residual ammonia inlet valve B10 and the spraying liquid inlet valve B11 are closed, and the spraying liquid sent from the lean oil pipe 24 enters the final cooler B2 through the lean oil inlet valve B9 for spray cleaning, the vent valve B15 is opened, and the spraying liquid outlet valve B14 is closed, and the venting liquid after cleaning passes through the vent valve B15 and enters the venting liquid pipe 30; the pump B inlet valve 18 is opened, the pump B inlet valve 2 19 is closed, and the venting liquid entering the venting liquid pipe 30 passes through the pump B inlet valve 2 19 and enters the spraying liquid circulation pump B5, the pump B outlet valve 23 is opened, and the pump B outlet valve 1 22 is closed, and the venting liquid is pumped out by the spraying liquid circulation pump B5 through the pump B outlet valve 23 and the drain pipe 27 and sent out of the boundary area;

[0037] When the final cooler B2 is in normal production and the final cooler A1 is cleaned, the residual ammonia water is first cleaned and the residual ammonia water is sent to the residual ammonia water pipeline 25 from the boundary area; the residual ammonia water inlet valve A7 is opened, the lean oil inlet valve A6 and the spray liquid inlet valve A8 are closed, and the spray liquid sent from the residual ammonia water pipeline 25 enters the final cooler A1 through the residual ammonia water inlet valve A7 for spray cleaning, the vent valve A13 is opened, and the spray liquid outlet valve A12 is closed, and the vent liquid after cleaning passes through the vent valve A13 and enters the vent liquid pipeline 30; the pump A inlet valve 16 is opened, and the pump A inlet valve 2 17 is closed, and the vent liquid entering the vent liquid pipeline 30 passes through the pump A inlet valve 16 and enters the spray liquid circulation pump A4, the pump A outlet valve 21 is opened, and the pump A outlet valve 20 is closed, and the vent liquid is pumped out by the spray liquid circulation pump A4 through the pump A outlet The lean oil is then cleaned and sent from the boundary area to the lean oil pipeline 24; the lean oil inlet valve A6 is opened, the residual ammonia inlet valve A7 and the spraying liquid inlet valve A8 are closed, the spraying liquid sent from the lean oil pipeline 24 enters the final cooler A1 through the lean oil inlet valve A6 for spray cleaning, the vent valve A13 is opened, the spraying liquid outlet valve A12 is closed, and the venting liquid after cleaning passes through the vent valve A13 and enters the venting liquid pipeline 30; the pump A inlet valve 16 is opened, the pump A inlet valve 2 17 is closed, the venting liquid entering the venting liquid pipeline 30 passes through the pump A inlet valve 2 17 and enters the spraying liquid circulation pump A4, the pump A outlet valve 21 is opened, the pump A outlet valve 1 20 is closed, and the venting liquid is pumped out by the spraying liquid circulation pump A4 through the pump A outlet valve 21 and the draining liquid pipeline 27 and sent out of the boundary area.

[0038] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.

Claims

1. A coke oven gas final cooler resistance cleaning system, characterized in that: The invention comprises a lean oil pipeline (24), a residual ammonia water pipeline (25), a spray liquid circulation pipeline, a venting liquid pipeline (30), a drainage pipeline (27), a final cooler and a circulation pump unit, wherein the final cooler comprises a final cooler A (1) and a final cooler B (2), the spray liquid circulation pipeline comprises a spray liquid inlet pipeline (26), a spray liquid outlet pipeline (29) and a spray liquid pump inlet pipeline (28), the spray liquid inlet pipeline (26) is respectively connected to the top of the final cooler A (1) and the final cooler B (2), one end of the spray liquid outlet pipeline (29) is respectively connected to the bottom of the final cooler A (1) and the final cooler B (2), the other end of the spray liquid outlet pipeline (29) is connected to the condensate tank (3), and the spray liquid inlet pipeline (26) is respectively connected to the top of the final cooler A (1) and the final cooler B (2). One end of the liquid inlet pump pipeline (28) is connected to the condensate tank (3), and the other end of the spraying liquid inlet pump pipeline (28) is connected to the spraying liquid inlet pipeline (26) through a circulating pump unit. The lean oil pipeline (24) and the residual ammonia pipeline (25) are respectively connected to the top of the final cooler A (1) and the final cooler B (2). The bottom of the final cooler A (1) and the final cooler B (2) are connected to the venting liquid pipeline (30), and the venting liquid pipeline (30) and the draining liquid pipeline (27) are connected through a circulating pump unit. The circulating pump unit includes a spraying liquid circulating pump A (4) and a spraying liquid circulating pump B (5). A spraying liquid inlet valve A is provided between the spraying liquid inlet pipeline (26) and the top of the final cooler A (1). (8), a spray liquid inlet valve B (11) is provided between the spray liquid inlet pipe (26) and the top of the final cooler B (2); a spray liquid outlet valve A (12) is provided between the spray liquid outlet pipe (29) and the bottom of the final cooler A (1), and a spray liquid outlet valve B (14) is provided between the spray liquid outlet pipe (29) and the bottom of the final cooler B (2); the spray liquid inlet pump pipe (28) is connected to the spray liquid circulation pump A (4) and the spray liquid circulation pump B (5), respectively, a pump A inlet valve 2 (17) is provided between the spray liquid inlet pump pipe (28) and the spray liquid circulation pump A (4), and a pump A inlet valve 1 (28) is provided between the spray liquid inlet pump pipe (28) and the spray liquid circulation pump B (5). There is a pump B inlet valve 2 (19); a pump A outlet valve 1 (20) is provided between the spray liquid circulation pump A (4) and the spray liquid inlet pipeline (26), and a pump B outlet valve 1 (22) is provided between the spray liquid circulation pump B (5) and the spray liquid inlet pipeline (26); a vent valve A (13) is provided between the end cooler A (1) and the vent liquid pipeline (30), and a vent valve B (15) is provided between the end cooler B (2) and the vent liquid pipeline (30); a pump A inlet valve 1 (16) is provided between the vent liquid pipeline (30) and the spray liquid circulation pump A (4), and a pump B inlet valve 1 (18) is provided between the vent liquid pipeline (30) and the spray liquid circulation pump B (5);A second pump A outlet valve (21) is provided between the spray liquid circulation pump A (4) and the liquid discharge pipe (27), and a second pump B outlet valve (23) is provided between the spray liquid circulation pump B (5) and the liquid discharge pipe (27). ; 2. A coke oven gas final cooler resistance cleaning system according to claim 1, characterized in that: A lean oil inlet valve A (6) is provided between the lean oil pipeline (24) and the top of the final cooler A (1), and a lean oil inlet valve B (9) is provided between the lean oil pipeline (24) and the top of the final cooler B (2).

3. A coke oven gas final cooler resistance cleaning system according to claim 2, characterized in that: A residual ammonia water inlet valve A (7) is provided between the residual ammonia water pipeline (25) and the top of the final cooler A (1), and a residual ammonia water inlet valve B (10) is provided between the residual ammonia water pipeline (25) and the top of the final cooler B (2).

4. The method for using the coke oven gas final cooler resistance cleaning system according to claim 3, characterized in that: The following steps are involved: (1) When the final cooler A (1) and the final cooler B (2) are in normal production, the condensate is sprayed on the final cooler A (1) and the final cooler B (2) through the spray liquid circulation pump A (4) and the spray liquid circulation pump B (5) respectively; when spraying the final cooler A (1), the outlet valve 1 (20) of the pump A is opened, and the outlet valve 2 (21) of the pump A is closed, and the condensate is pumped from the spray liquid circulation pump A (4) to the spray liquid inlet pipe (26); the spray liquid inlet valve A (8) is opened, and the lean oil inlet valve is closed. A (6), residual ammonia inlet valve A (7), the condensate sent from the spray liquid inlet pipe (26) passes through the spray liquid inlet valve A (8) into the final cooler A (1) for spraying, the spray liquid outlet valve A (12) is opened, the vent valve A (13) is closed, and the condensate after spraying passes through the spray liquid outlet valve A (12) and enters the condensate tank (3); open the pump A inlet valve 2 (17), close the pump A inlet valve 1 (16), and the condensate entering the condensate tank (3) passes through the spray liquid into the pump The condensate is pumped from the spray liquid circulation pump B (5) to the spray liquid inlet pipe (26); the spray liquid inlet valve B (11) is opened, the lean oil inlet valve B (9) and the residual ammonia inlet valve B (10) are closed, and the condensate sent from the spray liquid inlet pipe (26) passes through the spray liquid circulation pump B (5). The spray liquid inlet valve B (11) enters the final cooler B (2) for spraying, the spray liquid outlet valve B (14) is opened, the vent valve B (15) is closed, and the condensate after spraying passes through the spray liquid outlet valve B (14) and enters the condensate tank (3); the pump B inlet valve 2 (19) is opened, the pump B inlet valve 1 (18) is closed, and the condensate entering the condensate tank (3) passes through the spray liquid inlet pump pipeline (28) and the pump B inlet valve 2 (19) and enters the spray liquid circulation pump B (5) for circulating spraying; (2) When the final cooler A (1) is in normal production and the final cooler B (2) is to be cleaned, the residual ammonia water is first cleaned and the residual ammonia water is sent from the boundary area to the residual ammonia water pipeline (25); the residual ammonia water inlet valve B (10) is opened, the lean oil inlet valve B (9) and the spray liquid inlet valve B (11) are closed, and the spray liquid sent from the residual ammonia water pipeline (25) enters the final cooler B (2) through the residual ammonia water inlet valve B (10) for spray cleaning, and the vent valve B (15) is opened. Close the spray liquid outlet valve B (14), and the vent liquid after cleaning passes through the vent valve B (15) and enters the vent liquid pipeline (30); open the pump B inlet valve 1 (18), close the pump B inlet valve 2 (19), and the vent liquid entering the vent liquid pipeline (30) passes through the pump B inlet valve 1 (18) and enters the spray liquid circulation pump B (5); open the pump B outlet valve 2 (23), close the pump B outlet valve 1 (22), and the vent liquid is pumped out by the spray liquid circulation pump B (5) through the pump B outlet valve 2 (23). The lean oil is then cleaned and sent from the boundary area to the lean oil pipeline (24); the lean oil inlet valve B (9) is opened, the residual ammonia inlet valve B (10) and the spray liquid inlet valve B (11) are closed, and the spray liquid sent from the lean oil pipeline (24) passes through the lean oil inlet valve B (9) into the final cooler B (2) for spray cleaning; the vent valve B (15) is opened, the spray liquid outlet valve B (14) is closed, and the cleaned discharge liquid is discharged. The empty liquid passes through the vent valve B (15) and enters the vent liquid pipeline (30); the pump B inlet valve 1 (18) is opened, the pump B inlet valve 2 (19) is closed, the vent liquid entering the vent liquid pipeline (30) passes through the pump B inlet valve 2 (19) and enters the spray liquid circulation pump B (5); the pump B outlet valve 2 (23) is opened, the pump B outlet valve 1 (22) is closed, and the vent liquid is pumped out by the spray liquid circulation pump B (5) through the pump B outlet valve 2 (23) and the discharge pipeline (27) and sent out of the boundary area; (3) When the final cooler B (2) is in normal production and the final cooler A (1) is cleaned, the residual ammonia water is first cleaned and the residual ammonia water is sent from the boundary area to the residual ammonia water pipeline (25); the residual ammonia water inlet valve A (7) is opened, the lean oil inlet valve A (6) and the spray liquid inlet valve A (8) are closed, and the spray liquid sent from the residual ammonia water pipeline (25) enters the final cooler A (1) through the residual ammonia water inlet valve A (7) for spray cleaning; the vent valve A (13) is opened and the vent valve A (14) is closed. The spray liquid outlet valve A (12) allows the vent liquid after cleaning to pass through the vent valve A (13) and enter the vent liquid pipeline (30). The pump A inlet valve 1 (16) is opened, the pump A inlet valve 2 (17) is closed, the vent liquid entering the vent liquid pipeline (30) passes through the pump A inlet valve 1 (16) and enters the spray liquid circulation pump A (4). The pump A outlet valve 2 (21) is opened, the pump A outlet valve 1 (20) is closed, and the vent liquid is pumped out by the spray liquid circulation pump A (4) through the pump A outlet. Valve 2 (21) and the drain pipe (27) are used to send the oil out of the boundary area; then the lean oil is cleaned and the lean oil is sent from the boundary area to the lean oil pipe (24); the lean oil inlet valve A (6) is opened, the residual ammonia inlet valve A (7) and the spray liquid inlet valve A (8) are closed, and the spray liquid sent from the lean oil pipe (24) passes through the lean oil inlet valve A (6) and enters the final cooler A (1) for spray cleaning; the vent valve A (13) is opened, the spray liquid outlet valve A (12) is closed, and the vent liquid after cleaning is discharged. The venting liquid passes through the venting port valve A (13) and enters the venting liquid pipeline (30). The inlet valve 1 (16) of pump A is opened, and the inlet valve 2 (17) of pump A is closed. The venting liquid that has entered the venting liquid pipeline (30) passes through the inlet valve 2 (17) of pump A and enters the spraying liquid circulation pump A (4). The outlet valve 2 (21) of pump A is opened, and the outlet valve 1 (20) of pump A is closed. The venting liquid is pumped out by the spraying liquid circulation pump A (4), passes through the outlet valve 2 (21) of pump A, and is sent out of the boundary area through the discharge pipeline (27).